SAUDI BINLADIN GROUP

Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No. 160
Payment Certificate No. 13 - FINAL
As of November 2014

SN

Description

Unit

ADDENDUM 1
1.1

Epoxy screed 15mm thickness

m2

1.2

Floor epoxy coating, glossy system

m2

ADDENDUM 4
4.2

Anti-bacterial Paint for Hollow Core

m2

4.4

Sealant Joints between Roofs and Walls

Lm

4.5

Preparing wall surface before painting

m2

ADDENDUM 5
5.1

Epoxy Coating System for Walls

m2

Epoxy for Wall Repairs

m2

Epoxy for Wall Repainting

m2

Anti-bacterial Paint for Walls

m2

Anti-bacterial Paint for Ceiling

m2

5.3

Concrete screed 70mm with Fiber Glass

m2

5.4

5mm thk Self Smoothing Solvent free Epoxy Overlay System for Concrete
Floors

m2

Grinding the surface & apply another coat of epoxy primer for self leveling

m2

Remove Existing self-levelling and apply another coat 5 mm inside the left
boarder of dayroom

m2

Supply & apply 1mm self-leveling for single cell & corridor

m2

Adjusting Levels & Grinding the surface of the day area

m2

Epoxy Self Leveling 15mm thk (Dayroom)

m2

Epoxy Self Leveling additional thickness (Dayroom)

m2

Epoxy self leveling (behind Counters)

m2

Epoxy self leveling for Floors

m2

Epoxy self leveling for Floors (install only)

m2

5.2

ADDENDUM 6
6.2

Foam concrete (incl conc)

m2

6.3

Mortar cant strip

Lm

6.4

Primer

m2

6.5

Waterproofing membrane

m2

6.6

Separation layer

m2

6.7

Thermal Insulation

m2

Eng'r AHMAD SHEIKH

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No. 160
Payment Certificate No. 13 - FINAL
As of November 2014

SN

Description

Unit

6.8

Protection layer

m2

6.9

Gravel Surface

Lm

6.10

Concrete Tiles Surfacing

m2

6.11

Membrane skirting

Lm

6.12

Aluminum flashing with sealant

Lm

6.13

Treatment of Drain & Pipes

No.

ADDENDUM 11
11.1

Supply and Installation of Epoxy Coating Skirting

Lm

ADDENDUM 12
12

Additional thick: Foam concrete (incl conc)

m2

Eng'r AHMAD SHEIKH

Quantity
Previous

Current

575.53
14,964.80

3,673.63
1,300.58
4,381.61

14,392.36

To Date

1,523.41

(275.40)
-

816.85

575.53
16,488.21

3,673.63
1,025.18
4,381.61

15,209.20

1,645.45

1,645.45

4,352.21

4,352.21

6,347.15

90.10

6,437.26

7,984.12

327.75

8,311.87

16,928.77

1,391.25

18,320.02

30,943.64

905.34

31,848.98

97.74

97.74

135.75

135.75

72.00

72.00

40.70

40.70

153.60

153.60

40.00

40.00

28.80

259.20

288.00

1,041.00

530.94

1,571.94

69.56

69.56

16,804.92

16,804.92

8,740.96

8,740.96

16,804.92

16,804.92

18,234.92

18,234.92

16,804.92

16,804.92

15,721.02

1,083.90

16,804.92

Eng'r AHMAD SHEIKH

Quantity
Previous

Current

15,721.02
-

To Date

1,083.90
-

16,804.92
-

15,606.92

1,198.00

16,804.92

8,480.21

260.75

8,740.96

8,077.01

663.95

8,740.96

1,377.00

16,736.58

3,140.00

1,080.93

1,377.00

17,817.51

3,140.00

Eng'r AHMAD SHEIKH

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160

Payment Certificate No. 13 - FINAL


Epoxy Flooring

No
1

Description

Total Qty

% Progress
Prev

Current

To Date

Prev

1,617.01
700.44
760.00
2,356.00
2,356.00
10.00
2,356.00
138.01
200.00
2,356.00
2,356.00
2,356.00
16.00
16.00
16.00
2,356.00
2,356.00
2,356.00
2,356.00
1,737.00
3,049.40
29.12
31,848.98

95%
95%
95%
100%
100%

5%
5%
5%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

1,536.16
665.42
722.00
2,356.00
2,356.00
2,356.00
138.01
200.00
2,238.20
2,238.20
2,285.32
16.00
16.00
16.00
2,285.32
2,285.32
2,285.32
2,285.32
1,737.00
2,896.93
29.12
30,943.64

42.08
78.00
12.32
35.00
9.00
16.00
36.00
100.50
22.00
124.00
82.50
78.00
28.00
663.40

100%
100%
100%
100%
100%
0%
0%
85%
90%
85%
100%
100%
100%

100%
100%
100%
100%
100%
0%
0%
85%
90%
85%
100%
100%
100%

42.08
78.00
12.32
35.00
9.00
85.43
19.80
105.40
82.50
78.00
28.00
575.53

Epoxy Self Leveling for floors


1001
1002
1100
1201.01
1201.03
1201.04
1201.05
1201.06
1201.07
1201.09
1201.12
1201.17
1201.18
1201.19
1201.20
1201.21
1201.22
1201.23
1201.24
1204.03
1301
1702

unit

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

100%

100%
100%
100%
95%
95%
97%
100%
100%
100%
97%
97%
97%
97%
100%
95%
100%

5%
5%
3%
3%
3%
3%
3%
5%
-

Additional Works
Epoxy Screed 15mm thk (floor repair)
903
m2
1001
m2
1100
m2
1201.01
m2
1201.09
m2
1201.13
m2
1201.16
m2
1201.21
m2
1201.23
m2
1201.24
m2
1202
m2
1204.03
m2
1702
m2
m2

0%
0%
0%
0%
0%

Grinding the surface & apply another coat of epoxy primer for self leveling

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160

Payment Certificate No. 13 - FINAL


Epoxy Flooring

No

Description

unit

1201.03
1201.23

m2
m2
m2

Total Qty
407.26
407.26
814.52

% Progress
Prev

Current

To Date

12%
12%

0%
0%

12%
12%

Remove Existing self-levelling and apply another coat 5 mm inside the left boarder of dayroom
1201.03
m2
154.26
88%
0%
88%

Prev

48.87
48.87
97.74

135.75

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160

Payment Certificate No. 13 - FINAL


Epoxy Flooring

No

Description

unit

Total Qty

% Progress
Prev

Current

To Date

Supply & apply 1mm self-leveling for single cell & corridor
1201.03
m2
240.00

30%

0%

30%

72.00

Adjusting Levels & Grinding the surface of the day area


1201.24
m2
814.00

5%

0%

5%

40.70

Epoxy self leveling 15mm in Dayroom


1201.24
m2

192.00

80%

0%

80%

153.60

Supply & apply additional thickness in Dayroom


1204.03
m2
40.00

100%

100%

40.00

Epoxy self leveling (behind Counters)


1201.1~24
m2

10%

90%

100%

28.80

75%
75%

100%
100%
40%
25%
25%

100%
100%
40%
100%
100%

417.75
623.25
1,041.00

60%

60%

Epoxy self leveling for Floors


1001
1201.07
1201.07
1201.17
1201.18

m2
m2
m2
m2
m2
m2

Epoxy self leveling for Floors (install only)


1201.07
m2

288.00

103.00
34.56
115.94
557.00
831.00
1,641.50

115.94

Prev

Quantity
Current

To Date

80.85
35.02
38.00
10.00
117.80
117.80
70.68
70.68
70.68
70.68
70.68
152.47
905.34

1,617.01
700.44
760.00
2,356.00
2,356.00
10.00
2,356.00
138.01
200.00
2,356.00
2,356.00
2,356.00
16.00
16.00
16.00
2,356.00
2,356.00
2,356.00
2,356.00
1,737.00
3,049.40
29.12
31,848.98

42.08
78.00
12.32
35.00
9.00
85.43
19.80
105.40
82.50
78.00
28.00
575.53

Quantity
Current

To Date

48.87
48.87
97.74

135.75

Quantity
Current

To Date

72.00

40.70

153.60

40.00

259.20

288.00

103.00
34.56
46.38
139.25
207.75
530.94

103.00
34.56
46.38
557.00
831.00
1,571.94

69.56

69.56

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160

Payment Certificate No. 13 - FINAL


Concrete Screeding

No

Description

unit

201

m2

202

Total Work

Prev

Current

200.56

100%

100%

m2

104.22

100%

100%

800

m2

60.76

100%

100%

901.03

m2

275.00

100%

100%

901.04

m2

275.00

100%

100%

1002

m2

323.00

100%

100%

1201.02

m2

1,700.00

100%

100%

1201.05

m2

392.00

100%

100%

1201.06

m2

242.00

100%

100%

10

1201.10

m2

794.80

100%

100%

11

1201.13

m2

405.32

100%

100%

12

1201.14

m2

1,003.37

100%

100%

13

1201.17

m2

3,064.00

100%

100%

14

1201.18

m2

304.00

100%

100%

15

1201.19

m2

256.00

100%

100%

16

1201.20

m2

176.00

100%

100%

17

1201.21

m2

119.00

100%

100%

18

1201.22

m2

1,311.54

100%

100%

19

1202

m2

902.65

100%

100%

20

1204.01

m2

124.00

100%

100%

21

1204.02

m2

891.00

0%

22

1204.03

m2

248.00

100%

100%

23

1301

m2

1,352.00

100%

100%

24

1500

m2

367.92

0%

25

1602

m2

233.00

100%

26

1702

m2

294.07

50%

27

2006

m2

265.26

100%

100%

28

2201

m2

504.62

100%

100%

29

2202

m2

335.63

100%

100%

30

3203

m2

100.00

100%

100%

31

3207

m2

450.00

100%

100%

32

3208

m2

1,260.00

100%

100%

TOTAL

m2

18,334.72

100%

To Date

100%

100%

100%
-

45%

100%
95%

Prev

Current

To Date

200.56

200.56

104.22

104.22

60.76

60.76

275.00

275.00

275.00

275.00

323.00

323.00

1,700.00

1,700.00

392.00

392.00

242.00

242.00

794.80

794.80

405.32

405.32

1,003.37

1,003.37

3,064.00

3,064.00

304.00

304.00

256.00

256.00

176.00

176.00

119.00

119.00

1,311.54

1,311.54

902.65

902.65

124.00

124.00

891.00

891.00

248.00

248.00

1,352.00

1,352.00

233.00
147.04

367.92
132.33

367.92
233.00
279.37

265.26

265.26

504.62

504.62

335.63

335.63

100.00

100.00

450.00

450.00

1,260.00

1,260.00

16,928.77

1,391.25

18,320.02

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160

Payment Certificate No. 13 - FINAL


Painting Works

No

Description

Anti Bacterial Paint

unit

Total Qty

Prev

Current

Hollow Core
1201.01
1201.03
1201.13
1201.17

m2
m2
m2
m2

1,089.00
1,089.00
1,089.00
406.63
3,673.63

100%
100%
100%
100%

602
1002
1201.01
1201.03
1201.10
1201.13
2201

m2
m2
m2
m2
m2
m2
m2

810.00
1,185.73
879.40
160.36
879.40
879.40
2,480.18
7,274.47

95%
95%
100%
100%
20%
100%
95%

602
1002
1201.01
1201.03
1201.10
1201.13
1201.17
2201

m2
m2
m2
m2
m2
m2
m2
m2

317.19
948.36
1,827.36
1,558.29
2,916.36
1,827.36
720.76
1,003.65
11,119.33

100%
90%
100%
100%
10%
80%
100%
95%

1002
1201.01
1201.03
1201.10
1201.13
1201.17
2201

m2
m2
m2
m2
m2
m2
m2

1,259.51
3,984.48
3,984.48
3,984.48
3,984.48
1,398.01
399.02
18,994.46

100%
100%
100%
0%
85%
100%
95%

902
1001
1201.01
1201.02
1201.03
1201.04

m2
m2
m2
m2
m2
m2

97.96
170.21
322.36
37.00
322.36
37.00

95%
70%
100%
100%
100%
100%

Walls
5%
0%
0%
2%

Ceilings
10%
0%
10%
5%

Epoxy Paint

2
Walls

10%
10%
5%

Floor
5%
30%
-

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160

Payment Certificate No. 13 - FINAL


Painting Works

No

Description

unit

1201.05
1201.09
1201.10
1201.11
1201.12
1201.16
1201.17
1201.20
1201.21
1201.22
1201.23
1201.24
1204.01
1204.03
1601.01
1601.06
1602
1702

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

Total Qty
654.17
282.00
282.00
282.00
282.00
654.17
654.17
320.00
654.17
654.17
654.17
654.17
304.00
304.00
450.00
1,065.00
450.00
102.00

Prev

Current

95%
95%
95%
95%
95%
50%
98%
98%
98%
98%
98%
98%
95%
95%
100%
70%

5%
5%
5%
5%
5%
30%
2%
2%
2%
2%
2%
2%
5%
5%

100%

25%
100%
-

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160

Payment Certificate No. 13 - FINAL


Painting Works

No

Description

unit

2001
2003
2004
2201
3203

m2
m2
m2
m2
m2

Current

2,261.00
2,261.00
2,261.00
489.36
50.00
17,011.44

90%
90%
90%
95%
100%

5%
5%
5%
5%

469.09
469.09
87.00
1,025.18

100%
100%
50.0%

Lm
Lm
Lm

50%

Preparing Wall & Ceiling Surface before Painting


602
1201.13
1201.17
2201

Prev

Sealant for Joints between Roof & Walls


1201.01
1201.03
1201.17

Total Qty

m2
m2
m2
m2

331.02
2,105.00
984.93
960.66
4,381.61

100%
100%
100%
100%

Epoxy paint for Skirting


902
1001
1002
1201.01
1201.03
1201.05
1201.09
1201.10
1201.11
1201.12
1201.17
1201.20
1201.21
1201.22
1201.23
1201.24
1204.01
1204.03
1301
2201

Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm

83.00
1,178.30
686.00
1,178.00
1,178.00
1,178.00
583.00
94.00
94.00
94.00
1,178.00
94.00
1,178.00
1,178.00
1,178.00
1,178.00
199.54
1,178.00
498.87
627.00
14,833.71

95%
50%
95%
100%
100%
95%
80%
80%
90%
95%
99%
50%
99%
99%
99%
99%
95%
95%
100%
95%

5%
50%
5%

Epoxy paint - Repair for walls


1201.01
1201.03

m2
m2

247.44
247.44

50%
50%

0%
0%

Additional Works

5%
20%
20%
10%
5%
1%
0%
1%
1%
1%
1%
5%
5%
5%

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160

Payment Certificate No. 13 - FINAL


Painting Works

No

Description

unit

1201.17

m2

Total Qty

Prev

1,398.01
100%
1,892.89
Epoxy paint for Walls - Repainting after demolish concrete, plastering & repair
602
m2
261.00
100%
1002
m2
395.00
100%
1201.01
m2
477.40
100%
1201.03
m2
1,350.00
100%
1201.13
m2
580.00
100%
1201.17
m2
1,398.01
60%
2201
m2
450.00
100%
4,911.41
Epoxy paint for Skirting - REPAINTING
1001
Lm
132.00
1201.17
Lm
1,178.00
50%
1201.21
Lm
1,178.00
50%
1201.22
Lm
1,178.00
50%
1201.23
Lm
1,178.00
50%
1201.24
Lm
1,178.00
50%
6,022.00

Current
-

0%
-

65%
0%
0%
0%
0%
0%

UP

AL FACILITIES (P-1182)
TERNATIONAL Co. Ltd, Contract No 160

tificate No. 13 - FINAL

scription

unit

Total Qty

Prev

Current

To Date

Prev

cterial Paint

201.01
201.03
201.13
201.17

m2
m2
m2
m2

1,089.00
1,089.00
1,089.00
406.63
3,673.63

100%
100%
100%
100%

602
1002
201.01
201.03
201.10
201.13
2201

m2
m2
m2
m2
m2
m2
m2

810.00
1,185.73
879.40
160.36
879.40
879.40
2,480.18
7,274.47

95%
95%
100%
100%
20%
100%
95%

602
1002
201.01
201.03
201.10
201.13
201.17
2201

m2
m2
m2
m2
m2
m2
m2
m2

317.19
948.36
1,827.36
1,558.29
2,916.36
1,827.36
720.76
1,003.65
11,119.33

100%
90%
100%
100%
10%
80%
100%
95%

1002
201.01
201.03
201.10
201.13
201.17
2201

m2
m2
m2
m2
m2
m2
m2

1,259.51
3,984.48
3,984.48
3,984.48
3,984.48
1,398.01
399.02
18,994.46

100%
100%
100%
0%
85%
100%
95%

902
1001
201.01
201.02
201.03
201.04

m2
m2
m2
m2
m2
m2

97.96
170.21
322.36
37.00
322.36
37.00

95%
70%
100%
100%
100%
100%

5%
0%
0%
2%

10%
0%
10%
5%

100%
100%
100%
100%

1,089.00
1,089.00
1,089.00
406.63
3,673.63

100%
95%
100%
100%
20%
100%
97%

769.50
1,126.44
879.40
160.36
175.88
879.40
2,356.17
6,347.15

100%
100%
100%
100%
10%
90%
100%
100%

317.19
853.52
1,827.36
1,558.29
291.64
1,461.89
720.76
953.47
7,984.12

100%
100%
100%
10%
95%
100%
100%

1,259.51
3,984.48
3,984.48
3,386.81
1,398.01
379.07
14,392.36

100%
100%
100%
100%
100%
100%

93.06
119.15
322.36
37.00
322.36
37.00

oxy Paint
10%
10%
5%

5%
30%
-

UP

AL FACILITIES (P-1182)
TERNATIONAL Co. Ltd, Contract No 160

tificate No. 13 - FINAL

scription

201.05
201.09
201.10
201.11
201.12
201.16
201.17
201.20
201.21
201.22
201.23
201.24
204.01
204.03
601.01
601.06
1602
1702

unit
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

Total Qty
654.17
282.00
282.00
282.00
282.00
654.17
654.17
320.00
654.17
654.17
654.17
654.17
304.00
304.00
450.00
1,065.00
450.00
102.00

Prev

Current

To Date

95%
95%
95%
95%
95%
50%
98%
98%
98%
98%
98%
98%
95%
95%
100%
70%

5%
5%
5%
5%
5%
30%
2%
2%
2%
2%
2%
2%
5%
5%

100%
100%
100%
100%
100%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
95%
100%
100%

100%

25%
100%
-

Prev
621.46
267.90
267.90
267.90
267.90
327.09
641.09
313.60
641.09
641.09
641.09
641.09
288.80
288.80
450.00
745.50
102.00

UP

AL FACILITIES (P-1182)
TERNATIONAL Co. Ltd, Contract No 160

tificate No. 13 - FINAL

scription
2001
2003
2004
2201
3203

unit
m2
m2
m2
m2
m2

Total Qty

Prev

Current

To Date

2,261.00
2,261.00
2,261.00
489.36
50.00
17,011.44

90%
90%
90%
95%
100%

5%
5%
5%
5%

95%
95%
95%
100%
100%

469.09
469.09
87.00
1,025.18

100%
100%
50.0%

Prev
2,034.90
2,034.90
2,034.90
464.89
50.00
14,964.80

oints between Roof & Walls

201.01
201.03
201.17

Lm
Lm
Lm

100%
100%
100%

628.54
628.54
43.50
1,300.58

100%
100%
100%
100%

331.02
2,105.00
984.93
960.66
4,381.61

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
50%
100%
100%
100%
100%
100%
100%
100%
100%

78.85
589.15
651.70
1,178.00
1,178.00
1,119.10
75.20
75.20
84.60
89.30
1,166.22
47.00
1,166.22
1,166.22
1,166.22
1,166.22
189.56
1,119.10
498.87
595.65
13,400.38

50%

all & Ceiling Surface before Painting

602
201.13
201.17
2201

m2
m2
m2
m2

331.02
2,105.00
984.93
960.66
4,381.61

100%
100%
100%
100%

Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm
Lm

83.00
1,178.30
686.00
1,178.00
1,178.00
1,178.00
583.00
94.00
94.00
94.00
1,178.00
94.00
1,178.00
1,178.00
1,178.00
1,178.00
199.54
1,178.00
498.87
627.00
14,833.71

95%
50%
95%
100%
100%
95%
80%
80%
90%
95%
99%
50%
99%
99%
99%
99%
95%
95%
100%
95%

247.44
247.44

50%
50%

orks

Skirting
902
1001
1002
201.01
201.03
201.05
201.09
201.10
201.11
201.12
201.17
201.20
201.21
201.22
201.23
201.24
204.01
204.03
1301
2201

epair for walls


201.01
201.03

m2
m2

5%
50%
5%
5%
20%
20%
10%
5%
1%
0%
1%
1%
1%
1%
5%
5%
5%

0%
0%

50%
50%

123.72
123.72

UP

AL FACILITIES (P-1182)
TERNATIONAL Co. Ltd, Contract No 160

tificate No. 13 - FINAL

scription

201.17

unit

Total Qty

Prev

1,398.01
100%
1,892.89
Walls - Repainting after demolish concrete, plastering & repair
602
m2
261.00
100%
1002
m2
395.00
100%
201.01
m2
477.40
100%
201.03
m2
1,350.00
100%
201.13
m2
580.00
100%
201.17
m2
1,398.01
60%
2201
m2
450.00
100%
4,911.41
Skirting - REPAINTING
1001
Lm
132.00
201.17
Lm
1,178.00
50%
201.21
Lm
1,178.00
50%
201.22
Lm
1,178.00
50%
201.23
Lm
1,178.00
50%
201.24
Lm
1,178.00
50%
6,022.00

Current

m2

To Date
-

100%

1,398.01
1,645.45

100%
100%
100%
100%
100%
60%
100%

261.00
395.00
477.40
1,350.00
580.00
838.81
450.00
4,352.21

65%
50%
50%
50%
50%
50%

589.00
589.00
589.00
589.00
589.00
2,945.00

0%
-

65%
0%
0%
0%
0%
0%

Prev

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160
Payment Certificate No. 13 - FINAL
Waterproofing for Roof

No

Description

unit

Prev

Current

To Date

1001

1201-13

Roof Waterproofing
1

Foam Concrete (Excluding conc)

m2

Foam Concrete (incl conc)

m2

16,804.92

16,804.92

2,510.00

2,319.00

Mortar cant strip

Lm

8,740.96

8,740.96

1,344.00

1,194.00

Primer

m2

16,804.92

16,804.92

2,510.00

2,319.00

Waterproofing membrane

m2

18,234.92

18,234.92

3,940.00

2,319.00

Separation layer

m2

16,804.92

16,804.92

2,510.00

2,319.00

Thermal insulation

m2

15,721.02

1,083.90

16,804.92

2,510.00

2,319.00

Protection layer

m2

15,721.02

1,083.90

16,804.92

2,510.00

2,319.00

Gravel Surface

Lm

10

Tiles Surfacing

m2

15,606.92

1,198.00

16,804.92

2,510.00

2,319.00

11

Membrane skirting

Lm

8,480.21

260.75

8,740.96

1,344.00

1,194.00

12

Auminum flashing with sealant

Lm

8,077.01

663.95

8,740.96

1,344.00

1,194.00

13

Treatment of Drain & Pipes

No.

1,377.00

1,377.00

281.00

170.00

m2

3,140.00

3,140.00

Additional works
1

Light Weight Foam Concrete add. Thickness 25 cm (including


Cement)

785.00

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160
Payment Certificate No. 13 - FINAL
Waterproofing for Roof

No

Description

unit

1201-14

1201-19

1201-20

1701

2003

Roof Waterproofing
1

Foam Concrete (Excluding conc)

m2

Foam Concrete (incl conc)

m2

2,319.00

2,319.00

2,319.00

2,282.00

1,255.00

Mortar cant strip

Lm

1,194.00

1,194.00

1,194.00

1,043.00

657.00

Primer

m2

2,319.00

2,319.00

2,319.00

2,282.00

1,255.00

Waterproofing membrane

m2

2,319.00

2,319.00

2,319.00

2,282.00

1,255.00

Separation layer

m2

2,319.00

2,319.00

2,319.00

2,282.00

1,255.00

Thermal insulation

m2

2,319.00

2,319.00

2,319.00

2,282.00

1,255.00

Protection layer

m2

2,319.00

2,319.00

2,319.00

2,282.00

1,255.00

Gravel Surface

Lm

10

Tiles Surfacing

m2

2,319.00

2,319.00

2,319.00

2,282.00

1,255.00

11

Membrane skirting

Lm

1,194.00

1,194.00

1,194.00

1,043.00

657.00

12

Auminum flashing with sealant

Lm

1,194.00

1,194.00

1,194.00

1,043.00

657.00

13

Treatment of Drain & Pipes

No.

170.00

170.00

170.00

186.00

86.00

m2

785.00

785.00

785.00

Additional works
1

Light Weight Foam Concrete add. Thickness 25 cm (including


Cement)

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160
Payment Certificate No. 13 - FINAL
Waterproofing for Roof

No

Description

unit

2004

2301

2501-2

2501-3

2502-14

Roof Waterproofing
1

Foam Concrete (Excluding conc)

m2

Foam Concrete (incl conc)

m2

1,255.00

141.00

14.96

14.96

56.00

Mortar cant strip

Lm

657.00

109.00

21.48

21.48

112.00

Primer

m2

1,255.00

141.00

14.96

14.96

56.00

Waterproofing membrane

m2

1,255.00

141.00

14.96

14.96

56.00

Separation layer

m2

1,255.00

141.00

14.96

14.96

56.00

Thermal insulation

m2

1,255.00

141.00

14.96

14.96

56.00

Protection layer

m2

1,255.00

141.00

14.96

14.96

56.00

Gravel Surface

Lm

10

Tiles Surfacing

m2

1,255.00

141.00

14.96

14.96

56.00

11

Membrane skirting

Lm

657.00

109.00

21.48

21.48

112.00

12

Auminum flashing with sealant

Lm

657.00

109.00

21.48

21.48

112.00

13

Treatment of Drain & Pipes

No.

86.00

45.00

6.00

6.00

1.00

Additional works
1

Light Weight Foam Concrete add. Thickness 25 cm (including


Cement)

m2

SAUDI BINLADIN GROUP


Project
Subcon
Subject

CORRECTIONAL FACILITIES (P-1182)


AL HAZEM INTERNATIONAL Co. Ltd, Contract No 160

Waterproofing for Roof - FINAL PROGRESS

No

Description

unit

1001

1201.13

1201.14

1201.19

1201.20

1701

Roof Waterproofing
1

Foam Concrete (Excluding conc)

m2

Foam Concrete (Including conc)

m2

100%

100%

100%

100%

100%

100%

Mortar cant strip

Lm

100%

100%

100%

100%

100%

100%

Primer

m2

100%

100%

100%

100%

100%

100%

Waterproofing membrane

m2

100%

100%

100%

100%

100%

100%

Separation layer

m2

100%

100%

100%

100%

100%

100%

Thermal insulation

m2

100%

100%

100%

100%

100%

100%

Protection layer

m2

100%

100%

100%

100%

100%

100%

Gravel Surface

Lm

10

Tiles Surfacing

m2

100%

100%

100%

100%

100%

100%

11

Membrane skirting

Lm

100%

100%

100%

100%

100%

100%

12

Auminum flashing with sealant

Lm

100%

100%

100%

100%

100%

100%

13

Treatment of Drain & Pipes

No.

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Additional works
1

Light Weight Foam Concrete add. Thickness 25 cm (inclu

m2

2003

2004

2301

2501.2

2501.3

2502.14

3202b.2

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

90%

100%

100%

100%

100%

100%

100%

90%

100%

100%

100%

100%

100%

100%

90%

100%

100%

100%

100%

100%

100%

90%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

80%