Sei sulla pagina 1di 10

SITE HSE OBSERVATIONS REGI

Project ID:

PE-138 Tuwair

Month:

Category: Crane=Crane, Lifting operations=LO, Chain block=CB, Fork Lifter=FLT, Cherry


Confined Space=CS, Excavation=EX, System/Procedure=SOP, Hand and power Tool=HP
PPE=PPE, Scaffolding: Scaff, Certified Personnel= CP, Certified Heavy Equipment: CHE
Sr.#

Observation

UA/UC

Category

Foreman

Observation
Raised on

Company

An electrician was observed at height without safety harness.

UA

WH

Mr. Tanveer

1-Feb-16

Alfanar

A damaged hammer was found with electrical crew.

UA

HPT

Abu Ahmed

2-Feb-16

Alfanar

Scaffolding crew not removed all scaffolding materials after


dismantling the scaffold

UA

SCAFF

Abu Ahmed

2-Feb-16

Alfanar

A worker was not using eye protection while working

UA

PPE

Mr. Tanveer

3-Feb-16

Alfanar

A bobcat was in operation without the operator trained.

UC

CHE

Abu Ahmed

4-Feb-16

Alfanar

A grinding machine and an extension board were found without


color codes

UC

SOP

Abu Ahmed

4-Feb-16

Alfanar

Two webbing slings were found without color code tape.

UC

CRANE

Abu Ahmed

6-Feb-16

Alfanar

Drill bit was not tightened properly

UA

HPT

Mr. Tanveer

6-Feb-16

Alfanar

Toilets were not properly cleaned and dirt was accumulated on


the floor

UC

SCAFF

Admin Kamel
Sayed

6-Feb-16

Alfanar

10 Fire extinguisher box was kept in the walk way

UC

SOP

HSE

7-Feb-16

Alfanar

11 A worker without having earplugs while using drill machine

UA

PPE

Mr. Tanveer

7-Feb-16

Alfanar

12

Scaffolding dismantling was in progress with area properly


barricaded under neat.

SP

SCAFF

Abu Ahmed

8-Feb-16

Alfanar

13

A temporary extension cable was passing under a sharp metal


sheet.

UC

Mr. Tanveer

8-Feb-16

Alfanar

14

Two people crossed the lifting area barricade and moved under
the boom of boom truck.

UA

LO

Abu Ahmed

9-Feb-16

Alfanar

15 A worker was using a spanner to hammering a nail.

UA

HPT

Abu Ahmed

9-Feb-16

Alfanar

16 Rainy water drain was scattered basement slipping hazard.

UA

HK

Abu Ahmed

10-Feb-16

Alfanar

UC

HK

Abu Ahmed

10-Feb-16

Alfanar

UC

HK

Abu Ahmed

11-Feb-16

Alfanar

17

Need immediately removed or shifting of deshuttering material


from boundary wall.

18 Few rebars were found scattered near tent erection area.

19

Materials were shifted at height using a rope and area was


barricaded underneath.

SP

HK

Mr. Tanveer

11-Feb-16

Alfanar

20 Scaffold materials were stacked without barricade.

UC

HK

Abu Ahmed

12-Feb-16

Alfanar

21 Few workers were using black glasses in the evening.

UA

PPES

HSE

12-Feb-16

Alfanar

22 Handrail was missing on the stair of basement.

UC

WH

Abu Ahmed

14-Feb-16

Alfanar

UC

HK

Abu Ahmed

14-Feb-16

Alfanar

24 Stacking area was not properly segregated.

UC

HK

Abu Ahmed

15-Feb-16

Alfanar

25 workers working at height without 100 % tieoff was observed.

UA

WH

Mr. Tanveer

15-Feb-16

Alfanar

23

Poor Housekeeping was found at switch gear basement after


finied cable tray work activity.

26

Pneumatic tool was not having safety Pin connected to hose


pipe

UC

HPT

Abu Ahmed

16-Feb-16

Alfanar

27

Lifting activity was carried out safely by complying all safety


procedures.

SP

LO

Mr. Tanveer

16-Feb-16

Alfanar

Good tool box talk was given by supervisor all the hazards and
28 control measures was clearly identified and Discarded to
workers.

SP

SOP

Mr. Tanveer

17-Feb-16

Alfanar

29

Temporary low voltage Electrical cable got damaged dew to


bobcat operator carelessness.

UA

Abu Ahmed

17-Feb-16

Alfanar

30

A worker was working on red tag scaffolding platform even his


supervisor was present on the site

UA

WH

SABCON
HVAC

18-Feb-16

subcon/
HVAC

Before entering Into A Confined Space manhole outside


31 building area the Entrants were wearing harness to rescue the
worker.

SP

CS

Abu Ahmed

20-Feb-16

Alfanar

UA

PPE

Mr. Tanveer

21-Feb-16

Alfanar

SP

CS

Abu Ahmed

22-Feb-16

Alfanar

UA

PPE

Mr. Tanveer

23-Feb-16

Alfanar

35 Hose pipe was not managed properly on ground floor

UC

CHE

Abu Ahmed

24-Feb-16

Alfanar

36 Transformer are not installed gratings falling hazard.

UC

WH

Mr. Tanveer

24-Feb-16

Alfanar

37 General waste not removed from temporary yard.

UC

HK

Abu Ahmed

25-Feb-16

Alfanar

38 Segregation of wooden material proper stacking required.

UC

HK

Abu Ahmed

25-Feb-16

Alfanar

39 Inspection of lifting slings & lifting gears.

UA

LO

HSE

27-Feb-16

Alfanar

40 Subcon workers HVAC not wearing the safety harness belts.

UA

WH

Farhan

27-Feb-16

subcon/
HVAC

UC

CHE

Abu Ahmed

28-Feb-16

Alfanar

SP

HK

Abu Ahmed

28-Feb-16

Alfanar

32

Non - compliance to PPE's was observed GIS basements during


cable laying activity.

33 Manhole opened and air ejector's was installed.

34

41

Electrician was found in generator room without wearing ear


plugs.

Compressor Hose pipe was not properly attached & whip check
& safety Pin

42 Good housekeeping was observed at site.

43 HVAC subcon for AC duct stacking at access area.

UA

WH

Mr. FARHAN

29-Feb-16

Alfanar

44 Access points were clear off obstructions GIS Hall.

SP

HK

Mr. Tanveer

29-Feb-16

Alfanar

SP

Mr. Tanveer

29-Feb-16

Alfanar

45

Electrical DB's were in good condition and inspection TAG was


also present

PN= High Risk Observation


AN= Incident that happened is actual near miss.
Near Miss with Low Risk shall be left blank

UA=
UC=

REGISTER
Feb-16

Cherry Lift=CL, Working at height=WH, Electrical=E,


ol=HPT, Housekeeping=HK, Gas Cylinder/ Welding=GW,
: CHE
Observer's action

He was called down and advised to have


his harness to work at height

Responsible
Section

Nearmiss
Type

Status

Civil

CLOSED

Electrical

CLOSED

Civil

CLOSED

Advised to wear goggles.

Electrical

CLOSED

The operation was stopped and advised


to arrange operator.

Electrical

Immediately removed from site & give


warning.
Inform to foreman & instructed to
scaffloder must be remove immediately.

Safety check & visual inspection color


coded.

Civil

PN

CLOSED

CLOSED

Safety check & visual inspection color


coded.

Electrical

PN

CLOSED

Worker was advised to tight the bit


properly before drilling

Electrical

PN

CLOSED

Admin supervisor was informed to clean


the toilets

Civil

CLOSED

Removed from the walkway and fixed to


the Proper location.

Civil

CLOSED

He was advised to use the earplugs

Civil

CLOSED

Crew was appreciated.

Civil

CLOSED

Supervisor was informed to change the


cable route.

Electrical

CLOSED

They were called out immediately and


advised to always stay away from lifting
activity and respect the barricades.

Civil

He was stopped and advised to use a


hammer for that task.

Civil

Assigned labor to clean

PN

CLOSED

CLOSED

Electrical

PN

CLOSED

Instructed to civil foreman he assigned


working crew for shifting de shutting
material to temporary storage yard
appreciated.

Civil

PN

CLOSED

Supervisor was informed to remove the


rebars and place them in a proper place.

HSE

CLOSED

Appreciated the team.

Electrical

CLOSED

Informed scaffolding inspector to put the


barricade each scaffolding material.

Civil

CLOSED

They were instructed to wear clear


glasses.

HSE

CLOSED

Scaffolding inspector was informed to put


the handrail.

Civil

Instructed to foreman assigned crew


remove all scrap.

Civil

CLOSED

Crew was instructed must be proper


segregated.

Civil

CLOSED

Stop the work instructed to foreman must


be 100% tie mandatory.
Informed the supervisor about it and
arrange and fix it

Electrical

PN

PN

CLOSED

CLOSED

Civil

CLOSED

Appreciated the crew

Electrical

CLOSED

Appreciated them all

Electrical

CLOSED

Stop the activity. I informed to related


person's and got removed from the site

Civil

AN

CLOSED

Stop the work raised the warning memo.

AC Duct

PN

CLOSED

Appreciated Them
Advised the worker's to wear their PPE's
every time on site
Appreciated the crew
Instructed to him must be worn ear plugs.
give last warning to him.
Assigned labor to collect at place.

Civil

CLOSED

Electrical

CLOSED

Civil

CLOSED

Electrical

CLOSED

Civil

CLOSED

Instructed to foreman must be


immediately installed gratings under
transformer foundations.

Electrical

PN

OPEN

Informed to SM , PM to immediately

Civil

PN

OPEN

Informed to SM assigned some worker for


segregation the wooden material with
proper stacking as well as packaging
material. Only 30% removed

Civil

OPEN

Only tow found sling some damage


immediately remove form site not allowed
to used damage slings instructed to store
keeper.

HSE

CLOSED

Stop the work suspended work one day.

AC Duct

Closed

I immediately shutdown the compressor


and ask the supervisor to fix it

Civil

Supervisor was appreciated.

Civil

PN

CLOSED

CLOSED

Instructed to foreman put at one


designated place with warning tape.

AC Duct

Team was appreciated.

Electrical

CLOSED

Thanked the electrician

Electrical

CLOSED

Unsafe Act
Unsafe Condition

PN

CLOSED

Potrebbero piacerti anche