Check the following:
1. Position the unit on a level surface. With the boom
and outriggers stowed, check the oil level in the
hydraulic reservoir. The oil level must be
approximately two inches from the top of the reservoir.
If necessary, add the proper type and grade of oil as
described in the Maintenance Manual. The need to
add oil regularly indicates a leak in the hydraulic
system that should be corrected.
2. Visually inspect the units pins, fasteners, and welds
for looseness or damage. Check hydraulic cylinders,
hoses, tubes, and fittings for leaks or damage. Repair
or replace any loose, damaged, or defective
components before operating the unit. Give special
attention to the fasteners of the following components.
A. Articulating arm pivot pins (arm and link)
B. Articulating arm cylinder mounting pins
C. Lower boom pivot pin
D. Lower boom cylinder mounting pins
E. Upper boom extension cylinder mounting pins
F. Leveling cylinder mounting pins
G. Upper leveling bracket pivot pin
H. Platform mounting brackets
I. Platform rotator pin
J. Rotation bearing
K. Rotation gearbox
L. Pedestal mounting
3. Check visual and audible safety devices for proper
operation. Replace missing and/or illegible placards
before operating the unit.
4. Inspect the fiberglass upper boom, arm and link
sections for dirt and damage. Also, check for chipped
or scratched fiberglass surfaces. Any of these
conditions could reduce the dielectric properties of the
fiberglass. Clean the fiberglass as described in the
Maintenance Manual.
5. Apply the parking brake, chock the wheels, start the
engine, and engage the hydraulic system. With the
outriggers stowed, test the outrigger interlock system
by placing the lower boom control in the Raise
position. If boom movement occurs, the outrigger
interlock system is not functioning properly.
1 of 5
1 of 5
Altec AT
Crane Operator Checklist - Complete Monthly
Truck #:_____________________
- Inspected or Lubricated
R - Needs to be checked or repaired by mechanic (Turn in white copy of Drivers Inspection Report (Form 720) with
written request)
Month:
Date:
1. Perform the daily inspection
2. Hydraulic reservoir
Oil Level
3. Fiberglass
Upper boom (clean, surface damage)
4. Lubrication
Rotation bearing ball race (AT30-G only)
Lift cylinder spherical bearing
Outrigger inner leg outer surface
Gearbox teeth
2 of 5
Altec AT
K
Complete Semi-Annually
Truck #:_____________________
- Inspected or Lubricated
R - Needs to be checked or repaired by mechanic (Turn in white copy of Drivers Inspection Report (Form 720)
with written request)
Month:
Date:
1. Perform monthly inspection
2. Supplemental brake lock
Operation
3. Pump / PTO
No leaks
4. Unit mounting
Pedestal mounting (fasteners tight, welds intact, no cracks)
5. Hydraulic reservoir
Mounting (cap screws tight, welds intact, no cracks)
No leaks
Shutoff valve fully open
6. Filters
Change return line filter
7. Outriggers
Mounting (welds intact, no deformation or cracks)
Machine/ground level functions selector operation
Outrigger interlock system operation
Outrigger extend warning system operation
Operation (holding without drift)
Structures (welds intact, no deformation or cracks)
Pins and retainers secure
No leaks
8. Lower controls
Operation (metering, proper direction)
Engine start/stop switch operation
Lower/upper control operation
9. Pedestal
Structure (welds intact, no deformation or cracks)
No leaks
Covers
Rotary joint mounting cap screws (tight), restraint bracket secure
Slip ring mounting cap screws (tight)
10. Turntable
Structure (welds intact, no deformation or cracks)
Boom pin and retainers secure
Lift cylinder pivot pin and retainers secure
Covers
No leaks
11. Rotation bearing and gearbox
Motor mounting cap screws tight
Gearbox mounting cap screws tight
Eccentric ring lock in place and secure
No leaks
Operation (smoothness and noise level)
Pinion gear teeth
Rotation bearing gear teeth
Rotation bearing inspection and measurement (after 0.050" increased wear from initial measurement)*
Rotation bearing cap screws
12. Articulating arm cylinder (AT35G, AT37G)
Pin retainers secure
Operation
No leaks
Holding valves (operation, leaks)
Chromed rod
3 of 5
3 of 5
Altec AT
Crane Operator Checklist - Complete Annually
Truck #:_____________________
- Inspected or Lubricated
R - Needs to be checked or repaired by mechanic (Turn in white copy of Drivers Inspection Report (Form 720)
with written request)
Month:
Date:
1. Perform semi-annual inspection
2. Chassis underside
Hoses (routing, condition)
Exhaust shields
3. Pump/PTO
Operation
Mounting cap screws tight
Drive line (condition)
Noise level
4. Unit mounting
Utility body mounting and structure (cap screws tight, welds intact, no cracks)
Boom rest (welds intact, no deformation or cracks)
5. Hydraulic reservoir and system
Collect oil sample for analysis
6. Outriggers
Hoses and tubes (routing, condition)
Placards (condition, readable)
7. Hydraulic system pressure
System pressure (2,200 psi)
8. Lower controls
Placards (condition, readable)
9. Pedestal
Hoses and tubes (routing, condition)
10. Turntable
Hoses and tubes (routing, condition)
11. Rotation bearing and gearbox
Rotation bearing annual torque Inspection
12. Extension cylinder
Hoses (routing, condition)
13. Upper boom
Slide pad bearings and fasteners
14. Upper boom tip
Mounting to upper boom secure
15. Upper controls
Hoses and tubes (routing, condition)
Placards (condition, readable)
16. Platform
Liner (condition, cleanliness, mylon bolts tight)
Placards (condition, readable)
17. Testing
Dielectric test unit
Dielectric test platform liner
4 of 5
Altec AT
Crane Operator Checklist - Complete Every (2) Years
Truck #:_____________________
- Inspected or Lubricated
R - Needs to be checked or repaired by mechanic (Turn in white copy of Drivers Inspection Report (Form 720)
with written request)
Month:
Date:
1. Perform annual inspection
2. Hydraulic reservoir and system
Change hydraulic oil
Clean suction filter element
Clean or change filler hole strainer
Change filler/breather cap
Reservoir cover gasket (condition)
3. Rotation bearing and gearbox
Pinion to rotation bearing gear backlash
Gearbox internal lost motion
Rotation bearing inspection and measurement (before 0.050" increased wear from initial measurement)*
4. Lubrication
Pump input shaft splines
Altec AT
Crane Operator Checklist - Complete Every (4) Years
Truck #:_____________________
- Inspected or Lubricated
R - Needs to be checked or repaired by mechanic (Turn in white copy of Drivers Inspection Report (Form 720)
with written request)
Month:
Date:
1. Perform 2 year inspection
2. Hydraulic reservoir and system
Flush hydraulic system
Clean inside reservoir
5 of 5