Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Kazuyuki Kubo
Leader, Logo
Pavement Team
Public Works Research Institute
Paved Rate
Not Paved Rate
Paved Rate
Paved Rate
100
90
80
70
60
50
40
30
20
10
0
1960 1965 1970 1975 1980 1985 1990 1995 2000 2004
Motorway 7,300km
Asphalt 21,000km
(for Light Traffic 400km)
Cement 1,100km
Asphalt 30,600km
(for Light Traffic 4,700km)
Cement 1,000km
Not-paved 400km
Prefectural Roads
129,000km
Municipal Roads
997,300km
Total
1,187,700km
Asphalt 122,200km
(for Light Traffic 47,600km)
Cement 1,700km
Not-paved 5,100km
Asphalt
Asphalt for
Light Traffic
Asphalt 698,000km
(for Light Traffic 573,500km)
NotCement 50,800km
paved
Not-paved 248,500km
Cement
Asphalt 878,600km
(for Light Traffic 626,200km)
Cement 55,100km
Not-paved 254,000km
Technical Standards
All of Construction
By-Products
85%
58%
98%
Asphalt Concrete
Cement concrete
Waste Wood
from Construction site
Construction Sludge
Mixed Construction
Wastes
81%
For Construction Material
14%
9%
11%
20
38%
40%
41%
40
For Fuel
96%
65%
45%
83%
80
100%
Plant Recycling
Recycled aggregate
(Used pavement)
Recycle pavement
by-products at a
stationary mixing
plant (recycling
mixing plant)
Reuse them as
pavement materials
Rejuvenator
Recycled HMA
Virgin aggregate
Virgin Asphalt
Plant Recycling
70,000
60,000
Virgin Mixture
50,000
40,000
30,000
Recycled Mixture
20,000
10,000
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
80,000
1991
90,000
1990
4~5cm
5cm
Noise
Conventional Pavement
Drainage Asphalt Pavement