M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa "Calderillas"

Datos de precipitacin maximas de estacin


Ubicacin : departamento de tarija
PRECIPITACIN MXIMA EN 24 HORAS (mm)
AO
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
1975
10.5
0.0
25.1
9.0
1976
78.5
46.3
51.0
0.0
15.0
2.6
0.0
20.0
7.7
12.0
1977
29.9
64.5
47.5
40.0
26.8
0.0
0.0
40.0
20.0
14.0
1978
49.9
54.3
31.6
15.0
0.0
0.0
0.0
0.0
6.0
130.0
1979
59.0
40.5
40.0
20.5
0.0
0.0
10.5
1.8
6.0
15.2
1980
36.0
72.0
62.1
8.1
8.8
8.1
0.0
6.4
0.0
12.8
1981
51.6
64.5
45.0
33.7
2.6
0.0
0.0
7.0
5.0
12.0
1982
59.0
29.7
32.9
21.9
9.3
0.0
0.0
0.8
8.0
9.0
1983
54.5
29.6
17.5
8.3
7.8
0.0
1.2
0.9
9.5
14.5
1984
70.0
69.0
68.0
4.9
1.5
0.0
0.0
13.5
1.5
58.9
1985
26.0
74.9
23.0
26.4
0.0
1.5
0.4
7.0
4.4
2.7
1986
43.8
33.4
35.0
29.7
1.5
0.3
2.2
15.5
9.7
17.8
1987
86.0
25.1
16.0
14.0
1.5
1.0
0.0
0.0
0.0
12.5
1988
86.6
43.5
58.8
32.4
2.2
0
3.9
0.3
5.9
12.3
1989
29.5
26.6
55
8.8
1.3
6
0.7
0
4.5
14.3
1990
80
27.4
31
20
0.8
0
0
1.7
6
28
1991
56.2
57.2
48.5
13.2
1.8
0
0.9
4.5
9.9
19.2
1992
44.4
42
20
2.8
0
0
2.5
6.5
11.7
8.5
1993
34.5
23.9
25
3.8
6.5
0
5.5
5.6
0
33.5
1994
50.2
47
18
1.5
0
0.8
0
0.6
6
12.5
1995
54.8
28
25.5
2.9
3.9
0
0
0
10
20
1996
30.5
67
47
6
12
0.8
0
2.3
27.2
3.4
1997
57.9
79.5
46.2
13
6.1
0
0
0
11.2
3.4
1998
44.5
26.5
71.5
18.3
2.5
1.8
1
1
5
30.3
MX.
86.6
79.5
71.5
40.0
26.8
8.1
10.5
40.0
27.2
130.0

NOV
30.3
22.0
45.6
19.5
32.0
16.0
39.2
22.0
60.0
24.0
42.4
56.0
48.4
17.5
19
57.7
19
31
24
32
40.4
21.4
18.5
16.2
60.0

DIC
89.4
80.0
41.8
103.5
61.0
37.8
43.5
63.8
40.0
38.5
39.2
90.8
85.5
48
24.3
37.3
30
42.5
45
31
20
49.9
26.8
20
103.5

MX.
80.0
64.5
130.0
61.0
72.0
64.5
63.8
60.0
70.0
74.9
90.8
86.0
86.6
55.0
80.0
57.2
44.4
45.0
50.2
54.8
67.0
79.5
71.5
130.0

Proyecto Multiple Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

ANALISIS DE SERIES DE PRECIPITACIONES MENSUALES


ANALISIS DE CRECIDAS
RIO:
CUENCA:
MUNICIPIO:
PROVINCIA:
DEPARTAMENTO: TARIJA
Area de la cuenca =

37.95 Km2

AO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998

MAX
MIN
Xprom
Des.Est S

MAXIMA
DIARIA
(mm)
80.00
64.50
130.00
61.00
72.00
64.50
63.80
60.00
70.00
74.90
90.80
86.00
86.60
55.00
80.00
57.20
44.40
45.00
50.20
54.80
67.00
79.50
71.50
130.00
44.40
69.94
18.42

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas


DISTRIBUCIN DE PRECIPITPRECIPI
ACIO NES
MAX. DIARIAS
TACIONES
MAXIM ASMETODO
HORARIGUMBEL
AS (mm)

ANALISIS DE SERIES DE PRECIPITACIONES MXIMAS DIARIAS


DISTRIBUCIN DE PRECIPITACIONES MAXIMAS - METODO DE GUMBEL

PRECIPITACIN MXIMA DIARIA METODO DE GUMBEL

AO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998

MAX. DIARIA
MAXIMA
ORDENADA
DIARIA (mm)
(mm)
80.00
64.50
130.00
61.00
72.00
64.50
63.80
60.00
70.00
74.90
90.80
86.00
86.60
55.00
80.00
57.20
44.40
45.00
50.20
54.80
67.00
79.50
71.50

130.00
90.80
86.60
86.00
80.00
80.00
79.50
74.90
72.00
71.50
70.00
67.00
64.50
64.50
63.80
61.00
60.00
57.20
55.00
54.80
50.20
45.00
44.40

Gumbel
ht = Ed*(1+Kd*Log T)

Xprom=Promedio=
S=Desviacin Estndart=
Ed=Moda= Xprom-0.456*S=
Kd=Caracterstica=S/(0.557*Ed)=

69.943
18.422
61.543
0.537

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

DISTRIBUCIN DE PRECIPITACIONES M AX. DIARIAS M ETODO GUM BEL


140
120
100
PRECIPIOTACIN
mm
80
60
40
20
0
FRECUENCIA

CALCULO DE PRECIPITACIONES MAXIMAS DIARIAS


T (aos)
Hd (mm)
PERIODO
ALTURA
DE
RETORNO
LLUVIA MAX.
10000.00
193.84
1000.00
160.76
500.00
150.81
150.00
133.51
100.00
127.69
50.00
117.73
25.00
107.78
20.00
104.57
10.00
94.62
5.00
84.66
3.00
77.32
2.00
71.50
1.90
70.76
1.80
69.99
1.70
69.16
1.60
68.29
1.50
67.37
1.35
65.85
1.25
64.75
1.10
62.91
1.00
61.54

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

LLUVIAS MAXIMAS CORRESPONDIENTES A DIFERENTES TIEMPOS ( t ) INFERIORES A LAS DIARIAS


PERIODOS DE RETORNO ( T ) EN AOS
Usando la distribucin de mximo valores segn Ley de Gumbel, se obtine las precipitaciones correspondientes a
tiempos inferiores a 24 hrs.
Utilizando la ecuacin que relaciona la moda de los valores mximos diarios, con la moda correspondiente a otros
valores.
Et = Ed * ( t / td )b
Donde:
Et = Valor modal para un tiempo t en horas
Ed = Moda de la lluvia mxima diaria
t = Tiempo en horas
td = Tiempo correspondiente a la lluvia diaria
b = Exponente que varia de 0.20 a 0.30
Se considera que la lluvia diaria es igual a la lluvia de 12 hrs., un exponente de 0.30 para tiempos menores a 2 horas
y 0.20 para tiempos mayores a 2 horas.

LLUVIAS MXIMAS HORARIAS ( mm ) PARA DIFERENTES TIEMPOS ( t )


T
10000.00
1000.00
500.00
150.00
100.00
50.00
25.00
20.00
10.00
5.00
3.00
2.00
1.90
1.80
1.70
1.60
1.50
1.35
1.25
1.10
1.00

t=0.72h
83.34
69.12
64.84
57.41
54.90
50.62
46.34
44.96
40.68
36.40
33.25
30.74
30.43
30.09
29.74
29.36
28.97
28.32
27.84
27.05
26.46

t=1h
91.98
76.28
71.56
63.35
60.59
55.87
51.14
49.62
44.90
40.17
36.69
33.93
33.58
33.21
32.82
32.41
31.97
31.25
30.72
29.85
29.20

t=2h
113.24
93.92
88.10
78.00
74.59
68.78
62.96
61.09
55.27
49.46
45.17
41.77
41.34
40.89
40.41
39.90
39.36
38.47
37.83
36.75
35.95

t=3h
146.90
121.83
114.29
101.18
96.77
89.23
81.68
79.25
71.71
64.16
58.60
54.19
53.63
53.04
52.42
51.76
51.05
49.91
49.07
47.68
46.64

t=4h
155.60
129.05
121.06
107.18
102.50
94.51
86.52
83.94
75.95
67.96
62.07
57.40
56.80
56.18
55.52
54.82
54.08
52.86
51.98
50.50
49.40

t=6h
168.74
139.95
131.28
116.23
111.16
102.49
93.83
91.04
82.37
73.70
67.31
62.24
61.60
60.93
60.21
59.45
58.65
57.33
56.37
54.77
53.58

t=12h
193.84
160.76
150.81
133.51
127.69
117.73
107.78
104.57
94.62
84.66
77.32
71.50
70.76
69.99
69.16
68.29
67.37
65.85
64.75
62.91
61.54

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

PRECIPITACIONES M AXIM AS HORARIAS (mm)

Pr ecipitaciones Horarias (mm)

Perio d o De R eto rn o T (a o s)
t=0.5 h

t=1.0 h

t=2.0 h

t=3.0 h

t=4.0 h

t=6.0 h

t=12 h

PRECIPITACION MAXIMA MENOR A 24 HORAS T=10 aos


200
180
160
140
Precipitacin (mm)
120
100

T = 10

Logarithmic (T = 10)

T = 10000

Logarithmic (T = 10000)

T = 1000
f(x) = 25.3178939464 ln(x) + 56.8246943002
T = 500
R = 0.9825789169

Logarithmic (T = 1000)
Logarithmic (T = 500)

T=100

Logarithmic (T=100)

T= 50

Logarithmic (T= 50)

60

T = 25

Logarithmic (T = 25)

40

T=5

Logarithmic (T = 5)

T=3

Logarithmic (T = 3)

T=2

Logarithmic (T = 2)

T=1
10

Logarithmic (T = 1)
100

80

20
0
0.1

1
Tiempo (horas)

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

PRECIPITACION MAXIMA MENOR A 24 HORAS T=10 aos


200
180
160
140
Precipitacin (mm)
120

f(x) = 25.3178939464 ln(x) + 56.8246943002


R = 0.9825789169

100
80
60
40
20
0
0

T = 10

Logarithmic (T = 10)

T = 10000

Logarithmic (T = 10000)

T = 1000

Logarithmic (T = 1000)

T = 500

Logarithmic (T = 500)

(T=100)
1 Logarithmic
2
3
T = 25

5T= 50 6
7
Logarithmic
(T
=
Tiempo (horas) 25)

T=100
8

Logarithmic
(T= 50) 11
9
10
T=5

Logarithmic (T = 5)

T=3

Logarithmic (T = 3)

T=2

Logarithmic (T = 2)

T=1

Logarithmic (T = 1)

12

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

DISTRIBUCIN DE PRECIPITPRECIPIT
ACIO NESACIONES
MAX. DIARIAS
MAXIM ASMETODO
HORARIGUMBEL
AS (mm)

PRECIPITACIN MXIMA DIARIA METODO DE GUMBEL


i

AO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998

MAX. DIARIA
MAXIMA
PROB. EMPRICA
ORDENADA
DIARIA (mm)
(i/(N+1))
(mm)
80.00
64.50
130.00
61.00
72.00
64.50
63.80
60.00
70.00
74.90
90.80
86.00
86.60
55.00
80.00
57.20
44.40
45.00
50.20
54.80
67.00
79.50
71.50

130.00
90.80
86.60
86.00
80.00
80.00
79.50
74.90
72.00
71.50
70.00
67.00
64.50
64.50
63.80
61.00
60.00
57.20
55.00
54.80
50.20
45.00
44.40

0.04
0.08
0.13
0.17
0.21
0.25
0.29
0.33
0.38
0.42
0.46
0.50
0.54
0.58
0.63
0.67
0.71
0.75
0.79
0.83
0.88
0.92
0.96

Xprom=Promedio=
S=Desviacin Estndart=
Ed=Moda= Xprom-0.456*S=

69.943
18.422

Kd=Caracterstica=S/(0.557*Ed)=

0.537

61.543

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

218.51
171.10
158.23
142.05
130.36
119.07
108.08
93.76
82.75
66.62

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

Duracin
218.513631
171.099493
158.225992
142.045611
130.359322
119.068108
108.075649
93.7570544
82.7502616
66.6150918

0.75

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

PRECIPITACIN MXIMA DIARIA METODO DE GUMBEL


PERIODO DE
RETORNO

VARIABLE
REDUCIDA Y

T
24.00
12.00
8.00
6.00
4.80
4.00
3.43
3.00
2.67
2.40
2.18
2.00
1.85
1.71
1.60
1.50
1.41
1.33
1.26
1.20
1.14
1.09
1.04

PERIODO DE
RETONRNO
ADOPTADO T

3.1568
2.4417
2.0134
1.7020
1.4541
1.2459
1.0647
0.9027
0.7550
0.6180
0.4892
0.3665
0.2483
0.1330
0.0194
-0.0940
-0.2088
-0.3266
-0.4502
-0.5832
-0.7321
-0.9102
-1.1563
Gumbel
ht = Ed*(1+Kd*Log T)

10000.00
1000.00
500.00
100.00
50.00
25.00
10.00
5.00
2.00
1.85
1.71
1.60
1.50
1.41
1.33
1.26
1.20
1.14
1.09
1.04

FACTOR DE
FRECUENCIA
Kt

6.7313
4.9357
4.3948
3.1368
2.5924
2.0440
1.3047
0.7196
-0.1641
-0.2563
-0.3462
-0.4348
-0.5232
-0.6127
-0.7046
-0.8009
-0.9046
-1.0207
-1.1596
-1.3514

PREC.
MAX

193.946018
160.866831
150.903759
127.729178
117.70057
107.597361
93.9785552
83.1999422
66.9201892
65.2216597
63.5661133
61.933883
60.305017
58.6574365
56.9643083
55.1895877
53.2792052
51.1404913
48.5818744
45.0480155

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

12

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

ANALISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


METODO DE LA SOIL CONSERVATIN SERVICE

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Area de la cuenca A =

0.72 hr
0.93 hr
2.48 hr
37.95 Km2

Longitud del curso principal L =


Desnivel o altura H =
Pendiente del curso i =

14.7 millas2

7,470.86 m
1,041.00 m
13.93 %

Altuera de precipitacin mximas para diferentes perodos de retorno y Tc = 0,72 hr.


T (aos)
10
20
25
50
100
150
500
1000
10000

P (mm)
40.68
44.96
46.34
50.62
54.90
57.41
64.84
69.12
83.34

Para un tiempo de retonrno T = 10 aos


Precipitacin P =
Escorrentia directa Hd =
qp = (484 * A * h) / Tp =

40.68 mm
1.00 mm

Q = (484 * A * Hd) / Tp =

1.602
0.708

pulgadas.
pulgadas.

215.95 m3/seg
152.94 m3/seg

7,626.09 pie3/seg
5,401.09 pie3/seg

7,626.09 pie3/seg
5,401.09 pie3/seg
0.93 Hr

215.95 m3/seg
152.94 m3/seg

Datos:
qp =
Q=
Tp =

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40

0.000
0.015
0.075
0.160
0.280

0.000
0.093
0.186
0.279
0.372

Desc. Unit
m3/seg
0.00
3.24
16.20
34.55
60.47

Q=(Hd/h).q
0.00
2.29
11.47
24.47
42.82

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.50
4.00
4.50
5.00

0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.420
0.320
0.240
0.180
0.130
0.098
0.075
0.036
0.018
0.009
0.004

0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.675
1.861
2.047
2.233
2.419
2.605
2.791
3.256
3.721
4.187
4.652

92.86
129.57
166.28
192.19
209.47
215.95
211.63
198.67
181.40
161.96
142.52
120.93
90.70
69.10
51.83
38.87
28.07
21.16
16.20
7.77
3.89
1.94
0.86

65.76
91.77
117.77
136.12
148.35
152.94
149.88
140.71
128.47
114.71
100.94
85.65
64.24
48.94
36.71
27.53
19.88
14.99
11.47
5.51
2.75
1.38
0.61

HIDROGRAMA DE CRECIDAS PERIO DO DE RETORNO 10 Aos


M todo: Soil Conse rvatin Service
180
160
140
120

Caudal Q (m3/seg)
100
80
60
40
20
0
0.0

0.5

1.0

1.5

2.0

2.5

Tiempo (hrs.)

3.0

3.5

4.0

4.5

5.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

ANALISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


METODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 20 AOS

Precipitacin P =
Escorrentia directa Hd =
qp = (484 * A * h) / Tp =

46.34 mm
17.99 mm

Q = (484 * A * Hd) / Tp =
Datos:

qp =
Q=
Tp =

1.824
0.884

215.95 m3/seg
190.97 m3/seg

7,626.09 pie3/seg
6,743.98 pie3/seg

7,626.09 pie3/seg
6,743.98 pie3/seg
0.93 Hr

215.95 m3/seg
190.97 m3/seg

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.50

pulgadas.
pulgadas.

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.420
0.320
0.240
0.180
0.130
0.098
0.075
0.036

0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.675
1.861
2.047
2.233
2.419
2.605
2.791
3.256

Desc. Unit
m3/seg
0.00
3.24
16.20
34.55
60.47
92.86
129.57
166.28
192.19
209.47
215.95
211.63
198.67
181.40
161.96
142.52
120.93
90.70
69.10
51.83
38.87
28.07
21.16
16.20
7.77

Q=(Hd/h).q
0.00
2.86
14.32
30.55
53.47
82.12
114.58
147.05
169.96
185.24
190.97
149.88
140.71
128.47
114.71
100.94
85.65
64.24
48.94
36.71
27.53
19.88
14.99
11.47
5.51

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

4.00
4.50
5.00

0.018
0.009
0.004

3.721
4.187
4.652

3.89
1.94
0.86

2.75
1.38
0.61

HIDRO GRAMA DE CRECIDAS PERIODO DE RETORNO 20 Aos


Mtodo: Soil Conserva tin Se rvice
180
160
140
120
Caudal Q(m3/seg)
100
80
60
40
20
0
0.0

0.5

1.0

1.5

2.0

2.5
Tiempo (hrs)

3.0

3.5

4.0

4.5

5.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

ANALISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


METODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 50 AOS

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrentia directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =
qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
50.62 mm
25.96 mm
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

1.993
1.022
14.659

215.95 m3/seg
220.74 m3/seg

7,626.09 pie3/seg
7,795.21 pie3/seg

7,626.09 pie3/seg
7,795.21 pie3/seg
0.93 Hr

215.95 m3/seg
220.74 m3/seg

Datos:
qp =
Q=
Tp =

Relacin
Relacin Tiempo Descarga
T /Tp
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840

Tiempo
Hrs
0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209

Descarga
m3/seg
0.00
3.31
16.56
35.32
61.81
94.92
132.44
169.97
196.45
214.11
220.74
216.32
203.08
185.42

pulgadas.
pulgadas.
millas2

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

1.40
1.50
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.50
4.00
4.50
5.00

0.750
0.660
0.560
0.420
0.320
0.240
0.180
0.130
0.098
0.075
0.036
0.018
0.009
0.004

1.302
1.396
1.489
1.675
1.861
2.047
2.233
2.419
2.605
2.791
3.256
3.721
4.187
4.652

165.55
145.69
123.61
92.71
70.64
52.98
39.73
28.70
21.63
16.56
7.95
3.97
1.99
0.88

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 50 Aos


Mtodo: Soil Conservatin Service
240
220
200
180
160
140
120
100
80
60
40
20
0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

ANLISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


MTODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 100 AOS

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrenta directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =

qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
54.90 mm
29.55
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

2.162
1.163
14.659

215.95 m3/seg
251.21 m3/seg

7,626.09 pie3/seg
8,871.47 pie3/seg

7,626.09 pie3/seg
8,871.47 pie3/seg
0.93 Hr

215.95 m3/seg
251.21 m3/seg

Datos:
qp =
Q=
Tp =

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40

0.000
0.015
0.075
0.160
0.280

0.000
0.093
0.186
0.279
0.372

Descarga
m3/seg
0.00
3.77
18.84
40.19
70.34

pulgadas.
pulgadas.
millas2

M.T.C.B. Consultores Asociados S.R.L.

0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60

Proyecto Mltipropsito Presa Calderillas

0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.485
0.420
0.365
0.320
0.276
0.240
0.207
0.180
0.151
0.130
0.110
0.098
0.085
0.075
0.065
0.058
0.050
0.041
0.036
0.030
0.027
0.023
0.020
0.018
0.016
0.013
0.011
0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.0036
0.0032
0.0028
0.0024
0.0020
0.0018

0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.582
1.675
1.768
1.861
1.954
2.047
2.140
2.233
2.326
2.419
2.512
2.605
2.698
2.791
2.884
2.977
3.070
3.163
3.256
3.349
3.442
3.535
3.628
3.721
3.814
3.907
4.000
4.093
4.187
4.280
4.373
4.466
4.559
4.652
4.745
4.838
4.931
5.024
5.117
5.210

108.02
150.73
193.43
223.58
243.68
251.21
246.19
231.12
211.02
188.41
165.80
140.68
121.84
105.51
91.69
80.39
69.33
60.29
52.00
45.22
37.93
32.66
27.63
24.62
21.35
18.84
16.33
14.57
12.56
10.30
9.04
7.54
6.78
5.65
5.02
4.52
4.02
3.14
2.76
2.51
2.26
2.01
1.76
1.51
1.26
1.00
0.90
0.80
0.70
0.60
0.50
0.45

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

5.70
5.80
5.90
6.00

0.0016
0.0014
0.0012
0.0005

5.303
5.396
5.489
5.582

0.40
0.35
0.30
0.13

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 100 Aos


Mtodo: Soil Conservatin Service

260
240
220
200
180
160
140
120
100
80
60
40
20
0
0.0

1.0

2.0

3.0

4.0

5.0

6.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

ANLISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


MTODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 150 AOS

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrenta directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =

qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
57.41 mm
31.68
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

2.260
1.247
14.659

215.95 m3/seg
269.32 m3/seg

7,626.09 pie3/seg
9,511.10 pie3/seg

7,626.09 pie3/seg
9,511.10 pie3/seg
0.93 Hr

215.95 m3/seg
269.32 m3/seg

Datos:
qp =
Q=
Tp =

pulgadas.
pulgadas.
millas2

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.485
0.420
0.365
0.320
0.276
0.240
0.207
0.180
0.151
0.130
0.110
0.098
0.085
0.075
0.065
0.058
0.050
0.041
0.036
0.030
0.027
0.023
0.020
0.018
0.016
0.013
0.011
0.010
0.009
0.008
0.007

0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.582
1.675
1.768
1.861
1.954
2.047
2.140
2.233
2.326
2.419
2.512
2.605
2.698
2.791
2.884
2.977
3.070
3.163
3.256
3.349
3.442
3.535
3.628
3.721
3.814
3.907
4.000
4.093
4.187
4.280
4.373

Descarga
m3/seg
0.00
3.77
18.84
40.19
70.34
108.02
150.73
193.43
223.58
243.68
251.21
246.19
231.12
211.02
188.41
165.80
140.68
121.84
105.51
91.69
80.39
69.33
60.29
52.00
45.22
37.93
32.66
27.63
24.62
21.35
18.84
16.33
14.57
12.56
10.30
9.04
7.54
6.78
5.65
5.02
4.52
4.02
3.14
2.76
2.51
2.26
2.01
1.76

Descarga CMP
m3/seg
0.00
18.84
94.20
200.97
351.70
540.11
753.64
967.17
1117.89
1218.38
1256.06
1230.94
1155.58
1055.09
942.05
829.00
703.39
609.19
527.55
458.46
401.94
346.67
301.45
260.00
226.09
189.67
163.29
138.17
123.09
106.77
94.20
81.64
72.85
62.80
51.50
45.22
37.68
33.91
28.26
25.12
22.61
20.10
15.70
13.82
12.56
11.30
10.05
8.79

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60
5.70
5.80
5.90
6.00

0.006
0.005
0.004
0.0036
0.0032
0.0028
0.0024
0.0020
0.0018
0.0016
0.0014
0.0012
0.0005

4.466
4.559
4.652
4.745
4.838
4.931
5.024
5.117
5.210
5.303
5.396
5.489
5.582

1.51
1.26
1.00
0.90
0.80
0.70
0.60
0.50
0.45
0.40
0.35
0.30
0.13

7.54
6.28
5.02
4.52
4.02
3.52
3.01
2.51
2.26
2.01
1.76
1.51
0.63

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 150 Aos


Mtodo: Soil Conservatin Service

260
240
220
200
180
160
140
120
100
80
60
40
20
0
0.0

1.0

2.0

3.0

4.0

5.0

6.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

ANALISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


METODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 500 AOS

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrenta directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =
qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
64.84 mm
38.13
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

215.95 m3/seg
324.15 m3/seg

2.553
1.501
14.659

7,626.09 pie3/seg
11,447.20 pie3/seg

pulgadas.
pulgadas.
millas2

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Datos:
qp =
Q=
Tp =

7,626.09 pie3/seg
11,447.20 pie3/seg
0.93 Hr

Relacin
Relacin Tiempo Descarga
T /Tp
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.485
0.420
0.365
0.320
0.276
0.240
0.207
0.180
0.151
0.130
0.110
0.098
0.085
0.075
0.065
0.058
0.050
0.041
0.036
0.030
0.027
0.023
0.020
0.018
0.016
0.013
0.011

Tiempo
Hrs
0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.582
1.675
1.768
1.861
1.954
2.047
2.140
2.233
2.326
2.419
2.512
2.605
2.698
2.791
2.884
2.977
3.070
3.163
3.256
3.349
3.442
3.535
3.628
3.721
3.814
3.907
4.000

215.95 m3/seg
324.15 m3/seg

Descarga
m3/seg
0.00
4.86
24.31
51.86
90.76
139.38
194.49
249.59
288.49
314.42
324.15
317.67
298.22
272.28
243.11
213.94
181.52
157.21
136.14
118.31
103.73
89.46
77.80
67.10
58.35
48.95
42.14
35.66
31.77
27.55
24.31
21.07
18.80
16.21
13.29
11.67
9.72
8.75
7.29
6.48
5.83
5.19
4.05
3.57

M.T.C.B. Consultores Asociados S.R.L.

4.40
4.50
4.60
4.70
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60
5.70
5.80
5.90
6.00

Proyecto Mltipropsito Presa Calderillas

0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.0036
0.0032
0.0028
0.0024
0.0020
0.0018
0.0016
0.0014
0.0012
0.0005

4.093
4.187
4.280
4.373
4.466
4.559
4.652
4.745
4.838
4.931
5.024
5.117
5.210
5.303
5.396
5.489
5.582

3.24
2.92
2.59
2.27
1.94
1.62
1.30
1.17
1.04
0.91
0.78
0.65
0.58
0.52
0.45
0.39
0.16

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 500 Aos


Mtodo: Soil Conservatin Service
360
340
320
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20

200
180
160
M.T.C.B. Consultores Asociados S.R.L.
140

Proyecto Mltipropsito Presa Calderillas

120
100
80
60
40
20
0
0

ANLISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


MTODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 1000 AOS

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrenta directa Hd =

0.72
0.93 hr
2.48 hr
69.12 mm
41.91

2.721
1.650

pulgadas.
pulgadas.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =
qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

215.95 m3/seg
356.31 m3/seg

14.659

7,626.09 pie3/seg
12,583.06 pie3/seg

Datos:
qp =
Q=
Tp =

7,626.09 pie3/seg
12,583.06 pie3/seg
0.93 Hr

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.485
0.420
0.365
0.320
0.276
0.240
0.207
0.180
0.151
0.130
0.110
0.098
0.085
0.075
0.065
0.058
0.050
0.041

0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.582
1.675
1.768
1.861
1.954
2.047
2.140
2.233
2.326
2.419
2.512
2.605
2.698
2.791
2.884
2.977
3.070
3.163

215.95 m3/seg
356.31 m3/seg

Descarga
m3/seg
0.00
5.34
26.72
57.01
99.77
153.21
213.79
274.36
317.12
345.62
356.31
349.19
327.81
299.30
267.23
235.17
199.54
172.81
149.65
130.05
114.02
98.34
85.52
73.76
64.14
53.80
46.32
39.19
34.92
30.29
26.72
23.16
20.67
17.82
14.61

millas2

#REF!

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60
5.70
5.80
5.90
6.00

0.036
0.030
0.027
0.023
0.020
0.018
0.016
0.013
0.011
0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.0036
0.0032
0.0028
0.0024
0.0020
0.0018
0.0016
0.0014
0.0012
0.0005

3.256
3.349
3.442
3.535
3.628
3.721
3.814
3.907
4.000
4.093
4.187
4.280
4.373
4.466
4.559
4.652
4.745
4.838
4.931
5.024
5.117
5.210
5.303
5.396
5.489
5.582

12.83
10.69
9.62
8.02
7.13
6.41
5.70
4.45
3.92
3.56
3.21
2.85
2.49
2.14
1.78
1.43
1.28
1.14
1.00
0.86
0.71
0.64
0.57
0.50
0.43
0.18

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 1000 Aos


Mtodo: Soil Conservatin Service

380
360
340
320
300
280
260

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 1000 Aos


Mtodo: Soil Conservatin Service
M.T.C.B. Consultores Asociados S.R.L.
380

Proyecto Mltipropsito Presa Calderillas

360
340
320
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0
0.0

1.0

2.0

ANLISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


MTODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 10000 AOS

3.0

4.0

5.0

6.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrenta directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =
qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
83.34 mm
54.76
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

215.95 m3/seg
465.56 m3/seg

3.281
2.156
14.659

7,626.09 pie3/seg
16,440.97 pie3/seg

Datos:
qp =
Q=
Tp =

7,626.09 pie3/seg
16,440.97 pie3/seg
0.93 Hr

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.485
0.420
0.365
0.320
0.276
0.240
0.207
0.180
0.151

0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.582
1.675
1.768
1.861
1.954
2.047
2.140
2.233
2.326

215.95 m3/seg
465.56 m3/seg

Descarga
m3/seg
0.00
6.98
34.92
74.49
130.36
200.19
279.33
358.48
414.35
451.59
465.56
456.25
428.31
391.07
349.17
307.27
260.71
225.79
195.53
169.93
148.98
128.49
111.73
96.37
83.80
70.30

pulgadas.
pulgadas.
millas2

M.T.C.B. Consultores Asociados S.R.L.

2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60
5.70
5.80
5.90
6.00

Proyecto Mltipropsito Presa Calderillas

0.130
0.110
0.098
0.085
0.075
0.065
0.058
0.050
0.041
0.036
0.030
0.027
0.023
0.020
0.018
0.016
0.013
0.011
0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.0036
0.0032
0.0028
0.0024
0.0020
0.0018
0.0016
0.0014
0.0012
0.0005

2.419
2.512
2.605
2.698
2.791
2.884
2.977
3.070
3.163
3.256
3.349
3.442
3.535
3.628
3.721
3.814
3.907
4.000
4.093
4.187
4.280
4.373
4.466
4.559
4.652
4.745
4.838
4.931
5.024
5.117
5.210
5.303
5.396
5.489
5.582

60.52
51.21
45.62
39.57
34.92
30.26
27.00
23.28
19.09
16.76
13.97
12.57
10.48
9.31
8.38
7.45
5.82
5.12
4.66
4.19
3.72
3.26
2.79
2.33
1.86
1.68
1.49
1.30
1.12
0.93
0.84
0.74
0.65
0.56
0.23

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

HIDROGRAMA DE C REC IDAS PERIODO DE RETORNO 10000 Aos


Mtodo: Soil C onservatin Service

450
400
350
300
250
200
150
100
50
0
0.0

1.0

2.0

3.0

4.0

5.0

6.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Ventura
U.S. Soil Conservation Service:
Sherman

Tc = 0.1272*( A / i )1/2
Tc = 0.95*(L^3/H)^0.385
Tc=0,3*(L/S0,25)0,76

Kirpich
Giandotti
Burea of reclamatin

Tc = 0.0003245*( L / H )
Tc = (4*A1/2 + 1.5* L)/ 0.8*H1/2
Tc = (11,9*L3/H)0.385
Promedio

1041

1.15

2.0992
0.667955935
2.0114416366
0.665639229
0.8181076839
0.6666
0.72

0.38

24511.877
3415.521

Tp = D/2 + 0.60 * Tc Tiempo al pico


Tb = 2.67 * Tp Tiempo base
D = Periodo de lluvia neta en hr
S = ( 1000 / CN ) - 10
(3)
Diferencia potencial mxima entre P y Q en pulgadas, a la hora que comienza la tormenta
CN = Nmero de curva dado por las caractersticas del tipo de suelo que existen en la cuenca
Hd = (P - 0.2*S)2 / (P + 0.8 * S)
GRUPO
SUELO

DESCRIPCIN

comprende suelos poco profundos con subhorizontes casi


impermeables con pastisales sin tratamiento con mala condicion
para la infiltracin

Precipitacin P = 40.68
S = 1.24
Hd = 17.99
Hd/h = 0.71

CN

89

mm

1.6017

pul. Dato

mm

0.708

pul. Que viene a ser la escorrentia directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 10 Aos


Mtodo: Soil Conservatin Service

240
220
200
180
160
140
120
100
80
60
40
20
0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

comprende suelos poco profundos con subhorizontes casi


impermeables con pastisales sin tratamiento con mala condicion
para la infiltracin

Precipitacin P = 46.34
S = 1.24
Hd = 22.46
Hd/h = 0.88

89

mm

1.8245

pul. Dato

mm

0.884

pul. Que viene a ser la escorrentia directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Precipitacin P = 50.62
S = 1.24
Hd = 25.96

mm

1.993

pul. Dato

mm

1.022

pul. Que viene a ser la escorrentia directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Precipitacin P = 54.90
S = 1.24
Hd = 29.55

mm

2.162

pul. Dato

mm

1.163

pul. Que viene a ser la escorrenta directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Precipitacin P = 57.41
S = 1.24
Hd = 31.68

mm

2.260

pul. Dato

mm

1.247

pul. Que viene a ser la escorrenta directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Precipitacin P = 64.84
S = 1.24
Hd = 38.13

mm

2.553

pul. Dato

mm

1.501

pul. Que viene a ser la escorrenta directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

96.375824

Proyecto Mltipropsito Presa Calderillas

0.42 426.70295

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Precipitacin P = 69.12
S = 1.24
Hd = 41.91

0
4.46
22.28
47.54
83.20
127.77
178.28
228.79
264.45
288.22
297.13
291.19
273.36
249.59
222.85
196.11
166.39

2.2284735
13.370841
34.912752
65.368556
105.48108
153.02185
203.53391
246.61774
276.33072
292.67285
294.1585
282.27331
261.47423
236.21819
209.47651
181.24918

124.79

145.5936

95.08

109.93803

71.31

83.196344

53.48

62.397258

38.63

46.055119

29.12

33.872797

22.28

25.701728

mm

2.721

mm

1.650

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

10.70

16.490704

5.35

8.0225046

2.67

4.0112523

1.19

1.9313437

0.59

0.8913894

0.15

0.3714123
0.0742825

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

Precipitacin P = 83.34
S = 1.24
Hd = 54.76

0
4.46
22.28
47.54
83.20
127.77
178.28
228.79
264.45
288.22
297.13
291.19
273.36
249.59
222.85
196.11
166.39

2.2284735
13.370841
34.912752
65.368556
105.48108
153.02185
203.53391
246.61774
276.33072
292.67285
294.1585
282.27331
261.47423
236.21819
209.47651
181.24918

124.79

145.5936

95.08

109.93803

71.31

83.196344

53.48

62.397258

mm

3.281

mm

2.156

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

38.63

46.055119

29.12

33.872797

22.28

25.701728

10.70

16.490704

5.35

8.0225046

2.67

4.0112523

1.19

1.9313437

0.59

0.8913894

0.15

0.3714123
0.0742825

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

das, a la hora que comienza la tormenta.

a ser la escorrentia directa.

Proyecto Mltipropsito Presa Calderillas

Clculo del hidrograma triangular para cada incremento de escurrimient


se asume un incremento del tiempo de 1 hora.
Tp = (D/2) + 0.60 * Tc

Datos:
Tc =
A=
H=
D=

0.72 hr
37.95 Km2
2.54 cm
1 hr

Tp =
Tb =
qp =

0.93 hr
2.48 hr
7626.09 pie3/seg

14.659
1.00

215.82

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

a ser la escorrentia directa.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Que viene a ser la escorrentia directa.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Que viene a ser la escorrenta directa.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Que viene a ser la escorrenta directa.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Que viene a ser la escorrenta directa.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

ar para cada incremento de escurrimiento en nuestro caso para tiempos de concentracin que ocurren dentro de las 6 hrs,

qp = (484 * A * H) / Tp

Tb = 2.67 * Tp

millas2
pulg

15.303909
0.987

0
0.93

0
215.82

2.48

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Mltipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

ANALISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


METODO DE LA SOIL CONSERVATIN SERVICE

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Area de la cuenca A =

0.72 hr
0.93 hr
2.48 hr
37.95 Km2

Longitud del curso principal L =


Desnivel o altura H =
Pendiente del curso i =

14.7

7,470.86 m
1,041.00 m
13.93 %

Altuera de precipitacin mximas para diferentes perodos de retorno y Tc = 0,72 hr.


T (aos)
10
25
50
100
150
500
1000
10000

P (mm)
40.68
46.34
50.62
54.90
57.41
64.84
69.12
83.34

Para un tiempo de retonrno T = 10 aos


Precipitacin P =
Escorrentia directa Hd =
qp = (484 * A * h) / Tp =

40.68 mm
17.99 mm

Q = (484 * A * Hd) / Tp =

1.602
0.708

pulgadas.
pulgadas.

215.95 m3/seg
152.94 m3/seg

7,626.09 pie3/seg
5,401.09 pie3/seg

7,626.09 pie3/seg
5,401.09 pie3/seg
0.93 Hr

215.95 m3/seg
152.94 m3/seg

Datos:
qp =
Q=
Tp =

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40

0.000
0.015
0.075
0.160
0.280

0.000
0.093
0.186
0.279
0.372

Desc. Unit
m3/seg
0.00
3.24
16.20
34.55
60.47

Q=(Hd/h).q
0.00
2.29
11.47
24.47
42.82

millas2

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.50
4.00
4.50
5.00

0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.420
0.320
0.240
0.180
0.130
0.098
0.075
0.036
0.018
0.009
0.004

0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.675
1.861
2.047
2.233
2.419
2.605
2.791
3.256
3.721
4.187
4.652

92.86
129.57
166.28
192.19
209.47
215.95
211.63
198.67
181.40
161.96
142.52
120.93
90.70
69.10
51.83
38.87
28.07
21.16
16.20
7.77
3.89
1.94
0.86

65.76
91.77
117.77
136.12
148.35
152.94
149.88
140.71
128.47
114.71
100.94
85.65
64.24
48.94
36.71
27.53
19.88
14.99
11.47
5.51
2.75
1.38
0.61

HIDRO GRAMA DE CRECIDAS PERIODO DE RETORNO 10 Aos


Mtodo: Soil Conserva tin Se rvice
180
160
140
120
Q (m 100
3/s)
80
60
40
20
0
0.0

0.5

1.0

1.5

2.0

2.5
Tiempo hr

3.0

3.5

4.0

4.5

5.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

ANALISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


METODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 50 AOS
Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrentia directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =
qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
50.62 mm
25.96 mm
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

1.993
1.022
14.659

215.95 m3/seg
220.74 m3/seg

7,626.09 pie3/seg
7,795.21 pie3/seg

7,626.09 pie3/seg
7,795.21 pie3/seg
0.93 Hr

215.95 m3/seg
220.74 m3/seg

Datos:
qp =
Q=
Tp =

Relacin
Relacin Tiempo Descarga
T /Tp
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.420
0.320
0.240
0.180
0.130
0.098
0.075

Tiempo
Hrs
0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.675
1.861
2.047
2.233
2.419
2.605
2.791

Descarga
m3/seg
0.00
3.31
16.56
35.32
61.81
94.92
132.44
169.97
196.45
214.11
220.74
216.32
203.08
185.42
165.55
145.69
123.61
92.71
70.64
52.98
39.73
28.70
21.63
16.56

pulgadas.
pulgadas.
millas2

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

3.50
4.00
4.50
5.00

0.036
0.018
0.009
0.004

3.256
3.721
4.187
4.652

7.95
3.97
1.99
0.88

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 50 Aos


Mtodo: Soil Conservatin Service
240
220
200
180
160
Q (m140
3/s)
120
100
80
60
40
20
0
0.0

0.5

1.0

1.5

2.0

2.5
Tiem po hr

3.0

3.5

4.0

4.5

5.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

ANLISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


MTODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 100 AOS

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrenta directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =
qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
54.90 mm
29.55
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

2.162
1.163
14.659

215.95 m3/seg
251.21 m3/seg

7,626.09 pie3/seg
8,871.47 pie3/seg

7,626.09 pie3/seg
8,871.47 pie3/seg
0.93 Hr

215.95 m3/seg
251.21 m3/seg

Datos:
qp =
Q=
Tp =

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.485
0.420
0.365
0.320
0.276

0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.582
1.675
1.768
1.861
1.954

Descarga
m3/seg
0.00
3.77
18.84
40.19
70.34
108.02
150.73
193.43
223.58
243.68
251.21
246.19
231.12
211.02
188.41
165.80
140.68
121.84
105.51
91.69
80.39
69.33

pulgadas.
pulgadas.
millas2

M.T.C.B. Consultores Asociados S.R.L.

2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60
5.70
5.80
5.90
6.00

Proyecto Multipropsito Presa Calderillas

0.240
0.207
0.180
0.151
0.130
0.110
0.098
0.085
0.075
0.065
0.058
0.050
0.041
0.036
0.030
0.027
0.023
0.020
0.018
0.016
0.013
0.011
0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.0036
0.0032
0.0028
0.0024
0.0020
0.0018
0.0016
0.0014
0.0012
0.0005

2.047
2.140
2.233
2.326
2.419
2.512
2.605
2.698
2.791
2.884
2.977
3.070
3.163
3.256
3.349
3.442
3.535
3.628
3.721
3.814
3.907
4.000
4.093
4.187
4.280
4.373
4.466
4.559
4.652
4.745
4.838
4.931
5.024
5.117
5.210
5.303
5.396
5.489
5.582

60.29
52.00
45.22
37.93
32.66
27.63
24.62
21.35
18.84
16.33
14.57
12.56
10.30
9.04
7.54
6.78
5.65
5.02
4.52
4.02
3.14
2.76
2.51
2.26
2.01
1.76
1.51
1.26
1.00
0.90
0.80
0.70
0.60
0.50
0.45
0.40
0.35
0.30
0.13

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 100 Aos


Mtodo: Soil Conservatin Service
260
240
220
200
180
160
Q (m 3/s)
140
120
100
80
60
40
20
0
0.0

1.0

2.0

3.0
Tiem po hr

4.0

5.0

6.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

ANLISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


MTODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 150 AOS

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrenta directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =

qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
57.41 mm
31.68
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

2.260
1.247
14.659

215.95 m3/seg
269.32 m3/seg

7,626.09 pie3/seg
9,511.10 pie3/seg

7,626.09 pie3/seg
9,511.10 pie3/seg
0.93 Hr

215.95 m3/seg
269.32 m3/seg

Datos:
qp =
Q=
Tp =

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560
0.485
0.420

0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489
1.582
1.675

Descarga
m3/seg
0.00
3.77
18.84
40.19
70.34
108.02
150.73
193.43
223.58
243.68
251.21
246.19
231.12
211.02
188.41
165.80
140.68
121.84
105.51

Descarga CMP
m3/seg
0.00
18.84
94.20
200.97
351.70
540.11
753.64
967.17
1117.89
1218.38
1256.06
1230.94
1155.58
1055.09
942.05
829.00
703.39
609.19
527.55

pulgadas.
pulgadas.
millas2

M.T.C.B. Consultores Asociados S.R.L.

1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60
5.70
5.80
5.90
6.00

Proyecto Multipropsito Presa Calderillas

0.365
0.320
0.276
0.240
0.207
0.180
0.151
0.130
0.110
0.098
0.085
0.075
0.065
0.058
0.050
0.041
0.036
0.030
0.027
0.023
0.020
0.018
0.016
0.013
0.011
0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.0036
0.0032
0.0028
0.0024
0.0020
0.0018
0.0016
0.0014
0.0012
0.0005

1.768
1.861
1.954
2.047
2.140
2.233
2.326
2.419
2.512
2.605
2.698
2.791
2.884
2.977
3.070
3.163
3.256
3.349
3.442
3.535
3.628
3.721
3.814
3.907
4.000
4.093
4.187
4.280
4.373
4.466
4.559
4.652
4.745
4.838
4.931
5.024
5.117
5.210
5.303
5.396
5.489
5.582

91.69
80.39
69.33
60.29
52.00
45.22
37.93
32.66
27.63
24.62
21.35
18.84
16.33
14.57
12.56
10.30
9.04
7.54
6.78
5.65
5.02
4.52
4.02
3.14
2.76
2.51
2.26
2.01
1.76
1.51
1.26
1.00
0.90
0.80
0.70
0.60
0.50
0.45
0.40
0.35
0.30
0.13

458.46
401.94
346.67
301.45
260.00
226.09
189.67
163.29
138.17
123.09
106.77
94.20
81.64
72.85
62.80
51.50
45.22
37.68
33.91
28.26
25.12
22.61
20.10
15.70
13.82
12.56
11.30
10.05
8.79
7.54
6.28
5.02
4.52
4.02
3.52
3.01
2.51
2.26
2.01
1.76
1.51
0.63

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 150 Aos


Mtodo: Soil Conservatin Service
260
240
220
200
180
160
Q (m 3/s)
140
120
100
80
60
40
20
0
0.0

1.0

2.0

3.0
Tiem po hr

4.0

5.0

6.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

ANALISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


METODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 500 AOS
0
0
0
Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrenta directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =
qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
64.84 mm
38.13
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

215.95 m3/seg
324.15 m3/seg

2.553
1.501
14.659

7,626.09 pie3/seg
11,447.20 pie3/seg

Datos:
qp =
Q=
Tp =

7,626.09 pie3/seg
11,447.20 pie3/seg
0.93 Hr

Relacin
Relacin Tiempo Descarga
T /Tp
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840
0.750
0.660
0.560

Tiempo
Hrs
0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209
1.302
1.396
1.489

215.95 m3/seg
324.15 m3/seg

Descarga
m3/seg
0.00
4.86
24.31
51.86
90.76
139.38
194.49
249.59
288.49
314.42
324.15
317.67
298.22
272.28
243.11
213.94
181.52

pulgadas.
pulgadas.
millas2

M.T.C.B. Consultores Asociados S.R.L.

1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60
5.70
5.80
5.90
6.00

Proyecto Multipropsito Presa Calderillas

0.485
0.420
0.365
0.320
0.276
0.240
0.207
0.180
0.151
0.130
0.110
0.098
0.085
0.075
0.065
0.058
0.050
0.041
0.036
0.030
0.027
0.023
0.020
0.018
0.016
0.013
0.011
0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.0036
0.0032
0.0028
0.0024
0.0020
0.0018
0.0016
0.0014
0.0012
0.0005

1.582
1.675
1.768
1.861
1.954
2.047
2.140
2.233
2.326
2.419
2.512
2.605
2.698
2.791
2.884
2.977
3.070
3.163
3.256
3.349
3.442
3.535
3.628
3.721
3.814
3.907
4.000
4.093
4.187
4.280
4.373
4.466
4.559
4.652
4.745
4.838
4.931
5.024
5.117
5.210
5.303
5.396
5.489
5.582

157.21
136.14
118.31
103.73
89.46
77.80
67.10
58.35
48.95
42.14
35.66
31.77
27.55
24.31
21.07
18.80
16.21
13.29
11.67
9.72
8.75
7.29
6.48
5.83
5.19
4.05
3.57
3.24
2.92
2.59
2.27
1.94
1.62
1.30
1.17
1.04
0.91
0.78
0.65
0.58
0.52
0.45
0.39
0.16

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

HIDROGRAMA DE CRECIDAS PERIODO DE RETORNO 500 Aos


Mtodo: Soil Conservatin Service
360
340
320
300
280
260
240
220
200
Q (m 3/s)
180
160
140
120
100
80
60
40
20
0
0

3
Tiem po hr

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

ANLISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA


MTODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 1000 AOS

Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrenta directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =
qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
69.12 mm
41.91
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

215.95 m3/seg
356.31 m3/seg

2.721
1.650
14.659

7,626.09 pie3/seg
12,583.06 pie3/seg

Datos:
qp =
Q=
Tp =

7,626.09 pie3/seg
12,583.06 pie3/seg
0.93 Hr

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000
0.980
0.920
0.840

0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930
1.023
1.116
1.209

215.95 m3/seg
356.31 m3/seg

Descarga
m3/seg
0.00
5.34
26.72
57.01
99.77
153.21
213.79
274.36
317.12
345.62
356.31
349.19
327.81
299.30

pulgadas.
pulgadas.
millas2

#REF!

M.T.C.B. Consultores Asociados S.R.L.

1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60
5.70
5.80
5.90
6.00

Proyecto Multipropsito Presa Calderillas

0.750
0.660
0.560
0.485
0.420
0.365
0.320
0.276
0.240
0.207
0.180
0.151
0.130
0.110
0.098
0.085
0.075
0.065
0.058
0.050
0.041
0.036
0.030
0.027
0.023
0.020
0.018
0.016
0.013
0.011
0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.0036
0.0032
0.0028
0.0024
0.0020
0.0018
0.0016
0.0014
0.0012
0.0005

1.302
1.396
1.489
1.582
1.675
1.768
1.861
1.954
2.047
2.140
2.233
2.326
2.419
2.512
2.605
2.698
2.791
2.884
2.977
3.070
3.163
3.256
3.349
3.442
3.535
3.628
3.721
3.814
3.907
4.000
4.093
4.187
4.280
4.373
4.466
4.559
4.652
4.745
4.838
4.931
5.024
5.117
5.210
5.303
5.396
5.489
5.582

267.23
235.17
199.54
172.81
149.65
130.05
114.02
98.34
85.52
73.76
64.14
53.80
46.32
39.19
34.92
30.29
26.72
23.16
20.67
17.82
14.61
12.83
10.69
9.62
8.02
7.13
6.41
5.70
4.45
3.92
3.56
3.21
2.85
2.49
2.14
1.78
1.43
1.28
1.14
1.00
0.86
0.71
0.64
0.57
0.50
0.43
0.18

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

HIDROGRAMA DE C REC IDAS PERIODO DE RETORNO 1000 Aos


Mtodo: Soil C onservatin Service
380
360
340
320
300
280
260
240
220
Q (m 3/s)
200
180
160
140
120
100
80
60
40
20
0
0.0

1.0

2.0

3.0
Tie m po hr

4.0

5.0

6.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

0
ANLISIS DE CRECIDAS - HIDROGRAMA DE LA CUENCA
MTODO DE LA SOIL CONSERVATIN SERVICE
PERIODO DE RETORNO 10000 AOS
0
Tiempo de concentracin Tc =
Tiempo al pico Tp =
Tiempo base Tb =
Precipitacin P =
Escorrenta directa Hd =
Area de la cuenca A =
Longitud del curso principal L =
Desnivel o altura H =
Pendiente del curso i =
qp = (484 * A * h) / Tp =
Q = (484 * A * Hd) / Tp =

0.72
0.93 hr
2.48 hr
83.34 mm
54.76
37.95 Km2
7,470.86 m
1,041.00 m
13.93 %

215.95 m3/seg
465.56 m3/seg

3.281
2.156
14.659

7,626.09 pie3/seg
16,440.97 pie3/seg

Datos:
qp =
Q=
Tp =

7,626.09 pie3/seg
16,440.97 pie3/seg
0.93 Hr

Relacin
Relacin Tiempo Descarga Tiempo
T /Tp
Hrs
q /qp
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00

0.000
0.015
0.075
0.160
0.280
0.430
0.600
0.770
0.890
0.970
1.000

0.000
0.093
0.186
0.279
0.372
0.465
0.558
0.651
0.744
0.837
0.930

215.95 m3/seg
465.56 m3/seg

Descarga
m3/seg
0.00
6.98
34.92
74.49
130.36
200.19
279.33
358.48
414.35
451.59
465.56

pulgadas.
pulgadas.
millas2

M.T.C.B. Consultores Asociados S.R.L.

1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90
3.00
3.10
3.20
3.30
3.40
3.50
3.60
3.70
3.80
3.90
4.00
4.10
4.20
4.30
4.40
4.50
4.60
4.70
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
5.60
5.70
5.80
5.90
6.00

Proyecto Multipropsito Presa Calderillas

0.980
0.920
0.840
0.750
0.660
0.560
0.485
0.420
0.365
0.320
0.276
0.240
0.207
0.180
0.151
0.130
0.110
0.098
0.085
0.075
0.065
0.058
0.050
0.041
0.036
0.030
0.027
0.023
0.020
0.018
0.016
0.013
0.011
0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.0036
0.0032
0.0028
0.0024
0.0020
0.0018
0.0016
0.0014
0.0012
0.0005

1.023
1.116
1.209
1.302
1.396
1.489
1.582
1.675
1.768
1.861
1.954
2.047
2.140
2.233
2.326
2.419
2.512
2.605
2.698
2.791
2.884
2.977
3.070
3.163
3.256
3.349
3.442
3.535
3.628
3.721
3.814
3.907
4.000
4.093
4.187
4.280
4.373
4.466
4.559
4.652
4.745
4.838
4.931
5.024
5.117
5.210
5.303
5.396
5.489
5.582

456.25
428.31
391.07
349.17
307.27
260.71
225.79
195.53
169.93
148.98
128.49
111.73
96.37
83.80
70.30
60.52
51.21
45.62
39.57
34.92
30.26
27.00
23.28
19.09
16.76
13.97
12.57
10.48
9.31
8.38
7.45
5.82
5.12
4.66
4.19
3.72
3.26
2.79
2.33
1.86
1.68
1.49
1.30
1.12
0.93
0.84
0.74
0.65
0.56
0.23

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

HIDROGRAMA DE C REC IDAS PERIODO DE RETORNO 10000 Aos


Mtodo: Soil C onservatin Service

450
400
350
300
C audales
m3/seg
250
200
150
100
50
0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

Tiempo hr

4.0

4.5

5.0

5.5

6.0

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

Ventura
U.S. Soil Conservation Service:
Sherman

Tc = 0.1272*( A / i )1/2
Tc = 0.95*(L^3/H)^0.385
Tc=0,3*(L/S0,25)0,76

Kirpich
Giandotti
Burea of reclamatin

Tc = 0.0003245*( L / H )
Tc = (4*A1/2 + 1.5* L)/ 0.8*H1/2
Tc = (11,9*L3/H)0.385
Promedio

1041

1.15

2.0992
0.667955935
2.0114416366
0.665639229
0.8181076839
0.6666
0.72

0.38

24511.877
3415.521

Tp = D/2 + 0.60 * Tc Tiempo al pico


Tb = 2.67 * Tp Tiempo base
D = Periodo de lluvia neta en hr
S = ( 1000 / CN ) - 10
(3)
Diferencia potencial mxima entre P y Q en pulgadas, a la hora que comienza la tormenta
CN = Nmero de curva dado por las caractersticas del tipo de suelo que existen en la cuenca
Hd = (P - 0.2*S)2 / (P + 0.8 * S)
GRUPO
SUELO

DESCRIPCIN

CN

comprende suelos poco profundos con subhorizontes casi


impermeables con pastisales sin tratamiento con mala condicion
para la infiltracin

89

Precipitacin P = 40.68
S = 1.24
Hd = 17.99
Hd/h = 0.71

mm

1.6017

pul. Dato

mm

0.708

pul. Que viene a ser la escorrentia directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

Precipitacin P = 50.62
S = 1.24
Hd = 25.96

mm

1.993

pul. Dato

mm

1.022

pul. Que viene a ser la escorrentia directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

Precipitacin P = 54.90
S = 1.24
Hd = 29.55

mm

2.162

pul. Dato

mm

1.163

pul. Que viene a ser la escorrenta directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

Precipitacin P = 57.41
S = 1.24
Hd = 31.68

mm

2.260

pul. Dato

mm

1.247

pul. Que viene a ser la escorrenta directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

Precipitacin P = 64.84
S = 1.24
Hd = 38.13

mm

2.553

pul. Dato

mm

1.501

pul. Que viene a ser la escorrenta directa.

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

96.375824

Proyecto Multipropsito Presa Calderillas

0.42 426.70295

Precipitacin P = 69.12
S = 1.24
Hd = 41.91

0
4.46
22.28
47.54
83.20
127.77
178.28
228.79
264.45
288.22
297.13
291.19
273.36
249.59

2.2284735
13.370841
34.912752
65.368556
105.48108
153.02185
203.53391
246.61774
276.33072
292.67285
294.1585
282.27331
261.47423

mm

2.721

mm

1.650

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

222.85
196.11
166.39

236.21819
209.47651
181.24918

124.79

145.5936

95.08

109.93803

71.31

83.196344

53.48

62.397258

38.63

46.055119

29.12

33.872797

22.28

25.701728

10.70

16.490704

5.35

8.0225046

2.67

4.0112523

1.19

1.9313437

0.59

0.8913894

0.15

0.3714123
0.0742825

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

Precipitacin P = 83.34
S = 1.24
Hd = 54.76

0
4.46
22.28
47.54
83.20
127.77
178.28
228.79
264.45
288.22
297.13

2.2284735
13.370841
34.912752
65.368556
105.48108
153.02185
203.53391
246.61774
276.33072
292.67285

mm

3.281

mm

2.156

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

291.19
273.36
249.59
222.85
196.11
166.39

294.1585
282.27331
261.47423
236.21819
209.47651
181.24918

124.79

145.5936

95.08

109.93803

71.31

83.196344

53.48

62.397258

38.63

46.055119

29.12

33.872797

22.28

25.701728

10.70

16.490704

5.35

8.0225046

2.67

4.0112523

1.19

1.9313437

0.59

0.8913894

0.15

0.3714123
0.0742825

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

das, a la hora que comienza la tormenta.

a ser la escorrentia directa.

Proyecto Multipropsito Presa Calderillas

Clculo del hidrograma triangular para cada incremento de escurrimient


se asume un incremento del tiempo de 1 hora.
Tp = (D/2) + 0.60 * Tc

Datos:
Tc =
A=
H=
D=

0.72 hr
37.95 Km2
2.54 cm
1 hr

Tp =
Tb =
qp =

0.93 hr
2.48 hr
7626.09 pie3/seg

14.659
1.00

215.82

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Que viene a ser la escorrentia directa.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Que viene a ser la escorrenta directa.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Que viene a ser la escorrenta directa.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Que viene a ser la escorrenta directa.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

ar para cada incremento de escurrimiento en nuestro caso para tiempos de concentracin que ocurren dentro de las 6 hrs,

qp = (484 * A * H) / Tp

Tb = 2.67 * Tp

millas2
pulg

15.303909
0.987

0
0.93

0
215.82

2.48

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

M.T.C.B. Consultores Asociados S.R.L.

Proyecto Multipropsito Presa Calderillas

Potrebbero piacerti anche