SAUDI ARABIAN OIL COMPANY

SPECIFICATION
FOR

DISCIPLINE
ENGINEER

CONSTRUCTION OF OFFSHORE
PLATFORMS
AND PIPELINES

Date:

PROJECT
ENGINEER

Date:

CERTIFIED BY

Date:

VESSEL CONFORMANCE
REQUIREMENTS

CONSTRUCTION
AGENCY

Date:

OPERATIONS

Date:

VESSEL CONFORMANCE REQUIREMENTS

SPECIFICATION FOR

ARABIAN GULF

DWG. TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

1
of
14

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

By:
Date:

CONTROL NUMBER

EDSD
VERIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

2.0 APPLICABLE CODES, STANDARDS, AND REFERENCES

3.0 GENERAL REQUIREMENTS

4.0 TOWING REQUIREMENTS

5.0 CARGO BARGE REQUIREMENTS

6.0 BARGE OPERATIONS

7.0 WORK IN OFFSHORE OIL FIELDS

APPENDICES INDEX

DATE

APPENDIX I

Suggested Barge Towing Arrangement - Unmanned Tow

11

APPENDIX II

Emergency Anchor

12

APPENDIX III

Evaluation Record - Master & Mate

13

APPENDIX IV

Evaluation Record - Chief Engineer

14

APPENDIX V

SAUDI ARAMCO Marine Instructions

APPENDIX VI

SAUDI ARAMCO Operating Instructions & "Basic Marine


Vessel Specifications and Requirements" Document

APPENDIX VII

SAUDI ARAMCO General Instructions

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

1.0 SCOPE

REV.
NO.

JOB/EWO

DESCRIPTION

ENGG

TABLE OF CONTENTS

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)

CERT

PMT

1.0

SCOPE

ENGG

This Specification and the "Basic Marine Vessel Specifications and Requirements"
document cover the minimum requirements for vessel performance and manning
requirements in offshore operations. Requirements for tugs, barges, navigation, and
moorings are the major topics covered in this Specification and the "Basic Marine Vessel
Specifications and Requirements" document. In the event of a conflict, the most
stringent requirement shall apply.

APPLICABLE CODES, STANDARDS, AND REFERENCES


2.1

International Classification, Safety, Navigation and Oil Pollution Prevention


Regulations

2.2

Rules and Regulations for Saudi Arabian Seaports, Parts 1 through 4, June
1980, and the latest revisions are specific guidelines to be followed.

2.3

SAUDI ARAMCO Marine, Operating, and General Instructions as included or


referenced herein and other CONTRACT requirements shall be adhered to at
all times. Appendix V includes SAUDI ARAMCO Marine Instructions.
Appendix VI lists SAUDI ARAMCO Operating Instructions and Appendix VII
lists SAUDI ARAMCO General Instructions.

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

2.0

Date:

3.0

GENERAL REQUIREMENTS
3.1

The method of transportation and equipment utilization shall be subject to


review and approval by SAUDI ARAMCO. Minimum acceptable bollard pull in
metric tons shall be calculated from the vessel's brake horsepower (BHP) and
taken to be (BHP/100) X 1.1.

3.2

At least four weeks prior to load-out, a procedure for the transportation of any
item to the work site shall be submitted. This procedure shall include all
necessary drawings and calculations needed to support the proposed
procedure.

3.3

If load-out and sea fastening is performed by others, CONTRACTOR shall


check the tie-down drawings and calculations and submit his written
concurrence with the tie-down details at least four weeks prior to
transportation.

3.4

In addition to selection of tugs, all equipment and gear which should be found
on board the towing vessel(s) shall be subject to a towage survey per Section
3.6 of this Specification. A current (within past 3 months) Bollard Pull
Certificate is required.

3.5

As all aspects of towage preparation and towing may not be covered in these
recommendations, prior to towing any alternative arrangements or additional
recommendations that may be necessary shall be submitted in conjunction
with the transportation plan.

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)

A towage survey shall be performed by a recognized authority such as Noble


Denton or the Salvage-Association at each load-out from the fabrication
yard(s), and at time of mobilization of the marine vessels. Copies of towage
certificates shall be provided for vessels, tugs, barges, and other similar
spread components whether manned or unmanned.

3.7

Every marine spread working in or moving through the SAUDI ARAMCO


concession shall be supported by dedicated anchor handling tugs (AHTs).
The AHTs shall have a rated bollard pull acceptable to SAUDI ARAMCO,
current certificates provided, and be in accordance with recognized
international towage standards such as Noble Denton.

3.8

SAUDI ARAMCO's approval shall in no way relieve CONTRACTOR of his


responsibilities.

3.9

CONTRACTOR shall comply with the requirements and provisions of SAUDI


ARAMCO Operating Instruction Nos. 1.519 and 6.020 at all times during
performance of the work.

3.10

CONTRACTOR shall adhere to SAUDI ARAMCO General Instruction 7.030


requirements pertaining to crane operator and rigger qualifications.

3.11

CONTRACTOR shall move onto the work site only after all applicable
provisions of SAUDI ARAMCO Operating Instruction No. 1.519 have been
met. This obligation includes, but is not limited to, compliance with specified
notification period, approval of offshore installation and testing procedures,
Work Review and Planning Meeting with CONTRACTOR Representative
present and the issuance of the required Work Permit. CONTRACTOR is
responsible for obtaining the Work Permit. These provisions apply to each
separate work site move-in. No work shall be performed without a valid Work
Permit.

ENGG

DESCRIPTION
JOB/EWO
DATE
REV.
NO.
Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

3.12

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

By:
Date:

CONTROL NUMBER

4.0

TOWING REQUIREMENTS
4.1

General Requirements
4.1.1

The towage shall be performed by sea-going tug(s) holding a towage


certificate. SAUDI ARAMCO may inspect the tug while afloat and
under working conditions along with its equipment and machinery.

SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

CONTRACTOR shall ensure that all barges and vessels are clean and
sanitary. All barges and vessels shall be infestation free. SAUDI ARAMCO
reserves the right to perform periodic inspection of CONTRACTOR's barges
and vessels to confirm compliance with their obligation. Any deficiencies
discovered by SAUDI ARAMCO shall be corrected by CONTRACTOR within
five days of notification. If corrections are not accomplished in a timely
manner the barge or vessel may be removed from the work site at SAUDI
ARAMCO's direction until the deficiencies are corrected.

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

3.6

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)

Upon receipt of the barge dimensions, weight and the center of


gravity of the cargo, SAUDI ARAMCO will assess towage resistance
and submit recommendations for the tug's minimum brake
horsepower (BHP)/bollard pull requirements. See the "Basic Marine
Vessel Specifications and Requirements" document which accompanies Operating Instruction No. 1.519 for additional information.
Also, for additional details see Section 6.0 of this Specification.

4.1.3

The minimum towing equipment shall include a motorized work boat


to be carried by the tug to enable men and equipment to be
transferred to the barge without the tug going alongside. An
inflatable dinghy with hardboard bottom, powered by an outboard
motor may be accepted at SAUDI ARAMCO's discretion.

4.1.4

Tug(s) shall be in possession of a valid Towage Certificate as


applicable.

4.1.5

The proposed route, speed, and possible ports of refuge shall be


pre-established with the Master of the towing vessel. Navigation
warnings shall be issued at the discretion of the Master of the towing
vessel.

4.1.6

At least two seamen shall be able to demonstrate proficiency in


splicing rope, including polypropylene rope and wire.

4.1.7

Copies of all vessel related documentation shall be forwarded to


SAUDI ARAMCO with the submissions itemized in Sections 3.2 and
3.3 of this Specification.

ENGG

DESCRIPTION
JOB/EWO
DATE
REV.
NO.
Date:

PROJECT
ENGINEER

4.2

Date:

Towing Details

CERTIFIED BY

4.2.1

A recovery wire of approximately 3/4 inch (19 mm) diameter led from
a recovery winch through a snatchblock mounted on an "A" frame on
the bow and attached to the delta plate (or suitable alternate
arrangement) shall be provided. The recovery winch shall be
operated from its own power source and shall not be less than 5 tons
capacity.

4.2.2

A clear space shall be provided on the deck so that men may be


landed by winch from a helicopter to access emergency anchor
and/or towing gear.

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

4.1.2

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)

CERT

PMT

4.3

Unmanned Tows

ENGG

A floating main towing bridle retrieval line with buoy shall be attached to the
towing shackle or the delta plate on the main towing bridle. This pennant shall
be looped back to the barge and led down the port or starboard side and tied by
light lashings that will easily part when pulled on by the floating pick-up line (with
buoy). This may then be picked up by the tug crew. See Appendix I of this
Specification for additional details.

DESCRIPTION

5.0

CARGO BARGE REQUIREMENTS


Navigation Requirements
5.1.1

The combined stability of the barge with cargo shall be shown to


have a range of statical stability of at least 40.

5.1.2

Factor of safety against wind overturning shall be such that the area
under the curve of statical stability is in excess of the area under the
wind heeling curve by a factor of 1 to 4, bounded by the angle of
downflooding or the second intercept which ever is greater. As a
general rule for shamal period towages, wind speeds used shall be
60 knots. For summer tows, 5 year returns of meteorological data for
a maximum 1 minute sustained wind speed applicable to the towage
area may be considered.

5.1.3

For damage stability, the barge and cargo shall be shown to have
positive stability with any single compartment flooded and a factor of
safety against wind overturning of 1 to 4 calculated as above for 40
knots wind speed (this wind speed may be reduced depending on
season, area and length of tow).

5.1.4

Draft shall be commensurate with


lifting/launching/skidding considerations.

5.1.5

Trim shall allow for the best towage control condition (normally 12 to
24 inches (305 to 610 mm) by the stern), but also at the discretion of
CONTRACTOR's Marine Superintendent. Preferably, trim will be
obtained by disposition of cargo.

5.1.6

Items such as navigation light signals, pumps, lifesaving equipment,


and other similar items required by the 1983 Regulations for
Prevention of Collisions at Sea shall be supplied by the
CONTRACTOR.

5.1.7

Cargo barges transiting Tanajib Channel shall be accompanied by a


tail tug in addition to the tow tug.

REV.
NO.

DATE

JOB/EWO

5.1

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

stability,

load

line

or

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)


Mooring Requirements
5.2.1

In addition to the towing tug and crew, approval of moorings shall be


at the discretion of SAUDI ARAMCO.

5.2.2

A representative from CONTRACTOR and from SAUDI ARAMCO


shall be present in order to assure that contractual obligations are
met and to agree on the release of the towing tug.

5.2.3

Notation shall be made in the log of the towing tug by


CONTRACTOR and SAUDI ARAMCO that effective mooring has
been made and the tug is free to demobilize from site.

5.2.4

If mooring takes place at an offshore location, then CONTRACTOR


shall inspect barge and mooring at regular 12 hour intervals, and
more often in inclement weather. Each barge requires a dedicated
tug at all times.

5.2.5

If mooring takes place at an inshore location or pier, SAUDI


ARAMCO will make arrangements either for CONTRACTOR's
personnel or for SAUDI ARAMCO personnel to inspect barge and
mooring at regular 24 hour intervals.

5.2.6

Mooring buoys shall be supplied and maintained by CONTRACTOR


to satisfy Operating Instruction 1.519 requirements.

5.2.7

Unless otherwise agreed by SAUDI ARAMCO in rig move meetings


and installation procedures, no vessels shall soft line moor to
members on a offshore structure.

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

5.2

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

6.0

BARGE OPERATIONS
6.1

Date:

CONSTRUCTION
AGENCY

CONTRACTOR shall submit for SAUDI ARAMCO review and approval mooring
analyses to substantiate CONTRACTOR's selection of mooring system
components.

Date:

OPERATIONS

6.2

When made fast along side ships and other work or construction barges, cargo
barges shall be secured with proper and sufficient lines. Barges shall be fitted
with at least six fenders on each side.

By:
Date:

CONTROL NUMBER

Additional Requirements for Barges

SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

Heavy Lift Construction and Work Barge Requirements

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPERNS.

SAUDI ARABIAN OIL COMPANY

DISCIPLINE
ENGINEER

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)


OPERNS.

SAUDI ARABIAN OIL COMPANY

CERT

PMT

7.0

WORK IN OFFSHORE OIL FIELDS

ENGG

7.1

General Requirements

DESCRIPTION

While working in the SAUDI ARAMCO concession, CONTRACTOR shall fully


comply with all operational requirements, including those in O.I. 1.519. Part of
O.I. 1.519 requires CONTRACTOR to furnish, set and tie marker buoys to mark
locations of existing submarine cables and pipelines, and other SAUDI ARAMCO
facilities as relevant.
Anchoring Vessels in Oil Fields
7.2.1

Boats under the direction of a stationary barge or rig will be granted


permission to drop anchors only in SAUDI ARAMCO designated
anchorages.

7.2.2

CONTRACTOR shall verify daily that all marker buoys are on


location and indicate the status of all buoys in the vessel log. If a
buoy is missing, CONTRACTOR shall immediately replace it. SAUDI
ARAMCO will revoke the Work Permit if CONTRACTOR fails to
maintain buoys.

REV.
NO.

DATE

JOB/EWO

7.2

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

CONTROL NUMBER

By:
Date:
SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)

CERT

PMT

APPENDICES INDEX

ENGG

Appendices I through IV are attached to this Specification. Appendices V through VII are
part of the CONTRACT Documents. The Appendices index is as follows:

DESCRIPTION

I.

Suggested Barge Towing Arrangement - Unmanned Tow*

II.

Emergency Anchor*

III.

Evaluation Record - Master & Mate

IV.

Evaluation Record - Chief Engineer

V.

SAUDI ARAMCO Marine Instructions (**)

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER
Date:

M.I. 1185.003

Death or Injury Aboard Sea-Going Vessels

M.I. 1187.001

Collision and Damage by or to Marine Equipment or Craft

M.I. 1192.001

Operating Practices for Harbor Tugs, Offshore Vessels and


Launches Including Safety Rules

M.I. 1192.002

Operating Procedures for Barges Including Safety Rules

M.I. 1193.002

Navigation Warnings

M.I. 1193.504

Emergency Response Plan

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

By:
Date:

CONTROL NUMBER

NOTE: * - Details of these arrangements and provisions shall be included in


CONTRACTOR's Transportation Procedure to be submitted for review per
CONTRACT requirements.
** - Details of these procedures shall be included in CONTRACTOR's Installation
Procedures to be submitted for review per CONTRACT requirements.

SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

EDSD
VERIFICATION

Date:

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPERNS.

SAUDI ARABIAN OIL COMPANY

APPENDIX

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)


OPERNS.

SAUDI ARABIAN OIL COMPANY

CERT

PMT

APPENDICES INDEX (Cont.)

DESCRIPTION

ENGG

VI.

O.I. 1.501

Overall Disaster Control Procedure Safaniya/Tanajib Area

O.I. 1.503

Offshore Disaster Control Plan

O.I. 1.519

Operating Instruction Manual

---

"Basic Marine Vessel Specifications and Requirements"


Document

SAUDI ARAMCO General Instructions (**)


G.I. 2.100

Work Permit System

G.I. 6.020

Personal Flotation Devices for Work Over, On or Near Water

G.I. 7.30

Inspection and Testing Requirements of Elevating/ Lifting


Equipment

REV.
NO.

DATE

JOB/EWO

VII.

SAUDI ARAMCO Operating Instructions (**)

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER
Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY
Date:

OPERATIONS

By:
Date:

CONTROL NUMBER

NOTE: * - Details of these arrangements and provisions shall be included in


CONTRACTOR's Transportation Procedure to be submitted for review per
CONTRACT requirements.
** - Details of these procedures shall be included in CONTRACTOR's Installation
Procedures to be submitted for review per CONTRACT requirements.

SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

10

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)

REVISION CERTIFICATION

(DCC) NO.:

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

APPENDIX I. Suggested Barge Towing Arrangement - Unmanned Tow

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER

Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY

Date:

OPERATIONS

Date:

VESSEL CONFORMANCE REQUIREMENTS

SPECIFICATION FOR

ARABIAN GULF

DWG. TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

11

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

By:
Date:

CONTROL NUMBER

EDSD
VERIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)

REVISION CERTIFICATION

(DCC) NO.:

REV.
NO.

DATE

JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

OPERNS.

SAUDI ARABIAN OIL COMPANY

APPENDIX II. Emergency Anchor

DISCIPLINE
ENGINEER

Date:

PROJECT
ENGINEER

Date:

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY

Date:

OPERATIONS

Date:

VESSEL CONFORMANCE REQUIREMENTS

SPECIFICATION FOR

ARABIAN GULF

DWG. TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

12

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

By:
Date:

CONTROL NUMBER

EDSD
VERIFICATION

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)


OPERNS.

SAUDI ARABIAN OIL COMPANY

PMT

SAUDI ARAMCO Marine Department

DESCRIPTION

ENGG

CERT

Evaluation Record - Master & Mate

Name

Nationality
Seaman's Book

:
:

Rank
Date of Birth
Passport No.

:
:M
:

Certificate
Limitations
Issuing Country
Radio Telephone

:
:
:
:

Certificate No.
Date of Issue
Date of Renewal
GMDSS

:
:
:
:

Vessel
Date Joined
Last Vessel

:
:
:

Type of Vessel

Date Left

/D

/Y

REV.
NO.

DATE

JOB/EWO

Oil Field Experience (Min. 2 years):

DISCIPLINE
ENGINEER

Oil Field/Gas Procedures

Boat Handling

Set & Drift Calculations

Tides & Clearances

Safety Equipment

Radar

Knowledge of Vessel

Compass Error

Navigational Chart Work

Communication Skills

SCBA

Date:

Please use P = Pass F = Fail N/C = Not Checked

PROJECT
ENGINEER

TOWING/4 PT MOORING

CERTIFIED BY

Date:

CONSTRUCTION
AGENCY

OTHER VESSELS 120 FT OR


2400 BHP

ANCHOR HANDLING/

SUITABLE FOR:

Date:

GREATER OR EQUAL

LESS

Master

15

25

35

Mate

65

75

85

REMARKS:

Date:

OPERATIONS

BADGE#:

PLACE:

DATE:
Accepted

Rejected

By:
Date:

CONTROL NUMBER

SIGNED:

Overall Evaluation

APPENDIX III. Evaluation Record - Master & Mate

SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

Rules of the Road

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

13

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)


OPERNS.

SAUDI ARABIAN OIL COMPANY

PMT

SAUDI ARAMCO Marine Department

ENGG

CERT

Evaluation Record - Chief Engineer

Name

Nationality
Seaman's Book

:
:

Rank
Date of Birth
Passport No.

:
:M
:

Certificate
Limitations
Issuing Country

:
:
:

Certificate No.
Date of Issue
Date of Renewal

:
:
:

Type of Vessel

Date Left

/D

/Y

DESCRIPTION

Other Certificates/Courses Attended :


Vessel
Date Joined
Last Vessel

:
:
:

REV.
NO.

DATE

JOB/EWO

Oil Field Experience (Min. 2 years):

DISCIPLINE
ENGINEER

Knowledge of Machinery

Knowledge of Auxiliary Machinery & Systems

Data Recording

Machinery Space/Maintenance

Safety Equipment, Operation & Maintenance


Please use P = Pass F = Fail N/C = Not Checked

Date:

PROJECT
ENGINEER

SUITABLE FOR:
Chief Engineer

Date:

CERTIFIED BY

ANCHOR
HANDLING/TOWING/
4 PT. MOORING

GREATER OR EQUAL

LESS

96

97

98

OTHER VESSELS 120 FT OR 2400 BHP

REMARKS:

Date:

CONSTRUCTION
AGENCY
Date:

SIGNED:

BADGE#:

PLACE:

DATE:

OPERATIONS

Overall Evaluation

Rejected

By:
Date:

CONTROL NUMBER

Accepted

APPENDIX IV. Evaluation Record - Chief Engineer

SPECIFICATION FOR
(DCC) NO.:

REVISION CERTIFICATION

EDSD
VERIFICATION

Date:

THIS INDICATES THAT REV. NO.


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE

DWG. TYPE PLANT NO. INDEX

VESSEL CONFORMANCE REQUIREMENTS

ARABIAN GULF

DOC

SAUDI ARABIA

*
JOB# *

DRAWING NO.

DE-119959

SHT. NO. REV. NO.

14

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

lcp\DE-119959 Vessel
Conformance

Saudi Aramco 2616-ENG. (03/99)