Sei sulla pagina 1di 4

MOHAMED KAMAL

Mobile 1: 00919567783559(INDIA).

E-mail: abdulkamalmohamed@gmail.com
ae.linkedin.com/in/abdulkamalmohamed/
TECHNICALSUMMARY

OBJECTIVE
Pursuing for a challenging position in the field of Telecom; that
encourages prolonged learning and creativity; which provides exposure
to new ideas that stimulates professional, personal and institutions
growth.

WORK EXPERIENCE
 Company: ACES-CO, Saudi Arabia, Riyadh.
Role: Sr. IBS RF Consultant(Acting Optimization Manager).
Period: April 2015 Present
Reporting to: Project Manager.
- Advisor in delivering IBS DAS Design scenarios for special or
high priority sites as initial recommendation to customer for
approval.
- Daily coordination with customer and ACES management for
special design and optimization requirements.
- Focal Point for STC O&M project From all regions, Receiving
escalated concerns from STC and directing team for solving
the customer raised issues.
- Communicating project progress with customer for achieving
the good percentage in POs.
- Coordinating with customer to collect POs and reporting the
result to ACES management.
- Forecasting plans for improvement and coordination with
team; evaluating the progress and reporting to management.
- Advisor for Design, optimization and O&M concerns of ACES
under STC O&M projects.
- Handling IBS Optimization of Riyadh STC IBS sites(Around
200 Handed over sites) and also handling optimization of IBS
sites in all region of Saudi Arabia Under ACES Managed
solutions (Around 450 IBS sites).
- Lead for optimization activities in high priority/ high traffic
sites like Clock tower in Makkah for managing the traffic
introduced issues during the seasonal time.
- Proficient in optimization of active sites of leading vendors.
 Company: LCC Middle East, UAE, Dubai.
Role: Sr. IBS DAS Design Engineer.
Period: June 2014 March 2015.
Reporting to: Project Manager.
- Designs focal point of the company and handling
preliminary screening or verification of subcontractors/
suppliers design submissions.
- Design submission to Vendor/ Customer/ Operator after the
verification and close coordination for the final Approval.

More than 9 years of experience in


telecom sector and executed project
leading for indoor and outdooractivities.
iBwave Level-2 Equivalent designer, worked
for Qatar Telecoms(Q-Tel/ ooredoo),Zain
Kuwait and du Dubai projects.

Proficient in In-Building DASactive,


Passive & Hybrid Solutions; Small cell,
Femtos etc. and worked for GSM, DCS,
UMTS, LTE and TETRA technologies.
Expert in IBS DAS Design, implementation,
optimization and validation activities at a
level of project coordination and customer
management lead.

Proficient with Huawei,


Commscope/Andrew/TE, Power wave,
Rosenberger, Axell, Motorola, NSN
vendor equipments and Implemented for
2G, 3G and LTE; in deferent outdoor
and indoor scenarios.
Good knowledge in Andrews and
AxellsMaster Units, Remote unitsand
Repeaters and its commissioning.
Expert in Walk test, Drive test, Continuous
Wave test etc. using Nemo tools, Tems and
manipulation of the output with optimization
tools like Tems descovery, Nemo Analyze,
actix, mapinfo etc.

Expert in many latest and advanced


Telecom Tools, components and Optical
Splicing tools etc.

PROFICIENCY IN TELECOM TOOLS/FIELD


ASSOCIATED SOFTWARE
IBS DAS Design:iBwave, AutoCAD, Visio,

consultix band selective CW tester.


IBS DAS Optimization: Nemo Outdoor,Nemo

Handy, Nemo Analyze, TEMS, Actix.


Out Door Planning tool:Atoll, Mcom.
Outdoor Optimization Tool:Mcom, Tems,

Nemo, Genex probe, MapInfo, Actix.


Fiber:Fujikura FSM-60s optical
fibersplicing machine, Power meters etc.
Optical

Page 1 of4

Preparing Designs for complex venues and conducting


coverage assessment and proposal of special solutions in
issue sites on customer requests.
Coordinating activities with operator on prioritized tasks.
Coordination among Internal -SAQ (Site acquisition),
Implementation and Optimization/ Validation teams for
achieving the targets.
Conducting meetings with BM(Building Management)for
delivering IBS DAS procedures and goals on internal SAQ
request.
Assigning/ Distributing acquired works to suppliers and
coordinate to achieve the targets.
Maintain the Design tracker sheets and updating the
management with completion of works.
Preparing the Design PO Requests for completed sites and
following up for further processing wih vendor and/or PM.

 Company: Smart Village, Kuwait.


Role: IBS Project Coordinator; iBwave & IBS Designer,
implementation manager and NPO; Outdoor
networkrollout/modernization Projects Coordinator.
Period: January 2013January 2014
Reporting to: CEO/ Head of Departments.

DUTIES:
INDOOR:
-

IBS Design and Implementation


- Analyze RFPs (request for proposals), study the scope
Risk factors and report to management.
- End to end delivery of committed projects and managing
customers and clients.
- Delivering SOPs (System operation procedures)
According to customer and client requirements.
- Responsible to deliver small to high level IBS project
design and delivery.
- Conducting Initial Site Survey for IBS.
- Coordination among Operator, Building management and
smart village management.
- Design system, preparing link-budget and BOQ using
iBwave& generating predictions.
- Implementation, testing, analyzing and optimization of
IBS sites.
- Conducting the final acceptance test of sites with the
customer.
- Complete Responsibility of Quality Assurance And Safety.
- Day to day reporting to both company& customer.

IBS Using Axell repeater for Zain.


- Feeding selected channels from outdoor cells to IBS sites
- IBS design and Implementation.
- Walk test and providing plots to the customer.
- Conducting final Acceptance Test.

Installing Wifi Bridge among buildings.


- Establishing wifi bridge connectivity among buildings
using Air live equipment.

PROJECTS HANDLED
- Worked as project coordinator and
Quality control Engineer for Q-Tels
Qatar wide TETRA coverage
project in Qatar foundation.
Especially in Qatar National
Convention Center (QNCC) and
Qatar Science and Technology Park
(QSTP).
- Worked as project coordinator,
implementation
manager
and
quality control engineer for Q-Tels
Airport wide wireless coverage
project
in
New
Doha
International Airport (NDIA) for
coverage of GSM, DCS, UMTS and
TETRA.
- Leaded
Rollout,
Swap
and
modernization
other
turnkey
projects for more than 150 Outdoor
sites
for
LTE
and
other
technologies using Huawei vendor
equipments in Kuwait .
- Worked as team leader for Nokia
Siemens microwave swap project.

TECHNICAL CERTIFICATIONS AND


TRAININGS UNDERGONE
* Course Name: Masters Diploma in
Radio Network Planning.
Industry:Nex G Skills, ISO 9001:2008
certified company Registered to Govt.
of India, NOIDA, INDIA.
Duration: 7th Apr-2014 to 6th Jul-2014.
Subject: Industry orientedtheoretical
and practical training in RF Planning
&Optimization for 2G, 3G, and LTE
technologies. Completed hands on
training in Planning tools: Atoll,
Mcom; Drive test and Optimization
tools: Tems, Genex probe, Mapinfo,
Mcom and Actix,according to different
standards and requirements of
operators. Preparation of Reports as
per operator standards, proposal for
improvement in coverage for existing
towers and analyzing the log file
performed
before
and
after
optimization Etc.
Page 2 of4

OUTDOOR:

Lead for Kuwait Zain 3G Modernization Project.


- Swapping Motorola 3G Horizon/ Huawei 3812 cabinet
with Huawei 3900L cabinet.
- Upgrading the hardware configuration according to
customer requirements.
- Onsite commissioning and maintaining KPIs.
Lead for Kuwait Wataniya (Ooredoo) SRAN Swap
Project.
- Removing complete radio equipments from shelter and
equipping with Huawei DBS-3900, RRUs 3929 and 3829
and Hybrid-cable (Feeder less solution).
- Commissioning of BBU 3900.
- Proficient with CME, web LMT configuration and M2000
monitoring.
- Installing high gain antennas, etc.
- Maintaining/ improving the KPIs after installation.
Conducting Rollout activity for LTE technology in VIVA
and Zain sites.
- Removing old cabinets andequipping with Huaweis BTS3900L Cabinets for LTE.
- Installing high gain antennas, etc.
Conducting 2G reforming activity for VIVA
- Installing Huaweis 3900L cabinet for 900 and 1800MHz
frequencies.
- Installing Huaweis BTS 3012, 3812 for 3G in Zain Sites.
EQUIPMENTS USED FOR IBS IMPLEMENTATION:

1. Huaweis 3012, 3812 BTS, and 3900 BBUs.


2. Axell Wireless Digital repeater
3. AirMax5N for Wifi Bridge.
 Company:Nokia Solutions and Networks, Qatar.
Role:Project Coordinator, IBS TETRA, GSM, DCS, UMTS Designer
Using iBwave& IBS TETRA, GSM, DCS, UMTS NPO.
Period: January 2012 August 2012
Reporting to: Sr. Designs Manager.

DUTIES:
-

Conducting Initial Site Survey.


Designing IBS projects using iBwave tool/AutoCAD+Visio
according to the customer requirements and generating
the predictions.
Preparing link Budget for the design and submitting the
report to the customer.
Managing
the
different
subcontractors
during
implementation phase.
Checking the Quality of work for site acceptance.
Conducting walk test, analyzing the results and make
necessary changes in implementation after discussing
with planning & optimization team for better/suggested
improvement in coverage. Prepare the plots for customer
acceptance using Nemo outdoor/ Handy and Nemo
Analyze.
Submit Generated plots for customer requested
parameters and get the approval.
Expert in handling coverage & quality related issues in the
network.

*Course Name: CCNA Preparatory


Training.
Industry:CMS Info systems, Calicut,
India.
Duration:March 2014(One month)
Subject: Computer networking, CISCO
Switch and Router Configuration.
* Course Name: 3G Modernization
Swap Project (For Zain Telecom)
Industry: Huawei Technologies,
Kuwait (Sep-2014).
Subject: In-depth training in 3G
technology, Huawei system
architecture, commissioning.
Implementation of New 3G 3900L
cabinet By Swapping old system.
Duration: Two weeks.
*Course Name: SRAN Swap Project
(For Wataniya Telecom)
Industry: Huawei Technologies,
Kuwait(Mar- 2013).
Subject: Implementation of SRAN
feeder less solution Using DBS3900,
hybrid cable and RRUs.
Duration: Two weeks.
* Course Name: Wireless
Communication Technologies (Mar2010)
Industry: Pulsetone Industries
(Government of India Associated)
Subject: Industry oriented advanced
training in telecom tools,
implementation techniques and
technological developments.
Duration: Two Months.
*Course Name: Safety Training
Industry: New Doha International
Airport (NDIA) and Bechtel
Corporation.
Subject: Work safe, Lock-OUT and
Tag-OUT(LOTO) and Working at
Height.
Duration: One week.
OTHER SOFTWARE AND HARDWARE SKILLS
- MS office, Photoshop, OS installation,
Computer
hardware
assembling,
troubleshooting& networking etc.
Page 3 of4

Conducting the final acceptance test of sites with the


customer.
Complete Responsibility of Quality Assurance.
Day to day reporting to both company & customer

 Company: Zajel Telecommunication Co.


Position: Project Engineer
Period: June 2011August 2012
Reporting to: Sr. Project Manager.
DUTIES:
- IBS Project: Team leader for In-building solution for Q-Tel's
cellular network.
- Monitoring & controlling of IBS site Implementation.
- Co-ordination with the NSN quality team for quality check
of the implemented site.
- Feasibility Survey for IBS sites.
- Coordinating with building administration and other
contractors.
- Prepare the Bill of materials (BOM) of IBS Sites.
- Solving Implementation challenges.
- VSWR measurement and checking DTFand troubleshooting.
- Preparing as built document for DAS.
- Optical fiber testing using optical power meter TM-103
LOS Project: Team leader
- Conducted L.O.S survey for microwave swap project for NSN
Qatar.
- Verifying the Antenna height, Orientation, Tilt according to
the planning database
- In case of LOS not clear; close coordination with Planning
team and check feasible possibilities.
- LOS report Generation and submission.
 Company: Al-Noor Technologies.
Position: Telecom Engineer
Period: July 2006Feb 2011,
Reporting to: Project Coordinator.
DUTIES:
- Conducting site survey and L.O.S survey of microwave
antennae towers.
- Installation and commissioning of microwave Antennae.
- Installation and commissioning of CDMA/GSM antennae.
- In-building solution Installation.
- VSWR measurement and troubleshooting.
- Installation and Commissioning of battery and power system
for transceiver station
- Computer networking, etc.

DECLARATION

EDUCATIONAL QUALIFICATION
 MBA
(Master
Of
Business
administration) In Project Management
(2013-2015-Doing)
From Bharatiar
University (Tamil Nadu, India).
 PGDTTM (Post Graduate Diploma)
in
Telecom
technology
and
Management(2014-2015-Doing) from
Hyderabad University(Telangana, India)
In association with BSNL(Bharat Sanchar
Nigam Limited- Indias Biggest telecom
provider in Public Sector).
 B. Tech (Bachelor's Degree in
Technology)
in
Electronics
and
Communication Engineering (20042008) from University of Calicut(Kerala,
India)with 70.9% aggregate.
PERSONAL PROFILE
Date of birth
Sex

: February 8th 1987


: Male

Marital status

: Married

Languages

: English, Malayalam,
Hindi(S, R, W);
Arabic(R,W).

Nationality

: Indian

Driving license : Qatar and India.


PASS PORT DETAILS
Number
: Z2803021
Date of Issue
: 20/01/2014
Date of Expiry : 19/01/2018
Current Position:
Sr. IBS RF Consultant.
Expected Salary:
As per Industry Standard and norms.
Expected Date of Join:
ASAP.

I hereby declare that the above written particulars are true to the best of my knowledge and belief.

Date:

(Mohamed Kamal C.P.)

Page 4 of4

Potrebbero piacerti anche