Check the hardware is the first stage of the commissioning process that was done by ensuring
each sensor, switches and buttons are connected to a particular input and each actuator to output.
Make sure that when the process of commissioning the process address and cables should not be
mixed. In addition to the sensors and actuators must be in the proper automated system.
Before starting the commissioning process make sure the output is set in the test mode while the
actuator must function properly and if there are changes, the documentation (register allocation,
pictures, etc.) must also be updated so that the commissioning process can run well.
The next stage is to make sure to check the hardware input device, for example switch should be
on the contacts open and closed conditions and the corresponding LED on the module inputs are
observed. If there is a failure the LED is not lit check back improper cable connections to the
input module, the input device is not supported properly or input module LED or damaged, make
sure the push button has been installed so that each output can be tested.
Conclusion
In order to believe that the design of control systems in industrial automation is completely safe
to be operated, then the required inspection and testing or called Testing and Commissioning.
This process is a series of inspection activities and testing of control systems that have been
completed and going to be operated. With the results of inspection and testing is good, it is
believed that the design of safety systems at the time of operation. The above procedure should
be run with the discipline to produce a control system that has high performance.