Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
End User
Procedures
The header level defines the usage and status of the BOM record.
Activity
1. Follow the SAP menu as shown, or type the transaction code CS01 in the command field.
Page 1 of 5
Business Process
End User
Procedures
Plant: Plant in which this BOM is used, enter plant number (Plant 3000 is the default
plant for SPX PE Rochester Operation). Production BOMs are plant-specific.
**** Use pull down menu for other plants ****
BOM Usage: The area in which this BOM is to be used (Production, Cost, Engineering,
etc.) Enter BOM usage category. Typical value is 3 Universal.
**** Use pull down menu for other BOM usage categories ****
Alternative BOM: When you create a BOM, the system creates the first alternative.
If you want to create more BOMs for the same material (multiple BOM), you have two
options for assigning the alternative:
If you do not enter a number, the system determines the next unused alternative.
This value is displayed in the message line and set as a default.
If you enter a number an alternative. The system checks whether this already
exists.
Page 2 of 5
Business Process
End User
Procedures
Change Number: Enter Change Number if required. If required continue to enter data in
the fields within this section.
Valid From: Date from which change is effective. The system will use the current date as
the default date. Overridden by Change number date if ECM (Engineering Change
Management) is active.
ECM: Data record that contains all the information required for managing a change.
Revision Level: The link between a material with the change and a specific change
number. The system determines the valid-from date from the change master record.
No entry required
Result: The Create material BOM: General Item Overview screen displays.
Page 3 of 5
Business Process
End User
Procedures
4. On screen Create Material BOM: General Item Overview, enter information in the fields for each
material as specified below:
Item: Item number for the component. Automatically assigned by system. Renumber if
necessary to new sequence and / or insert new items number.
**** Use system generated as much as possible ****
Ict: Select appropriate code from pull down list. L Stock Item is the typical entry.
Quantity: Enter the quantity for the component that is required to make the material
being structured.
Un: Unit of measure defaults from material master. Enter if different from the defaulted
UOM.
Key the Enter key to move to the next item to be entered. Continue this procedure to
enter all materials required.
Note: Additional information may be entered/viewed regarding each line item by selecting the
line item of each component by clicking on the box in the far left column, and click the ITEM button,
. However, no additional data entry is required at this time.
5. To enter information to the BOM header-level data, bring up the BOM header or key the Header
key as show below:
Page 4 of 5
Business Process
End User
Procedures
Information to the header-level data such as Base Quantity, BOM status or BOM and Alternate Text may
be performed here as desired to complete the BOM entry.
Page 5 of 5