BILL OF MATERIALS
COMPUTATION SHEET
Item To Be
Estimated
Footings For
Rectangular
Column
Calculations
Cement
(bags)
F-1
Side Footing for Square Column
Conc. volume per footing =
2.916 m
0.2916 m3
3.2076 m3
1.828 m3
0.183 m3
2.0109 m3
Sand
(
Gravel
)
m3
Rectangular
Columns
C1
Square Column from Foundation to Roof Slab
Conc. volume per column =
19.332m3
0.9666 m3
20.2986 m3
C2
Square Column from Foundation to Roof Slab
Conc. volume per column =
14.5437 m3
0.72718 m3
3
15.2709 m
Reinforced
Concrete
Beams
FTB
Footing Tie Beam
Total Length of FTB =
78.825 m
0.3547 m3
3.9018 m3
0.9880 m3
10.8677 m3
10.8677 7.00=76.074
; say
; say
3B1
Third Floor Concrete Beam
Total Length of 3B1 = 109.775 m
Conc. volume of beams =
10.8677 m
10.8677 7.00=76.074
; say
; say
4B1
Fourth Floor Concrete Beam
Total Length of 4B1 = 109.775 m
Conc. volume of beams =
0.9880 m
10.8677 m3
10.8677 7.00=76.074
; say
; say
10.8677 m3
10.8677 7.00=76.074
; say
109.775 m
0.6587 m
7.2452m
Concrete
Slab
Slab on Ground
Area of conc. Slab on Ground = 8.2 14.20=116.44 m
Less : Column and Wall Area =
17.473 m2
98.6975 m2
98.6975 0.10=9.8698 m
0.98698 m
9.50
; say
S1
Second Floor Two-way Slab
Area of conc. Slab = 8.2 14.20=116.44 m
Less : Column, Wall and Stairwell Area =
Total Area of Concrete Slab =
Conc. volume of slab =
32.933 m2
83.5075 m
83.5075 0.15=12.526125 m
1.2526 m3
11.50
9.50
2
32.933 m
83.5075 m2
83.5075 0.15=12.526125 m3
1.2526 m3
32.933 m2
83.5075 m
83.5075 0.15=12.526125 m
1.2526 m3
32.933 m
83.5075 m2
83.5075 0.15=12.526125 m3
1.2526 m3
32.933 m2
132.3075
132.3075 0.10=13.23075m
1.323075 m3
3
Stair
Stair Details
23 Steps with Landing
Rise =
188 mm
Landing
Run =
300 mm
Width =
Width =
1000 mm
Thickness of Stairs =
Length =
150 mm
2110mm
20 00 mm
Thickness =
1 00 mm
2.11 m 3
0.10 m3
2.21 m3
2.50
517
39.50
74.00
BILL OF MATERIALS
COMPUTATION SHEET
Item to be
Estimated
Reinforced
Footing Bars
For
Rectangular
Column
Calculations
Materials And
Estimated Quantities
Required
10mm
steel bar
F-1
Side Footing Bars for Square Column
Length of footing bar S =
0.9 m
Plus:
Mild Steel Hook Allowance =
9 0.016=0.144 m
2 0.144=0.288 m
0.90+0.288=1.188 m
0.9 m
12 7.128=85.536 m
12mm
steel bar
16mm
steel bar
9 0.016=0.144 m
2 0.144=0.288 m
0.90+0.288=1.188 m
85.536+85.536=171.072
No. of Bars required:
171.072
=28.512
6
; say
F-2
Center Footing Bars for Square Column
Length of footing bar S =
0.75 m
Plus:
Mild Steel Hook Allowance =
9 0.016=0.144 m
2 0.144=0.288 m
0.75+0.288=1.038 m
5 1.038=5.19 m
13 5.19=62.28 m
0.75 m
48 pcs
9 0.016=0.144 m
2 0.144=0.288 m
0.75+0.288=1.038 m
5 1.038=5.19 m
13 5.19=62.28 m
62.28+62.28=124.56 m
No. of Bars required:
124.56
=20.760
6
; say
Reinforced
Bars for
Rectangular
Column
C1
Square Column from Second Floor to Roof Slab
Length of vertical bar =
17.90 m
Plus:
5 0.016=0.08 m
0.08 m
17.90+0.08=17.98 m
8 17.98=143.84 m
No. of Square Column = 12 sets
Length of vertical bar for 12 columns =
12 143.84=1726.08m
89 pcs
1726.08
=287.680
6
; say
C2
Square Column from Second Floor to Roof Slab
Length of vertical bar =
17.90 m
Plus:
5 0.016=0.08 m
0.08 m
17.90+0.08=17.98 m
8 17.98=143.84 m
No. of Square Column = 13 sets
Length of vertical bar for 13 columns =
13 143.84=1869.92m
51 pcs
1869.92
=311.653
6
; say
Column Ties / Lateral Ties
All Column Ties per set should be spaced, 4 @ 0.05 m; 4 @ 0.10 m;
Rest @ 0.20 m O.C.
Plus:
Mild Steel Hook Allowance =
Allowance per column tie =
9 0.010=0.09 m
2 0.09=0.18 m
1.20+0.18=1.38 m
For C1
Square Column from Foundation to Second Floor Beam
No. of column tie per column = 1074 pieces
Total Length of column ties per column =
1074 1.38=1482.12m
13 pcs
12 1482.12=17785.44 m
17785.44
=2964.240
6
; say
For C1
Square Column from Foundation to Second Floor Beam
No. of column tie per column = 1164 pieces
Total Length of column ties per column =
1164 1.18=1372.93 m
No. of Square Column = 13 sets
Total Length of Column Ties =
12 1372.93=17848.09 m
17848.09
=2974.682
6
98 pcs
; say
106 pcs
Reinforced
Bars for
Concrete
Beam
FTB
Footing Tie Beam
Total Length of FTB =
78.825 m
4 78.825=315.30 m
Plus:
5 0.012=0.06 m
315.30 2 4 0.06=19.2m
649.8 m
41 pcs.
649.80
=108.30
6
; say
2B1
Second Floor Concrete Beam
Total Length of 2B1 =
109.78 m
8 109.78=878.2 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 2 8 0.08=51.20 m
929.40 m
54.888 m
2 54.888=109.78 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 2 4 0.08=25.60 m
135.375 m
54.888 m
2 54.888=109.78 m
73 pcs
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 4 0.08=12.80 m
122.575 m
1187.35 m
1187.35
=197.892
6
; say
3B1
Third Floor Concrete Beam
Total Length of 3B1 =
109.78 m
8 109.78=878.2 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 2 8 0.08=51.20 m
929.40 m
54.888 m
2 54.888=109.78 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
42 pcs
40 2 4 0.08=25.60 m
135.375 m
54.888 m
2 54.888=109.78 m
Plus:
5 0.016=0.08 m
40 4 0.08=12.80 m
122.575 m
1187.35 m
1187.35
=197.892
6
; say
4B1
Fourth Floor Concrete Beam
Total Length of 4B1 =
109.78 m
8 109.78=878.2 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 2 8 0.08=51.20 m
929.40 m
54.888 m
2 54.888=109.78 m
10 pcs
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 2 4 0.08=25.60 m
135.375 m
54.888 m
2 54.888=109.78 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 4 0.08=12.80 m
122.575 m
1187.35 m
1187.35
=197.892
6
; say
5B1
Fifth Floor Concrete Beam
Total Length of 5B1 =
49 pcs
109.78 m
8 109.78=878.2 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 2 8 0.08=51.20 m
929.40 m
54.888 m
2 54.888=109.78 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 2 4 0.08=25.60 m
135.375 m
54.888 m
2 54.888=109.78 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 4 0.08=12.80 m
122.575 m
1187.35 m
1187.35
=197.892
6
; say
UDB1
Roof Beam
Total Length of UDB1 =
109.78 m
8 109.78=878.2 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 2 8 0.08=51.20 m
929.40 m
54.888 m
32 pcs
2 54.888=109.78 m
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
82 pcs
40 2 4 0.08=25.60 m
135.375 m
54.888 m
2 54.888=109.78 m
69 pcs
Plus:
Mild Steel Bend Allowance =
5 0.016=0.08 m
40 4 0.08=12.80 m
122.575 m
1187.35 m
53 pcs
1187.35
=197.892
6
; say
Stirrups / Beam Ties
All Stirrups per set should be spaced, 1 @ 0.05 m; 8 @ 0.10 m; Rest
@ 0.20 m O.C.
Length of stirrups =
0.20+0.40+ 0.20+0.40=1.20 m
14 pcs
Plus:
Mild Steel Hook Allowance =
Allowance per column tie =
9 0.010=0.09 m
2 0.09=0.18 m
1.20+0.18=1.38 m
Length of stirrups =
Plus:
9 0.010=0.09 m
2 0.09=0.18 m
0.90+0.18=1.08 m
411 1.08=443.475m
44 pcs
443.475
=73.9125
6
; say
For 2B1
Second Floor Concrete Beam
No. of stirrups = 575 pieces
Total Length of Stirrups =575 1.38=792.6375 m
No. of Bars required:
792.6375
=132.1063
6
; say
For 3B1
Third Floor Concrete Beam
No. of stirrups = 575 pieces
Total Length of Stirrups =575 1.38=792.6375 m
No. of Bars required:
792.6375
=132.1063
6
; say
For 4B1
Fourth Floor Concrete Beam
No. of stirrups = 575 pieces
792.6375
=132.1063
6
; say
For 5B1
Fifth Floor Concrete Beam
No. of stirrups = 575 pieces
Total Length of Stirrups =575 1.38=792.6375 m
No. of Bars required:
792.6375
=132.1063
6
; say
For UDB1
Roof Beam
No. of stirrups = 575 pieces
Total Length of Stirrups =
575 1.18=677.7625m
677.7625
=112.9604
6
; say
Reinforced
Bars for
Concrete Slab
Slab on Ground
Area of conc. Slab on Ground = 8.20 14 .20=116.44 m
Less : Column and Wall Area =
17.743 m2
135 pcs
S1
Second Floor Two-way Slab
Area of conc. slab =
8.20 14 .20=116.44 m2
2
83.508 m
317 pcs
Under 6 m steel bar at 0.10 m spacing distance:
8.20 14 .20=116.44 m
83.508 m
8.20 14 .20=116.44 m
83.508 m2
8.20 14 .20=116.44 m2
2
83.508 m
175 pcs
S5
One-way Roof Slab
Area of conc. roof slab =
10.20 16.20=103.23 m2
17.743 m2
2
147.50 m
Reinforced
Bars on CHB
Wall Footing
44.80 m
28 pcs.
134.40+ 89.6 0
=37.3333
6
; say
Interior Wall Footing
Total Length of Interior Wall Footing =
47.60 m
9 pcs.
142.80+ 95.20
=39.6667
6
; say
Reinforced
Bars on CHB
Wall
44.80 4.7=210.56 m
21.96 m2
183.98 m
391.8774 +295.557
=131.2391
6
; say
89 pcs.
39.9 0 2.7=107.73 m2
21.34 m
86.39 m
184.0107+ 185.7385
=61.62487
6
86 pcs.
; say
44.80 2 .7=120.96 m
24.94 m
96.02 m2
35 pcs.
204.5226+ 206.4430
=68.4943
6
; say
Exterior Wall from Fourth Floor to Fifth Floor
Area of Wall =
Less: Window =
38.30 2 .7=103.41 m2
15.34 m2
88.07 m2
187 .5891+189.3505
=62.8233
6
; say
Exterior Wall from Fifth Floor to Roof Beam
Area of Wall =
Less: Window =
44.80 2 .7=120.96 m
18.04 m
102.92m2
90 pcs.
219.2196+ 221.2780
=73.4163
6
; say
10.49 4.75=49.83 m2
0.60 2.10=1.26 m2
48.57 m
103.45+104.42
=34.64
6
; say
Interior Wall on Second Floor
Area of Wall =
Less: Door:
32.59 4.12=134.27 m2
3(0.80 2.10)=5.04 m2
2(0.60 2.10)=2.52 m 2
126.71m2
269.89+ 272.43
=90.39
6
; say
TOTALS
964
358
421
BILL OF MATERIALS
COMPUTATION SHEET
Materials And Estimated Quantities
Required
Item to be
Estimated
CHB for
Exterior Wall
Calculations
CHB
150 mm
33.12 4.50=149.04 m2
1.40 2.10=2.94 m2
0.80 2.10=1.68 m2
Window:
1565
CHB
100 mm
Cement
(Bags)
Sand
(
Gravel
(
m3
m3
125.18 m2
33.28 4.12=137.11 m
Area of Wall =
1507
120.49 m
CHB for
Interior Wall
10.49 4.75=49.83 m
0.60 2.10=1.26 m
48.57 m2
607
Less: Door:
32.59 4.12=134.27 m
1584
3(0.80 2.10)=5.04 m 2
2(0.60 2.10)=2.52 m 2
126.71m
Materials for
CHB Wall
Footing
33.12 m
0.40 m
31
2.50
4.50
10.49 m
10
1.00
1.50
0.13 m
Materials for
Cement
Mortar
Exterior Wall
Total Area =
125.18+120.49=245.67 m2
375
21.00
48.57+126.71=175.28 m2
92
8.00
Materials for
Cement
Mortar
Plastering
Exterior Wall
Total Area =
118.56+1 20.49=239.05
69
4.00
39.13+126.71=165.84 m2
32
3.00
3072
2191
609
39.50
6.00
BILL OF MATERIALS
COMPUTATION SHEET
Item To Be
Estimated
Forms for
Rectangular
Column
Calculations
1.38 9.15=12.63 m2
12.627 12=151.524 m2
No. of Plywood required:
53
12mm THK
Plywood
2 by 2
Lumber
2 by 3
Lumber
151.524
=52.61
2.88
1573
; say
Under Column using 6mm thick plywood on 2 by
2 wood frame:
53 29.67=1572.51 ; say
Forms for
Beam and
Girder
P=
2 ( a+b ) +0.10
P=
2 ( 0.40+0.20 ) +0.10
P=
1.30
136.28 m
1.30 136.38=177.29 m2
62
No. of Plywood required:
177.29
=61.56
2.88
1554
; say
Under Beam using 6 mm thick plywood on 2 by 2
wood frame:
62 25.06=1553.72 ; say
Forms for
Concrete
Slab
72.63 m2
72.63
=25.22
2.88
; say
Forms for
26
Roof Slab
88.53 m2
88.53
=30.73
2.88
31
; say
Forms for
Stair
Length of Stair =
9.90 m
Width of Stair =
1.00 m
9.90 1.00=9.90 m
Area of Rise =
0.20 1.00=0.20 m2
23 0.20=4.60 m2
14.50 m
14.50
=5.03
2.88
; say
Forms for
Doors and
Windows
Length of Doors =
6.40 m
Length of Windows =
Total Length =
23.12 m
29.52 m
29.52 0.20=5.90 m 2
No. of Plywood required:
2
5.90
=2.05
2.88
; say
Scaffolding
for Column
Length of Column =
9.15 m
9.15 12=109.80 m
769
2306
Scaffolding
for Beam
and Girder
136.28 m
818
641
Scaffolding
for Concrete
Slab
72.63 m
Scaffolding
for Roof
Slab
102.80 m2
661
936
TOTALS
64
7359
3184
BILL OF MATERIALS
COMPUTATION SHEET
Item To Be
Estimated
Floor Tiles
Calculations
30 by 30cm
Glazed Tiles
90.00 m2
30.92 0.15=4.64 m2
Interior Wall Area =
Column Area =
Bathroom Area =
Stair Area =
9.89 0.10=0.99 m2
12(0.42 0.17)=0.86 m2
2.05 1.42=2.91 m2
3.90 2.11=8.23 m
30 by 30cm
Unglazed
Tiles
30 by 60cm
Marble
Tiles
Square
Foot Wood
Tiles
5.40 0.60=3.24 m2
Kitchen Area =
Nook Area =
412
2.00 0.90=1.80 m2
67.34 m
67.34 5.56=374.41
Plus : 10 % allowance for cutting and edging =
37.44
Total No. of Tiles =
411.85 ; say
94.50 m2
33.28 0.15=4.99 m
127
2
28.99 0.10=2.90 m
15(0.42 0.17)=1.07 m2
Bedroom 1 Area =
3.45 3.55=12.25 m2
Bedroom 2 Area =
3.45 3.55=12.25 m2
3.29 6.60=21.71m
3.40 2.11=7.17 m
3.45 1.40=4.83 m2
3.29 2.00=6.58 m2
20.74 m
20.74 5.56=115.34
Plus : 10 % allowance for cutting and edging =
11.53
Total No. of Tiles =
Bedroom
Floor Tiles
126.88 ; say
3.45 3.55=12.25 m2
3.45 3.55=12.25 m2
3.29 6.60=21.71m 2
Net Bedroom Floor Area =
46.21 m
523.00
497.21 ft
24.86 ft 2
522.07 ft 2 ; say
Stair Tiles
1.00 0.30=0.30 m2
22 0.30=6.60 m2
Stair Landing Area =
2.11 1.00=2.11 m2
2
99.00
93.72 ft 2
4.68 ft 2
Total Stair Tile Area =
Kitchen
Tiles
98.40 ft 2 ; say
Kitchen Tiles
Kitchen Area =
Nook Area =
5.40 0.60=3.24 m2
2.00 0.90=1.80 m2
5.04 m2
5.04 11.11=55.99
Plus : 10 % allowance for cutting and edging =
62
5.60
Total No. of Tiles =
61.59 ; say
20
1.62 m2
1.62 11.11=18.00
Plus : 10 % allowance for cutting and edging =
1.80
Total No. of Tiles =
Bathroom
Tiles
19.80 ; say
2.05 1.42=2.91 m2
3.45 1.40=4.83 m2
3.29 2.00=6.58 m2
Total Bathroom Floor Tile Area =
14.32m
175
14.32 11.11=159.11
Plus : 10 % allowance for cutting and edging =
15.91
Total No. of Tiles =
175.02 ; say
6.34 1.80=11.41 m2
2
9.10 1.80=16.38 m
9.98 1.80=17.96 m2
Total Bathroom Wall Tile Area =
Under 30 by 30 cm floor tiles:
45.76 m2
560
50.83
559.18 ; say
TOTALS
580
237
539
622.00
BILL OF MATERIALS
COMPUTATION SHEET
Item to be
Estimated
Kitchen
Tiles
Calculations
Kitchen Area =
Nook Area =
Cement
(bags)
White Cement
(kg)
Tile Adhesive
(bags)
5.40 0.60=3.24 m2
2.00 0.90=1.80 m2
5.40 0.30=1.62m
6.66 m
1
4.00
1
Bathroom
Tiles
2.05 1.42=2.91 m2
3.45 1.40=4.83 m2
3.29 2.00=6.58 m2
6.34 1.80=11.41 m
9.10 1.80=16.38 m
9.98 1.80=17.96 m2
Total Bathroom Tile Area =
60.08 m
6
30.00
7
34.00
BILL OF MATERIALS
COMPUTATION SHEET
Item To Be
Estimated
Floor Tiles
Calculations
Wood Glue
(gallons)
Polymer
Liquid
(gallons)
Hardener
(quarts)
Calsomine
Powder
(kg)
90.00 m
30.92 0.15=4.64 m2
Interior Wall Area =
12(0.42 0.17)=0.86 m2
Column Area =
Bathroom Area =
Stair Area =
2.05 1.42=2.91 m2
3.90 2.11=8.23 m
Kitchen Area =
Nook Area =
9.89 0.10=0.99 m2
5.40 0.60=3.24 m2
2
2.00 0.90=1.80 m
67.34 m
2
3
94.50 m2
33.28 0.15=4.99 m
1
1
28.99 0.10=2.90 m2
Column Area =
15(0.42 0.17)=1.07 m2
Bedroom 1 Area =
3.45 3.55=12.25 m2
Bedroom 2 Area =
3.45 3.55=12.25 m2
3.29 6.60=21.71m 2
Stairwell Area =
3.40 2.11=7.17 m2
Bathroom Area =
3.45 1.40=4.83 m2
3.29 2.00=6.58 m2
20.74 m2
Bedroom
Floor Tiles
3.45 3.55=12.25 m2
3.45 3.55=12.25 m2
3.29 6.60=21.71m 2
2
Total Bedroom Floor Area = 46.21 m
Stair Tiles
1.00 0.30=0.30 m2
22 0.30=6.60 m2
Stair Landing Area =
2.11 1.00=2.11 m2
8.71 m
10
BILL OF MATERIALS
COMPUTATION SHEET
Item to be
Estimated
Exterior
Paint
Calculations
Concrete Primer
Sealer
(gallons)
Acrylic Gloss
Latex Paint
(gallons)
38.00 m
38.00 4.30=163.40 m2
1.40 2.10=2.94 m
0.80 2.10=1.68 m2
Window:
1.40 0.70=0.98 m
1.20 0.80=0.96 m2
0.60 0.60=0.36
Net Surface Area =
139.54 m2
139.54
=3.49
40
; say
Concrete
Neutralizer
(quarts)
139.54
=3.49
40
; say
For Concrete Neutralizer:
1.50
139.54
=3.49
40
* One quart of neutralizer is mixed with 2- gallons
of water
3.49
=1.40
2.5
; say
39.00 m
39.00 4.42=172.38 m2
Surface Area =
2
Less: Window: 6 ( 1.60 1.50 )=14.40 m
2
Net Surface Area = 155.76 m
155.76
=3.89
40
; say
For Final Coating:
1.50
155.76
=3.89
40
; say
For Concrete Neutralizer:
155.76
=3.89
40
* One quart of neutralizer is mixed with 2- gallons
of water
3.89
=1.56
2.5
; say
Interior
Paint
60.02 m
60.02 3.85=231.08 m2
0.60 2.10=1.26 m2
1.40 2.10=2.94 m2
0.80 2.10=1.68 m2
Window:
1.40 0.70=0.98 m2
1.20 0.80=0.96 m2
0.60 0.60=0.36
Net Surface Area =
205.96 m2
205.96
=5.15
40
; say
For Final Coating;
205.96
=5.15
40
; say
205.96
=5.15
40
* One quart of neutralizer is mixed with 2- gallons
of water
5.15
=2.06
2.5
; say
Second Floor Interior
Total Surface Perimeter =
Surface Area =
104.43 m
104.43 4.42=461.58 m2
2
Less: Door: 3(0.80 2.10)=5.04 m
11
2(0.60 2.10)=2.52 m2
Window:
437.40 m2
11
437.40
=10.94
40
; say
4.50
437.40
=10.94
40
; say
437.40
=10.94
40
* One quart of neutralizer is mixed with 2- gallons
of water
10.94
=4.37
2.5
; say
Roof Slab
Paint
Surface Area =
11.10 9.30=103.23 m
40.80 0.10=4.08 m2
29.10 0.30=8.73 m2
Total Surface Area of Roof Slab =
116.04 m 2
116.04
=2.90
40
; say
116.04
=2.90
40
; say
For Concrete Neutralizer;
116.04
=2.90
40
1.50
* One quart of neutralizer is mixed with 2- gallons
of water
2.90
=1.16
2.5
; say
27
TOTALS
27
11
BILL OF MATERIALS
COMPUTATION SHEET
Item to be
Estimated
Ceiling
Paint
Calculations
Wood Primer
(gallons)
90.00 m2
12(0.42 0.17)=0.86 m
Column Area =
Beam Area =
10.49 0.10=1.05m
63.60 0.20=12.72m2
Stairwell Area =
2.11 3.40=7.17 m2
68.20 m2
Quick Dry
Enamel
(gallons)
Paint Thinner
(gallons)
2
For Primer Paint;
68.20
=1.95
35
; say
2
For Top Coating;
68.20
=1.95
35
; say
Second Floor Ceiling
Second Floor Area =
94.50 m2
15(0.42 0.17)=1.07 m2
Column Area =
Beam Area =
32.59 0.10=2.90 m2
73.50 0.20=14.70 m
75.83 m
75.83
=2.17
35
; say
For Top Coating;
1
75.83
=2.17
35
; say
8 gallons
8 0.132=1.06 ; say
TOTALS
LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City
BILL OF MATERIALS
COMPUTATION SHEET
Item to be
Estimated
Materials Required
Estimated
Quantity
2 boxes
1 box
32 mm RSC Pipe
2 boxes
Lighting Outlet
63 pieces
16 pieces
Refrigerator Outlet
1 piece
1 piece
Range Outlet
1 piece
5 pieces
Weather-proof Outlet
2 pieces
2 pieces
7 pieces
7 pieces
Three-way Switch
2 pieces
Fuse Box
1 piece
Circuit Breaker
15 pieces
54 pieces
75 pieces
Electrical Tape
25 rolls
BILL OF MATERIALS
COMPUTATION SHEET
Item to be
Estimated
Materials Required
Estimated
Quantity
PVC Pipe 4 , 10 ft
Sanitary Line
Length of Pipe:
203.40
=20.34
10
21 pieces
; say
Sanitary Tee
9 pieces
Elbow
14 pieces
14 pieces
2 pieces
Sanitary Wye
15 pieces
Coupling
21 pieces
10 pieces
Solvent Cement
15 liters
Length of Pipe:
1.50+13.00+18.00=32.50m106.62 ft
106.62
=7.62
14
; say
8 pieces
72.00
=5.14
14
; say
6 pieces
Elbow in.
3 pieces
Elbow in.
6 pieces
Septic Tank
Street Ell
4 pieces
PE Adaptor
1 piece
1 piece
10 pieces
Reducer Ell
3 pieces
Reducer Tee
5 pieces
Nipple
14 pieces
Union
2 pieces
Water Meter
1 piece
Gate Valve
3 pieces
Faucet (Kitchen)
1 piece
Faucet (Bathroom)
5 pieces
Hose Bibb
2 pieces
200 400 mm
100 pieces
200 400 mm
260 pieces
14 pieces
Cement
32 bags
Sand
3.20 cu.m.
Gravel
0.90 cu.m.
Length of Pipe
36.00+14.00=50.00 m164.04 ft
No. of Bars required:
164.04
=16.40
10
; say
17 pieces
200 400 mm
120 pieces
3 pieces
Cement
15 bags
Sand
0.90 cu.m.
Gravel
1.20 cu.m
Water Closet
3 pieces
Fixtures and
Urinal
2 pieces
Accessories
Lavatory
3 pieces
Kitchen Sink
1 piece
Laundry Tray
1 piece
Soap Holder
3 pieces
3 pieces
Towel Holder
2 pieces
Shower Head
2 pieces
Floor Drain
4 pieces
Teflon Tape
20 rolls
Miscellaneous
BILL OF MATERIALS
COMPUTATION SHEET
Item to be
Estimated
Excavation for
Rectangular
Footing
Estimated
Quantity
Computation
F-1
Side Footing for Rectangular Column
4 1.72=6.86 m
6.90 m
F-2
Center Footing for Rectangular Column
23.00 m3
8 2.88=23.04 m
Excavation for
Wall Footing
33.12 m
3
15.90 m3
Excavation for
Septic Tank
Backfill and
Compaction for
Rectangular
Footing
F-1
Side Footing for Rectangular Column
5.00 m
Volume of Excavation =
10.49 m
1.72 m
1.07 m3
8.20 m3
0.06 m3
Volume of Column =
0.59 m3
2.40 m3
4 0.59=2.36 m
F-2
Center Footing for Rectangular Column
Volume of Excavation =
2.88 m3
1.21 m
12.90 m3
Volume of Column =
0.06 m
1.61 m3
Backfill and
Compaction for
Wall Footing
8 1.61=12.88 m
33.12 m
9.00 m3
10.49 m
3.20 m3
83.13 m2
Volume of Gravel =
83.13 0.20=16.62m
17.00 m3
BILL OF MATERIALS
COMPUTATION SHEET
Item To Be
Estimated
Ceiling Joist
Calculations
12mm THK
Plywood
2 by 2
Lumber
90.00 m2
12(0.42 0.17)=0.86 m2
Column Area =
Beam Area =
10.49 0.10=1.05m2
63.60 0.20=12.72m
Stairwell Area =
2.11 3.40=7.17 m
435
68.20 m2
94.50 m2
484
2
32.59 0.10=2.90 m
2
15(0.42 0.17)=1.07 m
Column Area =
73.50 0.20=14.70 m2
Beam Area =
75.83 m2
Ceiling
Board
90.00 m2
12(0.42 0.17)=0.86 m2
Column Area =
Beam Area =
10.49 0.10=1.05m2
63.60 0.20=12.72m
Stairwell Area =
2.11 3.40=7.17 m
68.20 m2
24
68.20
=23.68
2.88
; say
94.50 m2
32.59 0.10=2.90 m2
15(0.42 0.17)=1.07 m2
27
2
Beam Area = 73.50 0.20=14.70 m
75.83 m2
75.83
=26.33
2.88
; say
TOTALS
51
919