PROJECT TITLE: As-Built of Plan Two-Storey Residential House

OWNER/S: June and Maritess Raynes


LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City

BILL OF MATERIALS

COMPUTATION SHEET
Item To Be
Estimated

Footings For
Rectangular
Column

Materials And Estimated


Quantities Required

Calculations

Cement
(bags)

F-1
Side Footing for Square Column
Conc. volume per footing =

( 0.9 0.9 0.30 )=0.243 m3

Conc. volume for 12 footings =

2.916 m

Plus : 10 % allowance for wastage =


Total volume of footings =

0.2916 m3

3.2076 m3

Under 50 kg cement, using Class AA concrete mixture:

3.2076 9.50=30 .472 ; say


3.2076 0.50=1.6038 ; say
3.2076 1.00=3.2076 ; say
F-2
Center Footing for Square Column
Conc. volume per footing =

( 0.75 0.75 0.25 )=0.141 m 3


Conc. volume for 13 footings =

1.828 m3

Plus : 10 % allowance for wastage =


Total volume of footings =

0.183 m3

2.0109 m3

Under 50 kg cement, using Class AA concrete mixture:

2.0109 9.50=27.313 ; say


2.0109 0.50=1.9509 ; say

Sand
(

Gravel
)

m3

2.0109 1.00=3.9018 ; say

Rectangular
Columns

C1
Square Column from Foundation to Roof Slab
Conc. volume per column =

0.3 0.3 17.9=1.611 m 3

Conc. volume for 12 columns =

19.332m3

Plus : 5 % allowance for wastage =


Total Volume for Columns =

0.9666 m3
20.2986 m3

Under 50 kg cement, using Class A concrete mixture:

20.2986 7.00=142.090 ; say


20.2986 0.50=10.1493 ; say
20.2986 1.00=20.2986 ; say

C2
Square Column from Foundation to Roof Slab
Conc. volume per column =

0.30 0.30 17.9=1.1188 m3

Conc. volume for 13 columns =

14.5437 m3

Plus : 5 % allowance for wastage =


Total Volume for Columns =

0.72718 m3
3

15.2709 m

Under 50 kg cement, using Class A concrete mixture:

15.2709 7.00=106.897 ; say


15.2709 0.50=7.6355 ; say
15.2709 1.00=15.2709 ; say

Reinforced
Concrete
Beams

FTB
Footing Tie Beam
Total Length of FTB =

78.825 m

Conc. volume of beams =

0.30 0.15 78.825=3.547 m3

Plus : 10 % allowance for wastage =


Total Volume for Beam =

0.3547 m3

3.9018 m3

Under 50 kg cement, using Class A concrete mixture:

3.9018 7.00=27.313 ; say


3.9018 0.50=1.9509 ; say
3.9018 1.00=3.9018 ; say
2B1
Second Floor Concrete Beam
Total Length of 2B1 = 109.775 m
Conc. volume of beams =

0.30 0.30 109.775=9.880 m3


Plus : 5 % allowance for wastage =

0.9880 m3

Total Volume for Beam =

10.8677 m3

Under 50 kg cement, using Class A concrete mixture:

10.8677 7.00=76.074

; say

10.8677 0.50=5.4339 ; say


10.8677 1.00=10.868

; say

3B1
Third Floor Concrete Beam
Total Length of 3B1 = 109.775 m
Conc. volume of beams =

0.30 0.30 109.775=9.880 m3


0.9880 m3

Plus : 5 % allowance for wastage =


Total Volume for Beam =

10.8677 m

Under 50 kg cement, using Class A concrete mixture:

10.8677 7.00=76.074

; say

10.8677 0.50=5.4339 ; say


10.8677 1.00=10.868

; say

4B1
Fourth Floor Concrete Beam
Total Length of 4B1 = 109.775 m
Conc. volume of beams =

0.30 0.30 109.775=9.880 m


Plus : 5 % allowance for wastage =
Total Volume for Beam =

0.9880 m

10.8677 m3

Under 50 kg cement, using Class A concrete mixture:

10.8677 7.00=76.074

; say

10.8677 0.50=5.4339 ; say


10.8677 1.00=10.868
5B1
Fifth Floor Concrete Beam

; say

Total Length of 5B1 = 109.775 m


Conc. volume of beams =

0.30 0.30 109.775=9.880 m3


0.9880 m3

Plus : 5 % allowance for wastage =


Total Volume for Beam =

10.8677 m3

Under 50 kg cement, using Class A concrete mixture:

10.8677 7.00=76.074

; say

10.8677 0.50=5.4339 ; say


10.8677 1.00=10.868 ; say
UDB1
Roof Beam
Total Length of UDB1 =

109.775 m

Conc. volume of beams =

0.30 0.20 109.775=6.587 m


Plus : 5 % allowance for wastage =
Total Volume for Beam =

0.6587 m

7.2452m

Under 50 kg cement, using Class A concrete mixture:

7.2452 7.00=50.716 ; say


7.2452 0.50=3.6225 ; say
7.2452 1.00=7.2452 ; say

Concrete
Slab

Slab on Ground
Area of conc. Slab on Ground = 8.2 14.20=116.44 m
Less : Column and Wall Area =

17.473 m2

Total Area of Concrete Slab =


Conc. volume of slab =

98.6975 m2

98.6975 0.10=9.8698 m

Plus : 10% allowance for wastage =

0.98698 m

Total volume of Concrete = 10.8567 m

Under 50 kg cement, using Class B concrete mixture:

10.8567 6.00=65.140 ; say


10.8567 0.50=5.42836 ; say
10.8567 1.00=10.857

9.50

; say

S1
Second Floor Two-way Slab
Area of conc. Slab = 8.2 14.20=116.44 m
Less : Column, Wall and Stairwell Area =
Total Area of Concrete Slab =
Conc. volume of slab =

32.933 m2

83.5075 m

83.5075 0.15=12.526125 m

Plus : 10% allowance for wastage =

1.2526 m3

Total volume of Concrete = 13.7787 m

11.50

Under 50 kg cement, using Class B concrete mixture:

13.7787 6.00=82.672 ; say


13.7787 0.50=6.88937 ; say
13.7787 1.00=13.7787 ; say
S2
Third Floor Two-way Slab
Area of conc. Slab = 8.2 14.20=116.44 m
Less : Column, Wall and Stairwell Area =
Total Area of Concrete Slab =
Conc. volume of slab =

9.50
2

32.933 m

83.5075 m2

83.5075 0.15=12.526125 m3

Plus : 10% allowance for wastage =

1.2526 m3

Total volume of Concrete = 13.7787 m

Under 50 kg cement, using Class B concrete mixture:

13.7787 6.00=82.672 ; say


13.7787 0.50=6.88937 ; say

13.7787 1.00=13.7787 ; say


S3
Fourth Floor Two-way Slab
Area of conc. Slab = 8.2 14.20=116.44 m
Less : Column, Wall and Stairwell Area =
Total Area of Concrete Slab =
Conc. volume of slab =

32.933 m2

83.5075 m

83.5075 0.15=12.526125 m

Plus : 10% allowance for wastage =

1.2526 m3

Total volume of Concrete = 13.7787 m

Under 50 kg cement, using Class B concrete mixture:

13.7787 6.00=82.672 ; say


13.7787 0.50=6.88937 ; say
13.7787 1.00=13.7787 ; say
S4
Fifth Floor Two-way Slab
Area of conc. Slab = 8.2 14.20=116.44 m
Less : Column, Wall and Stairwell Area =
Total Area of Concrete Slab =
Conc. volume of slab =

32.933 m

83.5075 m2

83.5075 0.15=12.526125 m3

Plus : 10% allowance for wastage =

1.2526 m3

Total volume of Concrete = 13.7787 m

Under 50 kg cement, using Class B concrete mixture:

13.7787 6.00=82.672 ; say


13.7787 0.50=6.88937 ; say
13.7787 1.00=13.7787 ; say
S5
Fifth Floor One Way Roof Slab
Area of conc. Roof Slab = 10.2 14.20=116.44 m

Less : Column, Wall and Stairwell Area =


Total Area of Concrete Slab =

32.933 m2

132.3075

132.3075 0.10=13.23075m

Conc. volume of slab =

Plus : 10% allowance for wastage =

1.323075 m3
3

Total volume of Concrete = 14.553825 m

Under 50 kg cement, using Class B concrete mixture:

14.5538 6.00=87.323 ; say


14.5538 0.50=7.27691 ; say
14.5538 1.00=14.5538 ; say

Stair

Stair Details
23 Steps with Landing
Rise =

188 mm

Landing

Run =

300 mm

Width =

Width =

1000 mm

Thickness of Stairs =

Length =

150 mm

2110mm
20 00 mm

Thickness =

1 00 mm

Using Special Formulas and Calculations


Conc. volume of stairs =

2.11 m 3

Plus : 5% allowance for wastage =


Total volume of Concrete =

0.10 m3
2.21 m3

2.50

Under 50 kg cement, using Class A concrete mixture:

2.21 7.00=15.52 ; say


2.21 0.50=1.11 ; say
2.21 1.00=2.21 ; say
TOTALS

517

39.50

74.00

PROJECT TITLE: As-Built of Plan Two-Storey Residential House


OWNER/S: June and Maritess Raynes
LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City

BILL OF MATERIALS

COMPUTATION SHEET
Item to be
Estimated

Reinforced
Footing Bars
For
Rectangular
Column

Calculations

Materials And
Estimated Quantities
Required
10mm
steel bar

F-1
Side Footing Bars for Square Column
Length of footing bar S =

0.9 m

Plus:
Mild Steel Hook Allowance =

9 0.016=0.144 m

Allowance per footing bar S =

2 0.144=0.288 m

Total Length of footing bar S =

0.90+0.288=1.188 m

No. of Bar S per Footing = 6 pieces


Total Length of bar S per footing = 6 1.188=7.128 m
Total Length of bar S for 12 footings =
Length of footing bar S =
Plus:

0.9 m

12 7.128=85.536 m

12mm
steel bar

16mm
steel bar

Mild Steel Hook Allowance =

9 0.016=0.144 m

Allowance per footing bar S =

2 0.144=0.288 m

Total Length of footing bar S =

0.90+0.288=1.188 m

No. of Bar S per Footing = 6 pieces


Total Length of bar S per footing = 6 1.188=7.128 m
14 pcs
Total Length of bar S for 12 footings = 12 7.128=85.536 m
Total Length of Side Footing Bars

85.536+85.536=171.072
No. of Bars required:

171.072
=28.512
6
; say
F-2
Center Footing Bars for Square Column
Length of footing bar S =

0.75 m

Plus:
Mild Steel Hook Allowance =

9 0.016=0.144 m

Allowance per footing bar S =

2 0.144=0.288 m

Total Length of footing bar S =

0.75+0.288=1.038 m

No. of bar S per footing = 5 pieces


Total Length of bar S per footing =
Total Length of bar S for 13 footings =

Length of footing bar S =


Plus:

5 1.038=5.19 m
13 5.19=62.28 m

0.75 m
48 pcs

Mild Steel Hook Allowance =

9 0.016=0.144 m

Allowance per footing bar S =

2 0.144=0.288 m
0.75+0.288=1.038 m

Total Length of footing bar S =


No. of bar S per footing = 5 pieces

Total Length of bar S per footing =


Total Length of bar S for 13 footings =

5 1.038=5.19 m
13 5.19=62.28 m

Total Length of Center Footing Bars

62.28+62.28=124.56 m
No. of Bars required:

124.56
=20.760
6
; say

Reinforced
Bars for
Rectangular
Column

C1
Square Column from Second Floor to Roof Slab
Length of vertical bar =

17.90 m

Plus:

5 0.016=0.08 m

Mild Steel Bend Allowance =


Allowance per vertical bar =

0.08 m

Total Length of vertical bar =

17.90+0.08=17.98 m

No. of vertical bar per column = 8 pieces


Total Length of vertical bar per column =

8 17.98=143.84 m
No. of Square Column = 12 sets
Length of vertical bar for 12 columns =

12 143.84=1726.08m
89 pcs

No. of Bars required:

1726.08
=287.680
6
; say

C2
Square Column from Second Floor to Roof Slab
Length of vertical bar =

17.90 m

Plus:

5 0.016=0.08 m

Mild Steel Bend Allowance =


Allowance per vertical bar =

0.08 m

Total Length of vertical bar =

17.90+0.08=17.98 m

No. of vertical bar per column = 8 pieces


Total Length of vertical bar per column =

8 17.98=143.84 m
No. of Square Column = 13 sets
Length of vertical bar for 13 columns =

13 143.84=1869.92m
51 pcs

No. of Bars required:

1869.92
=311.653
6
; say
Column Ties / Lateral Ties
All Column Ties per set should be spaced, 4 @ 0.05 m; 4 @ 0.10 m;
Rest @ 0.20 m O.C.

Length of column tie =

0.3+0.3+ 0.3+ 0.3=1.20 m

Plus:
Mild Steel Hook Allowance =
Allowance per column tie =

9 0.010=0.09 m
2 0.09=0.18 m

Total Length of column tie=

1.20+0.18=1.38 m

For C1
Square Column from Foundation to Second Floor Beam
No. of column tie per column = 1074 pieces
Total Length of column ties per column =

1074 1.38=1482.12m

13 pcs

No. of Square Column = 12 sets


Total Length of Column Ties =

12 1482.12=17785.44 m

No. of Bars required:

17785.44
=2964.240
6
; say
For C1
Square Column from Foundation to Second Floor Beam
No. of column tie per column = 1164 pieces
Total Length of column ties per column =

1164 1.18=1372.93 m
No. of Square Column = 13 sets
Total Length of Column Ties =

12 1372.93=17848.09 m

No. of Bars required:

17848.09
=2974.682
6

98 pcs
; say

106 pcs

Reinforced
Bars for
Concrete
Beam

FTB
Footing Tie Beam
Total Length of FTB =

78.825 m

No. of horizontal top bar per beam = 2 pieces


No. of horizontal bottom bar per beam = 2 pieces
Length of horizontal bars =

4 78.825=315.30 m

Plus:

5 0.012=0.06 m

Mild Steel Bend Allowance =

No. of footing tie beam = 40 sets


Length of bend allowance =

315.30 2 4 0.06=19.2m

Total Length of Footing Tie Beam Bars =

649.8 m

No. of Bars required:

41 pcs.

649.80
=108.30
6
; say
2B1
Second Floor Concrete Beam
Total Length of 2B1 =

109.78 m

No. of horizontal top bar per beam = 3 pieces


No. of horizontal middle bar per beam = 2 pieces
No. of horizontal bottom bar per beam = 3 pieces
Length of horizontal bars =

8 109.78=878.2 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of 2B1 beam = 40 sets


Length of bend allowance =

40 2 8 0.08=51.20 m

Total Length of Horizontal Bars =


Length of left and right support bar =

929.40 m

54.888 m

No. of left and right support bar = 2 pieces


Length of left and right support bar =

2 54.888=109.78 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of 2B1 beam = 40 sets


Length of bend allowance =

40 2 4 0.08=25.60 m

Total Length of Left and Right Support Bar =


Length of mid-span support bar =

135.375 m

54.888 m

No. of left and right support bar = 2 pieces


Length of mid-span support bar =

2 54.888=109.78 m

73 pcs

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of 2B1 beam = 40 sets


Length of bend allowance =

40 4 0.08=12.80 m

Total Length of Mid-span Support Bar =


Total Length of 2B1 Bars =

122.575 m

1187.35 m

No. of Bars required:

1187.35
=197.892
6
; say
3B1
Third Floor Concrete Beam
Total Length of 3B1 =

109.78 m

No. of horizontal top bar per beam = 3 pieces


No. of horizontal middle bar per beam = 2 pieces
No. of horizontal bottom bar per beam = 3 pieces
Length of horizontal bars =

8 109.78=878.2 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of 3B1 beam = 40 sets


Length of bend allowance =

40 2 8 0.08=51.20 m

Total Length of Horizontal Bars =


Length of left and right support bar =

929.40 m

54.888 m

No. of left and right support bar = 2 pieces


Length of left and right support bar =

2 54.888=109.78 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m
42 pcs

No. of 3B1 beam = 40 sets


Length of bend allowance =

40 2 4 0.08=25.60 m

Total Length of Left and Right Support Bar =


Length of mid-span support bar =

135.375 m

54.888 m

No. of left and right support bar = 2 pieces


Length of mid-span support bar =

2 54.888=109.78 m

Plus:

5 0.016=0.08 m

Mild Steel Bend Allowance =


No. of 3B1 beam = 40 sets
Length of bend allowance =

40 4 0.08=12.80 m

Total Length of Mid-span Support Bar =


Total Length of 3B1 Bars =

122.575 m

1187.35 m

No. of Bars required:

1187.35
=197.892
6
; say
4B1
Fourth Floor Concrete Beam
Total Length of 4B1 =

109.78 m

No. of horizontal top bar per beam = 3 pieces


No. of horizontal middle bar per beam = 2 pieces
No. of horizontal bottom bar per beam = 3 pieces
Length of horizontal bars =

8 109.78=878.2 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of 4B1 beam = 40 sets


Length of bend allowance =

40 2 8 0.08=51.20 m

Total Length of Horizontal Bars =


Length of left and right support bar =

929.40 m

54.888 m

No. of left and right support bar = 2 pieces


Length of left and right support bar =

2 54.888=109.78 m

10 pcs

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of 4B1 beam = 40 sets


Length of bend allowance =

40 2 4 0.08=25.60 m

Total Length of Left and Right Support Bar =


Length of mid-span support bar =

135.375 m

54.888 m

No. of left and right support bar = 2 pieces


Length of mid-span support bar =

2 54.888=109.78 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of 4B1 beam = 40 sets


Length of bend allowance =

40 4 0.08=12.80 m

Total Length of Mid-span Support Bar =


Total Length of 4B1 Bars =

122.575 m

1187.35 m

No. of Bars required:

1187.35
=197.892
6
; say
5B1
Fifth Floor Concrete Beam
Total Length of 5B1 =

49 pcs

109.78 m

No. of horizontal top bar per beam = 3 pieces


No. of horizontal middle bar per beam = 2 pieces
No. of horizontal bottom bar per beam = 3 pieces
Length of horizontal bars =

8 109.78=878.2 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of 5B1 beam = 40 sets


Length of bend allowance =

40 2 8 0.08=51.20 m

Total Length of Horizontal Bars =


Length of left and right support bar =

929.40 m

54.888 m

No. of left and right support bar = 2 pieces

Length of left and right support bar =

2 54.888=109.78 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of 5B1 beam = 40 sets


Length of bend allowance =

40 2 4 0.08=25.60 m

Total Length of Left and Right Support Bar =


Length of mid-span support bar =

135.375 m

54.888 m

No. of left and right support bar = 2 pieces


Length of mid-span support bar =

2 54.888=109.78 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of 5B1 beam = 40 sets


Length of bend allowance =

40 4 0.08=12.80 m

Total Length of Mid-span Support Bar =


Total Length of 5B1 Bars =

122.575 m

1187.35 m

No. of Bars required:

1187.35
=197.892
6
; say
UDB1
Roof Beam
Total Length of UDB1 =

109.78 m

No. of horizontal top bar per beam = 3 pieces


No. of horizontal middle bar per beam = 2 pieces
No. of horizontal bottom bar per beam = 3 pieces
Length of horizontal bars =

8 109.78=878.2 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of UDB1 beam = 40 sets


Length of bend allowance =

40 2 8 0.08=51.20 m

Total Length of Horizontal Bars =


Length of left and right support bar =

929.40 m

54.888 m

32 pcs

No. of left and right support bar = 2 pieces


Length of left and right support bar =

2 54.888=109.78 m

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

82 pcs

No. of UDB1 beam = 40 sets


Length of bend allowance =

40 2 4 0.08=25.60 m

Total Length of Left and Right Support Bar =


Length of mid-span support bar =

135.375 m

54.888 m

No. of left and right support bar = 2 pieces


Length of mid-span support bar =

2 54.888=109.78 m
69 pcs

Plus:
Mild Steel Bend Allowance =

5 0.016=0.08 m

No. of UDB1 beam = 40 sets


Length of bend allowance =

40 4 0.08=12.80 m

Total Length of Mid-span Support Bar =


Total Length of UDB1 Bars =

122.575 m

1187.35 m
53 pcs

No. of Bars required:

1187.35
=197.892
6
; say
Stirrups / Beam Ties
All Stirrups per set should be spaced, 1 @ 0.05 m; 8 @ 0.10 m; Rest
@ 0.20 m O.C.
Length of stirrups =

0.20+0.40+ 0.20+0.40=1.20 m
14 pcs

Plus:
Mild Steel Hook Allowance =
Allowance per column tie =

9 0.010=0.09 m
2 0.09=0.18 m

Total Length of column tie =


For FTB
Footing Tie Beam

1.20+0.18=1.38 m

Length of stirrups =

0.30+0.15+ 0.30+ 0.15=0.90 m


55 pcs

Plus:

9 0.010=0.09 m

Mild Steel Hook Allowance =


Allowance per column tie =

2 0.09=0.18 m

Total Length of column tie =

0.90+0.18=1.08 m

No. of stirrups = 411 pieces


Total Length of Stirrups =

411 1.08=443.475m
44 pcs

No. of Bars required:

443.475
=73.9125
6
; say
For 2B1
Second Floor Concrete Beam
No. of stirrups = 575 pieces
Total Length of Stirrups =575 1.38=792.6375 m
No. of Bars required:

792.6375
=132.1063
6
; say
For 3B1
Third Floor Concrete Beam
No. of stirrups = 575 pieces
Total Length of Stirrups =575 1.38=792.6375 m
No. of Bars required:

792.6375
=132.1063
6
; say
For 4B1
Fourth Floor Concrete Beam
No. of stirrups = 575 pieces

Total Length of Stirrups =575 1.38=792.6375 m


No. of Bars required:

792.6375
=132.1063
6
; say
For 5B1
Fifth Floor Concrete Beam
No. of stirrups = 575 pieces
Total Length of Stirrups =575 1.38=792.6375 m
No. of Bars required:

792.6375
=132.1063
6
; say

For UDB1
Roof Beam
No. of stirrups = 575 pieces
Total Length of Stirrups =

575 1.18=677.7625m

No. of Bars required:

677.7625
=112.9604
6
; say

Reinforced
Bars for
Concrete Slab

Slab on Ground
Area of conc. Slab on Ground = 8.20 14 .20=116.44 m
Less : Column and Wall Area =

17.743 m2

Total Area of Slab on Ground = 98.698 m


Under 6 m steel bar at 0.25 m spacing distance:

98.698 1.627=135.25 ; say

135 pcs

S1
Second Floor Two-way Slab
Area of conc. slab =

8.20 14 .20=116.44 m2
2

Less : Beam, Column ad Stairwell Area = 32.933 m


Total Area of Slab =

83.508 m

317 pcs
Under 6 m steel bar at 0.10 m spacing distance:

83.508 4.369=364.8443 ; say


S2
Third Floor Two-way Slab
Area of conc. slab =

8.20 14 .20=116.44 m

Less : Beam, Column ad Stairwell Area = 32.933 m


Total Area of Slab =

83.508 m

Under 6 m steel bar at 0.10 m spacing distance:

83.508 4.369=364.8443 ; say


S3
Fourth Floor Two-way Slab
Area of conc. slab =

8.20 14 .20=116.44 m

Less : Beam, Column ad Stairwell Area = 32.933 m


Total Area of Slab =

83.508 m2

Under 6 m steel bar at 0.10 m spacing distance:

83.508 4.369=364.8443 ; say


S4
Fifth Floor Two-way Slab
Area of conc. slab =

8.20 14 .20=116.44 m2
2

Less : Beam, Column ad Stairwell Area = 32.933 m


Total Area of Slab =

83.508 m

Under 6 m steel bar at 0.10 m spacing distance:

83.508 4.369=364.8443 ; say

175 pcs

S5
One-way Roof Slab
Area of conc. roof slab =

10.20 16.20=103.23 m2

Less : Beam and Column Area


Total Area of Roof Slab =

17.743 m2
2

147.50 m

Under 6 m steel bar at 0.20 m spacing distance:

147.50 1.980=292.0451 ; say

Reinforced
Bars on CHB
Wall Footing

Exterior Wall Footing

44.80 m

Total Length of Exterior Wall Footing =


For longitudinal bars at 0.30 m on center:

44.80 3=134.40 mlong

For transverse bars at 0.30 m on center:


No. of transverse bars = 224 pieces

224 0.60=89.60 mlong


No. of Bars required:

28 pcs.

134.40+ 89.6 0
=37.3333
6
; say
Interior Wall Footing
Total Length of Interior Wall Footing =

47.60 m

For longitudinal bars at 0.30 m on center:

47.60 3=142.80 mlong


For transverse bars at 0.30 m on center:
No. of transverse bars = 238 pieces

238 0.60=95.20 mlong


No. of Bars required:

9 pcs.

142.80+ 95.20
=39.6667
6
; say

Reinforced
Bars on CHB
Wall

Exterior Wall from Footing to Second Floor


Area of Wall =

44.80 4.7=210.56 m

Less: Door: 4.62 m


Window =

21.96 m2

Net CHB Wall Area =

183.98 m

Under vertical reinforcement spaced at 0.60m:

183.98 2.13=391.8774 mlong


Under horizontal reinforcement at every 3 layers:

183.98 2.15=395.557 m long


No. of Bars required:

391.8774 +295.557
=131.2391
6
; say

89 pcs.

Exterior Wall from Second Floor to Third Floor


Area of Wall =
Less: Window =

39.9 0 2.7=107.73 m2
21.34 m

Net CHB Wall Area =

86.39 m

Under vertical reinforcement spaced at 0.60m:

86.39 2.13=184.0107 mlong


Under horizontal reinforcement at every 3 layers:

86.39 2.15=185.7385m long


No. of Bars required:

184.0107+ 185.7385
=61.62487
6

86 pcs.
; say

Exterior Wall from Third Floor to Fourth Floor


Area of Wall =
Less: Window =

44.80 2 .7=120.96 m
24.94 m

Net CHB Wall Area =

96.02 m2

Under vertical reinforcement spaced at 0.60m:

96.02 2.13=204.5226 mlong


Under horizontal reinforcement at every 3 layers:

96.02 2.15=206.4430m long

35 pcs.

No. of Bars required:

204.5226+ 206.4430
=68.4943
6
; say
Exterior Wall from Fourth Floor to Fifth Floor
Area of Wall =
Less: Window =

38.30 2 .7=103.41 m2
15.34 m2

Net CHB Wall Area =

88.07 m2

Under vertical reinforcement spaced at 0.60m:

88.07 2.13=187.5891m long


Under horizontal reinforcement at every 3 layers:

88.07 2.15=189.3505 mlong


No. of Bars required:

187 .5891+189.3505
=62.8233
6
; say
Exterior Wall from Fifth Floor to Roof Beam
Area of Wall =
Less: Window =

44.80 2 .7=120.96 m
18.04 m

Net CHB Wall Area =

102.92m2

90 pcs.

Under vertical reinforcement spaced at 0.60m:

102.92 2.13=219.2196 m long


Under horizontal reinforcement at every 3 layers:

102.92 2.15=221.2780 mlong


No. of Bars required:

219.2196+ 221.2780
=73.4163
6
; say

Interior Wall on First Floor


Area of Wall =
Less: Door:

10.49 4.75=49.83 m2

0.60 2.10=1.26 m2

Net CHB Wall Area =

48.57 m

Under vertical reinforcement spaced at 0.60m:

48.57 2.13=103.45 mlong


Under horizontal reinforcement at every 3 layers:

48.57 2.15=104.42 mlong


No. of Bars required:

103.45+104.42
=34.64
6
; say
Interior Wall on Second Floor
Area of Wall =
Less: Door:

32.59 4.12=134.27 m2

3(0.80 2.10)=5.04 m2
2(0.60 2.10)=2.52 m 2

Net CHB Wall Area =

126.71m2

Under vertical reinforcement spaced at 0.60m:

126.71 2.13=269.89 mlong


Under horizontal reinforcement at every 3 layers:

126.71 2.15=272.43 mlong


No. of Bars required:

269.89+ 272.43
=90.39
6
; say
TOTALS

964

358

421

PROJECT TITLE: As-Built of Plan Two-Storey Residential House


OWNER/S: June and Maritess Raynes
LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City

BILL OF MATERIALS

COMPUTATION SHEET
Materials And Estimated Quantities
Required

Item to be
Estimated

CHB for
Exterior Wall

Calculations

CHB
150 mm

Exterior Wall from Footing to Second Floor


Area of Wall =
Less: Door:

33.12 4.50=149.04 m2

1.40 2.10=2.94 m2
0.80 2.10=1.68 m2

Window:

2 (1.96 2.50 )=9.80 m2


2 (2.10 1.70 )=7.14 m2
1.40 0.70=0.98 m2
1.20 0.80=0.96 m2
0.60 0.60=0.36

1565

CHB
100 mm

Cement
(Bags)

Sand
(

Gravel
(

m3

m3

Net CHB Wall Area =

125.18 m2

No. of CHB required:

125.18 12.50=1564.75 ; say


Exterior Wall from Second Floor to Roof Beam

33.28 4.12=137.11 m

Less: Window: 6 ( 1.60 1.50 )=14.40 m

Area of Wall =

1507

2 ( 0.60 0.60 )=0.72m2


1.00 1.50=1.50 m

Net CHB Wall Area =

120.49 m

No. of CHB required:

120.49 12.50=1506.17 ; say

CHB for
Interior Wall

Interior Wall on First Floor


Area of Wall =
Less: Door:

10.49 4.75=49.83 m

0.60 2.10=1.26 m

Net CHB Wall Area =

48.57 m2
607

No. of CHB required:

48.57 12.50=607.09 ; say


Interior Wall on Second Floor
Area of Wall =

Less: Door:

32.59 4.12=134.27 m

1584

3(0.80 2.10)=5.04 m 2
2(0.60 2.10)=2.52 m 2

Net CHB Wall Area =


No. of CHB required:

126.71m

126.71 12.50=1583.88 ; say

Materials for
CHB Wall
Footing

Exterior Wall Footing

33.12 m

Total Length of Exterior Wall Footing =


Using the Volume Method of Concrete
Conc. volume of footing =

33.12 0.60 0.20=3.97 m

Plus : 10 % allowance for wastage =

0.40 m

Total volume of footings = 4.37 m

31
2.50
4.50

Under Class A concrete mixture:

4.37 7.00=30.60 ; say


4.37 0.50=2.18 ; say
4.37 1.00=4.37 ; say
Interior Wall Footing
Total Length of Interior Wall Footing =

10.49 m

Using the Volume Method of Concrete


Conc. volume of footing =

10.49 0.60 0.20=1.26 m

10
1.00

Plus : 10 % allowance for wastage =

1.50

0.13 m

Total volume of footings = 1.38 m


Under Class A concrete mixture:

1.38 7.00=9.69 ; say


1.38 0.50=0.69 ; say
1.38 1.00=1.38 ; say

Materials for
Cement
Mortar

Exterior Wall
Total Area =

125.18+120.49=245.67 m2
375

Under Class A mixture for a 150mm CHB:

245.67 1.526=374.89 ; say

21.00

245.67 0.0844=20.73 ; say


Interior Wall
Total Area =

48.57+126.71=175.28 m2

92
8.00

Under Class B mixture for a 100 mm CHB:

175.28 0.522=91.50 ; say


175.28 0.0435=7.62 ; say

Materials for
Cement
Mortar
Plastering

Exterior Wall
Total Area =

118.56+1 20.49=239.05

Under 16 mm thick plaster Class A mixture:

69

239.05 .288=68.85 ; say

4.00

239.05 .016=3.82 ; say


Interior Wall
Total Area =

39.13+126.71=165.84 m2

32
3.00

Under 16 mm thick plaster Class B mixture:

165.84 0.192=31.84 ; say


165.84 0.016=2.65 ; say
TOTALS

3072

2191

609

39.50

6.00

PROJECT TITLE: As-Built of Plan Two-Storey Residential House


OWNER/S: June and Maritess Raynes
LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City

BILL OF MATERIALS

COMPUTATION SHEET
Item To Be
Estimated
Forms for
Rectangular
Column

Calculations

Materials And Estimated Quantities


Required
6mm THK
Plywood

P=2 ( a+b ) +0.20


P=2 ( 0.42+0.17 ) +0.20
P=1.38 m

Area of the Forms =

1.38 9.15=12.63 m2

Total Area for 12 columns

12.627 12=151.524 m2
No. of Plywood required:

53

12mm THK
Plywood

2 by 2
Lumber

2 by 3
Lumber

151.524
=52.61
2.88
1573

; say
Under Column using 6mm thick plywood on 2 by
2 wood frame:

53 29.67=1572.51 ; say

Forms for
Beam and
Girder

P=

2 ( a+b ) +0.10

P=

2 ( 0.40+0.20 ) +0.10

P=

1.30

Total Length of Beams =

136.28 m

Total Area of the Beams

1.30 136.38=177.29 m2
62
No. of Plywood required:

177.29
=61.56
2.88
1554

; say
Under Beam using 6 mm thick plywood on 2 by 2
wood frame:

62 25.06=1553.72 ; say

Forms for
Concrete
Slab

Total Area of Concrete Slab =

72.63 m2

No. of Plywood required:

72.63
=25.22
2.88
; say

Forms for

26

Roof Slab

88.53 m2

Total Area of Roof Slab =


No. of Plywood required:

88.53
=30.73
2.88

31
; say

Forms for
Stair

Length of Stair =

9.90 m

Width of Stair =

1.00 m

Area of Forms for Stair

9.90 1.00=9.90 m

Area of Rise =

0.20 1.00=0.20 m2

Total Area of Rise

23 0.20=4.60 m2

Total Area of Forms for Stair =

14.50 m

No. of Plywood required:


5

14.50
=5.03
2.88
; say

Forms for
Doors and
Windows

Length of Doors =

6.40 m

Length of Windows =
Total Length =

23.12 m
29.52 m

Total Area of Forms for Doors and Windows

29.52 0.20=5.90 m 2
No. of Plywood required:
2

5.90
=2.05
2.88
; say

Scaffolding
for Column

Length of Column =

9.15 m

Total Length for 12 columns

9.15 12=109.80 m

Under Column using 2 by 3 lumber for vertical


support:

769

109.80 7.00=768.60 ; say


Under Column using 2 by 2 lumber for horizontal
support:

2306

109.80 21.00=2305.80 ; say


1285
Under Column using 2 by 2 lumber for diagonal
braces:

109.80 11.70=1284.66 ; say

Scaffolding
for Beam
and Girder

Total Length of Beams =

136.28 m

Under Beam using 2 by 3 lumber for vertical


support:

818

136.28 6.00=817.68 ; say


Under Beam using 2 by 2 lumber for horizontal
support:

641

136.28 4.70=640.52 ; say

Scaffolding
for Concrete
Slab

Total Area of Concrete Slab =

72.63 m

Under Column using 2 by 3 lumber for vertical


support:

72.626 9.10=660.90 ; say

Scaffolding
for Roof
Slab

Total Area of Concrete Slab =

102.80 m2

661

Under Column using 2 by 3 lumber for vertical


support:

936

102.80 9.10=935.48 ; say


115

TOTALS

64

7359

3184

PROJECT TITLE: As-Built of Plan Two-Storey Residential House


OWNER/S: June and Maritess Raynes
LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City

BILL OF MATERIALS

COMPUTATION SHEET
Item To Be
Estimated

Floor Tiles

Materials And Estimated Quantities


Required

Calculations

30 by 30cm
Glazed Tiles

First Floor Tiles


First Floor Area =

90.00 m2

Less: Exterior Wall Area =

30.92 0.15=4.64 m2
Interior Wall Area =
Column Area =
Bathroom Area =
Stair Area =

9.89 0.10=0.99 m2

12(0.42 0.17)=0.86 m2
2.05 1.42=2.91 m2

3.90 2.11=8.23 m

30 by 30cm
Unglazed
Tiles

30 by 60cm
Marble
Tiles

Square
Foot Wood
Tiles

5.40 0.60=3.24 m2

Kitchen Area =
Nook Area =

412

2.00 0.90=1.80 m2

Net First Floor Tile Area =

67.34 m

Under 30 by 60 cm floor tiles:

67.34 5.56=374.41
Plus : 10 % allowance for cutting and edging =

37.44
Total No. of Tiles =

411.85 ; say

Second Floor Tiles


Second Floor Area =

94.50 m2

Less: Exterior Wall Area =

33.28 0.15=4.99 m

127
2

28.99 0.10=2.90 m

Interior Wall Area =


Column Area =

15(0.42 0.17)=1.07 m2

Bedroom 1 Area =

3.45 3.55=12.25 m2

Bedroom 2 Area =

3.45 3.55=12.25 m2

Masters Bed Area =


Stairwell Area =
Bathroom Area =

3.29 6.60=21.71m

3.40 2.11=7.17 m

3.45 1.40=4.83 m2
3.29 2.00=6.58 m2

Net Second Floor Tile Area =

20.74 m

Under 30 by 60 cm floor tiles:

20.74 5.56=115.34
Plus : 10 % allowance for cutting and edging =

11.53
Total No. of Tiles =

Bedroom
Floor Tiles

Bedroom 1 Floor Area =

126.88 ; say

3.45 3.55=12.25 m2

Bedroom 2 Floor Area =

3.45 3.55=12.25 m2

Masters Bed Floor Area =

3.29 6.60=21.71m 2
Net Bedroom Floor Area =

Net Bedroom Floor Area =

46.21 m

523.00

497.21 ft

Plus : 5 % allowance for cutting and edging =

24.86 ft 2
522.07 ft 2 ; say

Total Bedroom Tile Area =

Stair Tiles

Stair Tread Area =

1.00 0.30=0.30 m2

No. of Steps = 22 Steps


Stair Tread Area for 22 steps =

22 0.30=6.60 m2
Stair Landing Area =

2.11 1.00=2.11 m2
2

Net Stair Tile Area = 8.71 m

Net Stair Tile Area =

99.00

93.72 ft 2

Plus : 5 % allowance for cutting and edging =

4.68 ft 2
Total Stair Tile Area =

Kitchen
Tiles

98.40 ft 2 ; say

Kitchen Tiles
Kitchen Area =
Nook Area =

5.40 0.60=3.24 m2
2.00 0.90=1.80 m2

Total Kitchen Tile Area =

5.04 m2

Under 30 by 30 cm floor tiles:

5.04 11.11=55.99
Plus : 10 % allowance for cutting and edging =

62

5.60
Total No. of Tiles =

61.59 ; say

Kitchen Wall Tiles


Kitchen Wall Area = 5.40 0.30=1.62m
Total Kitchen Wall Tile Area =

20

1.62 m2

Under 30 by 30 cm floor tiles:

1.62 11.11=18.00
Plus : 10 % allowance for cutting and edging =

1.80
Total No. of Tiles =
Bathroom
Tiles

19.80 ; say

Bathroom Floor Tiles

2.05 1.42=2.91 m2

Bathroom Floor Area =

3.45 1.40=4.83 m2
3.29 2.00=6.58 m2
Total Bathroom Floor Tile Area =

14.32m

175

Under 30 by 30 cm floor tiles:

14.32 11.11=159.11
Plus : 10 % allowance for cutting and edging =

15.91
Total No. of Tiles =

175.02 ; say

Bathroom Wall Tiles


Bathroom Wall Area =

6.34 1.80=11.41 m2
2

9.10 1.80=16.38 m

9.98 1.80=17.96 m2
Total Bathroom Wall Tile Area =
Under 30 by 30 cm floor tiles:

45.76 11.11=508.35 :say

45.76 m2

560

Plus : 10 % allowance for cutting and edging =

50.83
559.18 ; say

Total No. of Tiles =

TOTALS

580

237

539

622.00

BILL OF MATERIALS

COMPUTATION SHEET
Item to be
Estimated

Kitchen
Tiles

Materials And Estimated Quantities


Required

Calculations

Kitchen Area =
Nook Area =

Cement
(bags)

White Cement
(kg)

Tile Adhesive
(bags)

5.40 0.60=3.24 m2
2.00 0.90=1.80 m2

Kitchen Wall Area =

5.40 0.30=1.62m

Total Kitchen Tile Area =

6.66 m

1
4.00
1

Under 30 by 30 cm floor tiles:

6.66 0.086=0.57 ; say


6.66 0.50=3.33 ; say
6.66 0.11=0.73 ; say

Bathroom
Tiles

Bathroom Floor Area =

2.05 1.42=2.91 m2
3.45 1.40=4.83 m2
3.29 2.00=6.58 m2

Bathroom Wall Area =

6.34 1.80=11.41 m

9.10 1.80=16.38 m

9.98 1.80=17.96 m2
Total Bathroom Tile Area =

60.08 m

Under 30 by 30 cm floor tiles:

60.08 0.086=5.17 ; say

6
30.00
7

60.08 0.50=30.04 ; say


60.08 0.11=6.61 ; say
TOTALS

34.00

BILL OF MATERIALS

COMPUTATION SHEET
Item To Be
Estimated

Floor Tiles

Materials And Estimated Quantities


Required

Calculations

Wood Glue
(gallons)

Polymer
Liquid
(gallons)

Hardener
(quarts)

Calsomine
Powder
(kg)

First Floor Tiles


First Floor Area =

90.00 m

Less: Exterior Wall Area =

30.92 0.15=4.64 m2
Interior Wall Area =

12(0.42 0.17)=0.86 m2

Column Area =
Bathroom Area =
Stair Area =

2.05 1.42=2.91 m2

3.90 2.11=8.23 m

Kitchen Area =
Nook Area =

9.89 0.10=0.99 m2

5.40 0.60=3.24 m2
2

2.00 0.90=1.80 m

Net First Floor Area =

67.34 m

Under 30 by 60 cm floor tiles:

67.34 0.035=2.36 ; say


67.34 0.030=2.02 ; say
67.34 0.045=3.03 ; say
Second Floor Tiles

2
3

Second Floor Area =

94.50 m2

Less: Exterior Wall Area =

33.28 0.15=4.99 m

1
1

Interior Wall Area =

28.99 0.10=2.90 m2
Column Area =

15(0.42 0.17)=1.07 m2

Bedroom 1 Area =

3.45 3.55=12.25 m2

Bedroom 2 Area =

3.45 3.55=12.25 m2

Masters Bed Area =

3.29 6.60=21.71m 2
Stairwell Area =

3.40 2.11=7.17 m2

Bathroom Area =

3.45 1.40=4.83 m2
3.29 2.00=6.58 m2

Net Second Floor Area =

20.74 m2

Under 30 by 60 cm floor tiles:

20.74 0.035=0.73 ; say


20.74 0.030=0.62 ; say
20.74 0.045=0.93 ; say

Bedroom
Floor Tiles

Bedroom 1 Floor Area =

3.45 3.55=12.25 m2

Bedroom 2 Floor Area =

3.45 3.55=12.25 m2

Masters Bed Floor Area =

3.29 6.60=21.71m 2
2
Total Bedroom Floor Area = 46.21 m

No. of Wood Glue required:

46.21 0.165=7.62 ; say

Stair Tiles

Stair Tread Area =

1.00 0.30=0.30 m2

No. of Steps = 22 Steps


Stair Tread Area for 22 steps =

22 0.30=6.60 m2
Stair Landing Area =

2.11 1.00=2.11 m2

Total Stair Tile Area =

8.71 m

No. of Wood Glue required:

8.71 0.165=1.44 ; say


TOTALS

10

PROJECT TITLE: As-Built of Plan Two-Storey Residential House


OWNER/S: June and Maritess Raynes
LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City

BILL OF MATERIALS

COMPUTATION SHEET
Item to be
Estimated

Exterior
Paint

Materials And Estimated Quantities


Required

Calculations

Concrete Primer
Sealer
(gallons)

Acrylic Gloss
Latex Paint
(gallons)

First Floor Exterior


Surface Perimeter =
Surface Area =
Less: Door:

38.00 m

38.00 4.30=163.40 m2

1.40 2.10=2.94 m

0.80 2.10=1.68 m2
Window:

2 (1.96 2.50 )=9.80 m2


2 (2.10 1.70 )=7.14 m2
2

1.40 0.70=0.98 m

1.20 0.80=0.96 m2
0.60 0.60=0.36
Net Surface Area =

139.54 m2

Under area coverage of 40 sq. m. per gallon:


For Primer Paint:
4

139.54
=3.49
40
; say

Concrete
Neutralizer
(quarts)

For Final Coating:

139.54
=3.49
40
; say
For Concrete Neutralizer:

1.50

139.54
=3.49
40
* One quart of neutralizer is mixed with 2- gallons
of water

3.49
=1.40
2.5
; say

Second Floor Exterior


Surface Perimeter =

39.00 m

39.00 4.42=172.38 m2

Surface Area =

2
Less: Window: 6 ( 1.60 1.50 )=14.40 m

2 ( 0.60 0.60 )=0.72m2


1.00 1.50=1.50 m

2
Net Surface Area = 155.76 m

Under area coverage of 40 sq. m. per gallon:


For Primer Paint:

155.76
=3.89
40
; say
For Final Coating:

1.50

155.76
=3.89
40
; say
For Concrete Neutralizer:

155.76
=3.89
40
* One quart of neutralizer is mixed with 2- gallons
of water

3.89
=1.56
2.5
; say

Interior
Paint

First Floor Interior


Total Surface Perimeter =
Surface Area =
Less: Door:

60.02 m

60.02 3.85=231.08 m2

0.60 2.10=1.26 m2
1.40 2.10=2.94 m2
0.80 2.10=1.68 m2

Window:

2 (1.96 2.50 )=9.80 m2


2 (2.10 1.70 )=7.14 m

1.40 0.70=0.98 m2
1.20 0.80=0.96 m2
0.60 0.60=0.36
Net Surface Area =

205.96 m2

Under area coverage of 40 sq. m. per gallon:


For Primer Paint;

205.96
=5.15
40
; say
For Final Coating;

205.96
=5.15
40
; say

For Concrete Neutralizer;

205.96
=5.15
40
* One quart of neutralizer is mixed with 2- gallons
of water

5.15
=2.06
2.5
; say
Second Floor Interior
Total Surface Perimeter =
Surface Area =

104.43 m

104.43 4.42=461.58 m2

2
Less: Door: 3(0.80 2.10)=5.04 m

11

2(0.60 2.10)=2.52 m2
Window:

6 ( 1.60 1.50 )=14.40 m2


2 ( 0.60 0.60 )=0.72m2
1.00 1.50=1.50 m

Net Surface Area =

437.40 m2

Under area coverage of 40 sq. m. per gallon:


For Primer Paint;

11

437.40
=10.94
40
; say
4.50

For Final Coating;

437.40
=10.94
40
; say

For Concrete Neutralizer;

437.40
=10.94
40
* One quart of neutralizer is mixed with 2- gallons
of water

10.94
=4.37
2.5
; say

Roof Slab
Paint

Surface Area =

11.10 9.30=103.23 m

40.80 0.10=4.08 m2
29.10 0.30=8.73 m2
Total Surface Area of Roof Slab =

116.04 m 2

Under area coverage of 40 sq. m. per gallon:


3

For Primer Paint;

116.04
=2.90
40
; say

For Final Coating;

116.04
=2.90
40
; say
For Concrete Neutralizer;

116.04
=2.90
40
1.50
* One quart of neutralizer is mixed with 2- gallons
of water

2.90
=1.16
2.5
; say

27

TOTALS

27

11

BILL OF MATERIALS

COMPUTATION SHEET
Item to be
Estimated

Ceiling
Paint

Materials And Estimated Quantities


Required

Calculations

Wood Primer
(gallons)

First Floor Ceiling


First Floor Area =

90.00 m2

Less: Interior Wall Area =

12(0.42 0.17)=0.86 m

Column Area =
Beam Area =

10.49 0.10=1.05m

63.60 0.20=12.72m2

Stairwell Area =

2.11 3.40=7.17 m2

Total First Floor Ceiling Area =

68.20 m2

Under area coverage of 35 sq. m. per gallon:

Quick Dry
Enamel
(gallons)

Paint Thinner
(gallons)

2
For Primer Paint;

68.20
=1.95
35
; say
2
For Top Coating;

68.20
=1.95
35
; say
Second Floor Ceiling
Second Floor Area =

94.50 m2

Less: Interior Wall Area =

15(0.42 0.17)=1.07 m2

Column Area =
Beam Area =

32.59 0.10=2.90 m2

73.50 0.20=14.70 m

Total First Floor Ceiling Area =

75.83 m

Under area coverage of 35 sq. m. per gallon:


2
For Primer Paint;

75.83
=2.17
35
; say
For Top Coating;
1

75.83
=2.17
35
; say

For Paint Thinner


Total gallons of Paint =

8 gallons

Under an average of liter per gallon of paint:

8 0.132=1.06 ; say
TOTALS

PROJECT TITLE: As-Built of Plan Two-Storey Residential House


OWNER/S: June and Maritess Raynes

LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City

BILL OF MATERIALS

COMPUTATION SHEET
Item to be
Estimated

Materials Required

Estimated
Quantity

30.00mm2 THHN Copper Wire, 150m

2 boxes

8.0mm2 TW Copper Wire, 150m

1 box

32 mm RSC Pipe

2 boxes

Lighting Outlet

63 pieces

Duplex Convenience Outlet

16 pieces

Refrigerator Outlet

1 piece

Washing Machine Outlet

1 piece

Range Outlet

1 piece

Air Conditioning Unit Outlet

5 pieces

Weather-proof Outlet

2 pieces

Single Pole Switch

2 pieces

Duplex Pole Switch

7 pieces

Triplex Pole Switch

7 pieces

Three-way Switch

2 pieces

Fuse Box

1 piece

Circuit Breaker

15 pieces

Junction Box D.T. 4 x 4

54 pieces

Utility Box D.T. 2 x 4

75 pieces

Electrical Tape

25 rolls

PROJECT TITLE: As-Built of Plan Two-Storey Residential House


OWNER/S: June and Maritess Raynes
LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City

BILL OF MATERIALS

COMPUTATION SHEET
Item to be
Estimated

Materials Required

Estimated
Quantity

PVC Pipe 4 , 10 ft
Sanitary Line

Length of Pipe:

2.50+1.00+5.00+11.50 +10.50+1.50+1.50+21.00+3.00+2.50+ 2.00=62.00 m203.40 ft


No. of Bars required:

203.40
=20.34
10
21 pieces
; say
Sanitary Tee

9 pieces

Elbow

14 pieces

1/8 in. Bend Elbow

14 pieces

1/8 in. Bend Elbow and Wye Combo

2 pieces

Sanitary Wye

15 pieces

Coupling

21 pieces

Clean-out with Plug

10 pieces

Solvent Cement

15 liters

Pipe in. by 14.00 ft


Water Line

Length of Pipe:

1.50+13.00+18.00=32.50m106.62 ft

No. of Bars required:

106.62
=7.62
14
; say

8 pieces

Pipe in. by 14.00 ft


Length of Pipe

0.25+0.80+ 0.60+ 1.80+4.00+10.50+ 3.00+ 1.00=21.95 m72.00 ft


No. of Bars required:

72.00
=5.14
14
; say

6 pieces

Elbow in.

3 pieces

Elbow in.

6 pieces

Septic Tank

Street Ell

4 pieces

PE Adaptor

1 piece

Tapped Tee in.

1 piece

Tapped Tee in.

10 pieces

Reducer Ell

3 pieces

Reducer Tee

5 pieces

Nipple

14 pieces

Union

2 pieces

Water Meter

1 piece

Gate Valve

3 pieces

Faucet (Kitchen)

1 piece

Faucet (Bathroom)

5 pieces

Hose Bibb

2 pieces

Concrete Hollow Blocks, 100

200 400 mm

100 pieces

Concrete Hollow Blocks, 150

200 400 mm

260 pieces

Steel Reinforcing Bars, Deformed 10 mm

14 pieces

Cement

32 bags

Sand

3.20 cu.m.

Gravel

0.90 cu.m.

PVC Pipe 6 in. , 10 ft


Catch Basin

Length of Pipe

36.00+14.00=50.00 m164.04 ft
No. of Bars required:

164.04
=16.40
10

Concrete Hollow Blocks, 100

; say

17 pieces

200 400 mm

120 pieces

Steel Reinforcing Bars, Deformed10 mm

3 pieces

Cement

15 bags

Sand

0.90 cu.m.

Gravel

1.20 cu.m

Water Closet

3 pieces

Fixtures and

Urinal

2 pieces

Accessories

Lavatory

3 pieces

Kitchen Sink

1 piece

Laundry Tray

1 piece

Soap Holder

3 pieces

Toilet Paper Holder

3 pieces

Towel Holder

2 pieces

Shower Head

2 pieces

Floor Drain

4 pieces

Teflon Tape

20 rolls

Miscellaneous

PROJECT TITLE: As-Built of Plan Two-Storey Residential House

OWNER/S: June and Maritess Raynes


LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City

BILL OF MATERIALS

COMPUTATION SHEET
Item to be
Estimated
Excavation for
Rectangular
Footing

Estimated
Quantity

Computation
F-1
Side Footing for Rectangular Column

1.10 1.30 1.20=1.72m3

Excavation volume per footing =


No. of Side Footing = 4 sets

4 1.72=6.86 m

Total Excavation Volume =

6.90 m

F-2
Center Footing for Rectangular Column

2.00 1.20 1.20=2.88 m3

Excavation volume per footing =

23.00 m3

No. of Side Footing = 8 sets

8 2.88=23.04 m

Total Excavation Volume =

Excavation for
Wall Footing

Exterior Wall Footing


Total Length of Exterior Wall Footing =

33.12 m
3

33.12 0.60 0.80=15.90 m

Total Excavation Volume =

15.90 m3

Interior Wall Footing


Total Length of Interior Wall Footing =

Excavation for
Septic Tank

Excavation Volume of Septic Tank

Backfill and
Compaction for
Rectangular
Footing

F-1
Side Footing for Rectangular Column

3.70 1.30 1.70=8.18 m3

Less: Volume of Footing =

5.00 m

10.49 0.60 0.80=5.04 m3

Total Excavation Volume =

Volume of Excavation =

10.49 m

1.72 m

1.07 m3

8.20 m3

0.06 m3

Volume of Column =

Backfill and Compaction volume per footing =

0.59 m3
2.40 m3

No. of Side Footing = 4 sets


Total Backfill and Compaction Volume =

4 0.59=2.36 m

F-2
Center Footing for Rectangular Column
Volume of Excavation =

2.88 m3

Less: Volume of Footing =

1.21 m

12.90 m3
Volume of Column =

0.06 m

Backfill and Compaction volume per footing =

1.61 m3

No. of Side Footing = 8 sets


Total Backfill and Compaction Volume =

Backfill and
Compaction for
Wall Footing

8 1.61=12.88 m

Exterior Wall Footing


Total Length of Exterior Wall Footing =
Total Excavation Volume =

33.12 m

33.12 0.45 0.60=8.94 m

9.00 m3

Interior Wall Footing


Total Length of Interior Wall Footing =
Total Excavation Volume =
Gravel Fill

Area of Gravel Fill =

10.49 m

3.20 m3

10.49 0.50 0.60=3.15 m3

83.13 m2

Volume of Gravel =

83.13 0.20=16.62m

17.00 m3

PROJECT TITLE: As-Built of Plan Two-Storey Residential House


OWNER/S: June and Maritess Raynes
LOCATION: Lot 6, Blk. 24, Rose Hip St., Arbor Towne, Valenzuela City

BILL OF MATERIALS

COMPUTATION SHEET
Item To Be
Estimated

Ceiling Joist

Materials And Estimated


Quantities Required

Calculations

12mm THK
Plywood

2 by 2
Lumber

First Floor Ceiling


First Floor Area =

90.00 m2

Less: Interior Wall Area =

12(0.42 0.17)=0.86 m2

Column Area =
Beam Area =

10.49 0.10=1.05m2

63.60 0.20=12.72m

Stairwell Area =

2.11 3.40=7.17 m

435

68.20 m2

Total First Floor Ceiling Area =

Under 2 by 2 ceiling joist at 0.40 m by 0.40 m


spacing :

68.20 6.379=435.05 ; say


Second Floor Ceiling

94.50 m2

Second Floor Area =

Less: Interior Wall Area =

484
2

32.59 0.10=2.90 m
2

15(0.42 0.17)=1.07 m

Column Area =

73.50 0.20=14.70 m2

Beam Area =

75.83 m2

Total First Floor Ceiling Area =

Under 2 by 2 ceiling joist at 0.40 m by 0.40 m


spacing :

75.83 6.379=483.72 ; say

Ceiling
Board

First Floor Ceiling


First Floor Area =

90.00 m2

Less: Interior Wall Area =

12(0.42 0.17)=0.86 m2

Column Area =
Beam Area =

10.49 0.10=1.05m2

63.60 0.20=12.72m

Stairwell Area =

2.11 3.40=7.17 m

Total First Floor Ceiling Area =

68.20 m2
24

No. of Plywood required:

68.20
=23.68
2.88
; say

Second Floor Ceiling


Second Floor Area =

94.50 m2

Less: Interior Wall Area =


Column Area =

32.59 0.10=2.90 m2

15(0.42 0.17)=1.07 m2
27

2
Beam Area = 73.50 0.20=14.70 m

Total First Floor Ceiling Area =

75.83 m2

No. of Plywood required:

75.83
=26.33
2.88
; say
TOTALS

51