Sei sulla pagina 1di 24

LTE SCFT Report

Bharti Airtel TDD LTE Project


eNodeB Name

e_CHH04197

eNodeB ID
Date of Test

4197
2-Aug-13

Table of Content
1.

Tool Used............................................................................................................................................................................................................................................. 3

2.

Single Site Physical Parameter Check List........................................................................................................................................................................................... 3

3.

Performance Summary......................................................................................................................................................................................................................... 4

4. Single Site RF Performance Check List..................................................................................................................................................................................................... 5


4.1 Handover Test................................................................................................................................................................................... 5
4.2 Network Attach/Detach and E-RAB.................................................................................................................................................... 7
4.3 Subscriber service restoration time after BS reboot....................................................................................................................... 10
4.4 Paging and TAU update................................................................................................................................................................... 10
4.5 Throughput and Capacity Test........................................................................................................................................................ 12
5. Coverage Test........................................................................................................................................................................................................................................... 17
5.1. RSRP Plot........................................................................................................................................................................................ 19
5.2. SINR Plot........................................................................................................................................................................................ 21
5.3. DL Throughput Plot........................................................................................................................................................................ 23
5.4. UL Throughput Plot........................................................................................................................................................................ 24
5. NB List Check List................................................................................................................................................................................................................................... 26

1. Tool Used

Drive Test KIT which is including the latest testing software for LTE.
GARMIN GPS for Positioning.
UE with test SIM cards.
For model of all tools versions Please refer the below table:
Airtel LTE 4G
1.

Test UE model

E392

Drive Test Laptop model

HP(450)

Drive Test Software and its version

Genex Probe V3R5

2.
3.

4.
5.

Specification / Details

GPS Type / Model

Garmin

Drive Test Analysis Software & Version

Genex Assistant V3R5

6. Number of RB Used

100

2. Single Site Physical Parameter Check List

Test Date

Drive Test Engineer

Channel Bandwidth

ENodeB ID

No. of cells
3

2-Aug-13

Sanjeev saini

20 MHz

4197

Base Station Information


Site Name

e_CHH0419
7

Cell
ID
1
2
3

Antenna
Sharing Info
LTE Only
LTE Only
LTE Only

Cell
Info
0
1
2

PCI

186

Lat

28.46611

Long

77.18069

Azimuth

Down
tilt
E
M
Tilt Tilt

40

187

28.46611

77.18069

140

188

28.46611

77.18069

250

MIM
O
4T4R
4T4R
4T4R

Tx used
Fiber+MW
(60mbps)
Fiber+MW
(60mbps)
Fiber+MW
(60mbps)

Clutter
Type
urban
Suburba
n
Suburba
n

BS
Power
(dBm)
46
46
46

3. Performance Summary

No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

KPI
RRC Setup Success Rate
Erab Setup Success Rate
Call Drop Rate
DL Average Throughput (mpbs)
UL Average Throughput (mpbs)
DL Peak Throughput (mbps)
UL Peak Throughput (mbps)
Handover Delay (ms)
Attach Latency
Detach Latency

Target
98%
98%
1%
28
5
50
8
25
280~400 (EPC dependency)
40~90 (EPC dependency)

Achieved
100%
100%
0%
38.97
7.92
69.25
9.28
19.37
307.55
71.88

Remark
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
4

4. Single Site RF Performance Check List

4.1 Handover Test

Test No.

Site-HO1

Intra Site handover

Result
19.37 ms
10

Handover Delay (CPS avg.)


Total handover count
Handover success rate

Remark
Total HO count during drive test.

100%

4.2

Data, Logs and Snapshots


Handover_intra-site_0% Load:

Handover Driver Route :

Intra Site Handover

HO success rate is
100%

Cell Info

Handover Attempt

Successful Handover

Remark

Sector A to B

Successful

Sector B to C

Successful

Sector C to A

Successful

Sector A to C

Successful

Sector C to B

Successful

Sector B to A

Successful

Result

No.

CPS

Handover Delay (ms)


Intra-site(ms)
UPS (UL)

UPS (DL)

Network Attach/Detach and E-RAB

Test No.

Site-NE01
Networks attach and detach.

Result
100%
100%

Remark

Attach success rate


Detach success rate
Attach Delay (ms)

307.55ms

Avg. Attach Delay Time

Detach Delay (ms)

71.88 ms

Avg. Detach Delay Time

Data, Logs and Snapshots

Test Result

NEAR
Attach Delay
Data points

Attach

Samples
ATTACH DELAY(ms)
DETACH DELAY(ms)

1
301
70

2
307
73

MID
3
291
71

4
303
70

5
310
71

-EDGE
6
330
72

7
300
73

8
319
73

9
307
74

Average(msec)
307.55
71.88

100%
7

Success Rate
Detach
Success rate

100%

Remark

NA

Detail Dump
Enclosed

ATTACHDTACH.rar

Execution
Date

Test. No
E-RAB establish and delete
Establish success rate
Delete success rate

2-Aug-13

Site-NE02
Result
100%
100%

Remark

Data, Logs and Snapshots

Test
Result

Establish
success
rate
Remark

100%
This Test performed at sample sites.

Executio
n Date

23-May-13

4.3 Subscriber service restoration time after BS reboot

Test No.
Subscriber service restoration time after BS reboot
Restoration time

Site-NE03
Result

Remark
.

Data, Logs and Snapshots

ALARM RAISED
TIME
(Hr:Min:Sec)

SITE

ALARM
CLEARED TIME
(Hr:Min:Sec)

T1
(Min:Sec:m
s)

RRC Connection
Request
(Hr:Min:Sec:ms)

RRC Connection Reconfiguration


Complete
(Hr:Min:Sec:ms)

T2
(Min:Sec:m
s)

Total Restoration
Time (T1+T2)
(Min:Sec:ms)

Test Result

Restoration time
(avg.)
Remark

This Test performed at pilot sites later.

Execution Date

4.4 Paging and TAU update

Test No.
Paging and TAU update( Y/N)

Site-NE04
Result

Remark

Data, Logs and Snapshots

10

Paging

Test Result

SITE

Paging

RRCConnectionRequ
est

RRCConnectionSetup

RRCConnectionSetupComplete

Paging Time (ms)

e_GGN01542
e_GGN01542

17:25:07.398

17:25:07.412

17:25:07.442

17:25:07.451

53

17:35:47.3329

17:35:47.383

17:35:47.412

17:35:47.421

51

e_GGN01542

17:37:37.436

17:37:37.450

17:37:37.480

17:37:37.489

53

e_GGN01542

17:43:14.076

17:43:14.090

17:43:14.120

17:43:14.129

53

e_GGN01542

17:43:40.956

17:43:40.971

17:43:41.000

17:43:41.009

53

Tracking Area Update


SITE

TrackingAreaU
pdateRequest

RRCConnectionSetup

RRCConnectionSetupComplete

TrackingAreaUpdateAccept

TAU Time (ms)

e_GGN01542

18:27:48.320

18:27:48.362

18:27:48.371

18:27:48.439

119

e_GGN01542

18:28:37.871

18:28:37.920

18:28:37.929

18:28:37.998

04384

e_GGN01542

18:32:58.3275

18:32:58.710

18:32:58.719

18:32:58.7329

103

e_GGN01542

18:34:03.018

18:34:03.060

18:34:03.069

18:34:03.120

102

e_GGN01542

18:34:57.143

18:34:57.190

18:34:57.199

18:34:57.327

130

1.Paging

Data Points

Remark

2.TAU

Paging and TAU test is only for sample sites.

11

Detail Dump
Enclosed
Execution Date

Paging.rar TAU.rar

23-May-13

12

4.5 Throughput and Capacity Test

13

Test No.

Site-THR_01

Measurement of UL/DL Throughput, coverage, latency and jitter in stationary mode in TCP/UDP covering all the way from cell center to cell edge -- no
load on the neighboring cells

Data, Logs and Snapshots


Test Result

Test. No.

Site-THR_02

Peak throughput achieved by a device in best case possible


Downlink throughput (Mbps)
UL
Uplink Throughput (Mbps)
Throughput
Data,
Logs and Snapshots
in UDP

Result(Mbps)
69.25
9.28

Remark
Max. Throughput Achieved during Drive Test
Max. Throughput Achieved during Drive Test

Test Result

UL
Throughput
in TCP

DL
Throughput
in UDP

Not attemp due remot login of server not available & not required TCP is good

Data Points
DL Throughput.csv

DL
Remark
Throughput
inDetail
TCP Dump
Enclosed
Execution Date

UL Throughput.csv

Downlink/Uplink CSV files are attached for reference.


NA
2-Aug-13

14
Bidirectiona

5. Coverage Test

Test. No.

Site- CT02 , Site- CT01, Site- CT03

Outdoor and indoor coverage.


Drive Test

Result
Please refer index 4.4 and index 4.5 for
the same.
Please refer index 4.1 for the same.
Please refer index 4.3 for the same.
Could not about to do indoor test due to
access issue.

Achieved data rate


RSRP measurement
SINR Measurement
Outdoor and indoor coverage

Remark

Coverage quality and stability verify

Data, Logs and Snapshots


Test Result
Data Points
Remark

Please refer index 4.1 to 4.5 for the same details.

Detail Dump
Enclosed
Execution Date

2-Aug-13

Site Clutter layout:

PCI Coverage DT Plot:

15

Site Serving Clutter Details


ID

Clutter Class

1
2
3
4

Open_Area
Quasi_Open
Low_Dense_vegetation
Medium_Urban

Area(sq.km.
)

Percent

Total Duration of Drive: 2:05:00 Hr:Min:Sec.


Total Distance covered during drive: 2.79 km.
16

5.1. RSRP Plot

Type

RSRP DT Plot and Prediction Plot

17

Stats:
RSRP dBm

Drive Test Bin Count

Drive Test Percentage (%)

[-75, INF)
[-85, -75.0)

798
539
469
113
103
31
0

38.87%
26.25%
22.84%
5.50%
5.02%
1.51%
0.00%

[-95.0, -85.0)
[-100.0, -95.0)
[-110.0, -100.0)
[-117.0, -110.0)
[-INF, -117.0)

Simulation
Percentage%

Cumulative Percentage%
Drive test Percentage

Simulation test Percentage

38.87%
65.12%
87.97%
93.47%
98.49%
100.00%
100.00%

As per SCFT observation MU penetration loss is 17 dB.


Considering -117 dB as indoor acceptable level outdoor RSRP Acceptable level is -100 dBm.
Outdoor coverage radius as per 220 m.

18

5.2. SINR Plot

Type

SINR DT Plot and Prediction Plot

Stats:
SINR dB

Drive Test Bin Count

Drive Test Percentage


(%)

[20, INF]
[12, 20]
[5, 12]

1521
296
105

76.66%
14.92%
5.29%

Simulation Percentage
%

Cumulative Percentage%
Drive test Percentage

Simulation test Percentage

76.66%
91.58%
96.88%
19

[2, 5]
[-2, 2]
[-INF, -2]

21
23
18

1.06%
1.16%
0.91%

97.93%
99.09%
100.00%

5.3. DL Throughput Plot

Type

DL Throughput DT Plot

Stats:
DL Throughput Mbps

Drive Test Bin Count

Drive Test Percentage

Simulation Percentage

Cumulative Percentage%
20

(%)

Drive test
Percentage

[40.0,INF)

1045

51.30%

51.30%

[20.0,40.0)

906

44.48%

95.78%

[10.0,20.0)

81

3.98%

99.75%

[5.0,10.0)

0.25%

100.00%

[1.0,5.0)

0.00%

100.00%

[-INF,1.0)

0.00%

100.00%

Simulation test
Percentage

Average DL Throughput Received: 38.97 Mbps.

21

5.4. UL Throughput Plot

Type

UL Throughput DT Plot and Prediction Plot

Stats:
UL Throughput Mbps
[8.0,INF)
[5.0,8.0)

Drive Test Bin Count

959
194

Drive Test Percentage


(%)

74%
15%

Simulation Percentage
%

Cumulative Percentage%
Drive test
Simulation test
Percentage
Percentage

74.28%
89.31%
22

77
40
17
4

[2.0,5.0)
[1.0,2.0)
[0.5,1.0)
[-INF,0.5)

6%
3%
1%
0%

Average UL Throughput Received: 7.92

95.27%
98.37%
99.69%
100.00%

Mbps,

5. NB List Check List

Serving Cell
Name_Cell ID

Neighbor Cell
Name_Cell ID

Serving Cell PCI

Neighbor Cell PCI

Incoming HO

Outgoing HO

Remarks

e_CHH04197A

e_CHH04197B

186

187

Yes

Yes

Successful

e_CHH04197A

e_CHH04197C

186

188

Yes

Yes

Successful

e_CHH04197B

e_CHH04197A

187

186

Yes

Yes

Successful

e_CHH04197B

e_CHH04197C

187

188

Yes

Yes

Successful

e_CHH04197C

e_CHH04197A

186

Yes

Yes

Successful

e_CHH04197C

e_CHH04197B

187

Yes

Yes

Successful

188
188

No route in front of third sector for drive. Pls look attached sheet.
Remarks(Further comments)
google snap.PNG

Checked by
23

Signature(Huawei):
Signature(BHARTI):

24

Potrebbero piacerti anche