01 April 2011
Our ref:
Your ref:
PO-6295
GZBZJ-NJC-1925
DELIVERY: BY HAND
2)
525kV Switchyard
Your drawing titled "overall layout of 525kV Switchyard (1/3)" has been reviewed by NJC and is
returned with the stamp "Approved Except as Noted". Please incorporate our comments and
resubmit at an early date for our review.
3)
4)
Further your attention is drawn to ANNEX - 1 wherein a column "Response by Contractor" is provided .
You are required to fill the said column and return ANNEX - 1 to us.
Yours faithfully
for
N :~ONSUL:TS
As stated above
Filing
Owner
Printed
130. 560
Neelum Jhelum ConSUltants
1 Apnl2011
Status
Filla I
Distribution :
Addressee
CEO{NJHPC); PO
Electncal
File
Doc ref: PO 6295 E1 525kV XLPE Cable - Switchyard Layout
.l
ANNEX'- I
.,
** A
= APPROVED
AEN APPROVED EXCEPT AS NOTED
RFC = RETURNED FOR CORRECTION
31.03.11
As noted in
the table
below under
Conclusion**:
Column "Page
or Document
No."
i
Comment No.
Page or
Drawing No.
Covering
Letter
(Status: RFC)
KSH-2006-8
03 (Page 4/6)
(Status: RFC)
Clause/Para. No.
Comment by NJC
Response
by Contractor
Further
comment by NJC
Under heading
"Type"
i'l
Comment No.
Page or
Drawing No.
Clause/Para. No.
Under heading
"Type"
Under heading
"Type"
Attached is the blank formal proforma which you were required to fill {but
earlier you had not provided) while you had supplied "Form of Tender and
Appendices, Part 0, Appendix I to Tender". Please fill it now and submit
for our review
Under heading
"Cable
Construction"
Under heading
"Cable
Construction"
Under heading
"Cable
Construction"
In line No 12. You have indicated that professional Single Bend is 1.9
meter. Please note that minimum bending radius shall be 20 times outer
diameter of the cable. Hence 1.9 meter is not acceptable
Comment by NJC
Under heading
"Cable
Construction"
Under heading
"Cable
Construction"
The length of 525kV cable per phase per circuit is approximately 700
meters. Please inform whether a single drum will contain the above
mentioned 700 meter long cable.
10
Under heading
"Laying in air"
Response
by Contractor
Further
comment by NJC
I)
Comment No.
Page or
Drawing No.
Clause/Para. No.
11
KSH-2006-8
03 (Page 4/6)
(Status: RFC)
Under heading
"Laying in air"
Under heading
"Laying in air"
You have indicated a value of 0 W/m2 for solar radiation. Please submit a
drawing showing how, in the 525kV switchyard, cable is connected to
525kV bushing (which is resting on a steel structure). That is, please
inform if in this area the cable is enclosed in a flexible conduit. Also
provide a drawing showing the route of the cable from the 525kV cable
gal/ery upto above said bushing. In case even 600 mm of cable is
exposed to solar radiation near above said bushing then as per standards
a value of 1200 W/m2 for the solar radiation shall be taken into account.
Comment by NJC
12
KSH-2006-8
03 (Page 4/6)
(Status: RFC)
13
KSH-2006-8
03 (Page 4/6)
(Status: RFC)
Please confirm that the outer PE jacket of the cable will withstand a test
Under heading
voltage of 1OkV for a duration of 1 minute if this test voltage is applied
"Electrical Data"
between copper screen and the PE jacket.
14
KSH-2006-8
03 (Page 4/6)
(Status: RFC)
Under heading Please inform as to what is the maximum induced voltage (volts) on cable
"Electrical Data" screen under fault conditions
Response
by Contractor
Further
comment by NJC
15
KSH-2006-8
03 (Page 4/6)
(Status: RFC)
16
KSH-2006-8
03 (Page 4/6)
(Status: RFC)
Page or
Drawing No.
Response
by Contractor
Clause/Para. No.
Comment by NJC
17
Calculation for
525kV XLPE
Cable
(Status:RFC)
General
Please refer to Contract Drawing No. 4421 titled "Transformer Hall cross-
if the single core cables are laid in the trefoil formation in an enclosed
applicable for the entire route of the cable from the step-up Transformer
18
Calculation for
525kV XLPE
Cable
(Status:RFC)
Clause 1
Please also indicate the length of the cable and it should be fully in
accordance with above mentioned Contract Document, Part 0, Chapter 5,
Clause 5.1.
19
Calculation for
525kV XLPE
Cable
(Status:RFC)
Clause 2
20
Calculation for
525kVXLPE
Cable
(Status:RFC)
Comment No.
Clause 3.1
21
Calculation for
525kVXLPE
Cable
(Status:RFC)
Clause 3.2
22
Calculation for
525kV XLPE
Cable
(Status:RFC)
Clause 3.2
.....-
.--
.........-
. - -..... -..
-.-~-
..- . - . - . - . - ......... _.
......._.. _.
........_..
Further
comment by NJC
'.
II
Comment No.
Page or
Drawing No.
Response
by Contractor
Comment by NJC
Clause/Para. No.
23
DWG. C3-C
5046 Rev.O
(Status: AEN)
24
DWG. C3-C
5046 Rev.O
(Status: AEN)
25
DWG. C3-C
5046 Rev.O
(Status: AEN)
26
DWG. C3-C
5046 Rev.O
(Status: AEN)
Further
comment by NJC
J
.
27
DWG. C3-C
5046 Rev.O
(Status: AEN)
28
DWG. C3-C
5046 Rev.O
(Status: AEN)
29
DWG. C3-C
5046 Rev.O
(Status: AEN)
30
DWG. C3-C
5046 Rev.O
(Status: AEN)
31
DWG. C3-C
5046 Rev.O
(Status: AEN)
3i
DWG. C3-C
5046 Rev.O
(Status: AEN)
Comment No.
Page or
Drawing No.
33
DWG. C3-C
5046 Rev.O
(Status: AEN)
34
DWG. C3-C
5046 Rev.O
(Status: AEN)
35
DWG. C3-C
5046 Rev.O
(Status: AEN)
36
DWG. C3-C
5046 Rev.O
(Status: AEN)
37
DWG. C3-C
5046 Rev.O
(Status: AEN)
38
DWG. C3-C
5046 Rev.O
(Status: AEN)
39
DWG. C3-C
5046 Rev.O
(Status: AEN)
40
DWG. C3-C
5046 Rev.O
(Status: AE N)
41
DWG. C3-C
5046 Rev.O
(Status: AEN)
42
DWG. C3-C
5046 Rev.O
(Status: AEN)
43
DWG. C3-C
5046 Rev.O
(Status: AEN)
44
DWG. C3-C
5037 Rev.3
(Status: AEN)
Clause/Para. No.
Response
by Contractor
Comment by NJC
..
Further
comment by NJC
Comment No.
Page or
Drawing No.
Clause/Para. No.
Comment by NJC
45
DWG. C3-C
5037 Rev.3
(Status: AEN)
46
DWG. C3-C
5037 Rev.3
(Status: AEN)
47
DWG. C3-C
5037 Rev.3
(Status: AEN)
48
DWG. C3-C
5037 Rev.3
(Status: AEN)
49
DWG. C3-C
5037 Rev.3
(Status: AEN)
50
DWG. C3-C
5037 Rev.3
(Status: AEN)
51
DWG. C3-C
5037 Rev.3
(Status: AEN)
52
DWG. C3-C
5037 Rev.3
(Status: AEN)
53
DWG. C3-C
5037 Rev.3
(Status: AEN)
54
DWG. C3-C
5037 Rev.3
(Status: AEN)
Response
by Contractor
Further
comment by NJC
Comment No.
Page or
Drawing No.
55
DWG. C3-C
5037 Rev.3
(Status: AEN)
56
DWG. C3-C
5037 Rev.3
(Status: AEN)
SHOW LIGHTING FIXTURES FOR HIGH BAY HID LIGHTS [OR IF HID
LIGHTS ARE NOT USED BUT SOME OTHER TYPE IS USED THEN
THE SAME SHOULD BE SHOWN J ON CEILING, TO CONFIRM
PROPER CLEARANCE ABOVE CRANE TROLLY.
57
DWG. C3-C
5037 Rev.3
(Status: AEN)
58
DWG. C3-C
5037 Rev.3
(Status: AEN)
59
DWG. C3-C
5037 Rev.3
(Status: AEN)
60
DWG. C3-C
5037 Rev.3
(Status: AEN)
61
DWG. C3-C
5037 Rev.3
(Status: AEN)
62
DWG. C3-C
5037 Rev.3
(Status: AEN)
SHOW OPEINING IN FLOOR AND GIVE ITS SIZE FOR THE MAIN
TRANSFORMER HV BUSHING.
63
DWG. C3-C
5037 Rev.3
(Status: AEN)
64
DWG. C3-C
5037 Rev.3
(Status: AEN)
Clause/Para. No.
Comment by NJC
Response
by Contractor
Further
comment by NJC
Comment No.
Page or
Drawing No.
65
DWG. C3-C
5037 Rev.3
(Status: AEN)
DWG. C3-C
5037 Rev.3
(Status: AEN)
67
DWG. C3-C
5037 Rev.3
(Status: AEN)
PROVE ADEQUACY.
68
DWG. C3-C
5037 Rev.3
(Status: AEN)
69
DWG. C3-C
5037 Rev.3
(Status: AEN)
70
DWG. C3-C
5037 Rev.3
(Status: AEN)
71
DWG. C3-C
5037 Rev.3
(Status: AEN)
72
DWG. C3-C
5037 Rev.3
(Status: AEN)
66
--
Clause/Para. No.
Comment by NJC
Response
by Contractor
Further
comment by NJC
Comment No.
Page or
Drawing No.
73
DWG. C3-C
5037 Rev.3
(Status: AEN)
74
DWG. C3-C
5037 Rev.3
(Status: AEN)
75
DWG. C3-C
5037 Rev.3
(Status: AEN)
76
DWG. C2-E
4005 Rev.-
(Status: AEN)
77
DWG. C2-E
4005 Rev.-
(Status: AEN)
78
DWG. C2-E
4005 Rev.-
(Status: AEN)
79
DWG. C2-E
4005 Rev.-
(Status: AEN)
80
DWG. C2-E
4005 Rev.-
(Status: AEN)
81
DWG. C2-E
4005 Rev.-
(Status: AEN)
82
DWG. C2-E
4005 Rev.-
(Status: AEN)
83
DWG. C2-E
4005 Rev.-
(Status: AEN)
Response
by Contractor
Comment by NJC
Clause/Para. No.
Further
comment by NJC
t,
Comment No.
Page or
Drawing No.
84
DWG. C2-E
4005 Rev.-
(Status: AEN)
85
DWG. C2-E
4005 Rev.-
(Status: AEN)
86
DWG. C2-E
4005 Rev.-
(Status: AEN)
87
DWG. C2-E
4005 Rev.-
(Status: AEN)
88
DWG. C2-E
4005 Rev.-
(Status: AEN)
FOR ITEM NO.8 ONE OF THE CORE SHALL BE "110/3" AS PER MAIN
SINGLE LINE C3-E-9051.
89
DWG. C2-E
4005 Rev.-
(Status: AEN)
90
DWG. C2-E
4005 Rev.-
(Status: AEN)
91
DWG. C2-E
4005 Rev.-
(Status: AEN)
92
DWG. C2-E
4005 Rev.-
(Status: AEN)
93
DWG. C2-E
4005 Rev.-
(Status: AE.N)
The space for "Tender Dwg No." and the "Dwg. No. "should be properly
filled.
Clause/Para. No.
Response
by Contractor
Comment by NJC
Further
comment by NJC
1.9
Cables
1.9.1
Description
TS-68
Unit
Value
General Data:
Ma nufactu rer:
Sudakabel Gmbh
Mannheim, Germany
Type:
XPLE
Rated voltage
kV
kV
'It
kV
'It
kA
'It
s)
'It
Conductor temperatures:
- at rated cu rrent
at short circuit conditions
525
'It
'It
Construction
Conductor material
'It
Conductor cross-section
mmO!
'It
mm
'It
mm
'It
Conductor diameter
. Cond uctor screen
. Insulation thickness
Insulation screen
mm
'It
mm
'It
mm
'It
mm
'It
Electrical Data
Ohm/km
'It
Ohm/km
'It
F/km
'It
I
i
t~'
,~ ~
:r~
~:'
~k
PaQe 5 of 5
_L
Ref. : GZBZJ-NJC-1925
Date: 04 March 2011
RETURNED FOR
SUBJECT:
CORRECTION
Reviewed
Checked
h.\.:t
____ _
R~~ "- __ _
M.~~j>-~~ U _
Date
Dear Sir,
This refers to your above letter. Please find enclosed following documents and drawings, for your
review.
Sr. No.
Dwg. No.
Description
1.
2.
3.
4.
E&M
C3-C-5037
C3-C-5046
Yours truly,
~
For Mr. Deng Yinqi
"
C2-E-0004 (1/3)
1) AS PER CONTRACT DOCUMENT VOLUME - 2(0), PART 0 , CHAPTER 5, CLAUSE 5.1, SUBMIT
LIST OF PURCHASERS TO WHOM 525KV XLPE CABLE HAD BEEN SOLD BY MIS SUDKABEL.
ALSO PROVIDE LETTERS ON THEIR LEDER HEAD FORMS FROM ABOVE SAID PURCHASERS
WHEREIN IT SHOULD BE STATED THAT THE CABLE IS WORKING WITHOUT ANY PROBLEMS . IN
THIS REGARD THE LETTERS OF THE PURCHASERS SHOULD INDICATE THE FOLLOWING: .
AuthOrized Project Manage1. LIST OF ANY PROBLEM ENCOUNTERED AFTER THE CABLES WERE
CGGC-CMEC Consortiurn EXPLANATION OF HOW THESE PROBLEMS HAVE BEEN SOLVED.
HECKING IS ONLY TO CONFORMANCE W ITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT
NO COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND
SUBSEQUENT AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING
AND SELECTION IN ACCORDANCE WITH TECHNICAL GUARANTEES. APPLICABLE IEC STANDARDS
AND ITS OWN CALCULATIONS; FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS;I
FOR PHYSICAL DIMENSIONS TO BE CONFIRMED AND CORRELATED AT THE JOB SITE; FOR
INFORMATION THAT PERTAINS SOLELY TO THE FABRICATION PROCESS AND TO TECHNIQUES OF
NSTRUCTION, AND FOR COORDINATION OF ELECTRICAL DESIGN WITH OTHER DISCIPLINES.
L ~ PHOTO COPIES OF TYPE TEST REPORTS AS WELL AS ROUTINE TEST REPORTS WHICH HAV~ BEEN CONDUCTED ON A
2)
Ir..
-=,
;h
KV XLPE CABLE (HAVING COPPER CONDUCTORS) AS WELL AS TERMINAL EQUIPMENT ISSUED FROM SOME LABORATORY
:EPTABLE TO THE CLIENT [I E KEMA LABORATORY HOLLAND, CESIITALY, CRIEPI LAB JAPG\N , KERI LAB SOUTH KOREA]
SUDKABEL
:JVIOE MANUFACTURER'S LITERATURE (I.E. CATALOG OR CATALOG-CUTS) REGARDING 525KV XLPE CABLE CABLE TERMINAL
L--1HV1F-=NT (I E. CABLE::: TERMI NATION) AND CABLE JOINTS AS WELL AS CLAMPS, SPACERS AND TERMINAL SUPPORTING STRUCTU
.--~....,
u>
:::> Z
0
LL
UJ f
a::
rn 2
LL
:::>
Z
--
0:::
c>
W
0... Z
~ ~
0:::
UJ 0
It')
~o~
~f->UJ
....JO::
0::
FOLLOWING
ofo
:::>
:::>
Z
f-
~ ~
UJ
0..
6
II 0~ f~
U
W Z 0::
Z c> :::> 0
of
>-f-O:: 0
...J
Z 0
UJ >
(9
5530
0:: 0::
~ ~ a
Cl' 0
:::>
0
0
UJf-W~
~o-z--
u Z
:= UJ ..::::.
UJf ......... I~
I~~
i 52 kV m in
S,3
kV. mm
6
f-LL
6
z
LL
....J
~ ~
9~
,..
>
~
(3
Z
f 0
~ ~
:::>
(f)
'J/Ilim
~ ~
Wlrn
~ ~ ~ ~
~ trl ~ &j
W/m
W/m
~
f-
~ ~
~ ~
u:l
Cf)
<i
~ ~
~
LL
W Cf)
g:
0::
u:l
~ ~ ~
~::J~:::>z
S
figure 3: regular operation of system 1 -4 at 900C (aluminium conductor) (all more or less identical)
reference no .: KSH-2006-86
0
z 0
I
11
01
(3
4 A km
9888 kVA km
0 a5 ml-./krn
'
Co
....J
(3 >
z ~
&j ~
--~----~~~~~~~~~~__~__~~__~________________~~~
UJ
50 Hz
0 126 I t F km
date :15.02.2011
f-W
LL....J
om
><
~~~3~
.. z
:::>
~
~g
~ ~ ~ ~ ~
~~It')~-:--
~m~~~
page 4/6
t
r DICI""ITED A VALUE OF 0 W/m FOR SOLAR RADIAT ION . PLEASE SUBMIT A DRAWING SHOWING HOW IN THE 525KV
TOWARD CABLE IS CONNECTED TO 525KV BUSH 'NG (WHI CH IS RESTING ON A STEEL STRUCTURE) THAT IS, PLEASE INFORM IF IN
S AREA THE CABLE IS ENCLOSED IN A FLEXIBLE CONDUIT ALSO PROVIDE A DRAWING SHOWING THE ROUTE OF THE CABLE FROM
F: S2'iKV CABLE GALLERY UPTO ABOVE SAID BUSHING IN CASE EVEN 600 MM OF CABLE IS EXPOSED TO SOLAR RADIATION NEAR
BOvE SAID BUSHING THEN AS PER STANDARDS A VALUE OF 1200 W /m 2 FOR THE SOLAR RADIATION SHALl. BE TAKEN INTO ACCOUNT
Wl? 0 -
l.~ ~ ~
~ cr
5,
20) SINCE AS PER CONTRACT DOCUMENT VOLUME - 2(0), PART C. CHAPTER 3. CLAUSE 3.8.1. CABLE SHALL
IHAVE COPPER CONDUCTORS YOUR CALCULATIONS PERTAINING TO CABLES HAVING ALUMINUM COND,UCTORS
~
RE NOT ACCEPTABLE. PLEASE PROVIDE CALCULATIONS FOR CABLES HAVING COPPER CONDUCTORS
'<
.= :1 ~
~CIlt,
~~
1___
L
u a..
~ "5 b
1.
I-
~~~
~~ ~
<~
f - - - - - ,..
~~.
'
~~~
~~~~
~~J.~AAJ.
18) PLEASE ALSO INDICATE THE LENGTH OF THE CABLE AND IT SHOULD BE FULLY INI
ACCORDANCE WITH ABOVE MENTIONED CONTRACT DOCUMENT. PART 0, CHAPTER 5, CLAUSE 5.1. 1
IEC 60287-1
Q ';:( ~
~- cr: '
:s::J ~ f
2 (.,
(JuJ u..
rU
~ c
r ZI-
co ~ -
~2C
--
~ : -:
3.
IEC 60949
GB 50217-2006
~~~
3.2
0..
ww~u
J.. .A
J..
~ ~
~ ~ ~ ~-s:. '
~~
06
J = r;
,-,3 x 525 x l 0
~~~
cro L
CI)
l'
'"
~.
e- UTdrro
5Tl
T2
T3
T4
i
rr I l '
rj
1.
Where,
~ ~
~z_
2~
'-,
'i ~ :..
..,'Y5:
6. e
g: I
U
UJ
U)
~l z
~~cr
TI
Thermal resistance per unit length between the conductor and the metal protecting sheath (K.mIW) ,
~ 0 w I
U~I~
:r:
-l I-
I~o~
~wQ
"
I-
~xu
I'::: 0
<{
-o ~
Thermal resistance per unit length between the shielding layer and the metal protecting sheath (K.mIW),
T3
Thermal resistance per unit length of the cable outer sheath (K.mIW) ;
ct ~ i
CI) ~ ~
I-::JI-W
ffi ~ ~ ..:l
Thermal resistance per unit length between the cable surface and the outside medium (K.mIW);
The loss ratio of the metal protecting sheath to the conductor.
crcr<t:
g:j > 0 ~
uwO~
;"
~~
~
v
_
~~wu
Because the minimum conductor cross-section type of the 525kV XLPE cable is 800 mm 2 the 800mm 2 ~ ~ ~ ~
.
'
II
aluminum conductor cable should be chosen.
<.9 w ~ z
wOU)~
OC>~=
~ ~ E5 5
Qa..<t:1
wcr~
<{::c
T2
~~~
~~~
AC resistance per unit length of the conductor at the highest operating temperature (ohm/m) ;
z Q
J~
Itt ~ ~
:> S
u ~::J
cr
UJ
~~I ~
~~ ~~
}l
c~:
I0
~ CI):?! g: I
~ ~ g0
Dielectric loss per unit length of the conductor at the highest operating temperature rN/m) ,
(5 C
~
cr ~ tr ~
~ <.3 it "
~ ~ will .
Wd
T~
~...L.u.
53 ;i 5 ~
I-
z0
O.....l-U
ciIw W .
o~~
~ z. c
=~
0 :>
~~~
: CARRYING
22) YOU HAVE INDICATED A FORMULAE FOR CURRENT
CAPACITY BUT THIS IS DIFFERENT FROM THE
~ __~.J...
11 R[TI + (I + A.)(T2 + T3 + T4) 1;
f
....
~
1=
.....I
CIl~-~
Th(~U~n~a~~i ~(~p..a ~ity 1.~ould be calculated with the following formula as per IEC60287:
L"
It- ~ ~
5~ @
r ~ ~ ;l
= 324.4A
...L.OLL
CI) ~~
SQ
0
0 I
::JW05
295 x 1
Current rating
CI)-~
g5 ~ (;:
~ I- ,~
a::Jz~
The conductor cross-section should meet the requirements of normal operating current rating and the standard ~ ~ ~ ~
cross-section series of the manufacturers.
~ 01- 0:: ::c
~~~
~ t:
Ir
'"
~UJoo
6~ ~
:-. u (
I UJcr~
o ~
5~ ~ ~
. ::J ::J I- 0
u ~ l.L I
..J -::
.=
' odO U
z~-
W~
There are two conductor materials for the 525kV XLPE cable, which are copper and aluminum , and :5 > ~ Q
both have pluses and minuses: The copper conductor cable has relatively heavier current carrying capacity and ~ ~ ~ ~
greater weight, and it can bear hi~her short- circuit curr~nt than the aluminum conductor cable. In NJ project, due' ~ ~ <l: ~
to lower current rating and short- CirCUit current, th allIminum'Tcondudor caole Is'a~dnfe(j. ,t.....
~ 0 ~ III
~ ~ ;;
C ~ .L
~~
account
' ~1:
;i ~ ~
o:?!
I ~ 3 05 tt
~cr:~
. :-
<t:
w::J
3.1
~ ~ gj
~ ~ tl5
C!) ~ ~
u:: <{ cr:
I ' 0 ::J
0 ~ ~ ~
into
Calculation Process
15 ~ ~
~~
There are four (4) generators in Neelum Jhelum Hydroelectric Power Project with each unit capacity of 295MVA ~ V5 ~ ~
and total installed capacity of 1180MVA. The main transformers connected to the 525kV ground switchyard with ~ ~ ~
525kV XLPE Cable, are arranged in underground transformer hall, and the 525kV electrical equipments are laid on cr <.9 ~
-w z ~
....
- , ......
,', ... AS WELL AS CLAUSE NUMBER. FOR EXAMPLE IEC 60287-1 -1 (2006) . FURTHER THE REVISION
~ g: (j) b
I~ 3 ~
cr
I~ S ~ frlfu
S
_ ~ 2.
~ '~ f 1
g]
'<
J:
~b6
3 Z ffi .
, l.L' ~cr:~
:_1
t-
'T"'T'<'<'T~
t::
',)
,<t
r--k"
......
. () ~ ~
>~
'<"
'<
::15 f'
~~
I~ @~
~~~
~e
Wd
Tl
T2
T3
T4
/l
60
1.83
4.92x10-5
0.66
0.02
0.05
0.41
0.0047
6 ~ ~'.
::Jr I
Calculation
Data
a..
~ lli ~ ~
<t:
~ 0 0
U ill I-
CI)
I-~crw
~o~=
I
ocw :>
w_
(j)~~:>
C-' 0 ~
~~U)u
<l"
Q..U)I-Z
;:'I~~
NI-I-I
Calculation result of current carrying capacity is J = 934A >324.4A. So the 800mm aluminum conductor cable
can meet the requirement of the normal operating current rating.
OIi' 'T' I I D~rJ;'n w:.OIJ
~~~~~
If
3.3
~~~~ 1b
'"
(1 )
= K2 S2zn[ O{ + P]
f /J' t
e, + f3
ri
~I
= 75587.0 A
AlJ
CORRECTION
able
Reviewed
__~:J::I3 _
---
Checked
- -g,:.M -
---I
/"')/) (l ~i 2L,~3'1'
Dale
\.. l aus~
.:) t
0._.4 n':I l: I ~
Where,
1
on
the
materials
of the
current
carrying
148
[sec]
[As 1/2/mm2]
Constant depending
component
800
8f
Final temperature
250
['C ]
8i
Initial temperature
90
['C]
228
[K]
[mm
(2)
c=Jl+FAJ+F2BGJ
1.01202
Where,
F
A,B
A = -C,
(5( ,
~
- ' (mm
PI
! s) 112
B= ~('!".,PI }mm2 I s)
=2464 [mm/m]
where, C1
0.7
[(fYnrt ! S)"2]
0.96569
[(mm 2! syl2]
0.46848
[(mnl! st2]
(5(
CY e
2.50E+06
3
[J/K.m ]
CYi
2.40E+06
[J/K.m3]
2.5
[K.mNV]
75587.0
[AJ
1.01202
materials
Thermal
Pi
resistivity
of the
surrounding
or adjacent
non-metallic
materials
(3)
l=x/"w
I
J = 76.5 kA
lAD
1=
Jw
Namely, 800mm aluminum conductor cable can satisfy the heat stability of short-circuit current. So the 800mm 2
aluminum conductor cable can meet the requirement.
Conclusions
~ "I" 'Y ~
.,..,. '( ~,
Based on the above calculations, the 525kV XLPE cable shall b~t-"''''
aluminum
conducto
with cross-section of
R.onmrn 2
~.
. ....
DI S('I", ME"R
:'HE-:t<tNG S ONL ~c ':ONFORMA.NCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND COMPLIANCE WITH THE
Nr:ORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT AMENDMENTS THE CONTRACTOR IS SOLELY RESPONSIBLE
OR EQ~IPMENT SIZING AND SELECTION IN ACCORDANCE WITH TECHNICAL GUARANTEES. APPLICABLE IEC STANDARDS AND ITS
)M C.ALCU.ATIONS. FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS , FOR PHYSICAL DIMENSIONS TO BE
INF R'VIEJ AND CORREL.A.TED AT TH E JOB SITE FOR INFORMATION THAT PERTAINS SOLELY TO THE FABRICATION PROCESS AND
I 'E'-:HNluUES OF CONSTR UCTION AND FOR COORDINATION OF ELECTRICAL DESIGN WITH OTHER DISCIPLINES
-
- - -
,.
COM'MENTS
,. SHOW CABLE LADDER.S WmI OPEIllINGS IN THE FLOOR. MAIN CABLE TRAYS AND BRANCH CABLE TRAYS UP TO
HE EQUIPMENT AND PROVIDE SECTION VIEWS. ALSO CONFIRM THATTHESE DO NOT I/fTERFEAEWITH PIPES AND
DUers OF MECHANICAL EQUIPMENT SHOWN 0111 SAME DRAWIIliG. ALSO PROVIDE EsnMATED SIZES & NOS.OF
EACH 'TYPE OF CABLE TO JUsnFY ADEQUACY OF CABLE TRAY (PROVIDE THIS INFORMATION FOR POWER.
i2. USE THE LATEST LAYOUT5 PROVIDED BY NJC FOR YOUR NEXT REVISED SUBMITTAL
EREcnON BAY-1
SHOW NECESSARY USUAL STEEL
BRIDGES OVER THE CABLE
ERECTION BAY- 2
QC)
_
II ~.~
~ORMER
I I~I ~ TYP.)
AllING)O
5 25 ~ coble
ERN
at--..
.:ri
..... Ij{
.. _. __ L
=tl.
"I I)
'.I
rV
~ 'rl ~
~ f \.3
SI1
GIS
1-
hole
quopment
JL -
!/;I
7#
t- t:
.,~
<'"
~~
--
T
rMIN.
'::~
RADIUS
= ATLEAST
:20 TIMES
OUTER DIA
OF CABLE
"-"'>-
~S
Cj
13
14
3650
1516
17
18\
/ '19
6225
111111f
~ ..
~': I
: .,.:
.. __
'.-.
:[
:1Move
r~~,
~..:'!"
: I:;;W
~
. _. _
~~ ~
. . . . ~ --'(
! . ._._.
. . ~1
i '::. :;:~ : .l&,
~i-: i
:"r 'IIlJ'~
I!!t. : ~.'." ; ';:~,,:~': .,,= i~11il~ ~~~
'".:tfit:, ~/l:;)fu', :fij!,:~,
~!; Ijf.:; :
/I
~~'JlI["
iOOLilL " ''
ro:'!:
. ' F! (i)
I
,..
''' I~.
'
,..
"L
I
-
<" j
..
,.
i:;' ; :;
;;.,,-: .::
!,!'l~!' :~, . :
.\
.. .__, ._. _
I
-
--;='
I
-
I
-
:;,";
oJ
I ::
I
-
':
'.
::
-!J
'\
DISa.AIMER
g~;~~Nc~~C~~~YOTFOT~~r:R~~~~~~~~6~::l~AENl~i:~C:l l ,
THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS
NO SUBSEQUENT .AMENDMENTS. THE CONTRACTOR IS
SOLE LY RESPONSIBLE FOR EQU IPMENT SIZING AND
SElEcnON IN ACCORDANCE WITH TECHNICAL GUARANTEES.
APPLICABLE IEC STANDARDS. AND ITS OWN CALCULAn ONS:
FOR LOGIC AND ACCURACY OF SCHEMATIC AND 'A'lRING
DIAGRAMS, FOR PHYSICAL DIMENSIONS TO BE CONFIRMED
AND CORRELATED AT THE JOB SITE ; FOR INFORMATION THAT
PERTAINS SO LELY TO THE FABR ICAnON PROCESS AND TO
TECHNIQUES OF CONSTRUCTION; AND FOR COORDINAnON
jOF ELECTRICAL DES IGN 'A'lTH OTHER DISCIPUNES.
- - - - - -
J1r
SECTION G-G
REFER TO TI~DER DRAWING NO. 4154 AND
INJC DRAWIN NO 0-<:-4710. THE CABLE
\ RAY ALSO 5 PPORTS lPHASE l1KV CABLE
AND THE LU INARIES. INDICATE THESE HERE.
~~
<'" .::J
1- - - - - - - - - - - - - - - - - - - - - - - - -
I
-
!~ !
SECT ION H
h.
'tI
~
,;, -j';\~: ':, ::~, :
I
-
.. .
.:,,1 11',
,"
: I~
Cj
= )!..
'
: . oiN~!~
=,o{11i':
:.. J{)tN,~!.
: . !';>.j~i'
= to.';~ .": 1
. ,:~ ,; " '-'4)
a, ' H I ' '''it: ' ~ =,,<~ :" ~+ . ~ '% '" 't.:;i. ~ =oj '1.1'. 'W'("C' h =..... ''':'" ~!r-"h
.'
..~...'r'
"""""
.,
"""
. a:::::=t~v
rl'"'9"
"-"".,
:
./ 1PlI"'.
1/
--, ~
i~ ..i
. .....
2<22:
LLI
~l
~
ol
I!~'/
htj2000mmj
I:
;;.I?' ,::
I.
~1' lI l lb
(TVP )
rl 9
I:
:,'i!L ~.
=:i.I
"' ~'!'.
@90
Lo> s:::
"- ?
-..J~.::J
C-1
HlIll ~
eiB)
7)
l . f Move
!.
" I :
_. ._.) .:~ .
._.
..
I:.
IlL
~#
::
. ._ '\
right
----
::
",+61130
'I. ~ ";"
J IIII'I IIIY
225mm] i
::
..."
SECTION F-F
L
IMove
~II I I IIII-i
~. :.
_ I
left
II . /
J
V
-----.rrrrIT
450mm]
1111111111
./.
:,,111 , .
LtP)~ : '::
.:J.t; . " ;~ .. ~*.
I Hole
for Tr'11
HV bushing'
\
12
- IIU ~ UlIl~
,t/.
:": ~tlIl.1.'#.t~
. :~~ ;
~<'/I : : ~~:
II-
~ '~ ''''.~ ~ , :
~t
~ift
ing for~ISTAI RSHAJ.L I}EMOviol
UNIT 8 AY-1
./
. , / " ' "
~ /
~~;:&< :
I.
.3C
I
I~
t""
IL"-..
~80
,..n----1
UNIT BAY-4
._._.
~~nWT~E
AV~rl
,I
APPROVED EXCEPT
AS NOTED
Reviewed
.61,_I-*A __ __
_g.!. I!'L__ __ _
Checked
Ai
' J,
__
.J
rr-r~~~~~~~~~~~~~~~""""'~~"""""~~~""""~""""'~~~~~~~""':;y,:,(......~
Cable Interface
~
~
REV.
1
1
L _________________________________ I
CONTRACTO
Descrip tion
Dote
DESIGNER
NOTE:
..The .bovell&M equipment Layout, DOl C<JIIJ ldering th. HVAC equipment and pipe.
b.Tofinisb!he 1l&M equipm,.t Layout """"I'!ely BDd delenuine!he powbouse earn;", limit. p_ .prov;de thecoo~i w..... link 1o<I<X>'" >100" as possible, .
c. Sec,us< '""... E&M OQUIptDCDIJ .....01 rnI<=1, thelayou' of !he "lwpm<"" and !he" bol.. "'" pr<:limiD.eJy. Afttt otde""i ..,.". modifi","OfII will be made accordingly.
DRAWN
~COHnOL
CUBICLE
@IIANliALL! OPERATBD' INSULATED ,/AI KJ'ENANCB BARTHING SWI CM
'
T
EXAMPLE 'C.D.A"
REV.
.
SHOW CABLE LADDERS WITH OPENINGS IN THE flOOR. MAIN CABLE TRAYS AND BRANCH CABLE TRAYS UPTO THE EQUIPMENT AND PROVIDE SECTION VIEWS. ALSO CONFIRM THATTHESE 00 NOT INTERFERE WITH PIPES AND DUCTS OF MECHANICAL EQUIPMENT SHOWN ON SAME
DRAWING. ALSO PROVIDE ESTIMATED SIZES & NOS. OF EACH TYPE OF CABLE TO JUSTIFY ADEQUACY OF CABLE TRAY IPROVIDE THIS INFORMATION FOR POWER. CONTROL AND ANNUNCIATION CABLES)
USE THE LATEST LAYOUTS PROVIDED BY NJC FOR THE NEXT SUBMITTAL
SHOWCTS INCLUDED IN EXCITATION AND HV MAIN SERVICE TRANSFORMERS AS PER OUR MAIN SINGLE LINE DIAGRAM NO.C3-E-8051
ALSO SHOW THE ELECTRICAL PANEL ALONG WALL SIDES (I.E. UGHTING AND SMALL POWER BOARD WHICH ARE INSTALlED ON WALLS OR FLOOR .)
THE DRAWINGS NO. C3-E9061 AND NO. C3-C-S006 SHOULD BE CROSS REFERENCED FOR CONSISTENCY
MINIMUM VERTICAL CLEAR SPACE BETWEEN FIN ISHED FLOOR LEVEL AND CABLE TRAYS SHAll BE 1982 mm. OR THE
.ofd&:y
APPROVED EXCEPT
AS NOTED
Reviewed
_ t"l .:.J..:: A- - - - Checked
__ - -"..t'l - __ _--.:
Date
M~ _1 ~~11. _-I
TRANSFORMER
main
10
11
NOTE:
a...Excavatioo requi:reme:rJt5 uoder the bu. bID' DJ.llDel : To facilitate embedded pipes and paItS arrangement, the concrete thicknes& shouJd be 2.5 m at leasL
bllxcavalion n:quir'tmeDt!I WIder Ibe main b'aaJformer ,bould be adequate for all embedded pipes arraugemt.Dt from the powerhouse to the main tJ'aD.Sformex cavern.
c.The above I!4M equipmeot Jayout. Dot coo.ridering Ihe HVAC equipment and pipe.
SECTION N-N
1:100
d.To finish the E&.M equipment layout comptecdy aod deurnIine the powerhouse excavatioo limit. plea8b provide Ibe cooling water W1k location as SOO o as possible.
e.Because-soroe F..a:.'-'l equipments art: nO( ordtred, the layou t of dlo equipmenlS and their boles are preliminary. After orderi.og. some modificaLioos will be made- a.ccotdingly.
THIS
LOCATION
CONSULTANTS
,COMMENTS
IIrni
FENCE
~
.m!
287'"
.l2"' .
~ r-
"
JOOlO
ImO
7007
t:' E::~r
.
APPR~~~ t:f~
b'ev1'ew
"l;
e'd I e
~hecked
, -~~0':~v""~ v:--r
i
f- i
""
1:1
.t . . :
..""II ..,ei
;;1<\
?':'\;
Iwld!
11:
-----
--
P"~~ill "tlO
(II'\;
--{i
~r-
. - . - . ~.
J ~""Id.
----
...
1=1
IJ
1ioJ1'-
troll ""J I
. "" ""
ionIIolll.. """oIlOJil';;.'
fe------- ---------------
. .
,.
-------------"DO -
""-----;;------
. . ...
-------u:I- :>3---------------
~
~'" ~
R
...mtli CUl",Il"'iel.
1=1
-------~-----
-----(l""-
..
- . .-.-.-.-.-.-.-.-.-.-
.-.-.-.-.-.-.-.
. _._.-.-
--
1~ J ~ (/~
--------------<J-
J\
.d~ j ~
~I-R:
~h~ ~
._._
.-.- .- .- . - .
!'!
r.EN2
_.
.- .-
~. ~
,~ ~ .,<#
~
I:~E~E~:E
J~ t1 ~ (/~
I -"
,;f-
MAKE THESE
=~~~~N~~T
,";;,
r"
1\
IG
JOOlO
JOOlO
dj
-IN
NO,
CIRCUIT BREAKER
Name
D=
=CJ
.fo.\
~
~~
o
-CURRENT TRANSFORMER
VLTA
-0
(CV)
GE TRANSFORMER
-CABLE BUSHING
THIS SHALL BE " 110/3" AS PER
-POST INSULATOR
Phase)
(J
~ 3 ISOLATING SmCH (J
~ 4 ISOLATING SWITCH (J
a
i
:=>
Phase)
Phase)
SlITCH (3 Phase)
5 PAST ~ARTHIHG
6 CURR~NT TRAHSPORllER
JOOlO
El
Type
LW15A 550 1600A
GWllH50D~' 1600A
GWllA-550DW 1600A
GWlOA-550DW 1600A
Jf3A-5S0W 1600A
CA-550,200'9MlJlflAI)QO 1
~I!.!
mo
f;.
-LIGHTNING ROD
;~~I~C~~RSLIKEORAKE,
40kA
40kA
40kA
40kA
40kA
l!,2000/l~2000
YD525/.!l'~. 005Hr,/*"*'l7t'lkVO.2/3P/lP/3
7 VOLTAGETRAHSPORllER
8 VOLTAGE TRANSPORllER
TYD525/Jf-Q 005H 7j: r,v,1gj tV O.2/lP/JP
~ 9 VOLTAGETRANSPORllER
TYD525//f ~fv
0.1
:
10 CABLE BUSRING
_ _ r-Outdoor air type
11 SURGu.wBTZr
Outdoor type Y20V1-444/1065W
~hr POST mULATOR
ZSWI-550/ 8- 3
~ 13 IIAlSIlALLIKt com OLLCUBICLE
;;
.,.,
15
16
17
18
17
Ikll bar
11>200/ 184
JlJlJJli154.
LGH OO/35
LGJ- 300/25
RCSIltance me
Conductor ' ire (A CS R)
Groundl ire
LGJQT-1400
"""
JOOOO
' l E'
L' . IFOR MORE DETAIL. PLEASE PROVIDE SECTIONAL VIEW TO
ectnca
qUlpment
IstlcONFIRM THAT NECESSARY PROTECTION IS PROVIDED
Vl
-SURGE ARRESTER
MISSING. GIVE
_____
2 ISOLATING SWITCH
1m
2f:lIJ 1
CHOO
Uni t
pes
set
set
set
set
A pes
QTY
pes
pes
pes
pes
pes
pes
pcs
6 WITIKOOUB1E)AHTHING SWITCH
m
In
(CABLE BUSHING ARE 13 (1.E....,2 +1 SPARE) AS PER MAIN SIGLE UNE DVYG. NO.C3-E90S1
8W
~~-:
~!
II
'V
FeR
~ ~I~I
LV and Control
\\
dimensions are in
Cable Trench
mro, the
elevations are in m,
25YA/25VA/25YA/25VA
6 25YA/25YA/25YA
1225YA
21:t
Check
Appr
08..30.10
Date
~.-
.<\-;-:".
..
::.
.
NEELUMJHELUMHYDRO-POWERCOMPANY
U]
CONTRACTOR
T
f 12
I 24
DESIGNER
CGGC-CMEC Consortium
Changjiang Institute of Survey. Planning. ,Design & Research, CWRC
~ s- _ ~ /
ITENDER DWG
~ (1 3)
. INO IS "9061 " .
Overall Layout of 525kV Switchyard(1/3
.
525kV..lf-
.>,I, .\\.
/1 7'CJIIl i<S<"l' ...
540
main busbar
894 connection conductors bet.een 5!5kV equipment!
540 ~laced in HO. 14 for absorbing osci lIat ion causerl by breez
.
.. .
894 , laced ,n '0.1 ) for absorbing omliatlOn caused by breez
1890
mL
m
684
l!
Notes:
TECTION O F
~_~
IWE HAVE ALREADY SENT yOU OUR COMMENTS REGARDING 'LIGHTNING PROTECTION OF
Isw TC HYARD AREA' VIDE OUR LETTER PQ..5037 DATE D 5 OCTOBER 20 10 REGARDING LIGHTNING
m
m
~ 0~ ,
SOOXI
1. The
Remark
9 porcelain type
-'
GEN!
FOR THIS \MRE. SHOW THE ELEVATION OF THE LOWEST POINT OF THE SAG AT ao'c TEMPERATURE (I.E 40' C
LEGEND AMBIENT + TAKING INTO ACCOUNT SOLAR RAD IATION OF 1200 W I m') (TYP ICAL COMMENn
A CLEAR AND
DISTINCT
SYMBOL FOR
EACH
-'
'----_--- - - --- - - l1---- --------.-.-.-.-.-.-.-.-.-.-.-.-.- .g -* .-.- .- .- .- ._.- ._._.- ~: - f-- ":.~- -- - - ----- -- -- -- -- - - - - - . - . -.- . -.-----.--.- .~- -----.- . -./
lCOOO
SYMBOLS ARE
.-:-J
P_
-'
t~ t ~ (/~
-;F--------,.------ ~---~----- ~r ~--------------- :;;----8--------------:;.----- "
1=1
t-
t-
!!
- ~
ef- ~
"
~N~O~.1~~~~~~~=T:;11
._._._. _._.
r il
B
~/
1=1
D:J)~
.- .- ._ .- ._ ._.- . .- .- ._. - - - ' -'-'-'-'-'-'-' .-.-.-.-.-.-. . - .-.- -. '- ' ' - ' - "
Trench
IMAKEIT600mm\MDEr
SEE COMMENT I \
11IX>
~ff ~~ ~ ff
'"
A Cable
GEN'
'"0.
)1
- ""---- .&.II:
_. ._._. _._._._._._.__ ._._._._. __ ._. .._._._._ ._._._._._. _._.._._._.___ ._._ ._._ ._._._ . ._._._._._._.._._. __ .._.. _._ .
...
ower
. B-
P","'llirc.
<0,,,,,,11 cUnd.
J~ (/ '\ t1 ~
525kV
.Jm.
. ..
.,
r-
EQUIPMENT
t-::
OHl!
"
~r- yi
HAU BE IN ACCORDANCE WITH IEC sr"NDARDS. FURTHER STREET UGKT POLES ETC. WHICH ARE REQUIRED FOR LIGHTING FIXTURES SHALL BE SHOWN
1500
------------------ u -
~ff ~~ ~t'
Clal ~i'-' P p.2.4_n:rers_. ____ '-'-'- '- '- - '- '-l' ._ ._._.
OHL 2
1500
----~------------------~----- - - - - - - - - - - - , : - - - - - - - - - - - - - - - - y -
---
. . . ..
. !bIl"" .
. 1 ,/\
-I.::n... - - -
./!.l.:. . ___
r- r- ~
.:sJ . .
laF ~V'"~1~~~L
pate
IHm
J", "
!: :F-;: -------------~----
I ii
HID)
R, lt
I'"
'500
It
I:~ f'fl
Oe m
"HECKlNG IS ONLY TO CONFORMANCE \/\11TH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND COMPLIANCE WITH THE
p, PROVIDE ESTlM"TEO SIZES & NOS. OF EACH TYPE OF CABLE ( I,E. POWER. CONTROL AND ANNUNOATiON CABLES) TO JUSTIFY ADEQUACY Of CABLE TRA Y.
INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEOUENT AMENDMENTS. THE CONTRACTOR IS SOLELY
12. SUBMIT THE SECTION VIEWS WITH OUR COMMENTS INCORPORATED WHICH WE GAVE VIDE OUR lmER PO-S037 DATED 5 OCT 20 10
SHOW THE CABLES IN TENCHES IN TREFOil
RESPONSIBLE FOR EQUIPMENT StZlf1&3 AND SElECilON IN ACCORDANCE WITH TECHNICAL GUARANTEES APPUCABLE IEC
3. USE THE LATEST LAYOUTS PROVIDED BY NJC FOR THE NEXT SUBMITTAL
FORMATION AS PER CONTRACT ORA\MNG NO.4421
STANDARDS, AND ITS OWN CAlCULAnONS FOR LOOICANDACCURACY OF SCHEMAnCANDWIRING DIAGRAMS FOR PHYSICAl
Overall Layout Plan .. SHOW Ll5TOF RElATED RFERENCEDRAWING NOS
DIMENSIONS TO BE CONFIRMED AND CORRELATED AT THE J08 SITE; FOR INFORMATION THAT PE.RTAINS SOLelY TO THE~'
I
i
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION. AND FOR COORDINATION OF ELECTRICAL DESIGN WITH OTHER
S. PROVIDE DRAWING IN AUTOCAO FORMAT FOR OUR WORKING WITH EXACT DIMENSIONS.
In
10
20
30
411
50
nl""IP1 '''''''''
6. PLEASE SUBMIT AN ADDrr ONAl DRAWING SHOWING AREA LGHTING" AS Will AS "ROAD LIGHTING FOR THE ENTIRE SWITCHYARD. THE NECESSARY LUX LEVElS
1!.i'~
2 101~
CHECKED
:t
APPRO VED
NEELUM JHELUM
CONSUlTA~T"
~
j
C2- EDATE
10.11 .10
DWG. NO.
0004'1 "'3\~
' I. 1/
.) )'\
rr~ROJEC INO
1005800
c:J
IDrawing Is for Site C3 therefore drawing no. should be C3-E-0004 (113). Also ProVIde pages 213 and 3/3 of the same
REV