Sei sulla pagina 1di 10

Original/Copy

InterofficeCommunication
Ref: WSD/17/2015
Date:12/03/2015
From:- Workshop Division
To:- AMO Manager,NAC
Dear Sir,
This is to inform you that, since long time back some of the Shops under this Division are either
temporarily suspended by QA&FS Dept. on the ground of not meeting the requirement and some
are not functioning to the full extent due to different reasons like Manpower, machine/equipment
in out of order condition. In this context and also in view of addition of new fleets, these shops will
have to be brought into fulfunctioning and updated. In order to bring these shops into
functioning, following requirements needs to be fulfilled. Hence this is submitted for your kind
perusal and necessary action in time.
Nitrogen Plant (Hydro band):- Not working. Runs for brief time only and auto shuts down. Various
Maintenance actions have been taken. No spares are available. Manufacturer suggested
replacing the Plant as it is very old and out of date. The Model is not in existence any more. Thus
new compressor is to be installed.
Certification Staff for B757 Wheel & Brake & NDT: - Only One staff. Getting retired in short span of
time. Need to be trained one additional staff at the earliest in order to avoid no certification staff in
near future. Also one additional Helper is required.
Sheet metal Shop: - Presently we do not have Composite & Fiber glass Repair Shop. In View of New
AIRBUS
320 mainly of Composite Material.
Composite & Fiberglass Repair Shop need to be set up and developed In the Sheet Metal Shop. The
floor condition of the shop is to be repaired and Rain leakage in the room where many tools &
equipment are kept needs to be repaired. This is also pointed out in the findings of QA audit.
Certification staff on Structure: - We do not have Structural Licensed staff on both Metallic &
Composite. So 2 No of staff to be trained one in each field.
Cabin Shop: - Only one Technician Sr.T/O .Need one additional Technician & one tailor staff.
Hydraulic Shop: - Only one Staff AME with no appropriate Training on subject field. Training to be
provided and addition of one Technician is required.
Avionics Shops: - All Avionics Shop do have only one Technician.eg Radio, Electric, Instrument,
Calibration & Battery Shops. Additional technician one in each shop is required.
Engine Shop: - Only one staff with no proper Training. Proper Training & one additional staff is to be
arranged.
Aircraft Support Shop: - Only one Technician Sr.T/O & one helper. Need one Technician & one helper
and Training on Welding.
This is submitted for your needful actions. Thanking you.
CC:

-CAMO

Manager/Director

SR Karanjit
CC: - Quality Manager/Director QA&FS
Dy.Director
D
Workshop Division

engineering
for your kind information

for

your

Kind

information

Original/Copy
I
nter Office Communication
Date: - 25th March 2015

Handover and Taken over Of Printer

The Printer Machine Initially taken from Workshop Division office by Duty Engineer
of Line Office is now handed back to Workshop Div on 25th March 2015 i.e.
2071/12/11 per letter from Maint Division ref ED/EMD/514/2015 Dated 23 rd March
2015.

Handed over By
Received By

Original/Copy
I
nter Office Communication
Date:Ref: WSD/20/2015
From:Workshop
Division

Date:29/03/2015
To:CAMO
Engineering

Manager/Director

Dear Sir,
This is to draw your kind attention to the fact that the Nitrogen Plant in the work shop
is out of order since a very long time back and we are availing Nitrogen from outside
party for our day to day requirement. It is being noted that lot of
troubleshooting/inspection work has been done and the Vendor has also been
contacted and consulted for the maintenance of the Plant, but could not be made
serviceable till date because of no spare parts available in the market due to very old
model in one hand andOn the other hand, the demand for Nitrogen is rising due to
recent addition of new fleets for example MA-60, Y-12 & Airbus 320.
Keeping all those in view, this Division has reached in a conclusion that the Existing
Compressor Machine Replacement will be beneficiary to the organization. Thus
submitted to you for your necessary action in time.
Thanking You.
Cc: AMO Manager

-------------------------SR Karanjit
Dy.Director
Work Shop Division

For kind information

Original/Copy
Inter Office
Ref: WSD/17/2015
From:WorkshopDiv
ision
Communication

Date:12/03/2015
To:AMOManager,EngineeringDepart
mentNAC

Subject: - Arrangement of Eddy Current Inspection Training

Dear Sir,
This is to inform you that, after the Resignation of Mr.RP Banskota last year we do not
have Eddy Current Inspection & Certification staff in the office, as a result we have
been hiring Eddy Current Inspector from outside Party very frequently paying a
handsome amount and also not available when we require.

Original/Copy
Interoffice Communication
Ref: WSD/25/2015
From:Workshop
Division
Subject: Job Description (TOR)

Date:24/04/2015
To:
Ms.Yamuna
Engineer

Sharma,

First of all, I would like to welcome you in the Workshop Division of NAC as an
Engineer (Avionics).
You are required to work as an Engineer in the Avionics Shop under In charge of
Avionics Shop, who will allocate you in different shops on need basis.
You will assist in-charges of shops for day to day work.
You will put every effort to learn different works carried out in the shops and avail
weekly off day on every Saturday.
This Division expects your optimum effort and enthusiasm towards your stipulated
assignment.

...
SR Karanjit
Dy.Director
Workshop Division

CC: Director Engineering


CC: Dy.Director Maintenance Division

for kind information


for kind information

CC: Dy.Director ESTD

for information

CC: Dy.Director ESSD

for information

CC: Dy.Director

for information

CC: Engineering Administration

for information

Original/Copy
Inter
Office Communication
Ref: WSD/26/2015
From:Workshop
Division

Date:24/04/2015
To:
I/C
Administration
Subject: Duty Report.

Engineering

As Ms Yamuna Sharma newly appointed Engineer has joined duty in this


Division with effect from 5th April 2015 (2071-12-22) you are required to do the
needful for her Airport Entry Pass and Identity Card as per Corporation rule.

............................................
SR Karanjit
Dy.Director
Workshop Division

Original/Copy

Inter Office

Communication
Ref: WSD/27/2015
Date:21st April 2015
From:Workshop
To: Dy.Director, ESSD
Division
Subject: - Local Fabrication of Riveting Tool as per sample and Drawing.

Dear Sir,
As the Riveting Tool is broken during riveting of Brake unit assembly, we are unable to
do the assembling of B757 Brake Unit assembly. Brake Units are urgently required for
9N-ACB. Therefore you are requested to arrange to get it fabricated from Balaju
Training Center. The focal person is Mr.Rajendra Shrestha Mob.No.9851044072 who
has been already contacted and briefed.
Note: The sample along with Drawing is attached herewith.

..
SR Karanjit
Dy.Director
Workshop Division

CC: Director Engineering for kind information


CC: AMO Manager

for kind information

Original/Copy

Inter Office Communication

Original/Copy
Communication

Inter Office

Original/Copy
Communication

Inter Office

Potrebbero piacerti anche