Sei sulla pagina 1di 10

LARSEN & TOUBRO LIMITED

ECC Division - EDRC (Electrical)

PROJECT: Relocation of Riyam Substation and Transformer


Repair Shop.
TITLE:
EARTHING DESIGN CALCULATION FOR
S/S - Riyam
THIS DESIGN IS GENERALLY BASED ON IEEE 80 - 2000
AREA OF CROSS SECTION

REF NO:
PREPARED

CHECKED

APPROVED

SSJ

AKS

DM

PAGE 02 OF 06
DATE
3-03-2016

S = I x SQRT(t) / k
S = AREA OF CONDUCTOR IN Sq.mm
I = EARTH FAULT CURRENT IN AMPS
t = EARTH FAULT CLEARING TIME IN secs.
k = SQRT(( Qc x (B+20)/delta20) x ln ( 1+ (Qf-Qi)/(B+Qi)))
Qc = Volumetric Heat capacity of conductor ( J / oC mm3 )
B = Reciprocal of Temp.Coefft. of Resistivity ( oC )
delta20 = Electrical Resistivity of conductor at 20 oC ( Ohm.mm )
Qi = Initial Temperature of Conductor ( oC )
Qf = Final Temperature of Conductor ( oC )
I=

25000 amps

t=
Qc =

3 sec
0.00345 J / C mm3

B=
delta20 =

234.5 C
0.000020 Ohm.mm

Qi =

40 C

Qf =

700 C

k=
=
S=
=

{ Data for copper conductor }

SQRT( (0.00345x (234.5 + 20) /0.00002) x ln ( 1+ ((700-40 ) / (235 +40) ) )


231.909
25000 x SQRT (3.0) / 231.909
186.72
Sq.mm

Corrosion allowance considered for the conductor in percentage =


Minimum area of cross-section required =
### Sq.mm
Hence conductor size selected is,
300 Sq.mm
CONDUCTOR SIZE CHOSEN IS

50 x 6

Copper Flat

10 %
(Which is the minimum size specified in the specification)

10.01.07 FOR APPROVAL

AKS

AKS

FOR APPROVAL

AKS

AKS

CHKD

APPD

0
No.

DATE

REMARKS
REVISION

LARSEN & TOUBRO LIMITED


ECC - Division EDRC
PROJECT :

MADINAT AL NAHDAH PRIMARY S/S 33/11.5kV

PACKAGE :
SCALE

TITLE :

CODE

DATE

DSND

SSJ

10.01.07

DRWN

CHKD

AKS

10.01.07

APPD

AKS

10.01.07

DRG.No.

EARTHING DESIGN CALCULATION - MAIN GRID

SIGN

REV.
1

LARSEN & TOUBRO LIMITED


ECC Division - EDRC (Electrical)

PROJECT: MADINAT AL NAHDAH PRIMARY S/S 33/11.5kV


TITLE:

REF NO:
PREPARED

CHECKED

APPROVED

SSJ

AKS

AKS

EARTHING DESIGN CALCULATION - MAIN GRID

CALCULATIONS ARE BASED ON IEEE 80 - 2000.


DESIGN DATA
System Voltage
=

33 kV

System Grounding

SOLID

Soil Resistivity p

52.1 Ohm.m

Top Layer resistivity ps

5000 Ohm.m

Max. Earth Fault Current (I)

2000 AMPS

Conductor Size

50 x 6 Copper Flat

Equivalent diameter

0.0195 m

Length of Substation

34.93 m

Breadth of Substation

34.93 m

No: of grids in X direction

No: of grids in Y direction

Equivalent Number of grids N=na*nb*nc*nd

=
=
=
=

2.000
1.000
1.000
1.000

factor na = 2*Lc/Lp
factor nb= Sqrt(Lp/4/sqrt(A))
factor nc = (Lx*Ly/A)*e(0.7*A/Lx/Ly)
factor nd = Dm / sqrt(Lx^2+Ly^2)

na
nb
nc
nd

Spacing of conductors D

29 m

Total length of conductors Lc

140 m

139.72 m

Peripheral length of the grid in mtr


Area of Grid

Lp

Ag

### sq.m

Depth of burial h

0.6 m

Depth of Top Layer hs

0.1 m

Total No of electrodes m

14 Nos

Length of electrode

3 m

Total length of electrodes LR

42 m

Maximum length of
Lx
grid conductor in X-Direction

34.93 m

Maximum length of
Ly
grid conductor in Y-Direction

34.93 m

Dm is the max distance bet any two points in

49.40 i.e. Sqrt (34.93^2+34.93^2)

Lr

the grid in mtr


Diameter of electrodes d1

15 mm

Duration of Fault Current ts

1 sec

(As per specification)

PAGE 01 OF 04
DATE
3-03-2016

LARSEN & TOUBRO LIMITED


ECC Division - EDRC (Electrical)

PROJECT: MADINAT AL NAHDAH PRIMARY S/S 33/11.5kV

REF NO:
PREPARED

TITLE:

EARTHING DESIGN CALCULATION - MAIN GRID

Tolerable Touch Potential


Etouch = ( 1000 + 1.5 * Cs * ps ) * 0.116 / SQRT(ts)
Cs
a

=
=

SSJ

LTO/193/SSSRM/0005 PAGE 01 OF 04
CHECKED APPROVED
DATE
3-03-2016
AKS
AKS

(BASED ON IEEE 80 - 2000 CHAPTER 8)


For body weight of 50 kg

1 - a * { ( 1- p/ps) / ( 2 * hs + a) }
0.09 m
1 - 0.090*{( 1 - 52 / 5000 ) / ( 2 * 0.10 + 0.090 ) }
Cs = 0.6929
Etouch = (1000 + 1.5 * 0.6929 * 5000 ) * 0.116 / SQRT( 1.0 )
=
718.81 Volts
Tolerable Step Potential

Refer Equation-27 of page 23 of IEEE 80 - 2000

Estep = ( 1000 + 6.0 *Cs * ps ) * 0.116 / SQRT(ts)


Estep = (1000 + 6.0 * 0.6929 * 5000 ) * 0.116 / SQRT( 1.0 )
=
2527.25 Volts
Mesh Potential Attainable

For body weight of 50 kg

(BASED ON IEEE 80 - 2000 CHAPTER 8)

(BASED ON IEEE 80 - 2000 CHAPTER 16)


Refer Equation-91 of page 94 of IEEE 80 - 2000

Emesh = ( p * Km * Ki * I ) / (Lc + Lr)


Km

1/ (2 * ) * { ln[ D^2 /(16 * h * d)+ (D + 2h ) ^2 / (8* D * d) - h / (4 * d) ]


+ Kii / Kh ln[8 / ( * (2 * n-1) ) ] }
for grids with ground rods in perimeter

Kii =

1.00

Kh
ho
Kh

SQRT ( 1+ h/ho)
1.00 m
( reference depth of grid)
SQRT( 1 + 0.600 / 1.0 ) =
1.2649

=
=
=

Km =

1/ (2 * 22/7) * { ln [ 29.0^2/ (16 * 0.600 * 0.02 ) + (29.0 + 2 * 0.600 ) ^2 /( 8 * 29.0 * 0.02) - 0.600/ ( 4 * 0.02) ]
+ 1.00 / 1.2649 * ln [ 8 / (22/7 * (2 * 2.00 - 1 ) ) ] }
= 1.3237
Ki = 0.644 + 0.148 * n
=
0.644 + 0.148 *2
= 0.9400
Emesh = 26*0.4421*2.5680*22500 / (800+56)
= 713.49
Volts
Step Potential Attainable
Estep =

( p * Ks * Ki * I ) / ( 0.75*Lc + 0.85*m*Lr )

Ks

1 / * { 1 / (2 * h) + 1 / (D + h) + 1 / D * (1- 0.5^(n-2) ) }

n
Ks

=
=
=
Estep =
=

(BASED ON IEEE 80 - 2000 CHAPTER 16)

2
(Higher of the no.of grids in X & Y direction)
( 1 / 22/7 ) * { 1 / (2 * 0.600 ) + 1 / ( 29.0 + 0.600 ) + 1 / 29.0 * ( 1 - 0.5^(2 - 2 ) }
0.2759
( 52 * 0.2759 * 0.9400 * 2000 ) / ( 0.75 * 139.7 + 0.85 * 14 *3 )
192.35
Volts

LARSEN & TOUBRO LIMITED


ECC Division - EDRC (Electrical)

PROJECT: MADINAT ALMADINAT AL NAHDAH PRIMARY S/S 33/11.5kV REF NO:


PREPARED

TITLE:

EARTHING DESIGN CALCULATION - MAIN GRID

SSJ

LTO/193/SSSRM/0005 PAGE 01 OF 04
CHECKED APPROVED
DATE
3-03-2016
AKS
AKS

Comparison of Tolerable Etouch & Estep and Attainable Emesh & Estep
Tolerable Etouch =

718.81

Volts

Tolerable Estep =

2527.25

Volts

Attainable Emesh =

713.49

Volts

Attainable Estep =

192.35

Volts

Since Attainable Emesh is less than Tolerable Etouch and


Attainable Estep is less than Tolerable Estep, the design is safe.
The minimum conductor to be buried in ground for meeting the Touch and Step potential can be calculated as follows:
Emesh(tolerable) =

( p * Km * Ki * Ig ) / ( Lc + Lr )

( Lc + Lr )

( p * Km * Ki * Ig ) / Emesh(tolerable)

=
=

(52.1 * 1.3237 * 0.9400 * 2000.000 ) / 718.813


180.37 Mtr

Estep(tolerable) =

( p * Ks * Ki * Ig ) / ( 0.75*Lc + 0.85*Lr )

(0.75 * Lc+0.85* Lr ) ( p * Ks * Ki * Ig ) / Estep(tolerable)


=

(52.1 * 0.2759 * 0.9400 * 2000.000 ) / 2527.254

10.69

Mtr
**
Actual conductor buried is 281m which greater than the minimum required length Hence the design is safe

LARSEN & TOUBRO LIMITED


ECC Division - EDRC (Electrical)

PROJECT: MADINAT AL NAHDAH PRIMARY S/S 33/11.5kV

REF NO:
PREPARED

TITLE:

EARTHING DESIGN CALCULATION - MAIN GRID

SSJ

LTO/193/SSSRM/0005 PAGE 01 OF 04
CHECKED APPROVED
DATE
3-03-2016
AKS
AKS

CACULATION OF GROUNDING RESISTANCE


BASED ON IEEE 80-2000 CHAPTER 14
RESISTANCE OF GROUND RODS
Re =

p / (2 * m * * l ) * [ln (8 * l / d) - 1 + 2 * K1 * l / SQRT(A) * (SQRT(m)-1)^2 ]

K1 =
Re =

1.37
Refer Fig 25A page 67 IEEE 80 - 2000
52 / (2 * 14 * 22/7 * 3 ) * [ ln (8 * 3 / 15 / 1000 )) - 1 + 2 * 1.37 *
(3 / sqrt(1220)) * (sqrt (14)-1)^2 ]
2.6983
Ohms

RESISTANCE OF GROUND GRID


Rs =
p / ( * Lc) * [ ln (2 * Lc / h') + K1 *( Lc / SQRT(A)) - K2 ]
K1 =

1.37

K2 =
h' =

5.7
Refer Fig 25B page 67 IEEE 80 - 2000
SQRT(d * h)
SQRT(0.02 * 0.60)
=
0.1083
( 52 / (22/7 * 139.72)) * [ ln ( 2 * 139.72 / 0.1083 ) + 1.37 *
( 139.72 / sqrt (1220.10 )) - 5.7 ]
0.9119
Ohms

Rs =
=

MUTUAL RESISTANCE BETWEEN GROUND GRID AND GROUND RODS


Rse =
p /( * Lc) * [ln (2 * Lc / l) + K1 * (Lc / SQRT(A)) - K2 + 1]
K1 =

1.37

K2 =
Rse =

5.7
52 / (22/7 * 139.72) * [ln (2 * 139.72 / 3 ) + 1.37 *

0.63644

( 139.72 / sqrt (1220.10 )) - 5.7 + 1]


Ohms

COMBINED RESISTANCE OF GROUND GRID AND GROUND RODS


Rg =
Rg =

(Re * Rs - Rse^2 ) / ( Re + Rs - 2 * Rse)


( 2.6983 * 0.9119 - 0.6364^2 ) / ( ( 2.6983 * 0.9119 - 2 * 0.6364 )

0.8794

Ohms

CONCLUSION
Hence the design adopted meets the specification requirement with respect to
i) STEP & TOUCH POTENTIAL
ii) COMBINED RESISTANCE OF GRID & GROUND RODS < 1.0 OHM
NOTE
The conductors shall be uniformly distributed in substation area leaving the space for Building.
Earth mat conductor as per above calculation shall be laid in s/s around the building adopting the calculated
spacing.

LARSEN & TOUBRO LIMITED


ECC Division - EDRC (Electrical)

PROJECT: MADINAT AL NAHDAH PRIMARY S/S 33/11.5kV

REF NO:
PREPARED

CHECKED

APPROVED

SSJ

AKS

AKS

TITLE:

DATE
3-03-2016

S/S -CONDUCTOR SIZING


THIS DESIGN IS GENERALLY BASED ON IEEE 80 - 2000
AREA OF CROSS SECTION
S

= I x SQRT(t) / k

S = AREA OF CONDUCTOR IN Sq.mm


I = EARTH FAULT CURRENT IN AMPS
t = EARTH FAULT CLEARING TIME IN secs.
k = SQRT(( Qc x (B+20)/delta20) x ln ( 1+ (Qf-Qi)/(B+Qi)))
Qc = Volumetric Heat capacity of conductor ( J / oC mm3 )
B = Reciprocal of Temp.Coefft. of Resistivity ( oC )
delta20 = Electrical Resistivity of conductor at 20 oC ( Ohm.mm )
Qi = Initial Temperature of Conductor ( oC )
Qf = Final Temperature of Conductor ( oC )
I=

25000 amps

t=
Qc =

3 sec
0.00345 J / C mm3

B=
delta20 =

234.5 C
0.000020 Ohm.mm

Qi =

40 C

Qf =

700 C

k=
=
S=
=

{ Data for copper conductor }

SQRT( (0.00345x (234.5 + 20) /0.00002) x ln ( 1+ ((700-40 ) / (235 +40) ) )


231.909
25000 x SQRT (3.0) / 231.909
186.72
Sq.mm

Corrosion allowance considered for the conductor in percentage =


Minimum area of cross-section required =
### Sq.mm
Hence conductor size selected is,
300 Sq.mm
CONDUCTOR SIZE CHOSEN IS

50 x 6

Copper Flat

20 %
(Which is the minimum size specified in the specification)

LARSEN & TOUBRO LIMITED


ECC DIVISION-EDRC(ELECTRICAL)

CONSTRUCTION GROUP
PROJECT:
CLIENT:
CONSULTANT:
TITLE:

Construction of 2x20 MVA, 33/11kV ALNAHDAH Primary S/S & 33kV Line
Muscat Electricity Distribution Company
Energoprojekt - Entel LLC
PREPARED CHECKED APPROVED DATE

DOCUMENT NO:

Direction
East

SSJ

Avg.
Resistivit
y (Ohmm)
68.90

North
West

AKS

AKS

22.12.06

200.00

46.83

68.90

46.83

###

42.31

100.00
46.83
42.31

68.90
0.00

42.31
.

South

105.98

105.98
.

Area of the polygon


Radius of eqv. Circle
Avg. Soil Resistivity

8497
52.01
52.01 ohm-m

The lowest resistivity outcome in all the samples is 35.18 ohm-meter in the West
direction. Hence corrosion allowance of 15 % to be considered as Per CBAP
guidelines.
Remarks:
1. Polygon drawn for the average Resistivity values available in N,E,W,S directions.
Resultant Resistivity is calculated as the equivalent radius of the polygon area.
2. Calculations are based on IS:3043
3. Formula used is

Re sistivity=

where

307124533.xls

2sr

if ( d<s/20)
4sr

1+

{(

2s

( ss)+(4dd)

) ( (ss)+(dd))}

if (ds/20)

s - distance b/w spikes


d - depth of the spike
r - earth resistance
PageNo.8of10

LARSEN & TOUBRO LIMITED


ECC DIVISION-EDRC(ELECTRICAL)

CONSTRUCTION GROUP
PROJECT:
CLIENT:
CONSULTANT:
TITLE:
DOCUMENT NO:

Construction of 2x20 MVA, 33/11kV ALNAHDAH Primary S/S & 33kV Line
Muscat Electricity Distribution Company
Energoprojekt - Entel LLC
PREPARED CHECKED APPROVED DATE
SSJ

AKS

AKS

22.12.06

200.00

100.00
46.83
42.31

68.90
0.00

105.98

307124533.xls

PageNo.9of10

LARSEN & TOUBRO LIMITED


ECC DIVISION-EDRC(ELECTRICAL)

CONSTRUCTION GROUP
PROJECT:
CLIENT:
CONSULTANT:
TITLE:

Construction of 2x20 MVA, 33/11kV ALNAHDAH Primary S/S & 33kV Line
Muscat Electricity Distribution Company
Energoprojekt - Entel LLC
PREPARED CHECKED APPROVED
DATE

DOCUMENT NO.
Sl No.

SSJ
Earth
Earth
resistance resistivity
()
(-m)

AKS

AKS

22.12.06

Average
Value
(-m)

Direction

Remarks

Distance
between
spikes

Depth of
Spike (m)

2
5
10

250
250
250

2.2
0.97
0.72

55.29
60.95
90.48

68.9

East

2
5
10

250
250
250

2.14
0.64
0.37

53.78
40.21
46.49

46.83

North

2
5
10

250
250
250

2
0.66
0.28

50.27
41.47
35.18

42.31

West

2
5
10

250
250
250

3.7
1.64
0.97

92.99
103.04
121.89

105.98

South

307124533.xls

PageNo.10of10

Potrebbero piacerti anche