Sei sulla pagina 1di 29

6.

0 LOAD CALCULATION
VENDOR / DATASHEET SUPPLIED LOADS:
3

Empty Weight

De

Operating Load ( content only )

Do

Test Load ( content only )

Dt

Wind Load - Shear

Vvw

311.528kip

Vvw

311.528 kip

Wind Load - Moment

Mvw

34406.696kip ft

Mvw

34406.696 kip ft

Seismic Load - Shear (Empty)

Vveqem

44.0 kip

Vveqem

44 kip

Seismic Load - Moment (Empty)

Mveqem

5925.662kip ft

Mveqem

5925.66 kip ft

Seismic Load - Shear (Operating)

Vveqop

44.825kip

Seismic Load - Moment (Operating)

Mveqop

6094.729kip ft

1678.8kip
1945.2kip
3167.1kip

De
De

De

1.679 10 kip

Do

266.4 kip

Dt

1488.3 kip

Vveqop

44.825 kip

Mveqop

Note: WL is ASD load & Seismic Load is Ultimate load


EQUIPMENT DATA:
Inner Diameter of Vessel

di

Thickness of shell of Vessel

21.366ft

Thickness of insulation on Vessel

tins

Vessel Tangent to Tangent length

Tl

159ft

Height of Vessel skirt

Sh

28ft

Thickness of fireproofing on Vessel skirt

tfp

4in

Height to Vessel Top above FGL

Length

( 0.98

0.13 )in

4.0in

Tl

9in

Sh

di
4

Length

6.095 10 kip ft

193.091 ft

FOUNDATION DESIGN DATA:


Define bolt circle diameter:

BCB

Define number of anchor bolts:

NB

44

Sleeves required,

Slv

Diameter of anchor bolt,

21ft

Dbolt

1.15in

BCB

0 for Yes, 1 for No

If yes, Sleev dia

21.0958 ft

Sdia

0in

2.5in

Clear Cover to concrete exposed to earth,

cover

3in

Outer Dia. of base plate,

BPo

BCB

Inner Dia. of base plate,

BPi

di

Thickness of base plate,

BPT

Grout Thickness,

T gr

2 2Dbolt

2 2in

BPo

21.929 ft

BPi

21.033 ft

20.23in
1.5in

CALCULATION OF SIZE OF PIER


PierDia0

BCB

( 2) max 6 Dbolt 4.5in

PierDia0

23.596 ft

PierDia1

BPo

2 T gr

2in

PierDia1

22.513 ft

PierDia2

21.637 ft

PierDia3

22.554 ft

PierDia2

BCB

Sdia

9in

PierDia3

BCB

Sdia

7 Dbolt

Vertical bar dia


PierDia4

BCB

6
in
8

Ties dia
v

( 2) cover

Pierdia

Dbolt

ceil

1.5Dbolt

max ( PierDia)
6in
6in

4
in
8
PierDia4
Pierdia

22.429 ft
24 ft

PLATFORM DATA (If vessel has no platforms, enter np=0):


FOR PLATFORM REFER 3D MODEL
Define number of platforms:

np

16

0 max ( ( np

TOS j

TOS is support elevation & Wp is width of platform:Note: in order to fill in the range variables for
TOS and platform width, type in the value *
length unit followed by a comma to get to the
next position.
Define platform member depth plus 10" for handrail:
Define platform Cf value:C
fp

dp

2ft

Refer 2g. Fig.6.20

2.0

Define top of steel elevation (TOS) and platform width (wp) for each
platform:
Define Grade Elevation:

Grade 10ft
Wind Load Design Criteria: (ASCE 7-05)
Wind Loads:

[Ref. 3DG-C01-00001]

Given:
Define wind velocity:
Define importance factor:
Define exposure:

mi
Velwind 150
hr
Iw 1.15
Exp

Define topographic factor:

Kzt

1.0

Define Wind Directionality factor

Kd

0.95

1 0 ))

Ref 2j sec 4.1

Ref 2g Table 6.4

205ft
194ft
174ft
160ft
154ft
138ft
127ft
112ft
108ft
92ft
71ft
67ft
57ft
45ft
39ft
30ft
0ft
0ft
0ft
0ft

wp
j
20ft
6.5ft
7.5ft
6.5ft
6.5ft
6ft
6ft
6ft
8.75ft
6.5ft
9ft
6ft
6.5ft
11ft
6ft
8ft
5ft
7ft
5ft
18ft

Wind Load on Vessel:


Calculate vessel overall height:
h

Length
2 t

2 tins

58.854 m

193.091 ft

do

6.772 m

do

22.218 ft

Outer diameter of vessel

do

di

e1

if do 1 m 1.6 if do 1.5 m 1.37 if do 2 m 1.28 if do 2.5 m 1.2 1.18

Area increase factor:

e1

1.18

Area increase factor:

e2

[Refer Cl. 7.6.5 of


Ref 2g )]

[Increase in projected area for piping and appurtenances]


e2

Therefore Area increase factor

max e1 e2

1.18

Number of wind profile steps:


n

1 if h 15 ft

h 2 if 15 ft h 30 ft

5 ft
h
ceil
1 if 30 ft h 100 ft
10 ft
h 6 if 100 ft h 200 ft
ceil

20 ft
h
ceil
12 if 200 ft h
50 ft
ceil

Height to diameter ratio:

hd

h
do

di

Me1

t 490

Mo

Do De
---> M
o
h g

ft

16

sec
in

8.691

29 10 psi

Me1
2

hd
6

1
t --->
g
2.174 lbf

--->

Calculate the natural frequency of the vessel:


lbf

--->

0.66 lbf

sec
in

Me2
max Me1 Me2

E
De
h g

1.999 10 MPa

--->

Me2

1.877 lbf

sec
in

Reference: Appendix 4.A, Guidelines For Seismic Evaluation And Design Of Petrochemical Facilities by ASCE
Te

12M do in

sec
t lb

6 do
10

7.78

Te

0.849 s

fe

1
Te

--->

fe

1.178 Hz

6 do
10

7.78

To

To

0.914 s

fo

1
To

12Mo do in

sec
t

lb

--->

fo

1.094 Hz

If fo > 1 Hz, the vessel is not flexible - this document applies


if fo < 1 Hz, the vessel is flexible - this document does not apply
Assign Kz vectors:

0 n

Kz
i

Kztb
i

[Refer 2g : Table 6-3 (Equation C6-4a and C6-4b, see


right margin)]
2

Compute qz:

qz
i

Velwind
0.00256 Kd Kz Kzt
I psf
i
mph w

Compute qz for platforms: z


pj

if TOS j

Check size factor > 2.5:

Grade 0 ft

Exp
2
Vel
K wind I psf
zt mph w

if zp = 0 ft 0 psf if np = 0 0 psf qpz


j
j

qpz
j
Gh

0 TOS j

max 15 ft zpj

0.00256 2.01

zg
Exp

qpz
j

Assign Gh value:

Grade

[Refer 2g : Eq. 6-15]

Ghtb
Exp

do

ft

qz
0
psf

--->

Gh

162.385

0.85

[Refer 2g : Clause 6.5.8.1]

Determine Cf by interpolation
for rough shape:

Cf1

[Refer 2g : Fig. 6-21]

Cf

if hd

Fv

Compute shear for each platform:


Vwind

Mwind

hd

25 hd
0.7 0.1

6
18

qz Gh Cf Li do e
i

qpz Gh Cfp wp dp
j
j

Fvp

Fvi Fvpj
i

Moment at support:

--->

Vwind

Fv Armi
i

Fvp zp --->
j j

15 for range variables


0.85 used above: 53.4
The following
15.0 are the
values

5.0
5.0

5.0
10.0
10.0

10.0
10.0

ft z
10.0

10.0
10.0

20.0

20.0

20.0
20.0
13.1

---> C
f1

0.609

max Cf1 0.8

Compute shear for each profile step:

Total shear:

0.1

7 0.6

20
25

30
40
50

60
70

ft Kz
80

90
100

120

140

160
180
193.1

0.90
0.95

0.98
1.04
1.09

1.14
1.17

1.21
1.24
1.27

1.32

1.36

1.40
1.43
1.45

qz

56.8
59.5

61.8
65.7
68.8

71.5
73.9

psfFv
76

77.9
79.6

82.8

85.5

87.9
90.1
91.5

302 kip

Mwind

31997.08 kip ft

14.3

5.1
5.3

5.5
11.7
12.3

12.8
13.2

kip
13.5

13.9
14.2

29.5

30.5

31.4
32.1
21.3

Arm

7.5

17.5
22.5

27.5
35
45

55
65

ft
75

85
95

110

130

150
170
186.5

qpz

Wv

96.5

95.3
93

91.3
90.5
88.3

86.7
84.2

psf
83.5

80.4
75.5

74.5
71.5

67.2
64.6
59.7

Fvp

max Vvw Vwind

6.56

2.11
2.37

2.02
2
1.8

1.77
1.72

kip
2.48

1.78
2.31

1.52
1.58

2.51
1.32
1.62

Wv

311.5 kip

Max. tension per bolt:

Tw

1.6 ( 4 Wm)
NB BCB

Shear per bolt:

Vw

Wv
NB

Wm

max Mvw Mwind

0.9De
--->
NB

Tw

202.89 kip

--->

Vw

7.08 kip

Wm

34406.7 kip ft

Earthquake Load Calculation:


Seismic Design Criteria (Seismic Loads are calculated in accordance with ASCE-7,2005):
[Refer 2j : Section 4.1]

Site Class E
Earthquake Spectral Response Accel'ns:

0.11

Define Response Modification Factor (Table 15.4-2):

Rf

3.0

Acceleration based site coefficient From Table 11.4-1

Fa

2.5

Velocity based site coefficient From Table 11.4-2

Fv

3.5

Long period transition period From Fig.22-15 (considered)

TL

12

Max Considered Earthquake spectral response


acceleration at short period ( 11.4-1 of Ref 1. )

SMS

Fa SS

SMS

0.275

Max Considered Earthquake spectral response


acceleration at 1s period ( 11.4-1 of Ref 1. )

SM1

Fv S1

SM1

0.182

Design Earthquake spectral response acceleration at short


period ( 11.4-3 & 11.4-4 of Ref 1. )

SDS

2
S
3 MS

SDS

0.183

SD1

0.121

Importance Factor:

IE

SDS IE
Rf

( Eq. 12.8-2 )

Sec.11.4.1

1.25

Design Earthquake spectral response acceleration at


1s period (
1 1.4-3 & 11.4-4 of Ref 1. )

CS

S1

0.052 Refer ASCE 7-05

SS

CS

for Empty Vessel condition

0.076

SD1

CSmin

Te

0.849 s

2
S
3 M1
0.03

To

( Eq. 15.4-3 )

for Operating Vessel condition

0.914 s

CSmin

0.03

for Empty Vessel condition

Max. seis
coeff.
(Ref 2g,
Eq. 12.8-3)
Design Seis
coeff,
Seismic
shear
Seismic
moment

|
|
|
SD1 IE
CSmax_e
CSmax_e 0.06
|
1
Rf T e sec
|
|
|
max CS CSmin
|
CS_e min
|
CSmax_e

|
|
CS_e 0.06
|
Vsies_e CS_e De
|
Vsies_e 99.95 kip |
2 h
|
Me Vsies_e
3
Me 12865.73 kip ft |

for Operating Vessel condition


SD1 IE

CSmax_o

Rf T o sec

CSmax_o

max CS CSmin
CSmax_o

min

CS_o

Vseis_o
Mseis_o

CS_o Do

De

2 h
Vseis_o
3

0.055

CS_o

0.055

Vseis_o

107.6 kip

Mseis_o

13849 kip ft

A vessel of constant diameter with the entire mass distributed uniformly over the height is considered for frequency
calculations. Total Earthquake shear is applied at 2/3 height to calculate base moment.

Horizontal Earthquake Loads:

The calculation below compares the seismic shear and moment calculated by the equipment supplier to the shear and moment
calculated here and selects the larger of the two. It is possible that the Bechtel calculated load in one case (i.e. shear or
moment) may be chosen while the supplier load is selected for the other case.
Evoper

max Vveqop Vseis_o

Emoper

max Mveqop Mseis_o


Emoper

Evoper

107.58 kip

13849 kip ft

Max. tension per bolt :

4 Emoper

T E_oper

if

T E_oper

19.89 kip

VE_oper

NB BCB

Evoper
NB

De

Evempty

Evoper

Emempty

De
Emoper
Do De

Emempty

11952.31 kip ft

0.9 Do De

NB

Do

0 0

De

4 Emoper

NB BCB

Evempty

92.85 kip

0.9 Do De

NB

Shear per bolt :

Evoper

VE_oper

--->

NB

Vertical Earthquake Loads:

VE_oper

2.45 kip

ASCE 7-05, Section 15.7.2 requires the vertical component ( +/- 0.2*SDS *IE *D ) of the earthquake load be included when
designing using Strength Design. Since our foundation design is performed using Strength Design, this load is required.
Operating Case:

Max. tension per bolt :


Reactions at the POS:

Ezoper

0.2 SDS IE Do

Ezoper

89.16 kip ( +/- )

T E_vert

Ezoper

Empty Case:

De

T E_vert

NB

Ezempty

0.2 SDS IE De

Ezempty

76.95 kip( +/- )

2.03 kip

All Earthquake ( EQ ) loads for Foundation Design are Ultimate Strength Design ( ASD ) loads.

Description of Load

Vertical

Base Shear

Equip. Dead Load

De

1678.8 kip

Equip. Operating Load

Do

266.4 kip

Equip. Test Load

Dt

1488 kip

Wind Load

Wv

EQ Empty

Evempty

EQ Operating

Evoper

EQ Vertical Empty

Ezempty

EQ Vertical Operating

Ezoper

76.95 kip ( +/- )


89.16 kip

( +/- )

311.53 kip
92.85 kip
107.58 kip

Base Moment

Wm

34406.7 kip ft

Emempty
Emoper

11952.3 kip ft
13849 kip ft

9.0 MATERIAL TAKE OFF


Ref. page no - 22 and Attachment-C
10.0 CONCLUSION
Estimated quantity is found to be exceeded as shown below (compared to CORe, Attachment-C)
1.0 Pile: Total 17 nos. required against estimated 15 nos.
2.0 Concrete quantity
Description
Concrete
Reinforcement

Actual
119 CY
6.6 TN

Estimated
39 CY
1.62 TN

Possible Reasons
1.0 Vessel (O.D) dimension considered as 10'-11" in the estimation, while in present the vessel dimension is 11'-11".
2.0 In the estimation, wind load importance factor was considered as 1.0 instead of 1.15.

ATTACHMENT - A
(Vendor Drawing)

ATTACHMENT - B
(Geotechnical Study - Pile Graph)

ATTACHMENT - C
(Core Estimated Sheet)

ATTACHMENT - D
(Vendor Load Calc. For Wind Force)

Wind

Potrebbero piacerti anche