WOTy WOID Description

pe

Feedback

Tag Number

CM

698

Fixation for the unit


desander and its by-pass
filter as it exposed a high 30/12/2013
viberation ( fax dated Nov, 12:07:48----------24, 2013)
Waiting
engineering and
supplier
recommendation
as fax dated Nov,
24, 2013

EW2-NP-PI

CM

709

Please, fix the problem of


high cooler vibration S/D
when Nodal1 speed
exceeds 1000rpm

HAL-2200
30/12/2013
11:56:36----------Waiting for
engineering
company to
illustrate the
position of the
new bearing and
the supports
locations.

Page 1 Of 1, Date: 21/11/2015 10:01:07

WOTy WOID Description


pe

Feedback

CM

493

Valve must be
replaced because
the damaged one
does not have a
greasing point

07/05/2015
SDV-2000
11:58:49----------Needs MR for
valves that are
suitable for
actuators
mounting

Waiting For
Materials

CM

494

Valve must be
replaced because
the damaged one
does not have a
greasing point
according to PM WO
4308

07/05/2015
SDV-7001
11:58:46----------Needs MR for
valves that are
suitable for
actuators
mounting

Waiting For
Materials

CM

1686

Please, check and


fix EW-II Nodal-I
Desander BD valve
body (Ball) as it
sticks and doesn't
respond to actuator
motion.

07/05/2015
EW2-NP12:46:15----------- PRD-PI
MR should be
issued for valves
suitable for
actuators
mounting

Waiting For
Materials

Page 1 Of 1, Date: 21/11/2015 10:06:58

Tag
Number

Status

W
OT
ype

WOID

Description

PM

24100

Top overhaul for Cylinders of VHP P9390 GSI


engine (Waukesha gas engine 16V)

Feedback
06/08/2015
13:03:28---------Waiting for
S/D
approval, as
the expected
downtime is
two weeks

Tag Number

Status

CZZ-6000

In progress
(50%)

EW2-NP-PI

Completed

Please install spades for isloation at the


following places:
- Inlet Flange (De-Sander's upstream) 6" #600
- Gas Outlet Flange (ESDV upstream) 6" #600
- Condensate Outlet Flange (Pumps Discharge)
2" RTJ
- Water Outlet Flange ( upstream water tanks
header) 3" 600
- Flare Header Flange 6" #150
- start-up fuel gas line from discharge line (10'')
2'' 600

CM

2406

CM

2051

kindly fix oil leakage observed from Ew-2 nodal I

EW2NPCOMP

Completed

CM

2076

Please, check and fix the water leakage


observed in EW-II Nodal-I Engine as coolant
and/or water make-up is performed on hourly
basis.

CZZ-6000

Completed

CM

2108

kindly replace the oil compensation tank of EW2 nodal I due to its bad condition

EW2NPCOMP

CM

2128

due to it is not allowable to make alignment to


stub shaft bearing between engine and cooler of
nodal#1 because fixation and that leads to
unacceptable readings in vibration report, so it is
required to prepare a new base plate as bellow:

The bearings fixation holes should be


shaped slotted-holes with suitable length to give
a room for bearings alignment.

Jacking bolts for accuracy and ease


the bearings movement during alignment
then install the new plate and perfo

Z-7000

CM

2139

Please, modify the stub shaft guard to add


accessability for vibration sensor to facilitate
periodic vibration survey

CZZ-6000

PM

24102

Gas compressor 8000 hrs routine maintenance

CAE-7000

PM

24149

Gas compressor 3 months or 2000 hrs


lubrication

CAE-7000

PM

24101

Gas engine driver 12 months or 8000 hrs


lubrication

CZZ-6000

In progress

CM

2150

Please check the following leaks of Nodal-I


compression package which lead to:
1- continuous oil leakage (make-up rate 1 drum
daily).
2- continuous coolant leakage (make-up rate
every hour).

CM

2148

Please install guard of engine-cooler connection


of Nodal-I compression package

EW2-NP-PI

2266

kindly check and fix Check valves located on


both of nodal I condensate pumps and the one
located on the gathering line of the said pumps
due to passing

EW2NPCS-PI

CM

Please check and fix the problem of Nodal-I


condensate pump A discharge check valve
(where it cause back flow in case of PUMP B
running leading to vibration).

EW2-NP-PI

CM

2153

EW2-NP-PI

CM

2331

Please, check and fix the passing in EW-II


Nodal-I Inlet 6" Globe valve.

EW2-NP-PI

CM

2326

Please, perform EW-II Nodal-I Compressor's


skid housekeeping.

EW2-NP-PI

CM

2353

Kindly check the fixation of the the flame


detector holder located beside Nodal I desander
and adjust the flame detector angle

EW2-NP-PI

CM

2359

check fan bearing condition and coupling


condition.

CAE-7000

CM

2395

kindly clean De-Sander drain line as it is


plugged

EW2-NP-PI

CM

2394

kindly check and fix Ew-2 nodal I condensate


pump A as itcan NOT handle the accumulated
level in surge vessel

EW2NPCS-PI

CM

2392

kindly replace Ball valve on recycle line of Ew-2


nodaI pumps to surge vessel due passing

EW2NPCS-PI

CM

2389

kindly fix EW-2 nodal I De-sander's BDV due to


sticking problem

EW2-NP-PI

CM

2388

kindly replace 2 x 3" drain ball valves on Ew-2


Nodal I De-sander drainline due to passing

EW2-NP-PI

CM

2386

kindly check and fix Ew-2 nodal I separator


Water LCV by-pass valve due to passing

EW2NPSEP-PI

CM

2400

Please, dismantle EW-II Nodal-I Separator's


manway perior to its cleaning.

MBD-1000

Completed

CM

2399

Please, dismantle EW-II Nodal-I Surge Vessel's


manway perior to its cleaning.

MBD-2000

Completed

CM

1844

kindly check and fix Ew-2 nodal I Desander


Flushing water pump as it is out of service

EW2-NP-PRD-PI

Sr

WOType

WOID

Description

Feedback

Tag Number

CM

1774

please, fix the inlet ESDV as it doesn't take any


actions

Dismentaled cable+selonoid
Waiting to replace valve

EW2-NP-PRDPI

CM

2094

Install new fixed orfice plate downstream control


valve for water side to avoid problems such as
mechanical friction, cavitation, erosion.

LCV-1000-2

LCV-1000-2

CM

2103

Replace flange line for water side from RTJ flange


to Raised Face flange in order to install orfice plate
down stream LCV water side
Project Scope
Find attached sheets for MOC and P&ID

CM

2151

Please connect heat detector of Nodal-I


compressor (where it's disconnected)

EW2-NP-PI

PM

24103

Annual testing & calibration For Pnumatic Control


Valves

FCV-6001

PM

24104

Annual testing & calibration For Pnumatic Control


Valves

FCV-6002

PM

24119

Annual checks& calibration For Pressure Switch ,


Flow Switch

FSLL-7001

PM

24105

Annual testing & calibration For Pnumatic Control


Valves

LCV-2100

PM

24107

Annual testing & calibration For Pnumatic Control


Valves

LCV-2200

10

PM

24131

Annual checks For Level Indicator

LG-2100

11

PM

24132

Annual checks For Level Indicator

LG-2200

12

PM

24129

Annual checks For Level Indicator

LG-2201

13

PM

24130

Annual checks For Level Indicator

LG-2202

14

PM

24127

Annual checks For Level Switch

LSH-2100

15

PM

24128

Annual checks For Level Switch

LSHH-2200

16

PM

24123

Annual checks For Level Switch

LSLL-2201

17

PM

24124

Annual checks For Level Switch

LSLL-2202

18

PM

24126

Annual checks For Level Switch

LSLL-6001

19

PM

24125

Annual checks For Level Switch

LSLL-7001

20

PM

24106

Annual testing & calibration For Pnumatic Control


Valves

PCV-2100-1

21

PM

24113

Annual Checks For Self Acting Control Valve

PCV-6001

22

PM

24114

Annual Checks For Self Acting Control Valve

PCV-6002

23

PM

24115

Annual Checks For Self Acting Control Valve

PCV-6003

24

PM

24116

Annual Checks For Self Acting Control Valve

PCV-7001

25

PM

24111

Annual Checks For Self Acting Control Valve

PCV-7002

26

PM

24120

Annual checks For Pressure gauge-indicator (PG,I,


PDI)

PI-6000

27

PM

24121

Annual checks For Pressure gauge-indicator (PG,I,


PDI)

PI-6001

28

PM

24122

Annual checks For Pressure gauge-indicator (PG,I,


PDI)

PI-6005

29

PM

24318

ELECTRICAL PANEL & BOARD 6 MONTHS


MAINTENANCE

30

PM

24311

Annual checks& calibration For Deffrential


Pressure Transmitter

PT-2100

31

PM

24117

Annual checks& calibration For Deffrential


Pressure Transmitter

PT-2120

32

PM

24118

Annual checks& calibration For Deffrential


Pressure Transmitter

PT-2220

33

PM

24309

Annual checks& calibration For Deffrential


Pressure Transmitter

PT-6000

34

PM

24310

Annual checks& calibration For Deffrential


Pressure Transmitter

PT-6001

35

PM

24308

Annual checks& calibration For Deffrential


Pressure Transmitter

PT-7001

36

PM

24108

Annual Fail safe condition For ON-OFF Control


Valves

SDV-1000

37

PM

24110

Annual Fail safe condition For ON-OFF Control


Valves

SDV-4030

05/08/2015 18:52:58----------Descipline changed upon


Eng.Amr Gouda's request

PL-CAE-7000

38

PM

24109

Annual Fail safe condition For ON-OFF Control


Valves

SDV-7001

39

PM

24112

Annual Checks For Self Acting Control Valve

TCV-7001

40

PM

24140

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TE-2120

41

PM

24143

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TE-2220

42

PM

24133

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TE-6002

43

PM

24134

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TE-6003

44

PM

24135

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TE-6004

45

PM

24137

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TE-6005

46

PM

24312

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TE-7001

47

PM

24139

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TI-2110

48

PM

24141

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TI-2120

49

PM

24142

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TI-2210

50

PM

24144

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TI-2220

51

PM

24315

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TI-4041

52

PM

24136

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TI-4042

53

PM

24138

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TI-4051

54

PM

24316

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TI-4052

55

PM

24313

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TI-7003

56

PM

24314

Annual Checks For Temperature Element


(Thermocouple-RTD-GAUGE)

TI-7004

57

PM

24148

Annual Checking & cleaning For Vibration Switch

VSH-2200

58

PM

24147

Annual Checking & cleaning For Vibration Switch

VSHH-2100

59

PM

24317

Annual Checking & cleaning For Vibration Switch

VSHH-4050

60

PM

24146

Annual Checking & cleaning For Vibration Switch

VSHH-6001

61

PM

24145

Annual Checking & cleaning For Vibration Switch

VSHH-7001

62

CM

2352

kindly check the heat detector system for Ew-2


nodal I as it has fault on panel

EW2-NP-PI

63

PM

26841

Annual checks and calibration For PSV

64

CM

2377

Please check LSH of condensate surge vessel at


EW-II Nodal-I where it doesn't activate when level
exceeded the switch limit

65

CM

2376

Please, check passing from PSV of EW-II Nodal-I


condensate pumps discharge line.

66

CM

2384

Please, check and maintain EW-II NOdal-I


Desander BDV where it stuck close during flaring.

V-100

67

CM

2393

kindly replace Needle valve on recycle line of Ew-2


nodal I pumps to surge vessel as it is passing

EW2NPCS-PI

68

CM

2387

kindly calibrate Ew-2 nodal I Engine oil maintainer

EW2-NP-PI

69

CM

2397

kindly check and fix Ew-2 nodal I Inlet PCV due to


passing passing

EW2NPSEP-PI

70

CM

2398

kindly chech and clean Ew-2 nodal I separator


water bridle lower section as it is plugged

EW2NPSEP-PI

71

CM

2391

kindly Replace 6 x 1/2" ball valves for Ew-2 nodal I


separator

EW2NPSEP-PI

72

CM

2390

kindly Replace 4 x 1" ball valves for Ew-2 nodal I


condensate pumps skid

EW2NPCS-PI

15/11/2015 17:38:07----------Waiting for EMC

PSV-2120

EW2NPCS-PI
Dismentaled waiting to Cal.
By EMC

EW2NPCS-PI

Status
In progress

Completed

Completed
Completed
Completed
Completed
Completed

done

Completed
completed
completed
completed
completed

completed

done

done

done

electrical issue
Completed

Completed

Completed

Completed

Completed

Completed

Completed

in progress
done
Completed

Completed

Completed

Completed

in progress
done
in progress
done
in progress
done
Completed

Completed

Completed

Completed

done
Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

done waiting for transportation


Completed
In progress

done waiting for transportation

Completed
in progress will be check today
done
done
mechanical issue