REM Process)
Answer: 1) Define Distribution Keys
IMG > Production Planning for Process Industries > Master Data > Material List > Item Data
> Item Data from related areas > Define Distribution Keys
2) Determine Person responsible for Resource u2013
IMG > Production Planning for Process Industries > Master Data > Resource > General Data
> Determine Person responsible
3Define Planner GroupIMG > Production Planning for Process Industries > Master Data > Master Recipe > Define
Capacity Planner
4) Define Capacity Planner u2013
IMG > Production Planning for Process Industries > Master Data > Resource > Capacity
Requirement Planning > Determine Capacity Planner
5) Determine Standard Value Parameter u2013
IMG > Production Planning for Process Industries > Master Data > Resource > General Data
> Standard Value > Define Parameter
6) Define Setup Groups and Setup Group Categories
Define set up groups and set up categories u2013
IMG > Production Planning for Process Industries > Master Data > Master Recipe > Data for
operations and phases > Define set up groups and set up group categories
7) Define copy setting between plants-Process
IMG > Production Planning for Process Industries > Process Management > Tools > Define
copy setting between plants
8) Define Set Up Control Recipe destination u2013
IMG > Production Planning for Process Industries > Process Management > Control
Recipe/PI sheet > Set up control recipe destination
9Define MRP controller u2013
IMG > Material Management > Consumption based Planning > Master Data > Define MRP
controller
10) Special Procurement u2013
IMG > Material Management > Consumption based Planning > Master Data > Define Special
procurement types
11) Define Floats (Scheduled Margin Key)IMG > Material Management > Consumption based Planning > Planning > Define Floats
(Scheduled Margin Key)
12Define Splitting of Forecast requirements for MRPIMG > Material Management > Consumption based Planning > Evaluation > Forecast >
Define Splittng of forecast requirements of MRP
13) Maintain Correction Factors for Forecast
IMG > Material Management > Consumption based Planning > Planning > Procurement >
Maintain Correction factors for forecast
14 Carry Out Overall Maintenance of Plant Parameters
Maintaining plant parameters in MRP u2013
IMG > Material Management > Consumption based Planning > Plant Parameters > Carry out
overall maintenance of plant parameters
15) Define Planning Horizon
Define Planning Horizon u2013
IMG > Material Management > Consumption based Planning > Planning > MRP calculation
> Define Planning Horizon
16) Activate Requirement Planning u2013
IMG > Material Management > Consumption based Planning > Planning > Activate
Requirement Planning
17) Define Range of Coverage Profiles (Dynamic Safety Stock)
Range of coverage profile u2013
IMG > Material Management > Consumption based Planning > Planning > MRP calculation
> Define range of coverage profile (Dynamic Safety Stock)
18) Define Stock in Transfer and Blocked Stock Availability
IMG > Material Management > Consumption based Planning > Planning > MRP calculation
> Stocks > Define Stock in transfer and blocked stock
19) Define MRP Areas
IMG > Material Management > Consumption based Planning > Master Data > MRP areas >
Define MRP areas
20) Carry out maintenance of MRP groups
IMG > Material Management > Consumption based Planning > MRP groups> Carry out
maintenance of MRP groups
21) Define Scope of total Planning - MRP
IMG > Material Management > Consumption based Planning > Planning > Define Scope of
total Planning
22 Define Order Types
Define Order TypeIMG > Production Planning for Process Industries > Process Order > Master Data > Order >
Define Order Type
23Define Order Type Dependent parameters u2013
IMG > Production Planning for Process Industries > Process Order > Master Data > Order >
Define Order Type Dependent parameters
24) Define Production Scheduler u2013
IMG > Production Planning for Process Industries > Process Order > Master Data > Bill of
Material > Define Production Scheduler
25 Define Checking Control - Process Order
system will assign the status to it . Like if you create a subsequent document w.r.t notification
then the system status will be set as NOPR(Notification in process) and if you create any
return order or credit note w.r.t notification then the system status will be set as SOAS (Sales
order assigned)..like this system automatically update the status based on the action you do.
These statuses will be updated automatically by the system and user have no control on these
system status.
to view the list of system status - BS22
User status - you can create your own status under one status profile in t.code bs02 and can
assign to the relevant transaction . This status has to set manually in the transaction
Question 3; What is backflush ? Where we define the backflush? Priority of the backflush
indicator?
backflush.docx
Go-live Checklist
Let us assume that you have gone through the implementation guide and you have configured
your plans, add-ons and coupons. Now you think you're ready to deploy your billing and
payment system. But before you go live, please go through this checklist to make sure you
have everything squared away.
So, here is the detailed version with our recommendations:
Assuming that you already have your payment gateway account approved and ready, you will
need to configure this within Chargebee. Click here to know more.
3. Configure your Site Information
These settings will be found under the "Site Info" section under "Site Settings" in your
"Settings" tab. Specify your country and currency. Also enable daily digest under "Settings >
Site Settings > Report Settings".
4. Metered / Usage Based Billing Setup
Enable this if you have a metered based billing setup. Click here to find out how.
5. Tax Setup
Configure your tax settings. To know more about country specific tax, please contact our
support team at support@chargebee.com . Here's our documentation on taxes.
6. Retry Settings / Dunning Management
Review your defaults for retry settings to recover from credit card failures.
7. Invoice Customization
Every time a payment is made, Chargebee sends out an invoice to your customers on your
behalf. You can always customize the way it looks. Once you've customized it, email an
invoice to yourself to be sure it looks how you want it to be. To see how to customize your
invoices, click here to learn more.
8. Hosted Page Customization
If you are using Chargebee's hosted payment page, you can customize the way it looks from
Chargebee's web interface. Click here to learn more.
Note
Ensure that you have checked, edited and enabled all the email notification templates
that you need before you go live.
9. Email Notifications
Be sure to setup your email notifications as well as the templates you'll be using for your
transaction emails. Send a few test emails to yourself and have a look at them using different
browsers and devices. Here's more on configuring your transactional emails.
10. Provide Access to Team Members (Optional)
If you've already invited users to your test site, and you need those users to have access to
your live site as well, invite those users again from the LIVE site. In Chargebee, access is
controlled at a Site level, be it TEST or LIVE. So, you need to invite users explicitly for each
site.
11. Testing
We would recommend that you to run a few small value test transactions with real cards in
your LIVE site before opening it up to customers.
Test your checkout flow & create a new order / subscription using a plan with an amount
and 0 trial days to ensure the card is charged immediately
After a subscription has been created and charged successfully, try to add a charge
immediately after 20 minutes. This is to confirm that the recurring charges are
successful.
Cancel an order / subscription
You may download the latest version of the SAQ-A document from the PCI Security
Standards Website . It is under the SAQs section.
For any queries, email security@chargebee.com and we will help you with the details.
Storage location priority ? Where we define Goods movement (GR/GI) Storage loc?
Sloc doc.pdf
Purpose - need to check , how settlement becomes not equal to zero. (I am facing this problem)
Ans :- For this issue u need to check ur cost structure setting whether it is maintain properly or not.
Check ur material master accounting & costing views.
Check ur activity type to cost center assignment in work center costing tab.
check setting in OPL8 tcode -> costing tab check your actual & planned variant,default rule.
For REM
Question: What is the difference between planned independent requirement consumption and planned
independent requirement reduction ? Answer: The consumption reduces planned independent requirements
dynamically, whereas the reduction physically reduces the planning quantity and increases the withdrawal
quantity accordingly. For example: You create a planned independent requirement with 100 pieces. This planned
independent requirement is consumed against a sales order with 10 pieces. The planning quantity and
withdrawal quantity remain the same (see MD63) but the planned independent requirement is displayed in the
stock/requirements list (MD04) with the quantity 90. The independent requirements reduction occurs when you
post the goods movement, in this case, with the goods issue for the sales order. The planning quantity of the
planned independent requirement is reduced to 90 pieces and the withdrawal quantity is increased from 0 to 10
(see MD63). In the stock/requirements list, the planned independent requirement is still displayed with 90 pieces
despite the reduced planning quantity because when you post the goods issue, the customer requirement
against which the planned independent requirements had been consumed also disappears.
2. Question: Which consumption parameters (Consumption mode/consumption period) are taken into account?
Answer: The parameters maintained in the material master (material requirements planning view 3) have the
highest priority. If you do not specify a consumption mode, the system uses the consumption parameters from
the MRP group that is assigned to the material. If a consumption mode is not specified there, the consumption
mode is set to '1' by default (backward consumption only) with a (backward) consumption period of 999 days.
This means that the consumption cannot be deactivated because the consumption parameters have not been
maintained. The consumption periods are calculated in workdays.
What is MRP ?
The main function of material requirements planning is to guarantee material availability , that is, it is
used to procure or produce the requirement quantities on time both for internal purposes and for sales
and distribution. This process involves the monitoring of stocks and, in particular, the automatic
creation of procurement proposals for purchasing and production.
In doing so, MRP tries to strike the best balance possible between
The MRP component (PP-MRP) assists and relieves MRP controllers in their area of responsibility.
The MRP controller is responsible for all activities related to specifying the type, quantity, and time of
the requirements, in addition to calculating when and for what quantity an order proposal has to be
created to cover these requirements. The MRP controller needs all the information on stocks, stock
reservations, and stocks on order to calculate quantities, and also needs information on lead times
and procurement times to calculate dates. The MRP controller defines a suitable MRP and lot-sizing
procedure for each material to determine procurement proposals.
The consumption mode controls the direction on the time axis in which the system consumes
requirements.
What is scope of planning ? How to run MRP with respect to the Seq of plant?
In the scope of planning we define the organizational units and their sequence to be planned during
MRP run. It is defined in customization. These organizational units can be Plants or MRP areas.
We have to enter the key for the planning run in the initial screen of the total planning run MD01. The total
planning run then carries out MRP for the plants or MRP areas defined in the scope of planning.
You can enter as many plants or MRP areas as you like in the scope of planning. You can also only enter one
MRP area. MRP is then only carried out for one MRP area.
If you have activated MRP for MRP areas, when you enter a plant, this includes all MRP areas of this plant.
Features
The reorder point should cover the average material requirements expected during the replenishment
lead time.
The safety stock exists to cover both excess material consumption within the replenishment lead time
and any additional requirements that may occur due to delivery delays. Therefore, the safety stock is
included in the reorder level.
The following values are important for defining the reorder point:
Safety stock
Average consumption
The following values are important for defining the safety stock:
Forecast error, that is, the deviation from the expected requirements
In automatic reorder point planning, both the reorder level and the safety stock level are determined
by the integrated forecasting program.
The system uses past consumption data (historical data) to forecast future requirements. The system
then uses these forecast values to calculate the reorder level and the safety stock level, taking the
service level, which is specified by the MRP controller, and the material's replenishment lead time into
account, and transfers them to the material master.
Since the forecast is carried out at regular intervals, the reorder level and the safety stock level are
continually adapted to the current consumption and delivery situation. This means that a contribution
is made towards keeping stock levels low.
time phase
planning.pdf
forecast based
planning.pdf
Explain the diff type of Reorder point planning? What is diff bet
Manual and Automatic reorder point?
Reorder Point Planning: Use: In reorder point planning, procurement is triggered when the sum of plant stock and firmed receipts falls below
the reorder point.
Features: The reorder point should cover the average material requirements expected during the replenishment lead time.
The safety stock exists to cover both excess material consumption within the replenishment lead time and any
additional requirements that may occur due to delivery delays. Therefore, the safety stock is included in the
reorder level.
The following values are important for defining the reorder point:
- Safety stock
- Average consumption
- Replenishment lead time
The following values are important for defining the safety stock:
- Past consumption values (historical data) or future requirements
- Vendor/production delivery timelines
- Service level to be achieved
- Forecast error, that is, the deviation from the expected requirements
Manual Reorder Point Planning
In manual reorder point planning, you define both the reorder level and the safety stock level manually in the
appropriate material master.
Automatic Reorder Point Planning
In automatic reorder point planning, both the reorder level and the safety stock level are determined by the
integrated forecasting program.
The system uses past consumption data (historical data) to forecast future requirements. The system then uses
these forecast values to calculate the reorder level and the safety stock level, taking the service level, which is
specified by the MRP controller, and the material's replenishment lead time into account, and transfers them to
the material master.
Since the forecast is carried out at regular intervals, the reorder level and the safety stock level are continually
adapted to the current consumption and delivery situation. This means that a contribution is made towards
keeping stock levels low.
Forecast-Based Planning: Use: Forecast-based planning is also based on material consumption. Like reorder point planning, forecast-based
planning operates using historical values and forecast values and future requirements are determined via the
integrated forecasting program. However, in contrast to reorder point planning, these values then form the basis
of the planning run. The forecast values therefore have a direct effect in MRP as forecast requirements.
Features: The forecast, which calculates future requirements using historical data, is carried out at regular intervals. This
offers the advantage that requirements, which are automatically determined, are continually adapted to suit
current consumption needs. The forecast requirement is reduced by the material withdrawal so that the forecast
requirement quantity that has already been produced is not included in the planning run again.
For a monthly forecast, the requirements date would be set on the first workday of the month because, for
planning, it is assumed that the total requirement must be available at the beginning of the period. You can then
divide this monthly requirement into either daily or weekly requirements.
MRP Group:
MRP Group: It is a planning strategy for carrying out the MRP.
An MRP group is an object which you can use to assign common control parameters to a
group of materials for planning and organizational purposes.
For example, the creation indicator for purchase requisitions, schedule lines, planning
horizons and so on.
MRP groups are used when the plant division for planning is not enough for the division of
the different materials MRP requirements. You assign different groups according to the
requirements to run MRP (different Settings). These settings will be taken in account when
you run MRP for single item or total planning..
MRP Profile :
MRP Profile : All the MRP 1,2,3,4 views in the material master data are entered in this profile
and create MRP profile. When you are creating Material Master in MM01 while entering the
plant and storage location enter your MRP profile so that you do not need to enter the MRP
data again
MRP controller. Material Requirements Planning (PP-MRP) The person responsible for a
group of materials in MRP in a plant or company. Material that takes part in material
requirements planning must be assigned to an MRP controller
When activated materials can now be planned per MRP area and MRP runs can also be done on MRP area
Consumption history will be kept on MRP area level
How to explode the BOM? How many way explode the BOM?