Sei sulla pagina 1di 19

Release Note TJ100ME

RELEASE: R6.3
(TXC7 Software Bundle TPN: 130SW0000040-S, Rev 1.0)
Date: 3/6/2014

Tejas Networks Limited

Copyright by Tejas Networks 2000-2014 All Rights reserved worldwide.


This document contains information that is the property of Tejas Networks India
Ltd. This document may not be copied, reproduced, reduced to any electronic
medium or machine readable form, or otherwise duplicated, and the information
herein may not be used, disseminated or otherwise disclosed, except with the
prior written consent of Tejas Networks
Tejas Networks reserves the right, without prior notice or liability, to make
changes in equipment design or specifications.

Tejas Networks Limited

Table of Contents
1. PRODUCT INFORMATION
1.1 Software Bundle
1.2 Software Bundle

5
5
5

2. LIMITATIONS AND WORKAROUND

2.1 General Limitations


2.2 Open Issues
2.3 New features added in release 6.x

6
7
15

3. FIXED ISSUES
3.1 Field Issues fixed in the release
4. UPGRADE PROCEDURE
Supported Upgrade Paths Summary
4.1 Upgrade Procedure requiring Special Considerations

16
16
18
18
18

4.1.1 Software Upgrade Procedure for XC16ME05 from MER5.5 to MER6.3 having
ELAN04s-R1 cards.
18
4.1.2 Software Upgrade Procedure for XC16ME05: MER5.5 CA
(REL_5_3_12_a29_10/REL_5_3_12_a29_13) to ME-R6.3 having ELAN04sR3 card.
19
4.2 Upgrade Procedure from ME R6.0/6.1/6.2 to ME R6.3
5. TECHNICAL SUPPORT CENTRE CONTACT DETAILS

Tejas Networks Limited

20
21

Chapter

1
2

1. Product Information
1.1 Software Bundle

TPN : 130-SW0000040-S: Software bundle

TPN : 130-SW0000040-S: CRN.

1.2 Software Bundle

TPN : 400-SW0000017-S : Rev1.0 : TJ5500

TPN : 400-SW0000016-S : Rev1.1 : TJ5100

2. Limitations and Workaround


2.1 General Limitations
1. PDH Port protection is not allowed to be configured on Cards under Card protection.
2. EOW call will not be supported with the Overhead Tunnel in passthrough nodes.
3. In service Line rate downgrade is not supported with XC160ME01, XC16ME05, and
XC4ME01 cards.
4. Engineering orderwire supported with aggregate ports only and on Redundant
systems only(In TXC7 works only with Port-1)

Tejas Networks Limited

5. Wrong TPID values on the ingress would cause a traffic drop. In case of an upgrade
being done, please check the ingress TPID values to ensure that they are correct.
6.

Active electrical SFPs(which support auto-negotiation) are not supported.

7. MPLS-TP configuration should be done from the NMS only. Node side provisioning is
not supported.
8. Customized TCA profiles for ETH ports on ELAN04-R3 is not supported
9. Hitless restart on ELAN04 card is applicable only for normal restarts. In case the card
software crashes, then the restart would be a cold restart.
10. Flow point edit feature has been disabled in this release
11. DS0CC provisioning with mixed mode setup can cause issues over a power cycle
under the following conditions; a] Slot 7 is the master b] Provisioning is done without
any warm restart/cold restart given. This combination of actions is rare and therefore
these issues would not be prominent. In case these issues come, switchover back to
the slot7 XC, everything should come back up again.

2.2 Open Issues


135346|

Interval Validity is shown as 0 for current day and previous day counters

Synopsis:
Interval validity is shown as 0 for all interfaces and flow points on ELAN04R1/ELAN04-R3 cards for current day and previous day counters.
Workaround: None.
Customer Impact: Not much, counter values are correctly captured on the node. However,
on the NMS, the counters for current day and previous day would be shown as Invalid.

134644 |

Previous day counters for VCG ports not shown post LPG switching

Synopsis:
switches.

Previous Day counters for VCG ports are not shown post multiple LPG

Workaround: A warm restart may solve the issue.


Customer Impact: Minor. The issue itself is a rare occurrence and does not impact
operations per se. Service level counters can be referred to in case of debugging any issues.

Tejas Networks Limited

103129: |
not proper.

TXC7: Force Switch Active alarm clears over power cycle and MSP states are

Synopsis:
In MSP, when Forced Switch to Protect is given without any fault on the work
path, followed b y a Power Cycle, then the Force Switch Active alarm gets cleared over
power cycle. The MSP switch status shows No request. But if there is a SF/SD on work prior
to FS, then there is no issue over a power cycle
Workaround: None
Customer Impact: Major: In case there is SF on WORK before giving cold reboot to the
system, and we give FS to protect. Then after cold reboot, the MSP state m/c is fine. This is
typical field scenario where the FS to protect will be applied on MSP in case there is SF on
W. In this scenario, MSP comes up properly after Cold reboot/Power cycle to node.

Tejas Networks Limited

111839 |
FDB addresses on LAG FP are not flushed, on introducing link down on
member ports of LAG (Distribution Mode).
Synopsis:
flushed

On Link Down on Member ports of LAG, the FDB addresses on LAG FP are not

Workaround: FDB entries will be flushed after fdb timer


Customer Impact: Minor. Station Movement is implemented hence new path will be relearnt for same MAC address. Also the FDB entries will be flushed after fdb timer.

134603 |

File system full alarm seen after multiple restarts

Synopsis:
On a system with almost 200 services, when multiple restarts happen, the
/etc partition in the node gets filled up and this causes a file system almost full alarm to be
raised.
Workaround: The number of services cannot be 200, the limit where everything works fine
is 100-120 services. In case the customer reaches this state, then remove the PM folder and
give a warm restart to reduce the usage of space on the /etc partition.
Customer Impact: Critical, if provisioning gets disabled when the /etc folder gets filled up.

133531 |
used

ELAN04 card crashes when bandwidth profile with CIR/PIR = 64/65 kbps is

Synopsis:
When bandwidth profiles with CIR/PIR values as 64/65 Kbps is used, then the
internal chip driver crashes, due to which there is a traffic hit.
Workaround: Change the ingress bandwidth profile to any other values other than 64/65
Kbps, and this issue would not be seen.
Customer Impact: Major. However, once the workaround is applied, there should not be
any issue with the card.

Tejas Networks Limited

101328 |
mode

EOPDH for VCG_E3 with TMUX card is not supported when E3 is in framed

Synopsis:
LOF is reported on E3 ports of TMUX when Framed E3 traffic is carried over
VCG_E3 in EoPDH
Workaround: Use Unframed Mode
Customer Impact: Major. Cannot use Framed E3 for EoPDH application. Using E3 for
EoPDH is a rare deployment.

92641 |
Defragmentation of telecom bus is not supported for mixed granularity. In
Sonet VC11 is supported and SDH VC12 is supported
Synopsis:
Telecom Bus defragmentation will not work as expected when VCG with mixed
granularities are provisioned
Workaround: Some cases extra VC11 cross connects need to be deleted to accommodate
SDH equivalent Bandwidth
Customer Impact: Major; But mixed granularity of VC11 and VC12 in same VCG is not a
deployable scenario.

83363 |

Collecting debug data for EoPDH card leads to 'Connection timeout'

Synopsis:
Connection timeout is shown when collecting the debug data for ELAN04-R3
card. This happens when the Data size is huge and the FTP timeout exceeds. Though
timeout is shown, the data is actually collected. User can again go to the link and collect the
debug data
Workaround: Again click on the link to collect the data
Customer Impact: Misguiding message. User will have to again go to the same link to
collect the debug data.

Tejas Networks Limited

131661|
the same

Traffic goes down on deletion of protect pseudowire, with traffic running on

Synopsis:
When traffic is running on the protect pseudowire in a MPLS service, and the
user deletes the protect pseudowire, traffic does not switch to the work pseudowire on its
own.
Workaround: Do not delete the protect pseudowire when traffic is running on the same.
This can be checked easily from the NMS. Switch the traffic away from the protect
pseudowire and then delete the pseudowire.
Customer Impact: Major, in case the customer deletes the protect path from NMS for rerouting the same, then traffic will go down, which may not be desirable.

130756 |

First tunnel protection switch after a restart takes 3-6 secs

Synopsis:
In a MPLS tunnel setup, after a restart, if the protection switching is triggered
for the MPLS tunnel, then the first switch takes 3-6 secs to complete.
Workaround: None.
Customer Impact: Major. Restarts are common in the network due to various reasons, and
protection switching will not meet the 50 ms goal.

101116 |
ELAN04-R3

Broadcast/Multicast frames counter are not incrementing for jumbo frame in

Synopsis:
not updated

The Broadcast and Multicast Frames counter statistics for Jumbo frames are

Workaround: None
Customer Impact: Major.Will not get Jumbo frame statistics

Tejas Networks Limited

101257 |

ACPSU status in WUI shows up even without power feed

Synopsis:
The Card status is shown up and present for ACPSU even when power feed is
not connected
Workaround: None
Customer Impact: Major. As alarm and performance monitoring is not available in WUI for
ACPSU card, customer will not be able to get proper status of card from WUI will not be able
to see power is coming or not on ACPSU card

100426 |
Terminal In-Band NIU loopback is supported only when monitoring type is
selected as Alarm Monitoring. It is not supported when monitoring type is selected as
Alarm and Performance Monitoring
Synopsis:
NIU loopback is supported only for DS1 ports configured as monitoring type
as Alarm Monitoring
Workaround: Define Alarm Monitoring only during troubleshooting
Customer Impact: Minor. Customer will need to change the monitoring type to Alarm
Monitoring during troubleshooting

114471 |
creating FP.

Traffic won't work according to Storm Control/DLF control, if it is applied while

Synopsis:
On applying Broadcast/DLF Storm Control during Flow Point creation, the
profile will not get applied.
Workaround: Apply the Profiles after creation of Flow Points
Customer Impact: Minor. If the profile is created during FP creation, the traffic won't

work according to desired profile.Customer will have to apply the profile again after
creation of Flow Point

Tejas Networks Limited

10

120173 |

LAG port's MTU is fixed to 1522.Traffic with MTU more than 1526 is dropped

Synopsis:
The MTU size of LAG is fixed to 1522. Because of this frames with MTU more
than 1526 are dropped .
Workaround: Set the frame size to less than 1526
Customer Impact: Major. For Variable frame size packets, the packets more than

1526 frame size will be dropped.

130242|
Continuous crash observed when the number of hardware flows exceeds the
card capability in ELAN04-R3
Synopsis:
When services are created on the ELAN04-R3 card which exceed the number
of hardware resources available, then the card goes on a continuous reboot, till the number
of services are reduced.
Workaround: Delete a service which is not being used. In order to avoid this, the total
number of services on the ELAN04-R3 card should not exceed 150 at the maximum.
Customer Impact: Major, since the card would be unusable from a customer perspective

130081|

Loss measurement counters are not proper on pseudowires

Synopsis:
Loss measurement counters on the pseudowires do not show the correct
values for loss measurement. Even when there is no loss of packets the counters would
display a loss.
Workaround: A warm restart may clear the wrong values.
Customer Impact: Major. Loss measurement is used to indicate the stability of the link and
some random values would give the wrong picture to the customer.

Tejas Networks Limited

11

127035|

ELAN04-R3 card did not come up on a cancel upgrade from R6 to R5.01

Synopsis:
On doing an upgrade to the R6 release, if for any reason the node software
build reverts back to R5.01, then the ELAN04-R3 card would not come up until a cold restart
is given to the system.
Workaround: Cold restart the system, the card recovers post the cold restart.
Customer Impact: Major. A build can get reverted during the upgrade process due to
various reasons like node crash etc. When such things happen, the ELAN04-R3 card would
not come up and would need to cold restart the system for the card to come up.

126651|
ELAN04-R3 port level counters are showing junk values when the card is
under reboot
Synopsis:
When the ELAN04 card is under reboot, then an attempt to view the
port/service level counters would show junk values in the performance page.
Workaround: Do not try to view the performance level counters when the card is down in
the system. Check if the card is up before trying to view the performance counters.
Customer Impact: Major. The junk values are 20 digit numbers which once viewed, remain
in the performance interval, and add up to the day counters as well.

122044|
supported

Pseudowire CCM interval of 10 ms with tunnel CCM interval of 3.3 ms is not

Synopsis:
Pseudowire CCM interval of 10 ms, with the tunnel CCM interval set as 3.3 ms
is not supported, and when a tunnel switching is triggered, then the pseudowire also
switches over.
Workaround: None. This is a hardware limitation. In order to mitigate the impact, NMS
defaults to 100 ms for the pseudowire CCM interval, so that this issue may be rarely
encountered.
Customer Impact: Major. Multiple hits may be seen in the traffic, when one fiber cut would
happen.

Tejas Networks Limited

12

117642|
services

Memory exceeded alarms raised due to continuous protection switching of

Synopsis:
In a setup which has close to 200 services, continuous protection switching of
the MPLS services, would cause the ELAN04-R3 card to go out of memory.
Workaround: The maximum number of services which can be supported on this card
should be 120. Any more configuration would run the risk of hitting this issue.
Customer Impact: Major. Traffic can go down since the card would not have enough
memory to process link down events and trigger protection switching.

130364|

Switching time on Copper ports participating in a LPG group is high

Synopsis:
If an LPG group is made with copper ports, then the LPG switching time is
high, around 1 sec for tunnels with 3.3 ms as CCM interval.
Workaround: None, the LPG group could be made over fiber ports which have better
response times to link down events.
Customer Impact: Major. The customer expectation of 50 ms switching for MPLS services
will not be met.

126963|
Traffic goes down on ports with autonegotiation disabled, over an upgrade
from R5.01 to R6
Synopsis:
Autonegotiation disabled operation on a fiber port causes the link to go down
over an upgrade to R6 release, thereby causing the traffic to go down as well.
Workaround: None, the issue can be avoided if auto-negotiation is enabled on the fiber
ports. This is the standard expectation, and therefore should not be diffucult to achieve.
Customer Impact: Major. Traffic would go down over an upgrade, which would result in an
unnecessary outage.

Tejas Networks Limited

13

2.3 New features added in release 6.x


Features added on the ELAN04-R3 card
1. Support for MPLS-TP services and protection. Support for tunnel level protection as
well as pseudowire level protection.
2. Support for LSP ping and traceroute for debugging of MPLS-TP services.
3. Support for Y.1731 based OAM on MPLS-TP services.
4. Support for threshold crossing alerts on flow points for monitoring of Tx and Rx
packets.
5. Support for tagging enable/disable on egress interfaces.
6. Support for Transparent LAN services on UNI interfaces.
7. Support for binning of performance monitoring for interface level counters.
8. Support for BPDU tunneling on services.
9. Support for MTU of 9612 bytes on Eth and VCG ports.
10. Support for 600 Flow Points per card.
11. FPCR edition for VLAN values.
Features added on ELAN04-R1 card
1. Support for threshold crossing alerts on flow points for monitoring of Tx and Rx
packets.
2. Support for tagging enable/disable on egress interfaces.
3. Support for Transparent LAN services on UNI interfaces.
4. Support for binning of performance monitoring for interface level counters.
5. Support for hitless warm restart.
6. Support for BPDU tunneling on services.
Features added on DS0CC card
1. Support for mixed mode provisioning on DS0CC card. Allows for grooming of DS0
connection from DS1 to E1 and vice versa
2. Support for framer level alarms on DS0CC internal ports
3. Support for NXDS0 channels, for providing higher bandwidth services

Tejas Networks Limited

14

Chapter

3. Fixed Issues
3.1 Field Issues fixed in the release
162189 | Router connected Eth ports not coming UP post soft. upgradation
In the previous release, it was observed that if auto-negotiation was disabled on the optical
ports of the ELAN04-R3, then over an upgrade to R6.2, the ports would not come up. This
issue has been fixed and now auto-negotiation disabled is supported on the optical GigE
ports. Upgrade would not bring the ports down when auto-negotiation is disabled.
175044 | TJ100ME_ELAN04-R3_Traffic Down issue when node goes for a watchdog reset
In the previous release, it was observed that if the LPG is switched to the protect card and
the system goes for a watchdog reset for any reason, then the traffic goes down. This was
because watchdog reset was not handled correctly in the software. This has now been fixed
and watchdog reset does not cause any hits in the traffic running on the ELAN04-R3.
167171, 168701, 169006, 173259, 171760, 173260, 173822, 174422, 174920,
182927 | ICF alarm fluctuating on slot 6/7 cards of XC16ME05 and Memory Usage
exceeded threshold on primary XC16ME05
It was observed that the ICC alarm was fluctuating and the secondary card was not up. This
was root caused to the fact that due to Radius being enabled on the system and a large
number of alarms toggling on the interfaces, the system runs out of file descriptors which
are used for all the operations on the NE. This causes the system to run out of memory and
cause all sorts of unpredictable behavior. This issue is fixed in the firmware of the TXC7
card.
174407 | Authentication Alarm toggling issue after RADIUS implemetation
It was observed that the authentication alarm was fluctuating. There was no reason for this
alarm to come since no user was trying to login at that time. This was root caused to the
fact that due to Radius being enabled on the system and a large number of alarms toggling
on the interfaces, the system runs out of file descriptors which are used for all the

Tejas Networks Limited

15

Chapter

operations on the NE. This causes the system to have all sorts of unpredictable behavior.
This issue is fixed in the firmware of the TXC7 card.
172607 | ELAN04R3 traffic not switched to protection path.
It was observed that on a crash in the ELAN04-R3 card, traffic did not switch to the protect
card. The crash happened in flushing of the dynamic FDB, which has now been fixed. Also,
on a crash of any of the agent modules of the ELAN04-R3 card, a LPG switch would take
place. This would cause a hit in the traffic till the work card comes up. On all other crashes,
there would be no traffic hit and no LPG switching action would happen.
175878, 176126, 176368, 176636, 182521, 165708, 176623, 165708 | VCG traffic
on ELAN04-R3 goes down on its own, comes up only on changing the VCG port
It was observed that traffic running on VCG interfaces of the ELAN04-R3 card go down on its
own since the software was not able to read the correct VCG port number from the
hardware. It is not known as to why this happens and therefore a defensive fix is introduced
by virtue of which the software would correct the VCG port number on its own in case the
value read from the hardware was wrong. This should ensure that traffic does not go down
due to this issue.

4. Upgrade Procedure
Supported Upgrade Paths Summary
Release

Base card

Tejas Networks Limited

CA build

Special

Field

16

Upgrade
Consideratio
n
ME-R5.5
ME-R6
ME-R6

XC16ME05
XC16ME05
XC16ME05

REL_5_3_12_a29_10/
REL_5_3_12_a29_13
5_3_11_a61_1
5_3_11_a61_11

Yes for
ELAN04-R3 &
ELAN04-R1
NA
NA

Upgrade
path

Direct
Direct
Direct

Note: For the Upgrade Procedures with Special Upgrades Considerations, refer to the
corresponding section

4.1 Upgrade Procedure requiring Special Considerations


4.1.1 Software Upgrade Procedure for XC16ME05 from MER5.5 to
MER6.3 having ELAN04s-R1 cards.
1. This upgrade is supported for all the ME-R5.5 releases, i.e 5312a29_10/a29_13
2. Prior to the upgrade, check that any ingress bandwidth profiles present in the
config with CIR/PIR as 64 Kbps/65 Kbps, and change the same to CIR/PIR as 66
Kbps before the upgrade.
3. Upgrade the firmware of the TXC7 card first to 1_19 from the WUI. Perform a
warm restart for the system to get upgrade to firmware 1_19.
4. Once node comes up, there would be firmware mismatch alarms present on the
node UI. Ignore the same.
5. Upgrade to the R6.3 release 5_3_11_a61_14 using the unified upgrade
procedure.
6. Issue invoke upgrade and check that the NE comes up after the upgrade.
7. Once the node comes up, ELAN04R1 firmware needs to be upgraded to 1_7 from
the UI. Give a cold restart to the card. The cold restart is mandatory since there
is a change in the microcode of the ELAN04S card.
8. Traffic Hit in this case would be in any case less than 26 min (for two card
system)

Tejas Networks Limited

17

4.1.2 Software Upgrade Procedure for XC16ME05: MER5.5 CA


(REL_5_3_12_a29_10/REL_5_3_12_a29_13) to ME-R6.3 having
ELAN04s-R3 card.
1. Copy all the Software and Firmware builds for TXC7 and ELAN04-R3 from CD to
location on Server or Local PC.
2. Download the firmware of the TXC7 card (ver 1_19) from the UI and provide a
warm restart to the node so that the firmware gets upgraded. Once the NE
comes up after the upgrade, there would be a firmware mismatch alarm, which
can be ignored. Ensure that there are no Cold restart FPGA changed alarms on
the ELAN04-R3 card. In case there is a Cold restart required FPGA changed
alarm present on the ELAN04-R3 card, then perform a cold restart to the card,
and then proceed further.
3. Perform a unified upgrade to ME-R6.3 release 5_3_11_a61_14.
4. Check that node comes up and there are no firmware mismatch alarms present
on the node.
5. Download ELAN04-R3 firmware 1_5 from the UI. Once downloaded, issue a cold
restart to the ELAN04-R3 card. This cold restart is mandatory since there is a
change in the micro-code in this release.
6. Total outage time for the ELAN04-R3 traffic would be 30 mins.

Tejas Networks Limited

18

Chapter

4.2 Upgrade Procedure from ME R6.0/6.1/6.2 to ME R6.3


For all the above mentioned Upgrade paths, follow the Unified Upgrade Procedure.
There is no change in the ELAN04-R3 firmware, so only TXC7 needs to be
upgraded. Refer to the UI guide for details on the Unified Upgrade Procedure. This
upgrade can also be done from the EMS, supporting the bulk upgrade procedure.
There would be no traffic hit during the upgrade since the upgrade is a warm restart
only, which is hitless.

5. Technical Support Centre Contact Details


Tejas Networks provides technical support to its customers through email, phone and
skype.
Helpline:

080 41719090 (Hunting Line)


080 26591080
080 26591082

Fax: +91 80 2659 1081


E-mail: support@india.tejasnetworks.com
Skype: tscsupport123
Website: www.tejasnetworks.com

Tejas Networks Limited

19

Potrebbero piacerti anche