Bridge Development Report

Cost Estimating
General:
The purpose of the Bridge Development Report is to select the most appropriate structure type for the site
under consideration. One of the most important considerations is to select the most cost efficient bridge to
fit the unique circumstances at the site. The purpose of the procedure established in this chapter is to
bring uniformity to the cost estimating portion of the decision making process. For information purposes
selected project cost data is provided in the appendix.
The cost estimating procedure supplied herein should be used for all bridge structures with the exception
of the structure types stated below. This process is not suitable for cost estimating structure types without
repeatable bid history including the following bridge types: movable; cable stayed; cast-in-place on form
travelers; arches and tunnels. These very unique structures should be cost estimated by the use of
fundamental process of developing cost based on labor, materials, equipment and construction time.
This concept for cost estimating is a three-step process. The first step is to utilize the average unit
material costs provided herein to develop a cost estimate based on the completed preliminary design. The
second step is to adjust the total bridge cost for the unique site conditions by use of the site adjustment
factors. The third and final step is to review the computed total bridge cost on a cost per square foot basis
and compare this cost against the historical cost range for similar structure types. This three-step process
should produce a reasonably accurate cost estimate for structure type selection. However, if a site has a
set of odd circumstances which will affect the bridge cost be sure to account for these unique site
conditions in the estimate. If the estimated cost is outside the cost range in step three, documented reasons
should be provided for the variance in cost.
Cost Estimating Process:
The applicability of this three-step process is explained in the general section. The process stated below is
developed for estimating the bridge cost after the completion of the preliminary design which includes
member selection, member size and member reinforcing. This process will develop costs for the bridge
superstructure and substructure from beginning to end bridge. Costs for all other items including but not
limited to the following are excluded from the costs provided in this chapter: mobilization, operation costs
for existing bridge(s); removal of existing bridge or bridge fenders; lighting; walls; deck drainage systems;
embankment; fenders; approach slabs; maintenance of traffic; load tests; bank stabilization.

02/25/2016

305796498.xls

1/11

02/25/2016

305796498.xls

2/11

Bridge Development Report Cost Estimating


Effective 6/03/2009
Step One: Estimate Component Items
Utilizing the cost provided herein, develop the cost estimate for each bridge type under consideration.
A. Bridge Substructure
1. Prestressed Concrete Piling, (furnished and installed)
**Size of Piling
Cost per Lin. Foot
18" (Driven Plumb or 1" Batter )
$80
18" (Driven Battered)
$90
24" (Driven Plumb or 1" Batter )
$105
24" (Driven Battered)
$120
30" (Driven Plumb or 1" Batter )
$150
30" (Driven Battered)
$160
Embedded Data Collector (each)
$2,000

Quantity
0
0
0
0
0

Cost
$0
$0
$0
$0
$0

$0
$0

Quantity
0
0
0
0
0
Subtotal

Cost
$0
$0
$0
$0
$0
$0

Quantity

Cost
$0
$0
$0
$0
$0
Cost
$0
$0
$0
$0
$0
$0
Cost
$0
$0
$0
$0
$0
$0
$0
$0

Subtotal
* When heavy mild steel reinforcing is used in the pile head add $250 to the
piling cost.
** When microsilica is used add $6/LF to the piling cost
2. Steel Piling, (furnished and installed)
Size of Piling
Cost per Lin. Foot
14" x 73 H Section
$65
14" x 89 H Section
$75
20" Pipe Pile
$90
24" Pipe Pile
$96
30" Pipe Pile
$160

3. Drilled Shaft (Total in-place cost)


Dia. (on land, casing salvaged)
3 ft
4 ft
5 ft
6 ft
7 ft
Dia. (in water, casing salvaged)
3 ft
4 ft
5 ft
6 ft
7 ft
8 ft
Dia. (in water, permanent casing)
3 ft
4 ft
5 ft
6 ft
7 ft
8 ft
9 ft

Cost per Lin. Foot


$290
$430
$510
$630
$750
Cost per Lin. Foot
$320
$500
$600
$690
$800
$1,100
Cost per Lin. Foot
$460
$625
$750
$950
$1,100
$1,500
$1,800

Quantity

Quantity

Subtotal
02/25/2016

305796498.xls

3/11

02/25/2016

305796498.xls

4/11

A. Bridge Substructure (continued)


4. Sheet Piling Walls
Size (Prestressed Concrete)
10" x 30"
12" x 30"
Type (Steel)
Permanent Cantilever Wall
Temporary Cantilever Wall
Soil Anchors
Permanent
Temporary

Cost per Lin. Foot


$100
$125
Cost per Sq. Foot
$27
$16
Cost per Anchor
$3,200
$2,800

Quantity

Quantity

Quantity

Subtotal

Cost
$0
$0
Cost
$0
$0
Cost
$0
$0
$0

5. Cofferdam Footing (Cofferdam and Seal Concrete)


Prorate the cost provided herein based on area and depth of water. A cofferdam footing having the
following attributes cost $328,000:
Area 63 ft.H37.25 ft.; Depth of seal 5 ft.; Depth of water over the footing 16 ft.
Subtotal
$0
6. Substructure Concrete
Type
Concrete
Mass Concrete
Seal Concrete
Shell Fill

Cost per Cubic Yard


$875
$788
$650
$30

Quantity

Subtotal

Cost
$0
$0
$0
$0
$0

Admixtures: For Calcium Nitrite add $40/cy (@4.5 gal/cy)and for For silica fume add $40/cy (@
60 lb./cy) when cast-in-place and $48/cy when precast
7. Reinforcing Steel
Type
Reinforcing Steel

Cost per Pound


$1.12

Quantity
Subtotal

Substructure Subtotal

02/25/2016

305796498.xls

Cost
$0
$0

$0

5/11

B. Bridge Superstructure
1. Bearing Material
Type
Neoprene Bearing Pads
Multirotational Bearings (kips)
1- 250
251- 500
501- 750
751-1000
1001-1250
1251-1500
1501-1750
1751-2000
>2000

Cost per Cubic Foot


$650
Cost per Each
$3,000
$3,900
$4,600
$5,200
$6,800
$8,000
$9,000
$11,000
$14,000

Quantity
Quantity

Subtotal
2. Bridge Girders
Structural Steel (includes coating)
Cost per Pound
Quantity
*Rolled Wide Flange Sections
$1.75
*Plate Girders, Straight
$1.80
*Plate Girders, Curved
$2.00
*Box Girders, Straight
$2.15
*Box Girders, Curved
$2.25
* When weathering steel (uncoated) is used reduce the price by $0.04per pound.
Inorganic zinc coating systems have an expected life cycle of 20 years.
Prestressed Concrete Girders
Cost per Lin. Foot
Quantity
AASHTO Type II
$165
AASHTO Type III
$175
AASHTO Type IV
$190
AASHTO Type V
$225
AASHTO Type VI
$250
Fl. Bulb-Tee 54"
$160
Fl. Bulb-Tee 63"
$170
Fl. Bulb-Tee 72"
$190
Fl. Bulb-Tee(M) 78"
$220
Florida-I 36"
$190
Florida-I 45"
$205
Florida-I 54"
$220
Florida-I 63"
$235
Florida-I 72"
$250
Florida-I 78"
$260
78" Haunched Units(C.J.-C.J.)
$580
Fl. Double Tee 18"
$205
Fl. Double Tee 24"
$220
Fl. Double Tee 30"
$270
Fl. Inverted Tee 16"
$80
Fl. Inverted Tee 20"
$90
Fl. Inverted Tee 24"
$105
Fl. Tub (U-Beam) 48"
$700
Fl. Tub (U-Beam) 54"
$750
Fl. Tub (U-Beam) 63"
$800
Fl. Tub (U-Beam) 72"
$900
Solid Flat Slab (36"x15")
$220
Solid Flat Slab (36"x18")
$230
Subtotal
02/25/2016

305796498.xls

Cost
$0
Cost
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

Cost
$0
$0
$0
$0
$0

Cost
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
6/11

*Price is based on ability to furnish products without any conversions of casting beds and without
purchasing of forms. If these conditions do not exist, add the following cost: Inverted Tee $202,000: Fl. Tub - $403,000

02/25/2016

305796498.xls

7/11

B. Bridge Superstructure (continued)


3. Cast-in-Place Superstructure Concrete
Type
Cost per Cubic Yard
Box Girder Concrete, Straight
$1,250
Box Girder Concrete, Curved
$1,400
Deck Concrete
$850

Quantity

Subtotal
4. Concrete for Precast Segmental Box Girders, Cantilever Construction
Concrete Cost by Deck Area
Cost per Cubic Yard
Quantity
$1,230
< 300,000 SF
$1,200
> 500,000 SF
$1,175
Values Between (var. linearly)
Subtotal
5. Reinforcing Steel
Type
Reinforcing Steel

Cost per Pound


$1.10

Quantity
Subtotal

6. Post-Tensioning Steel
Type
Strand, Longitudinal
Strand, Transverse
Bars

Cost per Pound


$2.35
$4.00
$6.00

Quantity

Subtotal
7. Railings and Barriers
Type
Traffic Barrier
Pedestrian Railing
Bicycle Railing*
* For Metal Railing add $38/LF
8. Expansion Joints
Type
Strip Seal
Finger Joint <6"
Finger Joint >6"
Modular 6"
Modular 8"
Modular 12"

Cost per Lin. Foot


$115
$80
$85

Quantity

Subtotal

Cost per Lin. Foot


$150
$850
$1,500
$500
$700
$900

Quantity

Subtotal
Superstructure Subtotal

02/25/2016

305796498.xls

Cost
$0
$0
$0
$0

Cost
$0
$0
$0
$0

Cost
$0
$0

Cost
$0
$0
$0
$0

Cost
$0
$0
$0
$0

Cost
$0
$0
$0
$0
$0
$0
$0
$0

8/11

C. Miscellaneous Items
1. MSE Walls
Type
Permanent
Temporary

2. Sound Barriers
Type
Post and Panel Sound Barriers

3. Detour Bridges
Type
Acrow Detour Bridge

Cost per Sq. Foot


Quantity
$27
$16
Walls Subtotal

Cost
$0
$0
$0

Cost per Sq. Foot


Quantity
$30
Sound Barrier Subtotal

Cost
$0
$0

Cost per Sq. Foot


Quantity
$55
Detour Bridge Subtotal

Cost
$0
$0

The cost to construct a detour bridge using FDOT supplied components is provided herein. The
cost is for the bridge proper. Excluded from this cost is the following: Approach work; Surfacing;
Guardrail.
After developing the total cost estimate utilizing the unit cost, modify
the cost to Total
account for site condition
Unadjusted
$0
variables. If appropriate, the cost will be modified by the following variables:
Step
Two: construction
Estimate Conditional
Variables
and over
Cost traffic
per Square
Foot
** Phased
is defined as
construction
or construction
requiring multiple phases to
complete the construction of the entire cross section of the bridge. The 20 percent premium is applied to
the effected units of the superstructure and/or substructure.

% Increase/
Decrease
-6%
0%
3%
5%
Phased construction or widening, increase by 20 %.**
2%
*Broward, Dade, Duval, Hillsborough, Orange, Palm Beach, and Pinellas counties)
Conditional Variables
Rural construction, decrease cost by 6 %.
Urban construction, increase cost by 6 %. *
For construction over water, increase cost by 3 %.

Cost (+/-)
$0
$0
$0
$0
$0

** Phased construction is defined as construction over traffic or construction requiring multiple phases to
complete the construction of the entire cross section of the bridge. The 20 percent premium is applied to
the effected units of the superstructure and/or substructure.

02/25/2016

Substructure Subtotal
Superstructure Subtotal
Walls Subtotal
Sound Barrier Subtotal
Detour Bridge Subtotal
Conditional Variables
Total Cost

$0
$0
$0
$0
$0
$0
$0

Total Square Feet of Deck

Cost per Square Foot

$0

305796498.xls

9/11

Design Aid for Determination of Reinforcing Steel


In the absence of better information, use the following quantities of reinforcing steel per cubic yard
of concrete.
Location
Pile Abutments
Pile Bents

Pounds of Steel
135
145

Cubic Yds.
0
0

Tot. Pounds
0
0

Single Column Piers >25'


Single Column Piers <25'

210
150

0
0

0
0

Multiple Column Piers >25'


Multiple Column Piers <25'
Bascule Piers

215
195
110

0
0
0

0
0
0

Standard Deck Slabs


Isotropic Deck Slabs

205
125

0
0

0
0

Concrete Box Girders, Pier Seg


Concrete Box Girders, Typ. Seg
Flat Slabs @ 30ft & 15" Deep

225
165
220

0
0
0

0
0
0

Step Three: Cost Estimate Comparison to Historical Bridge Cost


The final step is a confirmation of the cost estimate by comparison with historic bridge cost based on a cost
per square foot. These total cost numbers are calculated exclusively for the bridge cost as defined in the
General Section of this chapter. Price computed by Steps 1 and 2 should be generally within the range of
cost as supplied herein. If the cost falls outside the provided range, good justification should be provided.

Bridge Superstructure Type


Short Span Bridges:
* Reinforced Concrete Flat Slab- Simple Span
* Pre-cast Concrete Slab - Simple Span
Medium Span Bridges:
*Concrete Deck / Steel Girder - Simple Span
*Concrete Deck / Steel Girder - Continuous Span
* Concrete Deck / Prestressed Girder - Simple Span
*Concrete Deck / Prestressed Girder - Continuous Span
*Concrete Deck / Steel Box Girder Span range from 150' to 280' (for curvature, add 15% premium
Segmental Concrete Box Girders - Cantilever Construction
Span range from 150' to 280'
Steel Box Deck/Girder
Movable Bridge - Bascule Spans & Piers
Demolition Costs:
Typical
Bascule
Project Type
Widening (Construction Only)

02/25/2016

305796498.xls

Total Cost per Square Foot


Low
High
$122
$115

$160
$200

$125
$135
$85
$115
$145

$135
$170
$155
$211
$225

$130

$160

$1,800

$2,000

$35
$60

$60
$70

$115

$175

10/11

* Increase the cost by twenty percent for phased construction


Estimated Cost per Square Foot

02/25/2016

305796498.xls

$0

11/11

Potrebbero piacerti anche