Vindhya Appliances

Pervaje Road, Karkala


To
Athri Infocon Builders
Karkala

Date: 01/10/2015
No. 1012

Quotation for LPG Reticulated System with 3 stage regulation for Sai Panchami Residency
S.No.
1

Description
Cylinder Manifold for 18 VOT cylinders
Ball Valve SS
Non Return Valve
Flexible Cylinder Pigtail
Click-on Adapter

Unit
No.
No.
No.
No.
No.
No.
No.

2
3

LPG Filter (Vanaz)


First Stage Regulation with auto
changeover (Vanaz) with SS Ball Valve,
Pressure Gauge & Fittings

Second Stage Regulation with built in


Set
OPSO & UPSO with Slam Shut Off
Valve (FRS Targaz/ESKA) with Pressure
Gauge and fittings.

Flame Arrester (SGI) Mesh Type M.S.


Seamless Body 1" BSP with SS Ball Valve

Rate (Rs.)
11550.00
1650.00
135.00
265.00
192.00
5100.00
16000.00

Amount (Rs.)
23100.00
3300.00
4860.00
9540.00
6912.00
10200.00
16000.00

11350.00

11350.00

5100.00

5100.00

Third Stage Regulator (United with


No.
OPSO) and Flow Meter (Raychem
RPG/United) including Ball Valves, Inlet
Outlet Assemblies and Appliance Valve

59

4595.00

271105.00

Single Piece SS Ball Valves with fittings No.


for Risers

15

1240.00

18600.00

No.

Qty.
2
2
36
36
36
2
1

Page 1 of 3

Pipeline as per IS1239 Specification with


all Bends, Tees, Clamps and socket
welding and painting
a) 15 NB MS "C" Class ERW
c) 15 NB Stainless Stell 304 SCH 40
e) Copper
Pipeline is only a estimation final billing
will be done as per actual length used

Mtr.
Mtr.
Mtr.

365
8
0

385.00
860.00
325.00

Total
VAT @ 14.50%
Installation, pressure testing of complete installation and commissioning of the system.

Grand Total
Approx. Cost per Apartment

140525.00
6880.00
0.00

527472.00
76483.44
23600.00

627555.44
10636.53

Rupees six lakh twenty seven thousand five hundred fifty five and paisa forty four only
Including installation, transportation and all taxes

Page 1 of 3

Terms and Conditions:


Installation Installation period will be 8-10 weeks from the date of receipt of purchase order along with advance. Any
time required for approval of drawings and inspection would be extra.
Period:
Terms of
Payment :

25% Advance with purchase order 50% after completion of all pipeline with regulation and balance with
all taxes & other charges after the completion of work.

Guarantee: All the materials used in the installation are warranted against any manufacturing defects for a period 12
months from date of completion installation.
Scope of
work:

The above installation is approximate and final billing will be done after the installation is complete for
the actual equipment used for the installation. But in case cost variation is above 10%, prior written
information would be given to the client. Scaffolding and core cutting or drilling of kadapa/marble/granite
if required has to be provided by client. Civil work is not in our scope.

Jurisdiction Subject to Mangalore jurisdiction.


Our offer is valid for a period of 60 days from the offer date and thereafter subject to confirmation.
Validity:

Trust the above is in order and you will find our offer competitive. We now look forward to receiving your valued
order, which we assure will receive our prompt attention. Should you need any more information, please feel free to
contact us.
Thanking you and assuring you of our best services at all times.
For Vindhya Appliances

Page 3 of 3