FIRE RATED DUCTWORK (2 HOUR) SPECIFICATION


1.0

General Requirements

All fire rated ductwork to be Galvanised Iron, Stainless Steel (or Mild Steel Duct with Antirust Primer),
constructed to tested standards and protected with fire resistant coating. The duct to be composite fire
duct manufactured to Method 3 of BS5588 Part 9, factory or site produced. Ductwork to be produced
in sections and is assembled on site utilising tested fireproof gaskets/sealants. Once erected, to be
pressure tested, if required by Engineer, to DW144 and/or SMACNA standards, in line with the
pressure classification of the duct being installed. The coating shall be of minimum 0.7mm (dry film)
thickness.
2.0 The Specification of Fire Rated Ductwork
2.1 Proof of Fire rated ductwork constructed for ventilation/smoke extract systems tested to BS476
Part 24
(1987) and ISO6944 (1985) for two hours Stability and Integrity shall be submitted. When
used as smoke extract, duct to maintain a minimum of 75% cross-sectional area along its whole
length for at least two hours. Evidence of test must be submitted. The Fire Rated Ductwork to be
protected with fire resisting coating materials to specifications by manufacturer. Composition of the
coating materials shall be of encapsulating compound, non-hazardous copolymer emulsion and
aggregates. Intumescent coating materials shall not be accepted.
1.2.1

Fire rated ductwork constructed for kitchen extract systems to be tested to BS476 Part 24
(1987) and ISO6944 (1985) for two hours Stability and Integrity. Suitable insulation cladding of
mineral wool material shall be added as required by the engineer.

1.2.2

The size of the Fire Rated Duct system may be extended up to 10 metres wide x 3 metres
high without adversely affecting the fire resistant of the duct systems in terms of criteria of
BS476: Part 24: 1987.

1.2.3

Fire rated ductwork to have UL (Underwriters Laboratories) classification and has been tested
by UL in the USA to determine compliance with NFPA 90A ( Installation of Air Conditioning
and Ventilation Systems ) for flame spread and smoke development with the following results:
NFPA Stipulation

Flame Spread not to


Exceed 25

Smoke Development not


higher than 50

9.4

0.2

Fire Rated Duct


Results

1.2.4

Fire rated ductwork to have passed hard body impact resistant test to BS EN 1128: 1996. At
impact energy of 52.46 J, no penetration of test specimen, no de-bonding, cracking and other
failure of the coating material at impact location. Test report to be submitted.

Further information please contact us:


Sales and Marketing Department
Tell: 39956 957/ 39955 324
Email sales@tcbm.vn - toancau@tcbm.vn

1.2.5

The fire duct to have been tested by ETL Intertek for 2 hours to ASTM-E119, including the
hose stream test with water pressure of 207 KPa (30 psi) for 2 minutes.

1.2.6

The fire coating to be non-hydroscopic and have been tested for over 2000 hours of exposure
to alternate UV and condensation cycling, with no adverse effect on the condition of the coated
duct.

1.3

Installation

1.3.1 The fire duct support system should be located at a maximum of 1500mm centres, the size of
the hangers and bearers upgraded to account for reduction in tensile strength of steel due to
fire. Proof, in the form of test or assessment report to BS476 Part 24 and ISO6944 that
suitable size hangers and bearers upgraded to account for the reduction in tensile strength of
steel due to fire from 430N/mm2 to 10N/mm2 for 2 hours, shall be submitted.
1.3.2
and

All gaskets and sealants to be non-combustible and installed as fire tested to BS476 Part 24
shall be supplied by the same manufacturer.

1.3.3 The Gasket shall be fire retardant Intumescent. Tape Gasket which is a highly flexible,
chemically
inert, non toxic foam tape, designed to seal flange joints and other metal surfaces that require
to be sealed together. It shall be self adhesive and easy to peel, will not shrink or degrade in
normal use and is unaffected by water or moisture. The Gasket shall be of dimensions 15mm
wide x 5mm thick x 15metre rolls for flanges up to 40mm.
1.3.4. The sealant material shall be a one part ready to use Intumescent Fire Retardant Acrylic
Sealant. It
shall be non-flammable in liquid state and not classified as hazardous under the CHIP
Regulations 1994/Amendments 1997. The intumescent fire retardant sealant has been tested
to BS 476 Part 22/1987 (ISO 834) in specified joint configurations.
1.3.5 The fire rated duct shall be connected to the fans with the use of fire rated flexible connections
with fire certification to BS476 Part 20.
1.3.6

All access doors/inspection covers and test holes shall be suitably positioned in relation to the
access provided by the false ceiling or other means of concealment supplied and fitted by the
building contractor.

1.3.7 The fire rated ductwork must be manufactured and erected in line with the requirements of BS
476 Part 24 (1987) and ISO6944 (1985).

Further information please contact us:


Sales and Marketing Department
Tell: 39956 957/ 39955 324
Email sales@tcbm.vn - toancau@tcbm.vn

FLAMEBAR BW11

Projects list

FLAMEBAR BW11 FIRE RATED DUCTWORK


A SELECTION OF INTERNATIONAL PROJECTS
Vietnam
MGM Hotram strip, Ba Ria-Vung Tau
Novotel Han river hotel, Da Nang
Crescent Shopping Mall, HCMC
Silver Sea Tower, Vung Tau
JW Marriot Hanoi Hotel, Hanoi
Indochina plaza, Ha Noi
Trang Tien Plaza, Ha Noi
West Lake Inter-Continental Hotel, Hanoi
Dubai
Burj Al Arab International 7* Hotel
(tallest hotel in the world)

Burj Khalifa Tower (tallest building in the world)


Emirates Towers
Jumeirah Beach Hotel
Festival City Shopping Mall
Mall of the Emirates
DIFC Towers (6 buildings)
Raffles Hotel & Wafi Mall
The Dubai Mall (with indoor ski arena)
Bur Jaman Center
Burj Dubai Lake Hotel
Movenpick Hotel & Spa & Oceana Residence
Shangri-La Hotel
Al Jaber Tower
Abu Dhabi
Snow Dome
Marine Mall
Dubai International Shopping Centre
Intercontinental Hotel
Twin Towers
Sheikh Bin Butti Building
Al Jimi Hypermarket
Sharjah
Sharjah University
Shop at Mall of Emirates
Mega Mall
Bahrain
Bahrain International Airport
World Trade Centre, Bahrain
Bahrain Financial Harbour
Muscat
Muscat Retail Park
Water Purification Plant
Saudi Arabia
King Fhads University

Oman
City Centre Mall Expansion
Barr Al Jissa Village Hotel
Shangri-La Hotel & Resort
Qatar
Sports Tower, Asian Games
Commercial Bank Plaza
Qatar Insurance Building
West Bank Residential Tower
Al Reem Tower
Ceremonial Tower
Al Wosail Tower
Al Fardan Tower
Australia
Office Building@ No.3 Hasler Road, Osborne
Park Perth
Office Building@ 226 Adelaide Terrace Perth
Woodside Building @240 St Georges Terrace,
Perth
Four Brisbane Hospitals
Perth Cancer Hospital
India
Delhi Metro Railway
Barbados
The Sands Hotel

Brunei
Royal Residence at Jln Tutong
Ministry of Foreign Affairs (MOFA) Building
Banquet Hall, The Empire Hotel and Country
Club, Brunei
Yayasan Secondary School
Meragang Secondary School
Radio Television Complex, Sungai Akar
I Maraburong Prison
Legislative Council Building, Bandar Seri
Begawan
slamic Bank of Brunei
Brunei International Airport
University of Brunei, Darussalam
Brunei Parliament House
China - Hong Kong SAR Cathay
Pacific Cargo Terminal Hennessey
Centre Redevelopment Tamar
Government Headquarter Atrium
Hotel
MTR Austin Station - KDB200 (Kowloon-Canton
Railway Corporation)
MTR Admiralty Station (replacement)
Hong Kong Cricket Club
Regal Airport Hotel (extension)
Landmark East (Phase 6)
Landmark Mandarin Hotel
Mandarin Oriental Hotel
Jardine House
Pacific Place Podium & Restaurant
Lincoln House, Taikoo Place
Oxford House, Taikoo Place
Devon House, Taikoo Place
Aberdeen Market (upgrade)
Sheung Wan Market (update)
St. Teresa Hospital
Tang Shiu Kin Hospital (re-modeling)
DHL Central Asia Hub
Charter House
Exchange Square Tower 2
Chek Lap Kok Airport
Shatin Heritage Museum
Olympia Plaza
Tradeport Logistics Centre
China - Macau
Venetian Macau Parcel 5&6 (Hotels)
New Taipa Immigration Office Building
Macau University of Science & Technology
City of Dreams
Ponte 16 Phase 2 (Commercial & Shopping)
Amaral Macau Public Car park
Le Royal Arc Casino & Retail Complex
New Yaohan Departmental Store
MGM Casino (Fire rated enclosure)
Wynn Resorts & Casino (Phase 1 &2)
Taipa Hotel, Resort & Casino
Fishermans Wharf Complex & Casino

Las Vegas Sands Hotel & Casino


Galaxy Starworld Hotel & Casino
The Venetian Macau (fire rated enclosure)
Holiday Inn Hotel & Casino
Indonesia
CIBA Vision Building Batam
Malaysia
National Library Jln Tun Razak
Glomac Tower Jln Pinang
DBKL Training Centre Jln Cheras
PPUM Petaling Jaya
Malaysian Milk Building Klang
University Putra Malaysia Serdang
General Hospital Kuala Lumpur
Menara Maxis, Jalan Ampang
Bank Negara (New Financial Centre)
Mont Kiara Le Grande Condominium
Taipan Star Condominium
Tanjong Bin Power Station (Johor)
Tanjung Pelepas Warehouse (Johor)
Mid Valley City Phase 2 The Garden Wing
Bank Negara (Central) Note Printing Centre
Sungai Buloh Hospital
Ministry of Finance Building, Putrajaya
Ampang Tower Office Building
Menara Landmark (shopping centre)
KLCC Convention Centre
La Grand Condominium, Mont Kiara
Traders Hotel
Central Bank Printing Facility Ericsson
Headquarters, Cyberjaya Kuala
Lumpur International Airport (main
terminal, satellite building & contact pier)

Palace of Justice, Putrajaya


Syariah Court, Putrajaya
Aquaria KLCC
Shangri-La Hotel
Singapore
NUS CREATE Research Building
SengSiong Hypermarket
Vista Condominium
Central Mall
Underground Military Complex@Jalan Gali Batu
Nanyang Technological University Teaching
Facility
Starville Condominium
Cuppage Plaza Refurbishment
Majestic Hotel@ Bukit Pasoh
IKEA Tampines
Singapore Botanic Garden (Herbarium)
Kallang Leisure Park
Robertson Walk Condominium
Haw Par Villa Annex Museum
Cuppage Plaza (refurbishment)
Bugis Junction
Tan Tock Seng Hospital
Singapore Airlines Headquarters

Ngee Ann City - Refurbishment


Swissotel Merchant Court Hotel
Sijori Resort, Sentosa
St Andrews Mission Hospital
Singapore Recreation Club
Taiwan (R.O.C)
Military 1011 Complex
Kaohsiung Medical University Hospital
Kaohsiung Post Office
Thailand
Mega@Bangna (with IKEA)
National Science & Technology Development
Agency Phase 1 & 2
Park Venture Hotel Plaza
Four Point Hotel
W Hotel
Land & House Condo & Plaza
Sathorn Square
Veranda Sofitel Bangkok
Gateway Ekamai Sirirat
Hospital Renaissance
Hotel Central Festival
Pattaya
Athenee Hotel Tower & Plaza (Extension)
Athenee Residence
Marriott Courtyard Hotel
Ratchada Tower
Asoke Complex
Le Meridien Hotel
The Soffitel Sukhumvit Hotel
The Zest Shopping & Residential Complex
The Tempo Commercial Complex @Thonglor
Le Cordon Blue Dusit Academy, Dusit Thani
Hotel, Bangkok
Bank of Thailand (New Office)
Grand Hyatt Erawan Hotel
Holiday Inn Silom Hotel (Renovation)
King Power Complex
Impact Challenger Convention Centre (one of the
largest convention centres in Asia)

USA (New York)


GE World Research, New York
USA (Massachusetts)
One First Street
MIT
Brookhaven
Northpoint
Lahey Clinic
Broad Institute (MIT)
Convention Center Hotel
Boston University (Metcalf Hall)

Harvard Bio
Harvard College (Hamilton Hall)
McCallan Building
Childrens Hospital
USA (Florida)
Hamptons, Aventura
Plaza on Brickell, Aventura
One Bal Harbour, Bal Harbour
55 Miracle Mile, Coral Gables
Orchid Beach, Deerfield Beach
DCOTA, Dania
NSU Performing & Visual Arts, Davie
NSU Dormitory, Davie
Palazzo Del Mare, Fisher Island
Navona, Fort Myers
Q Club, Fort Lauderdale
Capri, Fort Lauderdale
Sands, Key Biscayne
Ocean Tower II, Key Biscayne
Madeira, Marco Island
Marina Blue, Miami
Biscayne Landings 1 & 2, Miami
Aversana, Naples
Tuscany at Hammock Dunes, Palm Coast
Oceanside, Pompano
Sunny Isle City Hall, Sunny Isles
Beach Residence, Sarasota
Esplanade Grand, West Palm Beach
USA (Wisconsin)
Epic Learning Centre
St Marys Hospital
Vernon Hospital
St Clare Meadows Nursing Home
CUNA Mutual Group Insurance
St Lukes Medical Centre
Ambassador Hotel
St Marys Catholic Center High School
Atla Shaam
USA (Texas)
Galveston National Lab
American First National Bank
Houston Pavilion Shopping Mall
Energy Center Office Building

FLAMEBAR CNG TRNH TIU BIU

Project Name

1
2
3

Marriott Hotel
Silver Sea Tower
The Crescent - Shopping mall

Year

Place

2011

Ha Noi

2011

Vung Tau City

2011

HCMC

Ho Tram Strip

2011-2012

Vung Tau City

Trang Tien plaza

2012

Ha Noi

Novotel Han river

2012

Da Nang

Indochina plaza

2012

Ha Noi

West Lake Inter-Continental Hotel

2012

Ha Noi

Liberty Hotel

2013

HCMC

2013-2014

Cambodia

10

Aeon Mall

11

Shangrila

2013

HCMC

12

Mega Hoan Kiem

2014

Ha Noi

13

Riviera Point

2014

HCM

14

Des Art Saigon Hotel

2014

HCMC

15

SSG Tower

2014-2015

HCMC

FLAMEBAR BW11
Certificates
&
Test Reports

UL Online Certifications Directory


Home Quick Guide Contact Us UL.com

HNNX.R18284
Coated Ducts
Page Bottom

Coated Ducts
See General Information for Coated Ducts
R18284

FIRESPRAY INTERNATIONAL LTD


FLAMEBAR HOUSE
SOUTH RD
TEMPLEFIELDS
HARLOW, ESSEX CM20 2AR UNITED KINGDOM

FLAMEBAR BW11 Fire Rated Ductwork for use in Ventilation Duct Assembly No. V-6; and
Uninsulated Ventilation Duct Assembly Nos. V-5 and V-18.
Last Updated on 2010-05-28
Questions?

Print this page

Notice of Disclaimer

Page Top

Copyright 2011 Underwriters Laboratories Inc.


The appearance of a company's name or product in this database does not in itself assure that
products so identified have been manufactured under UL's Follow-Up Service. Only those
products bearing the UL Mark should be considered to be Listed and covered under UL's
Follow-Up Service. Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory
subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files)
must be presented in their entirety and in a non-misleading manner, without any manipulation of

the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with
permission from Underwriters Laboratories Inc." must appear adjacent to the extracted material.
In addition, the reprinted material must include a copyright notice in the following format:
"Copyright 2011 Underwriters Laboratories Inc."

FLAMEBAR BW11

Application

Duct fabrication, fixing of flanges to Flamebar BW11


Standard Drawing, checking of ducts to ensure correct
standard.

De- Greasing of duct - before spraying Flamebar BW11, clean


the duct of any grease or dust & hose it with water

Sealant and gasket installed on ductwork

Ducts dried & ready for spray also check to ensure sealants
are applied correctly (ducts must be properly dried before
spraying)

Preparing the duct for spraying - apply Flamebar BW11


coating to the flange/duct connections, corner, gaps.

Spraying of Flamebar BW11 - photo showing use of hopper


gun with nozzle size about 6mm to 7mm, powered by
minimum 90PSI compressor.

Checking thickness of Flamebar BW 11 coating

Ductwork after coating Flamebar BW11

Installed ductwork with Flamebar BW11

Installed ductwork with Flamebar BW11

Gauge for thickness.