DUCTWORK
FLAMEBAR BW11
Brochures
&
Technical Datasheet
FLAMEBAR BW11
Specification
General Requirements
All fire rated ductwork to be Galvanised Iron, Stainless Steel (or Mild Steel Duct with Antirust Primer),
constructed to tested standards and protected with fire resistant coating. The duct to be composite fire
duct manufactured to Method 3 of BS5588 Part 9, factory or site produced. Ductwork to be produced
in sections and is assembled on site utilising tested fireproof gaskets/sealants. Once erected, to be
pressure tested, if required by Engineer, to DW144 and/or SMACNA standards, in line with the
pressure classification of the duct being installed. The coating shall be of minimum 0.7mm (dry film)
thickness.
2.0 The Specification of Fire Rated Ductwork
2.1 Proof of Fire rated ductwork constructed for ventilation/smoke extract systems tested to BS476
Part 24
(1987) and ISO6944 (1985) for two hours Stability and Integrity shall be submitted. When
used as smoke extract, duct to maintain a minimum of 75% cross-sectional area along its whole
length for at least two hours. Evidence of test must be submitted. The Fire Rated Ductwork to be
protected with fire resisting coating materials to specifications by manufacturer. Composition of the
coating materials shall be of encapsulating compound, non-hazardous copolymer emulsion and
aggregates. Intumescent coating materials shall not be accepted.
1.2.1
Fire rated ductwork constructed for kitchen extract systems to be tested to BS476 Part 24
(1987) and ISO6944 (1985) for two hours Stability and Integrity. Suitable insulation cladding of
mineral wool material shall be added as required by the engineer.
1.2.2
The size of the Fire Rated Duct system may be extended up to 10 metres wide x 3 metres
high without adversely affecting the fire resistant of the duct systems in terms of criteria of
BS476: Part 24: 1987.
1.2.3
Fire rated ductwork to have UL (Underwriters Laboratories) classification and has been tested
by UL in the USA to determine compliance with NFPA 90A ( Installation of Air Conditioning
and Ventilation Systems ) for flame spread and smoke development with the following results:
NFPA Stipulation
9.4
0.2
1.2.4
Fire rated ductwork to have passed hard body impact resistant test to BS EN 1128: 1996. At
impact energy of 52.46 J, no penetration of test specimen, no de-bonding, cracking and other
failure of the coating material at impact location. Test report to be submitted.
1.2.5
The fire duct to have been tested by ETL Intertek for 2 hours to ASTM-E119, including the
hose stream test with water pressure of 207 KPa (30 psi) for 2 minutes.
1.2.6
The fire coating to be non-hydroscopic and have been tested for over 2000 hours of exposure
to alternate UV and condensation cycling, with no adverse effect on the condition of the coated
duct.
1.3
Installation
1.3.1 The fire duct support system should be located at a maximum of 1500mm centres, the size of
the hangers and bearers upgraded to account for reduction in tensile strength of steel due to
fire. Proof, in the form of test or assessment report to BS476 Part 24 and ISO6944 that
suitable size hangers and bearers upgraded to account for the reduction in tensile strength of
steel due to fire from 430N/mm2 to 10N/mm2 for 2 hours, shall be submitted.
1.3.2
and
All gaskets and sealants to be non-combustible and installed as fire tested to BS476 Part 24
shall be supplied by the same manufacturer.
1.3.3 The Gasket shall be fire retardant Intumescent. Tape Gasket which is a highly flexible,
chemically
inert, non toxic foam tape, designed to seal flange joints and other metal surfaces that require
to be sealed together. It shall be self adhesive and easy to peel, will not shrink or degrade in
normal use and is unaffected by water or moisture. The Gasket shall be of dimensions 15mm
wide x 5mm thick x 15metre rolls for flanges up to 40mm.
1.3.4. The sealant material shall be a one part ready to use Intumescent Fire Retardant Acrylic
Sealant. It
shall be non-flammable in liquid state and not classified as hazardous under the CHIP
Regulations 1994/Amendments 1997. The intumescent fire retardant sealant has been tested
to BS 476 Part 22/1987 (ISO 834) in specified joint configurations.
1.3.5 The fire rated duct shall be connected to the fans with the use of fire rated flexible connections
with fire certification to BS476 Part 20.
1.3.6
All access doors/inspection covers and test holes shall be suitably positioned in relation to the
access provided by the false ceiling or other means of concealment supplied and fitted by the
building contractor.
1.3.7 The fire rated ductwork must be manufactured and erected in line with the requirements of BS
476 Part 24 (1987) and ISO6944 (1985).
FLAMEBAR BW11
Projects list
Oman
City Centre Mall Expansion
Barr Al Jissa Village Hotel
Shangri-La Hotel & Resort
Qatar
Sports Tower, Asian Games
Commercial Bank Plaza
Qatar Insurance Building
West Bank Residential Tower
Al Reem Tower
Ceremonial Tower
Al Wosail Tower
Al Fardan Tower
Australia
Office Building@ No.3 Hasler Road, Osborne
Park Perth
Office Building@ 226 Adelaide Terrace Perth
Woodside Building @240 St Georges Terrace,
Perth
Four Brisbane Hospitals
Perth Cancer Hospital
India
Delhi Metro Railway
Barbados
The Sands Hotel
Brunei
Royal Residence at Jln Tutong
Ministry of Foreign Affairs (MOFA) Building
Banquet Hall, The Empire Hotel and Country
Club, Brunei
Yayasan Secondary School
Meragang Secondary School
Radio Television Complex, Sungai Akar
I Maraburong Prison
Legislative Council Building, Bandar Seri
Begawan
slamic Bank of Brunei
Brunei International Airport
University of Brunei, Darussalam
Brunei Parliament House
China - Hong Kong SAR Cathay
Pacific Cargo Terminal Hennessey
Centre Redevelopment Tamar
Government Headquarter Atrium
Hotel
MTR Austin Station - KDB200 (Kowloon-Canton
Railway Corporation)
MTR Admiralty Station (replacement)
Hong Kong Cricket Club
Regal Airport Hotel (extension)
Landmark East (Phase 6)
Landmark Mandarin Hotel
Mandarin Oriental Hotel
Jardine House
Pacific Place Podium & Restaurant
Lincoln House, Taikoo Place
Oxford House, Taikoo Place
Devon House, Taikoo Place
Aberdeen Market (upgrade)
Sheung Wan Market (update)
St. Teresa Hospital
Tang Shiu Kin Hospital (re-modeling)
DHL Central Asia Hub
Charter House
Exchange Square Tower 2
Chek Lap Kok Airport
Shatin Heritage Museum
Olympia Plaza
Tradeport Logistics Centre
China - Macau
Venetian Macau Parcel 5&6 (Hotels)
New Taipa Immigration Office Building
Macau University of Science & Technology
City of Dreams
Ponte 16 Phase 2 (Commercial & Shopping)
Amaral Macau Public Car park
Le Royal Arc Casino & Retail Complex
New Yaohan Departmental Store
MGM Casino (Fire rated enclosure)
Wynn Resorts & Casino (Phase 1 &2)
Taipa Hotel, Resort & Casino
Fishermans Wharf Complex & Casino
Harvard Bio
Harvard College (Hamilton Hall)
McCallan Building
Childrens Hospital
USA (Florida)
Hamptons, Aventura
Plaza on Brickell, Aventura
One Bal Harbour, Bal Harbour
55 Miracle Mile, Coral Gables
Orchid Beach, Deerfield Beach
DCOTA, Dania
NSU Performing & Visual Arts, Davie
NSU Dormitory, Davie
Palazzo Del Mare, Fisher Island
Navona, Fort Myers
Q Club, Fort Lauderdale
Capri, Fort Lauderdale
Sands, Key Biscayne
Ocean Tower II, Key Biscayne
Madeira, Marco Island
Marina Blue, Miami
Biscayne Landings 1 & 2, Miami
Aversana, Naples
Tuscany at Hammock Dunes, Palm Coast
Oceanside, Pompano
Sunny Isle City Hall, Sunny Isles
Beach Residence, Sarasota
Esplanade Grand, West Palm Beach
USA (Wisconsin)
Epic Learning Centre
St Marys Hospital
Vernon Hospital
St Clare Meadows Nursing Home
CUNA Mutual Group Insurance
St Lukes Medical Centre
Ambassador Hotel
St Marys Catholic Center High School
Atla Shaam
USA (Texas)
Galveston National Lab
American First National Bank
Houston Pavilion Shopping Mall
Energy Center Office Building
Project Name
1
2
3
Marriott Hotel
Silver Sea Tower
The Crescent - Shopping mall
Year
Place
2011
Ha Noi
2011
2011
HCMC
Ho Tram Strip
2011-2012
2012
Ha Noi
2012
Da Nang
Indochina plaza
2012
Ha Noi
2012
Ha Noi
Liberty Hotel
2013
HCMC
2013-2014
Cambodia
10
Aeon Mall
11
Shangrila
2013
HCMC
12
2014
Ha Noi
13
Riviera Point
2014
HCM
14
2014
HCMC
15
SSG Tower
2014-2015
HCMC
FLAMEBAR BW11
Certificates
&
Test Reports
HNNX.R18284
Coated Ducts
Page Bottom
Coated Ducts
See General Information for Coated Ducts
R18284
FLAMEBAR BW11 Fire Rated Ductwork for use in Ventilation Duct Assembly No. V-6; and
Uninsulated Ventilation Duct Assembly Nos. V-5 and V-18.
Last Updated on 2010-05-28
Questions?
Notice of Disclaimer
Page Top
the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with
permission from Underwriters Laboratories Inc." must appear adjacent to the extracted material.
In addition, the reprinted material must include a copyright notice in the following format:
"Copyright 2011 Underwriters Laboratories Inc."
FLAMEBAR BW11
Application
Ducts dried & ready for spray also check to ensure sealants
are applied correctly (ducts must be properly dried before
spraying)