This study analyses the needs for ancillary services to balance the Belgian control area in
2018 and the capacity of the existing resources in the Belgian system to meet these needs. It is
performed upon request by the CREG in its decision (B)120621-CDC-1162 on the approval
of the applicable reserve volumes for 2013, issued on the 21th of June 2012. This study does
not address the long-term issues of security of supply and generation adequacy; instead it
focuses on the reserves required for the TSO to perform real-time balancing.
Contents
1 Glossary ......................................................................................5
2 Executive summary .....................................................................7
2.1.
2.2.
4 Context......................................................................................19
4.1.
4.2.
4.3.
Methodology ...................................................................................25
6.1.1. Methodology ........................................................................25
6.1.2. Desaturation of FRRa by FRRm...............................................26
Inputs used for FRR dimensioning......................................................27
Scenarios .......................................................................................28
Resulting FRRa and FRRm needs in 2018 ............................................31
FRR dimensioning conclusions ...........................................................33
Flexibility........................................................................................37
Available reserve resources in 2018 ...................................................38
8.2.1. FCR ....................................................................................38
8.2.2. FRRa...................................................................................39
8.2.3. Upward FRRm ......................................................................41
8.2.4. Downward FRRm ..................................................................42
9 Conclusions ...............................................................................45
References ....................................................................................46
Annex 1: Extract from CREG decision ............................................47
Annex 2: FRR dimensioning methodology .....................................48
Annex 3: Imbalance drivers ..........................................................50
Page 4 of 56
Glossary
ACE
ACER
BRP
CCGT
CHP
CIPU
CREG
DA
Day-ahead
DSM
DSO
ENTSOe
FCR
FO
Forced Outage
FRR
FRR-
FRR+
FRRa
FRRm
GCT
GT
Gas Turbine
GWh
GigaWatthour
HUB
Platform for the exchange of electrical energy within the Belgium control
area.
HVDC
ID
Intraday
MW
MegaWatt
N-1
NC LFC&R
NRV
NWE
North Western-Europe
OCGT
Pdef
Deficit probability
PV
Qh
Quarter hour(ly)
RES
RG CE
RR
Replacement Reserves
RT
Real-time
SI
System imbalance
TJ
Turbojet
TSO
UK
United Kingdom
VRE
Page 6 of 56
Executive summary
This study was requested by CREG in its decision on the applicable reserves volumes for
the year 2013 [1]. The objectives of the study are to:
For the avoidance of doubt, this study is not addressing the issue of security of supply and
generation adequacy. It is strictly looking at the specific reserves to be secured by Elia in
the context of its responsibility to ensure the availability of appropriate ancillary services,
as defined by the Electricity Law, (art. 8 1) and the Federal Grid Code (art. 231 and 232).
The dimensioning of FCR (currently called primary reserves) is performed at ENTSOe level.
The contribution of the Belgian control area to these reserves for the Continental Europe
electricity system was historically within a range of about 90 to 106 MW. This need is
expected to remain more or less stable until 2018, although a small increase can be
expected since:
in the future the FCR share for Belgium is likely to be calculated on the basis of the
sum of net generation and consumption whereas before this was calculated on the
net generation only [2, 6]. This evolution might result in a small increase in FCR
capacity as Belgium is typically a net importer of electricity.
2.1.2.
Balancing responsible parties (BRPs) are responsible for balancing their perimeter on a 15minute time interval in the Belgian system [4]. BRPs have to nominate a balanced
perimeter in day-ahead and have to perform intraday adjustments according to more
accurate intraday forecasts and actual measurements of production and off-take, as the
uncertainty on the final balancing position of the perimeter decreases towards real-time.
Any residual system imbalance is in last instance resolved by Elia [3, 4] by deploying a
combination of automatic1 and manual2 frequency restoration reserves (resp. FRRa and
FRRm).
As a result, any assessment of the required reserve volumes for FRRa and FRRm crucially
depends on assumptions regarding the behaviour of BRPs.
This study assumes that major additional -compared to the actual situationefforts are performed by BRPs and other market parties in order to minimize the
residual imbalances in the Belgian control area. The resulting reserve needs set
forth in this study are therefore only valid under this strong assumption. A very
high increase in reserve needs and according costs for society is expected in case
of insufficient efforts and investments or in case of status quo.
The massive penetration of variable renewable energy sources (VRE) such as wind and PV,
for which the output is defined by weather conditions and not by system off-take,
increases the need for system flexibility to enable BRPs to balance their perimeter. VRE
can however also offer part of the required flexibility to the grid, subject to availability.
This study assumes that BRPs have access to and make use of- sufficient
flexibility to balance the expected position of their perimeter on a 15-minute time
interval. As a result no structural residual imbalances due to a lack of flexibility
to cover the predicted output of VRE is taken into account in the reserves
dimensioning.
1
2
It is thus assumed that BRPs balance this variable output within their perimeter by
themselves. Furthermore all BRPs are expected to invest in (and improve) highly accurate
intraday forecasts of VRE production and consumption within their perimeter.
Under this assumption Elia only has to resolve the residual imbalances due to
unpredictable or partially predictable events such as near to real-time forecast errors of
load and production (VRE, conventional,), outages of load and generation units and/or
HVDC interconnectors,...
The main drivers behind the evolutions in system reserve needs towards 20183 are
expected to be:
the massive increase of VRE capacity in the system, resulting in increased forecast
errors and possible increased volatility of the residual system imbalance;
Different scenarios for the evolution of the system reserve needs towards 2018 were
simulated. The table below gives an overview of the assumptions taken for each of the
scenarios. As already explained above all of the simulated scenarios assume major
additional efforts and investments by market parties in forecasting, flexibility and market
participation, compared to the actual situation. All simulated scenarios therefore have
identical assumptions for:
It has to be emphasized that these efforts and investments in forecasting, flexibility and
market participation, will only take place in case efficient and strong incentives are given
to BRPs and market parties in order to minimize residual system imbalances by investing
in and exploiting all- system flexibility and by accessing electricity markets in the dayahead and intraday timeframe to balance their position. These incentives are given by the
imbalance tariffs set by Elia.
It is currently observed however that during some periods the current incentives tend to
be inadequate, which has to be resolved in the near future in order to avoid a significant and very costly- increase in system reserve needs.
Incentives given to market parties have to be adequate in order to ensure the sustainable
integration of VRE in the system without requiring a continuous structural increase in
system reserve needs due to a lack of system flexibility.
In contrast to the above common assumptions, the simulated scenarios differ in:
The low reserve needs scenario assumes that a high share of intraday and 15-minute
flexibility is available, whereas less of such flexibility is assumed to be available in the high
reserve needs scenario. More detailed information on the different scenarios can be found
in paragraph 6.3 and in Annex 3.
This study takes the assumption that NEMO will be commissioned in 2018.
Page 8 of 56
Low
reserve
needs
scenario
High
reserve
needs
scenario
High
High
High
High
High
Low
High
Low
The figures and table below show the 2013 - 2018 interpolated system needs for FRRa and
FRRm, required to resolve residual imbalances for the different scenarios under the above
assumptions. The grey dotted lines show the very high increase in reserve needs in case
the above assumed significant efforts and investments, common for all scenarios, do not
(or only partially) take place, which would result in structural residual imbalances caused
by a lack of system flexibility or insufficient forecasting quality of VRE and system off-take.
Depending on the final market design on the balancing responsibility for the planned BE UK HVDC
interconnector (NEMO).
Page 9 of 56
Scenario
FRRa [MW]
FRRm downward
[MW]
FRRm upward
[MW]
2013 reference
140
695
1120
152
1138
1078
192
1331
1321
Insufficient efforts
& investments
Up to >300 MW
Up to >1750 MW
Up to >1700 MW
These reserves are not necessarily pre-contracted by the TSO; for instance they can be
offered as non-pre-contracted reserves in the balancing market; also, the reserve needs
represent volumes with an availability of 100%, but equivalent volumes for the case of an
availability less than 100%, taking portfolio effects into account, can be calculated.
It can be concluded that the reserve needs of the system heavily depend on the
BRP behaviour. In order to avoid a very steep increase in future reserve needs
(and according costs for society) as indicated by the grey dotted lines, it is of
crucial importance that:
TSO, DSOs, BRPs and other market parties perform additional efforts to
achieve accurate metering and load profiling (DSO responsibility).
In case insufficient system flexibility is made available to balance the output of VRE, or in
case of insufficient investments are made in accurate (intraday) forecasts, the reserve
needs of the system will increase significantly and are expected to be much higher than in
the simulated low and high reserve needs scenarios.
In addition the simulated scenarios for the estimation of the 2018 reserve needs showed
that:
The need for FRRa will increase towards 2018 due to an expected increase in
volatility of residual imbalances caused by ramping of VRE within the hour,
the ramping of the future HVDC interconnector between Belgium and UK,
forecast errors,...
The extent of increase of FRRa will depend on the amount of quarter hourly flexibility
available in the system. This stresses the importance of
o
Page 10 of 56
The need for upward FRRm shows an increase in the high reserve needs
scenario and even a very slight decrease in the low reserve needs scenario.
This can be explained as follows:
o
The 2012 baseline, used to simulate the 2018 needs, showed a significant
decrease in negative residual system imbalances compared to 2011 (which was
used as baseline to calculate the 2013 reserve needs);
the 2012 baseline, used to simulate the 2018 needs, showed a significant
increase in positive residual system imbalances compared to 2011 (used as
baseline for the 2013 needs).
2.1.3.
Replacement reserves (RR) are the slower manually activated reserves meant to (partially)
replace the FRR after 15 minutes.
In the Belgian system, market parties are authorised and incentivised to restore the
balance of their perimeter even in real-time. Therefore market parties fulfil the
replacement role in the Belgian system. As a result Elia does not contract RR, nor foresees
to contract RR in the future. The future NC LFC&R [2] confirms that RR are optional and
that the market design determines whether or not RR are required.
Provided that this fundamental feature of the Belgian balancing market design is
preserved, contracting of RR is not considered in the Belgian market design.
The average value of the 2012 residual system imbalance was 64 MW (long). The impact of
assuming an average balanced residual system imbalance on the above calculated reserve volumes is
assumed to be less than 50 MW due to probabilistic combinatorial effects in the dimensioning process.
Page 11 of 56
2.2.1.
From the point of view of system capability, under the assumptions that at least 3
of the existing CCGT units will still be available in the system in 2018 and that
part of the FCR will still be delivered by demand, for FCR and FRRa it is expected
that the 2018 reserve needs can be covered, for both the low and high reserve
needs scenario.
It has to be emphasized however that, in case of no investments in new FCR and FRRa
capability, the margins for FCR and FRRa will reduce, leading to a non-sustainable
situation, especially for the high reserve needs scenario.
From an economic point of view, as already observed today, the actual FCR and
(especially) FRRa resources do not allow an efficient procurement, as the majority of the
capability is concentrated on CCGT units. Therefore procurement costs for spinning
reserves are fully dependent of the CCGT market conditions, defined by the evolution of
the clean spark spread.
In an efficient reserve market the spinning reserves (FCR, FRRa) should be provided by
running demand facilities or by power plants being selected in the merit order, such as
wind parks, CCGT units, coal units, CHPs, biomass units, depending on the market
situation. Procurement of spinning reserves on power plants that arent selected in the
merit order should be avoided as it leads to very high procurement costs due to the must
run character.
In order to further minimize the procurement costs of FCR and FRRa the most efficient
power plants have to provide downward reserve capacity while the least efficient ones
provide the upward capacity.
It can be concluded that, in order to enable an economically efficient procurement
of FCR and FRRa, the participation of wind, CHP units, biomass units, and where
possible load, to such services must become a reality.
Important pre-conditions for this to happen include:
smart support schemes for RES and CHP units must set an attractive
framework for the participation of these units in the ancillary service
market, which is currently not always the case;
new and refurbished power plants need to have FCR and FRRa capability
in order to ensure the continuity of reserve capability of the Belgian
production park and to ensure that the newest -and therefore often the
most efficient- units are able to provide FCR and FRRa;
Page 12 of 56
new operation strategies for pump storage hydro units to optimize the
economic efficiency of FCR and especially FRRa delivery have to be
investigated further.
2.2.2.
For upward FRRm, from the point of view of system capability, it is expected that
the current reserve resources which are likely to be still available in 2018 will be
insufficient to cover the reserve needs. This is because of the combination of on the
one hand increasing needs for upward FRRm in the high reserve needs scenario and on the
other hand the assumed decommissioning of the turbojets (210 MW upward
FRRm) and some older OCGTs which currently provide upward FRRm.
In the high reserve needs scenario about 360 MW of additional upward FRRm capability
has to be developed.
Moreover, from an economic point of view, a diversification of the upward FRRm resources
is required in order to avoid excessive dependency on OCGT units and therefore on gas
and electricity prices for the procurement of upward FRRm.
It has to be noted that FRRm has two main functions:
very flexible non-spinning units -in terms of numbers activation frequencysuch as pump storage units,
covering rare but very large imbalances (typically outages of power units), allowing
FRRm by less flexible units in terms of activation frequency such as the
interruption of demand facilities,
2.2.3.
and
sharing
agreements
with
The Belgian system already encounters difficulties due to a lack of (activated) downward
system flexibility being referred to as situations of incompressibility- during some periods
in summer and even in winter. In addition the massive integration of VRE in the system
and the HVDC interconnector between Belgium and UK are expected to significantly
increase the need for downward flexibility by +/-700 MW in the high reserve needs
scenario.
Downward FRRm should in principle not be pre-contracted, as the need indicates
an excess of generation in the system. A framework in which downward
flexibility is offered by the available generation units or demand facilities
(increase of consumption) at a price reflecting their marginal activation costs for
downward regulation power is more sustainable on the long term and is required to
set proper incentives for investments in downward flexibility. This is in line with the current
framework for offering downward FRRm in accordance with the CIPU contract [8].
The imbalance tariffs then reflect these price signals (single marginal pricing), incentivizing
BRPs and market players to invest in sufficient downward flexibility, to balance their
portfolio on a 15-minute basis and to support the balance of the control area.
In case of absence of sufficient downward flexibility offered by market players additional
incentives in the imbalance tariffs might be needed as an intermediate measure to
incentivize the development and use of- downward flexibility.
It can be concluded that a significant amount of downward manual FRRm flexibility
has to be further developed towards 2018 by:
Page 13 of 56
Furthermore the same conclusions as for upward FRRm on its different functions, being desaturating the activated FRRa and covering rare but large incidents, hold for downward
FRRm.
Page 14 of 56
New term
Purpose
Primary
reserves
Frequency
Containment
Reserves (FCR)
Secondary
reserves
Automatic
(FRRa)
FRR
Tertiary
reserves
Manual
(FRRm)
FRR
Slow
tertiary
reserves
Replacement
Reserves (RR)
the on-going work in the Network Codes, especially NC LFC&R and NC Balancing,
for which the ultimate goal is a high degree of cooperation between Control Blocks
in balancing and the creation of a single European balancing market; and
the uncertainty on the impact of future changes in the system, such as the
integration of an HVDC interconnector between Belgium and UK, and the massive
increase of VRE in the system, on system operation and residual system
imbalances.
In order to address part of this uncertainty, Elia focused on the Belgian system only,
without considering future cross-border collaborations that might impact the system
reserve needs. Elia will however further investigate cross-border collaborations in the
future, especially as interconnection capacity with neighbouring areas will increase.
It is also important to note that this study assumes that towards 2018 there will be
significant additional efforts and investments in system flexibility, market participation,
production and load forecasting and accurate (smart) metering. The resulting system
reserve needs set forth in this study are only valid under these assumptions. In case these
assumptions are not fulfilled it is expected that the reserve needs will increase dramatically
towards 2018.
Furthermore Elia investigated several scenarios in order to reflect systems in which much
or almost no flexibility is available within the intraday timeframe as explained further on in
the document.
Given the high degree of uncertainty, it is important to note that the results of this study
only show general evolutions in the need for reserves, but that it is crucial for the TSO to
continuously monitor the evolutions and to perform a detailed assessment of the reserve
needs at least every year for the next year. As such the results of this study have only an
indicative character.
of the reserves. Tertiary reserves are delivered by load, non-spinning power plants or by
flexible spinning power plants.
The results of this study have to be considered in a context with a high degree of
uncertainty on:
future market evolutions, such as fuel costs, electricity spot prices, which will
impact the available resources in the system;
evolution towards smart support schemes for RES and CHP units in order to
facilitate their participation in the reserves market;
Due to the uncertainty related to the cross-border procurement of reserves, this study only considers
reserve resources available within the Belgian system. Elia will however continue to investigate the
option of cross-border exchange of reserves.
Page 17 of 56
Page 18 of 56
Context
balance their
the available
get a clearer
their position
The TSO resolves the residual imbalances in the system due to unpredictable or limited
predictable events. These are caused by forecast errors of load, VRE production, still
existing near to real-time and by outages of large loads, production units and HVDC
interconnectors7 that, given their size, cannot be compensated immediately by the BRPs in
question. BRPs are incentivised to balance their perimeter before and even in real-time via
the real time price signals of the imbalance mechanism. This is illustrated in the figure
below:
The imbalance mechanism must give adequate incentives to BRPs and market parties in
order to invest in accurate intraday forecasting of load and VRE production and to invest in
flexibility in their perimeter (by exploiting all flexibility of existing load and generation
assets and by investing in new flexibility resources if required). BRPs need this flexibility to
balance the variable output of VRE, the ramping of system off-take, and forecast errors of
load and production, in their perimeter and to adjust the position of their perimeter in the
intraday timeframe in accordance with more accurate forecasts.
The imbalance mechanism must ensure at all times that BRPs also deploy the required
flexibility to balance their perimeter in order to minimize residual imbalances in the
system. The reserve needs of the system -and according costs for society- are determined
by the amount of residual imbalances.
The imbalance mechanism is therefore an important tool to ensure that sufficient
investments in accurate forecasts and system flexibility are made by BRPs and other
market parties. This ensures the sustainable integration of the planned VRE capacity in the
system and minimizes costs for system reserves that are required to resolve residual
imbalances.
The Belgian market design allows -and incentivizes- the real-time (passive) reaction of
market parties (with a physical position) on imbalance prices, thereby supporting the
system balance and reducing residual system imbalances. This is of key importance to
foster investments in system flexibility by market parties and to minimize residual
imbalances.
The dimensioning of reserves is based on residual imbalances and does not
account for imbalances caused by a structural lack of system flexibility or lack of
qualitative forecasts. The financial incentives given by the imbalance mechanism
must be sufficiently strong to avoid such situations and to make sure that BRPs
exploit all reasonable measures to balance their perimeter. The current
incentives however tend to be inadequate during some time periods.
7
Market arrangements for the outage of the NEMO HVDC interconnector are not defined yet.
Depending on the final framework either Elia or a BRP can be responsible for balancing the cable.
Page 19 of 56
Suppose that during the upward ramping of the load in the morning (6 - 8 A.M.)
the amount of wind production decreases significantly. This would mean that the
import, together with the upward ramping of other power plants (or demand side
reaction), now have to cover both the decrease of wind production and increase of
load. This results in an increased need for system flexibility;
In case the VRE production and baseload production exceeds demand, energy has
to be exported or baseload (or VRE) production has to be modulated, which again
indicates the increasing need for system flexibility.
VRE however can and must be incentivized to- also offer some flexibility to the grid
(especially downward reserves), subject to availability. VRE has to provide some of the
required system flexibility to enable its sustainable integration in the system.
The table below gives an idea of the observed and/or forecasted ramping of onshore and
offshore wind production and of photovoltaic production in function of the installed
capacity. It can be concluded that especially offshore wind production has a high
variability, with fluctuations of its output of more than 13% of its installed capacity on a
15-minute basis and more than 30% on a 60-minute basis. This represents a real
challenge for the system when looking at the expected massive increase of VRE, and
especially of offshore wind production in the next years.
Maximum8
ramping
15 minutes
30 minutes
1 hour
Estimated 2012
2018 additional
installed capacity
[GW]9
PV
4,6%
8,7%
16,9%
Onshore wind
4,9%
7,7%
12,2%
0,9
Offshore wind
13,5%
21,3%
31,8%
1,9
[% of installed
capacity]
The ramping of renewables in timescales longer than 1 hour is even much higher, requiring
a very flexible system that is able to deal with this variability. Literature states that the
amount of system flexibility available in the system in a timeframe of 6 to 36 hours [5] this is the capability of the system to alternate between situations with full PV and wind
production to situations without PV and wind production - is the limiting factor for the
integration potential of VRE in the electricity system.
Covering 99-percentile of the historical observed absolute values of the ramps. For PV only daytime
was taken into account in order to give realistic values.
9
Based on current estimations. These values change during time and require close follow-up by Elia.
Page 20 of 56
The figure below gives a qualitative insight in the relationship between output of VRE, the
need for system flexibility deployed by the BRP to cover this variability and the residual
system imbalance which results from the part of the forecast error, still existing near realtime, that is not covered by the BRP.
For illustrative purposes, the figure assumes a constant off-take of the grid and shows the
required flexibility to cover e.g. the decreasing output of VRE output in order to keep the
system balanced. Although constant off-take is assumed, it has to be noted that (part of)
the required flexibility can also be provided by DSM.
It can be concluded that the need for system flexibility for the BRP, to offset the predicted
variable output of VRE, is many times bigger than the residual system imbalance to be
covered by the TSO.
The BRP (and other market parties supporting the balance of the system) are assumed to
offset any forecast error in real-time. The dimensioning of reserves only relates to the
residual system imbalances, while it is assumed that BRPs will deploy sufficient flexibility to
offset the variability of the VRE output and perform best efforts to resolve forecast errors
of VRE and load.
This shows again the importance of adequate and strong price incentives given by the TSO
to BRPs for resolving the residual system imbalances. These incentives ensure that BRPs
will invest in and actually deploy- the required flexibility, thereby leaving only small
residual imbalances in the system to be covered by the reserves of the TSO.
4.3.1.
It is estimated that the installed wind capacity will increase with +/-2,8 GW between 2012
and 2018 (0,9 GW onshore and 1,9 GW offshore). The PV capacity is expected to increase
with an additional 2 GW between 2012 and 2018. This results in a total predicted amount
of more than 8GW of VRE capacity installed in 2018.
The significant increase in installed capacity of PV and wind production in 2018 will have an
impact on the size and nature of the residual system imbalances, used as input for the
dimensioning of the reserves, due to:
Forecast errors of VRE output:
The actual output of VRE is difficult to predict. The uncertainty on the forecasts
(resulting in forecast errors) decreases towards real-time. The dimensioning of
reserves accounts for residual system imbalances caused by forecast errors of VRE
Page 21 of 56
output still existing near to real-time for which the BRP has only limited possibility
to offset them by its own.
Ramping of VRE output:
This indicates that the increase of volatility of the residual system imbalance due to
this effect is up to now very limited and negligible. Further follow up of this
effect by the TSO is required.
4.3.2.
HVDC interconnector
A second evolution in the system impacting the need for reserves is the introduction of a
1000 MW HVDC VSC interconnector between Belgium and UK (NEMO project)11. Following
two effects impact the required amount of reserves:
HVDC interconnector outages:
The forced outage of an HVDC interconnector can occur in situations of full import
or export. In case of full import the loss of the HVDC interconnector results in a
deficit of 1000 MW, which is comparable to the loss of a nuclear unit in the current
system. In case of full export, the loss of the cable introduces an excess of 1000
MW, which is completely new for the system.
The ramping of the planned HVDC cable is expected to increase both the size and
volatility of the residual system imbalances, as explained further in Annex 3.
10
The required amount of FCR is defined on the level of ENTSOe. Currently the total amount
of FCR within Continental Europe is 3000 MW, covering the instantaneous outage of two of
the largest units within Europe. The share for Elia for the Belgian control area is historically
within a range of about 90 106 MW and is determined by the amount of the net
generation of the Belgian area compared to the net generation of the entire Continental
Europe system. This ratio was more or less constant with only very limited changes.
In the report of the Ad-hoc Team Operational Reserves [6] the impact of deterministic
frequency deviations on the dimensioning of the FCR is identified. Deterministic frequency
deviations are instantaneous frequency deviations occurring during the hourly changes of
the energy schedules. These frequency deviations occur due to the fact that the hourly
energy blocks on the market do not allow load-following and due to insufficient alignment
of simultaneous ramping of different units within the system. These frequency deviations
are deterministic (always occur around the change of the hour) and, due to their specific
nature, disappear automatically as time progresses.
The figure below shows, on the top left, the distribution of the 2010 historical frequency
deviations for RG CE. The red curve shows the frequency deviations at the change of the
hour, the blue curve shows the one within the hour. The image beneath shows a
normalized distribution, which shows that practically all the large frequency deviations in
the Continental Europe system (RG CE) are located around the change of the hour.
The solution for these imbalances lays rather in a re-design of the market rules and a
better alignment of the ramping of units, addressing the main causes of these imbalances,
than in the increase of operational reserves.
These deterministic imbalances are quite big (several hundreds of MWs) and very fast
(phenomena within a few minutes). Therefore they can only be resolved by the fast FCR.
During such frequency deviations 50% up to 70% of the FCR is activated. This results in a
situation in which insufficient FCR is available to cover the outage of the 2 largest units.
The final report on operational reserves by ENTSOe [6] and the current draft of the NC
LFC&R [2] require that the risk of having insufficient FCR is monitored for each
Synchronous Area, in order to be able to increase the FCR in case an allowed risk threshold
is exceeded.
Simulations performed show that, in case the yearly number of minutes where the average
frequency deviation exceeds more than 75 mHz increases from 2360 (2010 value) to 4000
minutes, the required FCR would also increase from 3000 MW to 3070 MW.
In addition the current draft of the NC LFC&R [2] states that the FCR contribution of TSOs
shall be calculated in the future on the basis of the sum of net generation and consumption
of control blocks, which also leads to a small increase for Belgium as importer of electricity.
Therefore a 5 MW increase in FCR is assumed to the historical range of 95105 MW.
Based on this information, the amount of FCR to be provided by Elia in 2018 is
estimated to be within a 95 - 110 MW range.
Page 23 of 56
Page 24 of 56
6.1. Methodology
6.1.1.
Methodology
In contrast to FCR, the required amount of FRR (FRRa and FRRm12) is determined on the
level of the TSO. Historically TSOs used deterministic dimensioning criteria to determine
the total amount of FRR. A TSO dimensioned its FRR in order to cover the biggest outage
due to the loss of a single grid element.
Such a deterministic method doesnt take the increasing complexity of system operation
due to the integration of variable and limited predictable VRE into account. Elia changed its
reserves dimensioning methodology from deterministic to probabilistic in 2012. The
reserve volumes for 2013, as calculated in 2012, were based on this probabilistic
methodology. The determination and evaluation of reserves for 2013 on this basis was
approved by the CREG [1].
In the probabilistic methodology, the total required FRR (FRRa and FRRm) is determined as
the amount of FRR that covers the expected residual system imbalance in both directions
during 99,9% of time13. This allows to take imbalances due to forecast errors of load and
VRE into account. The methodology is explained in the figure below. The N-1 principle is
however kept as a strict minimum for the amount of total FRR, as required by ENTSOe.
Some general principles for the dimensioning of the reserves can be found in the ENTSOe
Operation Handbook Policy 1 [7].
The TSO dimensions the FRRa in order to reach a satisfactory balancing quality for its
Control Block. As FRRa is activated on an automated basis and is faster than FRRm, it is a
very important reserve to ensure a satisfying balancing quality on a continuous basis.
Finally the combination of FRRa and FRRm must allow the TSO to respect the ACE quality
targets agreed upon between the TSOs of the Synchronous Area.
The FRRa covers fast components of the residual system imbalance, which are modelled by
the difference between the residual system imbalances of two consecutive quarter hours,
being the volatility of the residual system imbalances. The actual amount of FRRa is
determined as the required volume to cover Y% of the volatility of the residual system
imbalances. This is shown in the figures below. A more detailed explanation of this
methodology can be found in Annex 2.
12
FRRm corresponds to manual activated reserves that can be deployed within 15 minutes such as
non-contracted manual bids according to CIPU, R3 production, interruptible industrial clients,
13
As Elia only procures upward FRRm, the yearly dimensioning only considers the upward FRRm
dimensioning.
Page 25 of 56
6.1.2.
The dimensioning model for the FRRa is based on a theoretical model in which an efficient
desaturation of FRRa by FRRm is assumed. During recent years Elia performed increased
efforts in order to improve the desaturation of FRRa by FRRm, with satisfying results. An
efficient desaturation of FRRa by FRRm allows to achieve a satisfying balancing quality with
a relatively limited amount of FRRa, which is scarce in Belgium and has a very high
reservation cost (see later).
This is illustrated in the figure below, which shows that, although the amount of system
imbalances nearly doubled last years, Elia managed to keep the ACE quality under control
by performing more activations of FRRm, while the amount of FRRa remained more or less
constant.
The graphs below shows the absolute energy contents [GWh] of the system imbalance, of
the activated FRRa and FRRm volumes and of the ACE for the last 4 years. These graphs
show the importance of FRRm to de-saturate and support the FRRa. Preliminary results of
the Elia participation to iGCC (only 2 months in 2012), also indicate an enhancement of the
ACE quality. Module 1 of iGCC avoids the activation of FRR control power whenever there is
an opposite demand for FRR control power in the different participating control areas.
Page 26 of 56
The above figures show that, despite an increase of the system imbalance of 515 GWh in
2012 compared to 2009 (+54%!), the increase in ACE was kept limited to 100 GWh due to
the increased amount of manual activations.
It is expected that the desaturation of FRRa by FRRm will become more challenging in the
future, given the steep increase in the required amount of manual activations. Elia
therefore continuously investigates efficient ways to de-saturate the FRRa, to increase the
liquidity on the FRRm products being able to de-saturate the FRRa on a nearly continuous
basis and to increase the liquidity of the FRRa market itself to enhance the balancing
quality.
The model used for each imbalance driver and the assumptions taken in the different
simulated scenarios (see paragraph 6.3) are further explained in Annex 3. Finally the
distribution of the total expected residual system imbalances is used as input in the
probabilistic dimensioning model for FRR.
The considered imbalance drivers are:
quarter hourly imbalances due to ramping of PV and wind within the hourly
timeframe.
Imbalances caused by
interconnector (NEMO).
forced
outages
of
units
and
the
planned
HVDC
Wind turbines automatically shut down in case the wind speed exceeds their respective
cut-off speeds during a certain period of time. This is especially a risk for offshore wind
parks given the high wind speeds they face. As a result in case of a storm a high amount
of offshore wind production might instantaneously shut down, creating large imbalances in
Page 27 of 56
the system. It has to be noted however that the instantaneous outage of all offshore wind
parks due to the occurrence of a storm is not considered as an N-1 incident as:
storms can be predicted and therefore preventive measures can be taken by BRPs
and/or the TSO to reduce the risk. This will be further investigated by Elia during
2013.
Elia identified different cut-off thresholds for the different offshore wind parks.
Furthermore it is expected that not all wind mills of a wind park simultaneoulsy
shut down.
This is illustrated by the following figure, which shows the forecast and
measurement of the Belgian offshore wind parks on 30/1/2013.
new wind turbine technology exists that avoids the instantaneous shutting down of
wind parks in case wind speed exceeds the cut-off speed. These wind turbines then
gradually reduce their output instead of going down to zero immediately.
The occurrence of a storm, and according forecast errors in case of the shutting down of
wind mills, is however taken into account in the calculation of the expected residual system
imbalance. In the different scenarios, significant improvements are expected for the
offshore production forecasts, which in such case also apply for forecast errors due to the
shutting down of offshore wind parks due to storms.
Elia has only limited experience with the behaviour of offshore wind parks in case of storm
and will further investigate this phenomenon in the future to improve the modelling of the
storm risk in the dimensioning of the reserves and to take appropriate measures.
6.3. Scenarios
The expected residual system imbalances and therefore the required volume of FRRa and
FRRm depend on the assumptions taken for the future system evolutions. Therefore
different scenarios were simulated, covering different possible evolutions.
As already explained above all the simulated scenarios assume significant additional efforts
and investments (compared to the current situation) by BRPs and other market parties in
order to increase the system flexibility and day-ahead and intraday forecasting quality of
load and VRE production. This is required to ensure the sustainable integration of high
shares of VRE in the system and to minimize residual system imbalances.
Therefore none of the scenarios assume residual imbalances as a result of a structural lack
of system flexibility, which is a very strong and optimistic assumption. If residual
imbalances are caused by a structural lack of system flexibility, system reserve needs will
increase dramatically, which is not taken into account in any of the simulated scenarios.
In all of the three simulated scenarios it is assumed that:
BRPs invest in highly accurate intraday forecasts of VRE production and off-take to
minimize residual system imbalances;
BRPs pro-actively foster the development of flexibility in their portfolio (load &
generation) and bring this flexibility to the markets (day-ahead, intraday and
balancing market). This allows the BRPs to balance at least the expected position
of their perimeter in day-ahead. Moreover it is assumed that BRPs actually deploy
all available system flexibility in order to minimize residual system imbalances.
Therefore no structural residual imbalances due to a lack of (day-ahead) flexibility
is taken into account;
Page 28 of 56
TSO, DSOs, BRPs and other market parties perform additional efforts to achieve
accurate metering and load profiling (DSO responsibility) resulting in a better realtime view on the actual off-take and injection within the system and the BRP
perimeter.
real-time market reaction on imbalance prices to support the balance of the BRP
perimeter and the Belgian system must be incentivized;
Within the above assumptions, three different scenarios were elaborated to estimate the
need for FRRa and FRRm in 2018, reflecting systems in which different amounts of
intraday flexibility and flexibility within the hourly timeframe are available to the BRPs.
The low reserve needs scenario represents a system in which ID flexibility and flexibility
within the hourly timeframe is abundant, thereby fully enabling BRPs to adjust their
perimeter in the ID time scales according to more accurate ID forecasts. The presence of a
liquid 15-minute ID market with short gate closure times (GCT) minimizes the imbalances
caused by the ramping of VRE within the hour and by the ramping of NEMO (see also
Annex 3).
In the high reserve needs scenario the ID system flexibility and flexibility within the hour
timeframe becomes scarce. This affects the ability of BRPs to balance their perimeter in
the intraday timescale, which results in an increase of residual imbalances in the system.
Furthermore this affects the ability of BRPs to offset the ramping of VRE within the hour
and to offset imbalances due to the ramping of NEMO. The medium reserve needs
scenario has to be considered as an intermediate one.
The assumptions for the different scenarios are shown in the table below:
Assumption
Development
profiling
of
forecasting,
metering
Low
reserve
needs
Medium
reserve
needs
High
reserve
needs
High
High
High
High
High
High
High
Medium
Low
and
Page 29 of 56
Intra-hourly balancing.
Ability of BRPs to balance the ramping of VRE (wind,
PV,) and HVDC interconnectors within the hour.
This depends on:
High
Medium
Low
The following paragraphs give a more detailed explanation on the assumptions and the
model parameters for the different assumptions (more details are given in Annex 3).
Assumptions taken for the improvement in the (ID) forecasting quality of VRE:
The reference forecast used to model the 2018 incremental wind forecast errors is
a day-ahead forecast. Therefore a significant increase in forecasting quality (up to
40%), due to the use of very accurate intra-day forecasts in 2018 is taken into
account.
Ability of BRPs to balance their portfolio on the basis of the DA expected position
of their perimeter:
All three scenarios assume that BRPs have sufficient flexibility available (and
actually make use of it) to balance (at least) the DA predicted position of their
perimeter (ramping of load and VRE,). This means that no structural
(predictable) residual imbalances are introduced in the system due to a lack of
system flexibility.
This represents a significant change from the current situation in which (balancing)
incentives given to the market tend to be insufficient during some periods,
resulting in imbalances due to a lack of (activated) system flexibility by market
parties.
within the BRP perimeter, such as flexible generation units, demand side
management,; and
The coupling of the NWE intraday market, planned before 2018, might lead to a
significant increase in ID market liquidity.
Ability of BRPs to offset ramping of VRE within the hour and to offset ramping of
NEMO:
Page 30 of 56
It is observed and expected that less flexible power plants (mainly gas plants in
Belgium) are, and will be, available in the system during some time periods. The
running hours of these units are decreasing as a result of the increase of VRE
production.
FRRa [MW]
FRRm downward
[MW]
FRRm upward
[MW]
140
695
1120
No ramping
152
1138
107814
With ramping
155
1135
1078
No ramping
159
1231
1131
With ramping
172
1238
1138
No ramping
166
1327
1317
With ramping
192
1331
1321
Up to >1750
MW
Up to >1700
MW
2013 reference
2018:
low
reserve
needs scenario
14
Up to >300
MW
The table above shows the amount of required FRRa and FRRm for the three different
scenarios as well as the 2013 reference.
Up to now Elia didnt notice an impact of the increase in VRE capacity in the Belgium
system on the volatility15 of the residual system imbalance. This might however be the
case if a significant amount of additional VRE capacity is introduced in the system.
Therefore two different cases are simulated for each scenario. In the first case the
imbalances due to ramping of VRE and the HVDC interconnector within the hourly
timescale are not taken into account (No ramping), while in the second case (With
ramping) they are.
The figures below show the interpolated ranges for the FRRa and the upward and
downward FRRm system needs for the two extreme scenarios (low reserve needs scenario
without ramping impact and high reserve needs scenario with ramping impact) between
2013 and 2018.
15
The volatility of the system imbalance is calculated as the delta between the average system
imbalance of the actual and the next quarter hour.
Page 32 of 56
In case insufficient system flexibility will be available to balance the variable output of the
planned additional VRE capacity, or in case of insufficient investments are made in
accurate ID forecasts, the reserve needs of the system (and costs for society) will increase
significantly and are expected to be much higher than in the above simulated scenarios.
The reserve needs of the system heavily depend on the BRP behaviour. In order to avoid a
very steep increase in future reserve needs (and costs for society), as indicated by the
grey dotted lines in the figures, it is of crucial importance that:
BRPs invest in best practice (DA and ID) forecasting of VRE production and off-take
in their perimeter;
BRPs make active use of markets on all timescales to balance their perimeter;
BRPs pro-actively foster the development of flexibility in their portfolio (load &
generation) and bring this flexibility to the markets (day-ahead, intraday and
balancing market);
TSO, DSOs, BRPs and other market parties perform additional efforts to achieve
accurate metering and load profiling (DSO responsibility).
real-time market reaction on imbalance prices to support the balance of the BRP
perimeter and the Belgian system must be accepted and incentivized;
the price signals given by the imbalance mechanism must be sufficiently strong at
any point in time to incentivize BRPs to make use of all flexibility to balance their
perimeter.
This represents a significant change from the current situation in which it is observed that
the incentives by the imbalance mechanism are not always sufficiently strong to achieve
this.
System reserve needs (and costs) will explode in case no accurate forecasts or
insufficient system flexibility are available (or are not being used) by BRPs to balance
the variable output of PV and wind production within their perimeter.
Gradual strong price signals by the imbalance mechanism, representing the market
cost for deployed balancing energy, in case of residual system imbalances must give
proper incentives to all involved market parties to invest in accurate ID forecasts of
load and VRE and to develop the required system flexibility.
The ability of BRPs to adjust their perimeter according to more accurate ID forecasts
depends strongly on the amount of ID flexibility within the system. In case of the low
reserve needs scenario, ID flexibility is abundant resulting in a rather limited increase
of reserve needs in the system.
The high reserve needs scenario assumes scarcity of ID flexibility in the system,
resulting in a significant increase of reserve needs. This shows again the importance of
adequate incentives by the imbalance mechanism for market parties to develop and
use ID system flexibility.
Page 33 of 56
The need for FRRa will increase towards 2018. This is mainly due to an expected
increase in volatility of residual imbalances because of the ramping of VRE within the
hour and the ramping of the planned HVDC interconnector between Belgium and UK.
The increase of FRRa therefore depends on the amount of quarter hourly flexibility
available in the system. This stresses the importance of
o
for the cost-effective integration of high shares of VRE and HVDC interconnectors in
the system.
This effect has to be closely followed by the TSO during next years.
All performed simulations assume an efficient desaturation of FRRa by FRRm. This can
only be achieved in case of the presence of a very flexible and liquid balancing market.
This will become more challenging in the future, as Elia already experienced during
recent years.
The reason for this is the high number of FRRm activations required, as a result of the
increase in amplitude and frequency of large residual system imbalances.
As a result two different functions for FRRm are identified:
o
the first function of FRRm is to cover rare but very large imbalances due to
instantaneous incidents or very large (but rare) forecast errors.
the second one being the de-saturation of the activated FRRa on a more or less
continuous basis.
Whereas historically the FRRm was mainly used to fulfil the first function, thereby
acting as a sort of contingency reserve, Elia now seeks additional volumes of the
FRRm fulfilling the second function, by exploiting different possibilities. The FRRm
reserve resources for the different functions may have different characteristics, e.g. in
activation frequency and duration, and may therefore be provided by different types of
resources.
One of the ways explored by Elia to capture additional FRRm able to de-saturate the
activated FRRa is the creation of a bid-ladder to capture more flexibility in the system,
thereby enabling all resources, such as biomass, wind production, CHPs, demand,to
offer this kind of flexibility.
The need for upward FRRm shows an increase in the high reserve needs scenario and
even a very limited decrease in the low reserve needs scenario. This can be explained
by the fact that:
o
the 2012 baseline, used to simulate the 2018 needs, showed a significant
decrease in negative residual system imbalances compared to 2011, which was
used as baseline for the calculation of the 2013 needs;
there is a collateralization of the increased needs for upward manual FRR due
to additional VRE capacity and the positive FRR required to cover the N-1;
the major increase in forecasting quality and ID flexibility in the low reserve
needs scenario compared to the 2013 situation.
The need for downward manual FRR increases significantly due to:
o
the 2012 baseline, used to simulate the 2018 needs, showed a significant
increase in positive residual system imbalances compared to 2011 (used as
baseline for the 2013 needs).
Page 34 of 56
Replacement Reserves
Replacement Reserves (RR) are the slower manually activated reserves meant to
(partially) replace the activated FRR after 15 minutes.
As authorised in the future NC LFC&R [2], Elia does not currently contract RR. Indeed, in
the Belgian system, market parties are authorised and incentivised to restore the balance
of their perimeter up to real-time. Therefore market parties fulfil the replacement role in
the Belgian system.
Provided this fundamental feature of the Belgian balancing market design is preserved, the
contracting of RR is not considered in the Belgian market design.
Page 35 of 56
Page 36 of 56
This chapter analyses whether the reserve resources that are reasonably expected to be
available in the system in 2018 are sufficient to cover the 2018 reserve needs for the
different simulated scenarios.
In addition some qualitative insights are given in required evolutions to enable the
economic efficient procurement of the required reserves in 2018. In this perspective it is
investigated whether the reserves portfolio will be sufficiently diversified to avoid excessive
exposure to specific market conditions for the procurement of reserves.
This study only considers reserve resources available in the Belgian system. Cross-border
reserve resources are not taken into account given the uncertainty of cross-border
exchange of reserves and the relatively long time horizon until 2018.
The development of cross-border exchange of reserves will however become very
important in the future and will be considered by Elia. The planned increase in
interconnection capacity might also increase the potential for cross-border exchange of
reserves.
As already mentioned in paragraph 3.3 there is a high degree of uncertainty regarding the
current reserve resources that will still be available in 2018. This depends e.g. on the
evolution of economic parameters such as fuel and electricity prices, for power plants, on
profitability of industrial demand facilities, This is shown e.g. by the current declared
intentions of decommissioning or mothballing of some gas fired plants in Belgium due to
reduced profitability. Furthermore there is a link with possible new investments required to
ensure system adequacy in the future.
For the avoidance of doubt, this study is not addressing the issue of security of supply and
generation adequacy. It is strictly looking at the specific reserves to be secured by Elia in
the context of its responsibility to ensure the availability of appropriate ancillary services,
as defined by the Electricity Law, (art. 8 1) and the Federal Grid Code (art. 231 and 232).
The results in this section are based on an extrapolation of the current trends and
evolutions, but can change significantly in function of the evolution of economic
parameters.
8.1. Flexibility
High system flexibility is the key requisite for the integration of large shares of VRE in the
system. The results of this study point out the high ramping capabilities of wind and PV,
which have to be covered by flexible resources together with flexibility on the DA and ID
electricity markets.
A lack of (activated) system flexibility generally results in structural and very large residual
imbalances. Although these imbalances can be predicted, they are not resolved by the
BRPs. The reserve dimensioning however only accounts for residual imbalances due to
unpredictable or partially predictable events.
The creation of a highly flexible system requires following continued efforts:
new units must have high ramping capabilities, very low minimum stable power
and the ability to start and stop quickly and frequently. Furthermore new units with
low marginal production costs must be able to provide spinning flexibility to the
system;
the right incentives must be in place in order to require RES units themselves to
provide system flexibility;
set incentives for BRPs to offer (and actually use) flexibility by giving adequate
price signals for imbalances;
Maximize the flexibility of the existing centralized production assets and demand
facilities; and
Set the framework for the creation of a coupled, liquid ID market with GCT near
real-time and a 15-minute resolution.
The results of the study show that the reserve needs of the system are highly dependent
of the system flexibility and on the incentives for BRPs to balance their portfolio on a 15Page 37 of 56
minute level. The results of the study performed here are only valid for a system without
structural flexibility issues.
Creating the attractive framework for RES to provide reserves (smart support
schemes, reserve products,);
Attracting new players and new reserve resources in the systems; and
Requiring new/refurbished power plants to have FCR, FRRa and FRRm capability.
Elia currently observes a highly concentrated, illiquid market for both FCR and FRRa, as
these reserves (especially FRRa) are almost only offered by CCGT units for which running
hours are decreasing under current market conditions. The procurement of FCR and FRRa
on CCGT units therefore introduces high must run costs in the system as costs fully depend
on the evolution of the clean spark spread.
Even though many changes were already introduced in the market to facilitate
diversification of reserve resources and that the technical possibility for several resources
to offer reserves already exists (no R&D required), a continued increased effort of all
parties is required to diversify the reserve resources and to ensure a well-functioning,
liquid reserves market.
8.2.1.
FCR
The estimated range for FCR in 2018 is [95 110 MW]. The following resources actually
provide FCR and are expected to be still available in the system in 2018:
FCR resource
CCGT units
Nuclear
Load
Pump-storage
hydro plants
For 2013 Elia procures part of its FCR in France. The cross-border procurement of FCR is
less complex than for other reserves given the full harmonization of the product on
European level. As already stated before this study however does not consider crossborder resources given the related uncertainty.
From the point of view of system capability for FCR it is expected that the current reserve
resources, which are expected to be still available in 2018, will allow to cover the 2018
reserve needs.
In the above table it is assumed that the current providers of R1 load mainly big
industries- will still be operational within the Belgian control area in 2018, which also
depends from external factors (economy,).
From an economic point of view though, as already observed today, these reserve
resources do not allow an efficient procurement of the reserves, as a large share of the
capability is concentrated on CCGT units. Therefore procurement costs for FCR (spinning
reserves) are highly dependent of the CCGT market conditions. These market conditions
are mainly determined by the evolution of the clean spark spread.
Spinning reserves such as FCR have to be provided by units that are selected in the merit
order, or by demand facilities, to avoid high must run costs. These units can be wind
parks, CCGT units, coal units, CHPs, biomass units depending on the market situation.
The most efficient power plants provide downward reserve capacity while the least efficient
ones provide the upward capacity.
This is the main reason why procurement costs for FCR significantly increased during
recent years as market conditions for CCGT unit worsened. Therefore it is of key
importance that some of the following FCR resources are developed in the future:
FCR resource
CHPs
New production
capacity &
refurbished
units
Load
RES units
It is important that BRPs and market parties are incentivized to develop these new reserve
resources. Smart support schemes for RES and CHP units must enable the efficient
participation of RES in the ancillary services market.
8.2.2.
FRRa
The estimated range for FRRa in 2018 is [152 192 MW]. The following resources actually
provide FRRa and are expected to be still available in the system in 2018:
Page 39 of 56
FRRa resource
CCGT units
Pump storage
units
CHP units
The cross-border procurement of FRRa is very complex given the variety of FRRa products
and market designs across Europe. Furthermore the cross-border procurement of FRRa
requires cross-border transmission capacity to be continuously available. This study
therefore doesnt consider the cross-border procurement FRRa.
From the point of view of system capability for FRRa it is expected that the current reserve
resources, which are expected to be still available in 2018, will allow to cover the 2018
reserve needs for both the low and high reserve needs scenario (resp. 152 and 192 MW).
It has to be emphasized however that, in case no further FRRa resources are developed
towards 2018, the presence of 3 CCGT units for the delivery of FRRa in the high reserve
needs scenario results in very limited margins. The unavailability of one or more CCGT
units will then affect the ability of the TSO to procure the required FRRa volumes.
Also from an economic point of view, as already observed today, these reserve resources
do not allow an efficient procurement of the reserves, as a large share of the capability is
concentrated on CCGT units. Therefore procurement costs for FRRa are fully dependent of
the CCGT market conditions, related to the evolution of the clean spark spread.
FRRa has to be provided by units that are selected in the merit order, or by demand
facilities, to avoid high must run costs. These units can be wind parks, CCGT units, coal
units, CHPs, biomass units, pump storage depending on the market situation. The most
efficient power plants provide downward reserve capacity while the least efficient ones
provide the upward capacity. Procurement of spinning reserves on units that arent
selected in the merit order leads to high must run costs and must be avoided.
The procurement costs for FRRa therefore depend on the evolution of the clean spark
spread. Therefore it is of key importance that some of the following FRRa resources are
developed in the future:
FRRa resource
CHPs
New production
capacity and
refurbished
units
Pump storage
units
Page 40 of 56
Load
RES units
8.2.3.
Upward FRRm
The estimated range for upward manual FRR in 2018 is [1078 1321 MW]. Currently
following resources in the Belgian control area are providing the majority of the upward
FRRm:
Turbojets;
Gas turbines;
Interruptible industrial clients (single and aggregated units) connected to the TSO
grid.
At the end of 2012 about 850 MW of power plants (gas turbines and turbojets) was
qualified to deliver FRRm (400 MW contracted), while about 350 MW of FRRm was offered
by interruptible industrial clients (261 MW contracted for balancing purposes).
The following resources actually provide upward FRRm and are expected to be still
available in the system in 2018:
Upward manual
FRR resource
R3
production
units
Interruptible
industrial clients
Elia relies also on non-contracted incremental bids in the framework of the CIPU contract16
[8] and on mutual support contracts with neighbouring TSOs. In 2013 Elia launched a pilot
project to gather experience in the participation of aggregated DSO connected load in the
FRRm market. A bid ladder project for FRRm was started to attract more FRRm bids
compared to the current CIPU framework.
From the point of view of system capability, for upward FRRm it is expected that the
current reserve resources which are expected to be still available in 2018, will be
insufficient to cover the reserves in both the low and high reserve needs scenarios. This is
because of the combination of increasing needs for upward FRRm, in the high reserve
needs scenario, and the assumed decommissioning of the turbojets (210 MW upward
FRRm). Depending on the scenario there is a need to develop up to 360 MW of additional
upward FRRm capability.
In the above table it is assumed that the interruptible industrial clients mainly big
industries- will still be operational within the Belgian control area in 2018, which also
depends from external factors (economy,). In addition, from an economic point of view, a
diversification of the resources is required in order to avoid excessive dependency on
OCGT units and therefore on gas and electricity prices for the procurement of upward
FRRm.
16
All power plants exceeding 75 MW are obliged to offer the remaining flexibility margins to Elia.
Page 41 of 56
The table below gives an overview of the different options for the development of 360 MW
of upward FRRm and for the further diversification of upward FRRm resources towards
2018:
Upward manual
FRR resources
Gas turbines
Load
Cross-border
cooperation
Sharing17 of up to
neighbouring TSOs.
New production
capacity &
refurbished
units
RES units
300
MW
of
upward
FRRm
with
The continuous de-saturation of the activated FRRa, requiring upward FRRm by:
o
Cover rare but very large imbalances (typically outages of power units), requiring
FRRm by less flexible units in terms of activation frequency such as the
interruption of demand facilities (in case of a limited number of activations per
year),
participation of load and new OCGTs (transformed CCGTs) in the upward FRRm
market;
8.2.4.
Downward FRRm
The estimated range for downward FRRm in 2018 is [1138 - 1348 MW], representing a
significant increase of +/- 700 MW compared to 2013. During recent years Elia noticed a
significant increase in the need for downward reserves, driven by the increase of VRE in
the system in combination with a lack of downward system flexibility and/or insufficient
incentives for BRPs to access the available downward flexibility.
Downward FRRm should in principle not be pre-contracted, as the need indicates an excess
of generation in the system. A framework in which downward flexibility is offered by the
available generation units at a price reflecting their marginal (activation) costs for
downward regulation power, or by demand for increasing consumption, is more sustainable
on the long term and is required to set proper incentives for investments in downward
17
Concept introduced in [2] and [6] allowing TSOs to share part of their FRRm.
Page 42 of 56
flexibility. This is in line with the actual framework for offering downward FRRm in
accordance with the CIPU contract.
The imbalance tariffs then reflect these price signals (single marginal pricing), incentivizing
BRPs and market players to invest in sufficient downward flexibility, to balance their
portfolio on a 15-minute basis and to support the balance of the control area.
In case of absence of sufficient downward flexibility offered by market players, additional
incentives in the imbalance tariffs might be needed as an intermediate measure to
incentivize the development and use of- downward flexibility.
Downward manual FRRm flexibility has to be further developed towards 2018. The
following table gives an overview of the different resources to be developed:
Downward
FRRm resources
New production
capacity and
refurbished
units
Existing power
plants
RES units
Cross-border
cooperation
Load
The sustainable integration of increasing shares of VRE in the system is only possible in
case sufficient downward flexibility is available in the system. Currently Elia observes
insufficient (activated) available downward flexibility in the system during some periods.
Therefore it is very important to give adequate price signals to BRPs and market players
reflecting the actual cost of and need for downward flexibility.
Furthermore the same conclusions as for upward FRRm on its different functions, being desaturating the activated FRRa and covering large incidents, hold for downward FRRm.
Page 43 of 56
Page 44 of 56
Conclusions
This study is not addressing the issue of security of supply and generation adequacy. It is
strictly looking at the specific reserves to be secured by Elia in the context of its
responsibility to ensure the availability of appropriate ancillary services, as defined by the
Electricity Law, (art. 8 1) and the Federal Grid Code (art. 231 and 232).
Elia resolves residual system imbalances in the system while BRPs are responsible for
balancing their perimeter on a 15-minute interval up to real-time and are incentivised to
do so. The Belgian market design allows for and incentivizes- real-time reaction of market
parties (with physical position) on the imbalance prices, thereby reducing residual system
imbalances. This market design is of crucial importance to enable the sustainable
integration of high shares of VRE in the system and to foster the required investments in
system flexibility and accurate intraday forecasting of load (smart metering) and VRE
production by all actors.
The system reserve needs depend on the amount of residual system imbalances and are
therefore highly dependent on the BRP behaviour to balance their perimeter on a 15minute basis. This study takes a strong assumption that BRPs and other market parties will
perform significant additional efforts and investments to increase the system flexibility,
thereby enabling them to balance the increasing shares of VRE in their perimeter, in
addition to significant investments in highly accurate intraday forecasts of VRE production
and system off-take. As such residual system imbalances are minimized and no residual
system imbalances due to a structural lack of system flexibility are therefore considered in
this study.
Adequate and efficient incentives for BRPs to be balanced on a 15-minute basis are of
crucial importance to achieve such a situation, which means that quarter-hourly imbalance
prices must be carefully monitored and their calculation further tuned in the future.
Furthermore it is important that all imbalances are exposed to the imbalance mechanism.
In case such required efforts and investment by market parties in terms of forecasting,
flexibility and market participation are not made (for instance due to lack of incentives),
system reserve needs (and according costs) will rise dramatically as residual system
imbalance will increase. This falls beyond the scope of this study and is therefore not
considered.
The study shows that a high amount of intraday flexibility and of system flexibility on a 15minutes timescale is very important to minimize the increase in system reserve needs.
Whereas there is only a slight increase expected for FCR, depending on the scenario the
needs for FRRa, upward and downward FRRm increase significantly towards 2018.
Especially the increase in downward FRRm is very high, in all simulated scenarios, due to
the introduction of a large positive dimensioning incident, being the outage of the planned
1000 MW HVDC interconnector between Belgium and UK (NEMO) in export mode, and due
to increased forecast errors of VRE.
The study assumes a very efficient de-saturation of FRRa by FRRm. This will require very
flexible FRRm that can be activated on an almost continuous basis. In addition there is a
need for FRRm required to cover rare, but very large, residual imbalances caused by
outages, which can be less flexible.
Under the assumption that at least 3 of the existing CCGT units will still be available in the
system in 2018, existing FCR and FRRa resources will probably allow to cover the FCR and
FRRa needs in all scenarios, although margins are decreasing and become very narrow.
Significant investments in both upward and especially downward FRRm are required
towards 2018 to cover the simulated reserve needs.
The currently high concentration of FCR, FRRa (and in lesser extent FRRm) resources on a
single technology (CCGTs, OCGTs) hinders the economically efficient procurement of
reserves. Therefore a further diversification of reserve resources towards participation of
existing and new power plants, RES (wind, biomass, CHPs) and load is of key importance
to facilitate the market and to enable a more efficient procurement of reserves. This
requires not only investments in the technical capability, but also might require changes in
the regulatory framework, such as smart support schemes for RES and CHP units to
participate in the ancillary services market, and changes in the FCR, FRRa and FRRm
market design.
Page 45 of 56
References
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
CIPU contract:
http://www.elia.be/en/products-and-services/~/media/files/Elia/Products-andservices/ProductSheets/S-Ondersteuning-net/S5_F_CIPU_08_07.pdf
[9]
[10]
[11]
Page 46 of 56
Page 47 of 56
the combination of FRRa and FRRm is used to cover the quarter hourly expected
residual system imbalances;
the FRRa is used to cover the fast imbalances, which in this model are simulated
by the delta between consecutive quarter hourly expected imbalances (volatility of
the residual system imbalance); and
the FRRm de-saturates the FRRa to prepare the FRRa for further imbalances and
supports the FRRa in case of large imbalances.
The total required amount of upward (downward) FRR i.e. the combined volume of FRRa
together with FRRm - is defined as the amount required to cover the expected future
quarter hourly negative (positive) residual imbalances during 99,9% of time, thereby
allowing a deficit probability of 0,1% (8,7 hours/year) for both positive and negative
residual imbalances. The figure below shows this for an arbitrary case. As required by
ENTSOe the N-1 incident acts as a strict minimum for the FRR dimensioning.
The required amount of FRRa is determined as the amount of FRRa that is required to
cover X% of the fast imbalances. These fast imbalances are modelled by the delta between
consecutive quarter hourly expected residual imbalances. This delta is also called the
quarter hourly volatility of the residual system imbalance. This is shown in the picture
below:
Page 48 of 56
The value of X%, being the deficit probability, is chosen based on historical observed
deficit probabilities for FRRa to cover the delta between the residual system imbalances of
consecutive quarter hours together with the observed ACE quality.
Based on historical observations, Elia defines the deficit probability in order to have a
satisfactory ACE quality, according to ENTSOe prescriptions. The monotonous diagram of
the volatility of the residual system imbalances allows to determine the required amount of
FRRa.
In a last stage the amount of FRRm is defined as the difference between the total required
amount of FRR and the amount of FRRa, as shown in the picture below.
Due to the uncertainty on the specifications and availability of the future reserve products
no link is made between the availability of the reserves products and the deficit probability
of covering the imbalances. This means that the resulting volumes are expected to be
available during 100% of the time. In the annual calculation of the required reserve
volumes, Elia is able to calculate equivalent reserve volumes with an availability of less
than 100% of time [1].
Page 49 of 56
Historical imbalances
The model uses the observed system imbalances of 2012 as a baseline, to which additional
imbalances due to:
Page 50 of 56
are added in order to obtain the expected residual system imbalance for 2018.
Periods during which forced outages occurred in 2012 were deleted from the quarter
hourly time-series of the 2012 residual system imbalance, as a separate statistical model
to simulate imbalances caused by outages is incorporated to estimate the required amount
of reserves. This is required as outages only occur rarely, so that the events gathered in
one year do not necessarily represent all possible combinations of outages. The figure
below gives the distribution of the 2012 quarter hourly residual system imbalances
(without forced outages):
The residual system imbalances (absolute) energy slightly decreased in 2012 for the first
time in four years compared to the 2011 case. This is assumed to be the result of better
incentives given by the new imbalance mechanism, as well as due to increased efforts in
monitoring and communication to BRPs. It has to be noted however that in 2012 much
more positive than negative system imbalances occurred. This evolution towards positive
imbalances is observed since a few years and is caused by the increase of RES units in the
system.
Continued efforts of BRPs to improve their forecasting quality of load, VRE and better price
incentives by the new imbalance mechanisms might eventually even reduce the baseline
residual system imbalances. This is taken into account by a correction factor for each
scenario that is simulated.
In the low reserve needs scenario it is expected that, due to better incentives and
increased forecast quality of both load, and the VRE already present in the residual system
imbalance of 2012, the baseline will decrease further in the future. The quarter hourly
time-serie of the residual system imbalances of the baseline is therefore reduced by 5%.
In the high scenario it is expected that, although balancing incentives and forecasting
quality improves, the baseline will remain constant as insufficient system flexibility is
expected to be available to realize the potential of increased forecasting quality.
The following table summarizes the assumptions for the baseline in the different scenarios:
Scenario
Low
-5%
Medium
-3%
High
0%
HVDC interconnector
The planned 1000 MW HVDC interconnector between Elia Belgium and National Grid UK is
expected to be commissioned in 2017 2018. The integration of such an interconnector in
the system will introduce some additional residual imbalances into the system because of:
The figure below shows the origin of imbalance caused by ramping in case hourly energy
blocks are exchanged over the HVDC cable. This is illustrated by the blue line, which shows
the ramping in case of an hourly schedule change from 500 MW import to 300 MW export.
The simultaneous upward or downward ramping of resources within the control area will
partly offset these ramping effects. In order to simulate this behaviour, 2012 hourly
operational data of an interconnector between UK and RG CE was used [9]. The
imbalances were calculated as the quarter hourly difference between the scheduled energy
block and the realized flow due to ramping. Different assumptions are taken for each of the
different scenarios for the size imbalances that actually would occur.
Scenario
Low
10%
Medium
30%
High
50%
The market design for the HVDC interconnector plays an important role on the system
operation. Situations in which a BRP compensates the ramping on an quarter-hourly
energy basis might lead to an overshoot (or undershoot) just before or after the ramping
period itself (shown by the red line in the figure above).
their low probability of occurrence: the baseline of 2012 doesnt take all possible
combinations of outages into account; and
Page 52 of 56
Unit outages
The model for the unit outages is a Monte-Carlo time-series simulation. The following
probabilities for the outages of the 2018 production park are taken into account:
Power plant type
Estimated outages/year
Nuclear units
1,5
For the low and medium reserve needs scenario, due to the expected increase in intraday
market liquidity towards 2018, it is assumed that the full imbalance due to the outage will
persist for 3 hours in the system, after which the BRP restores 15% of the outage per
hour. After 8 hours it is assumed that the full imbalance is dealt with by the BRP, as shown
in the figure below.
Due to the limited assumed intraday flexibility however in the high reserve needs scenario,
it is assumed that in this scenario the full imbalance due to an outage of a unit persists up
to 8 hours in the system.
HVDC interconnector
For the future HVDC interconnector between Belgium and UK, the assumption is made
that, in case of an outage, the full imbalance persists for 8 hours in the system. Afterwards
the imbalances is covered by intraday market deals or by a third BRP party, depending on
the market arrangements to be made18.
The model assumes 2,15 outages of NEMO per year, half of which occur in a situation of
full import (loss of 1000 MW) and half of them which occur in case of full export (excess of
1000 MW).
18
These assumptions have a high uncertainty, as the future market arrangements for the NEMO
interconnector are still unclear.
Page 53 of 56
FO NEMO (import)
FO power plant
FO NEMO (export)
PV forecast errors
In 2012 Elia started publishing a DA aggregated forecast for the installed PV production
output in the Belgian control area. Since the end of March 2013, Elia started also to publish
the real-time up-scaled measurement for the actual PV production output as well as an ID
solar forecast.
For the purpose of this study, the estimated residual forecast error for the PV production is
modelled on operational data of a nearby control area [10], for which a high correlation
exists for the solar forecast error with the Belgian control area. This reference forecast is
an intraday forecast at 8 AM.
Following assumptions on the improvement of solar forecasts and the ability of BRPs to
adjust their position accordingly in the intraday timeframe were made for the different
scenarios.
Scenario
Improvement of
forecast quality
Ability to adjust
position
accordingly in ID
Total estimated
reduction of
forecast error
Low
25%
70%
-18%
Medium
25%
40%
-10%
High
25%
10%
-3%
Page 54 of 56
Scenario
Improvement of (ID)
forecast quality
Ability to adjust
position
accordingly in ID
Total estimated
reduction of
forecast error
Low
40%
70%
-28%
Medium
40%
40%
-16%
High
40%
10%
-4%
The offshore wind forecast error is modelled by combining the day-ahead forecast errors of
Elia and the existing offshore wind parks. Following assumptions were taken for the
different scenarios.
Scenario
Improvement of (ID)
forecast quality
Ability to adjust
position
accordingly in ID
Total estimated
reduction of
forecast error
Low
40%
70%
-28%
Medium
40%
40%
-16%
High
40%
10%
-4%
By doing so it is assumed that the imbalances caused by the cutting-off of offshore wind
parks due to storms are reduced accordingly. This is justified by the fact that such events
are predictable, in which case preventive measures can be taken. Elia will investigate this
further in 2013.
Whether this effect will create residual quarter hourly imbalances in the system depends of
the actual amount of available system flexibility within the hourly timeframe. Currently
day-ahead an intraday markets exchange hourly energy blocks, meaning that the flexibility
within the hour has to be provided by flexible units or demand side management within the
system. Part of these imbalances are also offset by the simultaneous upward/downward
ramping of other units and/or load.
Page 55 of 56
Due to the massive integration of RES it is expected that the current flexible power plants,
able to provide flexibility within the hour timeframe, will be pushed out of the market more
often. Given the hourly resolution of the DA and ID market, flexibility will have to be
provided by the RES units themselves, by demand side management and by the remaining
flexible power plants in the grid.
The following assumptions were taken for the amount of imbalances due to ramping of
wind and PV within the hour for all the different scenarios:
Scenario
Low
10%
Medium
40%
High
70%
In case a liquid 15-minutes intraday market will be available in 2018, it is expected that
this effect will not introduce significant quarter hourly imbalances in the system.