Sei sulla pagina 1di 23

REPORT AND SPECIFICATION

Name of work- Construction of H.L. Bridge across Sarar Nalla


on Darra Patewa Road.

1 Name of Work

:-

2 Cost of Estimate

:-

3 Authority

:-

C.E. Bridge P.W.D. Raipur

4 Budget Provision

:-

5 Necessity

:-

B.I.No. 2314 Grant No. 24/5054 (1222) with budget provision of Rs.35.00 Lakhs.
for year 2015-16.
The Administrative approval of Harinbhatta nalla Bridge is accorded by Govt.of
C.G. vide letter no. F - 17-18/2015/19/tech-2 Dated 22-05-15 for amounting
Rs.513.61 lacs.Hence technical sanction from competent authority is necessary
as per norms of PWD C.G..,estimate has been framed for Rs. 490.23 Lacs.

Provisions
A.

370.01 Lacs

Following provisions have been made in the estimate.

Bridge Proper
1 Type of bridge

:-

High level

2 Length of bridge

:-

135.00 mtr. (9 span@15.00 m each)

3 Overall width

:-

8.40m.

4 Clear Roadway

:-

7.50 m.

5 Type of foundation

:-

Open foundation

6 Type of Sub-structure

:-

1. Pier

- R.C.C. Circular Type

2. Abutment - R.C.C. Box type


7 Type of super Structure

:-

R.C.C. Solid slab

8 Fixed Items

:-

Crash Barrier Railing, wearing coat, Strip seal expansion joint, Name plate etc
complete as per MORT & H Std. Drg.

B.

Approaches
i)

Length of approach road :-

Patewa Side

139.00 M

Darra Side

134.00 M

Total length

273.00 M

ii)

Top of Road width

:-

8.400 M.

iii)

Width of crust

:-

7.50 M

iv)

Thickness of crust

:-

G.S.B. Grade lll

300 mm.

W.M.M.

250 mm

B.M.

50 mm (i/c prime coat & tack coat)

S.D.B.C
v)

Protection work (concrete :block Pitching & PCC Toe


wall)

Patewa Side

= 2 x 119.00 m (i/c circular portion)

Darra Side

= 2 x 114.00 m (i/c circular portion)

Total

Sub Engineer

25 mm

= 2 x 233.00 m.

Specification

:-

MORT&H and IRC specification will be followed for the construction of the bridge.

Rates

:-

For bridge work SOR issued by Engineer-in-Chief C.G.P.W.D. Raipur w.e.f.


01.01.2015 & for road work SOR issued by Engineer-in-Chief C.G.P.W.D. Raipur
w.e.f. 01.01.2015 & amended up to date has been adopted to frame the
estimate.

Sub Divisional Officer


P.W.D. Bridge Const .Sub Div-2
Raipur ( C.G.)

Executive Engineer
P.W.D. Bridge Const. Division
Raipur (C.G.)

GENERAL ABSTRACT
Name of work- Construction of H.L. Bridge across Sarar Nalla
on Darra Patewa Road.
Circle

P.W.D. Bridge Construction Raipur

Division

P.W.D. Bridge Construction Raipur

Length of Bridge

135.00 mtr. ( 9 span@15.00m. Each)

Width of bridge

8.40m

(A)

Bridge proper
(i) Foundation

Rs.

5581025.00

(ii) Sub-Structure

Rs.

4684517.00

(iii) Super-Structure

Rs.

16460971.00

Rs.

26726513.00

Total of (A)
(B)

Approaches

(l) Earth work, crust work,

Rs.

3448909.00

(ii)B.T. work

Rs.

1239660.00

(iii) Protection work

Rs.

5586230.00

Total of (B)

Rs.

10274799.00

Grand Total

Rs.

37001312.00

Rs.

Say

Sub Divisional Officer


P.W.D. Bridge Const .Sub Div-2
Raipur ( C.G.)

370.01 Lacs

Executive Engineer
P.W.D. Bridge Const. Division
Raipur (C.G.)

ABSTRACT
Name of work- Construction of H.L. Bridge across Sarar Nalla on Darra Patewa Road.
s.n
o.
1
1

S.O.R.
ITEM

2
3
CH-2 / Excavation for Structures Earth work in
2.1 / excavation of foundation of structures as
P-13
per drawing and technical specification,
including setting out,
construction of
shoring and bracing, removal of stumps
and other deleterious matter, dressing of
sides and bottom and backfilling with
approved material including dewatering
etc. complete.
I
(i)
II

Descriptions

Ordinary Soil
Upto 3 m depth
Ordinary Rock (not requiring blast)

Quantity

Unit

Rate

Amount

856.073
575.947

cum
cum

175.20
295.20

149984.00
170020.00

155.636
333.097

cum
cum

4613.00
5992.00

717951.00
1995917.00

mt 68693.00

2288143.00

CH-2 / Plain/Reinforced cement concrete in open


2.6/ foundation complete as per drawing and
P-13
technical specifications
A
(i)
(vii)
CH-2 /

Using concrete mixer


PCC Grade M15
RCC Grade M30
Supplying, fitting and placing HSD (High
Strength Deformed Steel) bar reinforcement
2.24/ P- in foundation complete as per drawing and
18
technical specifications as per section
1600.

33.310

CH-2 /

Taking exploratory boring 100 mm dia.


at the location of piers and abutments or
2.25/ P- for high embankments in approaches in all
18
types of strata as per I.R.C. 78-2014 and
section 2400 of specifications for collection
of samples at different depth (rock sample
and undisturbed soil sample) and test
including preserving core samples as per
specifications.
(i)
(ii)
(iii)

upto 1.0 m below bed level


Beyond 1.0 m upto 5.0 depth
Beyond 5.0 depth

10
40
100

each
m
m

5951.00
1300.00
1475.00
total

59510.00
52000.00
147500.00
5581025.00

s.n
o.
1
5

S.O.R.
ITEM

Descriptions

3
SUB STRUCTURE
and
laying
Plain/Reinforced

Quantity

Unit

Rate

Amount

CH-3 / Providing
3.6/ cement concrete in sub-structure complete
P-20
as per drawing and technical specifications
section 1500, 1700 and 2200 (Newly laid
concrete shall be covered by gunny bags).

A
(d)
(iii)
CH-3 /
3.7/
P-21

Height upto 5m
Using concrete mixer
R.C.C. Grade M-30
Supplying, fitting and placing HSD (High
Strength
Deformed
Steel)
bars
reinforcement in sub-structure complete as
per drawing and technical specifications
section 1600 and 2200.

27.654

cum

6370.00

1761565.00

mt 69002.00

1908187.00

CH-3 / Back filling behind abutment, wing wall and


3.9/ return wall complete as per drawing and
P-22
Technical specification 710.1.4 of I.R.C. 78
and 2200.
(i) Granular material

276.541

Providing and laying of Filter media with


granular
materials/stone
crushed
3.10/ P- aggregates satisfying the requirements laid
22
down in clause 2504.2.2. of MORT&H
specifications to a thickness of not less than
600 mm with smaller size towards the soil
and bigger size towards the wall and
provided over the entire surface behind
abutment, wing wall and return wall to the
full height compacted to a firm condition
complete as per drawing and technical
specifications 710.1.4 of I.R.C. 78 and 2200.

704.450

cum

905.00

637527.00

86.520

cum

1926.00

166638.00

210600.00

cucm

1.00
Total

210600.00
4684517.00

CH-3 /

CH-3 /

Supplying, fitting and fixing in position true

to line and level elastomeric bearing


3.14/ Pconforming to IRC: 83 (Part-II) section IX
22
and clause 2005 of MORT&H specifications
complete including all accessories as per
drawing

and

Technical

section 2000 and 2200.

Specifications

s.n
o.
1

S.O.R.
ITEM

Descriptions

3
SUPER STRUCTURE
10 CH-4 / Furnishing
and
Placing
4.1/ Reinforced/Prestressed cement concrete in
P-24 super-structure as per drawing and
Technical Specification sections 1500, 1600
and 1700 (Newly laid concrete shall be
covered by gunny bags).
B

RCC Grade M-30

(i)

For Solid slab super structure

(a)

Using concrete Mixer

(ii)

Height 5m to 10m

Quantity

Unit

Rate

Amount

885.603

cum

7263.00

6432135.00

106.272

mt 70101.00

7449799.00

82.688

cum 11847.00

979599.00

11 CH-4 / Supplying, fitting and placing HSD (High


4.2/
Strength Deformed Steel) bar reinforcement
P-27
in super-structure complete as per drawing
and technical specifications
qty. as per item 4.1* 125 kg/cum
12 CH-4 / Providing and laying Cement concrete
4.4/ wearing
coat
M-30
grade
including
P-27 reinforcement complete as per drawing and
Technical Specifications as per relevant
clause of section 2700.
13 CH-4 /

Providing and fixing for hand railing top of

4.27/ P- crash barrier including cost of material


30
complete as per approved drawing.

294.00

rm

600.00

176400.00

14 CH-4 / Drainage Spouts complete as per drawing


4.9/
P-27
and Technical specifications of section 2705

54

no

2007.00

108378.00

7.519

cum

4437.00

33362.00

25.200

cum

9467.00

238568.00

15 CH-4 /

PCC M15 Grade leveling course below


approach slab complete as per drawing and
4.10/ P- Technical specification and as per relevant
27
section 2700

16 CH-4 /

Providing and laying M-30 grade Reinforced


cement concrete approach slab including
4.11/ Preinforcement and formwork complete as
28
per drawing and Technical specification and
as per relevant sections 1500, 1600, 1700
and 2704

s.n
o.

S.O.R.
ITEM

Descriptions

1
2
17 CH-4 /

3
Strip Seal Expansion Joint (Providing and
laying of a strip seal expansion joint
4.18/ Pcatering to maximum horizontal movement
29
upto 70 mm, complete as per approved
drawings and standard specifi cations to be
installed by the manufacturer/supplier or
their authorized representative ensuring
compliance
to
the
manufacturer's
instructions for installation.)

Quantity

Unit

Rate

Amount

84.000

Rm 11124.00

934416.00

18 CH-4 /

Painting on kerbs in black and yellow


alternate bands including cost of material
4.20/ P- and labour complete as per drawings and
29
specifications as per clause 803.

With Road Marking Point


19 CH-4 / Providing and Fixing of Av. 20mm thick
Granite
plate
including
cutting
and
4.23/ P- polishing and inscribed details as per
29
approved drawing i/c engraving the matter
as desired.
20 CH-4 /

294.000

sqm

56.00

16464.00

no

6600.00

26400.00

77

tonne

Testing of span of bridge for deflection due

to live load with platform for loading


4.24/ Parrangements, apparatus for measurement
30
etc. complete as per drawing and
specifications (As per IRC : SP-51)

Sub
Engineer

Sub Divisional Officer


P.W.D. Bridge Const .Sub Div
Dhamtari ( C.G.)

850.00
65450.00
TOTAL 16460971.00
Grand total 26726513.00

Executive Engineer
P.W.D. Bridge Const. Division
Raipur (C.G.)

DETAILED ESTIMATE
Name of work- Construction of H.L. Bridge across Sarar Nalla on Darra
Patewa Road.
Length of bridge

135.00 m. @ 9 span 15.00 each

Width of bridge

8.40 m

Formation level

R.L. 104.425 m

Soffit level

R.L. 103.500 m

High flood level

R.L. 102.000 m

Av. Ground level for abutments

R.L.

99.880 m

R.L.

99.425 m

R.L.

96.985 m

R.L. 95.000 m

R.L. 95.000 m

P4 & P5

R.L. 94.500 m

P6,P7&P8

R.L. 95.500 m

Av. Ground level for Piers


Av.Rock level
Foundation level

A1 & A2

P1,P2 & P3

s.n
o

S.O.R.
ITEM

CH-2 /
2.1 /
P-13

I
(i)

Descriptions

No.

H/D

Quantity

Unit

Excavation for Structures Earth work in


excavation of foundation of structures as
per drawing and technical specification,
including setting out,
construction of
shoring and bracing, removal of stumps
and other deleterious matter, dressing of
sides and bottom and backfilling with
approved material including dewatering
etc. complete.

Ordinary Soil
Upto 3 m depth
Av. Ground level R.L.99.880 m
Abutment A1& A2 (Patewa& Darra side)
(R.L.99.880 m to R.L.96.985 m)

6.850

8.700

2.895

345.055

cum.

(5.3)2

2.895
Total

511.018
856.073

cum.
cum.

8.700

1.985

236.592

cum.

Pier P1 to P8
(R.L.99.880 m to R.L.96.985 m)
II

3.14/4

Ordinary Rock (not requiring


blasting)
Abutment A1& A2 (Patewa& Darra side)
(R.L.96.985 m to R.L.95.000 m)

6.850

Pier P1 to P3
(R.L.96.985 m to R.L.95.000 m)

3.14/4

(5.3)2

1.985

131.395

cum.

3.14/4

(5.3)2

2.485

109.662

cum.

3.14/4

(5.3)2

1.485
Total

98.298
575.947

cum.
cum.

2
8

6.850
3.14/4

8.700
(5.3)2

0.150
0.150

17.879
26.478

cum.
cum.

2
8

30.500
3.14/4

0.300
(5.3)2

1.500
1.500
( - )

27.450
264.776
-172.802

cum.
cum.
cum.

Pier P4 to P5
(R.L.96.985 m to R.L.94.500 m)

Pier P6 to P8
(R.L.96.985 m to R.L.95.500 m)

CH-2 /
2.6/
P-13
A
(i)

Plain/Reinforced cement concrete in


open foundation complete as per drawing
and technical specifications
Using concrete mixer
PCC Grade M15
Levelling course
A1 & A2

P1 to P8
Trench filling
A1 & A2

P1 to P8
Deduct footing

s.n
o

S.O.R.
ITEM

(vii)

Descriptions

No.

(1.800)2

0.400
Total

6.550

Unit

33.012

cum.

0.300
4
8.400
0.250
2
8.400
0.300
4
5.700
0.250
4
5.700
(5.00)2
8 3.14/4
8x1/2 3.14/4*(5.0*5.0+
2.0*2.0)

3.500
3.500
3.500
3.500

35.280
14.700
23.940
19.950

cum.
cum.
cum.
cum.

0.600

94.260

cum.

0.500

45.530

cum.

Pier P1 to P8

3.14/4

Quantity

0.300

RCC Grade M30


Footing
Abutment A1 & A2
Abutment A1 & A2 wall

Side
Inter

H/D

cum.
cum.

-8

Front & back


inner

-8.144
155.636

Pier Soft

(R.L.95.400 m to R.L.98.900 m)

8.400

Pier shaft P1 to P3
(R.L.96.100 m to R.L.99.425 m)

3.14/4

(1.80)2

3.325

25.387

cum.

3.14/4

(1.80)2

3.825

19.469

cum.

3.14/4

(1.80)2

2.825
Total

Pier P4 & P5
(R.L.95.600 m to R.L.99.425 m)

Pier P6 to P8
(R.L.96.600 m to R.L.99.425 m)

CH-2 /
2.24/ P18

Supplying, fitting and placing HSD (High


Strength
Deformed
Steel)
bar
reinforcement in foundation complete as
per drawing and technical specifications as
per section 1600.
33309.702 Kg
33.310
M.T.

iten no.2.6 (vii) @ 100 kg. / cum


4

CH-2 /
2.25/ P18

(i)
(ii)
(iii)

CH-3 /
3.6/
P-20

A
(b)
(iii)

21.569
cum.
333.097

Taking exploratory boring 100 mm


dia. at the location of piers and abutments
or for high embankments in approaches in
all types of strata as per I.R.C. 78-2014 and
section 2400 of specifications for collection
of samples at different depth (rock sample
and undisturbed soil sample) and test
including preserving core samples as per
specifications.
upto 1.0 m below bed level
Beyond 1.0 m upto 5.0 depth
Beyond 5.0 depth
A1,A2,P1 to P3
P4 & P5
Pier P6 to P8

10
10

1
4

10
40

5
2
3

5
5
5
Total

25
10
15
100

nos.
m.
m.
m.
m.
m.

SUB STRUCTURE
Providing and laying Plain/Reinforced
cement concrete in sub-structure complete
as per drawing and technical specifications
section 1500, 1700 and 2200 (Newly laid
concrete shall be covered by gunny bags).
Height upto 5m
Using concrete Mixer
R.C.C. Grade M-30
Abutment A1 & A 2 wall
(R.L.99.880 m to R.L.102.600 m)

Front & back


inner
Side
Inter

4
2
4
4

8.400
8.400
5.700
5.700

0.300
0.250
0.300
0.250

2.720
2.720
2.720
2.720

27.418
11.424
18.605
15.504

cum.
cum.
cum.
cum.

2
6
2

8.400
0.700
8.400

1.150
0.550
0.300

0.400
0.461
1.100

7.728
1.065
5.544

cum.
cum.
cum.

(R.L.102.600 m to R.L.104.100 m)
Cap
pedestal

Dirt wall

s.n
o

S.O.R.
ITEM

Descriptions

No.

back
inner

Side
Inter

2
2
4
4

Pier P1 to P8

8.400
8.400
5.150
5.150

H/D

Quantity

Unit

0.300
0.250
0.300
0.250

1.500
1.500
1.500
1.500

7.560
6.300
9.270
7.725

cum.
cum.
cum.
cum.

(1.80)2

1.675

34.103

cum.

1.800
1.800
1.800
0.550

0.400
0.600
0.900
0.461

10.368
53.568
51.840
8.519

cum.
cum.
cum.
cum.

276.541

cum.

Pier Shaft
(R.L.99.425 m to R.L.101.100 m)
(R.L.99.300 m to R.L.101.700 m)
Squarehead
Cap

8
8
8
48

pedestal

3.14/4
1.800
6.200
4.000
0.700

Total
6

CH-3 /
3.7/
P-21

Supplying, fitting and placing HSD (High


Strength
Deformed
Steel)
bars
reinforcement in sub-structure complete as
per drawing and technical specifications
section 1600 and 2200.
27654.086 kg
27.654
M.T.

iten no.6 (iii) @ 100 kg. / cum


7

CH-3 /
3.9/
P-22

Back filling behind abutment, wing wall


and return wall complete as per drawing
and Technical specification 710.1.4 of I.R.C.
78 and 2200.
(i) Granular material
(R.L.95.40 m to R.L.102.600 m)

A1 & A2
(R.L.102.600 m to R.L.104.000 m)

A1 & A2

CH-3 /
3.10/ P22

CH-3 /
3.14/ P22

2.850
2.850

2.450
2.400

7.200
7.200

402.192
196.992

cum.
cum.

4
2
4
2

2.850
2.850
2.300
2.300

2.450
2.400
2.450
2.400

1.400
1.400
1.400
1.400
Total

39.102
19.152
31.556
15.456
704.450

cum.
cum.
cum.
cum.
cum.

17.500

0.600

4.120
Total

86.520
86.520

cum.
cum.

54

40.000

25.000

3.900

210600.000

cucm.

Providing and laying of Filter media with


granular
materials/stone
crushed
aggregates satisfying the requirements laid
down in clause 2504.2.2. of MORT&H
specifications to a thickness of not less
than 600 mm with smaller size towards the
soil and bigger size towards the wall and
provided over the entire surface behind
abutment, wing wall and return wall to the
full height compacted to a firm condition
complete as per drawing and technical
specifications 710.1.4 of I.R.C. 78 and
2200.
(R.L.99.880 m to R.L.104.000 m)

8
4

Supplying, fitting and fixing in position true


to line and level elastomeric bearing
conforming to IRC: 83 (Part-II) section IX
and clause 2005 of MORT&H specifications
complete including all accessories as per
drawing and Technical Specifications
section 2000 and 2200.
SUPER STRUCTURE

s.n
o

S.O.R.
ITEM

10

CH-4 /
4.1/
P-24

B
(i)
(a)
(ii)

Descriptions

RCC Grade M-30


For Solid slab super structure
Using concrete Mixer
Height 5m to 10m
mid portion
Crash barrier

CH-4 /
4.2/
P-27

H/D

15.000

6.000

0.888

719.280

18

15.000

1.200

0.188

74.448

147.000

0.450

0.300

39.690

147.000

0.350

0.250

25.725

147.000

0.225

0.400

26.460

CH-4 /
4.4/
P-27

Total

885.603

Providing and laying Cement


wearing coat M-30 grade
reinforcement complete as per
and Technical Specifications
relevant clause of section 2700.
on slab

concrete
including
drawing
as per

13 CH-4 / Providing and fixing for hand railing


top of crash barrier including cost of
4.27/ material complete as per approved
P-30 drawing.

9
2

15.000
6.000

147.000

7.500
7.500

0.075
0.075
Total

Total
14

CH-4 /
4.9/
P-27

Drainage Spouts complete as per drawing


and Technical specifications of section
2705

15

CH-4 /

PCC M15 Grade leveling course below


approach slab complete as per drawing
and Technical specification and as per
relevant section 2700

16

CH-4 /
4.11/ P28

17

CH-4 /
4.18/ P29

cum.

106272.3600
106.2724 M.T.

on Approach

4.10/ P27

Unit

Supplying, fitting and placing HSD (High


Strength
Deformed
Steel)
bar
reinforcement in super-structure complete
as per drawing and technical specifications
qty. as per item 4.1* 120 kg/cum

12

Quantity

Furnishing
and
Placing
Reinforced/Prestressed cement concrete in
super-structure as per drawing and
Technical Specification sections 1500, 1600
and 1700 (Newly laid concrete shall be
covered by gunny bags).

cantiveler

11

No.

75.938 cum.
6.750 cum.
82.688 cum.

294.000 Rm
294.000 m.

54

nos.

7.300

5.150

0.100

7.519 cum.
7.519 cum.

8.400

6.000

0.250

25.200 cum.

10

8.400

Providing and laying M-30 grade Reinforced


cement concrete approach slab including
reinforcement and formwork complete as
per drawing and Technical specification
and as per relevant sections 1500, 1600,
1700 and 2704
Strip Seal Expansion Joint (Providing and
laying of a strip seal expansion joint
catering to maximum horizontal movement
upto 70 mm, complete as per approved
drawings and standard specifi cations to be
installed by the manufacturer/supplier or
their authorized representative ensuring
compliance
to
the
manufacturer's
instructions for installation.)
84.000 m.

s.n
o

18

S.O.R.
ITEM
CH-4 /
4.20/ P29

19

CH-4 /
4.23/ P29

20

CH-4 /
4.24/ P30

Descriptions

No.

H/D

Quantity

Unit

Painting on kerbs in black and yellow


alternate bands including cost of material
and labour complete as per drawings and
specifications as per clause 803.
With Road Marking Paint
Providing and Fixing of Av. 20mm thick
Granite plate including cutting and
polishing and inscribed details as per
approved drawing i/c engraving the matter
as desired.

147.000 -

2*2

294.000 m.

nos.

Testing of span of bridge for deflection due


to live load with platform for loading
arrangements, apparatus for measurement
etc. complete as per drawing and
specifications (As per IRC : SP-51)
1

Sub
Engineer

77.000

77.000 MT

Sub Divisional Officer


P.W.D. Bridge Const .Sub Division dhamtari

ABSTRACT OF APPROACHES WORK


Name of work- Construction of H.L. Bridge across Sarar Nalla
Darra Patewa Road.
S.
n
o.

S.O.R.
ITEM

Descriptions

1
2
3
1 CH-3 /
Construction of embankment with Material
3.12 / P- Obtained from Borrow Pits/Borrow Area
12
(Construction of embankment with approved
material/selected soil having C.B.R.>5 (unless
specified otherwise in the contract) obtained
from borrow pits with all lifts and leads,
transporting to site, spreading, grading to
required slope and compacting to meet
requirement of table 300-2)

on

Quantity

Unit

Rate

Amount

7531.278

cum.

223.00

1679475.00

614.250

cum.

460.00

282555.00

1036.875

cum.

1434.00
Total

1486879.00
3448909.00

2047.500

sqm

64.00

131040.00

2 CH-4 /
Granular Sub-base as per Table:- 400-1
4.1/ P-15
Construction
of
granular
sub-base
by
providing graded Material, , carriage of mixed
Material to work site, spreading in uniform
layers with motor grader on prepared surface
watering, rolling and compacting with
vibratory power roller at OMC to achieve the
desired density, complete as per clause 401

By Mix in place method


Disintegrated rock i.e moorum having CBR
value not less than 20 and P.I. and L.L. not
more than 6 and 20 respectively.
(For
only)
Wet Village
Mix roads
Macadam
(Providing,
laying,
3 CH-4 /
4.10/ P- spreading and compacting graded stone
20
aggregate to wet mix acadam specification
including premixing the Material with water at
OMC in mechanical mix plant carriage of
mixed aterial by tipper to site, laying in
uniform layers with paver in sub- base / base
course on well prepared surface and
compacting with vibratory roller to achieve
the desired density as per clause 406.)

Prime coat (Providing and applying primer


4 CH-5 /
5.1/ P-19 coat with oil based bitumen emulsion (SS-1,
grade confirming to IS:8887) on prepared
surface of granular Base including clearing of
road surface and spraying primer using
mechanical means as per clause 502.
5 CH-5 /
5.2 (ii)/
P-19

(i) on WBM/WMM surface @0.85 Kg/sqm.


Tack coat Providing and applying tack coat
with
bitumen
emulsion
(RS-1,
grade
confirming to IS:8887) using emulsion
pressure
distributor
on
the
prepared
bituminous/granular surface cleaned with
mechanical broom and as per clause 503.

S.
n
o.

S.O.R.
ITEM

6 CH-5 /
5.3 (ii)/
P-21 19

Descriptions

Quantity

Unit

Rate

Amount

3
(ii) Granular surfaces treated with primes @
0.30 kg /Sqm

2047.500

sqm

17.00

34808.00

102.375

cum.

6255.00

640356.00

51.188

cum.

8468.000

433456.00

Total

1239660.00

2173183.00

Bituminous Macadam (Providing and laying


bituminous macadam as per clause 504 with
mixed prepared in minimum 40-60 TPH
capacity hot mix plant using crushed
aggregates of specified grading premixed with
bituminous binder, transported to site, laid
over a previously prepared surface with paver
finisher to the required grade, level and
alignment and rolled to achieve the desired
compaction)

B(ii) for Grading-II(19 mm nominal maximum size,


bitumen content 3.40%)
Semi-Dense Bituminous Concrete (Providing
7 CH-5 /
5.20 A and laying semi-dense bituminous concrete
(iii)/ P-24 with minimum 40-60 TPH capacity using
crushed aggregates of specified grading,
premixed with bituminous binder @ 4.50 to 5
% of mix and filler, transporting the hot mix to
work site, laying with a hydrostatic paver
finisher with sensor control to the required
grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers
to achieve the desired compaction as per
MORT&H specification clause No. 508
complete in all respects)

B
(iii)

With Mechanical paver finisher


for grading lI (10 mm nominal size) with
bitumen 5.0%

Providing and laying Pitching Stone/Boulder on


8 CH-9 /
9.11/ P- slopes laid over prepared filter media
40
including boulder apron laid dry in front of toe
of embankment complete as per drawing and
Technical specifications as per clause 2504.
Quantity as per enclosed sheed
9 CH-9 /
Providing
and
laying
Filter
material
9.12/ P- underneath pitching in slopes complete as per
40
drawing and Technical specification including
trimming of slopes to proper profile and
preparation of bed and as per clause 2504.

900.615

cum.

2413.000

Quantity as per enclosed sheed

450.307

cum.

2079.000
Total
Total

Sub
Engineer

Sub Divisional Officer


P.W.D. Bridge Const .Sub Div-2
Raipur ( C.G.)

936189.00
3109372.00
7797941.00

Executive Engineer
P.W.D. Bridge Const. Division
Raipur (C.G.)

DETAILED ESTIMATION OF APPROACHES WORK

Name of work- Construction of H.L. Bridge across Sarar Nalla


Darra Patewa Road.
s
no
.
1

S.O.R.
ITEM

Descriptions

CH-3 /
3.12 / P12

Construction of embankment with


Material
Obtained
from
Borrow
Pits/Borrow Area (Construction of
embankment
with
approved
material/selected soil having C.B.R.>5
(unless specified otherwise in the
contract) obtained from borrow pits
with all lifts and leads, transporting to
site, spreading, grading to required
slope and compacting to meet
requirement of table 300-2)

CH-4 /
4.1/ P15

Granular Sub-base as per Table:- 400-

No.

on

H/D

Sheet attached
2

CH-4 /
4.10/ P20

CH-5 /
5.1/ P19

7531.278

Cum

312.750
301.500
614.250

cum.
cum.

Construction of granular sub-base by


providing graded Material, , carriage
of mixed Material to work site,
spreading in uniform layers with
motor grader on prepared surface
watering, rolling and compacting with
By
Mix in power
place method
vibratory
roller at OMC to
Disintegrated
rock i.e
moorum
having
achieve the desired
density,
complete
CBR
value
not
less
than
20
and
P.I.
as per clause 401
and L.L. not more than 6 and 20
respectively.
(For Village roads only)
1
1

139.000
134.000

7.500
7.500

0.300
0.300
Total

1
1

224.000
329.000

7.500
7.500

0.250
0.250
Total

1
1

139.000
134.000

7.500
7.500

Wet Mix Macadam (Providing, laying,


spreading and compacting graded
stone aggregate to wet mix acadam
specification including premixing the
Material with water at OMC in
mechanical mix plant carriage of
mixed aterial by tipper to site, laying
in uniform layers with paver in subbase / base course on well prepared
surface and compacting with vibratory
roller to achieve the desired density
as per clause 406.)
Bharuadih side
Harinbhatta side

Unit

Patewa side
Darra side
3

Quantity

420.000
616.875 cum.
1036.875 cum.

Prime coat (Providing and applying


primer coat with oil based bitumen
emulsion (SS-1, grade confirming to
IS:8887) on prepared surface of
granular Base including clearing of
road surface and spraying primer
using mechanical means as per
clause 502.
(i)
on WBM/WMM surface @0.85
Kg/sqm.
Patewa side
Darra side

1042.500
1005.000 cum.
Total 2047.500 cum.

s
no
.
5

S.O.R.
ITEM

Descriptions

CH-5 /
5.2 (ii)/
P-19

Tack coat Providing and applying tack


coat with bitumen emulsion (RS-1,
grade confirming to IS:8887) using
emulsion pressure distributor on the
prepared bituminous/granular surface
cleaned with mechanical broom and
as per clause 503.

No.

H/D

Quantity

Unit

1
1

139.000
134.000

7.500
7.500

1
1

139.000
134.000

7.500
7.500

0.050
0.050
Total

52.125
50.250
102.375

cum.
cum.

1
1

139.000
134.000

7.500
7.500

0.025
0.025
Total

26.063
25.125
51.188

cum.
cum.

(ii) Granular surfaces treated with


primes @ 0.30 kg /Sqm
Patewa side
Darra side
6

CH-5 /
5.3 (ii)/
P-21 19

B(ii)

CH-5 /
5.20 A
(iii)/ P-24

B
(iii)

CH-9 /
9.11/ P40

1042.500
1005.000 cum.
Total 2047.500 cum.

Bituminous Macadam (Providing and


laying bituminous macadam as per
clause 504 with mixed prepared in
minimum 40-60 TPH capacity hot mix
plant using crushed aggregates of
specified grading premixed with
bituminous binder, transported to
site, laid over a previously prepared
surface with paver finisher to the
required grade, level and alignment
and rolled to achieve the desired
compaction)
for Grading-II(19 mm nominal
maximum size, bitumen content
3.40%)
Patewa side
Darra side
Semi-Dense
Bituminous
Concrete
(Providing and laying semi-dense
bituminous concrete with minimum
40-60 TPH capacity using crushed
aggregates of specified grading,
premixed with bituminous binder @
4.50 to 5 % of mix and filler,
transporting the hot mix to work site,
laying with a hydrostatic paver
finisher with sensor control to the
required grade, level and alignment,
rolling with smooth wheeled, vibratory
and tandem rollers to achieve the
desired compaction as per MORT&H
specification clause No. 508 complete
in all respects)
With Mechanical paver finisher
for grading lI (10 mm nominal size)
with bitumen 5.0%
Patewa side
Darra side
Providing
and
laying
Pitching
Stone/Boulder on slopes laid over
prepared
filter
media
including
boulder apron laid dry in front of toe
of embankment complete as per
drawing and Technical specifications
as per clause 2504.
(B) Cement Concrete blocks of size
0.3x0.3 x0.3 m cast in cement
concrete of Grade M15

cum.

s
no
.

S.O.R.
ITEM

Descriptions
Quantity as per enclosed sheed

CH-9 /
9.12/ P40

No.

H/D

Quantity

Unit

900.615

cum.

450.307

cum.

Providing and laying Filter material


underneath
pitching
in
slopes
complete
as per drawing and
Technical
specification
including
trimming of slopes to proper profile
and preparation of bed and as per
clause 2504.
Quantity as per enclosed sheed

Sub
Engineer

Sub Divisional Officer


P.W.D. Bridge Const .Sub Div.Dhamtari

ABSTRACT OF TOE WALL


Name of work- Construction of H.L. Bridge across Sarar Nalla
on Darra Patewa Road..
S.n
o.

1
1

S.O.R.
ITEM

2
3
CH-2 / Excavation for Structures Earth
2.1 work in excavation of foundation of
/ P-13 structures as per drawing and
technical specification, including
setting out,
construction of
shoring and bracing, removal of
stumps and other deleterious
matter,
dressing of sides and
bottom
and
backfilling
with
approved
material
including
dewatering etc. complete.

A
2

Descriptions

(i)
CH-2 /
2.6
/ P-14

Quantit
y
4

Rate
5

Ordinary soil
763.200 cum.
Upto 3 m depth
Plain/Reinforced cement concrete
in open foundation complete as
per
drawing
and
technical
specifications

Using concrete mixer

(i)

PCC Grade M15

512.775 cum.

146.000

4613.000
Total

Sub
Engineer

Sub Divisional Officer


P.W.D. Bridge Const .Sub Div-2
Raipur ( C.G.)

Executive Engineer
P.W.D. Bridge Const. Division
Raipur (C.G.)

s Sarar Nalla
ad..
Amount
7

111427.00

2365431.00
2476858.00

ve Engineer
ge Const. Division
pur (C.G.)

DETAILED ESTIMATION OF TOE WALL


Name of work- Construction of H.L. Bridge across Sarar Nalla
Darra Patewa Road..
s
S.O.R.
no
Descriptions
No
ITEM
.
1 CH-2 / Excavation for Structures Earth work in
2.1 / excavation of foundation of structures as
P-13
per drawing and technical specification,
including setting out, construction of
shoring and bracing, removal of stumps
and other deleterious matter, dressing
of sides and bottom and backfilling with
approved material including dewatering
etc. complete.

on

H/D

Quantity

Unit

135.00

1.20

1.20

388.80

cum

130.00

1.20
1.20
Total

374.40
763.20

cum
cum

135.00

1.20

0.30

97.20

135.00

0.450

1.35

164.03

130.00

1.20

0.30

93.60

130.00

0.450

1.35

157.95

Ordinary soil
(i)

Upto 3 m depth
Patewa Side i/c Circular portion
119.00 m + 16.00 =135.00
Darra Side i/c Circular portion
114.00 m + 16.00 =130.00

CH-2 / Plain/Reinforced cement concrete in


2.6 / open foundation complete as per
P-14
drawing and technical specifications

Using concrete mixer


(i)

PCC Grade M15


Patewa Side i/c Circular portion

Darra Side i/c Circular portion

Total

Sub Engineer

512.78

Sub Divisional Officer


P.W.D. Bridge Const .Sub Div.no. 2
Raipur ( C.G.)

cum

CALCULATION FOR QUANTITY OF E / W

Name of work- Construction of H.L. Bridge across Sarar Nalla on Darra -Patewa Road.
(A) Patewa side
Chainage

Ground
level

Formation
level

Depth/
Height

Topwidth

Bottom
width

Av.Width

Area

81.00

100.230

104.425

4.195

10.000

26.780

18.390

77.146

90.00
100.00
120.00
140.00
160.00
180.00
200.00
220.00

100.205
100.180
100.030
100.880
101.080
101.380
101.500
102.000

104.425
104.239
103.867
103.495
103.123
102.751
102.379
102.000

4.220
4.059
3.837
2.615
2.043
1.371
0.879
0.000

10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000

26.880
26.236
25.348
20.460
18.172
15.484
13.516
10.000

18.440
18.118
17.674
15.230
14.086
12.742
11.758
10.000

77.817
73.541
67.815
39.826
28.778
17.469
10.335
0.000

1)

conical portion
Deduct crust
Deduct concrete block
Deduct filter media

Av. Area

-77.481
75.679
70.678
56.684
34.302
23.123
13.902
5.168

Length

Quantity

-9.000
10.000
20.000
20.000
20.000
20.000
20.000
20.000
TOTAL

697.333
756.789
1413.561
1133.674
686.041
462.470
278.046
103.353
5531.266

2x3.14x(7.2)2x4.195
4
139.000

7.500

341.426

0.625

(-)

attached sheet
attached sheet

(-)
(-)
Net Quantity

Sub Engineer

Sub Divisional Officer


P.W.D. Bridge Const .Sub Division Dhamtari

M3
M3

651.563
496.762
248.381
4475.987

M3

CALCULATION FOR QUANTITY OF E / W

Name of work- Construction of H.L. Bridge across Sarar Nalla on Darra -Patewa Road.
(B) Darra side
Chainage

Ground
level

Formation
level

Depth/
Height

Topwidth

Bottom
width

Av.Width

Area

66.00

99.530

104.425

4.895

10.000

29.580

19.790

96.872

75.00
80.00
100.00
120.00
140.00
160.00
180.00
200.00

100.880
100.930
101.100
101.200
101.430
101.610
101.800
102.000

104.425
104.328
103.940
103.552
103.164
102.776
102.388
102.000

3.545
3.398
2.840
2.352
1.734
1.166
0.588
0.000

10.000
10.000
10.000
10.000
10.000
10.000
10.000
10.000

24.180
23.592
21.360
19.408
16.936
14.664
12.352
10.000

17.090
16.796
15.680
14.704
13.468
12.332
11.176
10.000

60.584
57.073
44.531
34.584
23.354
14.379
6.571
0.000

1)

portion

Av. Area

-78.728
58.828
50.802
39.558
28.969
18.866
10.475
3.286

Length

Quantity

-9.000
5.000
20.000
20.000
20.000
20.000
20.000
20.000
TOTAL

708.552
294.142
1016.040
791.150
579.373
377.326
209.506
65.715
4041.805

2x3.14x(9.85) x4.925
4
Deduct crust

329.000

5.500

750.202

0.625

(-)

1130.938
403.853

Deduct concrete block

attached sheet

(-)

Deduct concrete block

attached sheet

(-)
TOTAL
TOTAL (A+B)

Sub Engineer

M3

Sub Divisional Officer


P.W.D. Bridge Const .Sub Division Dhamtari

201.926
3055.291
7531.278

M3

CALCULATION QUANTITY OF PITCHING & FILTER MEDIA

Name of work- Construction of H.L. Bridge across Sarar Nalla on Darra -Patewa Road.
(A) Patewa side
Chainage
81.00
90.00
100.00
120.00
140.00
160.00
180.00
200.00
220.00

Ground Formation
level
level
100.230
104.425
100.205
104.425
100.180
104.239
100.030
103.867
100.880
103.495
101.080
103.123
101.380
102.751
101.500
102.379
102.000
102.000

Depth
4.195
4.220
4.059
3.837
2.615
2.043
1.371
0.879
0.000

Av. Depth
0.000
4.208
4.139
3.948
3.226
2.329
1.707
1.125
0.440

Sxd
0.000
8.415
8.279
7.896
6.452
4.658
3.414
2.250
0.879

Add for conical portion near abutment


Quantity of Concrete block
Quantity of Filter Media

Sub Engineer

=
=

slant
Length
Height
0.000
0.000
9.408
9.000
9.256
10.000
8.828
20.000
7.214
20.000
5.208
20.000
3.817
20.000
2.516
20.000
0.983
20.000
Total Area

side

Area
0
2
2
2
2
2
2
2
2

2X1/4X3.14X9.51x10.63
TOTAL AREA
2207.679 x 0.300
2207.679 x 0.150

Sub Divisional Officer


P.W.D. Bridge Const .Sub Division Dhamtari

0.000
169.349
185.124
353.120
288.542
208.312
152.679
100.623
39.310
1497.059
158.814
1655.873
496.762
248.381

Unit
--

Sq.m.
Sq.m.
Cu.m
Cu.m

CALCULATION QUANTITY OF PITCHING & FILTER MEDIA

Name of work- Construction of H.L. Bridge across Sarar Nalla on Darra -Patewa Road.
(B) Darra side
Chainage
66.00
75.00
80.00
100.00
120.00
140.00
160.00
180.00
200.00

Ground
level
99.530
100.880
100.930
101.100
101.200
101.430
101.610
101.800
102.000

Formation
level
104.425
104.425
104.328
103.940
103.552
103.164
102.776
102.388
102.000

Depth

Av. Depth

Sxd

4.895
3.545
3.398
2.840
2.352
1.734
1.166
0.588
0.000

0.000
4.220
3.472
3.119
2.596
2.043
1.450
0.877
0.294

0.000
8.440
6.943
6.238
5.192
4.086
2.900
1.754
0.588

Add for conical portion near abutment


Quantity of Concrete block
Quantity of Filter Media
Total (A+B)

Sub Engineer

=
=
=
=

slant
Length
Height
0.000
0.000
9.436
9.000
7.763
5.000
6.974
20.000
5.805
20.000
4.568
20.000
3.242
20.000
1.961
20.000
0.657
20.000
Total Area
2X1/4X3.14X11.01x4.925

side

Area

2
2
2
2
2
2
2
2
2

0.000
169.852
77.625
278.972
232.193
182.731
129.692
78.441
26.296
1175.803

TOTAL AREA
2817.967 x 0.300
2817.967 x 0.150
Quantity of Concrete block
Quantity of Filter Media

Sub Divisional Officer


P.W.D. Bridge Const .Sub Division Dhamtari

Unit
--

170.373

Sq.m.

1346.175
403.853
201.926
900.615
450.307

Sq.m.
Cu.m
Cu.m
Cu.m
Cu.m

Potrebbero piacerti anche