Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
DPPU SEPINGGAN
CALCULATION FOUNDATION
Doc. No : SPG-CAL-50.014
Job No : Rev. No : 1
Page 1 of 10
OWNER
CONTRACTOR
LOCATION
PROJECT NAME
REV.
NO
DATE
DESCRIPTION
PREPD
CHKD
APPD
10 Nov 2015
OMP
ARI
SWD
Doc. No : SPG-CAL-50.014
Job No : Rev. No : 1
REV. NO
DATE
DESCRIPTION
Page 2 of 10
Doc. No : SPG-CAL-50.014
Job No : Rev. No : 1
Page 3 of 10
Table of Contents
Revision Control Sheet.............................................................................................................................. 2
Table of Contents...................................................................................................................................... 3
List of Tables............................................................................................................................................. 3
1. General.................................................................................................................................................. 4
1.1. Background........................................................................................................................................ 4
1.2. Scope................................................................................................................................................. 4
1.3. Codes and Standards......................................................................................................................... 4
1.4. Material Specification......................................................................................................................... 4
1.4.1. Concrete.......................................................................................................................................... 4
1.4.2. Reinforcing Steel Bar...................................................................................................................... 5
1.4.3. Soil Bearing Capacity and Pile Grup Capacity................................................................................5
2. Equipment Data..................................................................................................................................... 7
2.1. Equipment Sizing............................................................................................................................... 7
2.2. Computing External Load................................................................................................................... 7
2.2.1. Dead Load....................................................................................................................................... 7
2.3. Structure Model.................................................................................................................................. 8
2.4. Node Numbers................................................................................................................................... 8
2.5. 3D Section.......................................................................................................................................... 9
3. Loading Combination............................................................................................................................. 9
3.1. Unfactored Load Combnation........................................................................................................... 9
3.2. Factored Load Combnation............................................................................................................. 10
4. Computation of External Load............................................................................................................. 10
5. Pond Design........................................................................................................................................ 10
List of Tables
Table 1.4.1. Material Class Strength.......................................................................................................... 2
Table 1.4.2.SNI 07-2052-2002 bar designation number, section area, weight..........................................2
APPENDIX 1 External Loading Calculation
APPENDIX 2 Pond Design
APPENDIX 3 Valve Chamber Drawing
Doc. No : SPG-CAL-50.014
Job No : Rev. No : 1
Page 4 of 10
1. General
1.1. Background
PT Pertamina plans to carryout the EPC of DPPU Sepinggan Air port expansion project located in
Balikpapan, East of Kalimantan.
1.2. Scope
This calculation shall include, but are not limited to design strength and stability, soil and foundation
analysis and material take off.
ASCE/SEI 7-10
American Society of Civil Engineers
Minimum Design Loads for Building and Other Structures.
fc = 29.4 MPa
fc = 13.7 MPa
c = 2.4 Ton/m3
Ec = 4700fc
= 300 Kg/cm2
= 140 Kg/cm2
= 0.20
= 0.0024 Kg/cm3
= 4700 (29.4) = 25485 MPa
= 2.6 x 106 Kg/cm2
CALCULATION FOUNDATION
Job No : -
Rev. No : 1
Page 5 of 10
390
235
4000
2400
560
380
5700
3900
Deformed
Diameter
mm
Area
cm2
Weight kg/m
Diameter
mm
Area
cm2
Weight
kg/m
0.2827
0.222
0.2827
0.222
0.5027
0.395
0.5027
0.395
10
0.7854
0.617
10
0.7854
0.617
12
1.131
0.888
13
1.327
1.040
14
1.539
1.120
16
2.011
1.580
16
2.011
1.580
19
2.835
2.230
19
2.835
2.230
22
3.801
2.980
22
3.801
2.980
25
4.909
3.850
25
4.909
3.850
29
6.625
5.180
10
28
6.158
4.830
32
8.042
6.310
11
32
8.042
6.310
36
10.180
7.990
Doc. No : SPG-CAL-50.014
Job No : Rev. No : 1
Page 6 of 10
Pcap
= 97.2 Ton
= 12 m
Z
(D4 d4 )
32 D
Section modulus Z
= 5321748 mm3
Effective prestress fps
Concrete compression f'c
strength of piles
Doc. No : SPG-CAL-50.014
Job No : Rev. No : 1
2. Equipment Data
2.1. Equipment Sizing
Page 7 of 10
Doc. No : SPG-CAL-50.014
Job No : Rev. No : 1
Page 8 of 10
CALCULATION FOUNDATION
Job No : -
Rev. No : 1
Page 9 of 10
2.5. 3D Section
Description
Dimension
b
h
Geometry
(m) (m)
Material
t
(m)
Note
CALCULATION FOUNDATION
Job No : -
Square
Square
5.1
6
Rev. No : 1
5
6
0.2
0.3
Concrete
Concrete
Page 10 of 10
Wall (Dir-X,Y)
Wall (Dir-Z)
3. Loading Combination
3.1. Unfactored Load Combnation
Load listed herein shall be considered to act in the following combinations ; whichever produces the
most unfavorable effect in the building, foundation, or structural member being considered. Effects of
one or more loads not acting shall be considered.
Condition
1. Erection :
2. Operating :
3. Operation :
No
100
101
102
103
104
105
106
107
Description
D + E (E) + L
D + (LP + SP)
D + E(O) + (LP + PAE) + 0.7(WV(X) + 0,3(WV(Z,-Z)))
D + E(O) + (LP + PAE ) + 0.7(WV(-X) + 0,3(WV(Z,-Z)))
D + E(O) + (LP + PAE) + 0.7(WV(Z) + 0,3(WV(X,-X)))
D + E(O) + (LP + PAE) + 0.7(WV(-Z) + 0,3(WV(X,-X)))
D + E (E) + L + SP
D + L + E (E)+ PAE
3. Operating :
Where :
1. D
2. L
3. SP
4. LP
5. PAE
6. WV(X)
7. WV(X)
8. WV(Z)
9. WV(-Z)
10. E(E)
11. E(O)
No
300
301
302
303
304
305
306
307
308
Descriptio
n
1.4 (D + E(E))
1.2 (D + E(E)) + 1.6 L
1.2 (D + E(E)) + 1.6 (L + SP)
1.2 (D + E(E)) + 1.6 (L + PAE)
1.2 (D + E(O)) + 1.6 (LP + SP)
1.2 (D + E(O)) + 1.6 (LP + PAE) + 1,0WV(X) + 0,3(WV(Z,-Z))
1.2 (D + E(O)) + 1.6 (LP + PAE) + 1,0WV(-X) + 0,3(WV(Z,-Z))
1.2 (D + E(O)) + 1.6 (LP + PAE) + 1,0WV(Z) + 0,3(WV(X,-X))
1.2 (D + E(O)) + 1.6 (LP + PAE) + 1,0WV(-Z) + 0,3(WV(X,-X))
: Dead Load
: Live Load
: Soil Pressure Load
: Liquid Pressure Load
: Soil Active Pressure Due to Seismic X-dir
: Hydrodynamic Pressure Due to Seismic X-dir
: Hydrodynamic Pressure Due to Seismic -X-dir
: Hydrodynamic Pressure Due to Seismic Z-dir
: Hydrodynamic Pressure Due to Seismic -Z-dir
: Equipment Empty
: Equipment Operating
5. Pond Design
See attachments 2 for detail calculation
Doc. No : SPG-CAL-50.014
Job No : Rev. No : 1
Page 11 of 10