Annex (B-1)
Environmental Permit Requirements for New Facility
1) Required Official Documents ‫( اﻟﻤﺘﻄﻠﺒﺎت اﻹدارﻳﺔ‬1
1. A letter to EAD from the project proponent and ‫ ﻣ ﻦ اﻟﺠﻬ ﺔ ﺻ ﺎﺣﺒﺔ اﻟﻤ ﺸﺮوع وﺟﻬ ﺔ ﺣﻜﻮﻣﻴ ﺔ‬،‫ آﺘ ﺎب إﻟ ﻰ اﻟﻬﻴﺌ ﺔ‬.1
from the government party responsible for .‫ﻣﺴﺌﻮﻟﺔ ﻋﻦ اﻟﺘﺮﺧﻴﺺ اﻟﺼﻨﺎﻋﻲ أو اﻟﺘﺠﺎري أو اﻟﻤﻬﻨﻲ‬
industrial, commercial, or profession permitting
regarding site relocation.

2. Proof of the legal status of any company /


establishment submitting the application directly ‫ إﺛﺒ ﺎت اﻟﻮﺿ ﻊ اﻟﻘ ﺎﻧﻮﻧﻲ ﻷي ﺷ ﺮآﺔ أو ﻣﺆﺳ ﺴﺔ ﺗﺘﻘ ﺪم ﺑﺎﻟﻄﻠ ﺐ‬.2
to EAD through Trade Name Reservation from ‫ﻣﺒﺎﺷﺮة إﻟﻰ اﻟﻬﻴﺌﺔ ﻣﻦ ﺧ ﻼل رﺧ ﺼﺔ )ﺣﺠ ﺰ اﻹﺳ ﻢ اﻟﺘﺠ ﺎري( ﻣ ﻦ‬
Commercial & Planning Department. ‫ﻗﺒﻞ داﺋﺮة اﻟﺘﺨﻄﻴﻂ واﻻﻗﺘﺼﺎد‬

3. A “Power of Attorney” letter to the concerned ‫ آﺘﺎب ﺗﺨﻮﻳﻞ إﻟﻰ اﻟﺸﺨﺺ اﻟﻤﻌﻨﻲ ﺑ ﺎﻟﺘﻮﻗﻴﻊ ﻋﻠ ﻰ آﺎﻓ ﺔ اﻟﻤﺮاﺳ ﻼت‬.3
individual authorizing the signature on all .‫اﻟﺮﺳﻤﻴﺔ اﻟﻤﻘﺪﻣﺔ إﻟﻰ اﻟﻬﻴﺌﺔ‬
documents submitted to EAD.

4. Project proponent or authorized signatory proof ‫ اﻋﺘﻤ ﺎد ﺗﻮﻗﻴ ﻊ ﻣﺎﻟ ﻚ اﻟﻤ ﺼﻨﻊ أو اﻟ ﺸﺨﺺ اﻟﻤﻌﻨ ﻲ ﺑ ﺎﻟﺘﻮﻗﻴﻊ ﻋﻠ ﻰ‬.4
of signature. ‫اﻟﻤﻌﺎﻣﻼت اﻟﺮﺳﻤﻴﺔ‬

5. Proof of land allocation / reservation for ‫ ﺻ ﻮرة‬:‫ ﺣﺠ ﺰ أرض اﻟﺒﻨ ﺎء أو ﻣ ﺎ ﻳﻌﺎدﻟ ﻪ )ﻣ ﺜﻼ‬/ ‫ إﺛﺒﺎت ﺗﺨﺼﻴﺺ‬.5
construction, or its equivalent (e.g., copy of ‫ ﺻ ﻮرة ﻣ ﻦ ﻣﻠﻜﻴ ﺔ اﻷرض أو‬،‫ﺷ ﻬﺎدة ﻣ ﻦ داﺋ ﺮة ﺗﺨﻄ ﻴﻂ اﻟﻤ ﺪن‬
certificate from the Town Planning Department, ‫ أو رﺳ ﺎﻟﺔ ﻣ ﻦ‬،‫ﺻﻮرة ﻣﻦ ﻋﻘﺪ اﻹﻳﺠﺎر ﻓﻲ ﺣﺎﻟﺔ اﺳ ﺘﺌﺠﺎر اﻷرض‬
copy of land ownership deed, copy of agreement (‫اﻟﻤﺆﺳﺴﺔ اﻟﻌﻠﻴﺎ ﻟﻠﻤﻨﺎﻃﻖ اﻻﻗﺘﺼﺎدﻳﺔ اﻟﻤﺘﺨﺼﺼﺔ‬
lease, or a letter from the Higher Corporation of
Specialized Economic Zones).

6. A detailed site map of appropriate scale ‫( اﻟﻤﻮﻗ ﻊ‬1) : ‫ ﺧﺮﻳﻄ ﺔ ﻣﻔ ﺼﻠﺔ ﺑﻤﻘﻴ ﺎس رﺳ ﻢ ﻣﻨﺎﺳ ﺐ ﻳﻮﺿ ﺢ ﻓﻴﻬ ﺎ‬.6
delineating the following:1) location, 2) property ‫( اﻻﺳﺘﺨﺪاﻣﺎت اﻟﻤﺠﺎورة ﻟﻸرض‬3) ‫( ﺣﺪود اﻷرض‬2)
boundaries, and 3) neighboring land uses.
2) Technical Requirements ‫( اﻟﻤﺘﻄﻠﺒﺎت اﻟﻔﻨﻴﺔ ﻟﻠﻤﻨﺸﺄة‬2
A) General Information ‫أ( ﻣﻌﻠﻮﻣﺎت ﻋﺎﻣـﺔ‬
† † † † †
‫ ﺣﺪد‬/ ‫ﻣﻨﻄﻘﺔ أﺧﺮى‬ ‫اﻟﻌﻴﻦ‬ ‫اﻟﻤﻨﻄﻘﺔ اﻟﻐﺮﺑﻴﺔ‬ ‫اﻟﻤﻔﺮق‬ ‫اﻟﻤﺼﻔﺢ‬
Western
Other Area / Specify Al Ain Al Mafraq Al Musafah
Region
Facility Location ‫ﻣﻮﻗـﻊ اﻟﻤﻨﺸﺄة‬

Area/Zone: :‫اﻟﻤﻨﻄﻘﺔ‬ Street: :‫اﻟﺸﺎرع‬


GPS: :‫إﺣﺪاﺛﻴﺎت اﻟﻤﻮﻗﻊ‬ Plot No. :‫رﻗﻢ اﻟﻘﻄﻌﺔ‬

(‫أﺧﺮى )ﺣﺪد‬ ‫زراﻋﻲ‬ ‫ﺳﻜﻨﻲ‬ ‫ﺗﺠﺎري‬ ‫ﺻﻨﺎﻋﻲ‬


Others (Specify) Agricultural Residential Commercial Industrial
‫اﻻﺳﺘﻌﻤﺎل‬
History of Land Use: † † † † ‫اﻟﺴﺎﺑﻖ‬
‫ﻟﻸرض‬
Classification of ‫ﺗﺼﻨﻴﻒ‬
Facility Area
† † † † ‫ﻣﻨﻄﻘﺔ اﻟﻤﻨﺸﺄة‬

‫ﺣﻮض ﻣﺎﺋﻲ أو ﺑﺌﺮ‬ ‫ﻣﻨﻄﻘﺔ زراﻋﻴﺔ‬ ‫ﻣﻨﻄﻘﺔ ﺳﻜﻨﻴﺔ‬


Distance to the nearest ‫اﻟﻤﺴﺎﻓﺔ إﻟﻰ‬
Water Body or Well Agricultural Area Residential Area
(km) (‫ )آﻢ‬:‫أﻗﺮب‬

‫ﻣﺴﺎﺣﺔ اﻟﺒﻨﺎء‬ ‫اﻟﻤﺴﺎﺣﺔ اﻟﻜﻠﻴﺔ اﻟﻤﺨﺼﺼﺔ ﻟﻠﻤﻨﺸﺄة‬


2 Built Area Area allocated to the facility ‫اﻟﻤﺴﺎﺣﺔ )ﻣﺘﺮ‬
Area (m )
(‫ﻣﺮﺑﻊ‬

Construction Cost: :‫ﺗﻜﻠﻔﺔ اﻹﻧﺸﺎء‬


Approximate Project Cost (Dhs) (‫اﻟﺘﻜﻠﻔﺔ اﻟﺘﻘﺪﻳﺮﻳﺔ ﻟﻠﻤﺸﺮوع )درهﻢ‬
Operation Cost: :‫ﺗﻜﻠﻔﺔ اﻟﺘﺸﻐﻴﻞ‬

Starting :‫ﺗﺎرﻳﺦ اﻟﺒﺪء‬


Construction Date: ‫اﻟﺒﻨﺎء‬
Ending
Date:
:‫ﺗﺎرﻳﺦ اﻻﻧﺘﻬﺎء‬
Expected Project Lifetime ‫اﻟﻌﻤﺮ اﻟﻤﺘﻮﻗﻊ ﻟﻠﻤﺸﺮوع‬
Starting :‫ﺗﺎرﻳﺦ اﻟﺒﺪء‬
Date:
Operation: ‫اﻟﺘﺸﻐﻴﻞ‬
Expected
Lifetime
:‫اﻟﻌﻤﺮ اﻟﻤﺘﻮﻗﻊ‬

‫ﻋﺎﻣﻞ‬ ‫ﻣﺸﺮف ﻋﻤﺎل‬ ‫ﻓﻨﻲ‬ ‫ﻣﻬﻨﺪس‬ ‫ﻣﺪﻳﺮ‬


labourer Supervisor Technician Engineer Manager

Estimated Maximum Number of Construction ‫ﻣﺮﺣﻠﺔ‬


Phase ‫اﻹﻧﺸﺎء‬ ‫اﻟﻌﺪد اﻷﻗﺼﻰ اﻟﻤﺘﻮﻗﻊ ﻟﻠﻌﺎﻣﻠﻴﻦ‬
Employees
Operation ‫ﻣﺮﺣﻠﺔ‬
Phase ‫اﻹﻧﺘﺎج‬
B) Required Technical Information ‫ب( اﻟﻤﻌﻠﻮﻣﺎت اﻟﻔﻨﻴﺔ اﻟﻤﻄﻠﻮﺑﺔ‬
The concerned individual submitting the site ‫ ﺗﻮﻓﻴﺮ‬،‫ﻋﻠﻰ ﺻﺎﺣﺐ اﻟﻌﻼﻗﺔ اﻟﻤﺘﻘﺪم ﺑﻄﻠﺐ ﺗﻐﻴﻴﺮ اﻟﻤﻮﻗﻊ‬
relocation application should supply the project's ‫اﻟﺒﻴﺎﻧﺎت واﻟﻤﺨﻄﻄﺎت اﻟﻔﻨﻴﺔ واﻟﺒﻴﺌﻴﺔ واﻟﻤﺘﻌﻠﻘﺔ ﺑﺎﻟﻤﻮﻗﻊ‬
technical and environmental data and diagrams,
‫ ﺑﺸﻜﻞ ﻣﻔﺼﻞ وواﺿﺢ ﺿﻤﻦ ﺗﻘﺮﻳﺮ ﻣﺘﻜﺎﻣﻞ وﻓﻘ ًﺎ‬،‫اﻟﺠﺪﻳﺪ‬
including those associated with the new location, in
a clear and detailed manner within a complete report :(‫ﻟﻠﻤﺤﺎور اﻟﻮارد ﻓﻲ أدﻧﺎﻩ )إذا اﻧﻄﺒﻖ‬
based along the following lines (where applicable):

1. General layout (detailed map) of the facility ‫ اﻟﻤﺨﻄﻂ اﻟﻌﺎم )ﺧﺎرﻃﺔ ﻣﻔﺼﻠﺔ( ﻟﻠﻤﻨﺸﺄة ﻣﺘﻀﻤﻨ ًﺎ ﻣﻮاﻗﻊ‬.1
including location of primary and secondary ‫اﻟﻮﺣﺪات اﻹﻧﺘﺎﺟﻴﺔ اﻟﺮﺋﻴﺴﻴﺔ واﻟﺜﺎﻧﻮﻳﺔ واﻟﻤﺨﺎزن‬
units, storage areas, offices and others, .‫واﻟﻤﻜﺎﺗﺐ وﻏﻴﺮهﺎ ﺷﺎﻣﻼ اﻟﺘﻌﺪﻳﻼت اﻟﻔﻨﻴﺔ‬
including the technical modifications.
2. Detailed description of the facility’s activities ‫ ﺷﺮح ﺗﻔﺼﻴﻠﻲ ﻟﻠﻨﺸﺎط اﻟﻤﺮاد إﺿﺎﻓﺘﻪ )ﻣﻊ إرﻓﺎق ﻣﺨﻄﻂ‬.2
(with attached process flow diagrams) ‫ ﻋﻠﻰ ﺳﺒﻴﻞ ﻟﺬآﺮ ﻻ‬،‫ ﻋﻠﻰ أن ﻳﻀﻤﻦ اﻵﺗﻲ‬،(‫ﺗﻮﺿﻴﺤﻲ‬
including, but not exclusive to:
:‫اﻟﺤﺼﺮ‬
(a) Primary and secondary operational ‫اﻟﻌﻤﻠﻴﺎت اﻟﺘﺸﻐﻴﻠﻴﺔ واﻷﻋﻤﺎل اﻟﺮﺋﻴﺴﻴﺔ واﻟﺜﺎﻧﻮﻳﺔ‬ -‫أ‬
processes
(b) All primary and secondary units and ‫آﺎﻓﺔ اﻟﻮﺣﺪات اﻟﺮﺋﻴﺴﻴﺔ واﻟﺜﺎﻧﻮﻳﺔ وﻣﻠﺤﻘﺎﺗﻬﺎ‬ -‫ب‬
their auxiliaries.
(c) Raw materials and their process entry ‫اﻟﻤﻮاد اﻷوﻟﻴﺔ وﻣﺪاﺧﻠﻬﺎ‬ -‫ت‬
points.
(d) Primary products, by-products and ‫اﻟﻤﻨﺘﺠﺎت اﻟﺮﺋﻴﺴﻴﺔ واﻟﺜﺎﻧﻮﻳﺔ وﻣﺨﺎرﺟﻬﺎ‬ -‫ث‬
process exit points.
(e) Copy of machinery technical data and ‫ﻧﺴﺨﺔ ﻣﻦ اﻟﻤﺨﻄﻄﺎت اﻟﺨﺎﺻﺔ ﺑﺎﻵﻻت‬ -‫ج‬
diagrams
(f) Point of generation and discharge of air ‫ﻧﻘﺎط ﺗﻮﻟﺪ وﺗﺼﺮﻳﻒ اﻟﻤﻠﻮﺛﺎت اﻟﻬﻮاﺋﻴﺔ‬ -‫ح‬
emission, liquid effluents and solid
waste. ‫واﻟﻤﺨﻠﻔﺎت اﻟﺴﺎﺋﻠﺔ واﻟﺼﻠﺒﺔ وﻣﺎ ﻳﺪﺧﻞ ﺑﻀﻤﻨﻬﺎ‬

3. A detailed listing of raw materials utilized ‫ ﻗﺎﺋﻤﺔ ﺑﻜﺎﻓﺔ اﻟﻤﻮاد اﻷوﻟﻴﺔ اﻟﻤﺴﺘﺨﺪﻣﺔ ﺿﻤﻦ اﻟﻌﻤﻠﻴﺎت‬.3
during primary and secondary operation ‫اﻟﺘﺸﻐﻴﻠﻴﺔ اﻟﺮﺋﻴﺴﻴﺔ واﻟﺜﺎﻧﻮﻳﺔ ﺑﺸﻜﻞ ﺟﺪول ﻣﻔﺼﻞ‬
processes specifying the following: material ،‫ وﻣﻜﻮﻧﺎﺗﻬﺎ اﻟﻜﻴﻤﻴﺎﺋﻴﺔ‬،‫ أﺳﻢ اﻟﻤﺎدة‬:‫ﻣﻮﺿﺤًﺎ ﻓﻴﻪ‬
name, chemical composition, source (local,
imported), physical properties (solid, liquid, ‫ وﺣﺎﻟﺘﻬﺎ اﻟﻔﻴﺰﻳﺎﺋﻴﺔ‬،(‫ ﻣﺴﺘﻮرد‬/‫وﻣﺼﺪرهﺎ )ﻣﺤﻠﻲ‬
gas) annual consumption rates, means of ،‫ وﻣﻌﺪﻻت اﺳﺘﻬﻼآﻬﺎ اﻟﺴﻨﻮﻳﺔ‬،(‫ ﻏﺎزﻳﺔ‬،‫ ﺳﺎﺋﻠﺔ‬،‫)ﺻﻠﺒﺔ‬
storage and transportation and others. ‫ وﻏﻴﺮهﺎ‬،‫وﻃﺮق اﻟﻨﻘﻞ واﻟﺘﺨﺰﻳﻦ‬

4. A detailed table of chemicals utilized during ‫ ﻗﺎﺋﻤﺔ ﺑﻜﺎﻓﺔ اﻟﻤﻮاد اﻟﻜﻴﻤﺎوﻳﺔ اﻟﻤﺴﺘﺨﺪﻣﺔ ﺿﻤﻦ اﻟﻌﻤﻠﻴﺎت‬.4
primary and secondary operations specifying ‫اﻟﺘﺸﻐﻴﻠﻴﺔ اﻟﺮﺋﻴﺴﻴﺔ واﻟﺜﺎﻧﻮﻳﺔ ﺑﺸﻜﻞ ﺟﺪول ﻣﻔﺼﻞ‬
the following: chemical name, source (local,
imported), physical properties (solid, liquid,
،(‫ ﻣﺴﺘﻮرد‬/‫ وﻣﺼﺪرهﺎ )ﻣﺤﻠﻲ‬،‫ أﺳﻢ اﻟﻤﺎدة‬:‫ﻣﻮﺿﺤًﺎ ﻓﻴﻪ‬
gas) annual consumption rates, storage and ‫ وﻣﻌﺪﻻت‬،(‫ ﻏﺎزﻳﺔ‬،‫ ﺳﺎﺋﻠﺔ‬،‫وﺣﺎﻟﺘﻬﺎ اﻟﻔﻴﺰﻳﺎﺋﻴﺔ )ﺻﻠﺒﺔ‬
means of transportation and others. Material .‫ وﻏﻴﺮهﺎ‬،‫ وﻃﺮق اﻟﻨﻘﻞ واﻟﺘﺨﺰﻳﻦ‬،‫اﺳﺘﻬﻼآﻬﺎ اﻟﺴﻨﻮﻳﺔ‬
safety data sheet (MSDS) submitted as (MSDS) ‫ﻣﻊ ﺿﺮورة إرﻓﺎق ﻻﺋﺤﺔ اﻟﺴﻼﻣﺔ اﻟﻜﻴﻤﺎوﻳﺔ‬
annexes to the report. .‫ﻟﻬﺎ ﺑﺸﻜﻞ ﻣﻼﺣﻖ‬
5. A detailed table of main products including, ‫ ﻗﺎﺋﻤﺔ ﺑﺎﻟﻤﻨﺘﺠﺎت اﻟﺮﺋﻴﺴﻴﺔ ﺑﺸﻜﻞ ﺟﺪول ﻣﻔﺼﻞ ﻣﻮﺿﺤ ًﺎ‬.5
but not limited to, product name, annual
design production rates, maximum annual /‫ واﻟﻄﺎﻗﺔ اﻹﻧﺘﺎﺟﻴﺔ اﻟﺘﺼﻤﻴﻤﻴﺔ )اﻟﻜﻤﻴﺔ‬،‫ اﻟﻤﻨﺘﺞ‬:‫ﻓﻴﻪ‬
production rates, expected production rate for ،(‫ اﻟﺴﻨﺔ‬/‫ واﻟﻄﺎﻗﺔ اﻹﻧﺘﺎﺟﻴﺔ اﻟﻘﺼﻮى )اﻟﻜﻤﻴﺔ‬،(‫اﻟﺴﻨﺔ‬
the proposed future expansion (quantity/year),
‫واﻟﻄﺎﻗﺔ اﻹﻧﺘﺎﺟﻴﺔ اﻟﻤﻘﺘﺮﺣﺔ ﻓﻲ اﻟﺘﻮﺳﻌﺎت اﻟﻤﺴﺘﻘﺒﻠﻴﺔ‬
and means of storage and transportation.
‫ وﻃﺮق ﻧﻘﻠﻬﺎ وﺗﺨﺰﻳﻨﻬﺎ وﻏﻴﺮ ذﻟﻚ‬،(‫ اﻟﺴﻨﺔ‬/‫)اﻟﻜﻤﻴﺔ‬
6. A detailed table of all secondary products ‫ ﻗﺎﺋﻤﺔ ﺑﺎﻟﻤﻨﺘﺠﺎت اﻟﺜﺎﻧﻮﻳﺔ ﺑﺸﻜﻞ ﺟﺪول ﻣﻔﺼﻞ ﻣﻮﺿﺤًﺎ‬.6
including, but not limited to, the product /‫ واﻟﻄﺎﻗﺔ اﻹﻧﺘﺎﺟﻴﺔ اﻟﺘﺼﻤﻴﻤﻴﺔ )اﻟﻜﻤﻴﺔ‬،‫ اﻟﻤﻨﺘﺞ‬:‫ﻓﻴﻪ‬
name, annual design production rates,
expected production rate for the proposed ‫ واﻟﻄﺎﻗﺔ اﻹﻧﺘﺎﺟﻴﺔ اﻟﻤﻘﺘﺮﺣﺔ ﻓﻲ اﻟﺘﻮﺳﻌﺎت‬،(‫اﻟﺴﻨﺔ‬
future expansion, and means of storage and ‫ وﻃﺮق ﻧﻘﻠﻬﺎ وﺗﺨﺰﻳﻨﻬﺎ‬،(‫ اﻟﺴﻨﺔ‬/‫اﻟﻤﺴﺘﻘﺒﻠﻴﺔ )اﻟﻜﻤﻴﺔ‬
transportation. ‫وﻏﻴﺮ ذﻟﻚ‬

7. A list of all equipment, instruments and ‫ ﻗﺎﺋﻤﺔ ﺑﻜﺎﻓﺔ اﻟﻤﻌﺪات واﻵﻻت واﻟﻤﺎآﻴﻨﺎت اﻟﻤﺴﺘﺨﺪﻣﺔ ﻓﻲ‬.7
machinery utilized in all primary and
‫ وﻧﺴﺦ ﻋﻦ‬،‫ﺟﻤﻴﻊ اﻟﻌﻤﻠﻴﺎت اﻟﺮﺋﻴﺴﻴﺔ واﻟﺜﺎﻧﻮﻳﺔ‬
secondary operations. Provide a copy of
relevant technical data sheets. ‫اﻟﻤﺨﻄﻄﺎت اﻟﺨﺎﺻﺔ ﺑﻬﺎ‬

8. A table showing the facility’s detailed ،‫ ﺑﺸﻜﻞ ﺟﺪول ﻣﻔﺼﻞ ﻳﺒﻴﻦ‬،‫ ﺑﻴﺎن ﻓﺘﺮات اﻟﺘﺸﻐﻴﻞ ﻟﻠﻤﻨﺸﺄة‬.8
operation schedule including the number of
‫ ﻋﺪد اﻟﻔﺘﺮات )اﻟﻤﻨﺎوﺑﺎت‬،‫ﻋﺪد أﻳﺎم اﻟﺘﺸﻐﻴﻞ ﺧﻼل اﻟﻌﺎم‬
working days per year, the number of shifts
per day, and the number of hours per shift. ‫)اﻟﻮردﻳﺎت(( ﻓﻲ اﻟﻴﻮم اﻟﻮاﺣﺪ وﻋﺪد ﺳﺎﻋﺎت ﻋﻤﻞ آﻞ‬
.(‫ﻣﻨﺎوﺑﺔ )وردﻳﺔ‬
9. A detailed table showing the fuel consumed ‫ اﻟﻮﻗﻮد اﻟﻤﺴﺘﺨﺪم ﺿﻤﻦ آﺎﻓﺔ اﻟﻌﻤﻠﻴﺎت ﺑﺸﻜﻞ ﺟﺪول‬.9
for all plant operations including the type of
fuel (Diesel, gas…etc.), consumption rates
،‫ ﻏﺎز‬،‫ ﻧﻮع اﻟﻮﻗﻮد )دﻳﺰل‬:‫ﻣﻔﺼﻞ ﻣﻮﺿﺤًﺎ ﻓﻴﻪ‬
(m3, tones / year), source, units that are ،(‫ اﻟﺴﻨﺔ‬/‫ اﻟﺦ‬،3‫ م‬،‫ وﻣﻌﺪﻻت اﻻﺳﺘﻬﻼك )ﻃﻦ‬،(‫اﻟﺦ‬....،
operated accordingly, and estimated quantity ،‫ واﻟﻮﺣﺪات اﻟﺘﻲ ﻳﺘﻢ ﺗﺸﻐﻴﻠﻬﺎ ﺑﻤﻮﺟﺒﻬﺎ‬،‫واﻟﻤﺼﺪر‬
to be stored on site (ton, m3…etc.). .(‫ اﻟﺦ‬،3‫ م‬،‫واﻟﻜﻤﻴﺔ اﻟﻤﺘﻮﻗﻊ ﺗﺨﺰﻳﻨﻬﺎ ﻓﻲ اﻟﻤﻮﻗﻊ )ﻃﻦ‬
10. A detailed table showing the electricity ‫ اﻟﻄﺎﻗﺔ اﻟﻜﻬﺮﺑﺎﺋﻴﺔ اﻟﻤﺴﺘﺨﺪﻣﺔ ﺿﻤﻦ آﺎﻓﺔ اﻟﻌﻤﻠﻴﺎت‬.10
consumed for all operations, annual electrical
‫ ﻣﻌﺪل اﻻﺳﺘﻬﻼك‬:‫ﺑﺸﻜﻞ ﺟﺪول ﻣﻔﺼﻞ ﻣﻮﺿﺤًﺎ ﻓﻴﻪ‬
power consumption rates (kW/hr), source
(grid, generator), and units that are operated ، (‫ ﻣﻮﻟﺪات‬،‫ اﻟﻤﺼﺪر )ﺷﺒﻜﺔ‬،(‫ اﻟﺴﺎﻋﺔ‬/‫)آﻴﻠﻮ واط‬
accordingly. .‫واﻟﻮﺣﺪات اﻟﺘﻲ ﻳﺘﻢ ﺗﺸﻐﻴﻠﻬﺎ ﺑﻤﻮﺟﺒﻬﺎ‬

11. A detailed table showing the source of water ‫ اﻟﻤﻴﺎﻩ اﻟﻤﺴﺘﺨﺪﻣﺔ ﺿﻤﻦ آﺎﻓﺔ اﻟﻌﻤﻠﻴﺎت ﺑﺸﻜﻞ ﺟﺪول‬.11
consumption in all facility operations (well,
‫ هﻴﺌﺔ ﻣﻴﺎﻩ‬،‫ ﺑﺤﺮ‬،‫ﻣﻔﺼﻞ ﻣﻮﺿﺤًﺎ ﻓﻴﻪ اﻟﻤﺼﺪر )ﺑﺌﺮ‬
sea, grid…etc.), annual water consumption
rates (m3/year), maximum consumption rates ،(‫ ﺳﻨﺔ‬/3‫ وﻣﻌﺪل اﻻﺳﺘﻬﻼك )م‬،(‫ اﻟﺦ‬...،‫وآﻬﺮﺑﺎء‬
(m3/year), uses and units that are operated ‫ ﺳﻨﺔ( واﻟﻐﺮض أو‬/3‫وﻣﻌﺪل اﻻﺳﺘﻬﻼك اﻷﻗﺼﻰ )م‬
accordingly. .‫اﻟﻮﺣﺪات اﻟﺘﺸﻐﻴﻠﻴﺔ اﻟﻤﺮﺗﺒﻄﺔ ﺑﻬﺎ‬

12. Complete technical details for the water ‫ اﻟﺘﻔﺎﺻﻴﻞ اﻟﻔﻨﻴﺔ اﻟﻜﺎﻣﻠﺔ ﻟﻮﺣﺪة ﺗﺤﻠﻴﺔ أو ﺗﺼﻔﻴﺔ اﻟﻤﻴﺎﻩ‬.12
desalination or purification unit within the
facility (if applicable) including process
:‫ ﻣﻮﺿﺤًﺎ ﻓﻴﻬﺎ وﺑﺪﻗﺔ‬،‫)أن وﺟﺪت( ﺿﻤﻦ اﻟﻤﻨﺸﺄة‬
stages, chemicals utilized, design and ‫ اﻟﻄﺎﻗﺔ‬،‫ اﻟﻤﻮاد اﻟﻜﻴﻤﺎوﻳﺔ اﻟﻤﺴﺘﺨﺪﻣﺔ‬،‫اﻟﻤﺮاﺣﻞ‬
maximum production capacities (m3/day), and ‫ اﻟﻤﺨﻠﻔﺎت اﻟﺴﺎﺋﻠﺔ‬.(‫ اﻟﻴﻮم‬/3‫اﻟﺘﺼﻤﻴﻤﻴﺔ واﻟﻘﺼﻮى )م‬
the type and quantity of liquid and solid /3‫ م‬،‫ ﻧﻮﻋﻬﺎ وآﻤﻴﺘﻬﺎ )ﻃﻦ‬:‫واﻟﺼﻠﺒﺔ اﻟﻤﺘﻮﻟﺪة ﻋﻨﻬﺎ‬
wastes produced (m3, ton / day) including their ‫ وﻃﺮق‬،‫اﻟﻴﻮم( وﺧﺼﺎﺋﺼﻬﺎ اﻟﻜﻴﻤﺎوﻳﺔ واﻟﻔﻴﺰﻳﺎﺋﻴﺔ‬
chemical and physical properties and methods .‫اﻟﺘﺨﻠﺺ ﻣﻨﻬﺎ‬
of disposal.
13. A detailed record of the liquid wastes ،‫ ﺑﻴﺎن ﺑﺎﻟﻤﺨﻠﻔﺎت اﻟﺴﺎﺋﻠﺔ اﻟﻤﺘﻮﻟﺪة ﻋﻦ اﻟﻌﻤﻠﻴﺎت اﻟﺘﺸﻐﻴﻠﻴﺔ‬.13
generated during operational processes which :‫ﺑﺸﻜﻞ ﻣﻔﺼﻞ ﻣﺘﻀﻤﻨﺔ اﻵﺗﻲ‬
include the following:
(a) The source, amount generated, average ‫ وﻣﻌﺪﻻت اﻟﺘﻮﻟﺪ واﻟﺘﺼﺮﻳﻒ اﻟﻄﺒﻴﻌﻲ‬،‫اﻟﻤﺼﺪر‬ -‫أ‬
and maximum discharges rates ‫ ﻗﻄﺮ أﻧﺒﻮب اﻟﺘﺼﺮﻳﻒ‬،(‫ ﻳﻮم‬/3‫واﻷﻗﺼﻰ )م‬
(m3/day) and discharge pipe diameter.
(b) Type of waste (industrial, cooling, ‫ اﻟﺦ( ﻣﻊ ﺑﻴﺎن‬،‫ ﻏﺴﻞ‬،‫ ﺗﺒﺮﻳﺪ‬،‫ ﻧﻮﻋﻴﺘﻬﺎ )ﺻﻨﺎﻋﻴﺔ‬-‫ب‬
cleaning…etc.) and their risk analysis (‫ ﻏﻴﺮ ﺧﻄﺮة‬/‫اﻟﺨﻄﻮرة )ﺧﻄﺮة‬
(hazardous / not hazardous).
(c) Methods of treatment (if present) ‫ ﻣﻊ إرﻓﺎق‬،(‫ ﻃﺮق اﻟﻤﻌﺎﻟﺠﺔ )إن وﺟﺪت‬-‫ت‬
including attached diagrams showing ،‫ اﻟﻮﺣﺪات وآﻔﺎءﺗﻬﺎ‬،‫اﻟﻤﺨﻄﻄﺎت اﻟﺘﻲ ﺗﻮﺿﺢ‬
units, treatment efficiency, country of
‫ و اﻟﻤﻮاد اﻟﻜﻴﻤﺎوﻳﺔ‬،‫ وﺳﻨﺔ اﻟﺘﺸﻐﻴﻞ‬،‫وﺑﻠﺪ اﻟﻤﻨﺸﺄ‬
origin, year of operation, chemicals
utilized, design and maximum /3‫ اﻟﻄﺎﻗﺔ اﻟﺘﺼﻤﻴﻤﻴﺔ واﻟﻘﺼﻮى )م‬،‫اﻟﻤﺴﺘﺨﺪﻣﺔ‬
3
treatment capacities (m /day), and type ‫ اﻟﻤﺨﻠﻔﺎت اﻟﺴﺎﺋﻠﺔ واﻟﺼﻠﺒﺔ اﻟﻤﺘﻮﻟﺪة ﻋﻨﻬﺎ‬.(‫اﻟﻴﻮم‬
and quantities of liquid and solid .((‫ اﻟﻴﻮم‬/3‫ م‬،‫)ﻧﻮﻋﻬﺎ وآﻤﻴﺘﻬﺎ )ﻃﻦ‬
wastes generated (tone, m3/day).
(d) Liquid waste minimization methods for ‫ وﺳﺎﺋﻞ اﻟﺘﻘﻠﻴﻞ ﻣﻦ آﻤﻴﺔ اﻟﻤﺨﻠﻔﺎت اﻟﺴﺎﺋﻠﺔ‬-‫ث‬
generated (if present is) including type
‫ ﻣﻊ ﺑﻴﺎن ﺗﻔﺼﻴﻠﻲ‬،(‫اﻟﻤﺘﻮﻟﺪة )أن وﺟﺪت‬
of reduction system (closed, semi-
،(‫ ﻣﻔﺘﻮح‬/‫ ﺷﺒﻪ ﻣﻐﻠﻖ‬/‫ اﻟﻨﻮع )ﻣﻐﻠﻖ‬:‫ﻣﺘﻀﻤﻨًﺎ‬
closed, open), associated units and their
efficiency, methodology ‫اﻟﻮﺣﺪات واﻵﻟﻴﺔ اﻟﻤﺘﺒﻌﺔ واﻟﻜﻔﺎءة واﻟﻜﻤﻴﺔ‬
utilized,
quantity of recycled water, make up ‫اﻟﺮاﺟﻌﺔ إﻟﻰ اﻟﻮﺣﺪات اﻹﻧﺘﺎﺟﻴﺔ وآﻤﻴﺔ اﻟﻤﻴﺎﻩ‬
water and discharge water in ‫اﻟﻤﻀﺎﻓﺔ )أن وﺟﺪت( واﻟﻜﻤﻴﺔ اﻟﺘﻲ ﻳﺘﻢ اﻟﺘﺨﻠﺺ‬
production operations (if present). .‫ﻣﻨﻬﺎ‬
(e) The physical, chemical and biological ‫ اﻟﺨﺼﺎﺋﺺ اﻟﻔﻴﺰﻳﺎﺋﻴﺔ واﻟﻜﻴﻤﻴﺎﺋﻴﺔ واﻟﺒﻴﻮﻟﻮﺟﻴﺔ‬-‫ج‬
properties of the liquid waste, before ‫ﻟﻬﺎ ﻗﺒﻞ وﺑﻌﺪ اﻟﻤﻌﺎﻟﺠﺔ‬
and after treatment.
(f) Methods of liquid waste storage, before .‫ ﻃﺮق ﺗﺨﺰﻳﻨﻬﺎ ﻗﺒﻞ اﻟﻤﻌﺎﻟﺠﺔ وﺑﻌﺪهﺎ‬-‫ح‬
and after treatment.
(g) Means of discharge, specify points of ‫ ﻃﺮق اﻟﺘﺨﻠﺺ وﺗﺤﺪﻳﺪ ﻧﻘﺎط اﻟﺘﺼﺮﻳﻒ‬-‫خ‬
discharge, final discharge (sea, sewer ‫ ﺷﺒﻜﺔ ﺻﺮف‬،‫واﻟﻮﺟﻬﺔ اﻟﻨﻬﺎﺋﻴﺔ ﻟﻬﺎ )ﺑﺤﺮ‬
network, storm-water network,
،(‫ اﻟﺦ‬،‫ اﻟﺘﺮﺑﺔ‬،‫ ﺷﺒﻜﺔ ﻣﻴﺎﻩ اﻷﻣﻄﺎر‬،‫ﺻﺤﻲ‬
soil…,etc.), and means of
transportation (if present). .(‫وﻃﺮق اﻟﻨﻘﻞ )أن وﺟﺪ‬
(h) Methods used for continuous ‫ اﻟﻮﺳﺎﺋﻞ اﻟﻤﺴﺘﺨﺪﻣﺔ ﻟﻠﻘﻴﺎس اﻟﻤﺴﺘﻤﺮ ﻟﻠﺘﺼﺮﻳﻒ‬-‫د‬
monitoring of discharge (if present). .(‫)أن وﺟﺪت‬
(i) Detailed description of ‫ اﻟﻤﻘﺘﺮح ﻓﻲ ﻣﺮاﻗﺒﺔ وﺗﺤﻠﻴﻞ‬/‫اﻟﻨﻈﺎم اﻟﻤﺘﺒﻊ‬ -‫ذ‬
(existing/proposed) monitoring and ‫ ﻣﻊ ﺑﻴﺎن‬،(‫اﻟﻤﺨﻠﻔﺎت اﻟﺴﺎﺋﻠﺔ اﻟﻤﺘﻮﻟﺪة )أن وﺟﺪ‬
analysis systems for liquid wastes (if
present).
.‫ﻣﻔﺼﻞ ﻟﻪ‬
(j) Detailed description of ‫ اﻟﻤﻘﺘﺮح ﻓﻲ ﻣﺮاﻗﺒﺔ وﺗﺤﻠﻴﻞ ﻣﻮﻗﻊ‬/‫اﻟﻨﻈﺎم اﻟﻤﺘﺒﻊ‬ -‫ر‬
(existing/proposed) monitoring and
.‫ ﻣﻊ ﺑﻴﺎن ﻣﻔﺼﻞ ﻟﻪ‬،(‫اﻟﺘﺼﺮﻳﻒ )أن وﺟﺪ‬
analysis systems at the disposal site (if
present).

14. A detailed record on the sludge generated ‫ ﺑﺸﻜﻞ‬،‫ ﺑﻴﺎن ﺑﺎﻟﺤﻤﺄة اﻟﻤﺘﻮﻟﺪة ﻋﻦ اﻟﻌﻤﻠﻴﺎت اﻟﺘﺸﻐﻴﻠﻴﺔ‬.14
during operational processes which include :‫ﻣﻔﺼﻞ ﻣﺘﻀﻤﻨﺔ اﻵﺗﻲ‬
the following:
(a) Sludge source and its average and ‫ وﻣﻌﺪﻻت اﻟﺘﻮﻟﺪ اﻟﻄﺒﻴﻌﻲ واﻷﻗﺼﻰ‬،‫ اﻟﻤﺼﺪر‬-‫أ‬
maximum production rates (m3/day). .(‫ ﻳﻮم‬/3‫)م‬
(b) Type of sludge (industrial…etc.)
‫ اﻟﺦ( ﻣﻊ ﺑﻴﺎن اﻟﺨﻄﻮرة‬،‫ ﻧﻮﻋﻴﺘﻬﺎ )ﺻﻨﺎﻋﻴﺔ‬-‫ب‬
including risk analysis (hazardous /
non-hazardous). .(‫ ﻏﻴﺮ ﺧﻄﺮة‬/‫)ﺧﻄﺮة‬
(c) Methods of treatment (if present) with ‫ ﻣﻊ إرﻓﺎق‬،(‫ ﻃﺮق اﻟﻤﻌﺎﻟﺠﺔ )إن وﺟﺪت‬-‫ت‬
attached (including) diagrams showing
،‫ اﻟﻮﺣﺪات وآﻔﺎءﺗﻬﺎ‬،‫اﻟﻤﺨﻄﻄﺎت اﻟﺘﻲ ﺗﻮﺿﺢ‬
units, treatment efficiency, country of
origin, year of operation, chemicals ‫ و اﻟﻤﻮاد اﻟﻜﻴﻤﺎوﻳﺔ‬،‫ وﺳﻨﺔ اﻟﺘﺸﻐﻴﻞ‬،‫وﺑﻠﺪ اﻟﻤﻨﺸﺄ‬
utilized, design and maximum /3‫ اﻟﻄﺎﻗﺔ اﻟﺘﺼﻤﻴﻤﻴﺔ واﻟﻘﺼﻮى )م‬،‫اﻟﻤﺴﺘﺨﺪﻣﺔ‬
3
treatment capacities (m /day), and type ‫ اﻟﻤﺨﻠﻔﺎت اﻟﺴﺎﺋﻠﺔ واﻟﺼﻠﺒﺔ اﻟﻤﺘﻮﻟﺪة ﻋﻨﻬﺎ‬.(‫اﻟﻴﻮم‬
and quantities of liquid and solid ((‫ اﻟﻴﻮم‬/3‫ م‬،‫)ﻧﻮﻋﻬﺎ وآﻤﻴﺘﻬﺎ )ﻃﻦ‬
wastes generated (m3/day).
(d) Sludge reduction methods (if present) ،(‫ وﺳﺎﺋﻞ اﻟﺘﻘﻠﻴﻞ ﻣﻦ اﻟﺤﻤﺄة اﻟﻤﺘﻮﻟﺪة )أن وﺟﺪت‬-‫ث‬
including type of reduction system
‫ ﺷﺒﻪ‬/‫ اﻟﻨﻮع )ﻣﻐﻠﻖ‬:‫ﻣﻊ ﺑﻴﺎن ﺗﻔﺼﻴﻠﻲ ﻣﺘﻀﻤﻨًﺎ‬
(closed, semi-closed, open), associated
units, methodology utilized, quantity of ‫ اﻟﻮﺣﺪات واﻵﻟﻴﺔ اﻟﻤﺘﺒﻌﺔ‬،(‫ ﻣﻔﺘﻮح‬/‫ﻣﻐﻠﻖ‬
sludge reduced, and the reduction .‫واﻟﻜﻤﻴﺔ اﻟﻤﺨﻔﻀﺔ واﻟﻜﻔﺎءة‬
system efficiency.
(e) The physical, chemical and biological ‫ اﻟﺨﺼﺎﺋﺺ اﻟﻔﻴﺰﻳﺎﺋﻴﺔ واﻟﻜﻴﻤﻴﺎﺋﻴﺔ واﻟﺒﻴﻮﻟﻮﺟﻴﺔ‬-‫ج‬
properties of sludge, before and after
‫ﻟﻬﺎ ﻗﺒﻞ وﺑﻌﺪ اﻟﻤﻌﺎﻟﺠﺔ‬
treatment.
(f) Methods of sludge storage, before and
.‫ ﻃﺮق ﺗﺨﺰﻳﻨﻬﺎ ﻗﺒﻞ اﻟﻤﻌﺎﻟﺠﺔ وﺑﻌﺪهﺎ‬-‫ح‬
after treatment.
(g) Method of sludge disposal, final ‫ ﻃﺮق اﻟﺘﺨﻠﺺ ﻣﻨﻬﺎ وﺗﺤﺪﻳﺪ اﻟﻮﺟﻬﺔ اﻟﻨﻬﺎﺋﻴﺔ ﻟﻬﺎ‬-‫خ‬
destination (sewer network,
landfill…etc.) and means of
.‫ وﻃﺮق اﻟﻨﻘﻞ‬،(‫ اﻟﺦ‬،‫ ﻣﻄﻤﺮ‬،‫)ﺻﺮف ﺻﺤﻲ‬
transportation.
(h) Detailed description of ‫ اﻟﻤﻘﺘﺮح ﻓﻲ ﻣﺮاﻗﺒﺔ وﺗﺤﻠﻴﻞ‬/‫ اﻟﻨﻈﺎم اﻟﻤﺘﺒﻊ‬-‫د‬
(existing/proposed) monitoring and .‫ ﻣﻊ ﺑﻴﺎن ﻣﻔﺼﻞ ﻟﻪ‬،(‫اﻟﺤﻤﺄة اﻟﻤﺘﻮﻟﺪة )أن وﺟﺪ‬
analysis systems at the disposal site (if
present).

15. A detailed record on the solid and semi-solid ‫ ﺑﻴﺎن ﺑﺎﻟﻤﺨﻠﻔﺎت اﻟﺼﻠﺒﺔ وﺷﺒﻪ اﻟﺼﻠﺒﺔ اﻟﻤﺘﻮﻟﺪة ﻋﻦ‬.15
wastes generated during operational processes :‫ ﺑﺸﻜﻞ ﻣﻔﺼﻞ ﻣﺘﻀﻤﻨﺔ اﻵﺗﻲ‬،‫اﻟﻌﻤﻠﻴﺎت اﻟﺘﺸﻐﻴﻠﻴﺔ‬
which covers the items mentioned below:
(a) Source of solid waste and their average ‫ وﻣﻌﺪﻻت اﻟﺘﻮﻟﺪ اﻟﻄﺒﻴﻌﻲ واﻷﻗﺼﻰ‬،‫اﻟﻤﺼﺪر‬ -‫أ‬
and maximum generation rates .(‫ ﻳﻮم‬/3‫ م‬،‫)ﻃﻦ‬
(m3/day).
(b) Type of solid wastes (industrial…etc.) ‫ اﻟﺦ( ﻣﻊ ﺑﻴﺎن اﻟﺨﻄﻮرة‬،‫ ﻧﻮﻋﻴﺘﻬﺎ )ﺻﻨﺎﻋﻴﺔ‬-‫ب‬
and its risk analysis (hazardous / not .(‫ ﻏﻴﺮ ﺧﻄﺮة‬/‫)ﺧﻄﺮة‬
hazardous).
(c) Means of segregation at site, based on ‫ ﻃﺮق اﻟﻔﺮز ﻓﻲ اﻟﻤﻮﻗﻊ ﻋﻠﻰ أﺳﺎس اﻟﻨﻮﻋﻴﺔ‬-‫ت‬
type and properties. ‫واﻟﺨﻄﻮرة‬
(d) Treatment methods such as incineration ‫ ﻃﺮق اﻟﻤﻌﺎﻟﺠﺔ آﺎﻟﻤﺤﺎرق وﻏﻴﺮهﺎ )إن‬-‫ث‬
and others (if present) including :‫ ﻣﻊ إرﻓﺎق اﻟﻤﺨﻄﻄﺎت اﻟﺘﻲ ﺗﻮﺿﺢ‬،(‫وﺟﺪت‬
technical details showing the number
of units, type of treatment, efficiency,
‫ وﺳﻨﺔ‬،‫ وﺑﻠﺪ اﻟﻤﻨﺸﺄ‬،‫ واﻟﻜﻔﺎءة‬،‫ واﻟﻨﻮع‬،‫اﻟﻌﺪد‬
country of origin, year of operation, ‫ وﻃﺮق اﻟﺘﺨﻠﺺ ﻣﻦ ﻧﻔﺎﻳﺎت‬،‫اﻟﺘﺸﻐﻴﻞ‬
methods of disposal of incinerator ‫ واﻟﺨﺼﺎﺋﺺ اﻟﻔﻴﺰﻳﺎﺋﻴﺔ واﻟﻜﻴﻤﻴﺎﺋﻴﺔ‬،‫اﻟﻤﺤﺎرق‬
wastes including physical and chemical ‫ و اﻟﻤﻮاد‬،(‫ﻟﻠﻨﻔﺎﻳﺎت )اﻟﺮﻣﺎد واﻟﻐﺒﺎر اﻟﻤﻨﺒﻌﺚ‬
properties of the waste (ash, and ‫اﻟﻄﺎﻗﺔ اﻟﺘﺼﻤﻴﻤﻴﺔ‬ ،‫اﻟﻜﻴﻤﺎوﻳﺔ اﻟﻤﺴﺘﺨﺪﻣﺔ‬
fugitive dust), chemicals utilized, .(‫ اﻟﻴﻮم‬/3‫واﻟﻘﺼﻮى )م‬
design and maximum capacities of the
unit (m3/day).
(e) Solid waste minimization methods such ،‫ وﺳﺎﺋﻞ اﻟﺘﻘﻠﻴﻞ ﻣﻦ اﻟﻤﺨﻠﻔﺎت اﻟﺼﻠﺒﺔ اﻟﻤﺘﻮﻟﺪة‬-‫ج‬
as recycling, reusing… etc (if present)
‫ ﻣﻊ‬،(‫ اﻟﺦ )أن وﺟﺪت‬/‫ إﻋﺎدة اﻟﺘﺼﻨﻴﻊ‬/‫اﻟﺘﺪوﻳﺮ‬
including the system type, units,
methodology utilized, quantity reduced ‫ اﻟﻮﺣﺪات واﻵﻟﻴﺔ‬،‫ اﻟﻨﻮع‬:‫ﺑﻴﺎن ﺗﻔﺼﻴﻠﻲ ﻣﺘﻀﻤﻨًﺎ‬
and system efficiency. .‫اﻟﻤﺘﺒﻌﺔ واﻟﻜﻤﻴﺔ اﻟﻤﺨﻔﻀﺔ واﻟﻜﻔﺎءة‬

(f) The physical, chemical and biological ‫ اﻟﺨﺼﺎﺋﺺ اﻟﻔﻴﺰﻳﺎﺋﻴﺔ واﻟﻜﻴﻤﻴﺎﺋﻴﺔ واﻟﺒﻴﻮﻟﻮﺟﻴﺔ‬-‫ح‬
properties of the solid wastes, before ‫ﻟﻬﺎ ﻗﺒﻞ وﺑﻌﺪ اﻟﻤﻌﺎﻟﺠﺔ‬
and after treatment.
(g) Methods of solid waste storage, before .‫ ﻃﺮق ﺗﺨﺰﻳﻨﻬﺎ ﻗﺒﻞ اﻟﻤﻌﺎﻟﺠﺔ وﺑﻌﺪهﺎ‬-‫خ‬
and after treatment.
(h) Method of solid waste disposal and ‫ ﻃﺮق اﻟﺘﺨﻠﺺ ﻣﻨﻬﺎ وﺗﺤﺪﻳﺪ اﻟﻮﺟﻬﺔ اﻟﻨﻬﺎﺋﻴﺔ ﻟﻬﺎ‬-‫د‬
specifying points of final disposal
(landfill…etc.) and means of
.‫ وﻃﺮق اﻟﻨﻘﻞ‬،(‫ اﻟﺦ‬،‫)ﻣﻄﻤﺮ‬
transportation.
(i) Detailed description of ‫ اﻟﻤﻘﺘﺮح ﻓﻲ ﻣﺮاﻗﺒﺔ وﺗﺤﻠﻴﻞ‬/‫ اﻟﻨﻈﺎم اﻟﻤﺘﺒﻊ‬-‫ذ‬
(existing/proposed) monitoring and ‫ ﻣﻊ ﺑﻴﺎن‬،(‫اﻟﻤﺨﻠﻔﺎت اﻟﺼﻠﺒﺔ اﻟﻤﺘﻮﻟﺪة )أن وﺟﺪ‬
analysis systems at the disposal site (if .‫ﻣﻔﺼﻞ ﻟﻪ‬
present).

16. A detailed record on air emissions generated ‫ ﺑﻴﺎن ﺑﺎﻟﻤﻠﻮﺛﺎت اﻟﻬﻮاﺋﻴﺔ اﻟﻤﺘﻮﻟﺪة ﻋﻦ اﻟﻌﻤﻠﻴﺎت‬.16
during operational processes which includes :‫ ﺑﺸﻜﻞ ﻣﻔﺼﻞ ﻣﺘﻀﻤﻨﺔ اﻵﺗﻲ‬،‫اﻟﺘﺸﻐﻴﻠﻴﺔ‬
the following:
(a) A description of the air emissions ‫ ﺗﻮﺿﻴﺢ ﻧﻈﺎم ﻣﺮاﻗﺒﺔ اﻟﻤﻮاد اﻟﻤﻨﺒﻌﺜﺔ وﻣﻌﺪل‬-‫أ‬
monitoring systems and the frequency of ‫اﻟﻤﺮاﻗﺒﺔ‬
monitoring.
(b) Emission sources (operational processes ‫ اﻟﻮﺣﺪات‬/‫ ﻣﺼﺎدر اﻟﺘﻮﻟﺪ )اﻟﻌﻤﻠﻴﺎت اﻟﺘﺸﻐﻴﻠﻴﺔ‬-‫ب‬
/ production units). (‫اﻹﻧﺘﺎﺟﻴﺔ‬
(c) Types of emission (suspended ‫ اﻟﺦ( وﻣﻜﻮﻧﺎﺗﻬﺎ ﻣﻊ ﺑﻴﺎن‬،‫ ﻏﺎزات‬،‫ ﻧﻮﻋﻴﺘﻬﺎ )دﻗﺎﺋﻖ‬-‫ت‬
(particulates), gaseous emissions…etc.), (‫ ﻏﻴﺮ ﺧﻄﺮة‬/‫اﻟﺨﻄﻮرة )ﺧﻄﺮة‬
their composition and their risk analysis
(hazardous / non hazardous).
(d) Description of stack engineering designs ‫ ﺗﻮﺿﻴﺢ اﻟﻤﻮاﺻﻔﺎت اﻟﻬﻨﺪﺳﻴﺔ اﻟﻤﺘﻌﻠﻘﺔ ﺑﺎﻟﻤﺪاﺧﻦ‬-‫ث‬
including associated production units, ‫ﻓﻲ اﻟﻤﻨﺸﺄة ﺑﺤﻴﺚ ﺗﻀﻤﻦ اﻟﻮﺣﺪات اﻹﻧﺘﺎﺟﻴﺔ‬
number of stacks, height, diameter, ،‫ وﻗﻄﺮهﺎ‬،‫ وارﺗﻔﺎﻋﻬﺎ‬،‫اﻟﻤﺮﺗﺒﻄﺔ ﺑﻬﺎ وﻋﺪدهﺎ‬
construction material, emission rate
(m3/hr), normal and maximum velocity /‫ﺳﺎﻋﺔ( وﺳﺮﻋﺔ )م‬/3‫ وﻣﻌﺪل )م‬،‫وﻧﻮع ﻣﺎدة اﻟﺒﻨﺎء‬
(m/sec). .‫اﻟﺜﺎﻧﻴﺔ( اﻻﻧﺒﻌﺎث اﻻﻋﺘﻴﺎدي واﻷﻗﺼﻰ‬
(e) Engineering designs and details for the ‫ ﻓﻲ ﺣﺎﻟﺔ وﺟﻮد ﺁﻟﻴﺎت أو وﺣﺪات ﻟﻠﺘﺤﻜﻢ أو‬-‫ج‬
emission treatment / control unit (if ‫اﻟﻤﻌﺎﻟﺠﺔ ﻹﻧﺒﻌﺎﺛﺎت اﻟﻤﻠﻮﺛﺎت اﻟﻬﻮاﺋﻴﺔ ﻓﺈﻧﻪ ﻳﺘﻮﺟﺐ‬
applicable) including number of units, ‫ﺑﻴﺎن ﺷﺮح ﻣﻔﺼﻞ ﻟﺬﻟﻚ ﺑﺤﻴﺚ ﻳﺘﻀﻤﻦ آﺎﻓﺔ‬
type of treatment, capacity, efficiency,
country of origin, chemicals utilized,
،‫ ﻣﺘﻀﻤﻨﺔ اﻟﻌﺪد‬،‫اﻟﻤﻮاﺻﻔﺎت واﻟﺘﺼﺎﻣﻴﻢ اﻟﻬﻨﺪﺳﻴﺔ‬
and the type and quantity (ton, m3/day) ‫ وﺳﻨﺔ‬،‫ وﺑﻠﺪ اﻟﻤﻨﺸﺄ‬،‫ واﻟﻜﻔﺎءة‬،‫ واﻟﺴﻌﺔ‬،‫واﻟﻨﻮع‬
of liquid and solid wastes produced. .‫ و اﻟﻤﻮاد اﻟﻜﻴﻤﺎوﻳﺔ اﻟﻤﺴﺘﺨﺪﻣﺔ‬،‫اﻟﺘﺸﻐﻴﻞ‬
‫اﻟﻤﺨﻠﻔﺎت اﻟﺴﺎﺋﻠﺔ واﻟﺼﻠﺒﺔ اﻟﻤﺘﻮﻟﺪة ﻋﻨﻬﺎ )ﻧﻮﻋﻬﺎ‬
((‫ اﻟﻴﻮم‬/3‫ م‬،‫وآﻤﻴﺘﻬﺎ )ﻃﻦ‬
(f) The physical and chemical properties of ‫ اﻟﺨﺼﺎﺋﺺ اﻟﻔﻴﺰﻳﺎﺋﻴﺔ واﻟﻜﻴﻤﻴﺎﺋﻴﺔ ﻟﻬﺎ ﻗﺒﻞ وﺑﻌﺪ‬-‫ح‬
the emissions, before and after ‫اﻟﻤﻌﺎﻟﺠﺔ‬
treatment.
(g) Continuous monitoring (systems) / units ‫ اﻟﻮﺣﺪات اﻟﻤﺴﺘﺨﺪﻣﺔ ﻟﻠﻘﻴﺎس اﻟﻤﺴﺘﻤﺮ‬/‫ اﻟﻮﺳﺎﺋﻞ‬-‫خ‬
(if present). .(‫ﻟﺨﺼﺎﺋﺺ ﻣﻠﻮﺛﺎت اﻟﻬﻮاء )أن وﺟﺪت‬
(h) Existing or proposed air emission ‫ اﻟﻤﻘﺘﺮح ﻓﻲ ﻣﺮاﻗﺒﺔ وﺗﺤﻠﻴﻞ‬/‫اﻟﻨﻈﺎم اﻟﻤﺘﺒﻊ‬ -‫د‬
monitoring and analyzing system
‫ ﻣﻊ ﺑﻴﺎن‬،(‫ﻣﻠﻮﺛﺎت اﻟﻬﻮاء اﻟﻤﺘﻮﻟﺪة )أن وﺟﺪ‬
including a detailed description.
‫ﻣﻔﺼﻞ ﻟﻪ وﻣﻌﺪﻻت ذﻟﻚ‬
17. A detailed description of the noise produced ‫ ﺷﺮح ﻣﻔﺼﻞ ﻋﻦ اﻟﻀﻮﺿﺎء ﻓﻲ اﻟﻤﻨﺸﺄة ﺑﺤﻴﺚ ﻳﺘﻀﻤﻦ‬.17
from the facility which includes: :‫اﻟﺘﺎﻟﻲ‬
(a) Noise sources within the facility.
‫ ﻣﺼﺎدر اﻟﻀﻮﺿﺎء ﺿﻤﻦ اﻟﻤﻨﺸﺄة‬-‫أ‬
(b) Maximum noise level at site boundary
dB(A) between 7 am to 8 pm. ‫ اﻟﻤﻌﺪل اﻷﻗﺼﻰ ﻟﻠﻀﻮﺿﺎء ﻓﻲ ﺣﺪود اﻟﻤﻮﻗﻊ‬-‫ب‬
(c) Maximum noise level at site boundary ‫ ﻣﺴﺎء‬8 – ‫ ﺻﺒﺎﺣﺎ‬7 ‫)دﻳﺴﺒﻞ( ﻣﻦ اﻟﺴﺎﻋﺔ‬
dB(A) between 8 pm to 7 am. ‫ اﻟﻤﻌﺪل اﻷﻗﺼﻰ ﻟﻠﻀﻮﺿﺎء ﻓﻲ ﺣﺪود اﻟﻤﻮﻗﻊ‬-‫ت‬
(d) Mitigation methods utilized to reduce ‫ ﺻﺒﺎﺣﺎ‬7 – ‫ ﻣﺴﺎء‬8 ‫)دﻳﺴﺒﻞ( ﻣﻦ اﻟﺴﺎﻋﺔ‬
noise levels. ‫ اﻟﻄﺮق اﻟﻤﺴﺘﺨﺪﻣﺔ ﻟﻠﺘﻘﻠﻴﻞ ﻣﻦ اﻟﻀﻮﺿﺎء‬-‫ث‬

18. Permits and technical certificates such as ‫ اﻟﺘﺼﺎرﻳﺢ واﻟﺸﻬﺎدات اﻟﻔﻨﻴﺔ اﻟﺘﻲ ﺣﺼﻠﺖ ﻋﻠﻴﻬﺎ اﻟﻤﻨﺸﺄة‬.18
environmental permits, industrial and ‫ اﻟﺠﻮاﺋﺰ اﻟﺼﻨﺎﻋﻴﺔ واﻟﺒﻴﺌﻴﺔ‬،‫آﺎﻟﺸﻬﺎدات اﻟﺒﻴﺌﻴﺔ‬
environmental awards, ISO 14000…etc.
‫ إﻟﺦ‬..... ،14000 ‫ اﻻﻳﺰو‬،‫اﻟﺘﺸﺠﻴﻌﻴﺔ‬
acquired by the facility.

19. If there exists a documented Environmental ‫( ﻟﻠﻤﻨﺸﺄة‬EMS) ‫ ﻓﻲ ﺣﺎﻟﺔ وﺟﻮد ﻧﻈﺎم إدارة ﺑﻴﺌﻲ ﻣﻮﺛﻖ‬.19
Management System (EMS) in the facility ‫ﻓﺈﻧﻪ ﻳﺘﺤﺘﻢ إﺑﺮازﻩ ﺿﻤﻦ هﺬا اﻟﺘﻘﺮﻳﺮ‬
then it should be included within this report.
20. A detailed description of the procedures / ‫ ﺗﻌﻠﻴﻤﺎت اﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻰ‬/‫ ﺑﺮاﻣﺞ‬/‫ ﺗﻮﺿﻴﺢ إﺟﺮاءات‬.20
programs / instructions associated with ‫ﺳﻼﻣﺔ اﻟﻌﺎﻣﻠﻴﻦ ﻓﻴﻞ ﻳﺘﻌﻠﻖ ﺑﺎﻟﻌﻤﻠﻴﺎت اﻟﺘﺸﻐﻴﻠﻴﺔ‬
operational processes and production units for ‫واﻟﻮﺣﺪات اﻹﻧﺘﺎﺟﻴﺔ واﻟﺘﻌﺎﻣﻞ ﻣﻊ اﻟﻤﻮاد واﻟﻤﺨﻠﻔﺎت‬
protection of workers and handling of .‫اﻟﻜﻴﻤﻴﺎﺋﻴﺔ واﻟﺨﻄﺮة‬
hazardous materials and wastes.
21. Emergency Preparedness and Response Plan ‫ إﺟﺮاءات اﻟﻄﻮارئ واﻹﺧﻼء اﻟﻄﺒﻲ‬/‫ ﺗﻮﺿﻴﺢ ﺧﻄﻂ‬.21
including medical evacuation
plans/procedures. ‫ ﻓﻲ ﺣﺎﻟﺔ وﺟﻮد ﺗﻄﻮرات ﻣﺴﺘﻘﺒﻠﻴﺔ ذات اﻟﻌﻼﻗﺔ ﺑﺎﻟﻤﻨﺸﺄة‬.22
22. A description of future expansions / ‫ﻓﺈﻧﻪ ﻳﺘﻮﺟﺐ ﺑﻴﺎن هﺬﻩ اﻟﺘﻮﺳﻌﺎت وﺧﻄﻂ اﻟﺘﻄﻮﻳﺮ‬
development plans concerning the facility .‫اﻟﻤﺴﺘﻘﺒﻠﻴﺔ‬
/project (if available).
‫ ﺗﻘﺪﻳﻢ ﻧﺴﺨﺔ ﻣﻦ ﻣﺎ هﻮ ﻣﺘﻮﻓﺮ ﻣﻦ دراﺳﺎت ﺑﻴﺌﻴﺔ )ﺗﻘﻴﻴﻢ‬.23
23. Submit a copy of environmental studies ‫ ﻣﻊ ﺑﻴﺎن‬،‫اﻷﺛﺮ اﻟﺒﻴﺌﻲ أو ﻏﻴﺮهﺎ( ﻟﻤﺸﺮوﻋﺎت ﻣﻤﺎﺛﻠﺔ‬
(Environmental Impact Assessments, and .‫اﻟﻤﺼﺪر‬
others) for similar projects and include the
source of study.