Sei sulla pagina 1di 2

Inspection Test Record

M02A Vessel
SOUTH ACIS

Client: Murphy Sarawak Oil Ltd.

Date: 21-Feb-2013

TagNo:

Description:

System:

Sub System:

SubSubSystem:

Package:

Area:

Location:

Drawing Ref No:


Manufacturer:
SerialNo:
Item
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Model:

Type:

Description
Check vendors instruction, dossier, associated equipment catalogue and test certificate
are provided.
Nameplate is provided and details are correct in accordance with the data sheet.
Equipment is installed according to installation drawing and manufacturer's instructions
and specification.
Vessel and supports are level. No undue flange distortion.
Holding down bolts are tight.
Check vessel drawing to establish whether or not saddles should have sliding feet. If so,
confirm they are free and have locknuts and special washers.
Saddles are fitted correctly.
Ensure that all pipes and equipment which interface with the vessel have been installed.
All spades and spectacle blinds are set as per P&ID
All flange bolts have been torqued, and torquing/tensioning certificates are complete and
torquing tags are still intact.
All hot oil flushing and chemical cleaning of adjoining pipework has been completed
All internal checks and work that requires internal access has been completed. (attach
photo) *W*
Calibration of the vessels PSV (if any) is within date.
All hot work in the vicinity of the vessel is complete, e.g. ensure that pipe supports shall
not be welded onto walls.
Check vessel for damage or dent.
Insulation to spec and undamaged.
Internal coating undamaged. *W*
Internals are to drawing. *W*
Internal of vessel is clean. *W*
Access through manway is adequate.
Vessel fittings and trims are complete.
All valves and gauges are accessible and operate freely.
All vents and drains are complete.
Check that tell-tale holes are plugged or sealed.
All access ladders and platforms are complete.
There is adequate access for removal of internals.
For Contactor Tower - conduct chimney tray leak test.*W*
All bolting is torqued up to spec.
Ensure that preservation is correct as per manufacturers instruction and complies with
project Preservation Procedure.
Where preservation materials are installed, equipment is marked
PRESERVATION INSIDE.
Upon successful completion of all steps above, close manway door with shipping gasket
only and finger tighten all bolts. New gasket must NOT be used. Seal/cover flange to
prevent entry of water/dirt. *W*

NA

OK

PL

Output /Remarks

Note:
*W* MOC rep. Witness points

Completed By Construction
Signature:
Print Name:
Date of Signing:
Printed by: Soh, Gerald. 21-Feb-2013 16:35, (ID=28922).

Certified By QA/QC

Accepted By BDEWC COMM.

Inspection Test Record


M02A Vessel
SOUTH ACIS

Client: Murphy Sarawak Oil Ltd.

Date: 21-Feb-2013

TagNo:

Description:

System:

Sub System:

SubSubSystem:

Package:

Area:

Location:

Drawing Ref No:


___________________________________________________________________________________________________________________
Remarks:

Completed By Construction
Signature:
Print Name:
Date of Signing:
Printed by: Soh, Gerald. 21-Feb-2013 16:35, (ID=28922).

Certified By QA/QC

Accepted By BDEWC COMM.

Potrebbero piacerti anche