OVERALL SUMMARY OF ALL CABLES & TERMINATIONS TESTED AT SHREE POWER, RAS

(August 2013)
Cable ID

Aux. Supply
7 & 8 (10
MVA
Transformer
)
Aux. Supply
7 & 8 (TG 3)
Inner
Cable
Aux. Supply
7 & 8 (TG 3)
Outer
Cable
Aux. Supply
9 & 10 (TG
4)
Aux. Supply
9 & 10 (TG
6)
TG 7 132 kV
Cable
Transformer
End
Tie Line 132
kV
Switchyard

Sens
or

Peak
Cabl
e PD
(pC)

Cable
PD
Critical
ity
(pC/cyc
le)

Ratio of
+ve to
ve
cycle
PD

Peak
Local
PD
(dB)

Local
PD
Criticali
ty
(mV/cyc
le)

R
Y

HFCT
HFCT

3512
0

827
0

0.99
-

0
0

0
0

HFCT

R1
Y1

HFCT
HFCT

5424
0

1097
0

1.05
-

0
0

0
0

B1

HFCT

R2
Y2

HFCT
HFCT

7888
0

999
0

0
0

0
0

B2

HFCT

R
Y
B
R
Y
B
R
Y

HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT

0
0
0
0
3157
7086
0
0

0
0
0
0
210
1461
0
0

1.26
1.15
-

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

HFCT

R
Y

HFCT
HFCT

0
0

0
0

0
0

0
0

HFCT

7620

11241

1.24

Pha
se
Und
er
Test

NO ACTION
ACTION MANDATORY,

ALARM

REQUIRED,

Analysis & Recommendations

Possible PD OR stray pulses from external source


detected. The Criticality level is low. No immediate
action required.
Possible PD OR stray pulses from external source
detected. The Criticality level is low. No immediate
action required.
Possible PD OR stray pulses from external source
detected. The Criticality level is low. No immediate
action required.
Healthy cables & local terminations, no action required.
Possible PD OR stray pulses from external source
detected. The Criticality level is low. No immediate
action required.
Healthy cables & local terminations, no action required.
Severe PD detected in B-Phase cable; at approximately
5.16 % from the far end of the cable (we tested at the
transformer end). Inspect cable for degradation &
monitor closely.

MONITOR,

ACTION RECOMMENDED,

TEST AFTER 2 YEARS


RE-TEST

TEST AFTER 1 YEAR

TEST AFTER 6 MONTHS

THEN

* The colour coding is based on our experience & comparisons of identical cables; as there are no international standards yet for on-line cable
PD testing.
* While certain guidelines are based on Peak PD & PD Ratio, PD Criticality is a better indicator of degradation if trends or comparisons are
available.

OVERALL SUMMARY OF ALL CABLES & TERMINATIONS TESTED AT SHREE POWER, RAS
(August 2013)
Cable ID

Evacuation
Feeder (Unit
6 to LC3)
Evacuation
Feeder (Unit
6 to LC3)
Evacuation
Feeder (Unit
6 to LC3)
Evacuation
Feeder (Unit
6 to LC3)
Evacuation
Feeder (Unit
6 to LC3)

Pha
se
Und
er
Test
R1
Y1
B1
R2
Y2
B2
R3
Y3
B3
R4
Y4
B4
R5
Y5
B5

Sens
or

Peak
Cabl
e PD
(pC)

Cable
PD
Critical
ity
(pC/cyc
le)

Ratio of
+ve to
ve
cycle
PD

Peak
Local
PD
(dB)

Local
PD
Criticali
ty
(mV/cyc
le)

HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

NO ACTION
ACTION MANDATORY,
TEST AFTER 2 YEARS
RE-TEST

ALARM

REQUIRED,
TEST AFTER 1 YEAR

Analysis & Recommendations

Healthy cables & local terminations, no action required.

Healthy cables & local terminations, no action required.

Healthy cables & local terminations, no action required.

Healthy cables & local terminations, no action required.

Healthy cables & local terminations, no action required.

MONITOR,

ACTION RECOMMENDED,

TEST AFTER 6 MONTHS

THEN

* The colour coding is based on our experience & comparisons of identical cables; as there are no international standards yet for on-line cable
PD testing.
* While certain guidelines are based on Peak PD & PD Ratio, PD Criticality is a better indicator of degradation if trends or comparisons are