(August 2013)
Cable ID
Aux. Supply
7 & 8 (10
MVA
Transformer
)
Aux. Supply
7 & 8 (TG 3)
Inner
Cable
Aux. Supply
7 & 8 (TG 3)
Outer
Cable
Aux. Supply
9 & 10 (TG
4)
Aux. Supply
9 & 10 (TG
6)
TG 7 132 kV
Cable
Transformer
End
Tie Line 132
kV
Switchyard
Sens
or
Peak
Cabl
e PD
(pC)
Cable
PD
Critical
ity
(pC/cyc
le)
Ratio of
+ve to
ve
cycle
PD
Peak
Local
PD
(dB)
Local
PD
Criticali
ty
(mV/cyc
le)
R
Y
HFCT
HFCT
3512
0
827
0
0.99
-
0
0
0
0
HFCT
R1
Y1
HFCT
HFCT
5424
0
1097
0
1.05
-
0
0
0
0
B1
HFCT
R2
Y2
HFCT
HFCT
7888
0
999
0
0
0
0
0
B2
HFCT
R
Y
B
R
Y
B
R
Y
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
0
0
0
0
3157
7086
0
0
0
0
0
0
210
1461
0
0
1.26
1.15
-
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
HFCT
R
Y
HFCT
HFCT
0
0
0
0
0
0
0
0
HFCT
7620
11241
1.24
Pha
se
Und
er
Test
NO ACTION
ACTION MANDATORY,
ALARM
REQUIRED,
MONITOR,
ACTION RECOMMENDED,
THEN
* The colour coding is based on our experience & comparisons of identical cables; as there are no international standards yet for on-line cable
PD testing.
* While certain guidelines are based on Peak PD & PD Ratio, PD Criticality is a better indicator of degradation if trends or comparisons are
available.
OVERALL SUMMARY OF ALL CABLES & TERMINATIONS TESTED AT SHREE POWER, RAS
(August 2013)
Cable ID
Evacuation
Feeder (Unit
6 to LC3)
Evacuation
Feeder (Unit
6 to LC3)
Evacuation
Feeder (Unit
6 to LC3)
Evacuation
Feeder (Unit
6 to LC3)
Evacuation
Feeder (Unit
6 to LC3)
Pha
se
Und
er
Test
R1
Y1
B1
R2
Y2
B2
R3
Y3
B3
R4
Y4
B4
R5
Y5
B5
Sens
or
Peak
Cabl
e PD
(pC)
Cable
PD
Critical
ity
(pC/cyc
le)
Ratio of
+ve to
ve
cycle
PD
Peak
Local
PD
(dB)
Local
PD
Criticali
ty
(mV/cyc
le)
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
HFCT
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
NO ACTION
ACTION MANDATORY,
TEST AFTER 2 YEARS
RE-TEST
ALARM
REQUIRED,
TEST AFTER 1 YEAR
MONITOR,
ACTION RECOMMENDED,
THEN
* The colour coding is based on our experience & comparisons of identical cables; as there are no international standards yet for on-line cable
PD testing.
* While certain guidelines are based on Peak PD & PD Ratio, PD Criticality is a better indicator of degradation if trends or comparisons are
available.