Sei sulla pagina 1di 4

EKL-HSE-F-0121

H & S Risk Assessment and Control Form


(Crane Operation)

Rev. 00
20 July 2009

Project: MOL-Manzalai-9 Wellhead Service Facility

Risk Assessment by: I/C Site HSE

Verification by:

Location: Manzalai

Date:

Date:

Sign:

Sign:

(a) RISK ASSESSMENT


Sr. No.

Identified Hazard

Consequence (C)
Descriptor

Rating

Likelihood (L)
Descriptor

Assessed Risk = L x C

Rating

Crane Operation

(i)

Moblization of Equipement: (Un-Authorized


Equipment, Mechanical Failuar, Unsafe Driving,
Road Accident)

(ii)

Falling Load: Personnel Injury, Property Loss

(iii)

Crane Tripping: Personnel Injury, Property Loss

15

(iv)

Hydraulic Failuer: Personnel Injury, Propoerty Loss

(v)

Fire Hazard:

10

Guidelines for Risk Assessment


Measurement of Consequence
Descriptor
Fatal

Rating
5

Description
Death

Measurement of Likelihood
Descriptor
Very Likely

Rating
5

Description
Will certainly occur in most of
circumstances

engineering kinetics (pvt.)ltd

Assesed Risk
Level
Etreme

Rating
18 - 25

Description
Stop the activity. Immediate action required;
notify Supervisor, I/C Site HSE

1 of 2

EKL-HSE-F-0121

H & S Risk Assessment and Control Form


(Crane Operation)

Rev. 00
20 July 2009

Major Injury

Extensive injuries with lost time injury > 5


days

Likely

Will probably occur in most


circumstances

High

12 - 18

Immediate action required, notify


Supervisor and I/C Site HSE

Minor Injury

Requires medical treatment with lost time


injury 1-5 days

Occasionally

Might occur at sometime

Moderate

6 - 12

Remedial action required

First Aid

First aid treatment where medical treatment


is not required

Unlikely

May occur in exceptional


circumstances

Low

1-6

Remedial action required to minimize


injury; Supervisor attention needed

Negligible

Incidents that do not require medical


treatment; property damage

Highly Unlikely

Will not occur in any circumstances

(b) RISK CONTROL

Hazard
No.

Control Measures

Responsibility

Planned
Target Date

Actual
Reason in case of
Completion
Delay
Date

Remarks

Name/ Signature/ Dept.


1

(i)

WELDING
All Crane moblize to project site should be 3rd
partty Certified.
Regular tool box talks shall be delivered to
operators. Operator must hold valid licence. Only
specific defined path followed during mobilization
at site. Speed limit should followed.

Execution/ Store

engineering kinetics (pvt.)ltd

2 of 2

H & S Risk Assessment and Control Form


(Crane Operation)

EKL-HSE-F-0121
Rev. 00
20 July 2009

(ii)

Crane and lifting gears shall be third party


certified. Crane Operator shall be third party
certified. Load chart to be followed.
Limit Switch and SLI shall be in working condition.
Trained riggers shall be deployed for the rigging
job. Crane shall be fitted with a reversing alarm.
Ensure proper
maintenance and inspection of crane before startup
Never leave a suspended load unattended.
To prevent non-essential
workers from entering crane operation site,
warning signs must be placed around the entire
working area.
Before operating a crane, the operator must
walk around the equipment and the entire work
area encompassed by the crane to ensure that his
work area is clear of obstructions, non-essential
people and other equipment.
Hoist hooks shall have safety
latches and the hooks are never to be repainted
even if they are worn out. A boom angle indicator
must be on the crane.

(iii)

Ground level shall be inspected before crane


operation.
Crane shall be installed on compacted soil.

(iv)

Area barrication shall be followed. Only authorized


persons are allowed to interact with crane
operation.
Crane
Should be inspected by third party and regular
inspection is also carried out by site HSE Team

Execution/ HSE

Execution

Execution/ HSE

engineering kinetics (pvt.)ltd

3 of 2

H & S Risk Assessment and Control Form


(Crane Operation)

EKL-HSE-F-0121
Rev. 00
20 July 2009

(v)

Fire extiguisher shall be present in crane and at


site.
Trainings to be conducted for fire prevention and
fire fighting. Any leakage or sepage shall be
rectified before starting the job. All the time LEL
should be monitor by HSE Representative.

Execution/ HSE

Verification By:____________________

_____________________________

I/C Site HSE

I/C / SM / PM

engineering kinetics (pvt.)ltd