CALCULATION SHEET FOR DEMIN TANK

Rev.
0

PROJECT

CLIENT

LOCATION

Issued for Implementation

12/11/2013

AYN

NNG/ASA BSR

EML

JHS

Issued for Approval

24/09/2013

AYN

NNG/ASA BSR

EML

JHS

Issued for Approval

12/07/2013

AYN

NNG/ASA BSR

EML

JHS

Issued for Review

06/03/2013

AYN

NNG/ASA BSR

EML

JHS

REV

DESCRIPTIONS

DATE

PREPD

REVISION HISTORICAL SHEET

CHKD

APPD

HOEGH - REKIND

TAS

PGN

CALCULATION SHEET FOR DEMIN TANK


Rev.
0

Rev No

Date

Description

06/03/2013

Issued for Review

12/07/2013

Issued for Approval

24/09/2013

Issued for Approval

12/11/2013

Issued for Implementation

TABLE CONTENT

CALCULATION SHEET FOR DEMIN TANK


Rev.
0

1. General ..................................................................................................................................................... 4
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
1.8.

Scope of Structure ............................................................................................................................. 4


Code and Standard ........................................................................................................................... 4
Allowable Strength of Material ........................................................................................................... 4
Stability Parameter ............................................................................................................................ 5
Allowable Bearing Capacity ............................................................................................................... 5
Allowable Pile Capacity ..................................................................................................................... 5
Unit Measurement ............................................................................................................................. 5
Computer Software............................................................................................................................ 5

2. Outline of Structure ................................................................................................................................. 6


2.1.
2.2.
2.3.
2.4.

Perspective ........................................................................................................................................ 6
Node Numbering ............................................................................................................................... 7
Member Numbering ........................................................................................................................... 7
Member Properties ............................................................................................................................ 8

3. Design Load ........................................................................................................................................... 12


3.1.
3.2.
3.3.
3.4.
3.5.
3.6.

Dead Load ....................................................................................................................................... 12


Live Load ......................................................................................................................................... 13
Equipment Load .............................................................................................................................. 13
Wind Load ....................................................................................................................................... 14
Seismic Load ................................................................................................................................... 15
Load Combination ........................................................................................................................... 18

4. Analysis Result Summary .................................................................................................................... 27


4.1. Displacement ................................................................................................................................... 27
4.2. Concrete Design .............................................................................................................................. 28
4.3. Steel Ratio ....................................................................................................................................... 35
5. Stability Analysis For Pile .................................................................................................................... 39

ATTACHMENT A LOADING DATA


ATTACHMENT B SOIL REPORT
ATTACHMENT C STAAD PRO INPUT&OUTPUT
ATTACHMENT D ENGINEERING DRAWING

CALCULATION SHEET FOR DEMIN TANK


Rev.
0

1. GENERAL
1.1. Scope of Structure
1.2. Code and Standard
1.2.1.

General Code and Standard


SKBI 1.3.53.1987.UDC : 624.042 Indonesia Loading Code for Building
ACI 318 2008 American Concrete Institute Building Code Requirement for Structural Concrete
AISC ASD Series American Institute of Steel Construction ASD Manual for Steel Construction, 9th
edition
UBC 97 Uniform Building Code
ANSI/ASCE 7 05 American Society of Civil Engineer Minimum Design Loads for Building and
other Structure
SNI 03-1729-2002 Tata Cara Perencanaan Struktur Baja untuk Bangunan Gedung
SNI 03-1726-2002 Standard Perencanaan Ketahanan Gempa untuk Struktur Bangunan Gedung
SNI 03-2847-2002 Tata Cara Perhitungan Struktur Beton untuk Bangunan Gedung

1.3. Allowable Strength of Material


a. Concrete
Compressive concrete at 28 days monitored by cylinder specimen test, shall be as follow :

fc = 350 kg/cm2
fc = 280 kg/cm2
fc = 136 kg/cm2

for major foundation


for structural concrete
for lean concrete

b. Reinforcing Steel Bar

Minimum yield strength of deformed bar


Minimum yield strength of plain bar
Minimum yield strength of wiremesh

: fy = 4000 kg/cm2
: fy = 2400 kg/cm2
: fy = 5000 kg/cm2

c. Structural Steel

Minimum yield strength of structural steel

1.4. Stability Parameter


1.4.1.

Permissible Deflection (reference SNI-03-1726-2002)


Column Deflection
- Permanent Load

H/300

- Temporary Load

H/200

: fy = 2400 kg/cm2

CALCULATION SHEET FOR DEMIN TANK


Rev.
0

Beam deflection (reference SNI-03-2847-2002)

1.4.2.

- Beam loaded with live load only

L/360

- Beam loaded with live load plus dead load

L/240

Foundation Stabililty
Safety factor for foundation stability shall as follow.
Sliding

not less than 1.5 for temporary and not less than 2.0 for permanen

Overturning

not less than 1.5 for temporary and not less than 2.0 for permanen

Buoyancy

not less than 1.1

1.5. Allowable Bearing Capacity


See attachment
1.6. Allowable Pile Capacity
See attachment
1.7. Unit Measurement
Unit of measurement shall be in metric units.
1.8. Computer Software
Applied computer software

STAAD Pro
Microsoft Office

2. OUTLINE OF STRUCTURE
The purpose of this calculation is to design for equipment foundation and structure for ORF Demin Tank and
analyze its structural integrity, strength, and stability verification.

CALCULATION SHEET FOR DEMIN TANK


Rev.
0

2.1. Perspective

Figure 1.

Perspective

Figure 2.

Modelling on staad pro.