EPS SEDACUSCO S.A.

Gerencia de Ingeniera

REPORTE FINANCIERO
OBRA
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
CUENTA CONTABLE: 339531
ITEM
1
2
3
4

CONCEPTO
MANO DE OBRA
MATERIALES
EQUIPOS
SERVICIOS DIVERSOS
TOTAL

JULIO

AGOSTO

SETIEMBRE

0.00

0.00

11,762.72
372,045.69
0.00
281.10
384,089.51

APROBADO
639,604.64
869,629.84
13,000.00
19,071.23
1,541,305.71

EJECUTADO
11,762.72
372,045.69
0.00
281.10
384,089.51

SALDO
627,841.92
497,584.15
13,000.00
18,790.13
1,157,216.20

OCTUBRE

NOVIEMBRE

0.00

DICIEMBRE

0.00

ENERO

0.00

0.00

PRESUPUESTO ANALITICO
ITEM
1
2
3
4

CONCEPTO
MANO DE OBRA
MATERIALES
EQUIPOS
SERVICIOS DIVERSOS - OTROS
TOTAL (SOLES)
TOTAL(%)

DESCRIPCION

Avance Financiero Programado


Avance Financiero Ejecutado

100.00%

24.92%

PRESUPUESTO

75.08%

AVANCE DEL MES

AVANCE ACUMULADO

SALDO POR EJECUTAR

DE OBRA

S/.

S/.

S/.

1,541,305.71
1,541,305.71

400,000.00
384,089.51

25.95%
24.92%

400,000.00
384,089.51

25.95%
24.92%

1,141,305.71
1,157,216.20

74.05%
75.08%

FEBRERO

0.00

MARZO

0.00

ABRIL

MAYO

0.00

JUNIO

0.00

JULIO

0.00

0.00

AGOSTO

0.00

TOTAL
11,762.72
372,045.69
0.00
281.10
384,089.51

CONTROL DE AVANCE
PROGRAMADO Vs. EJECUTADO
80,000

73,609
70,000

73,609

73,609

73,609

73,609

73,609

Octubre

Noviembre

Diciembre

Enero

Febrero

60,000

50,000
Monto
40,000

30,000

20,000

10,000

0
Septiembre

Meses
Avance Programado

Avance Ejecutado

EPS SEDACUSCO S.A.


Gerencia de Ingeniera

CONTROL DE AVANCE FISICO


PROGRAMADO Vs. EJECUTADO
Avance Programado
Mes

Mensual

Acumulado

S/.
Septiembre

Avance Ejecutado

S/.

Adelanto

Atraso

S/.

S/.

Acumulado
%

73,608.54

Err:509

Err:509

Err:509

Err:509

73,609

Err:509

Octubre

#VALUE!

#VALUE!

73,609

Err:509

Noviembre

#VALUE!

#VALUE!

73,609

Err:509

Err:509

Err:509

Diciembre

#VALUE!

#VALUE!

73,609

Err:509

Err:509

Err:509

Enero

#VALUE!

#VALUE!

73,609

Err:509

Err:509

Err:509

Febrero

#VALUE!

#VALUE!

73,609

Err:509

Err:509

Err:509

Total

Descripcin

Err:509

Mensual

Situacin de la Obra

Err:509

73,609
En el Mes

Acumulado Actual

Saldo por Ejecutar

S/.

S/.

S/.

Programado

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Ejecutado

73,609

73,609

Err:509

A.R. (%)

Valorizacin Acumulada Real


Monto del Contrato de Obra

73,609
Err:509

Err:509

A.P. (%)

Valorizacin Acumulada Prog.


Monto del Contrato de Obra

Err:509
Err:509

Err:509

Err:509
Err:509

Err:509

(%)

A.R. (%)
A.P. (%)

VALORIZACION EJECUTADA MENSUAL

Err:509

% AVANCE ACTUAL

Err:509

% AVANCE ACUMULADO

Err:509

VALORIZACION PROGRAMADA MENSUAL

#REF!

% AVANCE PROGRAMADA MENSUAL

#REF!

VALORIZACION EJECUTADA MENSUAL

Err:509

VALORIZACION ACUMULADA

Err:509

COMPLEM

IMPORTE DE LA EJECUCION PRESUPUESTAL ACUMULADA

S/. 0.00

IMPORTE DE LA EJECUCION PRESUPUESTAL MENSUAL

S/. 0.00

Err:509
M1
M2
M3
M4
M5
M6

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

0.050897004 0.18916146
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

2863318.12
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

2863318.12
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

PRESUPUESTO VALORIZADO
Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

RESUMEN DE VALORIZACIONES DE AVANC


MES
OBRA

DICIEMBRE 2013
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
MONTO DE OBRA
MONTO ASIGNADO
FECHA DE INICIO DE OBRA
PLAZO DE EJECUCIN
FECHA DE TERMINO

S/. 102,944.52
S/. 102,944.52
11/19/2013
60
1/18/2014

DIAS

PRESUPUESTO
ITEM

ANTERIOR
Valorizado
S/.

VALORIZACION
S/.

PROGRAMADO

MAYOR METRADOS

COSTOS TOTAL

102,944.52

0.00%

2,027.77

0.00%

102,944.52

0.00%

N DE VALORIZACIONES DE AVANCE DE OBRA

REGION
DEPARTAMENTO
PROVINCIA
DISTRITO
LOCALIDAD

: CUSCO
: CUSCO
: CUSCO
: SAN SEBASTIAN
A.P.V. TRABAJADORES DE CORPAC

FECHA DE PRESENTACIN:

12/1/2013

AVANCES
ACTUAL
Valorizado
S/.

ACUMULADO
Valorizado
S/.

SALDO
%

71,580.77

69.53%

71,580.77

69.53%

2,027.77

1.97%

2,027.77

1.97%

73,608.54

71.50%

73,608.54

71.50%

Valorizado
S/.

31,363.77
-

31,363.77

30.47%
0.00%

30.47%

PARTIDAS EJECUTADAS EN ELPROYECTO

Se ha realizado la ejecucion de obra, segn el Expediente Tecnico Aprobado, habiendoce ejecutado las siguientes partidas
PARTIDA
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
01.07.00

DESCRIPCION DE LA PARTIDA
OBRAS PROVISIONALES SISTEMA DE AGUA
Construccion de Oficina, Almacen y Guardiania
los beneficiaios proporcionaron ambientes tanto para la residencia y almacen de obra
Energia Electrica Provisional
se tuvo que pagar a los beneficiarios por la energia electrica temporal
Puentes Peatonales de Madera
partida no ejecutada
Tranqueras de Madera Para Desvio Vehicular
partida no ejecutada
Cartel de Identificacion de Obra
partida no ejecutada
Limpieza de Obra
esta partida se ejecuto mediante faenas de los pobladores del APV Corpac Cusco
Cinta de seguridad
partida no ejecutada

02.00.00
02.01.00

TRABAJOS PRELIMINARES
Limpieza de Terreno Manual
esta partida se ejecuto mediante faenas de los pobladores del APV Corpac Cusco

03.00.00
03.01.00
03.01.01

REDES DE DISTRIBUCION
TRABAJOS PRELIMINARES
Trazo Nivelacion y Replanteo
se ubico en el terreno l eje de la red de distribucion, habiendoce ubicado ademas el are de empalme, valvulas de compuerta
y demas detalles que aparecen en los planos, luego se procedio al trazo del ancho de la zanja con yeso, segn lo que indica
en los planos de planta

03.01.02

Trazo Nivelacion y Replanteo Durante el Proceso


se realizo el control permanente y minucioso del alineamiento, a fin de evitar modificaciones en el eje de la tuberia instalada

03.02.00
03.02.01

MOVIMIENTO DE TIERRAS
Excavacion de Zanjas para Tuberia PVC (C-10) 90mm
se realizo el corte de la zanja a mano a fin de evitar daos en las instalaciones existentes habiendoce realizado entibaciones
para evitar derrumbe de las zanjas excavadas, en tramos donde no existia instalaciones se utilizo maquinaria pesada
(retroexcavadora) para aperturar la zanja.

03.02.02

Perfilado de zanjas

03.02.03

Cama de apoyo para tuberias E=0.10m


una vez realizada el refine de fondo de la zanja, se utilizo material granular ( piedra chancada de 1/2") como cama de apoyo
para la tuberia instalada
Relleno y compactado con material propio

03.02.04

se procedio a la seleccin del terreno, que se utilizo como primer relleno, habiendoce ejecutado este en capas de 15 cm de
altura realizandoce la compactacion manual hasta una altura de 60 cm, luego se procedio a realizar el segundo relleno
habiendoce utilizado apisonadores tipo pison (compactador canguro)
03.02.05

Eliminacion y acarreo de material exedente


se elimino una parte del material exedente con maquinaria alquilada, el restante se procedio con apoyo de la municipalidad
Distrital de San Sebastian

03.02.06

Entibado y apuntalamiento de zanjas H>2.5m


se utilizo maderamen adquirido con recursos propios (tablas y listones)

03.03.00
03.03.01

TUBERIAS
PVC NTP ISO 4422 SERIE 20 (C-10) 90mm
se utilizo tuberia de PVC con union flexible clase 10 de 90 mm de diametro segn norma de fabricacion ISO 4422, con anillo
elastomerico, segn lo especificado en el expediente tecnico aprobado, habiendoce puesto especial cuidado en el
transporte manipuleo evitando ser golpeado y/o arrastrado, el almacenamiento se ralizo en un lugar alquilado bajo techo y
ventilcion natural.

03.04.00
03.04.01

SUMINISTRO Y COLOCACION DE ACCESORIOS Y VALVULAS


Suministro y colocacion de valvula de purga 90mm en red de distribucion
se utilizo esta valvula de purga al final de la tuberia instalada, en la parte mas baja de la red

03.04.02

Suministro y colocacion de valvula de compuerta de 90mm en red de distribucion


las valvulas usadas son de tipo compuerta HD ISO 7259 de 90 mm de diametro segn especificado en el expediente tecnico
aprobado

03.05.00
03.05.01

PRUEBA HIDRAULICA
Prueba hidraulica en tuberias
para la ejecucion de la prueba hidraulica, se procedio a instalar el balde de prueba con el manometro en el extremo mas
bajo del tramo de prueba, una vez taponado los extremos del tramo sometido a la prueba, se realizo el llenado de la red
con agua , luego se procedio con el bombeo a travez del valde de prueba en las presiones de 50, 80, 100, 150 psi, se
purgo el aire atrapado en la red , luego de llegar a la presion de prueba (1.5 veces la presion de trabajo), se procedio a
comprobar la impermeabilidad del tramo observando las posibles variaciones en el manometro durante 1 hora de prueba,
lo cual no se tuvo variaciones y se procedio a dar el visto buebo por parte del supervisor y su posterior firmado de los
protocolos de calidad.

03.05.02

Desinfeccion en tuberias
una vez realizada la prueba hidraulica se procdio con la desinfeccion de la tuberia para su posterior puesta en marcha

03.06.00
03.06.01
03.06.02
03.06.03

VARIOS
Reposicion de conexiones de agua
partida no ejecutada
Demolicion y reposicion de pavimento
partida no ejecutada
Puesta en operacin del sistema de agua
luego de ejecutar la instalacion de las diferentes tuberias, accesorios y valvulas con la aprobacion de la supervision de obra,
se procedio a la puesta de operacin del sistema

NOTA:

EL PROYECTISTA EN LA PARTIDA DE EXCAVACION DE ZANJAS PARA LA INSTALACION DE LA TUBERIA CONCIDERA LA


CUBICOS Y NO EN METROS LINEALES.

CUTADAS EN ELPROYECTO

Aprobado, habiendoce ejecutado las siguientes partidas


UNIDAD

METRADO

M2

0.00

GLB

1.00

UND

0.00

UND

0.00

UND

0.00

M2

1,383.26

0.00

M2

1,383.26

M2

549.41

M2

549.51

M3

398.00

959.75

M3

57.58

M3

233.27

M3

114.46

90.00

959.75

PZA

1.00

PZA

2.00

GLB

2.00

915.69

UND

0.00

M2

0.00

GLB

1.00

E ZANJAS PARA LA INSTALACION DE LA TUBERIA CONCIDERA LA UNIDAD EN METROS

VALORIZACION DE
PRIN
MES
OBRA

NOVIEMBRE 2013
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
S/. 102,944.52
S/. 102,944.52
11/19/2013
60
1/18/2014

MONTO DE OBRA
MONTO ASIGNADO
FECHA DE INICIO DE OBRA
PLAZO DE EJECUCIN
FECHA DE TERMINO

DIAS

PRESUPUESTO PROGRAMADO
PARTIDA

DESCRIPCION

UNIDAD
METRADO

01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
01.07.00

OBRAS PROVISIONALES SISTEMA DE AGUA


Construccion de Oficina, Almacen y Guardiania
Energia Electrica Provisional
Puentes Peatonales de Madera
Tranqueras de Madera Para Desvio Vehicular
Cartel de Identificacion de Obra
Limpieza de Obra
Cinta de seguridad

02.00.00
02.01.00
03.00.00
03.01.00
03.01.01
03.01.02

P. UNIT.

PRESUP.

P. TOTAL

S/.

S/.

S/.

M2
GLB
UND
UND
UND
M2
M

50.00
1.00
20.00
8.00
1.00
1,383.26
1,831.38

81.85
500.00
19.47
29.37
593.93
0.95
0.50

4,092.50
500.00
389.40
234.96
593.93
1,314.10
915.69

4092.5
500.00
389.4
234.96
593.93
1,314.10
915.69

TRABAJOS PRELIMINARES
Limpieza de Terreno Manual

M2

1,383.26

0.95

1,314.10

1,314.10

REDES DE DISTRIBUCION
TRABAJOS PRELIMINARES
Trazo Nivelacion y Replanteo
Trazo Nivelacion y Replanteo Durante el Proceso

M2
M2

549.41
549.51

1.35
1.07

741.70
587.98

741.70
587.98

03.02.00
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06

MOVIMIENTO DE TIERRAS
Excavacion de Zanjas para Tuberia PVC (C-10) 90mm
Perfilado de zanjas
Cama de apoyo para tuberias E=0.10m
Relleno y compactado con material propio
Eliminacion y acarreo de material exedente
Entibado y apuntalamiento de zanjas H>2.5m

M3
M
M3
M3
M3
M

366.28
915.69
54.94
219.77
114.46
90.00

21.68
0.63
59.00
18.07
14.51
17.02

7,940.95
576.88
3,241.46
3,971.24
1,660.81
1,531.80

7,940.95
576.88
3,241.46
3,971.24
1,660.81
1,531.80

03.03.00
03.03.01

TUBERIAS
PVC NTP ISO 4422 SERIE 20 (C-10) 90mm

915.69

10.48

9,596.43

9,596.43

03.04.00
03.04.01
03.04.02

SUMINISTRO Y COLOCACION DE ACCESORIOS Y VALVULAS


Suministro y colocacion de valvula de purga 90mm en red de distribucion
Suministro y colocacion de valvula de compuerta de 90mm en red de distribucion

PZA
PZA

1.00
2.00

843.99
674.59

843.99
1,349.18

843.99
1,349.18

03.05.00
03.05.01
03.05.02

PRUEBA HIDRAULICA
Prueba hidraulica en tuberias
Desinfeccion en tuberias

GLB
M

1.00
915.69

450.59
0.16

450.59
146.51

450.59
146.51

03.06.00
03.06.01
03.06.02
03.06.03

VARIOS
Reposicion de conexiones de agua
Demolicion y reposicion de pavimento
Puesta en operacin del sistema de agua

UND
M2
GLB

21.00
50.00
1.00

221.12
98.47
277.40

4,643.52
4,923.50
277.40

4,643.52
4,923.50
277.40

0.6829368
0.18

COSTO DIRECTO
GASTOS GENERALES 68.29 %
IMPUESTO IGV 18%
PRESUPUESTO TOTAL

51,838.62
35,402.50
15,703.40
102,944.52

VALORIZACION DE
ADICIONALES - POR M
MES
OBRA

NOVIEMBRE 2013
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
S/. 102,944.52
S/. 102,944.52
11/19/2013
60
1/18/2014

MONTO DE OBRA
MONTO ASIGNADO
FECHA DE INICIO DE OBRA
PLAZO DE EJECUCIN
FECHA DE TERMINO

DIAS

PRESUPUESTO PROGRAMADO
PARTIDA

DESCRIPCION

UNIDAD
METRADO

03.02.00
03.02.01

P. UNIT.

PRESUP.

P. TOTAL

S/.

S/.

S/.

MOVIMIENTO DE TIERRAS
Excavacion de Zanjas para Tuberia PVC (C-10) 90mm

M3

31.72

21.68

687.75

687.75

Perfilado de zanjas

44.06

0.63

27.76

27.76

03.02.03

Cama de apoyo para tuberias E=0.10m

M3

2.64

59.00

155.97

155.97

03.02.04

Relleno y compactado con material propio

M3

13.50

18.07

243.95

243.95

03.03.00

TUBERIAS

03.03.01

PVC NTP ISO 4422 SERIE 20 (C-10) 90mm

44.06

10.48

461.75

461.75

03.05.00

PRUEBA HIDRAULICA

03.05.01

Prueba hidraulica en tuberias

GLB

1.00

450.59

450.59

450.59

03.02.02

COSTO DIRECTO

2,027.77

VALORIZACION DE
ADICIONALES - POR
MES
OBRA

NOVIEMBRE 2013
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
S/. 102,944.52
S/. 102,944.52
10/1/2012
210 DIAS
4/28/2013

MONTO DE OBRA
MONTO ASIGNADO
FECHA DE INICIO DE OBRA
PLAZO DE EJECUCIN
FECHA DE TERMINO

PRESUPUESTO PROGRAMADO
PARTIDA

DESCRIPCION

UNIDAD
METRADO

COSTO DIRECTO

P. UNIT.

PRESUP.

P. TOTAL

S/.

S/.

S/.

0.00

RIZACION DE AVANCE DE OBRA


PRINCIPAL

REGION
DEPARTAMENTO
PROVINCIA
DISTRITO
LOCALIDAD

: CUSCO
: CUSCO
: CUSCO
: SAN SEBASTIAN
A.P.V. TRABAJADORES DE CORPAC
FECHA DE PRESENTACIN:

1/6/2016

AVANCES
ANTERIOR
Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

SALDO

ACTUAL

Valorizado S/.

Valorizado S/.

ACUMULADO

Metrado

Metrado

Valorizado S/.

Metrado

Valorizado S/.

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
1.00
0.00
0.00
0.00
1,383.26
0.00

0.00
500.00
0.00
0.00
0.00
1,314.10
0.00

0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
0.00%

1.00
1,383.26
-

500.00
1,314.10
-

0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
0.00%

50.00
20.00
8.00
1.00
1,831.38

4,092.50
389.40
234.96
593.93
915.69

0.00%

1,383.26

1,314.10

100.00%

1,383.26

1,314.10

100.00%

0.00%
0.00%

549.41
549.51

741.70
587.98

100.00%
100.00%

549.41
549.51

741.70
587.98

100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

366.28
915.69
54.94
219.77
114.46
90.00

7,940.95
576.88
3,241.46
3,971.24
1,660.81
1,531.80

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

366.28
915.69
54.94
219.77
114.46
90.00

7,940.95
576.88
3,241.46
3,971.24
1,660.81
1,531.80

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00

0.00%

915.69

9,596.43

100.00%

915.69

9,596.43

100.00%

0.00

0.00%
0.00%

1.00
2.00

843.99
1,349.18

100.00%
100.00%

1.00
2.00

843.99
1,349.18

100.00%
100.00%

0.00
0.00

0.00%
0.00%

1.00
915.69

450.59
146.51

100.00%
100.00%

1.00
915.69

450.59
146.51

100.00%
100.00%

0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
1.00

0.00
0.00
277.40

0.00%
0.00%
100.00%

1.00

277.40

0.00%
0.00%
100.00%

21.00
50.00
-

4,643.52
4,923.50
-

36,045.1
24,616.54
10,919.10
71,580.77

69.53%

0.0
0.00
0.00
0.0

0.00%

0.00%

69.53%

36,045.1
24,616.54
10,919.10
71,580.77

69.53%

69.53%

15,793.50
10,785.96
4,784.30
31,363.77

RIZACION DE AVANCE DE OBRA


ALES - POR MAYORES METRADOS

REGION
DEPARTAMENTO
PROVINCIA
DISTRITO
LOCALIDAD

: CUSCO
: CUSCO
: CUSCO
: SAN SEBASTIAN
A.P.V. TRABAJADORES DE CORPAC
FECHA DE PRESENTACIN:

1/6/2016

AVANCES
ANTERIOR
Metrado

SALDO

ACTUAL

Valorizado S/.

Metrado

Valorizado S/.

ACUMULADO
%

Metrado

Valorizado S/.

Metrado

Valorizado S/.

0.00

0.00%

31.72

687.75

100.00%

31.72

687.75

100.00%

0.00

0.00%

44.06

27.76

100.00%

44.06

27.76

100.00%

0.00

0.00%

2.64

155.97

100.00%

2.64

155.97

100.00%

0.00

0.00%

13.50

243.95

100.00%

13.50

243.95

100.00%

0.00

0.00%

44.06

461.75

100.00%

44.06

461.75

100.00%

0.00

0.00%

1.00

450.59

100.00%

1.00

450.59

100.00%

2,027.77

100.00%

0.00

0.00%

2,027.77

100.00%

0.00

RIZACION DE AVANCE DE OBRA


NALES - POR NUEVAS PARTIDAS

REGION
DEPARTAMENTO
PROVINCIA
DISTRITO
LOCALIDAD

: CUSCO
: CUSCO
: CUSCO
: CUSCO
: SANTA ANA - JARDINES DEL INCA
FECHA DE PRESENTACIN:

1/6/2016

AVANCES
ANTERIOR
Metrado

ACTUAL

Valorizado S/.

0.00

%
-

0.00

SALDO

Metrado
0.00

Valorizado S/.
0.00
0.00

ACUMULADO
%

Metrado

Valorizado S/.
-

%
-

0.00

Metrado

Valorizado S/.
-

0.00

SALDO
%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%

0.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%

0.00%
0.00%

100.00%
100.00%
0.00%

30.47%

30.47%

SALDO
%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00%
0.00%

SALDO
%

VALORIZACION DEDUCTIVOS
MES
OBRA

DICIEMBRE 2013
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO

PARTIDA

DESCRIPCION
UNIDAD

01.00.00
01.01.00
01.03.00
01.04.00
01.05.00
01.07.00

OBRAS PROVISIONALES SISTEMA DE AGUA


Construccion de Oficina, Almacen y Guardiania
Puentes Peatonales de Madera
Tranqueras de Madera Para Desvio Vehicular
Cartel de Identificacion de Obra
Cinta de seguridad

03.06.00

VARIOS

03.06.01
03.06.02

Reposicion de conexiones de agua


Demolicion y reposicion de pavimento
COSTO DIRECTO
GASTOS GENERALES 68.29 %
IMPUESTO IGV 18%
PRESUPUESTO TOTAL

0.6829368
0.18

M2
UND
UND
UND
M

UND
M2

ZACION DEDUCTIVOS

RABAJADORES CORPAC - CUSCO

PRESUPUESTO
P. UNIT.

P. TOTAL

S/.

S/.

50.00
20.00
8.00
1.00
1,831.38

81.85
19.47
29.37
593.93
0.50

4092.5
389.4
234.96
593.93
915.69

21.00
50.00

221.12
98.47

4,643.52
4,923.50

METRADO

15,793.50
10,785.96
4,784.30
31,363.77

PLANILLA DE METRADOS OBRA PRINCI


PROYECTO:

CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO

ITEM

DESCRIPCION

UND

METRADO

19

20

21

22

23

24

25

01.00.00

OBRAS PROVISIONALES SISTEMA DE AGUA

01.01.00

Construccion de Oficina, Almacen y Guardiania

M2

01.02.00

Energia Electrica Provisional

GLB

1.00

01.03.00

Puentes Peatonales de Madera

UND

20.00

01.04.00

Tranqueras de Madera Para Desvio Vehicular

UND

8.00

01.05.00

Cartel de Identificacion de Obra

UND

01.06.00

Limpieza de Obra

M2

1,383.26

01.07.00

Cinta de seguridad

1,831.38

02.00.00

TRABAJOS PRELIMINARES

02.01.00

Limpieza de Terreno Manual

M2

1383.26

420

03.00.00

REDES DE DISTRIBUCION

03.01.00

TRABAJOS PRELIMINARES

03.01.01

Trazo Nivelacion y Replanteo

M2

549.41

120

03.01.02

Trazo Nivelacion y Replanteo Durante el Proceso

M2

549.51

03.02.00

MOVIMIENTO DE TIERRAS

03.02.01

Excavacion de Zanjas para Tuberia PVC (C-10) 90mm

M3

366.28

03.02.02

Perfilado de zanjas

915.69

03.02.03

Cama de apoyo para tuberias E=0.10m

M3

54.94

03.02.04

Relleno y compactado con material propio

M3

219.77

03.02.05

Eliminacion y acarreo de material exedente

M3

114.46

03.02.06

Entibado y apuntalamiento de zanjas H>2.5m

03.03.00

TUBERIAS

03.03.01

PVC NTP ISO 4422 SERIE 20 (C-10) 90mm

03.04.00

SUMINISTRO Y COLOCACION DE ACCESORIOS Y VALVULAS

50.00

1.00

725.4

380

405

80
220

180
180

90.00

80.5
220
11
44.5
30
28

70.8
280
10.5
43.5
15
25

88.5
180
12
46
45
26

915.69

220

195

210

03.04.01

Suministro y colocacion de valvula de purga 90mm en red de distribucion

PZA

1.00

03.04.02

Suministro y colocacion de valvula de compuerta de 90mm en red de distribucion

PZA

2.00

03.05.00

PRUEBA HIDRAULICA

03.05.01

Prueba hidraulica en tuberias

GLB

03.05.02

Desinfeccion en tuberias

915.69

03.06.00

VARIOS

03.06.01

Reposicion de conexiones de agua

UND

21.00

03.06.02

Demolicion y reposicion de pavimento

M2

50.00

03.06.03

Puesta en operacin del sistema de agua

GLB

1.00

1.00

PLANILLA DE METRADOS
PARTIDAS ADICIONALES - POR MAYORES ME
PROYECTO:

CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO

ITEM

DESCRIPCION

UND

METRADO

03.02.00

MOVIMIENTO DE TIERRAS

03.02.01

Excavacion de Zanjas para Tuberia PVC (C-10) 90mm

M3

31.72

03.02.02

Perfilado de zanjas

44.06

03.02.03

Cama de apoyo para tuberias E=0.10m

M3

2.64

03.02.04

Relleno y compactado con material propio

M3

13.50

03.03.00

TUBERIAS

03.03.01

PVC NTP ISO 4422 SERIE 20 (C-10) 90mm

44.06

03.05.00

PRUEBA HIDRAULICA

03.05.01

Prueba hidraulica en tuberias

GLB

1.00

19

20

21

22

23

24

25

PLANILLA DE METRADOS
PARTIDAS ADICIONALES - POR MAYORES METRADOS N
PROYECTO:
ITEM

CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO

DESCRIPCION

UND

METRADO

12

13

14

15

16

17

18

ETRADOS OBRA PRINCIPAL

26

27

28

29

30

SALDO

ACUMULADO

TOTAL

CANT

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
1.00
0.00
0.00
0.00
1383.26
0.00

0.00
1.00
0.00
0.00
0.00
1383.26
0.00

50.00
0.00
20.00
8.00
1.00
0.00
1831.38

100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%

1,383.26

0.00

1383.26

1383.26

0.00

0.00%

169.41

549.41
549.51

0.00
0.00

549.41
549.51

549.41
549.51

0.00
0.00

0.00%
0.00%

59.98
105.69
10
42.77
24.46

366.28
915.69
54.94
219.77
114.46
90.00

0.00
0.00
0.00
0.00
0.00
0.00

366.28
915.69
54.94
219.77
114.46
90.00

366.28
915.69
54.94
219.77
114.46
90.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

140.19

915.69

0.00

915.69

915.69

0.00

0.00%

178.26

149.51

11

150.5

ACTUAL

0.00
1.00
0.00
0.00
0.00
1,383.26
0.00

657.86

66.5
130
11.44
43

ANTERIOR

1
1

915.69

1.00
2.00

0.00
0.00

1.00
2.00

1.00
2.00

0.00
0.00

0.00%
0.00%

1.00
915.69

0.00
0.00

1.00
915.69

1.00
915.69

0.00
0.00

0.00%
0.00%

0.00
0.00
1.00

0.00
0.00
0.00

0.00
0.00
1.00

0.00
0.00
1.00

21.00
50.00
0.00

100.00%
100.00%
0.00%

LA DE METRADOS
LES - POR MAYORES METRADOS

26

27

28

29

30

ANTERIOR

ACTUAL

SALDO

ACUMULADO

TOTAL

CANT

31.723
44.06
2.6436
13.5

31.72
44.06
2.64
13.50

0.00
0.00
0.00
0.00

31.72
44.06
2.64
13.50

31.72
44.06
2.64
13.50

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

44.06

44.06

0.00

44.06

44.06

0.00

0.00%

1.00

0.00

1.00

1.00

0.00

0.00%

LA DE METRADOS
MAYORES METRADOS NUEVAS PARTIDAS
SALDO
L

19

20

21

22

23

ANTERIOR

ACTUAL

ACUMULADO

TOTAL

0.00

CANT

0.00

0.00

0.00

0.00

METAS DE AVANCE DE OBRA


PARTIDA

DESCRIPCION

UNIDAD

01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
01.07.00

OBRAS PROVISIONALES SISTEMA DE AGUA


Construccion de Oficina, Almacen y Guardiania
Energia Electrica Provisional
Puentes Peatonales de Madera
Tranqueras de Madera Para Desvio Vehicular
Cartel de Identificacion de Obra
Limpieza de Obra
Cinta de seguridad

02.00.00
02.01.00

TRABAJOS PRELIMINARES
Limpieza de Terreno Manual

M2

03.00.00
03.01.00
03.01.01
03.01.02

REDES DE DISTRIBUCION
TRABAJOS PRELIMINARES
Trazo Nivelacion y Replanteo
Trazo Nivelacion y Replanteo Durante el Proceso

M2
M2

03.02.00
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06

MOVIMIENTO DE TIERRAS
Excavacion de Zanjas para Tuberia PVC (C-10) 90mm
Perfilado de zanjas
Cama de apoyo para tuberias E=0.10m
Relleno y compactado con material propio
Eliminacion y acarreo de material exedente
Entibado y apuntalamiento de zanjas H>2.5m

M3
M
M3
M3
M3
M

03.03.00
03.03.01

TUBERIAS
PVC NTP ISO 4422 SERIE 20 (C-10) 90mm

03.04.00
03.04.01
03.04.02

SUMINISTRO Y COLOCACION DE ACCESORIOS Y VALVULAS


Suministro y colocacion de valvula de purga 90mm en red de distribucion
Suministro y colocacion de valvula de compuerta de 90mm en red de distribucion

PZA
PZA

03.05.00
03.05.01
03.05.02

PRUEBA HIDRAULICA
Prueba hidraulica en tuberias
Desinfeccion en tuberias

GLB
M

03.06.00
03.06.01
03.06.02
03.06.03

VARIOS
Reposicion de conexiones de agua
Demolicion y reposicion de pavimento
Puesta en operacin del sistema de agua

UND
M2
GLB

M2
GLB
UND
UND
UND
M2
M

TAS DE AVANCE DE OBRA


ACTUAL
%

ACUMULADO
%

SALDO
%

0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
0.00%

0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
0.00%

100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%

100.00%

100.00%

0.00%

100.00%
100.00%

100.00%
100.00%

0.00%
0.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

100.00%

100.00%

0.00%

100.00%
100.00%

100.00%
100.00%

0.00%
0.00%

100.00%
100.00%

100.00%
100.00%

0.00%
0.00%

0.00%
0.00%
100.00%

0.00%
0.00%
100.00%

100.00%
100.00%
0.00%

RESUMEN DE EJECUCION PRESUPUESTAL


OBRA
F. DE FINANCIAMIENTO

: CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO


: RECURSOS PROPIOS

TIPO DE DOCUMNETO

NUMERO

1
2
3
4
5
6
7
8
9
10
11
12

B/V
B/V
B/V
PROFORMA
B/V

36632
4941
17012
1
4390

B/V
B/V
B/V
B/V
NOTA PEDIDO
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V

4950
4524
1239
481
1072
4399

13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V

1
2
3
4
5
6

NINGUNA
NINGUNA
NINGUNA
NINGUNA
NINGUNA
NINGUNA

1
2
3

NOTA DE ENTREGA
NOTA DE ENTREGA
NOTA DE ENTREGA

225
1240
483
10282
10281
10286
9189
1308
1028
36746
36745
1311
1310
1309
36878
36883
492
10316
10339

81
82
83

4
5
6
7
8
9

NOTA DE ENTREGA
NOTA DE ENTREGA
NOTA DE ENTREGA

85
86
87

B/V

RESUMEN DE EJECUCION PRESUPUESTAL


: CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
: RECURSOS PROPIOS

DESCRIPCION

IMPORTE
PARCIAL

COMPRAS
COMPRA DE TUBERIA Y ACCESORIOS PARA LA INSTALACION DE AGUA POTABLE
MATERIAL DE FILTRO (CONFITILLO)
LUBRICANTE PARA TUBERIA
CORDEL NYLON
SOGA DRIZA
GASOHOL
MATERIAL DE FILTRO (CONFITILLO)
BOTAS DE JEBE
MATERIAL DE FILTRO (CONFITILLO)
MATERIAL DE FILTRO (CONFITILLO)
MADERAMEN PARA ENTIBADOS
VARIOS
MATERIAL DE FILTRO (PIEDRA CHANCADA DE 1/2")
GRASA N3 VISTONY
VARIOS
MATERIAL DE FILTRO (CONFITILLO)
LLAVE CHECK
BOTAS DE JEBE
CEMENTO
GASOHOL
VARIOS
MATERIAL DE FILTRO (CONFITILLO)
MANGUERA DE 3/4"
COMPRA DE TUBERIA Y ACCESORIOS PARA LA INSTALACION DE AGUA POTABLE
ACCESORIOS PARA LA INSTALACION DE AGUA POTABLE
MATERIAL DE FILTRO (CONFITILLO)
MATERIAL DE FILTRO (CONFITILLO)
MATERIAL DE FILTRO (CONFITILLO)
CINTA TEFLON
UNION DE REPARACION
ACCESORIOS PARA LA INSTALACION DE AGUA POTABLE
MATERIAL DE FILTRO (CONFITILLO) Y CEMENTO
VARIOS (ALQUILER DE LOCALES PARA ALMACENES ENTRE OTROS)
WINCHA DE 50 MTS
SUB TOTAL

9306.15
250.00
38.00
11.00
40.00
44.00
150.00
36.00
550.00
250.00
131.00
9.00
975.00
20.00
18.00
250.00
30.00
22.00
24.00
50.00
56.00
275.00
36.00
4907.30
160.00
275.00
275.00
110.00
1.50
20.00
99.50
104.00
4254.50
22.00
22799.95

CARGA DE PERSONAL
MOVILIDAD (PASAJES)
LEVANTAMIENTO DE OBSERVACIONES EXPEDIENTE TECNICO
SERVICIOS DE MANO DE OBRA
SERVICIOS DE MANO DE OBRA
COSTO POR MANO DE OBRA EN LAS FAENAS
SERVICIOS DE MANO DE OBRA
SUB TOTAL

49.00
3000.00
1000.00
700.00
26400.00
1700.00
32849.00

SERVICIO POR TERCEROS


ALQUILER DE MAQUINARIA PESADA PARA EXCAVACION DE ZANJA (RETROEXCAVADORA)
ALQUILER DE MAQUINARIA PESADA PARA EXCAVACION DE ZANJA (RETROEXCAVADORA)
ALQUILER DE MAQUINARIA PESADA PARA EXCAVACION DE ZANJA (RETROEXCAVADORA)

550.00
600.00
700.00

ALQUILER DE MAQUINARIA PESADA PARA EXCAVACION DE ZANJA (RETROEXCAVADORA)


ALQUILER DE MAQUINARIA PESADA PARA EXCAVACION DE ZANJA (RETROEXCAVADORA)
ALQUILER DE MAQUINARIA PESADA PARA EXCAVACION DE ZANJA (RETROEXCAVADORA)
ELIMINACION DE MATERIAL EXEDENTE CON MAQUINARIA ALQUILADA
TARBAJOS DE TOPOGRAFIA
ALQUILER DE MAQUINARIA LIVIANA
SUB TOTAL

1100.00
700.00
1070.00
2135.82
2000.00
660.00
9515.82

TOTAL

TOTAL

22799.95

32849.00

9515.82

65164.77