REPORTE FINANCIERO
OBRA
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
CUENTA CONTABLE: 339531
ITEM
1
2
3
4
CONCEPTO
MANO DE OBRA
MATERIALES
EQUIPOS
SERVICIOS DIVERSOS
TOTAL
JULIO
AGOSTO
SETIEMBRE
0.00
0.00
11,762.72
372,045.69
0.00
281.10
384,089.51
APROBADO
639,604.64
869,629.84
13,000.00
19,071.23
1,541,305.71
EJECUTADO
11,762.72
372,045.69
0.00
281.10
384,089.51
SALDO
627,841.92
497,584.15
13,000.00
18,790.13
1,157,216.20
OCTUBRE
NOVIEMBRE
0.00
DICIEMBRE
0.00
ENERO
0.00
0.00
PRESUPUESTO ANALITICO
ITEM
1
2
3
4
CONCEPTO
MANO DE OBRA
MATERIALES
EQUIPOS
SERVICIOS DIVERSOS - OTROS
TOTAL (SOLES)
TOTAL(%)
DESCRIPCION
100.00%
24.92%
PRESUPUESTO
75.08%
AVANCE ACUMULADO
DE OBRA
S/.
S/.
S/.
1,541,305.71
1,541,305.71
400,000.00
384,089.51
25.95%
24.92%
400,000.00
384,089.51
25.95%
24.92%
1,141,305.71
1,157,216.20
74.05%
75.08%
FEBRERO
0.00
MARZO
0.00
ABRIL
MAYO
0.00
JUNIO
0.00
JULIO
0.00
0.00
AGOSTO
0.00
TOTAL
11,762.72
372,045.69
0.00
281.10
384,089.51
CONTROL DE AVANCE
PROGRAMADO Vs. EJECUTADO
80,000
73,609
70,000
73,609
73,609
73,609
73,609
73,609
Octubre
Noviembre
Diciembre
Enero
Febrero
60,000
50,000
Monto
40,000
30,000
20,000
10,000
0
Septiembre
Meses
Avance Programado
Avance Ejecutado
Mensual
Acumulado
S/.
Septiembre
Avance Ejecutado
S/.
Adelanto
Atraso
S/.
S/.
Acumulado
%
73,608.54
Err:509
Err:509
Err:509
Err:509
73,609
Err:509
Octubre
#VALUE!
#VALUE!
73,609
Err:509
Noviembre
#VALUE!
#VALUE!
73,609
Err:509
Err:509
Err:509
Diciembre
#VALUE!
#VALUE!
73,609
Err:509
Err:509
Err:509
Enero
#VALUE!
#VALUE!
73,609
Err:509
Err:509
Err:509
Febrero
#VALUE!
#VALUE!
73,609
Err:509
Err:509
Err:509
Total
Descripcin
Err:509
Mensual
Situacin de la Obra
Err:509
73,609
En el Mes
Acumulado Actual
S/.
S/.
S/.
Programado
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Ejecutado
73,609
73,609
Err:509
A.R. (%)
73,609
Err:509
Err:509
A.P. (%)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
(%)
A.R. (%)
A.P. (%)
Err:509
% AVANCE ACTUAL
Err:509
% AVANCE ACUMULADO
Err:509
#REF!
#REF!
Err:509
VALORIZACION ACUMULADA
Err:509
COMPLEM
S/. 0.00
S/. 0.00
Err:509
M1
M2
M3
M4
M5
M6
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.050897004 0.18916146
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2863318.12
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2863318.12
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PRESUPUESTO VALORIZADO
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
DICIEMBRE 2013
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
MONTO DE OBRA
MONTO ASIGNADO
FECHA DE INICIO DE OBRA
PLAZO DE EJECUCIN
FECHA DE TERMINO
S/. 102,944.52
S/. 102,944.52
11/19/2013
60
1/18/2014
DIAS
PRESUPUESTO
ITEM
ANTERIOR
Valorizado
S/.
VALORIZACION
S/.
PROGRAMADO
MAYOR METRADOS
COSTOS TOTAL
102,944.52
0.00%
2,027.77
0.00%
102,944.52
0.00%
REGION
DEPARTAMENTO
PROVINCIA
DISTRITO
LOCALIDAD
: CUSCO
: CUSCO
: CUSCO
: SAN SEBASTIAN
A.P.V. TRABAJADORES DE CORPAC
FECHA DE PRESENTACIN:
12/1/2013
AVANCES
ACTUAL
Valorizado
S/.
ACUMULADO
Valorizado
S/.
SALDO
%
71,580.77
69.53%
71,580.77
69.53%
2,027.77
1.97%
2,027.77
1.97%
73,608.54
71.50%
73,608.54
71.50%
Valorizado
S/.
31,363.77
-
31,363.77
30.47%
0.00%
30.47%
Se ha realizado la ejecucion de obra, segn el Expediente Tecnico Aprobado, habiendoce ejecutado las siguientes partidas
PARTIDA
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
01.07.00
DESCRIPCION DE LA PARTIDA
OBRAS PROVISIONALES SISTEMA DE AGUA
Construccion de Oficina, Almacen y Guardiania
los beneficiaios proporcionaron ambientes tanto para la residencia y almacen de obra
Energia Electrica Provisional
se tuvo que pagar a los beneficiarios por la energia electrica temporal
Puentes Peatonales de Madera
partida no ejecutada
Tranqueras de Madera Para Desvio Vehicular
partida no ejecutada
Cartel de Identificacion de Obra
partida no ejecutada
Limpieza de Obra
esta partida se ejecuto mediante faenas de los pobladores del APV Corpac Cusco
Cinta de seguridad
partida no ejecutada
02.00.00
02.01.00
TRABAJOS PRELIMINARES
Limpieza de Terreno Manual
esta partida se ejecuto mediante faenas de los pobladores del APV Corpac Cusco
03.00.00
03.01.00
03.01.01
REDES DE DISTRIBUCION
TRABAJOS PRELIMINARES
Trazo Nivelacion y Replanteo
se ubico en el terreno l eje de la red de distribucion, habiendoce ubicado ademas el are de empalme, valvulas de compuerta
y demas detalles que aparecen en los planos, luego se procedio al trazo del ancho de la zanja con yeso, segn lo que indica
en los planos de planta
03.01.02
03.02.00
03.02.01
MOVIMIENTO DE TIERRAS
Excavacion de Zanjas para Tuberia PVC (C-10) 90mm
se realizo el corte de la zanja a mano a fin de evitar daos en las instalaciones existentes habiendoce realizado entibaciones
para evitar derrumbe de las zanjas excavadas, en tramos donde no existia instalaciones se utilizo maquinaria pesada
(retroexcavadora) para aperturar la zanja.
03.02.02
Perfilado de zanjas
03.02.03
03.02.04
se procedio a la seleccin del terreno, que se utilizo como primer relleno, habiendoce ejecutado este en capas de 15 cm de
altura realizandoce la compactacion manual hasta una altura de 60 cm, luego se procedio a realizar el segundo relleno
habiendoce utilizado apisonadores tipo pison (compactador canguro)
03.02.05
03.02.06
03.03.00
03.03.01
TUBERIAS
PVC NTP ISO 4422 SERIE 20 (C-10) 90mm
se utilizo tuberia de PVC con union flexible clase 10 de 90 mm de diametro segn norma de fabricacion ISO 4422, con anillo
elastomerico, segn lo especificado en el expediente tecnico aprobado, habiendoce puesto especial cuidado en el
transporte manipuleo evitando ser golpeado y/o arrastrado, el almacenamiento se ralizo en un lugar alquilado bajo techo y
ventilcion natural.
03.04.00
03.04.01
03.04.02
03.05.00
03.05.01
PRUEBA HIDRAULICA
Prueba hidraulica en tuberias
para la ejecucion de la prueba hidraulica, se procedio a instalar el balde de prueba con el manometro en el extremo mas
bajo del tramo de prueba, una vez taponado los extremos del tramo sometido a la prueba, se realizo el llenado de la red
con agua , luego se procedio con el bombeo a travez del valde de prueba en las presiones de 50, 80, 100, 150 psi, se
purgo el aire atrapado en la red , luego de llegar a la presion de prueba (1.5 veces la presion de trabajo), se procedio a
comprobar la impermeabilidad del tramo observando las posibles variaciones en el manometro durante 1 hora de prueba,
lo cual no se tuvo variaciones y se procedio a dar el visto buebo por parte del supervisor y su posterior firmado de los
protocolos de calidad.
03.05.02
Desinfeccion en tuberias
una vez realizada la prueba hidraulica se procdio con la desinfeccion de la tuberia para su posterior puesta en marcha
03.06.00
03.06.01
03.06.02
03.06.03
VARIOS
Reposicion de conexiones de agua
partida no ejecutada
Demolicion y reposicion de pavimento
partida no ejecutada
Puesta en operacin del sistema de agua
luego de ejecutar la instalacion de las diferentes tuberias, accesorios y valvulas con la aprobacion de la supervision de obra,
se procedio a la puesta de operacin del sistema
NOTA:
CUTADAS EN ELPROYECTO
METRADO
M2
0.00
GLB
1.00
UND
0.00
UND
0.00
UND
0.00
M2
1,383.26
0.00
M2
1,383.26
M2
549.41
M2
549.51
M3
398.00
959.75
M3
57.58
M3
233.27
M3
114.46
90.00
959.75
PZA
1.00
PZA
2.00
GLB
2.00
915.69
UND
0.00
M2
0.00
GLB
1.00
VALORIZACION DE
PRIN
MES
OBRA
NOVIEMBRE 2013
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
S/. 102,944.52
S/. 102,944.52
11/19/2013
60
1/18/2014
MONTO DE OBRA
MONTO ASIGNADO
FECHA DE INICIO DE OBRA
PLAZO DE EJECUCIN
FECHA DE TERMINO
DIAS
PRESUPUESTO PROGRAMADO
PARTIDA
DESCRIPCION
UNIDAD
METRADO
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
01.07.00
02.00.00
02.01.00
03.00.00
03.01.00
03.01.01
03.01.02
P. UNIT.
PRESUP.
P. TOTAL
S/.
S/.
S/.
M2
GLB
UND
UND
UND
M2
M
50.00
1.00
20.00
8.00
1.00
1,383.26
1,831.38
81.85
500.00
19.47
29.37
593.93
0.95
0.50
4,092.50
500.00
389.40
234.96
593.93
1,314.10
915.69
4092.5
500.00
389.4
234.96
593.93
1,314.10
915.69
TRABAJOS PRELIMINARES
Limpieza de Terreno Manual
M2
1,383.26
0.95
1,314.10
1,314.10
REDES DE DISTRIBUCION
TRABAJOS PRELIMINARES
Trazo Nivelacion y Replanteo
Trazo Nivelacion y Replanteo Durante el Proceso
M2
M2
549.41
549.51
1.35
1.07
741.70
587.98
741.70
587.98
03.02.00
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
MOVIMIENTO DE TIERRAS
Excavacion de Zanjas para Tuberia PVC (C-10) 90mm
Perfilado de zanjas
Cama de apoyo para tuberias E=0.10m
Relleno y compactado con material propio
Eliminacion y acarreo de material exedente
Entibado y apuntalamiento de zanjas H>2.5m
M3
M
M3
M3
M3
M
366.28
915.69
54.94
219.77
114.46
90.00
21.68
0.63
59.00
18.07
14.51
17.02
7,940.95
576.88
3,241.46
3,971.24
1,660.81
1,531.80
7,940.95
576.88
3,241.46
3,971.24
1,660.81
1,531.80
03.03.00
03.03.01
TUBERIAS
PVC NTP ISO 4422 SERIE 20 (C-10) 90mm
915.69
10.48
9,596.43
9,596.43
03.04.00
03.04.01
03.04.02
PZA
PZA
1.00
2.00
843.99
674.59
843.99
1,349.18
843.99
1,349.18
03.05.00
03.05.01
03.05.02
PRUEBA HIDRAULICA
Prueba hidraulica en tuberias
Desinfeccion en tuberias
GLB
M
1.00
915.69
450.59
0.16
450.59
146.51
450.59
146.51
03.06.00
03.06.01
03.06.02
03.06.03
VARIOS
Reposicion de conexiones de agua
Demolicion y reposicion de pavimento
Puesta en operacin del sistema de agua
UND
M2
GLB
21.00
50.00
1.00
221.12
98.47
277.40
4,643.52
4,923.50
277.40
4,643.52
4,923.50
277.40
0.6829368
0.18
COSTO DIRECTO
GASTOS GENERALES 68.29 %
IMPUESTO IGV 18%
PRESUPUESTO TOTAL
51,838.62
35,402.50
15,703.40
102,944.52
VALORIZACION DE
ADICIONALES - POR M
MES
OBRA
NOVIEMBRE 2013
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
S/. 102,944.52
S/. 102,944.52
11/19/2013
60
1/18/2014
MONTO DE OBRA
MONTO ASIGNADO
FECHA DE INICIO DE OBRA
PLAZO DE EJECUCIN
FECHA DE TERMINO
DIAS
PRESUPUESTO PROGRAMADO
PARTIDA
DESCRIPCION
UNIDAD
METRADO
03.02.00
03.02.01
P. UNIT.
PRESUP.
P. TOTAL
S/.
S/.
S/.
MOVIMIENTO DE TIERRAS
Excavacion de Zanjas para Tuberia PVC (C-10) 90mm
M3
31.72
21.68
687.75
687.75
Perfilado de zanjas
44.06
0.63
27.76
27.76
03.02.03
M3
2.64
59.00
155.97
155.97
03.02.04
M3
13.50
18.07
243.95
243.95
03.03.00
TUBERIAS
03.03.01
44.06
10.48
461.75
461.75
03.05.00
PRUEBA HIDRAULICA
03.05.01
GLB
1.00
450.59
450.59
450.59
03.02.02
COSTO DIRECTO
2,027.77
VALORIZACION DE
ADICIONALES - POR
MES
OBRA
NOVIEMBRE 2013
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
S/. 102,944.52
S/. 102,944.52
10/1/2012
210 DIAS
4/28/2013
MONTO DE OBRA
MONTO ASIGNADO
FECHA DE INICIO DE OBRA
PLAZO DE EJECUCIN
FECHA DE TERMINO
PRESUPUESTO PROGRAMADO
PARTIDA
DESCRIPCION
UNIDAD
METRADO
COSTO DIRECTO
P. UNIT.
PRESUP.
P. TOTAL
S/.
S/.
S/.
0.00
REGION
DEPARTAMENTO
PROVINCIA
DISTRITO
LOCALIDAD
: CUSCO
: CUSCO
: CUSCO
: SAN SEBASTIAN
A.P.V. TRABAJADORES DE CORPAC
FECHA DE PRESENTACIN:
1/6/2016
AVANCES
ANTERIOR
Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SALDO
ACTUAL
Valorizado S/.
Valorizado S/.
ACUMULADO
Metrado
Metrado
Valorizado S/.
Metrado
Valorizado S/.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
1.00
0.00
0.00
0.00
1,383.26
0.00
0.00
500.00
0.00
0.00
0.00
1,314.10
0.00
0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
0.00%
1.00
1,383.26
-
500.00
1,314.10
-
0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
0.00%
50.00
20.00
8.00
1.00
1,831.38
4,092.50
389.40
234.96
593.93
915.69
0.00%
1,383.26
1,314.10
100.00%
1,383.26
1,314.10
100.00%
0.00%
0.00%
549.41
549.51
741.70
587.98
100.00%
100.00%
549.41
549.51
741.70
587.98
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
366.28
915.69
54.94
219.77
114.46
90.00
7,940.95
576.88
3,241.46
3,971.24
1,660.81
1,531.80
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
366.28
915.69
54.94
219.77
114.46
90.00
7,940.95
576.88
3,241.46
3,971.24
1,660.81
1,531.80
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00%
915.69
9,596.43
100.00%
915.69
9,596.43
100.00%
0.00
0.00%
0.00%
1.00
2.00
843.99
1,349.18
100.00%
100.00%
1.00
2.00
843.99
1,349.18
100.00%
100.00%
0.00
0.00
0.00%
0.00%
1.00
915.69
450.59
146.51
100.00%
100.00%
1.00
915.69
450.59
146.51
100.00%
100.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
1.00
0.00
0.00
277.40
0.00%
0.00%
100.00%
1.00
277.40
0.00%
0.00%
100.00%
21.00
50.00
-
4,643.52
4,923.50
-
36,045.1
24,616.54
10,919.10
71,580.77
69.53%
0.0
0.00
0.00
0.0
0.00%
0.00%
69.53%
36,045.1
24,616.54
10,919.10
71,580.77
69.53%
69.53%
15,793.50
10,785.96
4,784.30
31,363.77
REGION
DEPARTAMENTO
PROVINCIA
DISTRITO
LOCALIDAD
: CUSCO
: CUSCO
: CUSCO
: SAN SEBASTIAN
A.P.V. TRABAJADORES DE CORPAC
FECHA DE PRESENTACIN:
1/6/2016
AVANCES
ANTERIOR
Metrado
SALDO
ACTUAL
Valorizado S/.
Metrado
Valorizado S/.
ACUMULADO
%
Metrado
Valorizado S/.
Metrado
Valorizado S/.
0.00
0.00%
31.72
687.75
100.00%
31.72
687.75
100.00%
0.00
0.00%
44.06
27.76
100.00%
44.06
27.76
100.00%
0.00
0.00%
2.64
155.97
100.00%
2.64
155.97
100.00%
0.00
0.00%
13.50
243.95
100.00%
13.50
243.95
100.00%
0.00
0.00%
44.06
461.75
100.00%
44.06
461.75
100.00%
0.00
0.00%
1.00
450.59
100.00%
1.00
450.59
100.00%
2,027.77
100.00%
0.00
0.00%
2,027.77
100.00%
0.00
REGION
DEPARTAMENTO
PROVINCIA
DISTRITO
LOCALIDAD
: CUSCO
: CUSCO
: CUSCO
: CUSCO
: SANTA ANA - JARDINES DEL INCA
FECHA DE PRESENTACIN:
1/6/2016
AVANCES
ANTERIOR
Metrado
ACTUAL
Valorizado S/.
0.00
%
-
0.00
SALDO
Metrado
0.00
Valorizado S/.
0.00
0.00
ACUMULADO
%
Metrado
Valorizado S/.
-
%
-
0.00
Metrado
Valorizado S/.
-
0.00
SALDO
%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
30.47%
30.47%
SALDO
%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SALDO
%
VALORIZACION DEDUCTIVOS
MES
OBRA
DICIEMBRE 2013
CONSTRUCCION DEL SISTEMA DE AGUA POTABLE APV. TRABAJADORES CORPAC - CUSCO
PARTIDA
DESCRIPCION
UNIDAD
01.00.00
01.01.00
01.03.00
01.04.00
01.05.00
01.07.00
03.06.00
VARIOS
03.06.01
03.06.02
0.6829368
0.18
M2
UND
UND
UND
M
UND
M2
ZACION DEDUCTIVOS
PRESUPUESTO
P. UNIT.
P. TOTAL
S/.
S/.
50.00
20.00
8.00
1.00
1,831.38
81.85
19.47
29.37
593.93
0.50
4092.5
389.4
234.96
593.93
915.69
21.00
50.00
221.12
98.47
4,643.52
4,923.50
METRADO
15,793.50
10,785.96
4,784.30
31,363.77
ITEM
DESCRIPCION
UND
METRADO
19
20
21
22
23
24
25
01.00.00
01.01.00
M2
01.02.00
GLB
1.00
01.03.00
UND
20.00
01.04.00
UND
8.00
01.05.00
UND
01.06.00
Limpieza de Obra
M2
1,383.26
01.07.00
Cinta de seguridad
1,831.38
02.00.00
TRABAJOS PRELIMINARES
02.01.00
M2
1383.26
420
03.00.00
REDES DE DISTRIBUCION
03.01.00
TRABAJOS PRELIMINARES
03.01.01
M2
549.41
120
03.01.02
M2
549.51
03.02.00
MOVIMIENTO DE TIERRAS
03.02.01
M3
366.28
03.02.02
Perfilado de zanjas
915.69
03.02.03
M3
54.94
03.02.04
M3
219.77
03.02.05
M3
114.46
03.02.06
03.03.00
TUBERIAS
03.03.01
03.04.00
50.00
1.00
725.4
380
405
80
220
180
180
90.00
80.5
220
11
44.5
30
28
70.8
280
10.5
43.5
15
25
88.5
180
12
46
45
26
915.69
220
195
210
03.04.01
PZA
1.00
03.04.02
PZA
2.00
03.05.00
PRUEBA HIDRAULICA
03.05.01
GLB
03.05.02
Desinfeccion en tuberias
915.69
03.06.00
VARIOS
03.06.01
UND
21.00
03.06.02
M2
50.00
03.06.03
GLB
1.00
1.00
PLANILLA DE METRADOS
PARTIDAS ADICIONALES - POR MAYORES ME
PROYECTO:
ITEM
DESCRIPCION
UND
METRADO
03.02.00
MOVIMIENTO DE TIERRAS
03.02.01
M3
31.72
03.02.02
Perfilado de zanjas
44.06
03.02.03
M3
2.64
03.02.04
M3
13.50
03.03.00
TUBERIAS
03.03.01
44.06
03.05.00
PRUEBA HIDRAULICA
03.05.01
GLB
1.00
19
20
21
22
23
24
25
PLANILLA DE METRADOS
PARTIDAS ADICIONALES - POR MAYORES METRADOS N
PROYECTO:
ITEM
DESCRIPCION
UND
METRADO
12
13
14
15
16
17
18
26
27
28
29
30
SALDO
ACUMULADO
TOTAL
CANT
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1383.26
0.00
0.00
1.00
0.00
0.00
0.00
1383.26
0.00
50.00
0.00
20.00
8.00
1.00
0.00
1831.38
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
1,383.26
0.00
1383.26
1383.26
0.00
0.00%
169.41
549.41
549.51
0.00
0.00
549.41
549.51
549.41
549.51
0.00
0.00
0.00%
0.00%
59.98
105.69
10
42.77
24.46
366.28
915.69
54.94
219.77
114.46
90.00
0.00
0.00
0.00
0.00
0.00
0.00
366.28
915.69
54.94
219.77
114.46
90.00
366.28
915.69
54.94
219.77
114.46
90.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
140.19
915.69
0.00
915.69
915.69
0.00
0.00%
178.26
149.51
11
150.5
ACTUAL
0.00
1.00
0.00
0.00
0.00
1,383.26
0.00
657.86
66.5
130
11.44
43
ANTERIOR
1
1
915.69
1.00
2.00
0.00
0.00
1.00
2.00
1.00
2.00
0.00
0.00
0.00%
0.00%
1.00
915.69
0.00
0.00
1.00
915.69
1.00
915.69
0.00
0.00
0.00%
0.00%
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
21.00
50.00
0.00
100.00%
100.00%
0.00%
LA DE METRADOS
LES - POR MAYORES METRADOS
26
27
28
29
30
ANTERIOR
ACTUAL
SALDO
ACUMULADO
TOTAL
CANT
31.723
44.06
2.6436
13.5
31.72
44.06
2.64
13.50
0.00
0.00
0.00
0.00
31.72
44.06
2.64
13.50
31.72
44.06
2.64
13.50
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
44.06
44.06
0.00
44.06
44.06
0.00
0.00%
1.00
0.00
1.00
1.00
0.00
0.00%
LA DE METRADOS
MAYORES METRADOS NUEVAS PARTIDAS
SALDO
L
19
20
21
22
23
ANTERIOR
ACTUAL
ACUMULADO
TOTAL
0.00
CANT
0.00
0.00
0.00
0.00
DESCRIPCION
UNIDAD
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
01.07.00
02.00.00
02.01.00
TRABAJOS PRELIMINARES
Limpieza de Terreno Manual
M2
03.00.00
03.01.00
03.01.01
03.01.02
REDES DE DISTRIBUCION
TRABAJOS PRELIMINARES
Trazo Nivelacion y Replanteo
Trazo Nivelacion y Replanteo Durante el Proceso
M2
M2
03.02.00
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
MOVIMIENTO DE TIERRAS
Excavacion de Zanjas para Tuberia PVC (C-10) 90mm
Perfilado de zanjas
Cama de apoyo para tuberias E=0.10m
Relleno y compactado con material propio
Eliminacion y acarreo de material exedente
Entibado y apuntalamiento de zanjas H>2.5m
M3
M
M3
M3
M3
M
03.03.00
03.03.01
TUBERIAS
PVC NTP ISO 4422 SERIE 20 (C-10) 90mm
03.04.00
03.04.01
03.04.02
PZA
PZA
03.05.00
03.05.01
03.05.02
PRUEBA HIDRAULICA
Prueba hidraulica en tuberias
Desinfeccion en tuberias
GLB
M
03.06.00
03.06.01
03.06.02
03.06.03
VARIOS
Reposicion de conexiones de agua
Demolicion y reposicion de pavimento
Puesta en operacin del sistema de agua
UND
M2
GLB
M2
GLB
UND
UND
UND
M2
M
ACUMULADO
%
SALDO
%
0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
0.00%
TIPO DE DOCUMNETO
NUMERO
1
2
3
4
5
6
7
8
9
10
11
12
B/V
B/V
B/V
PROFORMA
B/V
36632
4941
17012
1
4390
B/V
B/V
B/V
B/V
NOTA PEDIDO
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
4950
4524
1239
481
1072
4399
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
1
2
3
4
5
6
NINGUNA
NINGUNA
NINGUNA
NINGUNA
NINGUNA
NINGUNA
1
2
3
NOTA DE ENTREGA
NOTA DE ENTREGA
NOTA DE ENTREGA
225
1240
483
10282
10281
10286
9189
1308
1028
36746
36745
1311
1310
1309
36878
36883
492
10316
10339
81
82
83
4
5
6
7
8
9
NOTA DE ENTREGA
NOTA DE ENTREGA
NOTA DE ENTREGA
85
86
87
B/V
DESCRIPCION
IMPORTE
PARCIAL
COMPRAS
COMPRA DE TUBERIA Y ACCESORIOS PARA LA INSTALACION DE AGUA POTABLE
MATERIAL DE FILTRO (CONFITILLO)
LUBRICANTE PARA TUBERIA
CORDEL NYLON
SOGA DRIZA
GASOHOL
MATERIAL DE FILTRO (CONFITILLO)
BOTAS DE JEBE
MATERIAL DE FILTRO (CONFITILLO)
MATERIAL DE FILTRO (CONFITILLO)
MADERAMEN PARA ENTIBADOS
VARIOS
MATERIAL DE FILTRO (PIEDRA CHANCADA DE 1/2")
GRASA N3 VISTONY
VARIOS
MATERIAL DE FILTRO (CONFITILLO)
LLAVE CHECK
BOTAS DE JEBE
CEMENTO
GASOHOL
VARIOS
MATERIAL DE FILTRO (CONFITILLO)
MANGUERA DE 3/4"
COMPRA DE TUBERIA Y ACCESORIOS PARA LA INSTALACION DE AGUA POTABLE
ACCESORIOS PARA LA INSTALACION DE AGUA POTABLE
MATERIAL DE FILTRO (CONFITILLO)
MATERIAL DE FILTRO (CONFITILLO)
MATERIAL DE FILTRO (CONFITILLO)
CINTA TEFLON
UNION DE REPARACION
ACCESORIOS PARA LA INSTALACION DE AGUA POTABLE
MATERIAL DE FILTRO (CONFITILLO) Y CEMENTO
VARIOS (ALQUILER DE LOCALES PARA ALMACENES ENTRE OTROS)
WINCHA DE 50 MTS
SUB TOTAL
9306.15
250.00
38.00
11.00
40.00
44.00
150.00
36.00
550.00
250.00
131.00
9.00
975.00
20.00
18.00
250.00
30.00
22.00
24.00
50.00
56.00
275.00
36.00
4907.30
160.00
275.00
275.00
110.00
1.50
20.00
99.50
104.00
4254.50
22.00
22799.95
CARGA DE PERSONAL
MOVILIDAD (PASAJES)
LEVANTAMIENTO DE OBSERVACIONES EXPEDIENTE TECNICO
SERVICIOS DE MANO DE OBRA
SERVICIOS DE MANO DE OBRA
COSTO POR MANO DE OBRA EN LAS FAENAS
SERVICIOS DE MANO DE OBRA
SUB TOTAL
49.00
3000.00
1000.00
700.00
26400.00
1700.00
32849.00
550.00
600.00
700.00
1100.00
700.00
1070.00
2135.82
2000.00
660.00
9515.82
TOTAL
TOTAL
22799.95
32849.00
9515.82
65164.77