Sei sulla pagina 1di 29

Customer

Supplier Name
Part No
Description

Production
Part
Approval
Process

Customer :

Part name : OILSEAL

Supplier name:

Part No. :

VOS 193

List of documents submitted


(Tick inside the box)
PPAP manual ref no

Design record

Engineering change documents

Customer engineering approval

Design FMEA

Process flow diagram

Process FMEA

Dimensional results

Material performance test results

Initial process study

10

Measurement system analysis studies

10

11

Qualified labarotary documentation

12

Control Plan

12

13

Part submission Warrant

13

14

Appearance approval report

14

15

Bulk material requirement check list

15

16

Sample product

17

Master Sample

18

Checking aids

19

Deviation and action plan

PPAP rev no.:

11

16
17

18
-

Submission date:

16.09.10

PPAP manual ref no

PPAP History Sheet


PART NO :VOS 193
PPAP
SNO
Rev .No
Date
1

NIL

16.09.10

PREPARED BY :

Details of Change

Signature

Initial submission

APPROVED BY:

PROCESS FLOW
Part Name / Description : Oil Seal

Date (original) : 13.09.2010

Drawing / Part no : VOS 193

10. A. Incoming Inspn. Of Raw


Material. (Shell)

10. B. Incoming Inspn. Of Raw


Material. (Spring)

10.C. Incoming Inspection of


Chemicals & Raw Rubber

: 00

Revision Date : NIL

Customer Ref. No : BSE 0300B - WK


30.14(B)
Op. / Brief Desc.

Rev No

Process flow no : BI / PF/ 193


Incoming Sources of Variations
1.Wrong Specification Material
shipped by supplier
2. Visual
defects like Rust , Burr, Bend,
cutshell, tool mark, Rust, Dent, OD
line mark , Pit mark supplied by the
Supplier
1.Wrong Specification Material
shipped by supplier
2. Visual
defects like Bend, Rust , Burr, peel
off supplied by the Supplier

Process Flow Diagram

10.A.

10.B.

Wrong Specification Material


shipped by supplier
10.C.

20.Storage of Raw Material

1.Wrong Grade Material


2.Wrong
Specification/Size Material
3.Defective material

30.Weighing of Mix Ingredients

1.Incorrect ingredients weight


2.Incorrect
chemical selection.
3.Ingredients missed out
4. Instrument
Error.

40. Rubber Mixing

1. Poor Dispersion
2.Temperature variation of
coolant circulation in roll mill.

20

30

40

Core Team : Production / Quality /


Marketing (CFT)

Customer

Product Characteristics

Process Characteristics

1. I.D. : 44.10 0.10 mm


2. P.D. : 35.50
0.15 mm
3. HT. : 6.35 0.10 mm
_
4. ST :0.91
MATERIAL :
CRCS IS 513 - 1994
1. Spring Length : 103.00 mm
2. Coil Dia : 1.58 mm
3.
_
Wire Dia : 0.30 mm
MATERIAL : GI IS 4454 - 2001
PART1

Material Grade

Material Grade

Weight of the Ingredients

Rubber Compound

Mixing Time.

PROCESS FLOW
Part Name / Description : Oil Seal

Date (original) : 13.09.2010

Drawing / Part no : VOS 193

50. Compound testing


A)Hardness

Process flow no : BI / PF/ 193


Incoming Sources of Variations

Variation in Rubber Hardness

Process Flow Diagram

50.A.

Core Team : Production / Quality /


Marketing (CFT)

Customer

Product Characteristics

Process Characteristics

Hardness : 70 5 shore A

1.20 ~ 1.25

Minimum 12.5 N/mm

50.B.

50. Compound testing


B)Specific Gravity

Specific Gravity variation.

50. Compound testing


C)Tensile Strength

Tensile Strength variation.

50. Compound testing


D) Ultimate Elongation

Elongation variation.

60. Extrusion

Over Cure of Rubber compound.

70. Dipping

: 00

Revision Date : NIL

Customer Ref. No : BSE 0300B - WK


30.14(B)
Op. / Brief Desc.

Rev No

1) In correct/ Excess bonding layer


in shell
2) Rust / Surface
defects in shell
3)
Process Temperature variation
4) Life time of
dipping chemicals

50.C.

50.D.

60

70

Minimum 250 %

Blank Shape

Extrusion Time

Dipping Chemical Specific Gravity.

Process Temperature.

PROCESS FLOW
Part Name / Description : Oil Seal

Date (original) : 13.09.2010

Drawing / Part no : VOS 193

80. Rubber Cutting

: 00

Revision Date : NIL

Customer Ref. No : BSE 0300B - WK


30.14(B)
Op. / Brief Desc.

Rev No

Process flow no : BI / PF/ 193


Incoming Sources of Variations

1) Incorrect Rubber selection


2) Variation in Rubber
weight
3) Weighing
Machine Error.

Process Flow Diagram

80

Core Team : Production / Quality /


Marketing (CFT)

Customer

Product Characteristics

Rubber Blank

Process Characteristics

PROCESS FLOW
Part Name / Description : Oil Seal

Date (original) : 13.09.2010

Drawing / Part no : VOS 193

90.Moulding

: 00

Revision Date : NIL

Customer Ref. No : BSE 0300B - WK


30.14(B)
Op. / Brief Desc.

Rev No

Process flow no : BI / PF/ 193


Incoming Sources of Variations
1)Curing Temperature Variation
2) Pressure Variation
3)Time Variation
4) Visual
Defects like Short fill , Poor flow,
tearing , stripping, Bad mould,
Under cure , foreign matter , Bad
shell , Bond failure , Dent
1) Uneven Flash removal, Tearing.,
2) Poor Finishing
3) Tool bit wear

100. Finishing

Core Team : Production / Quality /


Marketing (CFT)

Process Flow Diagram

Customer

Product Characteristics

Process Characteristics

1.Appearance.
70.
90

2.Temperature.
_
3.Time.
4.Pressure.

100

Apperance

1) After trimming , Ensure Id thro ID


checking Gauge. ID: 29.00 0.25

out

110. Trimming

1) Trimming Needle wear out


2) Uneven location of
seal in Trimming machine
3)
Incorrect Trimming / I.D. Dimension
variation

120. Final Inspection

1) Dimension Variation
2) Short fill , Poor
flow, tearing , stripping, Bad mould,
Under cure , foreign matter , Bad
shell , Bond failure , Dent .

130. Spring Fitment (Spring with oil


seal)

1) Wrong Spring selection


2) spring open out
while fitment with seal

140. Packing & Labelling

1) Quantity Variation
2) Incorrect packing
media.
3)Product Mixup

70.
110

1) O.D. : 47.78 / 47.93 mm


2) I.D. :
120

28.75 0.25 mm
3) Height : 8.00
0.20
4) Free
from visual defects like Short fill , Poor
flow, tearing , stripping, Bad mould, Under
cure , foreign matter , Bad shell , Bond
failure , Dent .

130

140

Visual.

Part No & Qty.

CONTROL PLAN
Prototype

Pre-launch

Control plan Number :

BI / CP/193

Production

Key Contact / Phone

Part Name / Description : Oil Seal

Core Team

: PRODUCTION ,QUALITY, MARKETING

Drawing / Part no : VOS 193

Engineering change level

Supplier Code

Supplier / Plant approval / Date


Characteristics

Part /
Process
Machine,Devi
Process
Name/Operati ce,Jigs,Tools
Numbe
on Description
for Mfg
r

10.A.

10. B.

10. A.
Incoming
Inspn. Of Raw
Material.
(Shell)

10. B.
Incoming
Inspn. Of Raw
Material.
(Spring)

Digi Vernier

Digi Vernier
& Scale

No

: 00

Customer Eng. Approval / Date : N/A

: Nil.

Product

Dimension

Date (original) : 13.09.2010


Revision Date : NILRev No
Customer Quality approval / Date : N/A
Other Approval Date ( If required ) :

Process

Plant / Location :
Methods
Sperc
Reaction
Evaluation /
Error
ial
Plan /
Product/Process
Measureme
Resp.
Proofi
Size
Frequency Control methods Correctiv
Char.
Spercification / tolerance
nt
ng
Class
e action
Technique
1. I.D. : 44.10 0.10
mm
2. P.D. :
Digimatic
35.50 0.15 mm
Vernier
As Per
Incoming
Reject
Store &
3. HT. : 6.35 0.10 mm caliper, Dial Nil sampling Each lot
Inspection Report the RM
QC
Indicator ,
Plan
4. ST :0.91 Micrometer.
MATERIAL
:
1. Spring Length
: 103.00
CRCS IS 513 - 1994
mm
2. Coil Dia :
1.58 mm
3.
Wire Dia : 0.30 mm

Dimension

Digimatic
Vernier
caliper,
Steel Scale.

Nil

As per
sampling
plan

Each lot

Incoming
Inspection Report

Reject
the RM

Store &
QC

Visual
check

Nil

Every
time

Each lot

Supplier Test
Report

Reject
the RM

Store &
QC

Visual
check

Nil

Every
time

Each lot

Visual check ,
stock Record.

Reject
the RM

As per mixing weight


chart.

Weigh
Machine
Read out.

Nil

Every
time

Every Batch

Receipe Check
List

Stop &
Correct
the
process.

Milling
Section

Visual
check

Nil

Every
time

Every Batch

Stop &
Correct
the
process.

Milling
Section

Hardness
Tester

Nil

One
Every Batch Testing Records.
sample

Stop &
Correct
Lab
the
Assistant
process.

MATERIAL : GI IS 4454 2001 PART1


10.C.

10.C. Incoming
Inspection of
Chemicals &
Raw Rubber

Material Grade

20

20.Storage of
Raw Material

Material Grade

30

30.Weighing of
Mix
Ingredients

40

40. Rubber
Mixing

50.A.

50.B.

50.C.

50.D.

Weighing
Machine

Two Roll Mill.

50. Compound
testing
Hardness
Tester
A)Hardness
50. Compound
testing
Densimeter.
B)Specific
Gravity
Compound
testing
UTM(Univers
al Testing
C)Tensile
Machine)
Strength
Compound
testing
UTM(Univers
E) al Testing
Machine)
Ultimate
Elongation

Ensure Chemical Grade


Number, Weight, Quantity
1.Correct Grade of
with respect to D.C.
material

2.Correct
specification/size of
material

Weight of the ingredients

As per Milling
procedure.

Store

Rubber Compound

Mixing Time

As per Milling procedure.

Hardness

Hardness : 70 5 shore A

Specificgravity

1.20 ~ 1.25

Densimeter

Nil

One
Every Batch Testing Records.
sample

Stop &
Correct
Lab
the
Assistant
process.

a.Tensile Strength

Minimum 12.5 N/mm

UTM(Univer
sal Testing
Machine)

Nil

Two
Sample

15 days
once.

Testing Records.

Stop &
Correct
Lab
the
Assistant
process.

Ultimate Elongation

Minimum 250 %

UTM(Univer
sal Testing
Machine)

Nil

Two
Sample

15 days
once.

Testing Records.

Stop &
Correct
Lab
the
Assistant
process.

CONTROL PLAN
Prototype

Pre-launch

Control plan Number :

BI / CP/193

Production

Key Contact / Phone

Part Name / Description : Oil Seal

Core Team

: PRODUCTION ,QUALITY, MARKETING

Drawing / Part no : VOS 193

Engineering change level

Supplier Code

Supplier / Plant approval / Date


Characteristics

Part /
Process
Machine,Devi
Process
Name/Operati ce,Jigs,Tools
Numbe
on Description
for Mfg
r

60

70

60. Extrusion

70. Dipping

Cleaning
Process

Drying Section

Drying Section

No

Extruder &
Die

Date (original) : 13.09.2010


Revision Date : NILRev No
: Nil.
:

Product

Customer Quality approval / Date : N/A


Other Approval Date ( If required ) :

Process

Plant / Location :
Methods
Sperc
Evaluation /
Error
ial
Product/Process
Measureme
Proofi
Size
Frequency
Char.
Spercification / tolerance
nt
ng
Class
Technique

Thermomet
er

Nil

Sampling
Every Day
Plan

Stop &
Process Condition
Correct
Record
the
FR/DPC/27a
process.

Dipping
Section

As per Work Instruction

Time
Indicator

Nil

Sampling
Plan

Every Day

Process Condition
Record
FR/DPC/27a

Dipping
Section

Drying Temperature

As per Work Instruction

Nil

Every lot

Visual check

Dipping
Section

Dryer

Drying Time

As per Work Instruction

Nil

Every lot

Visual check

Dipping
Section

Dipping Solution Specificgravity.

As per Work Instruction

Hydrometer

Nil

Sampling
Plan

Every Day

Testing Records.

Stop &
Correct
the
process.

Dipping
Section

Rubber Blank.

As per Loading Chart

Digital Read
out of
Weighing
Machine.

Nil

Random Every Batch

Visual check

Stop &
Correct
the
process.

Rubber
Cutting
Section.

Appearance

Part should be free from


Short fill , Poor flow,
tearing , stripping, Bad
moulding, Under cure ,
foreign matter , Bad
shell , Bond failure , Dent

Visual

Nil

Random

Every Lift

In patrol
Inspection
Report.

Stop &
QC Correct
Patrol
the
Inspector.
process.

Temperature
Controller.

Temperature

170c 5c

Pyrometer

Nil

2 Times

Every Shift

In patrol
Inspection
Report.

Stop &
QC Correct
Patrol
the
Inspector.
process.

Timer
Controller

Curing Time

3.5 mins

Time
Indicator

Nil

Every Lift Every Lift

In patrol
Inspection
Report.

Pressuer
Indicator

Nil

Every Lift Every Lift

In patrol
Inspection
Report.

Digimatic
Vernier
caliper.

Nil

Temperature
Controller.

Timer
Controller

Uniformity of Rubber
blank.

Cleaning Chemical

Process Temperature.

As per Work Instruction

Cleaning Chemical

Process Time

Dryer

Every
time

Dipping

90

80. Rubber
Cutting

90.Moulding

Stop &
Correct Extrusion
the
operator.
process.

Nil

Timer
Controller

Extrusion Time.

Resp.

Visual
check

Temperature
Controller.

Blank Shape.

Reaction
Plan /
Control methods Correctiv
e action

Every Batch

Visual check

Hydrometer

80

: 00

Customer Eng. Approval / Date : N/A

Weighing
Machine

Hydraulic
Press Cavity
& Tools

90

1) O.D. : 47.78 / 47.93


mm
Pressure
Gauge

Pressure.

1500psi
- 2000psi
I.D. : 28.75
0.25 mm

2)

3)
Height : 8.00 0.20
Seal
Dimension

Oilseal

_
4) Free from
visual defects like Short
fill , Poor flow, tearing ,
stripping, Bad mould,

First off
(Every
setting)

Each sizes

In First-off
Approval Record
(FR/FAM/29b)

Stop &
Correct
the
process.

QC

CONTROL PLAN
Prototype

Pre-launch

Control plan Number :

BI / CP/193

Production

Key Contact / Phone

Part Name / Description : Oil Seal

Core Team

: PRODUCTION ,QUALITY, MARKETING

Drawing / Part no : VOS 193

Engineering change level

Supplier Code

Supplier / Plant approval / Date


Characteristics

Part /
Process
Machine,Devi
Process
Name/Operati ce,Jigs,Tools
Numbe
on Description
for Mfg
r

100

100. Finishing

Finishing
Motor,
Mandrel &
Emery sheet.

110

110. Trimming

Trimming
Machine

120

120. Final
Inspection

Gauge,
Digi.vernier
& ID plug
Gauge

No

Product

Visual

Date (original) : 13.09.2010


Revision Date : NILRev No
: Nil.
:

Customer Quality approval / Date : N/A


Other Approval Date ( If required ) :

Process

Plant / Location :
Methods
Sperc
Evaluation /
Error
ial
Product/Process
Measureme
Proofi
Size
Frequency
Char.
Spercification / tolerance
nt
ng
Class
Technique
As per Work Instruction

ID Dimension

: 00

Customer Eng. Approval / Date : N/A

Visual
check

1) After trimming ,
Ensure Id thro ID checking I.D. Gauge
1)
O.D. :ID:
47.78
/ 47.93
Gauge.
29.00
0.25
mm
2)
I.D. : 28.75 0.25 mm
3)
Height : 8.00 0.20

1. Visual
2. Dimension.
4) Free from
visual defects like Short
fill , Poor flow, tearing ,
stripping, Bad mould,
Under cure , foreign
matter , Bad shell , Bond
failure , Dent .

Reaction
Plan /
Control methods Correctiv
e action

Resp.

Nil

Random

Each lot

Visual check

Stop &
Correct Finishing
the
Section
process.

Nil

First off
(Every
setting)

Each lot

In First-off
Approval Record
(FR/FAT/29a)

Stop &
Correct Trimming
the
Section
process.

Each lot

Final Inspection
Report.

Reject
the
Material.

As per
Sampling

Digimatic
Vernier
caliper.

Nil

Plan.
2) 100%
Visual
Inpection
.

QC

PROCESS FMEA
Part Name / Description : Oil Seal

Drawing / Part no : VOS 193

Date(Orijnal): 13.9.2010

Model Year / Vehicle(s) :

FMEA Number : BI / FMEA / 193

Revision Date : NIL

Customer Ref. No : BSE 0300B - WK 30.14(B)

Core Team

Rev no : 00

Process Function \
Requirements

Potential Failure Mode

PC
Potential effects Se
Pot. Cause(s) /
Oc
Clas
of Failure
v
Mechanism of Failure c
s

Incorrect material
supplied by the
supplier.

32

Incorrect material
supplied by the
supplier.

1)Incoming
Inspection with
respect to sampling
plan.
2
2) Incoming
Inspection
Report( Ref :
WI/II/01 - Rev-00)

32

Incorrect material
supplied by the
supplier.

80

Product reject .

1) Incorrect Method
of stacking raw
material.
2)
Storekeeper product
knowledge / less
awareness.,

30

Performance get
reduced &
Difficult to meet
customer
requirement

1.Sequence of
1)Weight Machine
material pick - up not 2
followed.

32

Performance get
reduced &
Difficult to meet
customer
requirement

1. Inadequate mixing
1)Harddness testing
time.
2 method
2
2.Excess mixing
2)visual
time.

32

Performance get
reduced

1. Inadequate mixing
time.
2
2.Excess mixing
time.

Hardness tester
Indicator

24

Performance get
reduced

Sequence of material
2
added not followed.

Densimeter output
values/ Testing
results

24

a.Tensile Strength Variation

Performance get
reduced

1.Inadequate mixing
time.
2.Excess mixing time.

UTM Test Result

32

Elongation Variation

Performance get
reduced

1.Inadequate mixing
time.
2.Excess mixing time.

UTM Test Result

32

10. A. Incoming
Inspn. of Raw
Material. (Shell)

10. B. Incoming
Inspn. Of Raw
Material. (Spring)

1.Wrong Specification Material


shipped by supplier
Product reject
2. Visual
and return to the
defects like Bend, Rust , Burr, peel
supplier.
off supplied by the Supplier

20.Storage of Raw
Material

30.Weighing of Mix
Ingredients

40. Rubber Mixing

50. Compound
testing
A)Hardness

Wrong Specification Material


shipped by supplier

1.Wrong Grade Material


2.Wrong
Specification/Size Material
3.Defective material
1.Incorrect ingredients weight
2.Incorrect
chemical selection.
3. Life time of ingredients
4.Ingredients missed out
1. Hardness variation
2. Poor Dispersion
3.Temperature
variation of coolant circulation in
roll mill.

Variation in Rubber Hardness

50. Compound
testing
Specific Gravity variation.
B)Specific Gravity
50. Compound testing
C)Tensile Strength
50.Compound testing
D)
Ultimate Elongation

Respty and
Current Process
RP
target /
Det
Action Taken
Action taken
Control Detection
N
Comp.
Date

1)Incoming
Inspection with
respect to sampling
plan.
2
2) Incoming
Inspection
Report( Ref :
WI/II/01 - Rev-00)

1.Wrong Specification Material


shipped by supplier
2. Visual
Product reject
defects like Rust , Burr, Bend,
and return to the
cutshell, tool mark, Rust, Dent, OD
supplier.
line mark , Pit mark supplied by
the Supplier

10.C. Incoming
Inspection of
Chemicals & Raw
Rubber

: QUALITY,MARKETING & PRODUCTION. (CFT)

Product reject
and return to the
supplier.

1) As per test
certificate

1) Work instruction
displayed
2)Skill Matrix &
2 Training for
concern person
/operator ( Ref :
WI/SI/13 - Rev-00)

O D RPN

PROCESS FMEA
Part Name / Description : Oil Seal

Drawing / Part no : VOS 193

Date(Orijnal): 13.9.2010

Model Year / Vehicle(s) :

FMEA Number : BI / FMEA / 193

Revision Date : NIL

Customer Ref. No : BSE 0300B - WK 30.14(B)

Core Team

Rev no : 00

Process Function \
Requirements

60. Extrusion

70. Dipping

Potential Failure Mode

Over cure of Rubber compound.

: QUALITY,MARKETING & PRODUCTION. (CFT)

Respty and
Current Process
RP
target /
Det
Action Taken
Action taken
Control Detection
N
Comp.
Date

PC
Potential effects Se
Pot. Cause(s) /
Oc
Clas
of Failure
v
Mechanism of Failure c
s

Operable at
reduced level of
performance.

1) In correct/ Excess bonding layer in


shell
2) Rust / Surface
defects in shell
3) Process
Temperature variation
1) Bond failure
2)Curing process
4) Process Time variation.
may delay

1. Not feed the


material continuously.
8

2
2.Problem in water
circulation.

1) Periodic checking
of water circulation.
2
2)
visual

32

1)Testing Method
2) Work
2 Instruction Displayed.
( Ref : WI/DI/02
- Rev-00)

32

Digital Read out of


weigh Machine

20

Product Rejection 8

1. Hydraulic
Patrol Inspection
pressure , Curing
Record.
Time , Temperature
3
variation (Heater
Problem ).
2.Lack
of cavity cleaning

48

Product Rejection 7

1. Improper Finishing.
2. Incorrect 2
selection of Tool.

Visual

28

In First-off Approval
Record (FR/FAT/29a)

32

32

32

24

Process not followed as


per Work Instruction.

5)Dipping Procedure Variation.


6)Life time of dipping chemicals.

80. Rubber Cutting

1) Incorrect Rubber selection


2) Variation in Rubber Product Rejection 5
weight

90.Moulding

1) Visual Defects like Short fill ,


Poor flow, tearing , stripping,
Under cure , foreign matter , Bad
shell , Bond failure , Dent,
Badmoulding.
1) Uneven Flash removal, Tearing.,

100. Finishing

2) Poor Finishing

Manual cutting of
Rubber blank.

1) Trimming Needle wear out


Product Rejection

Improper trimming and


Improper tool Finishing.

1. Incorrect Inspection

Performance get
reduced /
Fitment problem
to the End User.

Inadequate Visual
Aids and defect
samples.

130. Spring Fitment


(Spring with oil seal)

1) Wrong Spring selection


2) spring open out
while fitment with seal

Performance get
reduced /
Fitment problem
to the End User.

Due to carelessness
of the operator.

140. Packing &


Labelling

1) Quantity Variation
2) Incorrect packing
media.
3)Product Mixup

110. Trimming

120. Final Inspection

2) Incorrect
Trimming / I.D. Dimension variation

NOTE:
A Typer- Detect on failur HIC- High impact characteristics
B Typer- Detect on failure causBP- Blue print
C Typer -Prevent on failure cau ES- Engineering spercification

Customer
dissatisfaction.

1)
2 Final Inspection
Report
2) 100% Visual
Inspection
( Ref :
WI/FII/07 - Rev-00)
1) I.D. Checking
2 Gauge available.,.

1. Similar Parts
placed at near by
location or same
2
location.
2. Counting
_
Error.

FC-Functional charactistics
IP - Inprocess product characteristics

O D RPN

STATISTICAL PROCESS CONTROL STUDY


PART NAME:

Oilseal

INSTRUMENT:

Digi.vernier

L.COUNT:

0.01 mm

PART NO.:

VOS 193

SPEC:

29.00 0.25

MACHINE:

Trimming Machine

PARAMETER:

INNER DIAMETER

NO.OF DECIMALS:

SAMPLE SIZE:
50
DATA COLLECTION: S. NO.
1
2

10

28.94

29.02

29.08

29.04

29.05

29.02

29.06

29.12

29.02

29.06

28.96

29.03

29.06

29.04

29.06

29.04

29.05

29.08

29.04

28.96

29.02

29.04

29.02

29.04

29.05

29.06

29.10

29.02

28.92

29.04

29.06

29.04

29.06

29.03

29.04

29.12

29.05

29.04

28.94

29.02

29.05

29.05

29.06

29.05

29.04

29.10

29.04

29.05

DATE:

15.09.10

SAMPLE

D2

A2

D4

1.123

2.560

3.270

29.04

1.128

1.880

3.270

29.01

1.693

1.020

2.570

2.059

0.730

2.230

2.326

0.590

2.110

U.T.L.

41.25

L.T.L.

40.75

CALCULATIONS: FOR HISTOGRAM


XLARGE

28.96

29.04

29.08

29.05

29.06

29.05

29.06

29.12

29.05

29.06

Xmax.=

29.1200

XSMALL

28.92

29.02

29.04

29.02

29.04

29.02

29.04

29.08

29.02

29.01

Xmin.=

28.9200

NO.OF NON CONFORMING PART =

50 NOS.

RANGE

0.04

0.02

0.04

0.03

0.02

0.03

0.02

0.04

0.03

0.05

R-BAR =

0.03200

NO. OF PARTS ABOVE U.T.L. =

0 NOS.

AVG.

28.94

29.03

29.06

29.04

29.05

29.04

29.05

29.10

29.03

29.04

X-BAR =

29.0386

NO. OF PARTS BELOW L.T.L. =

50 NOS.

Process Width ( P ) = 0.2000

Specification Width(S) =

0.5000

Index (K)={2 x (D-XBAR) / S}=

47.8456

Design Centre ( D ) = 41.0000

Interval =

0.0400

Selecting no. of classes =

28.8000

Starting Point =

No. of readings=

50.0000

Shift Of 'X-BAR' from 'D' =

11.9614

28.8400

28.9200

FREQ.

VALUE

HISTOGRAM

25

20

X-CHART

29.15
29.1
29.05
29
28.95

15

28.9
28.85

10

29.2800

29.2400

29.2000

29.1600

29.1200

29.0800

29.0400

29.0000

28.9600

28.9200

28.8800

28.8400

28.8000
28.8400
28.8800
28.9200
28.9600
29.0000
29.0400
29.0800
29.1200
29.1600
29.2000
29.2400

DIMENSION

REMARKS :

PROCESS IS EXCELLENT

INTERVAL

5 SAMPLE
6
7

0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0

10

A
V
G
.
U
.
C
.
L
.
L
.
C
.
L
.

R- CHART
R
A
N
G
E
U
.
C
.
L
.

10

FREQ.

CU. FREQ.

28.8400

28.8800

28.8800

28.9200

28.9200

28.9600

28.9600

29.0000

29.0000

29.0400

29.0400

29.0800

23

28

29.0800

29.1200

18

46

29.1200

29.1600

50

29.1600

29.2000

50

29.2000

29.2400

50

29.2400

29.2800

50

U.C.L.XBAR =

29.05748

L.C.L.XBAR =

29.01972

U.C.L.RBAR =

0.0675200000000001

L.C.L.RBAR =

Std.Dev."s"=

0.03995

Pp=(S/6s)=

2.08600

Ppk=Min(PPL,PPU)=

-97.71847

Gauge Repeatability & Reproducibility Study


APPRAISER/
TRIAL #
1(A)
1
2
2
3
3
Average
Range

1
29.02
29.03
29.02
29.023
0.01

2
28.94
28.95
28.95
28.947
0.01

PART
3
29.12
29.13
29.13
29.127
0.01

4
29.08
29.09
29.08
29.083
0.01

VOS 193
5
29.06
29.07
29.07
29.067
0.01

6
29.12
29.11
29.11
29.113
0.01

7
29.02
29.02
29.02
29.020
0.00

8
28.96
28.97
28.96
28.963
0.01

9
29.14
29.15
29.15
29.147
0.01

AVERAGE
10
29.050
29.04
29.055
29.03
29.053
29.04
29.037 Xabar = 29.05
0.01 Rabar = 0.01

4(B)

29.02

28.94

29.12

29.08

29.06

29.12

29.02

28.96

29.14

29.04

29.050

29.02

28.93

29.13

29.07

29.06

29.11

29.03

28.97

29.14

29.03

29.049
29.053

29.03

28.94

29.13

29.08

29.07

29.11

29.02

28.96

29.15

29.04

Average

29.023

28.937

29.127

29.077

29.063

29.113

29.023

28.963

29.143

29.037 Xbbar = 29.0507

7 Range

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

Rbbar = 0.010

7 (C)

29.02

28.94

29.12

29.09

29.06

29.12

29.02

28.96

29.14

29.04

29.051

78

29.02

28.93

29.12

29.08

29.06

29.12

29.03

28.96

29.14

29.04

29.050

29.03

28.94

29.13

29.08

29.07

29.11

29.02

28.97

29.15

29.05

29.055

Average

29.023

28.937

29.123

29.083

29.063

29.117

29.023

28.963

29.143

29.043 Xcbar = 29.0520

Range

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

16 Part

Xdbar = 29.0518

Average(Xp)
17

29.023

[Ra =

18 [MAX X=
19

Rcbar = 0.010

28.940

29.126

0.009 ]+[Rb=
29.0527 ]-[MIN X=

[R=

29.081

0.010 ] + [Rc=

29.064

29.114

29.022

28.963

29.144

29.039

0.010 } / {# OF APPRAISERS =3] =

Rp= 0.2
Rdbar = 0.01

29.0507 ] XDIFF

0.0020

0.010 ]x[D4*=2.58] = UCLR

20
[R=
0.010 ]x[D3*=0.00] = LCLR
NOTE:- * D4=3.27 for 2 trials and 2.58 for 3trials, D3= 0 for up to 7 trials Uclr represents the limit of
indvidual R's. Circle those that are beyond this limit. Identify the cause and correct. Repeat
these readings using the same appraiser and unit as originally used or discard values and
re-average and recompute R and the limiting value from the remaining observations.
APPRAISER ( a ) ---P.PAGIYA LAKSHMI
APPRAISER ( b ) ---M.VIGNESH
APPRAISER ( c ) ---A.SARAVANAN

UCLr =

0.0249

LCLr =
UCLx =
LCLx =

0.000
29.0617
29.0419

ANALYSIS OF R(bar) CHART :


RANGE CHART
No. of Points outside UCLr = 0

0.030
0.025

% of Points outside UCLr =

0.020

UCLr

0.015

LCLr

0 %

R(bar)

0.010

As the Range chart is in control, so we can proceed for


the Average chart (Xbar).

0.005
0.000
0

10

15

20

25

30

35

ANALYSIS OF X(bar) CHART :

X(BAR) CHART
29.200
29.150
29.100
29.050
29.000
28.950
28.900
28.850
28.800

UCLx
LCLx
X(bar
)

No. of Points outside UCLx =


No. of Points outside LCLx =
Total Points outside UCL & LCL =

15
14
29

% of Points outside UCLx & LCLx =

96.7

As this % is greater than 50% , the Measurement


system is adequate to detect part to part variation

MEASUREMENT SYSTEM ANALYSIS


Part Name- OILSEAL
Gage Name:
VERNIER
Characteristics:- ID
Identification No.:- 561311009
Specs. 41.00 0.25
From data sheet :Rdbar = 0.010
XDIEFFbar =
0.0020
Measurement Unit Analysis
Repeatability - Equipment Variation (EV)
EV = Rdbar x K1
.= 0.006
Trials
2
3
Reproducibility - Appraiser Variation (AV)

Date - 13.09.2010

Rp = 0.204
% Total Variation (TV)
% EV = 100 [EV/TV]
.= 8.84 %

K1
0.8862
0.5908
% AV = 100[AV/TV]

AV = [(XDIEFF x K2) - (EV /nr)]


2

.=
.= 0.0010
n=number of parts
Appraisers
r=number of trials
K2
Repeatability & Reproducibility (R&R)
R&R=

2
0.7071

3
0.5231
% R&R = 100[R&R/TV]
.= 8.99 %

(EV2+AV2)
.= 0.006

Part Variation (PV)


PV=Rp x K3
.= 0.064

Total Variation (TV)


TV =
(R&R2+PV2)

1.6 %

Parts
2
3
4
5
6
7
8
9
10

K3
0.7071
0.5231
0.4467
0.4030
0.3742
0.3534
0.3375
0.3249
0.3146

% PV = 100[PV/TV]
.= 99.6 %

ndc = 1.41(PV/R&R)
.= 12.6
~
13

.= 0.065

Note:1. All calculations are based upon predicting 5.15 sigma (99%of the area under the normal distribution curve).
2. AV- If a negative value is calculated under the square root sign, AV defaults to zero(0).
3. Guidelines for acceptance of gage repeatability and reproducibility (%R&R) are.
Under 10% error - the measurement system is acceptable.
10% to 30% error - may be acceptable based upon importance of application, cost of gauge,cost of repairs,etc.
Over 30% error - measurement system needs improvement. Make every effort to identify the problems and
have them corrected.
4. ndc is truncated to the integer & ought to be greater than or equal to 5.
(Refer MSA Manual - Third Edition)

Suppliers Name

List of checking Aids

Date: 13.09.10

Part No.:VOS 193

Customer :

Part namOILSEAL
Rev. No.: 0
Sl.

Characteristic /

Gauge / Instrument

No

Description

Description

OUTER DIAMETER

INNER DIAMETER

HEIGHT

SPRING LENGTH

PREPARED BY :

DIGITAL VERNIER
CALIPER
Plug Gauge
DIAL INDICATOR /
DIGITAL VERNIER
CALIPER
STEEL SCALE

Least Count

Gauge

Availabile

Calibration

Drg.

of gauge /

frequency/agency

Rev. No.

Instrument

0.01 mm 561311009

6Months

BI / PG / 151
BI / DI / 01 /
0.01 mm
1.0 mm

1Year
QA

1Year & 6Months

561311009
BSS 01

1Year

APPROVED BY:

frequency/agency

TO
INSPECTION REPORT

Date:
Description: Oil Seal
Customer Ref: BSE 0300B - WK 30.14(B)
Our Ref: VOS 193
Dimension: 48*30*8
Hardness: 70 +/- 5 Shore A
Sample size:
Qty:

DIMENSIONAL INSPECTION
Sl.NO Description Method
Of
Checking
1)

2)

3)

4)

Outer Dia Digi.Vernier

Inner Dia
Gauge
(with spring)

Height

Digi.Vernier

Specification
Max
Min
mm
mm
47.93

29.00

8.20

47.78

28.50

7.80

Observation

mm

47.89

47.84

47.82

47.81

47.85

47.91

47.92

47.86

47.88

47.82

ok

ok

ok

ok

ok

ok

ok

ok

ok

ok

7.94

8.06

7.92

8.00

8.04

8.04

8.08

7.98

8.04

8.08

OK

OK

OK

OK

OK

Visual

Conclusion:
Accepted Rejected Con.Accept

Inspected By:

in

Approved By:

Part Submission Warrant


Part Name

Cust. Part Num

Shown on Drawing No.

Org. Part Numb

Engineering Change Level

Dated

---

Additional Engineering Changes


Safety and/or Government Regulation

Yes

Checking Aid No.

---

Dated

Purchase Order No.

No

Weight (kg)

N/A

Checking Aid Engineering Change Level

ORGANISATION MANUFACTURING INFORMATION

Dated

N/A

CUSTOMER SUBMITTAL INFORMATION


Customer Name/Division

Street Address

Buyer/Buyer Code

Region

Postal Code

Country

Application

Has Customer-required Substances of Concern information been reported?

RUBBER MOULDING

Yes

No

n/a

Yes

No

n/a

Submitted by IMDS or other customer format :

Are polymeric parts identified with appropriate ISO marking codes?

REASON FOR SUBMISSION ( Check at least one )

Initial submission

Change to Optional Construction or Material

Engineering Change (s)

Sub-Supplier or Material Source Change

Tooling: Transfer, Replacement, Refurbishment, or additional

Change in Part Processing

Correction of Discrepancy

Parts produced at Additional Location

Tooling Inactive > than 1 year

Other - please specify below

REQUESTED SUBMISSION LEVEL (Check one)


Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer.
Level 2 - Warrant with product samples and limited supporting data submitted to customer.

Level 3 - Warrant with product samples and complete supporting data submitted to customer.
Level 4 - Warrant and other requirements as defined by customer.
Level 5 - Warrant with product samples and complete supporting data reviewed at organisation's manufacturing location.

SUBMISSION RESULTS
The results for

dimensional measurements

These results meet all design record requirements:

material and functional tests

YES

NO

appearance criteria

statistical process package

(If "NO" - Explanation Required)

Mold / Cavity / Production Process


DECLARATION
I affirm that the samples represented by this warrant are representative of our parts which where made by a process that meets all production part
Approval Process Manual 4th Edition Requirements. I further affirm that these samples were produced at the production rate of _2800 / __8___ hours.
I also certify that documented evidence of such compliance is on file and available for review. I have noted any deviations from this declaration below.
EXPLANATION/COMMENTS:

Is each Customer Tool properly tagged and numbered?

Yes

No

n/a

Organisation Authorised Signature

Date

Print Name:

Phone No.

FAX No.

E-mail

Title

FOR CUSTOMER USE ONLY (IF APPLICABLE)


PPAP Warrant Disposition:
Customer Signature
Print Name

Feb

Approved

Rejected

Other
Date
Customer Tracking Number ( Optional )

PROCESS FLOW
Part Name

: " INSERT "

Rev No

Part Number : SI/RF/MECH : 1469

Date origin : 03.01.08

Revision Date :

Process Sheet : 01

Process flow no : GAJ 01

Department

Op. / Brief Desc.

Incoming Sources of Variations

1.Wrong Specification Material shipped


by supplier
2.Rusted/Pitted Material supplied by
10. Incoming Inspn. Of Raw Material. the Supplier
( Material - IS 513 Grade 'DD' )
3.Incorrect Thickness supplied by
the supplier
4. Wrong report
attache

20.Storage of Raw Material

1.Wrong Grade Material


2.Wrong Specification/Size
Material
3.Rust/Pit mark
observed material

Process Flow Diagram

:TOOLROOM.

Product Characteristics
1.Correct Specification of RM

10

2.Rust/Pit mark free material


3.Correct Report with every
consignment
1.Correct Grade of material

20

2.Correct
specification/size of material
3.Rust prevention of material

2.Width:70.0 0.50
30.Strip Shearing of sheets

1.Inspector training for intrepretation


of report.
2.Operator knowledge on Rust/ Pit
mark material identification,while
unloading the material

1.Moisture/Acid content in Storage


Area
2.Application of Rust
prevention on the material surface
2.Operator knowledge on identifying /
storage of Raw Material
3.Material Handling methodology /
Equipment 4.Duration of storage

1.Length:12503.0

1.Incorrect Size (Thickness,Width &


Length) of Material
2.Wrong
Grade Raw Material

Process Characteristics

30

3.Thick ness: 0.60


4.Appearance:Free from
burr, bend,twist,tool mark&cut blank.

1.Operator knowledge on Parameter


setting on shearing machine
2.Operator knowledge on identifying
the correct Raw Material to be fed
3.Cleanliness and condition of
Shearing machine
4.Capacity of the machine

1.Outer dia-1: 54.00 0.20


40

40. Shell forming & Piercing

Forming locator is offset to punch


profile.

50.Facing

Carriage stopper length variation &


tool performance.

50

60.Deburring

Improper butting & belt grinder


m/cbelt performance

60

2.Outer dia-2: 48.000.20

Forming locator symmetrical to punch


profile.

1.Height Face:7.80 0.10


0.10
4.Height:7.800.20

3.Thickness: 0.60 Maintain stopper distance&tool bit


performance.

5.Appearance:Free
2.Appearance:freefrom
from
Free from burr
burr,tol
mark,bend,twist&crack
tool
mark,bend,crack&twist.

Proper butting&maintainbelt grinding


M/C belt performance.

PROCESS FLOW
Part Name

: " INSERT "

Rev No

Part Number : SI/RF/MECH : 1469

Date origin : 03.01.08

Revision Date :

Process Sheet : 01

Process flow no : GAJ 01

Department

Op. / Brief Desc.

Incoming Sources of Variations

Process Flow Diagram

:TOOLROOM.

Product Characteristics

Process Characteristics
1.Operator skill

70

70. Patrol Inspection

80.Storage after pressing (in Bins) in


station / Inventroy Area

1.Accept Good Part


2.Reject Bad Part

1.Thick
1.No Pit ness:0.600.10
mark/Rust on parts

1.Parts with Pitmark/Rust


2.Damaged Parts
3.Parts with out proper
identification

80

2.No Damages
2.Material
on parts
specification:IS:513
GRADE"DD"
3.Correct identification with
complete details
3.Outer dia-1: 54.00 0.20
4.Outer dia-2: 48.000.20

90

90. 100% Visual Final Inspection

2.Operator
knowledge on disposition
methodology
3.Operator vision Capability
4.Lighting in Inspection Area
1.Operator knowledge on stacking
methodology of parts in Bin
2.Bin cleanliness
3.Selection of storage
Bins
4.Quantity stacked
5.Duration of storage of
P

5.Height Face:7.80 0.10

1.Operator skill
6.Appearance:
2.Operator
Free from burr,bend,cutting taper,rust,blow knowledge on disposition
holes&scratches.
methodology
3.Operator vision Capability
4.Operator
knowledge on keeping the material
with identification
1.Quantity in Pack

100

100.Packaging & Labelling

2.Correct selection of Packing media


3.Attach correct Standard Label

110.Despatch to customer

1.Wrong Label / Part

110

Correct shipment of Part / Invoice / DC

1.Operator knowledge on Pack


Quantity / Stacking method

PROCESS FMEA
Part Name

: " INSERT "

Part Number : SI/RF/MECH : 1469

FMEA No

Model Year / Vehicle(s) :

Date(Orig )

Rev no :

Prepared by :

Core Team

Process Function \
Requirements

Potential Failure Mode

PC
Potential effects
Sev Clas
of Failure
s

: 3.01.08
: TOOLROOM,QUALITY,MARKETING&PRODUCTION.

Pot. Cause(s) /
Mechanism of Failure

10. Incoming Inspn. Of


Raw Material.
( Material - IS 513 Grade
'DD' )

1.Wrong Specification
Cust- Difficult to
Material shipped by
meet production
supplier
shedule
2.Rusted/Pitted
Material supplied by the
Supplier
3.Incorrect
Thickness supplied by
the supplier

Delivery not checked


asper invoice while
unloading

20.Storage of Raw
Material

1.Wrong Grade
Cust- Difficult to
Material4. Wrong report meet production
attache 2.Wrong
shedule
Specification/Size
Material
3.Rust/Pit mark
observed material

Wrong receipt from


supplier
Wrong disposition of RM

30.Strip Shearing of
sheets

1.Incorrect Size
(Thickness,Width &
Length) of Material

Cust- Silver
streaks

Operator knowledge on
idnetifying / storage of
RM
1.Material handling
methodology/Equipment
2.Duration of
RM storage
Supplier compounding /
formulation error /
process error

Occ

Current Process
Control
Prevention

Current Process
Control Detection

De
Rec.
RPN
t
Actions

1.Operator
training

Training to operators

1.Operator
training

WI for RM handling
PM of
trollys as per
schedule
A.Visual inspection 7
RM inventroy
after pressing of the
monitoring against
part
selflife

49

21

49

2.Wrong
Grade Raw Material
3.Cleanliness and
condition of Shearing
machine
4.Capacity of the
machine
1.Forming tool
2 Frequency &
2.Machine,method &
training.
operator.

WI for cleaning of
De-humidifier
WI
for cleaning of RM
feeding area
Proper locator

40. Shell forming &


Piercing

Forming locator is offset Product reject.


to punch profile.

50.Facing

Height u/s&o/s.

Product reject.

2.Facing tool,lathe
method

3 Frequency &
training.

60.Deburring

Burr

Product
reject&rework.

& operator.
1.Belt grinding
m/c belt
performance.

3 Frequency &
training.

Revision Date :

Process Responsibility:TOOLROOM

1 1.Propper
7
RM verification
incoming
against P.O.while
inspection of raw offlaoding
material.
Visual
2.Inspector
Inspection of RM
training
Verification of
Rust/Pit mark on the
surface by random
check
1 1.Material
RM verification
3
size&Grade
during incoming
specifications
stage
provided on
Training for
Rmstorage room. Inspectors

1 Two
sides&opposite
sides stopper
provided.

: GAJ 01

40

Detail work
instruction given in
pcp

45

Maintain belt
performance

54

Respty and
target /
Comp. Date

Actio
n
S O D
taken

RPN

PROCESS FMEA
Part Name

: " INSERT "

Part Number : SI/RF/MECH : 1469

FMEA No

Model Year / Vehicle(s) :

Date(Orig )

Rev no :

Prepared by :

Core Team

Process Function \
Requirements

Potential Failure Mode

PC
Potential effects
Sev Clas
of Failure
s
5

70..First & Patrol


Inspection

80..Storage after
moulding in Bins in
station / Inventory Area

90. 100% Visual Final


Inspection

Parts with scratches


Damaged Parts

Accept bad Part

Difficult to meet
customer
schedule

Difficult to meet
customer
schedule

100.Packaging &
Labelling

110.Despatch to
customer

Wrong label / Part

Customer
dissatisfied

: 3.01.08
: TOOLROOM,QUALITY,MARKETING&PRODUCTION.

Pot. Cause(s) /
Mechanism of Failure
1.Operator skill
2.Operator
knowledge on disposition
methodology
3.Operator
vision capability
Lighting
in Inspection
4.Operator
knowledge of
Area
Rejection methodology

Operator knowledge on
stacking methodology of
parts in Bins

1.Bin cleanliness
2.Selection of
storage Bins
3.Quantity stacked
4.Duration of
storage of Parts
1.Operator skill
2.Operator
knowledge on disposition
methodology
3.Operator
vision capability
4.Operator knowledge of
Rejection methodology

Current Process
Control
Prevention

Current Process
Control Detection

De
Rec.
RPN
t
Actions

Training to operators 3

45

Proper lighting near


the machine
Training to operators 3

42

Training to store
personnel

3 100%Visual &
Trainign to operators 4
Gauge check up / Inspectors
in final
inspection.

60

1.Operator knowledge on
Pack Quantity / Stacking
method

Training to operators 4

48

Stores personnel skill

Training to store
personnel

36

A Typer- Detect on failure HIC- High impact characteristics

FC-Functional charactistics

B Typer- Detect on failure cause BP- Blue print

IP - Inprocess product characteristics

Revision Date :

Process Responsibility:TOOLROOM

NOTE:

C Typer -Prevent on failure causeES- Engineering spercification

Occ

: GAJ 01

Respty and
target /
Comp. Date

Actio
n
S O D
taken

RPN

CONTROL PLAN
Prototyper

Pre-launch

Production

Control plan Number : SI/RF/Mech:1469

Key Contact / Phone

: Mr.M..MURUGAVEL

Part Name

Core Team

: TOOLROOM,QUALITY,MARKETTING&PRODUCTION.

: " INSERT "

Part Number : SI/RF/MECH : 1469


Supplier Code

57372

Part /
Process
Machine,De
Process
Name/Operatio vice,Jigs,Tool
Numbe
n Description
s for Mfg
r
10

Engineering change level

10. Incoming
Inspn. Of Raw
Material.
( Material IS 513 Grade
'DD' )

09344006009 , 09345202505

10.01 1.Correct Specification of


RM

2.Rust/Pit mark free


material

Revision Date :

Customer Quality approval / Date : N/A

Other Approval Date ( If required ) :

Characteristics

Product

Rev No

Customer Eng. Approval / Date : N/A

:A

Supplier / Plant approval / Date

No

Date(Orig.):05.01.08

Process
1.Inspector training for
interpretation of replort
2.Operator knowledge
on repacking methodology
after inspcetion
3.Operator
skill to use measuring
instruments/ gauges

Sperci
al
Char.
Class

Plant / Location :Bright, Pondicherry

Methods
Product/Process
Spercification / tolerance
IS513GRADE:DD

Evaluation / Error
Measurement Proofin
Technique
g
Supplier test Nil
certificate

Size

Frequenc
y

As per Each lot


samplin
g plan

Control methods

Reaction
Plan /
Corrective
action

Resp.

Visual inspection on Reject the MAT & QA


raw material.
RM
Check as per
invoice while
unloading

Length:25003.0
20

20.Storage of
RM

Grade
of material
20.01 1.Correct
3.Correct
Report
with Moisture content in storage
area
every consignment

2.Correct
specification/size of
20.02 1.Length:12503.0
Operator knowledge on
material
identifying / storage of RM
20.03

30

30.Strip
Shearing of
sheets

Shearing
machine

30.01

3.Rust
2.Width:70.0
prevention of 0.50
material

Material handling
methodology / Equipment
Duration of storage
1.Maintain stopper distance
55.00 mm
2.Operator
knowledge on identifying the
correct RM to be fed

40

40. Shell
forming &
Piercing

4.Appearance:Free from
burr, bend,twist,tool
Power
40.01 1.Outer dia-1: 54.00
mark&cut blank.
press&formi
0.20
ng&Piercing
tool

Visual check Nil

Every
time

Each lot

width:12503.0
Correct
identification
1.Length:12503.0
Alloted location
Length:25003.0
WI for material handling
Thick&
Equipment
As per FIFO
ness : 0.600.10
2.Width:70.0
0.50

Training to
Store
personnel
Training to
Store
personnel

Nil

one
time

Training Record

HR

Nil

one
time

As per
training
calender
As per
training
calender

Skill Record
Training Record

HR

Measuring
tape
Vernier
Micrometer.

Nil

Each
tray

Every
time

IN-process ins rep

Every
time

whenever Machine capacity


colour
record
changes

Nil

5 Nos

F.O.S.
IN-process ins rep
everyhou
r

Stop
&correct

Vernier
Nil
Micrometer.
Visual check

5 Nos

Once in
hour

IN-process ins rep

Stop
&correct

PRD

5 Nos

Once in
hour

IN-process ins rep

Stop
&correct

PRD

width:12503.0

PRD

Skill Record
Stop
&correct

PRD

3.Thick ness:

3.Thick ness: 0.60


30.02

IS513GRADE:DD

3.Cleanliness and condition of


Shearing machine
4.Capacity of the
machine
Forming locator symmetrical
to punch profile.

0.60

Thick

ness : 0.600.10

Visual check Nil

4.Appearance:Free
from burr, bend,twist,tool
mark&cut
blank.54.00 0.20 1.Vernier
1.Outer
dia-1:

PRD

2.Outer
2.Outer dia-2: 48.000.20
50

60

50.Facing

60.Deburring

Center lathe 50.01 1.Height Face:7.80 0.10

Belt grinder 60.01 Free from burr


M/C
3.Thickness:
0.60 0.10

dia-2: 48.000.20
Propper cariage stopper
distance.

Maintain belt performance

1.Height Face:7.80 0.10

Free from burr


3.Thickness: 0.60 0.10
4.Height:7.800.10

4.Height:7.800.10
2.Appearance:free from tool
mark,bend,crack&twist.

2.Appearance:free from tool


mark,bend,crack&twist.

2.micro
meter.
Visual check Nil

CONTROL PLAN
Prototyper

Pre-launch

Production

Control plan Number : SI/RF/Mech:1469

Key Contact / Phone

: Mr.M..MURUGAVEL

Part Name

Core Team

: TOOLROOM,QUALITY,MARKETTING&PRODUCTION.

: " INSERT "

Part Number : SI/RF/MECH : 1469


Supplier Code

57372

Part /
Process
Machine,De
Process
Name/Operatio vice,Jigs,Tool
Numbe
n Description
s for Mfg
r
70

80

90

70.First part &


Patrol
Inspection

80.Storage
after Pressing
in Bins in
station /
Inventory Area

90. 100%
Visual Final
Inspection

Engineering change level

09344006009 , 09345202505

Other Approval Date ( If required ) :

Characteristics

70.01 1.Accept Good Part


2.Reject Bad Part
2.Material
specification:IS:513
GRADE"DD"

6.Appearance: Free from


burr,bend,cutting
taper,rust,blow
holes&scratches.

Revision Date :

2.Operator
knowledge
on disposition
Lighting in Inspection
Area
methodology

2.Material
specification:IS:513
GRADE"DD"
Proper lighting in Inspection
area

4.Operator knowledge of
rejection methodology
1.Operator skill

2.Operator
knowledge on disposition
methodology

Plant / Location :Bright, Pondicherry

Methods

1.Operator skill

Operator knowledge on
stacking methodology of parts
in Bins
3.Operator vision capability
80.02 4.Outer dia-2: 48.000.20 Bin Cleanliness
Selection of storage Bins
Quantity stacked
Duration of storage of parts

90.01

Sperci
al
Char.
Class

Product/Process
Spercification / tolerance
1.Thick ness:0.600.10
As per sample

Process

3.Outer dia-1: 54.00


80.01 Scratch
0.20
Damage
Warpage

5.Height Face:7.80 0.10

Customer Quality approval / Date : N/A

Product
1.Thick ness:0.600.10

Rev No

Customer Eng. Approval / Date : N/A

:A

Supplier / Plant approval / Date

No

Date(Orig.):05.01.08

Training
to operator
3.Outer dia-1:
54.00 0.20

4.Outer

Evaluation / Error
Measurement Proofin
Technique
g
Visual check Nil

5.Height Face:7.80
6.Appearance: Free from
burr,bend,cutting
taper,rust,blow
holes&scratches.

Frequenc
y

3 shots Initial
Once in 2
hrs

Control methods
First Part Approval

Resp.

Reject the QA
part

Patrol Inspection

Visual check Nil

One
time

Per shift

QA

Nil

One
time

As per
Training Record
schedule
Skill Record

HR

Visual check Nil

One
time

Every
shift

STR

Vernier
Nil
Micrometer.
Visual check

100%

Each lot

F.I.R.

Visual check Nil

100%

Each lot

Visual Inspection

STR

Training to store
personnel

STR

dia-2: 48.000.20

0.10

Size

Reaction
Plan /
Corrective
action

Reject the QA
part

3.Operator vision
capability
100

100.Packaging
& Labelling

100

Quantity in dunnage
Correct selection of
dunnage
Correct standard label

110

110.Despatch
to customer

110

Correct shipment of Part /


Invoice / DC

1.Operator knowledge on Pack


Quantity / Stacking method
4.Operator knowledge of
rejection methodology

As per packaging standard

Potrebbero piacerti anche