Design & Construction Engineering Disciplines and Wage Rates


US Country Base ............................................................................... 31-3
UK Country Base .............................................................................. 31-4
JP Country Base ................................................................................ 31-5
Engineering Expenses and Indirects ................................................. 31-6
Standard Engineering Drawing Types ............................................. 31-8
User-Specified Drawing Classifications ............................................ 31-9

G3 ICARUS Corporation, 1998.

31-2

ICARUS Reference

ICARUS Corporation, 1998. G3

Chapter 31: Engineering

31-3

Design & Construction Engineering Disciplines and Wage Rates


US Country Base
Design
Discipline

$/MH*

Basic Engineering:
01
Project Engineering
02
Process Engineering
03
Piping Design
04
Instrument Design

27.40
29.30
23.50
23.50

No.

05
06
07
08

Mechanical Design
Electrical Design
Civil Design
Piping Drafting

23.50
23.50
23.50
18.00

09
10
11
12

Instrument Drafting
Mechanical Drafting
Electrical Drafting
Civil Drafting

18.00
18.00
18.00
18.00

13
14
15
16

General Drafting
Planning, Scheduling
Cost Estimating
Support, Clerical

18.00
23.50
20.50
10.70

Detail Engineering:
01
Project Engineering
02
Process Engineering
03
Piping Design
04
Instrument Design

27.40
29.30
23.50
23.50

05
06
07
08

Mechanical Design
Electrical Design
Civil Design
Piping Drafting

23.50
23.50
23.50
18.00

09
10
11
12

Instrument Drafting
Mechanical Drafting
Electrical Drafting
Civil Drafting

18.00
18.00
18.00
18.00

13
14
15
16
17

General Drafting
Planning, Scheduling
Cost Estimating
Support, Clerical
Model Building

18.00
23.50
20.50
10.70
23.50

Procurement:
01
Procurement
02
Support, Clerical

20.50
10.70

Eng'g Management:
01
Project Engineering

27.40

Note: $ indicates U.S. Dollars.

These rates are the current (1Q 1998) System


base values, which are escalated by the Design
Engineering Index specified by the user in the
Indexing/Escalation data.

Base Design Engineering Index = 1450


G3 ICARUS Corporation, 1998.

No.

Construction
Discipline

Home Office:
01
Project Management
02
Cost Accounting
03
Construction Dept.
04
Planning, Scheduling
05
06
07
08

Tools, Equipment
Industrial Relations
Subcontract Admin.
Support, Clerical

Field Office:
01
Project Constrn. Supt.
02
Area Superintendents

$/MH**
32.60
20.50
26.30
25.40
26.30
26.30
26.30
10.70
37.90
30.60

03
04
05
06
07
08

Field Superintendents:
Piping
Instrumentation
Electrical
Civil
Mechanical
QC&A, Inspection

28.60
28.60
28.60
28.60
28.60
28.60

09
10
11
12
13

Subcontract Admin.
Cost Engineering
Field Engineering
Planning, Scheduling
Safety & Medical

28.60
26.50
27.60
27.60
26.50

14
15
16
17

Field Accounting
Materials Control
General Drafting
Support, Clerical

24.40
24.40
19.60
11.60

Construction Management (Home):


01
Project Management
02
Cost Accounting
03
Construction Dept.
04
Subcon. Admin. (Field)
05
Construction Manager

32.60
20.50
26.30
26.30
35.40

06
07
08
09
10

Area Managers
Subcon. Coordinator
Field Inspector
Cost Engineering
Field Engineering

29.30
26.30
28.20
24.30
25.40

11
12
13

Planning, Scheduling
Safety & Medical
Support, Clerical

25.40
24.30
10.70

Start-up, Commissioning:
01
Commissioning Staff
02
Start-up Staff
03
Performance Testing

28.20
28.20
28.20

** These rates are the current (1Q 1998) System


base values, which are escalated by the
Construction Management Index specified by the
user in the Indexing/Escalation data.
Base Construction Management Index = 1450

31-4

ICARUS Reference
UK Country Base
Design
No.

Discipline

Basic Engineering:
01
Project Engineering
02
Process Engineering
03
Piping Design
04
Instrument Design

PS/MH*
18.30
18.60
17.30
17.30

No.

Construction
Discipline

PS/MH**

Home Office:
01
Project Management
02
Cost Accounting
03
Construction Dept.
04
Planning, Scheduling

05
06
07
08

Mechanical Design
Electrical Design
Civil Design
Piping Drafting

17.30
17.30
17.30
12.90

09
10
11
12

Instrument Drafting
Mechanical Drafting
Electrical Drafting
Civil Drafting

12.90
12.90
12.90
12.90

13
14
15
16

General Drafting
Planning, Scheduling
Cost Estimating
Support, Clerical

12.90
14.20
12.90
7.50

Detail Engineering:
01
Project Engineering
02
Process Engineering
03
Piping Design
04
Instrument Design

03
04
05
06
07
08

Field Superintendents:
Piping
Instrumentation
Electrical
Civil
Mechanical
QC&A, Inspection

17.00
17.00
17.00
17.00
17.00
17.00

18.30
18.60
17.30
17.30

09
10
11
12
13

Subcontract Admin.
Cost Engineering
Field Engineering
Planning, Scheduling
Safety & Medical

17.00
15.20
15.80
15.20
13.00

14
15
16
17

Field Accounting
Materials Control
General Drafting
Support, Clerical

12.10
12.10
12.60
7.30

05
06
07
08

Mechanical Design
Electrical Design
Civil Design
Piping Drafting

17.30
17.30
17.30
12.90

09
10
11
12

Instrument Drafting
Mechanical Drafting
Electrical Drafting
Civil Drafting

12.90
12.90
12.90
12.90

13
14
15
16
17

General Drafting
Planning, Scheduling
Cost Estimating
Support, Clerical
Model Building

12.90
14.20
12.90
7.50
17.30

05
06
07
08

22.20
12.90
17.10
15.50

Tools, Equipment
Industrial Relations
Subcontract Admin.
Support, Clerical

17.10
17.10
17.10
7.50

Field Office:
01
Project Constrn. Supt.
02
Area Superintendents

23.10
17.00

Construction Management (Home):


01
Project Management
02
Cost Accounting
03
Construction Dept.
04
Subcon. Admin. (Field)
05
Construction Manager

22.20
12.90
17.30
17.30
24.00

06
07
08
09
10

Area Managers
Subcon. Coordinator
Field Inspector
Cost Engineering
Field Engineering

18.40
17.10
17.30
15.50
16.00

11
12
13

Planning, Scheduling
Safety & Medical
Support, Clerical

15.50
13.20
7.50

Note: PS indicates Pounds Sterling

Start-up, Commissioning:
01
Commissioning Staff
02
Start-up Staff
03
Performance Testing

17.30
17.30
17.30

* These rates are the current (1Q 1998) System base


values, which are escalated by the Design
Engineering Index specified by the user in the
Indexing/Escalation data.

** These rates are the current (1Q 1998) System base


values, which are escalated by the Construction
Management Index specified by the user in the
Indexing/Escalation data.

Base Design Engineering Index = 2780

Base Construction Management Index = 2880

Procurement:
01
Procurement
02
Support, Clerical

12.50
7.50

Eng'g Management:
01
Project Engineering

18.30

ICARUS Corporation, 1998. G3

Chapter 31: Engineering


JP Country Base
Design
No.

Discipline

Basic Engineering:
01
Project Engineering
02
Process Engineering
03
Piping Design
04
Instrument Design

KY/MH*
3.6
3.6
3.6
3.6

05
06
07
08

Mechanical Design
Electrical Design
Civil Design
Piping Drafting

3.6
3.6
3.6
2.7

09
10
11
12

Instrument Drafting
Mechanical Drafting
Electrical Drafting
Civil Drafting

2.7
2.7
2.7
2.7

13
14
15
16

General Drafting
Planning, Scheduling
Cost Estimating
Support, Clerical

2.7
3.0
3.0
1.8

Detail Engineering:
01
Project Engineering
02
Process Engineering
03
Piping Design
04
Instrument Design

3.6
3.6
3.6
3.6

05
06
07
08

Mechanical Design
Electrical Design
Civil Design
Piping Drafting

3.6
3.6
3.6
2.7

09
10
11
12

Instrument Drafting
Mechanical Drafting
Electrical Drafting
Civil Drafting

2.7
2.7
2.7
2.7

13
14
15
16
17

General Drafting
Planning, Scheduling
Cost Estimating
Support, Clerical
Model Building

2.7
3.0
3.0
1.8
2.3

No.

Construction
Discipline

KY/MH**

Home Office:
01
Project Management
02
Cost Accounting
03
Construction Dept.
04
Planning, Scheduling
05
06
07
08

Tools, Equipment
Industrial Relations
Subcontract Admin.
Support, Clerical

Field Office:
01
Project Constrn. Supt.
02
Area Superintendents

4.1
3.0
3.2
3.0
3.2
3.2
3.2
1.8
4.1
3.2

03
04
05
06
07
08

Field Superintendents:
Piping
Instrumentation
Electrical
Civil
Mechanical
QC&A, Inspection

3.2
3.2
3.2
3.2
3.2
3.2

09
10
11
12
13

Subcontract Admin.
Cost Engineering
Field Engineering
Planning, Scheduling
Safety & Medical

3.2
3.0
3.0
3.0
3.0

14
15
16
17

Field Accounting
Materials Control
General Drafting
Support, Clerical

3.0
3.0
2.8
1.8

Construction Management (Home):


01
Project Management
02
Cost Accounting
03
Construction Dept.
04
Subcon. Admin. (Field)
05
Construction Manager

4.1
3.0
3.2
3.2
4.1

06
07
08
09
10

Area Managers
Subcon. Coordinator
Field Inspector
Cost Engineering
Field Engineering

4.1
3.2
3.2
3.0
3.0

11
12
13

Planning, Scheduling
Safety & Medical
Support, Clerical

3.0
3.0
1.8

Note: KY indicates thousand YEN

Start-up, Commissioning:
01
Commissioning Staff
02
Start-up Staff
03
Performance Testing

3.2
3.0
3.0

* These rates are the current (1Q 1998) System base


values, which are escalated by the Design
Engineering Index specified by the user in the
Indexing/Escalation data.

** These rates are the current (1Q 1998) System base


values, which are escalated by the Construction
Management Index specified by the user in the
Indexing/Escalation data.

Base Design Engineering Index = 1360

Base Construction Management Index = 1350

Procurement:
01
Procurement
02
Support, Clerical

3.0
1.8

Eng'g Management:
01
Project Engineering

4.1

G3 ICARUS Corporation, 1998.

31-5

31-6

ICARUS Reference

Engineering Expenses and Indirects

(COST, ICARUS 2000 and ICARUS ProcessEvaluator)

US Country Base

Phase
Basic Engineering
Detail Engineering
Procurement
Engineering Management

Expense Rate
($/MH)*
3.70
2.90
6.60
0.00

% Eng'ng Manpower Cost


Payroll Burdens
Indirects
25
25
25
25

75
75
75
75

25
25
25
25

75
75
75
75

($/MH)**
Home Office Construction Services
Field Office Supervision
Construction Management
Start-up, Commissioning

2.70
0.00
0.00
0.00

UK Country Base

Phase
Basic Engineering
Detail Engineering
Procurement
Engineering Management

Expense Rate
(PS/MH)*
2.70
2.30
4.90
0.00

% Eng'ng Manpower Cost


Payroll Burdens
Indirects
40
40
40
40

90
90
90
90

40
40
40
40

90
90
90
90

(PS/MH)**
Home Office Construction Services
Field Office Supervision
Construction Management
Start-up, Commissioning

2.00
0.00
0.00
0.00

JP Country Base

Phase
Basic Engineering
Detail Engineering
Procurement
Engineering Management

Expense Rate
(KY/MH)*
0.49
0.38
0.87
0.00

% Eng'ng Manpower Cost


Payroll Burdens
Indirects
25
25
25
25

75
75
75
75

25
25
25
25

75
75
75
75

(KY/MH)**
Home Office Construction Services
Field Office Supervision
Construction Management
Start-up, Commissioning

0.36
0.00
0.00
0.00

ICARUS Corporation, 1998. G3

Chapter 31: Engineering

Engineering Expenses and Indirects (continued)


*

These rates are the current (1Q 1998) System base values, which are escalated by the Design Engineering
Index specified by the user in the Indexing/Escalation data.

** These rates are the current (1Q 1998) System base values, which are escalated by the Construction Management
Index specified by the user in the Indexing/Escalation data.
Base Design Engineering Index
Base Construction Management Index
Note: $ indicates U.S. Dollars
PS indicates Pounds Sterling
KY indicates thousand YEN

G3 ICARUS Corporation, 1998.

= 1450 (US), 2780 (UK), 1360 (JP)


= 1450 (US), 2880 (UK), 1350 (JP)

31-7

31-8

ICARUS Reference

Standard Engineering Drawing Types

(COST, ICARUS 2000 and ICARUS Process Evaluator)

Basic Engineering:

Detail Engineering:

Drawing
No.

Drawing
No.

Description

1
2
3
4
5

Process Flow Diagrams


Piping & Instrument Diagrams
Interconnecting Piping Diagrams
Utility Flow Diagrams
Utlity Piping & Instrument Dgs

6
7

Electrical One Line Diagrams


Elec. System Distribution

8
9

General Equipment Arrangements


Other (Plot Plants, Etc.)

User-specified Drawings
Up to nine user-specified drawings (or other tasks,
such as models) may be added to the system drawings
by using a drawing number from the range 91-99.
Note: Only the drawing numbers shown in this table
and 91-99 are accepted.

Description

1
2
3
4

Piping Arrangements (Plans & Elevns.)


Piping Isometrics
Special Hanger/Support Drawings
Steam Tracing Drawings

7
8
9
10
11
12

Instrument Location Drawings


Control Cable Schedules
Control Room/Console Drawings
Control Systems Schematics
Instrument Loop Diagrams
Connection Diagrams/Junction Box Drwgs

13
14
15
16
17
18
19
20
21

Electrical One Line Diagrams


Substation Layout Drawings
Electrical Schematics
Power Distribution Drawings
Circuit Scheds, Connection Diagrams
Cable Tray Drawings
Lighting Drawings
Grounding Drawings
Electrical Tracing Drawings

23
24
25
26
27

Equipment Foundation Drawings


Steelwork Foundation Drawings
Area Paving Drawings
Misc. Concrete, Supports, Etc.
Underground Piping Drawings

28
29
30

Structural Steel (Plans & Elevns.)


Ladders & Platforms, Misc. Steel
Grating Drawings

32
33

Building Arrangement Plans, Elevns.


Architectural Details

34
35
36

Facilities Plot Plans


Area Equipment Layouts
Site Developement

38

Other Detail Drawings, Lists

ICARUS Corporation, 1998. G3

Chapter 31: Engineering

User-Specified Drawing Classifications

(COST, ICARUS 2000 and ICARUS Process Evaluator)

The two character drawing classification code is composed of a letter which signifies the major account (e.g., piping),
and a number which indicates the group of disciplines performing the work (e.g., engineers and draftsmen). Thus, a
drawing classification of P4 describes a small scale piping model.

Account
Piping
Instrumentation
Electrical
Civil
Steelwork
Building
General

Discipline Group
Design engineering
Design, drafting and checking
Drafting and checking
Model building
Engineering support

G3 ICARUS Corporation, 1998.

31-9

Symbol
P
I
E
C
S
B
G

Symbol
1
2
3
4 (piping account only)
5

31-10 ICARUS Reference

ICARUS Corporation, 1998. G3