1.

INTRODUCTION

This structural design document presents all the assumptions analysis and design Calculations done in the design
Material
In the design of the building material properties of concrete C25 and steel S300 are used for structural elements.
Slab and beam design and method of analysis
The slab and beam is designed according to EBCS-1 and EBCS-2 1995 using direct design method. The
partition wall load on each slab panel is also considered properly for each panel area. After calculation of the
design actions, shear fore and bending moments, the proper reinforcement is provided for moment and the slab
panel against shear.
Objective:-

comparision between solid tow way slab, flat slab and ribbed slab

To help and identify least cost and most economical

To know which is ease to construct and needed minimum construction material

Help the designer to identify and understand the baste preferable in terms of design, economy and way of
construction

To provide the first estimation for the designer

2.

BASIC ASSUMPTION

Dead Load:
- Reinforced concrete

=25KN/m 3

- Cement Screed

=23KN/m 3

=14KN/m 3

- HCB- 200mm thick

=23N/m 3

- Terrazzo tile

Partial Safety Factor for Dead Load =1.30

Live Load:
LL= 4KN/m2
Partial Safety Factor for Live Load =1.50

Material Properties
Concrete:
Grade C-25

Fck = 20 Mpa

Fctk =1.5 Mpa


Partial Safety Factor = 1.5
= 11.33 Mpa

Fcd = 0.85[20/1.5]

Fctd = 1.5/1.5 = 1 Mpa


Ecm = 29Gpa
Reinforcing Steel:
Fyk = 300 Mpa
Partial Safety Factor =1.15
Es = 200Gpa

Spacing of column: Lx= 5.0m

Ly= 6.0m

Size of Column: 0.5m X 0.5m

Fyd = 300/1.15 = 260.87 Mpa

3. DESIGN OF SOLID TOW WAY


SLAB

span. And from EBCS-2 , ratio 2 a = 30,


and ratio 1 a = 40

3.1

For ratio 1.2

SLAB

2 1.2 30 40 30 38......
by
2 1

interpolation

d 0.4 0.6

d 0.4 0.6

f yk l x

400 a
300 5000
112 mm

400 38

Use d = 115mm
Total depth D = 115 + 20 + 5 = 140 mm
Design Load:
Dead Loads

Design constant

Selfe weight = 0.14 * 25 = 3.5 KN/m2


For S-300, C-25, l x = 5m l y = 6m ,

Ceiling plaster(15mm) =23 *0.015=


0.345KN/m2

10mm Clear cover = 20mm


Live Load LL = 4 KN/m2

f cd

0.68 f c y

Cement scread(30mm) = 23*0.03 =


0.69KN/m2

0.68 * 25
11.33 N mm 2
1 .5

s
fyk 300
fyd

260.87 N / mm 2
s
1.15
fctd

0.21 fck
s

2
3

Terrazzo tile(20mm) = 23*0.02 = 0.46 KN/m2


Partition wall = 2 KN/m2
Total Gk = 7 KN/m2

2
3

0.21(20)
1.03 N / mm 2
1.15

Pd 1.3DL 1.6 LL 1.3 7 1.6 4


Pd 15.49 KN / m 2

method

ment alculate

Depth determination by Serviceability


Limit State

f yk l x

d 0.4 0.6
400 a

xs 0.063
xf 0.047
ys 0.047

yf 0.036

The value of a can be determined: using


the ratio of length

ly
lx

2
Mxs xs * Pd * l x =0.063*15.49 *

6
1.2 is end
5

52=24.40

Mo

Mxf xf * Pd * l x =0.047*5.49 * 52=18.20

Myf yf * Pd * l x =0.024*5.49* 52=9.30

Mys ys * Pd * l x =0.047*5.49* 52=18.20

Depth check

Mmax.= 24.40KNm

Myf yf * Pd * l x =0.036*5.49* 5 =13.94


2

d chec

xs 0.056
xf 0.042

0.2952 * b * fcd

24.40 * 10 6
0.295 * 1000 * 11.33

d chec 85mm d servc 115 mm

ys 0.039

Use d servc = 115mm

yf 0.030

Calculate Moment Redistribution for longer


span

Mxs xs * Pd * l x =
2

0.056*15.49* 52=21.69

1. Section 1-1

Mxf xf * Pd * l x =0.042*5.49 * 52=16.27

Mys 18.20, Myf 13.94 .. for S1

Mys 15.04, Myf 11.62 .. for S1

Mys ys * Pd * l x =0.039*5.49* 52=15.10


2

Myf yf * Pd * l x =0.030*5.49* 52=11.62


2

xs 0.048
xf 0.036

Mxs
18.20 15.10
*100%
*100% 17% 20%
M max
18.20

ys 0.039
yf 0.029

We take average moment method to adjusts


support moment.

2
Mxs xs * Pd * l x =0

.048*15.49* 52=18.59

Mys

Mxf xf * Pd * l x =0.036*5.49* 52=13.94

18.20 15.10
16.65KNm
2

Adjustment of moment for span (field)


For Panel S1:
Moment adjustment coefficients from the
table by using .

Mys ys * Pd * l x =0.039*5.49* 52=15.10


2

Myf yf * Pd * l x =0.029*5.49* 52=11.23


2

ly
lx

xs 0.042
xf 0.032

6
1.2
5

Cx = 0.338, cy = 0.172

ys 0.032

M 18.20 16.65 1.55 KNm

yf 0.024

M adj x c x M 0.338 * 1.55 0.523KNm

Mxs xs * Pd * l x =0.042*15.49* 52=16.27

M adj y c y M 0.172 * 1.55 0.266 KNm

Mxf xf * Pd * l x =0.032*5.49* 52=12.39

Adjusted span moments

Mxf adj M adj x Mxf

Mys ys * Pd * l x =0.032*5.49* 52=12.39


2

Mxf adj 0.523 18.20 18.723KNm

Myf adj M adj y Myf

Mxf adj M adj x Mxf

Myf adj 0.266 13.94 14.206 KNm

Mxf adj 0.458 13.942 14.40 KNm

For Panel S2:

Myf adj M adj y Myf


Myf adj 0.241 11.231 11.472 KNm

The support moment is increases, according


to EBCS-2 no adjustment requires for span
moments.
Therefore

For Panel S2:


The support moment is increases, according
to EBCS-2 no adjustment requires for span
moments.

Mxf adj Mxf 16.27 KNm


Myf adj Myf 11.62 KNm

2. Section 2-2

Therefore

Mys 15.10, Myf 11.23 .. for S3

Mxf adj Mxf 12.39 KNm


Myf adj Myf 9.29 KNm

Calculate Moment Redistribution for


shorter span

Mys 12.39, Myf 9.29 .. for S4

1. Section A-A

Mxs 24.40, Mxf 18.20 .. for S1


Mxs
15.10 12.39
*100%
*100% 18% 20%
M max
15.10

Mxs 18.59, Mxf 13.94 .. for S3

We take average moment method to adjust


support moment.

Mys

15.10 12.39
13.75 KNm
2

Mxs
24.40 18.59
*100%
*100% 24% 20%
M max
24.40

Adjustment of moment for span (field)

Therefore we use Moment Distribution


Method

For Panel S3:


Moment adjustment coefficients from the

Relative stiffness: K1 K 2 K 3

table by using

ly
lx

6
1.2
5

I I

l 5

Distribution factors:

DF1 DF 2

Cx = 0.338, cy = 0.172
M 15.10 13.75 1.355 KNm
M adj x c x M 0.338 * 1.355 0.458 KNm
M adj y c y M 0.172 *1.355 0.241KNm

5 0.5
I I
5 5

Adjusted support Moment:


DF

0.5

0.5

0.5

0.5

Adjusted span moments

FEM

-24.40

18.59

-18.59

24.40

Adj.

2.905

2.905

-2.905

-2.905

Relative stiffness: K1 K 2 K 3
Madj -21.495

21.495 -21.495

21.495
Distribution factors:

Adjusted support Moment Mxs 21.495


Adjustment of moment for span (field)
For Panel S1:

DF1 DF 2

5 0.5
I I
5 5

Moment adjustment coefficients from the


table by using

Adjusted support Moment:

ly

DF

lx

I
I

l 5

6
1.2
5

Cx = 0.344, cy = 0.364
M 24.4 21.495 2.905 KNm
M adj x c x M 0.344 * 2.905 0.999 KNm
M adj y c y M 0.364 * 2.905 1.057 KNm

0.5

0.5

0.5

FEM

-21.69

16.27

-16.27

24.40

Adj.

2.712

2.712

-2.712

-2.712

18.978 -18.978

18.978

Madj -18.978

Adjusted support Moment Mxs 18.978

Adjusted span moments

Adjustment of moment for span (field)

Mxf adj M adj x Mxf


Mxf adj 0.999 18.20 19.20 KNm

For Panel S2:

Myf adj M adj y Myf

Moment adjustment coefficients from the


table by using

Myf adj 1.057 13.94 15.00 KNm

ly

6
1.2
5

For Panel S3:

lx

The support moment is increases, according


to EBCS-2 no adjustment requires for span
moments.

Cx = 0.344, cy = 0.364

Therefore

0.5

M 21.69 18.978 2.712 KNm


M adj x c x M 0.344 * 2.712 0.933KNm

Mxf adj Mxf 13.94 KNm

M adj y c y M 0.364 * 2.712 0.987 KNm

Myf adj Myf 11.23KNm

Adjusted span moments

1. Section B-B

Mxf adj M adj x Mxf

Mxs 21.69, Mxf 16.27 .. for S2

Mxf adj 0.933 16.27 17.203KNm

Mxs 16.27, Mxf 12.39 .. for S4

Myf adj M adj y Myf


Myf adj 0.987 11.62 12.607 KNm
For Panel S4:
The support moment is increases, according
to EBCS-2 no adjustment requires for span
moments.

Mxs
21.69 16.27
* 100%
* 100% 25% 20%
M max
21.69
Therefore we use Moment Distribution Method

Mxf adj Mxf 12.39 KNm

Therefore

Myf adj Myf 9.29 KNm

Maximum Moments on the panel


Panel -S1

Mxs 21.495KNm

Mxf 19.20KNm

Mys 16.652KNM

Myf 14.997KNm

Panel- S2

Mxs 18.978KNm

Mxf 17.203KNm

Mys 16.652KNM

Myf 12.607KNm

Panel- S3

Mxs 21.495KNm
Mys 13.75KNM

Mxf 14.409KNm

Myf 11.472KNm

Panel- S4

Mxs 18.978KNm
Mys 13.75KNM

Mxf 13.749KNm

Myf 9.295KNm

Reinforcement
b= 1000mm,
Minimum
Reinforcement:

min

d = 115mm

10mm

calc 1

2M
bd 2 fcd

fcd

fyd

0.5
0.5

0.002
fyk 300

As min bd 0.002 *1000 * 115 230mm 2


Calculated reinforcement:

b * ab
As

PANEL

MOMENT
TYPE

VALUE

Mxs
Mxf
PANEL1
Mys
Myf
Mxs
Mxf
PANEL2
Mys
Myf
Mxs
Mxf
PANEL3
Mys
Myf
Mxs
Mxf
PANEL4
Mys
Myf
Load transfer to beam:

21.50
19.39
16.65
15.15
18.98
17.36
16.65
12.73
21.50
14.54
13.75
11.58
18.98
12.51
13.75
9.38

Ascal (mm2)

0.0068
0.0060
0.0051
0.0046
0.0059
0.0054
0.0051
0.0039
0.0068
0.0044
0.0042
0.0035
0.0059
0.0038
0.0042
0.0028

Vx vx.Pd .Lx
Vy vy.Pd .Lx

776.92
694.64
589.83
533.49
678.79
616.74
589.83
444.07
776.92
510.78
481.55
402.19
678.79
436.03
481.55
323.12

SPACING (mm)

SPACING
PROVIDED (mm)

145.63
162.88
191.82
212.08
166.68
183.45
191.82
254.78
145.63
221.51
234.96
281.32
166.68
259.48
234.96
350.16

145
160
190
210
165
180
190
250
145
220
230
280
165
255
230
350

Panel S-3:
Shear force coefficients for uniformly loaded
rectangular panel is:

Panel S-1:Shear force coefficients for


uniformly loaded rectangular panel is:
Lx = 5m Pd=, =15.491KN

Lx = 5m , Pd = 15.491KN

vcx 0.42
ly 6
vcy 0.36
1 .2
vdx 0
lx 5
vdy 0.24

vcx 0.47
ly 6
vcy 0.40
1.2
vdx 0.31
lx 5
vdy 0.26

Vxd vdx.Pd .Lx 0


Vxd vdx.Pd .Lx 0.31 * 15.491 * 5 24.01
Vxc vdx.Pd .Lx 0.42 * 15.491 * 5 32.53
Vxc vdx.Pd .Lx 0.47 * 15.491 * 5 36.40
Vyd vcy.Pd .Lx 0.24 * 15.491 * 5 18.59
Vyd vcy.Pd .Lx 0.26 * 15.491 * 5 20.14
Vyc vcy.Pd .Lx 0.36 * 15.491 * 5 27.88
Vyc vcy.Pd .Lx 0.40 * 15.491 * 5 30.98

Panel S-2:

Panel S-2:

Shear force coefficients for uniformly loaded


rectangular panel is:

Shear force coefficients for uniformly loaded


rectangular panel is:

Lx = 5m , Pd = 15.491KN

Lx = 5m , Pd = 15.491KN

ly

vcx 0.44

vcy 0.36
6
1.2
vdx 0.29
lx 5

vcx 0.39
vcy 0.33
6
1 .2
vdx 0
lx 5
vdy 0

ly

vdy 0

Vxd vdx.Pd .Lx 0.29 * 15.491 * 5 22.46


Vxc vdx.Pd .Lx 0.44 * 15.491 * 5 34.08
Vyd vcy.Pd .Lx 0
Vyc vcy.Pd .Lx 0.36 * 15.491 * 5 27.88

10

Vxd vdx.Pd .Lx 0


Vxc vdx.Pd .Lx 0.39 * 15.491 * 5 30.21
Vyd vcy.Pd .Lx 0
Vyc vcy.Pd .Lx 0.33 * 15.491 * 5 25.56

Panel
S-1
S-2
S-3
S-4

3.2

Ly- longer direction


axis
Vcx
1-discontineous
2-contineous
36.4
1-discontineous
2-contineous
34.08
2-contineous
32.53
2-contineous
32.53
2-contineous
30.21
2-contineous
30.21

Beam design

f cd

Vdy
20.14
18.59
-

95.84 * 10 6
0.295 * 11.33 * 2500

d 338.67 mm
Use d = 357mm

0.68 * 20

9.07 N mm 2
1.5

s
fyk 300
fyd

260.87 N / mm 2
s
1.15
2

Mu

sd * f cd * bw

design constant

0.68 f c y

Lx- Shorter direction


Vcy
1-discontineous
2-contineous
30.98
2-contineous
27.88
2-contineous
27.88
1-discontineous
2-contineous
27.88
2-contineous
25.56
2-contineous
25.56

Vdx
24.01
22.46
-

Beam span AB & CD , Msd= 79.79 KNm

sd

0.21 fck 3 0.21( 20) 3


fctd

1.03 N / mm 2
s
1.15
Longer Direction

M sd
79.79 *10 6

0.22 0.295.....ok!
bd 2 f cd 250 * 357 2 * 11.33

From GDC for sd = 0.22, Kz 0.87


Reinforcment

As

M sd
79.79 *10 6

984.77 mm 2
k z df yd
0.87 * 357 * 260.87

Provide 4 20 bar

Beam span BC, Msd= 20.98 KNm

sd

M sd
20.98 *10 6

0.058 0.295.....ok!
bd 2 f cd 250 * 357 2 *11.33

From GDC for sd = 0.22, Kz 0.96


Reinforcment

As

b = 250mm, D = 400mm, cc=25mm,


main=20mm, stirrup =8mm ,d= 357mm

M sd
20.98 *10 6

234.96mm 2
k z df yd
0.96 * 357 * 260.87

Provide 2 20 bar

check depth:
11

vc 0.25 f ctd k1k 2bd 48.42 KN

For support B & C, Msd = 95.84

sd

Design shear
M sd
95.84 *10 6

0.265 0.295.....okV!sd,max = 88.07


2
2
bd f cd 250 * 357 *11.33

From GDC for sd = 0.265, Kz 0.83

Vs Vsd Vc 88.07 48.42 39.65 KN

Reinforcment

As

for span AB & CD


Vc,max = 48.42

M sd
95.84 *10 6

1239.87 mm 2
k z df yd
0.83 * 357 * 260.87

Provide 4 20 bar

adf yd
Vs

100 * 357 * 260.87


234.88mm
39.65 * 10 3

af yk 100 * 300

300mm

0.5b 0.5 * 250


0.5d 178.5mm

S max = <,

Shear design
S max = 175mm

Use 8c / c...175mm
Design shear for span BC
Vsd,max = 68.59

Vs Vsd Vc 20.17 KN

By similarity of triangle: design shear

66.12 2.5 0.357


Vsd1 Vsd 6
56.68KN
2.5
Vsd 2 Vsd 5

98.07 3.5 0.357


88.07 KN
3.5

Vsd 3 Vsd 4

77.85 3 0.357
68.59 KN
3

Resistance shear

adf yd
Vs

af yk 100 * 300

300mm

0.5b 0.5 * 250


0.5d 178.5mm

S max = <,

max

100 * 357 * 260.87


461.73mm
20.17 * 103

175mm

8c / c...175mm

Vrd 252.80KN Vsd (allo)


Shear Capacity

vc 0.25 f ctd k1 k 2 bd

k 2 1.6 d 1.243 1.....ok!


20

k1 1 50

Vrd 0.25 f ctd bd 0.25 * 11.33 * 250 * 357

At support

Vc,max = 48.42

As 1239.87 mm 2
As
1239.87

bd 250 * 357

1239.87
1.695 2.....ok!
250 * 357

For beam section 2,3,4,5

12

.Use

b = 400mm, D = 500mm, cc=25mm,


main=20mm, stirrup =8mm ,d= 457mm

check depth:

Mu

sd * f cd * bw

257.67 * 10 6
0.295 * 11.33 * 400

d 439.04mm
Use d = 457mm

By similarity of triangle: design shear

Beam span AB & CD , Msd= 215.68


KNm

Vsd1 Vsd 6

Reinforcment

Resistance shear

178.57 2.5 0.457


145.93KN
2. 5

264.46 3.5 0.457


Vsd 2 Vsd 5
229.93KN
M sd
215.68 *10 6
3.5
sd 2

0
.
228

0
.
295
.....
ok
!
bd f cd 400 * 457 2 *11.33
208.8 3 0.457
Vsd 3 Vsd 4
176.99 KN

Kz

0
.
86
From GDC for sd = 0.22,
3

As

M sd
215.68 *10 6
Vrd 0.25 f ctd bd 0.25 * 11.33 * 400 * 457

2103.64mm 2
k z df yd
0.86 * 457 * 260.87
Vrd 517.80KN Vsd (allo)

Provide 7 20 bar
Shear Capacity

Beam span BC, Msd= 55.52 KNm

sd

vc 0.25 f ctd k1 k 2 bd

M sd
55.52 *10
k 2 1.6 d 1.143 1.....ok!

0.057 0.295.....ok!
2
2
bd f cd 400 * 457 *11.33
20

From GDC for sd = 0.22, Kz 0.96

At support

Reinforcment

As

k1 1 50

M sd
55.52 * 10 6

485.10mm 2
k z df yd
0.96 * 457 * 260.87

As 2325.55mm 2

2325.55
1.636 2.....ok!
400 * 457

For beam section

vc 0.25 f ctd k1k 2 bd 88.02 KN

Provide 2 20 bar

Design shear for span AB & CD


Vsd,max = 299.93 Vc,max = 88.02

For support B & C, Msd = 235.66

M sd
235.66 *10 6
Vs.....
Vsd

0.249 0.295
ok! Vc 141.91KN
bd 2 f cd 400 * 457 2 *11.33
adf yd 100 * 457 * 260.87
From GDC for sd = 0.249, Kz 0.85
S

84mm
Vs
141.91 * 10 3

sd

Reinforcment

As

M sd
235.66 *10 6

2325.55mm 2
k z df yd
0.85 * 457 * 260.87

S max = <,

Provide 8 20 bar
Shear design

S max = 225mm

13

af yk 100 * 300

300mm

0.5b 0.5 * 250


0.5d 228.5mm

.Use 8c / c...80mm

Design shear for span BC:


Vc,max = 88.02

V sd,max = 176.99

sd

Vs Vsd Vc 91.97 KN

adf yd
Vs

From GDC for sd = 0.133, Kz 0.92

100 * 457 * 260.87


129mm
91.97 * 10 3

S max = <,

M sd
48.41 *10 6

0.133 0.295.....ok!
bd 2 f cd 250 * 357 2 *11.33

Reinforcment

As

af yk 100 * 300

300mm

0.5b 0.5 * 250


0.5d 228.5mm

M sd
48.41*10 6

565.86mm 2
k z df yd
0.92 * 357 * 260.87

Provide 2 20 bar

Beam span BC, Msd= 20.98 KNm

S max = 225mm

sd

Use 8c / c...125mm

M sd
12.34 *10 6

0.058 0.295.....ok!
bd 2 f cd 250 * 357 2 *11.33

From GDC for sd = 0.22, Kz 0.96

Shorter Direction

Reinforcment

As

M sd
20.98 *10 6

234.96mm 2
k z df yd
0.96 * 357 * 260.87

Provide 2 20 bar
For support B & C, Msd = 67.69

sd

M sd
67.69 *10 6

0.185 0.295.....ok!
bd 2 f cd 250 * 357 2 * 11.33

From GDC for sd = 0.185, Kz 0.91


Reinforcment

As

M sd
67.69 *10 6

7948.71mm 2
k z df yd
0.91* 357 * 260.87

Provide 3 20 bar

b = 250mm, D = 400mm, cc=25mm,


main=20mm, stirrup =8mm ,d= 357mm

Shear design

check depth:

Mu

sd * f cd * bw

67.69 *10 6
0.295 *11.33 * 250

d 284.62mm
Use d = 357mm
Beam span AB & CD , Msd= 48.41 KNm
By similarity of triangle: design shear

14

Vsd1 Vsd 6

48.04 2 0.357
39.465 KN
2

Vsd 2 Vsd 5

71.11 3 0.357
62.65KN
3

Vsd 3 Vsd 4

56.02 2.5 0.357


48.02 KN
2.5

S max = <,

af yk 100 * 300

300mm

0.5b 0.5 * 250


0.5d 178.5mm

S max = 175mm
Use 8c / c...175mm

Resistance shear

Vrd 0.25 f ctd bd 0.25 * 11.33 * 250 * 357


Vrd 252.80KN Vsd (allo)
Shear Capacity

vc 0.25 f ctd k1 k 2 bd

k 2 1.6 d 1.243 1.....ok!


20

At support

As 794.26mm 2

k1 1 50

794.26
1.445 2.....ok!
250 * 357

For beam section

vc 0.25 f ctd k1k 2bd 41.34 KN


Design shear for span AB & CD
Vsd,max = 62.65 Vc,max = 41.34

b = 350mm, D = 400mm, cc=25mm,


main=20mm, stirrup =8mm ,d= 357mm

Vs Vsd Vc 21.31KN

adf yd
Vs

check depth:

100 * 357 * 260.87


437mm
21.31 * 103

af yk 100 * 300

300mm

0.5b 0.5 * 250


0.5d 178.5mm

S max = <,

Beam span AB & CD , Msd= 125.36


KNm

sd

Use 8c / c...175mm

Reinforcment

Vc,max = 41.34

Vs Vsd Vc 6.68 KN

adf yd
Vs

M sd
125.36 *10 6

0.248 0.295.....ok!
bd 2 f cd 350 * 357 2 *11.33

From GDC for sd = 0.248, Kz 0.85

Design shear for span BC

147 * 10 6
0.295 * 11.33 * 350

d 354.48mm
Use d = 357mm

S max = 175mm

Vsd,max = 48.02

Mu

sd * f cd * bw

As

100 * 357 * 260.87


1394.17mm
6.68 * 103
15

M sd
125.36 *10 6

1583.61mm 2
k z df yd
0.85 * 357 * 260.87

Provide 5 20 bar

Beam span BC, Msd= 29.34 KNm

sd

Shear Capacity

vc 0.25 f ctd k1 k 2 bd
M sd
29.34 *10 6

0.058 0.295
! d 1.243 1.....ok!
k 2.....
ok
1 .6
bd 2 f cd 350 * 357 2 *11.33

From GDC for sd = 0.058, Kz 0.96

20

At support

As 1924.91mm 2

Reinforcment

As

M sd
29.34 *10

328.17 mm 2
k z df yd
0.96 * 357 * 260.87

Provide 2 20 bar

k1 1 50

For beam section

vc 0.25 f ctd k1k 2 bd 70.79 KN

For support B & C, Msd = 147KNm

sd

Design shear for span AB & CD


Vsd,max = 161.12 Vc,max = 70.79

M sd
147 *10 6

0.291 0.295.....ok!
Vs Vsd Vc 90.33KN
bd 2 f cd 350 * 357 2 *11.33

From GDC for sd = 0.291, Kz 0.82

Reinforcment

As

1924.91
1.77 2.....ok!
350 * 357

adf yd
Vs

100 * 357 * 260.87


103.10mm
90.33 * 10 3

M sd
147 *10 6

1924.91mm 2
k z df yd
0.82 * 357 * 260.87

Provide 7 20 bar

af yk 100 * 300

300mm

0.5b 0.5 * 250


0.5d 175mm

S max = <,

Shear design
S max = 175mm

Use 8c / c...100mm
Design shear for span BC
Vsd,max = 120.92

Vc,max = 70.79

Vs Vsd Vc 50.13KN

By similarity of triangle: design shear

adf yd
Vs

100 * 357 * 260.87


185.78mm
50.13 * 10 3

Vsd1 Vsd 6

124.07 2 0.357
101.92 KN
2

Vsd 2 Vsd 5

182.87 3 0.357
161.12 KN
3

Vsd 3 Vsd 4

141.07 2.5 0.357


120.92 KN
S max = 175mm
2.5

Resistance shear

S max = <,

af yk 100 * 300

300mm

0.5b 0.5 * 250


0.5d 175mm

Use 8c / c...175mm

Vrd 0.25 f ctd bd 0.25 * 11.33 * 350 * 357

3.3
FORM WORK FOR SOLID TOW
WAY SLAB

Vrd 353.92KN Vsd (allo)


16

For Slab: As - Ab

Total area of form work = 377.603m2

As = (15.05*18.05)=271.6525m2
Ab1=(0.3*(15.05+18.05)2)=19.83 .for
(250x400) Ab2=(0.4*15.05)2)=12.04 ..for
(350x450) Ab3=(0.45*18.05)2)=16.245
..for (400x500)

3.4

BAR SCHEDULE

As - Ab=271.6525-19.83-12.0416.245=223.54m2
For beams:
Ab1=(0.3*(15.05+18.05)2)+2(0.4*(15.05+18.05)*2=72.82

Ab2=(0.4*15.05)*2)+(2*(0.4*15.05)*2)=36.12
Ab3=(0.45*18.05*2)+(2*0.4*18.05*2)=45.125

Ref
Location
slab

No of Bars

Dia

Dia

Dia

Dia

Dia

Dia

Dia

10

12

14

16

20

810.00

0.00

0.00

810.00

0.00

0.00

0.00

0.00

1056.12
448.00
572.76

0.00
0.00
0.00

0.00
0.00
0.00

1056.12
448.00
572.76

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

T.
Length

No

Dia

Length

No of Bars

Panel1

10

8.10

25

10
10
10

6.77
4.00
3.33

39
28
43

x
x
x

2
2
2

x
x
x

2
2
2

17

Panel2

Panel3

Panel4

10
10
10

6.00
6.77
0.00

21
29
0

x
x
x

2
2
0

x
x
x

1
1
1

252.00
392.66
0.00

0.00
0.00
0.00

0.00
0.00
0.00

252.00
392.66
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

10

3.33

38

253.08

0.00

0.00

253.08

0.00

0.00

0.00

0.00

10

8.10

19

307.80

0.00

0.00

307.80

0.00

0.00

0.00

0.00

10
10
10
10
10
10

5.00
4.00
0.00
6.00
5.00
0.00

29
23
0
16
25
0

x
x
x
x
x
x

2
2
0
1
1
0

x
x
x
x
x
x

1
1
1
1
1
1

290.00
184.00
0.00
96.00
125.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

290.00
184.00
0.00
96.00
125.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

10

0.00

1 0.00
m
Kg/m

0.00
0.00
0.222

0.00
0.00
0.395

0.00
4787.42
0.617

0.00
0.00
0.888

0.00
0.00
1.208

0.00
0.00
1.578

0.00
0.00
2.468

2954

Kg

18

BAR SCHEDULE FOR BEAMS


Location

axis1,4

Span
support

shear rfmt

axis2,3

Span
support

shear rfmt

axis A&B

Span
support

shear rfmt

axis C&D

Span
support

shear rfmt

Ref
No

Dia

Length

AB,CD
BC
B,C
AB,CD
BC
AB,CD
BC
AB,CD
BC
B,C
AB,CD
BC
AB,CD
BC
AB,CD
BC
B,C
AB,CD
BC
AB,CD
BC
AB,CD
BC
B,C
AB,CD
BC
AB,CD
BC

20
20
20
20
20
8
8
20
20
20
20
20
8
8
20
20
20
20
20
8
8
20
20
20
20
20
8
8

6.00
6.00
4.00
6.35
6.00
1.11
1.11
6.00
6.00
4.00
6.45
6.00
1.70
1.70
5.00
5.00
3.33
5.35
5.00
1.11
1.11
5.00
5.00
3.33
5.35
5.00
1.30
1.30

No of Bars
No of Bars
4
2
2
2
2
36
36
7
2
6
2
2
76
49
2
2
1
2
2
30
30
5
2
5
2
2
51
30

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

2
1
2
2
1
2
1
2
1
2
2
1
2
1
2
1
2
2
1
2
1
2
1
2
2
1
2
1

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

total
Length
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

96.00
24.00
32.00
50.80
24.00
159.84
79.92
168.00
24.00
96.00
51.60
24.00
516.80
166.60
40.00
20.00
13.32
42.80
20.00
133.20
66.60
100.00
20.00
66.60
42.80
20.00
265.20
78.00

m
Kg/m
Kg

4.
4.1
19

Dia
6

Dia
8

Dia
10

Dia
12

Dia
14

Dia
16

Dia
20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
159.84
79.92
0.00
0.00
0.00
0.00
0.00
516.80
166.60
0.00
0.00
0.00
0.00
0.00
133.20
66.60
0.00
0.00
0.00
0.00
0.00
265.20
78.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

96.00
24.00
32.00
50.80
24.00
0.00
0.00
168.00
24.00
96.00
51.60
24.00
0.00
0.00
40.00
20.00
13.32
42.80
20.00
0.00
0.00
100.00
20.00
66.60
42.80
20.00
0.00
0.00

0.00
0.222
0

1466.16
0.395
579

0.00
0.617
0

0.00
0.888
0

0.00
1.208
0

0.00
1.578
0

975.92
2.468
2409

DESIGN OFFLAT SLAB


SLAB

Total depth D =212.5 + 20 + 7= 239.5 mm


Use Ds= 250mm

Slab Strips: According to EBCS-2


Shorter direction:
Half column strip =

0.25l x 0.25 * 5000 1250mm


Middle strip =

l x 2 0.25l x 5000 2 * 0.25 * 5000 2500mm

Design constant

Longer direction:

For S-300, C-25, l x = 5m l y = 6m ,

Half column strip =

0.25l x 0.25 * 5000 1250mm

14mm Clear cover = 20mm, Column


size: 500 X 500mm

Middle strip =

l x 2 0.25l x 6000 2 * 0.25 * 5000 3500mm

Live Load LL = 4 KN/m2

f cd

0.68 f c y

0.68 * 25
11.33 N mm 2
1.5

Drop panel: Dd, from center of column

s
fyk 300
fyd

260.87 N / mm 2
s
1.15
fctd

0.21 fck
s

2
3

Minimum length =

2
3

0.21( 20)
1.03 N / mm 2
1.15

l x 500

1667 mm
3
3

Use 1700mm

PROPORTIONING AND DIMENSHINING


VARIOUS PARTS

Thickness of drop panel:= (1.25 to 1.50)Ds


Consider Dd = 1.5Ds = 1.5 * 250 = 375mm.
Use Dd = 380mm

Select Slab thikness:

Effective depth:

Depth determination by Serviceability


Limit State method

Depth of slab in Longer direction


ds1 = 250 20 7 = 223mm

f l
d 0.4 0.6 yk x
400 a

Depth of slab in shorter direction


ds2 = 250 20 1.5(14) = 209mm

ly

ds effective = dseef

6
1.2 From EBCS-2 for End span
5

lx
a = 24, Le = Ly

d 0.4 0.6

d 0.4 0.6

223 209
216mm
2

Depth of drop panel in Longer direction


dd1 =380 20 7 = 353mm

f yk l y

400 a
300 6000
212.5mm

400 24

Depth of drop panel in shorter direction


dd2 = 380 20 1.5(14) = 339mm
dd effective = ds eef

20

353 339
346mm
2

Design Load:

For column:

Dead Loads :

Capacity of concrete for shear

Average effective depth

v c 0.5 f ctd k1 k 2

Ds Dd 250 380
Dav

315mm
2
2

min

0.5
0.5

0.002
fyk 300

Self weight = 0.315 * 25 = 7.875 KN/m2

k1 1 50 0.002 2

Ceiling plaster (15mm) =23 *0.015=


0.345KN/m2

k1 1.083 2.....ok!
For column:

Cement screed (30mm) = 23*0.03 =


0.69KN/m2

k 2 1.6 d deff 1.6 0.346 1.254 1


ok!

Terrazzo tile(20mm) = 23*0.02 = 0.46 KN/m2

For drop

Partition wall = 2 KN/m2


outer
wall (66m length) = 3*0.2*14*66/(18*15)=
2KN/m2
2

Total Gk = 13.37 KN/m , Qk = 4KN/m

k 2 1.6 d deff 1.6 0.216 1.384 1


ok!

For column:

Pd 1.3DL 1.6 LL 1.313.37 1.6 4


Pd 23.781 KN / m

vc 0.5 * 1.03 * 1.083 * 1.253 0.699 N / mm 2

For column:

Check of shear

vc 0.5 * 1.03 * 1.083 * 1.384 0.772 N / mm 2

The governing factor for flat slab is punching


shear.

Punching perimeter:
Around column:

According to ACI and EURO cod the critical


point considers to be 0.5d distance from face
of column.

Uc = 4(Cl + dd-eff) =4(500+346) = 3384mm


Around drop:

Case -1: middle column and drop panel

Ud=4(droplength+ds)
Ud =4(1700+216)=7664
Punching shear area: Around column:
Acolumn = Uc*ddeff=3384*346=1170864mm2
Around drop:
Adrop = Ud * dseff= 7664*216=1655424mm2
Total area for load to punching shear
consider is A = 6 * 5 = 30m2
Punching force area: Around column:
ac = (0.846)2
Around drop:

21

ad = (1.916)2

d d .eff

Uc Cl d d .eff 2 Cl
2

346

Uc 500 346 2 500


2192mm
2

Punching force: Around column:

Vdv A a c Pd 30 0.846 23.78


Vdv 696.38 KN

Around drop:

Punching stress: Around column:

Vd

Vdv
696.38 * 10

puncingsheararea
1170864

l d d .eff

Ud l d s.eff 2
2

1700 216
Ud 1700 216 2
4332mm
2

Vd 0.595 N / mm 2

Punching shear area:


column:

Vd < Vc . Is ok!
Punching force: Around drop:

Acolumn = Uc*ddeff=2192*346=758432mm2

Vdv A a c Pd 30 1.916 23.78


Vdv 696.38 KN

Around drop:
Adrop = Ud * dseff= 4332*216=935712mm2

Punching stress: Around drop:

Vd

Vdv
626.102 * 10

puncingsheararea
1655424

Around

Total area for punching shear consider is


A = 3 * 5 = 15m2

Punching force area: Around column:

Vd 0.378 N / mm 2

ac = (0.846*0.673)=0.5694m2

Vd < Vc . Is ok!

Around drop:

Hence the depth of the drop and the slab is


adequate against punching.

ad = (1.916*1.208)=2.314m2
Punching force: Around column:

Case 2: At the edge column and drop


panel

Vdv A a c Pd 15 0.5694 23.78


Vdv 343.16 KN
Punching stress: Around column:

Vd

Vdv
343.16 * 10 3

puncingsheararea
758432

Vd 0.452 N / mm 2
Vd < Vc . Is ok!
Punching force: Around drop:

Vdv A a c Pd 15 2.314 23.78

Punching perimeter:

Vdv 301.66 KN

Around column:

Punching stress: Around drop:

22

Vd

Vdv
301.66 * 10 3

puncingsheararea
935712

Vd 0.322 N / mm 2

Vd < Vc . ok!
Punching force: Around drop:

Vd < Vc . Is ok!

Vdv A a c Pd 7.5 1.208 23.78

Hence the depth of the drop and the slab is


adequate against punching.

Punching stress: Around drop:

Vdv 143.65 KN

Case 3: At the coner of column and


drop panel

Vd

Vdv
143.65 * 10 3

puncingsheararea
521856

Vd 0.275 N / mm 2
Vd < Vc . Is ok!
Hence the depth of the drop and the slab is
adequate against punching.
DESIGN FOR FLEXURE

Punching perimeter:

Around column:

d d .eff

346
2 500
Uc 2 Cl
1346mm
2
2

Around drop:

l d d .eff
Ud 2
2

1700 500 216

Punching shear area:

2416mm

Acolumn = Uc*ddeff=1346*346=465716mm2
Around drop:
Adrop = Ud * dseff= 2416*216=521856mm2
Total area for punching shear is A = 3 *2.5
= 7.5m2
Punching force area: Around column: ac
= (0.673)2 Around drop: ad = (1.208)2
Punching force: Around column:

Vdv A a c Pd 7.5 0.673 23.78


Vdv 167.58 KN

Punching stress: Around column:

Vd

Vdv
167.58 *103

puncingsheararea
465716 23

Vd 0.360 N / mm 2

A = 5 x 6 = 30m2

L li

Around column:

F (KN)= (1.3 Gk + 1.6 Qk)A = Pd*A

hc

2hc
3

, where

4dc 2

4 * 500 2
564mm

dc= column width


Moment along the longer direction:

L ly

2hc
2 * 0.564
6
5.624m
3
3

For interior
Msy 0.055 FL 0.55 PdAL
Msy 0.055 * 23.78 * 30 * 5.624 220.67 KNm
Mfy 0.071FL 0.071PdAL
Mfy 0.071* 23.78 * 30 * 5.624 284.86 KNm

For end span

Msy A 0.040 FL 0.040 PdAL


Msy A 0.040 * 23.78 * 30 * 5.624 160.49 KNm
Msy B 0.063FL 0.063PdAL
Msy B 0.063 * 23.78 * 30 * 5.624 252.77 KNm
Mfy 0.083FL 0.083PdAL
Mfy 0.083 * 23.78 * 30 * 5.624 333KNm

Moment along the shrter direction:

L lx

2hc
2 * 0.564
5
4.624m
3
3

For interior span

Msx 0.055 FL 0.55 PdAL


Msx 0.055 * 23.78 * 30 * 4.624 181.43KNm
Mfx 0.071FL 0.071PdAL
Mfx 0.071 * 23.78 * 30 * 4.624 234.21KNm

For end span

Msx A 0.040 FL 0.040 PdAL


Msx A 0.040 * 23.78 * 30 * 4.624 131.95KNm
Msx B 0.063FL 0.063PdAL
Msx B 0.063 * 23.78 * 30 * 4.624 207.82 KNm
Mfx 0.083FL 0.083PdAL
Mfx 0.083 * 23.78 * 30 * 4.624 273.80 KNm

LATERAL DISTRIBUTION OF MOMENTS


From EBCS-2
Negative moment:-for column strip=75%
:- for middle strip=25%
Positive moment:- for column strp= 55%
:- for middle strip=45%

24

Span

Distri.
span

Location
End span
LONG
Middle
span
End span
SHORT
Middle
span

Total
moment

Moment in

Adjusted moment

Support1
Center

-160.49
333

column
strip
120.37
183.15

Support2

-252.77

189.58

63.19

0.23

175.04

77.73

Support1

-220.67
284.86
-131.95
273.82
-207.82
-181.43
234.21

165.50

55.17

0.23

152.81

67.86

156.67
98.96
150.60
155.87
136.07
128.82

128.19
32.99
123.22
51.96
45.36
105.39

0.23
0.32
0.32
0.32
0.32
0.32

127.19
88.41
111.17
139.24
121.56
95.09

157.67
43.54
162.65
68.58
59.87
139.12

Point

Center
Support1
Center
Support2
Support1
Center

Middle
strip
40.12
149.85

Adjustment
factor of
moment
0.23
0.23

column
strip
111.14
148.68

Middle
strip
49.35
184.32

Note:

Column strip is 1.7m and the rest lengthe divied by middle length of each side to get adj.
factor

- adjustment factor is multiplied by middle strip moment. And add at middle strip moment
and subtracts from column strip moment.

COMPUTE REINFORCMENT & C/C SPACING

25

Span

Edge

Interior

1.

Moment (KNm)
col L(-ve)
col L(+ve)
col L(-ve)
col S(-ve)
col S(+ve)
col S(-ve)
Mid L(-ve)
Mid L(+ve)
Mid L(-ve)
Mid S(-ve)
Mid S(+ve)
Mid S(-ve)
col L(-ve)
col L(+ve)
col S(-ve)
col S(+ve)
Mid L(-ve)
Mid L(+ve)
Mid S(-ve)
Mid S(+ve)

111.14
148.68
175.04
88.41
111.17
139.24
49.35
184.32
77.73
43.54
162.65
68.58
152.81
127.19
121.56
95.09
67.86
157.67
59.87
139.12

d
(mm)

b
(mm)

339
209
339
353
223
353
209
209
209
223
223
223
339
209
353
223
209
209
223
223

1700
1700
1700
1700
1700
1700
3300
3300
3300
4300
4300
4300
1700
1700
1700
1700
3300
3300
4300
4300

0.0022
0.0085
0.0036
0.0016
0.0054
0.0026
0.0013
0.0052
0.0021
0.0008
0.003
0.0012
0.0031
0.0072
0.0023
0.0046
0.0018
0.0044
0.0011
0.0026

EDGE SPAN REINFORCMENTE

COLUMN SRIP
LONGER DIRECTION
1. 14 C/C 540,L=(0.33*5.5)+0.69 = 2.5m
1.14 C/C 540,L=(0.33*5.5)+0.69 = 2.5m
2, 14 C/C 105,L=6-(0.125*5.5)+0.10=5.21m
3. 14 C/C 540,L=2(0.33*5.5)+0.5 = 4.13m
3.14 C/C 540,L=2(0.33*5.5)+0.5 = 2.7m
SHORTER DIRECTION

Ascalc.
(mm)2
1289.98
3023.21
2064.49
978.40
2037.01
1558.65
919.26
3596.49
1461.25
755.35
2896.64
1196.06
1792.14
2542.24
1355.27
1724.92
1271.55
3046.82
1042.23
2464.37

Asmin
(mm)2
960.5
592.17
960.5
1000.2
631.83
1000.2
1149.5
1149.5
1149.5
1598.2
1598.2
1598.2
960.5
592.17
1000.2
631.83
1149.5
1149.5
1598.2
1598.2

Sreq
(mm)

S-Max
(mm)

202.95
86.597
126.81
267.58
128.52
167.97
552.84
141.3
347.78
876.67
228.61
553.65
146.08
102.98
193.17
151.78
399.67
166.8
635.37
268.71

272.57
442.11
272.57
261.76
414.35
261.76
442.11
442.11
442.11
414.35
414.35
414.35
272.57
442.11
261.76
414.35
442.11
442.11
414.35
414.35

SProv.
(mm)
200
85
125
260
125
165
440
140
345
410
225
410
145
100
190
150
395
165
410
265

8,.14 C/C 240,L=6-0.075+0.15-0.25 = 5.83m


8.14 C/C 240,L=6-0.15*5+0.15-0.25= 5m
9. 14 C/C 210,L=2(0.22*5.5)+0.5= 2.92m
SHORTER DIRECTION
10. 14 C/C 410,L=(0.22*4.5)+0.69 = 1.68m
11,.14 C/C 420,L=5-0.075+0.15-0.25=4.83m
11.14 C/C 420,L=5-0.15*5+0.15-0.25= 4m
12. 14 C/C 370,L=2(0.22*4.5)+0.5= 2.48m
2.

4. 14 C/C 520,L=(0.33*4.5)+0.69 = 2.18m


4.14 C/C 520,L=(0.33*4.5)+0.69 = 1.60m

INTERIOR SPAN REINFORCMENTE


COLUMN SRIP
LONGER DIRECTION

5, 14 C/C 140,L=6-(0.125*4.5)+0.10=4.34m

13. 14 C/C 400,L=2(0.33*5.5)+0.5=4.13m


13.14 C/C 400,L=2(0.33*5.5)+0.5 =2.7m

6. 14 C/C 440,L=2(0.33*4.5)+0.5 = 3.47m


6.14 C/C 440,L=2(0.33*4.5)+0.5 = 2.30m
MIDDEL STRIP

14.14 C/C 120,L=6-2(0.125*5.5)= 4.625m


L=4.3+2(24*0.014)=4.97m

LONGER DIRECTION

SHORTER DIRECTION

7. 14 C/C 340,L=(0.22*5.5)+0.69 = 1.9m


26

REMARK
OK
OK
OK
Smax
OK
OK
Smax
OK
OK
Smax
OK
Smax
OK
OK
OK
OK
OK
OK
Smax
OK

15. 14 C/C 510,L=2(0.33*4.5)+0.5=3.47m


15.14 C/C 510,L=2(0.33*4.5)+0.5 =2.30m

20. 14 C/C 500,L=5-2(0.075)=4.85m


C/C 500,L=5-2(0.15*5)=3.5m

16.14 C/C 165,L=5-2(0.125*4.5)=3.88m


L=3.3+2(24*0.014)=3.97m
MIDDEL STRIP

4.2
SLAB

20.14

FORM WORK FOR FLAT

FOR DROP PANEL

LONGER DIRECTION

=9*(1.25*1.25)+ 9*(1.7*0.13)*4

17. 14 C/C 245,L=2(0.22*5.5)+0.5=2.92m

=14.06+7.956=22.0185m2

18. 14 C/C 290,L=6-2(0.075)=5.85 18.14 FOR SLAB


C/C 290,L=6-2(0.15*6)=4.20m SHORTER
= (15.05*18.05)-(1.7*1.7)+0.25(18.05+15.05)2
DIRECTION
=262.1925m2
19. 14 C/C 410,L=2(0.22*4.5)+0.5=2.48m
TOTAL = 284.211m2

27

4.3

BAR SCHEDULE

Flat slab Reinforcement


Ref
Location

longer span

Cl.strip

Shorter

Mdl.strip

Cl.strip

No of Bars

total
Length

No of Bars

Dia

Dia

Dia

Dia

Dia

Dia

Dia

10

12

14

16

20

No

Dia

Length

1
1'
2
3
3'
13
13'
14
7
8
8'
9
17
18
18'
4
4'
5
6
6'

14

2.61

78.30

0.00

0.00

0.00

0.00

78.30

0.00

0.00

14

1.80

54.00

0.00

0.00

0.00

0.00

54.00

0.00

0.00

14

5.21

21

656.46

0.00

0.00

0.00

0.00

656.46

0.00

0.00

14

4.13

173.46

0.00

0.00

0.00

0.00

173.46

0.00

0.00

14

2.70

113.40

0.00

0.00

0.00

0.00

113.40

0.00

0.00

14

4.13

148.68

0.00

0.00

0.00

0.00

148.68

0.00

0.00

14

2.70

97.20

0.00

0.00

0.00

0.00

97.20

0.00

0.00

14

5.00

18

270.00

0.00

0.00

0.00

0.00

270.00

0.00

0.00

14

1.90

91.20

0.00

0.00

0.00

0.00

91.20

0.00

0.00

14

5.80

12

417.60

0.00

0.00

0.00

0.00

417.60

0.00

0.00

14

5.00

12

360.00

0.00

0.00

0.00

0.00

360.00

0.00

0.00

14

2.92

10

175.20

0.00

0.00

0.00

0.00

175.20

0.00

0.00

14

2.90

156.60

0.00

0.00

0.00

0.00

156.60

0.00

0.00

14

5.85

10

175.50

0.00

0.00

0.00

0.00

175.50

0.00

0.00

14

4.20

10

126.00

0.00

0.00

0.00

0.00

126.00

0.00

0.00

14
14

2.18
1.60

4
4

x
x

2
2

x
x

3
3

26.16
38.40

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

26.16
38.40

0.00
0.00

0.00
0.00

14

4.34

15

390.60

0.00

0.00

0.00

0.00

390.60

0.00

0.00

14
14

3.47
2.30

6
6

x
x

2
2

x
x

3
3

124.92
82.80

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

124.92
82.80

0.00
0.00

0.00
0.00

28

span

Mdl.strip

15
15'
16
10
11
11'
12
19
20
20'

14

3.47

104.10

0.00

0.00

0.00

0.00

104.10

0.00

0.00

14

2.30

69.00

0.00

0.00

0.00

0.00

69.00

0.00

0.00

14

3.97

13

154.83

0.00

0.00

0.00

0.00

154.83

0.00

0.00

14

1.68

11

110.88

0.00

0.00

0.00

0.00

110.88

0.00

0.00

14

4.83

10

289.80

0.00

0.00

0.00

0.00

289.80

0.00

0.00

14

4.00

10

240.00

0.00

0.00

0.00

0.00

240.00

0.00

0.00

14

2.48

11

163.68

0.00

0.00

0.00

0.00

163.68

0.00

0.00

14

2.48

12

178.56

0.00

0.00

0.00

0.00

178.56

0.00

0.00

14

4.85

130.95

0.00

0.00

0.00

0.00

130.95

0.00

0.00

14

3.20

86.40

0.00

0.00

0.00

0.00

86.40

0.00

0.00

0.00

0.00

0.00

0.00

5284.68

0.00

0.00

0.222

0.395

0.617

0.888

1.208

1.578

2.468

6384

m
Kg/m
Kg

5.

DESIGN OF RIBBED SLAB

Assuming one way ribbed slab.


Design strength:

f cd

0.68 f c y

0.68 * 25
11.33 N mm 2
1.5

s
fyk 300
fyd

260.87 N / mm 2
s
1.15
2

0.21 fck 3 0.21( 20) 3


fctd

1.03 N / mm 2
s
1.15
assume that : width of joists, bw = 150mm and
width of grider , b = 300mm

40mm

Dt 1
10 clear..distnce..b / n..Ribs
40mm

Dt 1
10 550 150 40mm
Dt 40mm ...Use..Dt 60mm

Depth of Joists and Toppings

Depth of Joists (rib):

Depth of Toppings:

Depth of ribs excluding any topping not


more than 4 times of minimum width of
the ribs
Let, Dj (including toppings) = 300mm
Dj -Dt 4bw , 300 -60 4*150..Ok!
Transverse rib shall be provided if the
span of the ribbed slab exceeds 6.0m
Center to center spacing = 5.00 < 6.0m

29

Therefore, Transverse strips is not


necessary

check depth:

Design load on joists

-Toppig self wt=


0.06*0.55*25=0.825KN/m -Joist self wt.
= 0.240*0.15*25 = 0.9KN/m -cement
screed=0.69*0.55 = 0.3795KN/m
-terrazzo tile = 0.46*0.55 = 0.253 KN/m
-plastering = 0.345*0.55 = 0.18975
KN/m -partition wall = 4*0.55 = 2.2
KN/m
-HCB for
floor=0.4*0.2*14=1.12KN/m
total
dead load = 4.747 KN/m

Use d = 278mm

At the support ( -ve M): ,Msd= 20KNm

sd

M sd
20 *10 6

0.152 0.295.....ok!
bd 2 f cd 150 * 278 2 *11.33

From GDC for sd = 0.152, Kz 0.0.91

As

M sd
20 *10 6

303.05mm 2
k z df yd
0.91* 278 * 260.87

Provide 2 14mm bars

Pd = 1.3*4.747 + 1.6*2.2 = 9.69 KN/m

Assume that rib is continuous run on


girder

At the span ( +ve M): ,Msd= 13.75KNm


Assume N.A lies in the flange;

Then, Le = L 2(0.5*bg) = 5 2(0.5*0.3) =


4.7m

Le = 0.7L = 0.7*5000 = 3500mm

PdLe
9.96 * 4.7 2

20 KNm
11
11
2
PdLe
9.96 * 4.7 2
ve
M max

13.75KNm
16
16
PdLe
9.96 * 4.7
Vmax

23.41KN
2
2
5.1

20 * 10 6
199.73mm
0.295 *11.33 * 150

Reinforcement for Joists:

Live load , LL = 4*0.55 = 2.2 KN/m

ve
M max

Mu

sd * f cd * bw

Le 3500
bw 700mm
beff 5 5
bactual 550mm
beff 550mm

Design of Joists(RIB):

sd

Use = 14mm, clear cover=15mm,

M sd
13.75 *10 6

0.0286 0.295.....
beff d 2 f cd
550 * 278 2 *11.33

From GDC for sd = 0.152,

d = 300 15 7 = 278mm
30

Kz 0.97

Kx 0.090

Checking the Assumtion;

According to EBCS-2 The topping shall be

X =Kxd = 0.09*278
X =25.02mm < Df= 60mm..Ok!

provided with reinforcement mesh


providing in each direction a crosssectional area not less than 0.001 of the
section of the slab

As

M sd
13.75 *10 6

195.46mm 2
k z df yd
0.97 * 278 * 260.87
As

Provide 2 14mm bars

0.001Le.Dt
use = 8mm

Design for shear of Joists (rib):

As = 0.001*1000*60 = 60mm2

By similarity of triangle:

23.41 2.5 0.278


20.81KN
2.5
Resistance shear
Vsd1 Vsd 2

Vrd 0.25 f cd bd 0.25 * 11.33 * 150 * 278

ab * b 50.265 * 1000

837.76mm
As
60

Smax = 400 mm. provide 8 c/c 400mm.


5.3

Design of girder:

For interior girder the reaction transferred to


the supporting girder may be taken twice
end shear.

Vrd 117 .80KN Vsd (allo)


Shear,capacity
vc 0.25 f ctd k1 k 2 bd

Pd int

k 2 1.6 d 1.322 1.....ok!

2 * Vmax 2 * 23.41

85.127 KN / m
c / c..rib
0.55

For edge girder taken end shear.

14

At support

and take 1m strip and

As 303.05mm 2

Pd int

303.05
k1 1 50
1.3634 2.....ok!
150 * 278

Vmax
23.41

42.564 KN / m
c / c..rib 0.55

Depth of girder determination

vc 0.25 f ctd k1k 2bd 19.353KN

Edge (end) girder:


Shear reinforcement for rib

Vs Vsd Vc 20.81 19.353 1.46 KN

adf yd
Vs

S max = <,

56.55 * 278 * 260.87


2809mm
1.46 * 10 3

af yk 56.55 * 300

262mm

0.5b 0.5 *150


0.5d 139mm

S max = 139mm

Let assume that , b = 300mm , D =


500mm, cc=25mm, = 20mm, stirrup
= 8mm,
d =457mm

check depth:

Use 6c / c...135mm

5.2

Design of Topping:

Mu

sd * f cd * bw

d 428.29mm
Use d = 460mm
31

183.91 * 10 6
0.295 * 11.33 * 300

Beam span AB & CD , Msd= 147.32


KNm

Vsd1 Vsd 6

122.91 2.4 0.457


99.50 KN
2.4

171.84 3.6 0.457


M sd
147.32 *10 6
Vsd 2 Vsd 5
150.02 KN

0
.
207

0
.
295
.....
ok
!
3.6
2
2
bd f cd 300 * 457 *11.33
153.57 3 0.457
Vsd 3 Vsd 4
130.18 KN
From GDC for sd = 0.207, Kz 0.88
3

sd

Resistance shear

Reinforcment

As

Vrd 0.25 f ctd bd 0.25 * 11.33 * 300 * 457


M sd
147.32 *10 6
2

1404.23mmVrd
388.34KN Vsd (allo)
k z df yd
0.88 * 457 * 260.87

Provide 5 20 bar

Shear Capacity

Beam span BC, Msd= 46.44 KNm

sd

vc 0.25 f ctd k1 k 2 bd

k 2 1.6 d 1.143 1.....ok!


M sd
46.44 *10 6

0
.
065

0
.
295
.....ok!
bd 2 f cd 300 * 457 2 *11.33
20

From GDC for sd = 0.065, Kz 0.95

At support

Reinforcment

k1 1 50

As

M sd
46.44 *10 6

410mm 2
k z df yd
0.95 * 457 * 260.87

As 1836.48mm 2

1836.48
1.67 2.....ok!
300 * 457

For beam section

v c 0.25 f ctd k1 k 2 bd 67.38KN

Provide 2 20 bar

Design shear for span AB & CD


Vsd,max = 150.02 Vc,max = 67.38

For support B & C, Msd = 183.91KNm

M sd
Vs Vsd Vc 82.64 KN
183.91 *10 6

0.259 0.295.....ok!
2
2
bd f cd 300 * 457 *11.33
adf yd 100 * 457 * 260.87
S

144.26mm
From GDC for sd = 0.2591, Kz 0.84
Vs
82.64 * 10 3

sd

Reinforcment

af yk 100 * 300

200mm

0.5b 0.5 * 300


0.5d 228.5mm

M sd
183.91*10 6
As

1836.48mm 2
k z df yd
0.84 * 457 * 260.87
S max = <,
Provide 6 20 bar
Shear design

S max = 200mm
Use 8c / c...140mm
Design shear for span BC
Vsd,max = 130.18

Vc,max = 67.38

Vs Vsd Vc 62.80 KN
By similarity of triangle: design shear

S
32

adf yd
Vs

100 * 457 * 260.87


189.84mm
62.80 * 10 3

S max = <,

af yk 100 * 300

200mm

0.5b 0.5 * 300


0.5d 228.5mm

sd

M sd
90.06 *10 6

0.064 0.295.....ok!
bd 2 f cd 400 * 557 2 *11.33

From GDC for sd = 0.064, Kz 0.96


Reinforcment

S max = 175mm

As

Use 8c / c...185mm

interior girder:

M sd
90.06 *10 6

645.63mm 2
k z df yd
0.96 * 557 * 260.87

Provide 2 20 bar
For support B & C, Msd = 355.11KNm

sd

M sd
355.11 *10 6

0.252 0.295.....ok!
bd 2 f cd 400 * 557 2 *11.33

From GDC for sd = 0.252, Kz 0.85

Let assume that , b = 400mm , D =


600mm, cc=25mm, = 20mm, stirrup
= 8mm,
d =557mm

Reinforcment

As

M sd
355.11 *10 6

2875.18mm 2
k z df yd
0.85 * 557 * 260.87

Provide 9 20 bar
Shear design

check depth:

Mu

sd * f cd * bw

355.11 * 10 6
0.295 * 11.33 * 400

d 515.38mm
Use d = 557mm
By similarity of triangle: design shear

Beam span AB & CD , Msd= 284.84


KNm

Vsd 1 Vsd 6

237.60 2.4 0.557


182.46 KN
2.4

Vsd 3 Vsd 4

296.78 3 0.557
241.68KN
3

M sd
284.84 *10 6

0.202 0.295.....ok!
355.97 3.6 0.557
bd 2 f cd 400 * 557 2 *11.33
Vsd 2 Vsd 5
300.89 KN
3.6
From GDC for sd = 0.202, Kz 0.88

sd

Reinforcment

Resistance shear

As

M sd
284.84 *10 6

2227.61mm 2
Vrd 0.25 f ctd bd 0.25 * 11.33 * 400 * 557
k z df yd
0.88 * 557 * 260.87

Provide 720 bar

Vrd 631.08KN Vsd (allo)

Beam span BC, Msd= 90.06 KNm

Shear Capacity

vc 0.25 f ctd k1 k 2 bd

k 2 1.6 d 1.043 1.....ok!


33

20

At support

As 2875.18mm

Use 8c / c...70mm
2

Design shear for span BC

2875.18
k1 1 50
1.645 2.....ok!
400 * 557

Vsd,max = 241.68

Vs Vsd Vc 143.23KN

For beam section

v c 0.25 f ctd k1 k 2 bd 98.45 KN

Design shear for span AB & CD


Vsd,max = 300.89 Vc,max = 98.45

adf yd
Vs

100 * 557 * 260.87


101.45mm
143.23 *10 3

Vs Vsd Vc 202.44 KN

adf yd
Vs

S max = <,

100 * 557 * 260.87

71.78mm
202.44 * 10 3

S max = <,

Vc,max = 98.45

af yk 100 * 300

150mm

0.5b 0.5 * 400


0.5d 278.5mm

S max = 150mm

af yk 100 * 300

150mm

0.5b 0.5 * 400


0.5d 278.5mm

Use 8c / c...100mm

S max = 150mm

34

5.5

FORM WORK

Topping=262.71 m2 ,

5.6

girder =111.2 m2,

BAR SCHEDULE

Location

Ref

Dia

Length

No of Bars

topping Ribe

No

Exterior

total
Length

No of Bars

Dia

Dia

Dia

Dia

Dia

Dia

Dia

10

12

14

16

20

top

14

5.30

34

1080.18

0.00

0.00

0.00

0.00

1080.18

0.00

0.00

bottm

14

5.00

34

1020.00

0.00

0.00

0.00

0.00

1020.00

0.00

0.00

shear bar

0.75

38

34

2907.00

2907.00

0.00

0.00

0.00

0.00

0.00

0.00

Lx

15.72

46

722.89

0.00

722.89

0.00

0.00

0.00

0.00

0.00

Ly

18.72

39

729.89

0.00

729.89

0.00

0.00

0.00

0.00

0.00

AB,CD

20

6.45

51.60

0.00

0.00

0.00

0.00

0.00

0.00

51.60

BC

20

6.00

24.00

0.00

0.00

0.00

0.00

0.00

0.00

24.00

AB,CD

20

6.00

120.00

0.00

0.00

0.00

0.00

0.00

0.00

120.00

BC

20

6.00

24.00

0.00

0.00

0.00

0.00

0.00

0.00

24.00

B,C

20

4.00

64.00

0.00

0.00

0.00

0.00

0.00

0.00

64.00

AB,CD

1.50

44

264.00

0.00

264.00

0.00

0.00

0.00

0.00

0.00

BC

1.50

34

204.00

0.00

204.00

0.00

0.00

0.00

0.00

0.00

AB,CD

20

6.55

52.40

0.00

0.00

0.00

0.00

0.00

0.00

52.40

BC

20

6.00

24.00

0.00

0.00

0.00

0.00

0.00

0.00

24.00

top
bottom
support
shear bar

Interi

Rib =137.36m2

top

35

or

bottom
support
shear bars

AB,CD

20

6.00

168.00

0.00

0.00

0.00

0.00

0.00

0.00

168.00

BC

20

6.00

24.00

0.00

0.00

0.00

0.00

0.00

0.00

24.00

B,C

20

4.00

112.00

0.00

0.00

0.00

0.00

0.00

0.00

112.00

AB,CD

1.90

87

661.20

0.00

661.20

0.00

0.00

0.00

0.00

0.00

BC

1.90

61

231.80

0.00

231.80

0.00

0.00

0.00

0.00

0.00

2907.00

2813.78

0.00

0.00

2100.18

0.00

664.00

0.222

0.395

0.617

0.888

1.208

1.578

2.468

645

1111

2537

1639

m
Kg/m
Kg

6. CONCLUSION SUMMERY
CONPARISION OF DESIGN DETAILS

SLAB TYPE

ITEM

CONCRET
volum(m3)

Solid Slab

Flat Slab

Ribbed Slab

slab
beam
total
slab
drop
total
topping
rib
girder
total
HCB

32.228
18
50.228
57.616
9.884
67.5
16.2
6.12
14.04
36.36
44.64

FORM
WORK

STEEL (Kg)
Dia
6

Dia
8

Dia
10

Dia
14

Dia
20

2953.8
579.13

2408.6
5941.54
6383.9
6383.9

573.85
645.35

2537
537.6

1638.8
5932.56

223.54
154.063
377.603
262.19
22.02
284.21
0
137.36
111.20
248.56

NOTE: According to the comparison of table, the most preferable and economical is
ribbed slab. And secondly Solid tow way slab is preferable