Sei sulla pagina 1di 18

Project List 2011

PROJECT
NO.
1

CLIENT
Sara-Chem Sdn
Bhd

Mild steel Navigational Buoy for Marine


Base

Hock Seng Lee


Berhad

Mild steel plate to pipe casing

Ban Leong
Enterprise Sdn
Bhd

6m Street Lighting Column

Electrical
Electrical Co.
Sdn Bhd

Hydroicon

11m and 9m hot-dip galvanised standard


high tensile pole for BELB Talian Grid
Negeri Sarawak Tahun Zon Tiga Sarikei &
Kapit)
6m Street Lighting Column

Electronic
Electrical Co.
Sdn Bhd

Sabah
Electricity Sdn
Bhd
MEMC
Electrionic
Materials, Inc.

10
11

Sabah
Electricity Sdn
Bhd
Shorefield Sdn
Bhd
Chiyoda

CONSULTANT

PROJECT

11m High tension pole and 9m Low


Tension Pole for BELB Talian Grid Negeri
Sarawak Tahun Zon Tiga(3) Tahun 20102011 (Sarikei & Kapit)
Steel pole to Sabah Electricity Central
Store Kolombong, Kota Kinabalu
Steel beams for crane system, filter
platform and 1 ton crane girder for
MEMC Merdeka Project at Samajaya
Industrial Zone

Steel pipe and teekay coupling to Mini


Hydro Melangkap, Kota Belud, Sabah
9m hot-dip galvanised low tension pole
Steel Structure Fabrication (Package -E)

GENERAL DESCRIPTION
OF WORKS
Supply and fabricate 3050mm x
5450mm overall height mild steel
navigational buoy, comprising of
buoyancy chamber
couterweight,manholes,lifting and
mooring eyes,battery
compartment,trestles shoes and trestle,
all shot blasting to SA 3 and painted
with 3 coats marine grade epoxy paint
Supply of labour and equipment for
rolling of mild steel plate to pipe casing
including of prebending and one
longitudinal weld
6m nominal mounting height 1.2m
planted galvanised tapered octagonal
steel street lighting column c/w cchannel (100mm x 50mm x 3mm thk) to
mount spot lights
11m and 9m hot-dip galvanised
standard high tensile pole

6m nominal mounting height 0.8m


planted galvanised tapered octagonal
steel street lighting column c/w single
short arm
Hot Dip Galvanised 11m High Tension
Pole, 11m High Tension H-pole, 9m Low
Tension pole
Supply and delivery of LT pole
intermediate, 31ft, HT pole
intermediate 33ft, HT pole terminal 33ft
Supply,fab,painting,delivery and
installation of:- (1) steel beams for
cranes system and provision of labour &
equipment for installation of 2 units
crane griders and crane hoists.(2) Filter
Platform (3) 1 ton crane girder inclusive
of hoist motor c/w JKKP approval
Supply, test inspection, delivery and
transportation of steel pipe and teekay
coupling
Supply 9m hot-dip galvanised standard
low tension pole
Package E: General Utility Area Inland

1|Page

Sarawak Sdn
Bhd

for TMP Project, Bintulu

12

Esajadi Power
Sdn Bhd

13

MEMC
Electrionic
Materials, Inc.

1.8m ID x 8mmthk x 6m(L) mild steel


bare pipe for Sg Pangapayaun Mini
Hydro Power Plant Kota Kinabalu
Pipe support

transportation charge and insurance up


to delivery to project jobsite in Bintulu
including unloading. Application of
painting material brand Kansai Paint,
Documentation and inspection charges
Supply and delivery of1.80m Idx
6mmthk x 6m (L) Ms bare pipe FOB
Kuching Port
Supply,fabricate,painting,delivery and
installation of pipe support

2|Page

Project List 2010


PROJECT
NO.
1

CLIENT

CONSULTANT

PROJECT

CMS Clinker
Sdn Bhd

Perunding SL

Edisi Optima
Sdn Bhd
KKB Industries
(Sabah) Sdn
Bhd
Pusat
Pembangunan
Kemahiran
Sarawak (PPKS)
Putra Perdana
Construction
Sdn Bhd

Jurutera Minsar

Contract No: CNTR/CLKR/10/965: Proposed steel structure and equipment


installation for Bucket Elevator Kiln
Feeding System at CMS Clinker Plant on
Lot 571, Block 4, Sentah Segu Land
District, Kampung Mambong, Kuching,
Sarawak
Proposed New Hanger for Awan Inspirasi
Sdn Bhd At Miri Airport, Sarawak
Kompleks Sukan Blok E-1: - Project
Cadangan Pembinaan Bangunan KD Sri
Tawau, Tawau, Sabah
The Proposed Renovation Works to be
Done At Automotive & Welding Institute
Of Sarawak

8
9

Sabah
Electricity Sdn
Bhd
Jawatan
Pembinaan
Dewan
Serbaguna SJK
Chung Hua,
Serian
GA Chip
Enterprise
ASSAR
Chemicals
Engineering
Services Sdn
Bhd

10

Hock Seng Lee


Bhd

11

Nam Joon
Trading Sdn

Perunding SL

GENERAL DESCRIPTION
OF WORKS
Supply,fabricate,delivery of structure
steel works

Steel Structure Works and metal roofing


Supply, fabricate, hdg, delivery and
installation of steel structure
Supply,fabricate,painting,delivery and
installation of metalworks 6" vice
portable welding bay,6G table

Design, Construction, Completion and


Commissioning of Proposed Sarawak
Energy Berhad (SEB) Headquaters
Building On Lot 2833 (Part of Lot 2342),
Block 7, Isthmus, MLTD, Kuching,
Sarawak
31feet Intermediate Low Tensile Pole to
SESB Central Store Kolombong, Kota
Kinabalu, Sabah
The Proposed Multi-purpose Hall for
Chung Hua School on Lot 76, Serian
Bazaar, Serian Town District at
Simanggang Road, Serian.

Supply,fabricate and installation of


structural steel works

Mild Steel plate for Ship

Supply of 22mm x 8' x 30' Grade ABS


mild steel plate
Supply and delivery of Tubular Steel
Pipe piles

Supply and Delivery of Tubular steel pipe


piles for The Construction and
Completion of The Proposed ASSAR
Senari Industrial Complex (ASIC II) Oil,
Gas and Chemical (OGC) Jetty and
Marine Operation Centre (MOC) at
Tanjung Manis, Mukah, Sarawak
Supply of mild steel casing

6000IG capacity Mild Steel Underground


Tank

Supply and delivery of 31 feet


Intermediate Low Tensile pole
Supply of labours,materials and
equipment for fabrication and painting
of structural steel works and roof truss
for multi-purpose hall

Supply of labour and equipment for


rolling of mild steel plate to pipe casing
inclusive of prebending and one
longitudinal weld
Supply of 6000IG capacity single wall,
single compartment mild steel flat

3|Page

Bhd
12

CMS Clinker
Sdn Bhd

Proposed Grinding Ball Sorting Machine


(Media) for CMS Cement Pending, Plant

13

CH2M Hill
Malaysia Sdn
Bhd

14

Sri Datai
Construction
(Sarawak) Sdn
Bhd
AWI Builder
Sdn Bhd

Package 398615-4001 -The Structural


Steel Works for The Proposed MEMC
Merdeka Project at Samajaya Free
Industrial Zone, Kuching
The Proposed Quarry Plant Project At
Gunong Sibanyis On Lot 246, Block 5,
Sentah Segu Land District, Kuching
Division, Sarawak
Program Menilai,
Membaiki/Menggantikan Jambatan di
Jalan Persekutuan Negeri Sarawak (Fasa
2) - Package A :The Proposed Batu Kawa
Bridge Extension Kuching Division.
Contract No: CNTR/1310/010/967 - The
Proposed new 350 TPH Crushing
Screening and Stockpiling Plant At
Gunong Sibanyis, Jalan Mambong
Kuching
Hot-Rolled Steel reinforcement bar for
MEMC Project at Samajaya Industrial
Zone, Kuching
Membina Jalan Hubungan Lapangan
Terbang Antarabangsa
Kuching/Stutong,Kuching (Phase 2) Mild steel Bridge Parapet railing for Sg
Gatal
Mild Steel Tank

15

16

CMS Quarries
Sdn Bh

17

Borneo
Geotechnic Sdn
Bhd
Global Upline
Sdn Bhd

18

19

20

21
22

23

24

Swee Joo
Coastal
Shipping Sdn
Bhd
H.S.G.J.V
Engineering

GA Chip
Enterprise
Borneo
Geotechnic Sdn
Bhd
MEMC Kuching
Sdn Bhd

Sinohydro

Cadangan Penswastaan Pembinaan


Komplek 1 Division Dan Kem 4 Renjer
Diraja di Muara Tuang, Kota Samarahan,
Sarawak
Mild steel plate for fabrication of ship
Hot-rolled steel reinforcement bar For
MEMC Merdeka Project at Samajaya
Free Industrial Zone, Kuching
Hot-Rolled Steel materials for fabrication
of 2 units Junior Furnace Platform for
MEMC Merdeka Project at Samajaya
Free Industrial Zone, Kuching
10,000LT capacity Mild Steel Skid Tank

ended underground tank c/w one coat


bituminous paint to external surface
Supply,fabricate,painting,delivery,install
ation, testing and commissioning of
Mild Steel Grinding Ball Sorting Machine
Complete with Mechanical and
Electrical installation
Supply,fabricate,shot blasting,delivery
and installation of steel structure

Supply, fabricate, deliver and install for


steel structural works and roof covering

Supply, fabricate, painting,delivery and


installation of composite 1-beam and
miscellaneous works

Supply of all materials,


labour,tools,machinery and equipment
to Fabricate, Erection,
installation,testing and commissioning
Supply of hot rolled steel reinforcement
bar
Supply,fabricate,hot-dip galvanising and
installation of mild steel bridge parapet
railing a distance of 652.4m

Supply and fabricate 5.50 length mild


steel tank c/w 2 nos manhole including
shot blasting to SA2 and apply 2 coat
epoxy paint
Supply,delivery, installation of
underground tanks, pipeworks,
submersible pumps, fuel dispenser, air
compressor
Supply of 22mm x 8' x 30' Grade ABS
mild steel plate
Supply and delivery of hot-rolled steel
reinforcement bar to BS 4499 in
standard Y25 x 12m length
Supply of Hot-Rolled Steel materials for
fabrication of 2 units Junior Furnace
Platform
Supply,fabricate and painting of 1.80m

4|Page

Corporation
(M) Sdn Bhd

For Bengoh Dam Project

25

CH2M Hill
Malaysia Sdn
Bhd

Package 405666-4017 - Architectural


interior works for MEMC Merdeka
Project at Samajaya Free Industrial Zone,
Kuching

26

MEMC Kuching
Sdn Bhd

27

MEMC Kuching
Sdn Bhd

28

ALSTOM Hydro
Malaysia Sdn
Bhd
Shorefield Sdn
Bhd
Shorefield Sdn
Bhd
IMPSA
(Malaysia ) Sdn
Bhd
Lim Aik Chai
Electrical Sdn
Bhd
Tung Hin
Enterprise Sdn
Bhd

Big daddy frame for MEMC Merdeka


Project at Samajaya Free Industrial Zone,
Kuching
Staircase & frame of Poly Disp BBU for
MEMC Merdeka Project at Samajaya
Free Industrial Zone, Kuching
Mild steel components for Bakun
Hydroelectric Project

29
30
31

32

33

Hot-dip galvanised of mild steel pole


accessories
9m & 11m hot-dip galvanised standard
Low Tension Pole
GCB support structures for Bakun
Hdyroelectric Project

Supply,fabricate and hot-dip galvanising


of 9m steel pole 3.8mm thk

9m Street Lighting Column

9m nominal mounting height planted


galvanised tapered Octagonal steel
Street Lighting Column c/w 3m single
bracket arm (Base plate size 400 x 400 x
25mm thk with 400 x 100 x 25mm thk
anchor plate and anchor bolts)
8m nominal mounting height planted
galvanised tapered octagonal steel
lighting column c/w 3m single & double
bracket
9m & 11m hot-dip galvanised standard
Low Tension Pole
Supply of hdg higway guardrail 4318mm
overall length c/w 8pc splicing bolt and
nut
Supply,fabricate,hdg and installation of
mild steel bridge parapet a distance of
1000m
Supply,fabricate and hdg of 11m and
9m x 3.8mm thk LT pole
Supply of hot dip galvanised highway
guardrail

Lim Aik Chai


Electrical Sdn
Bhd

35

Shorefield Sdn
Bhd
Global Upline
Sdn Bhd

8m nominal mounting height planted


galvanised tapered octagonal steel
lighting column c/w 3m single& double
bracket
9m & 11m hot-dip galvanised standard
Low Tension Pole
Supply of hdg highway guardrail for
Stutong Link Road,Kuching (SLRK)

37

Global Upline
Sdn Bhd

Mild steel bridge parapet for Upgrading


of Jalan Kepayan, Kota Kinabalu, Sabah

38

Citra Alti Sdn


Bhd
PPES Works
(Sarawak) Sdn
Bhd

11m and 9m Low Tensile Pole

39

Supply,Fabricate,painting,delivery and
installation of Staircase & frame of Poly
Disp BBU
Supply and delivery of hot-dip
galvanising mild steel angles, plate and
Grade 8.8 bolt & nuts
Supply of Hot-dip galvanised mild steel
pole accessories
Supply of 9m & 11m hot-dip galvanised
standard Low Tension Pole
Design, supply,fabricate and hot-dip
galvanising of GCB support structures

9m steel pole 3.8mm thk

34

36

x 4m length 10,000LT diesel tank c/w


fitting and epoxy painting to external
surface
Package 405666-4017 - Architectural
interior works for MEMC Merdeka
Project at Samajaya Free Industrial
Zone, Kuching - door Frame (Type
A,B,C,D)
The supply,fabricate,painting,delivery
and installation of the big daddy frame

Highway guardrail for Kuching-Serian


Road Miles 15 Traffic Light intersectionKuching Samarahan Division Boundary
Miles 25

5|Page

40

Group
Engineers (M)
Sdn Bhd

9m Street Lighting Column for Samalaju


Project

41

Global Upline
Sdn Bhd

Highway guardrail & accessories for


Stutong Ling Road, Kuching (SLRK)
Project

42

Syarikat Alson
Enterprise

Highway guardrail & Accessories

43

Global Upline
Sdn Bhd

10m Street Lighting Column for


Upgrading of Jalan Kepayan,Kota
Kinabalu (UJK) Project

44

Hexacomm
Engineering
Sdn Bhd

4m and 10m mounting height Street


lighting column

45

R.T Cargo Sdn


Bhd
Lim Aik Chai
Electrical Sdn
Bhd

Mild steel plate

47

Lim Aik Chai


Electrical Sdn
Bhd

6m Street Lighting Column

48

Daya Kuasa
Suria Sdn Bhd

9m hot-dip galvanised standard Low


Tension Pole (Type 9S)

46

8m Steel Street Lighting Column

9m nominal mounting height 1.30m


planted galvanised tapered octagonal
Street Lighting Column c/w 1.50m
bracket arm
Supply of hdg higway accessories
including c-channel post,end wind (fish
tail),median terminal,bull nose
terminal,M16 hexagon & round bolt &
nut
Supply of hot-dip galvanising highway
guardrail 4318(effective length
4000mm) overall length c/w 8pcs
splicing bolt & nut
10m nominal mounting height flanged
hot-dip galvanising and painted round
Decorative Steel Street Lighting Column
complete with base plate and anchor
bolt c/w single arm or double arm
4m nominal mounting height hdg midhinges flange mounted tapered oct
Steel street lighting column c/w bracket
arm and lighting arrestor base plate
Supply and hot dip galvanising of
3mmthkx 8' long mild steel plate
8m nominal mounting height planted
galvanised tapered Octagonal Steel
Street Lighting Column c/w 3m double
arm bracket
6m nominal mounting height 1.30m
planted galvanised tapered octagonal
steel street lighting column c/w short
spigot
9m hot-dip galvanised standard Low
Tension Pole as per SESCO Specification

6|Page

Project List 2009


PROJECT
NO.
1

CLIENT

CONSULTANT

PROJECT

F&NCC
Beverages Sdn
Bhd

CHT Jururunding

Hock Seng Lee


Bhd

Hashim & NEH


(Sarawak) Sdn
Bhd

Swee Joo
Coastal
Shipping Sdn
Bhd

Asian Foresty
Company

Jabatan Kerja
Raya Sarawak

Proposed Construction and Completion


of Proposed Infrastructural works on Lot
583, Block 4 Matang Land District for
Messrs Borneo Springs Sdn Bhd,
Matang,Kuching.
Cadangan Pembinaan Dan Penyiapan
Dewan Utama Universiti Malaysia,
Sarawak (UNIMAS), Kota Samarahan
Supply and Fabricate 20 Single
Compartment Mild Steel Tank Container
c/w 2 nos manhole including shot
blasting to SA 2 and supply 2 coats
epoxy paint
Design, Supply, Fabriacate and Hot Dip
Galvanising of 4.00m width steel truss
bridge (3M modular construction) as per
manufacturer details
Construction and Completion of
proposed Samalaju Water Supply,
Bintulu Division, Sarawak.

Jurutera
Perunding Wahba
Sdn Bhd
Jurutera M&E
Konsult (Sarawak)
Sdn Bhd

GENERAL DESCRIPTION
OF WORKS
Civil and structure construction and any
other works not included in the above
but deemed, necessary for the
completion of the work or as shown in
the drawings.
Structural Steel Roof Framing for main
Great Hall, Banquet Hall, Curtain Wall,
Mai Orchestra & Gemilang Stage.
ISO Tank for transportation of palm oil
and chemical.

Design and Supply of 30M Maximum


Span Modular Bridge.
Pipe Laying for MSCL pipeworks
Chamber, pipe support, anchor block,
thrust block & reinstatement of
existing works
Earthworks for raw water intake and
water treatment plant
Construction & Completion of Raw
Water Intake Facilities
Construction & Completion of Water
Treatment Plant
Pipe laying for HDPE pipeworks
Mechanical & Electrical installation

7|Page

Project List 2008


PROJECT NO.

CLIENT

CONSULTANT

PROJECT

1000P01-08

Moh Heng Co
Sdn Bhd

United
Consultants

1000P02-08

Asia Depot Sdn


Bhd

Arkitek Mok JY

The Construction and


Completion of the Proposed
Double Storey Office Cum
Factory at Muara Tebas Land
District
Proposed 2 Storey Office & 1
Storey General Warehouses at
Lahad Datu, Sabah

1000P03-08

F&N Beverages
Sdn Bhd

MARS &
ASSOCIATES Sdn
Bhd

SJ#8000015

Global Upline
Sdn Bhd

PY Konsep
Perunding Sdn
Bhd

SP#8000003

Alstom Hydro
Malaysia Sdn
Bhd

SSM Associates
Sdn Bhd

SJ#8000001

LSL Sdn Bhd

WE Engineering

SO#8000600

Riaplus Sdn Bhd

Nil

1000P05-08

Malaysia-China
Hydro Joint
Venture

Angkasa
Consulting
Services Sdn Bhd

Proposed Warehouse and Office


Extension on Sublot 1 of
Subdivision of Parent Lots at
Jalan Datuk Amar Stephen
Kalong Ningkan, Kuching
Sarawak
Project Pembinaan Jejambat Di
Persimpangan Jalan PutatanKepayan Dengan Jalan Lintas,
Dan Jalan Putatan-Kepayan
Dengan Jalan Mat Salleh, Kota
Kinabalu Sabah - Bridge Parapet
Railing
Bakun Hydro Electric Project System, Hisc, Structure,Platform
& Tanks

GENERAL DESCRIPTION
OF WORKS
Construction and Completion of
Warehouse / Factory Building,
including all associated Archieture, RC
works, M&E Services and
Infrastructure Works
Construction and Completion of
Warehouse / Factory Building
including all associated Archieture, RC
works, M&E Services and
Infrastructure Works
Construction and Completion of
Warehouse / Factory Building
including all associated Archieture, RC
works, M&E Services and
Infrastructure Works
Supply, Hot Dip Galvanising, Delivery
and Installation of Bridge Parapet
Railing and Post

Supply, Fabricate, Hot Dip Galvanising


and delivery of Steel Structure for
Package EM1

Supply, Fabricate and Hot Dip


Galvanise, mild steel Polygonal
Monopole c/w anchor bolt,
detachable climbing rung,
feeder mount and Antenna
Mounting
Supply of 350mm O.D x 10mm x
12.00m length mild steel plain
ended pipe

Design, Supply, Fabricate and Hot Dip


Galvanising of Telecommunication
Monopole

Bakun Hydroelectric Project


Package CW2-Main Civil Works
Construction and Completion of
Log Boom structures

Manufacture, Fabricate, Supply,


Delivery, Installation and
Commissioning of Log Boom
Structures, including all related R.C.
Works.

Supply and Delivery of Steel Pipe Pile

JECTS LIST 2009


8|Page

Project List 2007


PROJECT NO.

CLIENT

CONSULTANT

PROJECT

F1/2007

Sinohydro
Corporation
(M) Sdn Bhd
PPES Works
(Sarawak) Sdn
Bhd.

Nil

Powerhouse for Bakun


Hydroelectric Project

Jurutera Minsar
Consult Sdn Bhd

The proposed Construction and


Completion of Sarawak
Convention and Exhibition
Centre
Construction , Completion and
commissioning of the proposed
Second raw water intake for
Salim Water Treatment Plant,
Sibu
Menbina Jalan Hubung
Lapangan Terbang Antara
Bangsa Kuching (KIA/Stutong) ,
Kuching Sarawak-Water Supply
Works (Package CW1)
Projek Menaiktaraf
Persimpangan Miri KeLutong Pembinaan Jejambat Di Bulatan
Pujut Dan Puchong,Miri ,
Sarawak (Water Supply
Proposed Extension to Existing
Food And Consumer
Products ,Warehouse on lot
794,Block 7,Muara Tebas Land
District ,Demak Laut Industrial
Park,Kuching.
The Supply , Fabricate and
Erection of Structural Steel
Work(Including Roof Covering,
Wall Cladding and Accessories)
to coal shed for the proposed
Mukah Coal-Fired Power
Station,Mukah Division,Sarawak
The Annual Supply and Delivery
of Steel Products
The Construction and
Completion of the Coal handling
related structures for the
proposed Mukah Coal-Fired
Power Station,Mukah Division ,
Sarawak
Projek Menaiktaraf

F2/2007

1000P01-07

Sibu Water
Board

Jurutera
Jasa(Sarawak)

1000P02-07

Global Upline
Sdn Bhd

Jurutera Minsar
Consult Sdn Bhd

1000P03-07

Global Upline
Sdn Bhd

Jurutera Minsar
Consult Sdn Bhd

1000P04-07

Tang Container
and Services
Sdn Bhd

Eswel Engineers
Sdn Bhd

F3-07

PPES Works
(Sarawak)Sdn
Bhd

F4-07
F5-07

Syarikat Sesco
Berhad
PPES Works
(Sarawak)Sdn
Bhd

SJ#7000022

Global Upline

China National
Machinery &
Equipment Import
& Export
Corporation

China National
Machinery &
Equipment Import
& Export
Corporation

GENERAL DESCRIPTION
OF WORKS
Supply and Delivery of Metal Roofing
Sheet,Rock Wool Single Side
Supply, Fabricate,Painting, Delivery and
Installation of Mild steel structural
works
1200mm ND pipeline, Jetty, Steel
Fender, Generator House,Guard
House,Sub-station,Air Compressor
House,External Works and Mechanical
& Electrical Services.
400mm ND MSCL pipeline & 200mm ND
HDPE pipeline and associated R.C.
works

450mm ND DI Pipeline ,250mm ND DI


Pipeline,100mm ND,150mm ND & 250
mm ND HDPE pipeline and associated
R.C works .
81.00m X 37.00m Steel Warehouse
Structure with Metal Roofing ,Cladding,
R.C. Works and External Works.

Structural Steel Works with Associated


Metal Roofing and cladding works

Supply Of Hot Dip galvanized Steel


Product
Structural steel works with associated
Metal roofing and Cladding works.

Supply of Hot Dip Galvanized Steel

9|Page

Sdn Bhd

SJ#7000061

Global Upline
Sdn Bhd

Persimpangan Miri Ke Lutong Pembinaan jejambat Di Bulatan


Pujut dan Puchong ,
Miri,Sarawak
Traffic Improvement and
Management Schemes Along
Jalan Kepayan,Kota Kinabalu

bridge Papapet Railing

Supply of Hot Dip Galvanized


Decorative Street Lighting colums.

10 | P a g e

Project List 2006


PROJECT NO.

CLIENT

CONSULTANT

PROJECT

P1/2006

Global Upline
Sdn Bhd

Jurutera Minsar
Consult Sdn Bhd

Naiktaraf Persimpangan BDC/


Jalan Tun Jugah , Kuching Dan
Membina Jalan Hubung
Lapangan Terbang
Antarabangsa, Kuching/Stutong
Contract for the Bienial Supply
and Delivery of Steel Products.
Supply, Fabricate,Hot Dip
Galvanising and Delivery Of Pole
strut 30'
Naiktaraf Persimpangan BDC/
Jalan Tun Jugah , Kuching Bridge
Parapet
Supply, Fabricate, Shot
blasting ,Painting, Delivery and
Installation of Mild Steel
Structural Steel Fame for Teluk
Salut 190MW Combined Cycle
Conversion Project.
Upgrading of Labuan Airport,
Wilayah Persekutuan LabuanStructural Steel Works(Package
BW1-)
Upgrading of Labuan Airport,
Wilayah Persekutuan LabuanStructural Steel Works for New
5th Squadron Hanger (Package
BW3-)
Redevelopment of Kota Kinabalu
Internatuional Airport, Sabah
(Package 2 - Airside
Infrastructure, Act & New LCC
Terminal- Structural Steel
Works)
Supply, Fabricate and delivery
FOB Kuching Wharf of 1500mm
diameter steel pipe pile (25mm
Thick Grade 50C), including Pile
Shoe
Upgrading of Kota Kinabalu
International Airport , Sabah Package1 Terminal Building and
Landside Infrastructure
Facilities.

PC44/06/MB
SJ6000055

SJ6000072

Syarikat Sesco
Berhad
Sabah
Electricity Sdn
Bhd
Global Upline
Sdn Bhd

Nil
Nil

Jurutera Minsar
Consult Sdn Bhd

SO6000179

Marudu
Construction
Sdn Bhd

Jurutera Minsar
Consult Sdn Bhd

SO6000431

Global Upline
Sdn Bhd

Jurutera Minsar
Consult Sdn Bhd

SO6000431

Global Upline
Sdn Bhd

Jurutera Minsar
Consult Sdn Bhd

SO6001021

Global Upline
Sdn Bhd

Jurutera Minsar
Consult Sdn Bhd

SO6001764

Inai Kiara Sdn


Bhd

Nil

SO6001988

WCT
Construction
Sdn Bhd

Jurutera Minsar
Consult Sdn Bhd

GENERAL DESCRIPTION
OF WORKS
Mild Steel Cement Lined Pipe and
Associated Works

Supply, Fabricate , Hot Dip Galvanising


and Delivery Mild Steel Products.
Supply, Fabricate, Hot Dip Galvanizing
and Delivery Of Pole Strut 30'
Supply, Fabricate,Hot Dip Galvanise,
Delivery and Installation of Mild Steel.
Structural Steel Works ,Steam Turbine
Building,ACC substation and Platform.

Structural Steel Works for Main


Terminal and Ancillary Building

Structural Steel Works for RMAF Hanger

Structural Steel works for Main


Terminal and Ancillary Building.

Supply Fabricate and delivery FOB


Kuching Wharf of 1500mm diameter
steel pipe pile (25mm thick Grade 50C),
including pile.
Structural Steel Works for Terminal
Building and Landside Infrastructure
Facilities.

11 | P a g e

SO6002031

CM Global Sdn
Bhd

Nil

Supply, Fabricate and Primer


Painting of One Unit Mild Steel
Trailer Beam, Cargo Support and
all necessary towing lug and
Bracket.

Supply, Fabricate and Primer Painting of


One Unit Mild Steel Trailer Beam, Cargo
Support and all necessary towing lug
and Bracket.

12 | P a g e

Project List 2005


PROJECT NO.

CLIENT

CONSULTANT

PROJECT

P1/2005

KuchingWater
Board

Consultant SHC
Sdn Bhd

Supply,Delivery ,
Installation,Testing &
Commissioning of the proposed
1100mm (N.D) Steel Pipeline
including all associated works
from Jln Matang/ Jln Bt Kawa
Junction to Bukit Siol
Reservoir,Kuching.
Proposed Wood Particle Block
Factory and 2 Storey Office on
Plot 7 of Parent Lot 817 ,Block
37 ,Kemena Land District at
Jepak Industrial estate
(JIE) ,Bintulu , Sarawak.

P3/2005

Derasas Jaya
Sdn Bhd

1.I.Jong Architect
2.Perunding
Muhandis Sdn
Bhd.

GENERAL DESCRIPTION
OF WORKS
Supply,Delivery,Installation,Testing &
Commissioning of 1100mm (N.D) Steel
Pipeline

Construct a Wood Particle Block


Factory, 2 Storey Building & associated
infrastructure works

3.Perunding
Elecmec Sdn Bhd

13 | P a g e

Project List 2004


PROJECT NO.

CLIENT

CONSULTANT

PROJECT

P1/2004
(SJ400031)

Kuching Water
Board

Kuching
Waterboard

SJ4000032

Shell Malaysia
Trading Sdn
Bhd

P2/2004

Government of
Sarawak Jabatan Kerja
Raya

KTA (Sarawak) Sdn


Bhd

P3/04
(SO4000359)

Premier Capital
Venture
Corporation

Jurutera Jasa (S)


Sdn Bhd

Proposed HDPE Lining and


Reinstatement of Steel Bracings
to 1 Million Gallon Elevated ERP
water Tanks at Samajaya Free
Industrial Zone, Kuching
Supply, fabricate, hot-dip
galvanising and delivery of shell
metal pallet complete with
locking bar and cable for Port
Dickson, Ipoh and Sepangar Bay
The Construction and
Completion of Tasik Biru - Lundu
- Sematan Water Supply,
Pumping Main from Batu Kitang
WTP to Bau Package 1 Installation of Pumping main
Kuching Division, Sarawak
Upgrading Sarawak Clinker Sdn
Bhd Plant, Mechanical Works

P4/2004

Sarawak
Electricity
Supply
Corporation
Global Upline
Sdn Bhd

P5/2004
(WO#29356)

P6/2004

Kuching Water
Board

P7/2004

Global Upline
Sdn Bhd

Biennial Supply and Delivery of


Steel Product

Construction, Completion and


Commissioning of the Proposed
MSCL pipeline for
Redevelopment of Kuching
International Airport (REKIA)
Proposed 600mm ND Steel Main
Renewal along Jalan Datuk
Bandar Mustapa (From Chainage
om to 1552m), Kuching
Redevelopment of Kuching
International Airport (REKIA)

GENERAL DESCRIPTION
OF WORKS
HDPE Lining Works and Steel Bracing
Reinstatement Works

Supply, fabricate, hot-dip galvanising


and delivery of shell metal pallet

The Construction, Completion and


installation of 700mm pipeline

Supply, fabricate, painting, delivery and


installation of Mechanical Works for
Hammer Mill System and Preheater
Primary and Cooler Fans
Supply, fabricate, hot-dip galvanising
and delivery of Steel Product

Supply, installation, testing and


commissioning of 1050mm and
alternative 457mm MSCL pipeline

Supply, installation, testing and


commissioning of 1050mm and
alternative 457mm MSCL pipeline
Redevelopment of Kuching
International Airport (REKIA)

14 | P a g e

Project List 2003


PROJECT NO.

CLIENT

P01/03

DBKS (MBKS)

P02/03

Ibraco Realty
Development
Sdn. Bhd.
Tang Container
& Services Sdn.
Bhd.

CHT Jurunding

P04/03

PS Geotechnic
Sdn. Bhd

TKY Consultant
Sdn. Bhd

P05/03

Ibraco Realty
Development
Sdn. Bhd

Jurutera Jasa (S)


Sdn. Bhd

P06/03

Kuching Water
Board

Jurutera Jasa (S)


Sdn. Bhd

P07/03

Kuching Water
Board

Konsortium
Malaysia

P03/03

CONSULTANT

Jurutera Jasa (S)


Sdn. Bhd.

PROJECT
Construction of Bus Shelters for
the Council of City of Kuching
South for year 2003.
Proposed 3 Storey Shophouse at
Tabuan Heights Commercial
Centre at MTLD, Jalan Song
Proposed new warehouse on Lot
794, Block 7, Demak Laut
Industrial Park, Sejingkat,
Kuching (Phase II)
Supply, Delivery, Laying, Testing
& Installation of 800mm ND
nd
MSCL Pipeline for the 2
Kuching Bridge Project Package
CP2/A: Bridge Structure
Remaining Sub-contractor
Works
Construction, Completion and
Commissioning of the Proposed
900mm/700mm Diameter Steel
Pipeline from Jalan Airport/Jalan
Stutong to Samajaya
Construction, Completion and
Commissioning of the Proposed
1600mm Diameter Steel Pipeline
from Jalan Batu Kitang to Jalan
Datuk Stephen Yong/Jalan Batu
Kawa Junction, Kuching
Supply, Delivery, Laying, Testing
and Commissioning of the
Proposed 800mm Diameter
Steel Pipeline from Jalan
Meranek/Jalan Muara Tabuan
Junction to Samarahan Industrial
Estate

GENERAL DESCRIPTION
OF WORKS
Construction and completion of
proposed Bus Shelters.
Supply, fabricate, delivery and
installation of structural steel and metal
works
Supply, fabricate, and dhg of structural
Steel and metal works

Supply, Delivery, Laying, Testing and


Installation of 800mm ND MSCL
Pipeline

Supply, Delivery, Laying, Testing and


Commissioning of 900mm/700mm
MSCL Pipeline

Construction, Completion and


Commissioning of the proposed
1600mm Diameter Steel Pipeline

Supply, Delivery, Laying, Testing &


Commissioning of the Proposed 800mm
Diameter Steel Pipeline

15 | P a g e

Project List 2002


PROJECT NO.

CLIENT

P1/02

Shell Timur Sdn


Bhd

P2/02

KWB

P3/02

Edisi Optima
Sdn Bhd

P4/02

HDG Division

P5/02

Option Nets
Sdn Bhd

P6/02

SWB

P7/02

KWB

P8/02

KWB

P9/02

P10/02

Metro Sedia
Management
Sdn Bhd
SESCO

P11/02

P11/02

CONSULTANT

PROJECT
Structural steel works for the
new Lubricants Warehouse at
Sibu Installation.
Proposed 1400mm steel pipes
from Batu Kitang Treatment
Plant to Jalan Batu Kitang / Jalan
Penrisen Junction Kuching.
Renovation of IK Ho workshop
building at Lot 1382, Blk 66,
Jalan Kilang Pending Industrial
Estate Kuching.
Structural steel works for the
upgrading of the existing
galvanizing units.
Proposed of construction and
completion of Fish/Prawn feed
Factory Manufacturing and
packaging Factory at Lot 9898
Block 59, Muara Tuang Land
District, Kota Samarahan Ind.
Estate, Samarahan.
Proposed system Agihan Bandar
Baru Sibu, Sarawak.
Proposed 750mm steel pipeline
from Jalan Penrisen/Jalan Muara
Tuang Junction to 9 Mile
Reservoir, Kuching, Sarawak.
Proposed Upgrading / Renewal
of 500mm Asbestos Cement
(AC) Truck Main to 750mm Steel
Main from 7th Miles Reservoir
to Datu Muda Reservoir.
Proposed Bitumen Storage &
Delivery facilities at Pending
Port, Kuching, Sarawak.
Biennial Supply and Delivery of
hot-dip galvanised pipes.
Proposed Semi Detached Light
Industrial Estate Building on Sub
lots at Parent Lots 1269 & 1185,
Block 12, Jalan Setia Raja (Muara
Tabuan Phase V Stage III)

GENERAL DESCRIPTION
OF WORKS
Supply, fabricate, hot-dip galvanising
and installation
Supply, Delivery, Laying and
Commissioning

Supply and fabricate

Supply, fabricate, painting and site


installation
Supply and fabricate

Supply, Delivery, Laying, Testing and


Commissioning
Supply, Delivery, Laying, Testing and
Commissioning

Supply, Delivery, Laying, Testing and


Commissioning

Construction, Testing and


Commissioning
Supply, and Delivery
Supply, Fabricate, Hot-dip galvanizing,
Painting, Delivery and Installation

16 | P a g e

Project List 2001


PROJECT NO.

CLIENT

P1/2001

Naim Cendera
Sdn.Bhd.
Hock Seng Lee
Bhd

P2/2001

P3/2001

P4/2001

SKH Sports
Equipment
Sdn.Bhd.
Kuching
Waterboard
(Contract No :
KWB/Con.8/2001)

CONSULTANT

PROJECT
Proposed Institute Kemahiran
Belia Negara, Miri (IKBN)
Proposed water reticulation
mains, r.c. drainage and main
access road to Sarawak
Technology Park, Samarahan
External Water supply system
Construction of Proposed
Warehouse at Siol and Demak
Nines
600mm Nominal Diameter Steel
Main along Jln Kuching / Serian
from 9 Miles Jln Kuching /
Serian to the junction of Jln
Quap & along Jln Kuching /
Serian (from chainage 0m to
905m), Kuching

GENERAL DESCRIPTION
OF WORKS
Supply and install roof truss
Supply, lay, joint, test and fixing bends
along pipe route

Construction and completion of


proposed warehouse
Supply, delivery and laying

17 | P a g e

Project List 2000


PROJECT NO.

CLIENT

CONSULTANT

PROJECT

P1/2000

Nishimatsu
Construction
Co. Ltd

WTS Konsultant

P2/2000

Walter Group
International IJM Joint
Venture
Mudajaya
Corporation
Bhd.
Syarikat Wisma
Kontrektor
Petronas
Dagangan Bhd.
Kuching Water
Board

Proposed Phase IV factory


Building for Taiyo Yuden(S) Snd.
Bhd. on lots 1132 & 1188, Blk
12, Off Jalan Setia Raja,
Samajaya Free Industrial Zone Factory 8 and miscellaneous
steelwork
1st Silicon Waferfab Project,
Kuching. FAB Utility steel
Package at 2nd Floor Level
(Package No. 2SC-P-F27E)
Proposed UTM Hostel at
Samarahan, Kuching

P3/2000

P4/2000
P5/2000
P6/2000

Lim Consultant
Team
Syarikat Wisma
Kontrektor

Jurutera Jasa (S)


Sdn. Bhd

Proposed Observation Tower at


Miri - Structural Steelworks
Supply and fabricate of 4,000Gl
skid tank and underground tank
Construction, completion &
commissioning of the proposed
900mm/700mm steel pipeline
from Jalan Airport/Jalan Stutong
junction to Samajaya Kuching,
Sarawak

GENERAL DESCRIPTION
OF WORKS
Supply, fabricate, paint, deliver and
erection of structural steelwork and
other miscellaneous steel structures

Supply, fabrication, painting and


erection of pipe supporting channels
and etc.
Supply of all materials of steel
structures.
Supply, fabricate and hot-dip galvanised
of structural steelworks
Supply, fabricate and painting of skid
tank
Supply and installation of pipelines

18 | P a g e

Potrebbero piacerti anche