*12137*
13141
4 Hours/100 Marks
Seat No.
20
Rs. 11,65,300=00
5%
8%
5%
5%.
P.T.O.
12137
-2-
*12137*
MARKS
16
*12137*
-3-
12137
MARKS
12137
*12137*
-4-
MARKS
3. Attempt any two :
16
a) Work out the quantity of concrete and steel for 8 Nos. of R.C.C. footing
shown in Fig. No. 2.
Fig. No. 2
b) A simply supported beam resting on two wall supports of 300 mm thick with
clear distance between support is 4.5 m. The reinforcement provided in the
beam is as follows :
Top Bars
2 Nos. 10
Bottom bars
3 Nos. 12
Bentup bars
2 Nos. 16
Stirrups
6
150 mm c/c
*12137*
12137
-5-
MARKS
4. Attempt any two :
16
c) Refer Figure No. 3 and calculate the quantities of the following in respect of
under ground water tank :
12137
-6-
*12137*
MARKS
Figure No. 3
i) Excavation for foundation
ii) P.C.C. 1 : 4 : 8
iii) B.B. masonry in C.M. 1 : 6
iv) Internal cement plaster in C.M. 1 : 4.
5. Attempt any four :
16
a) Calculate the liftwise quantities of earth work for a well of 10 m diameter and
4.5 depth. The strata available from G.L. to 4.5 m depth is hard murum.
b) i) State the rules for deduction of plaster as per IS 1200.
ii) State the multiplying factors for taking the measurements of painting works
for the following :
1) A.C. Sheet corrugated
2) M.S. Grill
3) Flush door
4) Fully glazed window.
c) i) State any four factors to be considered while preparing the detailed
estimate.
ii) Define the check list and explain why the check list preparation is
necessary before the preparation of detailed estimate.
d) State any four factors affecting measurement sheet.
e) State four factors affecting task work.
*12137*
12137
-7-
MARKS
6. Attempt any four :
16
a) Enlist the data required for preparation of detailed estimate with necessity of
each.
b) State the factors affecting the rate analysis. Explain any one in details.
c) State any three methods for calculating the earth work for road. Explain any
one briefly.
d) Enlist the different types of detailed estimates and explain any one briefly.
e) Define task work. What is the task work for the following items ?
i) P.C.C. 1 : 4 : 8 in foundation
ii) B.B. Masonry in super structure
iii) R.C.C. Slab in C.C. 1 : 1.5 : 3
iv) 20 mm thick cement plaster in C.M. 1 : 6.
f) Define rate analysis and state any six purposes of rate analysis.
_________________