LIGHTNING PROTECTION SYSTEM INSPECTION CHECKLIST
PROJECT TITLE :
Type of Work :
Location :
No.
A
Main
Contractor
Check earth chamber as per approved and free from defect and
at correct location and level as per approved drawings.
Remarks
Installation
Check the correct location for electrode/earth point as per
approved drawings.
Check conductor routing, alignment and setting out as per
approved construction/shop drawings
Clients
Consultant
Preparatory
Approved material submission.
(including accessories)
Date :
Items To Be Checked
RFWI No :
Ref. Drawing No
10
11
Status of Inspection
We have carried out
specifications/document.
all
necessary
inspections
Checked By
Main-Contractor
and
verify
that
the
above
items/activities
Verified By
Clients Consultant
Signature
Name
Company
Date
* S t a t u s O f I n s p e c t i o n : = Acceptable , X = Not Acceptable, - = Not Applicable
conform
to
the
Acknowledged By
ER/ERA
contract