LIGHTNING PROTECTION SYSTEM INSPECTION CHECKLIST

PROJECT TITLE :
Type of Work :
Location :

No.
A

Approved Method of Statement.

Approved Construction/Shop Drawings.

Main
Contractor

Check correct fastening of conductors and interval of clips.

Check all joint/clamp are properly done and tight as per


approved method and shop drawings.

Check earth chamber as per approved and free from defect and
at correct location and level as per approved drawings.

Remarks

Installation
Check the correct location for electrode/earth point as per
approved drawings.
Check conductor routing, alignment and setting out as per
approved construction/shop drawings

Clients
Consultant

Preparatory
Approved material submission.
(including accessories)

Date :

Items To Be Checked

RFWI No :

Ref. Drawing No

Check for correct material and accessories:


Cable/tape and size
Tape clips
Test clamps
Junction clamp
Adhesives
Air terminal base
Air terminal
Earth rod
Rod to Tape clamp
Bimetallic connector
Others specified by manufacturer
Completion

10

Testing instrument calibrated (to show certificate).

11

Earthing test result (not to exceed ___ ) pls. refer to


specification.

Status of Inspection
We have carried out
specifications/document.

all

necessary

inspections

Checked By
Main-Contractor

and

verify

that

the

above

items/activities

Verified By
Clients Consultant

Signature
Name
Company
Date
* S t a t u s O f I n s p e c t i o n : = Acceptable , X = Not Acceptable, - = Not Applicable