The information in this document is the property of BHARAT HEAVY ELECTRICALS LIMITED
It must not be used directly or indirectly in any way detrimental to the interest of the company.
Jayanand R
2011.02.14
17:39:35
+05'30'
JOB NO.
STATUS
324
CONTRACT
DISTRIBUTION
Rev 02
DATE 07.02.11
ALT.
TM
CHKD
AJ
CONSULTANT:
TATA CONSULTING ENGINEERS LIMITED
MUMBAI
APPD.
PK
Customer/consultant
comments incorporated
REV DATE ALTD CHKD APPD
01 20.03.10 TM
AJ
PK
01
Customer/consultant
comments
TITLE:
incorporated
DEPT.
NAME SIGN DATE
CODE:
N
DESN TM Sd/- 05.10.09
CHD. AJ Sd/- 05.10.09
APPD PK Sd/- 05.10.09
SCALE
NTS
DOCUMENT NO:
PE-DC-324-165-N002
Page 1 of 5
REV 02
TITLE:
CW SYSTEM
DESIGN PHILOSOPHY & SYSTEM
WRITE-UP
2X600MW JINDAL INDIA TPL
DOCUMENT NO.:
REVISION NO.:
DATE:
SHEET:
INDEX
S. NO.
DESCRIPTION
1.
INTRODUCTION
2.
3.
4.
5.
6.
PE-DC-324-165-N002
02
07.02.11
Page 2 of 5
TITLE:
CW SYSTEM
DESIGN PHILOSOPHY & SYSTEM
WRITE-UP
2X600MW JINDAL INDIA TPL
DOCUMENT NO.:
REVISION NO.:
DATE:
PE-DC-324-165-N002
02
07.02.11
SHEET:
3 OF 5
1.0 INTRODUCTION
This document covers the system description, Design Philosophy and Control &
Instrumentation Philosophy for Cooling Water System for 2X600MW JINDAL INDIA TPL.
=
=
=
=
=
3.1.3 The pressure drop in Valves & Fittings are based on the following formula as per Crane
Handbook :
HL
V2
2g
TITLE:
CW SYSTEM
DESIGN PHILOSOPHY & SYSTEM
WRITE-UP
2X600MW JINDAL INDIA TPL
Where:
HL
K
g
V
=
=
=
=
DOCUMENT NO.:
REVISION NO.:
DATE:
PE-DC-324-165-N002
02
07.02.11
SHEET:
4 OF 5
3.1.4 Piping above 150 Nb shall be carbon steel IS 2062, rolled and welded conforming to IS 3589.
3.1.5 The Design Pressure of CW system shall be 5 Kg/cm2 (g).
Valves
Valve 50 Nb & below :
Gate/Globe/Check valves:
4.1.1
Body
Bonnet & Trim
4.1.2
4.1.3
4.1.4
4.2
Shaft
Seal
Seat ring
SS-410
Buna-N/ Nitrile rubber
18-8 SS
Bearings
CI IS 210 Gr FG 260
Piping
The Control of CW system shall be from central control room (CCR) through OWS.
TITLE:
CW SYSTEM
DESIGN PHILOSOPHY & SYSTEM
WRITE-UP
2X600MW JINDAL INDIA TPL
DOCUMENT NO.:
REVISION NO.:
DATE:
PE-DC-324-165-N002
02
07.02.11
SHEET:
5 OF 5
MO BFV open/close push button shall also be provided on the integral starter of these
valves.
Motor actuators for condenser inlet & outlet Butterfly valves, all control logics, Process
Interlocks under BHEL scope within the battery limit & Remote I/O panel in CW pump
house shall be controlled/ realized from BHEL supplied DCS. Relevant inputs shall be
wired to the Remote panel by CW pump vendor.
All alarms shall be annunciated in OWS at CCR.
CW System P&ID
Drg.No.PE-DG-324-165-N001