Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Sl No.
(Lead)
charges for
trucks and
tippers for
Earth /
Sand /Gravel
Distance
/ Murrum/
Lime/ Surki/
per cu.meter
1
1
2
3
4
5
6
7
2
Lead up to 1 km
Lead up to 2 km
Lead up to 3 km
Lead up to 4 km
Lead up to 5 km
for Every km beyond 5 km up to 30 km
for Every km beyond 30 km
Sl No.
Description of item
Loading
1
2
3
4
5
30
10000
3
30.00
42.00
56.00
68.00
80.00
12.00
10.00
(Lead)
charges
(Lead)
for trucks
(Lead)
charges
for
and
charges for
trucks
and
(Lead)
trucks and tippers for
(Lead)
tippers per charges for
Cement/
tippers for
charges
for
cu.meter for trucks and
Steel/
Rubble/Size
trucks
and
PCC slabs/ tippers per
RCC
stones/ Cut
Shahabad cu.meter for tippers for
Stones/ poles/ AC slabs/ CC & water/ 1000 Bricks /
& GI
1000 nos
Coarse
Laterite
litres
sheets/
aggregate
blocks/
per cu.meter Packed
Wood/ cum
materials/
tonne
4
28.90
40.40
56.00
68.00
80.00
12.00
10.00
5
18.00
25.30
35.00
42.50
50.00
7.50
6.30
Rubble/ size
Earth /
stone/ cut
Sand /Gravel
stone/
Cement in
Murrum/ /
Coarse
Rs/Tonne
Surki/ Rs /
aggregate,
cum
Lime in
Rs/cum
15.20
30.30
50.10
6
42.40
59.40
82.40
100.00
117.70
17.60
14.70
7
17.80
24.90
33.20
40.30
47.40
7.10
5.90
Steel in
Rs/Tonne
Bricks
Rs/1000 Nos.
60.00
41.70
8
48.10
67.30
89.80
109.00
128.30
19.20
16.00
Unloading
7.60
15.15
50.10
60.00
41.70
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
16
17
18
19
1
2
3
4
5
6
1
2
Allowances
Add for MA @ 25%
Overheads&Contractors Profit @0%
Quarry
Lead in KM
Swarnamuki 0/7 KM
Swarnamuki 0/7 KM
Swarnamuki 0/7 KM
Cherlopalli
Local
Local
Local
Kodandaramapuram
Kodandaramapuram
Kodandaramapuram
Kodandaramapuram
Kodandaramapuram
Perur
Perur
Ithepalli
Kadapa
Kadapa
Aug-14
6000.00
48500.00
48000.00
51000.00
51000.00
50000.00
0.25
0.00
7.00
7.00
7.00
3.00
3.00
3.00
3.00
20.00
20.00
20.00
20.00
20.00
4.00
4.00
13.00
10.00
10.00
Page-4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Items
Common burnt clay bricks (23x11x7cm)
Flyash cement / lime solid blocks (50 Kgs/
sq.cm) 290mmx225mmx140mm
Flyash cement / lime solid blocks (50 Kgs/
sq.cm) 290mmx100mmx140mm
Flyash cement / lime solid blocks (50 Kgs/
sq.cm) 225mmx100mmx60mm
Reference
S.No./ Item
to SoR
Code No.
page
Rate
Unit
13
BMT-A.01
3707.00
13
BMT-A-10
19.00
1 No.
14
BMT-A-13
10.00
1 No.
14
BMT-A-14
5.00
1 No.
14
BMT-B-05
1544.00
1 Sqm
15
BMT-B-06
1287.00
1 Sqm
15
BMT-B-10
2392.00
1 Sqm
15
BMT-B-11
2033.00
1 Sqm
15
BMT-B.16
933.00
1 Sqm
15
BMT-C.01
447.00
1 Sqm
15
BMT-C.02
538.00
1 Sqm
15
BMT-C.07
397.00
1 Sqm
16
BMT-C.16
607.00
1 Sqm
19
BMT-D.04
266.00
1 Sqm
20
BMT - E.01
63567.00
1 cum
20
BMT - E.02
70630.00
1 cum
20
1 cum
20
BMT - E.06
116540.00
1 cum
20
BMT - E.15
48543.00
1 cum
20
BMT-E.17
207.00
1 sqm
20
BMT-E.20
56.00
1 Kg
Cost of MS Tube
21
BMT-F.04
57.00
1 Kg
21
BMT-F.05
187.00
1 Kg
21
BMT-F.06
309.00
1 Kg
22
BMT-F.28
16.00
1 Sqm
22
BMT-F.29
2500.00
1 Sqm
1000 Nos.
Sl.
No
27
28
29
30
31
32
33
34
35
Items
Page-5
Reference
S.No./ Item
to SoR
Code No.
page
Rate
Unit
22
BMT-F.30
2187.00
1 Sqm
23
BMT-G.02
148.00
1 No.
23
BMT-G.03
198.00
1 No.
23
BMT-G.08
92.00
1 No.
23
BMT-G.11
159.00
1 No.
23
BMT-G.15
35.00
1 No.
23
BMT-G.16
50.00
1 No.
24
BMT-G.22
219.00
1 No.
24
BMT-G.26
132.00
1 No.
24
BMT-G.30
40.00
1 No.
24
BMT-G.33
101.00
1 No.
24
BMT-G.34
112.00
1 No.
24
BMT-G.35
31.00
1 No.
24
BMT-G.36
46.00
1 No.
24
BMT-G.37
891.00
1 No.
24
BMT-G.39
2442.00
1 No.
24
BMT-G.41
314.00
1 No.
24
BMT-G.42
341.00
1 No.
24
BMT-G.44
137.00
1 No.
24
BMT-G.45
164.00
1 No.
24
BMT-G.46
179.00
1 No.
24
BMT-G.53
46.00
1 No.
24
BMT-G.57
50.00
1 No.
24
BMT-G.58
303.00
1 No.
25
BMT-G.62
1482.00
1 No.
25
BMT-G.71
97.00
1 No.
25
BMT-G.77
3198.00
1 No.
26
BMT-H.01
24.00
0.50 Kg
26
BMT-H.91
15.00
1 Kg
33
BMT-I.02
521.00
1 sqm
33
BMT-I.06
1099.00
1 sqm
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
Sl.
No
58
59
60
61
62
63
64
65
66
67
68
69
Items
Page-6
Reference
S.No./ Item
to SoR
Code No.
page
Rate
Unit
34
BMT-I.12
1443.00
1 sqm
34
BMT-I.13
309.00
1 sqm
34
BMT-I.16
697.00
1 sqm
34
BMT-J.03
121.00
1 Ltr
34
BMT-J.04
175.00
1 Ltr
34
BMT-J.05
135.00
1 Ltr
34
BMT-J.07
135.00
1 Kg
Spirit
34
BMT-J.10
95.00
1 Ltr
Linseed Oil
34
BMT-J.11
54.00
1 Ltr
34
BMT-J.12
125.00
1 Ltr
French Polish
34
BMT-J.14
177.00
1 Ltr.
Melamine Polish
34
BMT-J.16
299.00
1 Ltr.
34
BMT-J.21
81.00
1 Kg
35
BMT-J.25
183.00
1 Ltr
35
BMT-J.26
1106.00
25 Kgs
35
BMT-J.27
515.00
25 Kgs
35
35
BMT-J.31
BMT-J-42
175.00
631.00
1 Ltr
25 Kgs
37
BMT-K.81
806.00
1 sqm
39
BMT-M.01
255.00
1 sqm
39
BMT-M.03
232.00
1 sqm
39
BMT-M.04
69.00
1 RM
39
BMT-M.05
79.00
1 RM
39
BMT-M.06
78.00
1 RM
39
BMT-M.07
69.00
1 RM
39
BMT-M.08
38.00
1 RM
39
BMT-M.10
50.00
1 RM
39
BMT-M..11
BMT-M.12 &
13
37.00
1 RM
44.50
1 RM
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
39
Sl.
No
Reference
S.No./ Item
to SoR
Code No.
page
Items
87
88
89
90
91
92
93
94
95
96
97
98
99
101
102
103
104
105
106
107
108
109
110
111
112
Rate
Unit
39
BMT-M.14
43.00
1 RM
39
BMT-M.15
24.00
1 RM
39
BMT-M.16
32.00
1 RM
Connecting Clips
39
BMT-M.17
2.00
1 No.
Rawl Plug
39
BMT-M.18
2.00
1 No.
39
BMT-M.19
3.00
1 No.
Soffit Cleats
40
BMT-M.20
2.00
1 No.
40
BMT-M.21
2.00
1 No.
Jointing Compound
40
BMT-M.22
27.00
1 Kg.
40
BMT-M.23
5.00
1 RM
40
BMT-M.24
133.00
40
BMT-M.25
3.00
1 No.
40
BMT-M.26
11.00
1 RM
40
40
40
BMT-M.27
BMT-M.29
BMT-M.31
9.00
479.00
317.00
1 RM
1 sqm
1 sqm
41
BMT-M.37
24.00
1 sqm
46
BMT-M.77
3207.00
1 sqm
100
Page-7
1 Ltr
40
BMT-M.82
344.00
1 sqm
48
BMT-M.86
444.00
1 sqm
56
BMT-N-16
771.00
1 sqm
56
BMT-N-17
844.00
1 sqm
59
BMT-N.32
3218.00
1 sqm
68
BMT-N.66
8889.00
1 sqm
68
BMT-N.67
9482.00
1 sqm
76
BMT - P.10
5775.00
1 sqm
77
BMT - P.14
5145.00
1 sqm
Top hung
77
BMT-P.17
5985.00
1 sqm
Fixed louvered
77
BMT-P.20
4095.00
1 sqm
113
114
Sl.
No
Items
i)
Reference
S.No./ Item
to SoR
Code No.
page
Rate
Unit
79
BMT - P.29
6930.00
1 sqm
79
BMT - P.31
6300.00
1 sqm
79
BMT - P.32
5513.00
1 sqm
88
BMT-P.82
5490.00
1 sqm
89
BMT-P.83
5800.00
1 sqm
94
BMT - Q.01
6300.00
1 sqm
95
BMT - Q.02
5093.00
1 sqm
95
BMT Q.03&04
5198.00
1 sqm
95
BMT Q.05&06
4410.00
1 sqm
97
BMT-S.01
306.00
1 cum
97
BMT-S.03
106.00
10 sqm
97
BMT-S.04
96.00
10 sqm
97
BMT-S.06
160.00
1 cum
97
BMT-S.07
33.00
10 sqm
97
BMT-S.08
37.00
10 sqm
97
BMT-S.11
53.00
10 sqm
97
BMT-S.14
34.00
10 sqm
97
BMT-S.15
36.00
10 sqm
98
BMT-U.05
376.00
1 sqm
99
BMM-V.09
80.00
1 RM
123
99
BMM-V.10
245.00
1 RM
124
99
BMM-V.11
317.00
1 RM
99
BMM-V.12
13.00
1 RM
115
116
Page-8
117
118
119
120
Dismantling
a)
b)
122
125
Sl.
No
Items
126
127
128
130
132
133
134
135
136
137
138
139
140
141
142
143
144
128
129
130
131
Unit
13.00
1 RM
99
BMM-V.14
20.00
1 Kg
99
BMM-V.15
4.00
1 Kg
99
BMM-V.18
101.00
1 Kg
99
BMM-V.20
737.00
1 sqm
99
BMM-V.23
295.00
1 sqm
99
BMM-V.24
221.00
1 sqm
100
BMS-W-01
300.00
1 Kg
Rubber beading
Chloropyriphos
Lindane
Emulsifiable
concentrate of 20%
Aluminium composite cladding 4mm thick
with skin material thickness of 0.25mm
Aluminium composite cladding 4mm thick
with skin material thickness of 0.50mm
100
BMS-W-06
2.00
100
BMS-W-09
213.00
100
BMS-W.13
2350.00
1 sqm
100
BMS-W.14
2636.00
1 sqm
101
BMS-W.17
375.00
1 Sqm
101
BMS-W.18
282.00
1 sqm
104
BMS-W.62
5.00
1 No.
104
BMS-W.64
9.00
1 No.
GI washers
104
BMS-W.65
1.00
1 No.
104
BMS-W.66
0.30
1 No.
Bitumen washers
104
BMS-W.67
0.25
1 No.
White cement
104
BMS-W.68
27.00
1 Kg
104
BMC-X.02
117.00
1 hour
104
BMC-X.03
108.00
1 hour
A)
Rate
BMM-V.13
131
Reference
S.No./ Item
to SoR
Code No.
page
99
129
Page-9
Reference
Material hire Labour
to SSR
charges
charges
page
1 RM
1 Ltr
Unit
1st floor
107
8.99
54.34
1 Sqm
2nd floor
8.99
77.01
1 Sqm
3rd floor
8.99
99.69
1 Sqm
4th floor
8.99
122.36
1 Sqm
Sl.
No
Items
B)
Page-10
Reference
S.No./ Item
to SoR
Code No.
page
Rate
Unit
Plastering to walls
a)
b)
c)
d)
1st floor
108
0.90
5.43
1 Sqm
2nd floor
0.90
7.70
1 Sqm
3rd floor
0.90
9.97
1 Sqm
4th floor
0.90
12.24
1 Sqm
Sl.
No
Items
132
Page-11
Reference
S.No./ Item
to SoR
Code No.
page
Rate
Unit
133
1st floor
108
2.11
11.08
1 Sqm
2nd floor
2.11
15.57
1 Sqm
3rd floor
2.11
20.05
1 Sqm
4th floor
2.11
24.54
1 Sqm
HIRE CHARGES FOR CENTERING&SCAFFOLDING-centering using Steel scaffolding pipes , jack props
wallers , Foot plates , brackets , steel centering plates etc.,
Reference Material hire
to SSR
charges
Labour
charges
1st Floor
a)
b)
c)
134
106
137.00
415.00
Pedestals
109.00
660.00
Plinth beams
1158.00
1000.00
2nd
3rd Floor
Floor
456.50
498.00
HIRE CHARGES FOR CENTERING & SCAFFOLDING -Unsupported height of 3.66M - Casurina Ballies
Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc.,
Reference Material hire
to SSR
charges
Labour
charges
680.00
2nd
3rd Floor
Floor
834.00 917.00 1001.00
134.00
128.00 141.00
1st Floor
a)
b)
c)
d)
e)
f)
g)
135
Lintels
111
154.00
205.00
1201.00
136.00
111.00 122.00
133.00
140.00
114.00 125.00
137.00
348.00
426.00 469.00
511.00
138
BMW-G.106
18.00
1 Each
Bar bender
303
I-1
370.00
1 Each
Blacksmith
303
I-2
350.00
1 Each
Blaster
303
I-3
400.00
1 Each
Carpenter
303
I-4
350.00
1 Each
303
I -10
335.00
1 Each
LABOUR CHARGES
SKILLED
136
137
138
139
140
Sl.
No
141
142
143
144
145
Page-12
Reference
S.No./ Item
to SoR
Code No.
page
Items
Mason / Brick layer
Rate
Unit
303
I -11
350.00
1 Each
303
I -16
350.00
1 Each
303
I - 23
350.00
1 Each
Painter
304
I - 35
400.00
1 Each
304
I - 36
400.00
1 Each
Sprayer(semi skilled)
304
II - 1
320.00
1 Each
Carpenter
304
II - 4
320.00
1 Each
305
II - 35
320.00
1 Each
Painter
305
II - 37
320.00
1 Each
304
II - 9
320.00
1 Each
305 / 306
III - 3, 4
280.00
1 Each
Binding wire
308
70.00
1 Kg
Detonator electric
309
21
13.00
1 No.
309
27(a)
385.00
1 Cum
309
27(b)
285.00
1 Cum
309
28
505.00
1 Cum
322
M - 008
120.00
1 Cum
324
M - 050
700.00
1 Cum
324
M - 051
890.00
1 Cum
324
M - 052
1045.00
1 Cum
324
M - 053
1300.00
1 Cum
325
M - 054
805.00
1 Cum
Gelatin 80%
327
M - 104
73.00
1 Kg
Water
331
M - 189
100.00
1 KL
59
PH ITEMS
Table18
139.00
1 RM
Pneumatic
SEMI SKILLED
145
146
147
148
149
150
UN SKILLED
Man Mazdoor / Woman Mazdoor
Cost of Materials :
151
152
153
154
155
156
157
158
159
160
161
162
163
164
Sl.
No
Items
Page-13
Reference
S.No./ Item
to SoR
Code No.
page
165
b)
ii)
ii)
iv)
v)
vi)
vii)
168
169
354
916.00
1 hour
354
234.40
1 hour
354
16
128.90
1 hour
355
40
20.50
1 hour
355
41
26.80
1 hour
355
52
1474.40
1 hour
356
67
318.90
1 hour
Seigniorage charges
i)
167
Unit
Hire &
Fuel
charges
Machinery Charges
a)
Rate
358
50.00
1 cum
Earth , Gravel
359
22.00
1 cum
359
40.00
1 cum
Bricks
359
38.50
1000 Nos.
359
7.00
1 sqm
359
4.00
1 sqm
Granite
359
32.73
1 sqm
160.00
1 cum
12
245.00
1 cum
142
140.00
1 RM
Chemical admixture
50.00
1 cum
5.00
1 sqm
75.00
1 No.
25.00
1 No.
10.00
1 No.
20.00
1 RM
250.00
1 No.
18.00
1 No.
Rubber bush
20.00
1 No.
150.00
1 sqm
50.00
1 sqm
(Part II)
Roads &
Bridges
Sl.
No
12
13
14
15
Items
Reference
S.No./ Item
to SoR
Code No.
page
Page-14
Rate
Unit
100.00
1 No.
15.00
1 No.
400.00
1 RM
50.00
1 No.
Page-15
Page-16
Page-17
Page-18
Page-19
Page-20
Page-21
1 Cum
1 Cum
1 Cum
1 Cum
166.00
1 Sqm
1522.00
1 Cum
1227.00
1 Cum
144.00
1 Sqm
148.00
1 Sqm
554.00
1 Sqm
Page-22
Page-23
Crew
charges
167.20
269.50
174.20
261.30
125.40
187.20
209.00
Page-24
Page-25
Page-26
SSR
Page No.
Item code
113
BMW-A.01
390.00
1 RM
113
BMW-A.02
262.00
1 RM
113
BMW-A.03
526.00
1 RM
113
BMW-A.04
407.00
1 RM
113
BMW-A.05
113.00
1 RM
113
BMW-A.06
154.00
1 RM
114
BMW-A.17
453.00
1 RM
114
BMW-A.18
829.00
1 RM
114
BMW-A.19
1195.00
1 RM
116
BMW-A.72
530.00
1 Each
118
BMW-B.03
4999.00
1 Each
118
BMW-B.04
7662.00
1 Each
118
BMW-B.06
3104.00
1 Each
121
BMW-C.41,42
307.00
50.00
1 Each
Orissa
pan
580mmx440mm
Hindware/Parry/Neycer - ISI mark
122
BMW-D.04,06
1157.00
320.00
1 Each
122
BMW-D.09
278.00
1 Each
123
BMW-D.10
83.00
1 Each
123
BMW-D.14,15
1582.00
224.00
1 Each
123
BMW-D.16,17
430.00
65.00
1 Each
1455.00
320.00
1 Each
759.00
128.00
1 Each
2530.00
128.00
1 Each
ITEM
b)
Labour
Unit
Rate
5
6
7
8
9
10
11
x
to
12
13
14
15
16
17
18
19
20
Flat back
Wash hand basin
(HSW/Parryware/Neyser) 1st quality
550mmx400mm-single CP Pillar cock
124&125 BMW-D.24,28
S&F flat back bowl urinal 440 x 265 x
315
125&126 BMW-D.33,36
S&F flat back bowl urinal 590 x 375 x
390
126
BMW-D.35,36
Sl.
No.
SSR
Page No.
Item code
126
BMW-D.37,39
4048.00
320.00
1 Each
126
BMW-D.38,39
4554.00
320.00
1 Each
126
BMW-D.40,41
646.00
205.00
1 Each
126
BMW-E.07,08
380.00
26.00
1 Each
126
BMW-E.09,10
241.00
26.00
1 Each
126
BMW-E.11,12
64.00
13.00
1 Each
127
BMW-E.29
253.00
15mm NB
128
BMW-F.21,22
350.00
40.00
1 Each
20mm NB
128
BMW-F.19,20
474.00
40.00
1 Each
25mm NB
128
BMW-F.17,18
698.00
40.00
1 Each
32mm NB
128
BMW-F.23,24
1044.00
40.00
1 Each
40mm NB
128
BMW-F.25,26
1423.00
61.00
1 Each
50mm NB
128
BMW-F.27,28
2055.00
82.00
1 Each
65mm NB
128
BMW-F.29,30
3920.00
102.00
1 Each
80mm NB
128
BMW-F.31,32
5548.00
121.00
1 Each
130
BMW-F.79,80
173.00
37.00
1 RM
130
BMW-F.81,82
192.00
37.00
1 RM
131
BMW-F.83,84
252.00
37.00
1 RM
131
BMW-F.85,86
354.00
37.00
1 RM
131
BMW-F.87,88
396.00
40.00
1 RM
131
BMW-F.89,90
427.00
61.00
1 RM
131
757.00
131
BMW-F.91
BMWF.100,101
132
ITEM
21
22
23
24
25
26
27
Page-27
Rate
Labour
Unit
duty
1 Each
GM peet valves
28
a)
b)
c)
d)
e)
f)
g)
h)
29
30
31
32
174.00
18.00
BMW-G.01,02
6.00
1.00
132
BMW-G.05
26.00
1 Each
132
BMW-G.08
1455.00
1 Each
133
BMW-G.10
823.00
1 Each
33
34
1 RM
1 Each
1 Lt
Sl.
No.
b)
c)
36
b)
c)
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
75mm dia.
133
BMW-G.11
255.00
3 RM
90mm dia.
133
BMW-G.12
405.00
3 RM
110mm dia.
133
BMW-G.13
484.00
3 RM
75mm dia.
138
BMW-G.104
15.00
1 Each
90mm dia.
138
BMW-G.105
17.00
1 Each
110mm dia.
138
BMW-G.106
18.00
1 Each
139
BMW-G.118
102.00
1 Each
139
BMW-G.119
144.00
1 Each
140
BMW-G.152
65.00
1 Each
145
BMW-I.07
145
BMW-I.18
39.00
7.00
1 Each
145
BMW-I.20,21
153.00
40.00
1 Each
145
BMW-I.28,29
227.00
11.00
1 Each
146
BMW-I.42,43
24.00
8.00
1 Each
146
BMW-I.46
40.00
1 RM
146
BMW- I.47
61.00
1 No.
146
BMW-I.48,49
95.00
18.00
1 Each
146
BMW-I.63
68.00
20.00
1 Each
146
BMW-I.65
111.00
32.00
1 Each
148
BMW-I.105,106
479.00
106.00
1 Each
148
BMW-I.119,120
6409.00
461.00
1 Each
148
BMW-I.123,124
4579.00
409.00
1 Each
148
BMW-I.125
462.00
1 Each
149
BMW-I.141
4071.00
1 Each
158
BMW-I.220
132.00
Rate
Labour
Unit
Pipe clip
a)
38
Item code
37
SSR
Page No.
ITEM
35
Page-28
26.00
1 RM
1 RM
Sl.
No.
ITEM
22.20mm OD pipe - SDR 13.5
28.60mm OD pipe - SDR 13.5
34.90mm OD pipe - SDR 13.5
41.30mm OD pipe - SDR 13.5
54.00mm OD pipe - SDR 13.5
15.90mm OD pipe - SDR 11
22.20mm OD pipe - SDR 11
28.60mm OD pipe - SDR 11
34.90mm OD pipe - SDR 11
41.30mm OD pipe - SDR 11
54.00mm OD pipe - SDR 11
55
56
a)
b)
c)
d)
e)
f)
SSR
Page No.
Item code
Rate
Labour
Unit
149.00
198.00
270.00
336.00
490.00
146.00
176.00
212.00
289.00
358.00
523.00
1 RM
1 RM
1 RM
1 RM
1 RM
1 RM
1 RM
1 RM
1 RM
1 RM
1 RM
935.97
1 sqm
80mm dia.
780.00
1 RM
100mm dia.
950.00
1 RM
125mm dia.
1198.00
1 RM
150mm dia.
1452.00
1 RM
200mm dia.
2120.00
1 RM
250mm dia.
2856.00
1 RM
158
159
BMW-I.221
BMW-I.222
BMW-I.223
BMW-I.224
BMW-I.225
BMW-I.226
BMW-I.227
BMW-I.228
BMW-I.229
BMW-I.230
BMW-I.231
Page-29
100.00
1 Each
NAME OF THE WORK : CONSTRUCTION OF OFFICE CUM LABORATORY BUILDING AT CRS, TIRUPATI, CHITTOR DISTRICT
LEAD CHART (COMMON SoR 2013-2014) (Cement & Steel - AUGUST , 2014 rates)
Sl.
No.
Description
(1)
(2)
Ordinary Portland Cement 43 / 53 grade
1
(including loading charges)
Reference
S.No./
to SSR
Source of Materials
Item Code
page
No.
number
(3)
(4)
(5)
Unit
(6)
Initial
Cost
Lead in
excluding
KM
seigniorage
charges
(7)
(8)
ConveyLoading
ance
charges
Charges
(9)
(10)
Unloading
charges
(11)
1 MT
6000.00
43.95
1 MT
48500.00
52.63
1 MT
48000.00
52.63
1 MT
51000.00
52.63
5 Structural steel
1 MT
51000.00
52.63
6 MS flats
1 MT
50000.00
52.63
Swarnamuki 0/7 KM
309
Swarnamuki 0/7 KM
309
Swarnamuki 0/7 KM
309
Cherlopalli
13
27(a)
1 Cum
7.00
385.00
64.92
7.00
505.00
64.92
7.00
285.00
64.92
3.00
3707.00
36.58
36.58
36.58
28
27(b)
1 Cum
11
Local
13
3.00
19000.00
188.68
188.68
188.68
12
Local
14
3.00
10000.00
83.86
83.86
83.86
Kodandaramapuram
325
20.00
805.00
202.72
M - 054
1 Cum
Sl.
No.
Description
(1)
(2)
(3)
(4)
(5)
Kodandaramapuram
324
Reference
S.No./
to SSR
Source of Materials
Item Code
page
No.
number
Unit
Initial
Cost
Lead in
excluding
KM
seigniorage
charges
ConveyLoading
ance
charges
Charges
(6)
(7)
(8)
(9)
M - 053
1 Cum
20.00
1300.00
202.72
324
M - 052
1 Cum
20.00
1045.00
202.72
Kodandaramapuram
324
M - 051
1 Cum
20.00
890.00
202.72
Kodandaramapuram
324
M - 050
1 Cum
20.00
700.00
202.72
Perur
(Part II)
Roads &
Bridges
1 Cum
4.00
160.00
34.30
Perur
(Part II)
Roads &
Bridges
12
1 Cum
4.00
245.00
34.30
Ithepalli
322
M - 008
1 Cum
13.00
120.00
128.08
(10)
Unloading
charges
(11)
21
Kadapa
14
BMT-B-05
10 Sqm
10.00
1544.00
23.64
4.39
2.19
22
Kadapa
15
BMT-B-06
10 Sqm
10.00
1287.00
21.49
3.99
1.99
15
BMT-B-10
Sqm
2392.00
15
BMT-B-11
Sqm
2033.00
24
1) Certified that the leads mentioned in the lead statement are shortest and correct.
2) Certified that metal are to be obtained by blasting.
3) Certified that sufficient quantities & quanlity material are available in the quarries.
Sl.
No.
Description
(1)
(2)
Reference
S.No./
to SSR
Source of Materials
Item Code
page
No.
number
(3)
(4)
(5)
4) Certified that for non SSR items lowest market rates are adopted
5) Certified that 20% extra on labour towards Municipal area allowance is allowed .
Unit
(6)
Initial
Cost
Lead in
excluding
KM
seigniorage
charges
(7)
(8)
ConveyLoading
ance
charges
Charges
(9)
(10)
Unloading
charges
(11)
Total
25%
(12)
(13)
10.99
6054.94
13.16
48565.79
13.16
48065.79
13.16
51065.79
13.16
51065.79
13.16
50065.79
449.92
569.92
349.92
9.14
3825.88
47.17
19613.21
20.96
10272.54
1007.72
MA
Total
25%
(12)
(13)
1502.72
1247.72
1092.72
902.72
194.30
279.30
248.08
0.55
1574.77
0.50
1314.97
2392.00
2033.00
MA
Total
25%
(12)
(13)
D A T A ( SoR 2012-13)
NAME OF THE WORK : CONSTRUCTION OF OFFICE CUM LABORATORY BUILDING AT CRS, TIRUPATI, CHITTOR
DISTRICT
CM (1:2)
CM (1:3)
CM (1:4)
CM (1:5) CM (1:6)
(
598.42
598.42
598.42
598.42
598.42
4359.56
2906.37
2179.78
1743.82
1453.19
56.00
56.00
56.00
56.00
56.00
14.00
14.00
14.00
14.00
14.00
5027.98
3574.79
2848.20
2412.24
2121.61
0.60
1502.72
901.63
0.15
1247.72
187.16
0.15
1092.72
163.91
0.10
902.72
90.27
Cost of cement
1342.97
0.60
1247.72
748.63
0.20
1092.72
218.54
0.20
902.72
180.54
1147.72
DATA
Sl.
No.
1
Description
Quantity
Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceab
materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements befor
dismantling including all labour charges , overheads & contractor profit etc., complete
a) Brick masonry
(BLD-CSTN-14-9/299)
Mazdoor(unskilled)
Add for MA @ 25%
Rate per 1 cum
Overheads&Contractors Profit @0%
0.409 Nos.
0.25
0.00
280.00
114.52
1 Each
143.15
say
280.00
683.20
1 Each
854.00
say
280.00
1366.40
1 Each
1708.00
say
4.32 Nos.
0.25
280.00
1209.60
1 Each
0.50 Nos.
0.50 Nos.
0.25
320.00
280.00
300.00
1 Each
1 Each
0.00
1887.00
say
53.00
53.00
10 sqm
6.63
say
Sl.
No.
Description
f) Stone masonry in cement mortar
Rate as per SSR
Add for MA @ 25%
Rate per 1 cum
Overheads&Contractors Profit @0%
Quantity
1.00 cum
0.25
306.00
306.00
0.00
382.50
1 cum
say
g) Pan tiled or Mangalore tiled roof with out roof timbers :
Rate as per SSR
10.00 sqm
Add for MA @ 25%
0.25
Rate per 10 sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
0.00
96.00
96.00
10 sqm
12.00
say
106.00
106.00
10 sqm
13.25
say
160.00
160.00
1 cum
200.00
say
10.00 sqm
0.25
0.00
33.00
33.00
10 sqm
4.13
say
10.00 sqm
0.25
0.00
37.00
37.00
10 sqm
4.63
say
l) Clean removal of lime plaster from walls and raking out joints 20mm deep
or from terraced roof and raking out joints 100 mm deep
Sl.
No.
Description
Rate as per SSR S.No.834(BMT-S.14)
Add for MA @ 25%
Rate per 10 sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
Quantity
10.00 sqm
0.25
0.00
10 sqm
4.25
say
m) Clean removal of cement plaster from walls and raking out joint 200 mm deep
Rate as per SSR S.No.835(BMT-S.15)
10.00 sqm
36.00
Add for MA @ 25%
0.25
36.00
Rate per 10 sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
0.00
4.50
10 sqm
say
Sl.
No.
Description
Quantity
n) Dismantling doors , windows and clear storey windows, Ventilators etc., ( wood or steel ) shutters includin
Chowkhats , architraves,hold fasts and other attachments etc., and stacking them within 100m lead includin
labour charge etc., and overheads & contractors profit complete for finished item of work
(BLD-CSTN-14-11)
a) Not exceeding 3 sqm in area :
Details of cost per each :
2nd class mason
Mazdoor(Male)
2nd class Blacksmith
Add for MA @ 25%
Overheads&Contractors Profit @0%
Cost per each
0.10 Nos.
0.20 Nos.
0.05 Nos.
0.25
320.00
280.00
320.00
104.00
0.00
130.00
1 No.
1 No.
1 No.
Say
b) Exceeding 3 sqm in area :
Details of cost per each :
2nd class mason
Mazdoor(Male)
2nd class Blacksmith
Add for MA @ 25%
Overheads&Contractors Profit @0%
Cost per each
0.13 Nos.
0.27 Nos.
0.07 Nos.
0.25
320.00
280.00
320.00
139.60
0.00
174.50
1 No.
1 No.
1 No.
Say
1
Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotto
soils and ordinary soils with Augoring and boring equipment in site as per IS 2911 - 1980 as per approve
designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and she
equipment, etc, complete for all depths and for finished item of work for piles of 300mm dia.
(BLD-CSTN-2-1)
up to 300 mm dia - DOUBLE UNDER REAMING
Total cost for 1 Bulb Each
a) Labour
Mazdoor ( Unskilled)
0.56 Nos.
Add for MA @ 25%
0.25
b&c)
Overheads&Contractors Profit @0%
Cost for 10 cum ( a+b+c)
Rate per cum (a+b+c) / 10
Seigniorage charges
Rate per 1cum
0.00
1.00 cum
280.00
156.80
1 No.
196.00
22.00
1.00 cum
Say
Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wa
in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including a
operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads
contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., a
per SS 20 B(APSS 308)
(BLD-CSTN-2-1)
Ordinary Soil - Manual Means up to 3m depth
Sl.
No.
Description
Unit : 1 cum
Taking output : 10 cum
a) Labour
Mazdoor ( Unskilled)
Add for MA @ 25%
b&c)
Overheads&Contractors Profit @0%
Cost for 10 cum ( a+b+c)
Rate per cum (a+b+c) / 10
Seigniorage charges
Quantity
3.64 Nos.
0.25
280.00
1019.20
0.00
1274.00
1.00 cum
22.00
1 No.
1.00 cum
Say
Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wa
in ordinary soils and depositing on bank with an initial lead of 10m and 1m additional lift charges over th
initial depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, plankin
strutting etc., and overheads & contractors profit complete for finished item of work including seigniorag
excluding dewatering charges etc., as per SS 20 B(APSS 308)
(BLD-CSTN-2-1& COM-LDLFT-6-66)
Rate with initial lead & lift
Mazdoor for extra lift ( 1 No. for 60m)
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Rate per 1cum
1.00 cum
0.02 Nos.
0.25
0.00
1.00 cum
127.40
280.00
5.60
7.00
22.00
1 cum
1 Each
1.00 cum
Say
Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositin
on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidenta
labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit comple
for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
(BLKD-CSTN-2-2)
Ordinary Soil - Mechanical Means up to 3m depth
Unit : 1 cum
Taking output : 240 cum
a) Labour
Mazdoor ( Unskilled)
8.32 Nos.
Add for MA @ 25%
0.25
b) Machinery
6.00 hours
Shovel 0.50cum 75hp
6.00 hours
Crew charges
Add MA on crew charges
0.25
Add 75% for foundations
c&d)
Overheads&Contractors Profit @0%
Cost for 240 cum ( a+b+c+d)
Rate per cum (a+b+c+d) / 240
Seigniorage charges
Rate per 1cum
280.00
2329.60
1 No.
1474.40
187.20
1123.20
1 Hour
1 Hour
0.75
13162.40
0.00
13162.40
1.00 cum
22.00
1.00 cum
Say
Sl.
No.
5
Description
Quantity
Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositin
on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidenta
labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit comple
for finished item of work including seigniorage including dewatering charges etc., as per SS 20 B(APSS 308)
(BLKD-CSTN-2-2)
Ordinary Soil - Mechanical Means up to 3m depth
Unit : 1 cum
Taking output : 240 cum
a) Labour
Mazdoor ( Unskilled)
8.32 Nos.
Add for MA @ 25%
0.25
b) Machinery
6.00 hours
Shovel 0.50cum 75hp
6.00 hours
Crew charges
Add MA on crew charges
0.25
Add 3% for dewatering
c&d)
Overheads&Contractors Profit @0%
Cost for 240 cum ( a+b+c+d)
Rate per cum (a+b+c+d) / 240
Seigniorage charges
Rate per 1cum
280.00
2329.60
1 No.
1474.40
187.20
1123.20
1 Hour
1 Hour
0.03
13162.40
0.00
13557.27
1.00 cum
22.00
1.00 cum
Say
Sl.
No.
6
Description
Quantity
Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositin
on bank for all lifts and with an initial lead of 10m and 3m to 6m depth including all operational,incidenta
labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit comple
for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
(BLKD-CSTN-2-3)
Ordinary Soil - Mechanical Means up to 3m to 6m depth
Unit : 1 cum
Taking output : 210 cum
a) Labour
Mazdoor ( Unskilled)
8.32 Nos.
Add for MA @ 25%
0.25
b) Machinery
6.00 hours
Shovel 0.50cum 75hp
6.00 hours
Crew charges
Add MA on crew charges
0.25
c&d)
Overheads&Contractors Profit @0%
Cost for 210 cum ( a+b+c+d)
Rate per cum (a+b+c+d) / 210
Seigniorage charges
0.00
1.00 cum
280.00
2329.60
1 No.
1474.40
187.20
1123.20
1 Hour
1 Hour
13162.40
22.00
1.00 cum
Say
Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositin
on bank for all lifts and with an initial lead of 10m and 3m to 6m depth including all operational,incidenta
labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit comple
for finished item of work including seigniorage including dewatering charges etc., as per SS 20 B(APSS 308)
(BLKD-CSTN-2-3)
Ordinary Soil - Mechanical Means up to 3m to 6m depth
Unit : 1 cum
Taking output : 210 cum
a) Labour
Mazdoor ( Unskilled)
8.32 Nos.
Add for MA @ 25%
0.25
b) Machinery
6.00 hours
Shovel 0.50cum 75hp
6.00 hours
Crew charges
Add MA on crew charges
0.25
Add 3% for dewatering
c&d)
Overheads&Contractors Profit @0%
Cost for 210 cum ( a+b+c+d)
Rate per cum (a+b+c+d) / 210
Seigniorage charges
Rate per 1 cum
280.00
2329.60
1 No.
1474.40
187.20
1123.20
1 Hour
1 Hour
0.03
13162.40
0.00
13557.27
1.00 cum
22.00
1.00 cum
Say
Sl.
No.
8
Description
Quantity
Earth work excavation for foundations (Manual Means) of buildings in ordinary rock ( not requirin
blasting ) and depositing on bank with an initial lead of 10m and depth up to 3m including a
operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads
contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., a
per SS 20 B(APSS 308)
(BLD-CSTN-2-4)
Ordinary rock(not requiring blasting) - Manual Means up to 3m depth
Unit : 1 cum
Taking output : 10 cum
a) Labour
Mazdoor ( Unskilled)
5.20 Nos.
280.00
Add for MA @ 25%
0.25
1456.00
b&c)
Overheads&Contractors Profit @0%
Cost for 10 cum ( a+b+c)
Rate per cum (a+b+c) / 10
Seigniorage charges
0.00
1.00 cum
1820.00
50.00
1 No.
1.00 cum
Say
Earth work excavation for foundations (Mechanical Means) for buildings in ordinary rock (not requirin
blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including a
operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads
contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., a
per SS 20 B(APSS 308)
(BLKD-CSTN-2-5)
Ordinary rock(not requiring blasting)- Mechanical Means up to 3m depth
Unit : 1 cum
Taking output : 180 cum
a) Labour
Mazdoor ( Unskilled)
6.24 Nos.
280.00
Add for MA @ 25%
0.25
1747.20
b) Machinery
6.00 hours
1474.40
Shovel 0.50cum 75hp
6.00 hours
187.20
Crew charges
Add MA on crew charges
0.25
1123.20
c&d)
Overheads&Contractors Profit @0%
Cost for 180 cum ( a+b+c+d)
Rate per cum (a+b+c+d) / 180
Seigniorage charges
Rate per 1cum
0.00
1.00 cum
1 No.
1 Hour
1 Hour
12434.40
50.00
1.00 cum
Say
Sl.
No.
10
Description
Quantity
Earth work excavation for foundations for buildings in hard rock (requiring blasting) and depositing o
bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labo
charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete fo
finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
(BLKD-CSTN-2-6)
Hard rock (requiring blasting)- up to 3m depth
Unit : 1 cum
Taking output : 10 cum
a) Labour
Driller
0.50 Nos.
Blaster
0.25 Nos.
Mazdoor ( Unskilled)
8.35 Nos.
Add for MA @ 25%
0.25
b) Machinery
1.00 hour
Air compressor 7cmm (diesel)
2.00 hours
Jack hammer/Pneumatic braker
Crew charges
1.00 Hours
Air compressor
2.00 Hours
Jack hammer/Pneumatic braker
Add MA on crew charges
0.25
c)Material
3.50 Kgs
Gelatin 80%
Detonator electric
14 Nos.
c&d)
Overheads&Contractors Profit @0%
Cost for 10 cum ( a+b+c+d)
Rate per cum (a+b+c+d) / 10
Seigniorage charges
0.00
1.00 cum
350.00
400.00
280.00
2613.00
916.00
20.50
1 Hour
1 Hour
167.20
261.30
689.80
1 Hour
1 Hour
73.00
13.00
1 Kg
1 No.
5523.00
50.00
1 No.
1 No.
1 No.
1.00 cum
Say
Earth work excavation for foundations for buildings in hard rock (blasting prohibited) and depositing o
bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labo
charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete fo
finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
(BLKD-CSTN-2-7)
Hard rock (blasting prohibited)- up to 3m depth
Unit : 1 cum
Taking output : 10 cum
a) Labour
Mazdoor ( Unskilled)
5.20 Nos.
Add for MA @ 25%
0.25
b) Machinery
6.00 Hours
Air compressor
12.00
Hours
Jack hammer/Pneumatic braker
Crew charges
6.00 Hours
Air compressor
12.00 Hours
Jack hammer/Pneumatic braker
Add MA on crew charges
0.25
c&d)
280.00
1456.00
1 No.
916.00
20.50
1 Hour
1 Hour
167.20
261.30
4138.80
1 Hour
1 Hour
Sl.
No.
Description
Quantity
0.00
1.00 cum
50.00
Say
Conveyance of un-useful excavated earth to a distance of 5 KM for disposal including hire charges of T
P, labour charges etc., and overheads & contractors profit complete for finished item of work.
Rate as per SoR
Overheads&Contractors Profit @0%
1 cum
0.00
70.18
70.18
1 cum
Say
Providing anti termite treatment as per IS 6315 (Part-2) 2001 (pre-constructional chemical treatmen
measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surfac
of the basement filling below flooring bed as per the specified procedure confirming to IS 6315 (Part-2) 2001 an
other relevent approved specification duly using Chlorpyriphos / Lindane emulsifiable concentrate 20% with 1%
concentration @ 7.5 Liters/sqm of the vertical surface & 5.0 Liters/sqm of the horizontal surface of th
substructure to a depth of 500mm around columns & 300mm deep around plinth beams, basements & floo
filling area including excavation channel along the wall & rodding etc & cost & conveyane of all materials to th
site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of th
Engineer-in-Charge. ( The rate includes overheads & contractors profit )
(BLD-CSTN-16-1)
Unit : 10sqm
A)Materials
Chloropyriphos Lindane
concentrate of 20%
B)Water charges 1%
C)Labour charges
Man Mazdoor
Sprayer
Add for MA @ 25%
Emulsifiable
D)Hire charges
Sprayer , drilling machine etc., 10%
Sundries and contingencies 3%
Water charges&Electricity 1.50%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
14
1.00 cum
4.51 Ltrs
0.01
213.00
960.63
1 Ltr
3.00 Nos.
0.22 Nos.
0.25
280.00
320.00
910.40
1 No.
1 No.
0.10
0.03
0.015
2108.24
2108.24
2108.24
0.00
2413.93
Filling with carted coarse sand in trenches,sides of foundations and basement with initial lead in layers n
exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and a
peraitonal,incidental ,labour charges,hire charges of T&P etc., and overheads & contractors profit complete fo
fnished item of work(APSS NO.309&310)
(BLD-CSTN-2-8)
Unit : 1 cum
Taking output = 6 cum
a) Labour
Mazdoor ( Unskilled )
Add for MA @ 25%
0.31 Nos.
0.25
280.00
86.80
1 No.
Sl.
No.
Description
b)Material :
Coarse sand for filling
c&d)
Overheads&Contractors Profit @0%
Rate per 6 cum (a+b+c+d)
Rate per 1cum
Seigniorage charges
Sand
Quantity
6.00 cum
0.00
1.00 cum
1 cum
2208.02
40.00
1 cum
Say
15
Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers n
exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and a
peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete fo
fnished item of work(APSS NO.309&310)
(BLD-CSTN-2-8)
Unit : 1 cum
Taking output = 6 cum
a) Labour
Mazdoor ( Unskilled )
Add for MA @ 25%
b)Material :
Gravel
c&d)
Overheads&Contractors Profit @0%
Rate per 6 cum (a+b+c+d)
Rate per 1cum
Seigniorage charges
Gravel
0.31 Nos.
0.25
280.00
86.80
1 No.
6.00 cum
248.08
1 cum
0.00
1.00 cum
1596.98
22.00
1 cum
Say
16
Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides
foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming includin
cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&
etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)
(BLD-CSTN-2-9)
Unit : 1 cum
Taking output = 6 cum
a) Labour
Mazdoor ( Unskilled )
Add for MA @ 25%
b&c)
Overheads&Contractors Profit @0%
Rate per 6 cum (a+b+c)
Rate per 1 cum (a+b+c) / 6
Rate per 1cum
0.31 Nos.
0.25
280.00
86.80
0.00
108.50
1 No.
Say
Sl.
No.
1
Description
Quantity
Filling with Carted earth (excluding rock) including excavation and carting with a lead of 1.0 Km in trenche
sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and rammin
including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charge
of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)
(BLD-CSTN-2-9)
Unit : 1 cum
Taking output = 6 cum
a) Labour
Excavation by mechanical means
Lead charges
Mazdoor ( Unskilled )
Add for MA @ 25%
b&c)
Overheads&Contractors Profit @0%
Rate per 6 cum (a+b+c)
Rate per 1 cum (a+b+c) / 6
Rate per 1cum
6.00 Cum
1.00 Kms
0.31 Nos.
0.25
85.00
26.32
280.00
86.80
0.00
644.82
1 Cum.
1 Cum.
1 No.
Say
Sl.
No.
17
Description
Quantity
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and unde
flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quar
including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, includin
seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, layin
concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the require
level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)
(BLD-CSTN-3-5)
Unit : 1 cum
A.MATERIALS :
Cement
Coarse aggregate 40mm
Fine aggregate ( Sand )
Water (including curing)
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity
Crew charges
Add MA on crew charges
C.LABOUR :
1st class mason
Mazdoor (unskilled)
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 1 cum
Seigniorage charges
Coarse aggregate
Fine aggregate
162.00 Kgs
0.90 Cum
0.45 Cum
1.20 kl
6054.94
1007.72
449.92
100.00
1000 Kgs
1 Cum
1 Cum
1 kl
1.00 hour
1.00 hour
0.25
128.90
174.20
174.20
1 hour
1 hour
0.10 Nos.
1.39 Nos.
0.25
350.00
280.00
424.20
1 Each
1 Each
0.00
0.90 Cum
0.45 Cum
3087.21
50.00
40.00
1 Cum
1 Cum
Say
18
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and unde
flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quar
including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, includin
seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, layin
concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the require
level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)
(BLD-CSTN-3-7)
Unit : 1 cum
A.MATERIALS :
Cement
Coarse aggregate 40mm
Fine aggregate ( Sand )
Water (including curing)
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity
Crew charges
Add MA on crew charges
C.LABOUR :
1st class mason
Mazdoor (unskilled)
Add for MA @ 25%
129.60 Kgs
0.90 Cum
0.45 Cum
1.20 kl
6054.94
1007.72
449.92
100.00
1000 Kgs
1 Cum
1 Cum
1 kl
1.00 hour
1.00 hour
0.25
128.90
174.20
174.20
1 hour
1 hour
0.10 Nos.
1.39 Nos.
0.25
350.00
280.00
424.20
1 Each
1 Each
Sl.
No.
Description
Overheads&Contractors Profit @0%
Rate per 1 cum
Seigniorage charges
Coarse aggregate
Fine aggregate
Quantity
0.00
0.90 Cum
0.45 Cum
50.00
40.00
1 Cum
1 Cum
Say
19
Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard other than granit
stones carted from approved quarry including cost and conveyance of all materials like cement, screened san
water, stones etc., from approved quarry, to site and including seigniorage charges, sales & other taxes on a
materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, constructio
curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basemen
(APSS No. 601 & 615)
( BLD-CSTN-6-13 )
Unit = 1 cum
A.MATERIALS
Cement
Rough stone (OTG)
Fine aggregate(sand)
B) LABOUR
1st class mason
Mazdoor (unskilled)
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 1cum
Seigniorage charges
Rough stones
Fine aggregate
59.40 Kgs
1.10 Cum
0.33 Cum
6054.94
194.30
569.92
1000 Kgs
1 Cum
1 Cum
1.20 Nos.
2.00 Nos.
0.25
350.00
280.00
980.00
1 Each
1 Each
0.00
1.10 Cum
0.33 Cum
1986.47
50.00
40.00
1 Cum
1 Cum
Say
20
Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones
carted from approved quarry including cost and conveyance of all materials like cement, screened sand, wate
stones etc., from approved quarry, to site and including seigniorage charges, sales & other taxes on all materia
including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curin
etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APS
No. 601 & 615)
( BLD-CSTN-6-13 )
Unit = 1 cum
A.MATERIALS
Cement
Rough stone (HBG)
Fine aggregate(sand)
B) LABOUR
1st class mason
Mazdoor (unskilled)
Add for MA @ 25%
59.40 Kgs
1.10 Cum
0.33 Cum
6054.94
279.30
569.92
1000 Kgs
1 Cum
1 Cum
1.20 Nos.
2.00 Nos.
0.25
350.00
280.00
980.00
1 Each
1 Each
Sl.
No.
Description
Overheads&Contractors Profit @0%
Rate per 1cum
Seigniorage charges
Rough stones
Fine aggregate
Quantity
0.00
1.10 Cum
0.33 Cum
50.00
40.00
1 Cum
1 Cum
Say
21
Vibrated Plain Cement Concrete (1:3:6) nominal mix using 40mm size machine crushed hard granite met
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fin
aggregate (sand), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on a
materials, all charges for mixing, laying concrete in position, vibrating, curing, centering charges, overheads
contractors profit etc.,for finished item of work for footings and basement 400mm thick.
400 mm thick
(BLD-CSTN-3-10 & 11)
Unit : 1cum
A.MATERIALS :
HBG 40mm size metal
Sand
Cement
Water ( including for curing )
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity
Crew Charges
Add MA on crew charges
Needle vibrator 40mm ( petrol )
Crew charges
Add MA on crew charges
C.LABOUR :
1st class mason
Mazdoor (Unskilled)
Add for MA @ 25%
Rate for 1 Cum
Centering & ScaGFolding (Hire)
Centering & ScaGFolding (Labour)
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
0.90 Cum
0.45 Cum
220.00 Kgs
1.20 Kl
1007.72
449.92
6054.94
100.00
1 Cum
1 Cum
1 MT
1 Kl
1.00 hour
1.00 hour
0.25
1.00 hours
1.00 hours
0.25
128.90
174.20
174.20
26.80
125.40
125.40
1 hour
1 hour
0.10 Nos.
1.39 Nos.
0.25
350.00
280.00
424.20
1 Each
1 Each
2.50 sqm
2.50 sqm
0.25
348.00
426.00
1065.00
1 sqm
1 sqm
0.00
5823.20
0.90 Cum
0.45 Cum
50.00
40.00
1 hour
1 hour
1 Cum
1 Cum
Say
Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quar
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc
to site and including seigniorage charges, sales & other taxes on all materials including all operational, incident
and labour charges such as weigh batching, machine mixing, pouring concrete by tremmy, curing etc., comple
but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimu
cement content as per IS code from standard suppliers approved by the department including tremmy pumpin
laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item
work.
Sl.
No.
Description
Quantity
BORED CAST-IN-SITU UNDER REAMED PILES including Bore pile stem and under ream bulbs
A.MATERIALS :
Cement
20mm HBG graded metal
Sand
B.LABOUR :
1st class Mason
2nd class Mason
Mazdoor (both men&women)
Add for MA @ 25%
C.MACHINERY :
Batching plant 0.50 cum
Crew charges
Add MA on crew charges
Water(including for curing)
Basic cost per 1cum
22
380.00 Kgs
0.80 Cum
0.40 Cum
6054.94
1342.97
449.92
1000 Kgs
1 Cum
1 Cum
0.100 Nos
0.200 Nos
3.45 Nos
0.25
350.00
320.00
280.00
1065.00
1 Each
1 Each
1 Each
234.40
269.50
269.50
100.00
1 hour
1 hour
1.000 hours
1.000 hours
0.25
1.20 kl
1 kl
Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum
cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm siz
graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% o
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cos
and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to sit
and including Seigniorage charges, sales & other taxes on all materials , centering using Ste
scaGFolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including a
operational, incidental and labour charges such as weigh batching, machine mixing, laying concret
curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabricatio
charges for finished item of work (APSS No. 402)
(BLD-CSTN-3-14)
FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)
A.MATERIALS :
Cement
20mm HBG graded metal
Sand
B.LABOUR :
1st class Mason
2nd class Mason
Mazdoor (both men&women)
Add for MA @ 25%
C.MACHINERY :
Batching plant 0.50 cum
Crew charges
Needle vibrator 40mm ( petrol )
Crew charges
Add MA on crew charges
Water(including for curing)
Basic cost per 1cum
380.00 Kgs
0.80 Cum
0.40 Cum
6054.94
1342.97
449.92
1000 Kgs
1 Cum
1 Cum
0.133 Nos
0.267 Nos
4.60 Nos
0.25
350.00
320.00
280.00
1419.99
1 Each
1 Each
1 Each
234.40
269.50
26.80
125.40
526.40
100.00
1 hour
1 hour
1 hour
1 hour
1.333 hours
1.333 hours
1.333 hours
1.333 hours
0.25
1.20 kl
1 kl
Sl.
No.
Description
a Footings
Rate for Design mix M 25
Hire charges of centering
scaGFolding
Labour charges
Add for MA @ 25%
Quantity
1.00 Cum
6456.39
1 Cum
1.00 Cum
1.00 Cum
0.25
137.00
415.00
415.00
1 Cum
1 Cum
and
0.00
0.80 Cum
0.40 Cum
7112.14
50.00
40.00
1 Cum
1 Cum
Say
b Column pedestals
Rate for Design mix M 25
Hire charges of centering
scaGFolding
Labour charges
Add for MA @ 25%
1.00 Cum
6456.39
1 Cum
1.00 Cum
1.00 Cum
0.25
109.00
660.00
660.00
1 Cum
1 Cum
and
0.00
0.80 Cum
0.40 Cum
7390.39
50.00
40.00
1 Cum
1 Cum
Say
c Plinth Beams
Rate for Design mix M 25
Hire charges of centering
scaGFolding
Labour charges
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Rate per 1 cum
1.00 Cum
6456.39
1 Cum
1.00 Cum
1.00 Cum
0.25
1158.00
1000.00
1000.00
1 Cum
1 Cum
0.00
8864.39
and
0.80 Cum
0.40 Cum
50.00
40.00
1 Cum
1 Cum
Say
0.00
0.18 Cum
0.09 Cum
6456.39
1 Cum
137.00
415.00
95.45
1 Cum
1 Cum
1635.79
50.00
40.00
1 Cum
1 Cum
Say
Sl.
No.
23
Description
Quantity
Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cemen
content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machin
crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15%
13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of a
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorag
charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reaper
Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weig
batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors pro
etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)
(BLD-CSTN-3-15)
COLUMNS, LINTELS, WATER TANKS, RCC WALL IN BUILDINGS:
A.MATERIALS :
Cement
380.00 Kgs
6054.94
0.80 Cum
1342.97
20mm HBG graded metal
0.40
Cum
449.92
Sand
B.LABOUR :
0.167 Nos
350.00
1st class Mason
0.167 Nos
320.00
2nd class Mason
5.60 Nos
280.00
Mazdoor (both men&women)
0.25
1679.89
Add for MA @ 25%
C.MACHINERY :
1.333 hours
234.40
Batching plant 0.50 cum
1.333 hours
269.50
Crew charges
1.333 hours
26.80
Needle vibrator 40mm ( petrol )
1.333 hours
125.40
Crew charges
0.25
526.40
Add MA on crew charges
Water(including for curing)
1.20 kl
100.00
Basic cost per 1cum
1000 Kgs
1 Cum
1 Cum
1 Each
1 Each
1 Each
1 hour
1 hour
1 hour
1 hour
1 kl
Sl.
No.
Description
a) COLUMNS :
un supported height up to 3.66 m
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Labour charges
Add for MA @ 25%
Lift charges of materials(Manual)
Add for MA @ 25%
Rate per 1cum
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Rate per 1cum
Say
b) LINTELS :
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Labour charges
Add for MA @ 25%
Lift charges of materials(Manual)
Add for MA @ 25%
Rate per 1cum
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Rate per 1cum
Say
c) WATER TANKS, SUMP, LIFT :
150mm thick side walls
Cost of M 25 design mix
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Labour charges
Add for MA @ 25%
Lift charges of materials(Manual)
Add for MA @ 25%
Rate per 10 sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Rate per 1 sqm
Say
Quantity
GF
6781.27
FF
6781.27
SF
6781.27
205.00
1171.00
292.75
0.00
0.00
8450.02
0.00
8450.02
205.00
1288.00
322.00
167.99
42.00
8806.25
0.00
8806.25
205.00
1405.00
351.25
335.98
83.99
9162.48
0.00
9162.48
40.00
16.00
8506.02
8506
40.00
16.00
8862.25
8862
40.00
16.00
9218.48
9218
GF
6781.27
FF
6781.27
SF
6781.27
680.00
834.00
208.50
0.00
0.00
8503.77
0.00
680.00
917.00
229.25
167.99
42.00
8817.50
0.00
680.00
1001.00
250.25
335.98
83.99
9132.48
0.00
40.00
16.00
8559.77
8560
40.00
16.00
8873.50
8874
40.00
16.00
9188.48
9188
0.15 cum
6781.27
GF
1017.19
FF
1017.19
SF
1017.19
348.00
426.00
106.50
0.00
0.00
1897.69
0
348.00
469.00
117.25
25.20
6.30
1982.94
0
348.00
511.00
127.75
50.40
12.60
2066.94
0
6.00
2.40
1906.09
1906
6.00
2.40
1991.34
1991
6.00
2.40
2075.34
2075
1.00 cum
Sl.
No.
Description
Quantity
Sl.
No.
Description
d) 200mm thick side walls
Cost of M 25 design mix
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Labour charges
Add for MA @ 25%
Lift charges of materials(Manual)
Add for MA @ 25%
Rate per 10 sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Rate per 1 sqm
Say
Quantity
0.30 cum
6781.27
GF
2034.38
FF
2034.38
SF
2034.38
348.00
426.00
106.50
0.00
0.00
2914.88
0
348.00
469.00
117.25
50.40
12.60
3031.63
0
348.00
511.00
127.75
100.79
25.20
3147.12
0
12.00
4.80
2931.68
2932
12.00
4.80
3048.43
3048
12.00
4.80
3163.92
3164
1.00 cum
Sl.
No.
24
Description
Quantity
Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cemen
content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machin
crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15%
13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of a
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorag
charges, sales & other taxes on all materials , centering using Casurina Ballies , Bamboos , Wooden Reapers
Runners , Wood Posts , Wall Plates etc., including all operational, incidental and labour charges such as weig
batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors pro
etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)
(BLD-CSTN-3-16)
RCC SLABS , BEAMS :
A.MATERIALS :
Cement
20mm HBG graded metal
Sand
B.LABOUR :
1st class Mason
2nd class Mason
Mazdoor (both men&women)
Add for MA @ 25%
C.MACHINERY :
Batching plant 0.50 cum
Crew charges
Needle vibrator 40mm ( petrol )
Crew charges
Add MA on crew charges
Water(including for curing)
Basic cost per 1cum
A) BEAMS :
un supported height up to 3.66 m
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Labour , lift charges for scaGFolding
Add for MA @ 25%
Lift charges of materials(Manual)
Add for MA @ 25%
Rate per Cum
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Say
380.00 Kgs
0.80 Cum
0.40 Cum
6054.94
1342.97
449.92
1000 Kgs
1 Cum
1 Cum
0.067 Nos
0.133 Nos
3.077 Nos
0.25
350.00
320.00
280.00
927.57
1 Each
1 Each
1 Each
0.308 hours
0.308 hours
0.308 hours
0.308 hours
0.25
1.20 kl
234.40
269.50
26.80
125.40
121.63
100.00
1 hour
1 hour
1 hour
1 hour
GF
5067.17
FF
5067.17
SF
5067.17
1201.00
982.00
245.50
0.00
0.00
7495.67
0
1201.00
1080.00
270.00
92.76
23.19
7734.12
0
1201.00
1178.00
294.50
185.51
46.38
7972.56
0
40.00
16.00
7551.67
7552
40.00
16.00
7790.12
7790
40.00
16.00
8028.56
8029
1 kl
Sl.
No.
Description
Quantity
B) RCC SLABS :
a) Loft Slabs 75mm thick :
un supported height up to 3.66 m
Rate for Design mix M 25
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Labour , lift charges for scaGFolding
Add for MA @ 25%
Lift charges of materials(Manual)
Add for MA @ 25%
Rate per 1 Sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Say
0.075 Cum
5067.17
GF
380.04
FF
380.04
SF
380.04
136.00
111.00
27.75
0.00
0.00
654.79
0
136.00
122.00
30.50
6.96
1.74
677.23
0
136.00
133.00
33.25
13.91
3.48
699.68
0
4.60
1.84
661.23
661
4.60
1.84
683.67
684
4.60
1.84
706.12
706
1 Cum
0.115 Cum
5067.17
GF
582.72
FF
582.72
SF
582.72
136.00
111.00
27.75
0.00
0.00
857.47
0
136.00
122.00
30.50
10.67
2.67
884.56
0
136.00
133.00
33.25
21.33
5.33
911.64
0
4.60
1.84
863.91
864
4.60
1.84
891.00
891
4.60
1.84
918.08
918
0.125 Cum
5067.17
GF
633.40
FF
633.40
SF
633.40
136.00
111.00
27.75
0.00
0.00
136.00
122.00
30.50
11.59
2.90
136.00
133.00
33.25
23.19
5.80
1 Cum
1 Cum
Sl.
No.
Description
Rate per 1 Sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Say
c) Roof Slabs 150mm thick :
Rate for Design mix M 25
un supported height up to 3.66 m
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Lift charges for scaGFolding
Add for MA @ 25%
Lift charges of materials(Manual)
Add for MA @ 25%
Rate per 1 Sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Say
Quantity
908.15
0
936.39
0
964.63
0
5.00
2.00
915.15
915
5.00
2.00
943.39
943
5.00
2.00
971.63
972
0.15 Cum
5067.17
GF
760.08
FF
760.08
SF
760.08
136.00
111.00
27.75
0.00
0.00
1034.83
0
136.00
122.00
30.50
13.91
3.48
1065.97
0
136.00
133.00
33.25
27.83
6.96
1097.11
0
6.00
2.40
1043.23
1043
6.00
2.40
1074.37
1074
6.00
2.40
1105.51
1106
1 Cum
Sl.
No.
Description
d) Roof Slabs 175mm thick :
Rate for Design mix M 25
for un supported height of 3.66 m
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Labour , lift charges for scaGFolding
Add for MA @ 25%
Lift charges of materials(Manual)
Add for MA @ 25%
Rate per 1 Sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Say
e) Roof Slabs 200mm thick :
Rate for Design mix M 25
for un supported height of 3.66 m
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Labour , lift charges for scaGFolding
Add for MA @ 25%
Lift charges of materials(Manual)
Add for MA @ 25%
Rate per 1 Sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Say
Quantity
0.175 Cum
5067.17
GF
886.75
FF
886.75
SF
886.75
140.00
114.00
28.50
0.00
0.00
1169.25
0
140.00
125.00
31.25
16.23
4.06
1203.30
0
140.00
137.00
34.25
32.46
8.12
1238.59
0
7.00
2.80
1179.05
1179
7.00
2.80
1213.10
1213
7.00
2.80
1248.39
1248
0.30 Cum
5067.17
GF
1520.15
FF
1520.15
SF
1520.15
140.00
114.00
28.50
0.00
0.00
1802.65
0
140.00
125.00
31.25
27.83
6.96
1851.18
0
140.00
137.00
34.25
55.65
13.91
1900.97
0
12.00
4.80
1819.45
1819
12.00
4.80
1867.98
1868
12.00
4.80
1917.77
1918
1 Cum
1 Cum
Sl.
No.
25
Description
Quantity
Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum ceme
content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machin
crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15%
13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of a
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorag
charges, sales & other taxes on all materials , centering using Casurina Ballies , Bamboos , Wooden Reapers
Runners , Wood Posts , Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thic
at free end with an average thickness of 6.25cm including all operational, incidental and labour charges suc
as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads
contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of wor
(APSS No. 402, 403 & 903)
(BLD-CSTN-3-16)
A.MATERIALS :
Cement
20mm HBG graded metal
Sand
B.LABOUR :
1st class Mason
2nd class Mason
Mazdoor (both men&women)
Add for MA @ 25%
C.MACHINERY :
Batching plant 0.50 cum
Crew charges
Add MA on crew charges
Water(including for curing)
Basic cost per 1cum
Cost of RCC M 25 design mix
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Labour , lift charges for scaGFolding
Add for MA @ 25%
Lift charges of materials(Manual)
Add for MA @ 25%
Rate per 1 RM
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate(concrete)
Rate per 1 RM
Say
380.00 Kgs
0.80 Cum
0.40 Cum
6054.94
1342.97
449.92
1000 Kgs
1 Cum
1 Cum
0.067 Nos
0.133 Nos
3.077 Nos
0.25
350.00
320.00
280.00
927.57
1 Each
1 Each
1 Each
0.308 hours
0.308 hours
0.25
1.20 kl
234.40
269.50
83.01
100.00
1 hour
1 hour
5010.64
1 cum
0.0375 cum
GF
187.90
FF
187.90
SF
187.90
80.40
76.80
19.20
0.00
0.00
364.30
0
80.40
84.60
21.15
3.48
0.87
378.40
0
80.40
92.40
23.10
6.96
1.74
392.49
0
1.50
0.60
366.40
366
1.50
0.60
380.50
380
1.50
0.60
394.59
395
1 kl
Sl.
No.
26
Description
Quantity
Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) usin
common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23
11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost an
conveyance of all materials like cement, screened sand, bricks, water etc., to site, including seigniorag
charges, sales & other taxes on all materials and such as labour charges, like mixing cement morta
scaGFolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors prof
complete for finished item of work. (APSS No. 501 & 504).
(BLD-CSTN-5-5)
Unit : 1cum
A.MATERIALS :
Cement
Common burnt clay bricks 23x11x7cms
Fine aggregate ( Sand )
B.LABOUR :
1st class mason
2nd class mason
Mazdoor (Unskilled)
water charges @ 1%
Add for MA @ 25%
Rate for 1 cu.m.
a Up to basement
Rate as worked out above
Overheads&Contractors Profit @0%
Seigniorage charges
Bricks
Fine aggregate
Rate for 1 cu.m.
6054.94
1000 Kgs
512 Nos
0.20 cu.m.
3825.88
569.92
1000 Nos
1 cu.m.
0.24 Nos.
0.56 Nos.
1.89 Nos.
0.01
0.25
350.00
320.00
280.00
792.40
800.32
1 Each
1 Each
1 Each
1.00 Cum
0.00
3291.22
3291.22
1 Cum
38.50
40.00
1000 Nos.
1 Cum
36.00 Kgs
512 Nos
0.20 cu.m.
Say
b) Superstructure :
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate for 1 cu.m.
Overheads&Contractors Profit @0%
Seigniorage charges
Bricks
Fine aggregate
Say
GF
3291.22
39.09
236.26
59.07
0.00
0.00
3625.63
0
FF
3291.22
39.09
334.83
83.71
80.03
20.01
3848.88
0
SF
3291.22
39.09
433.43
108.36
160.06
40.02
4072.17
0
4F
3291.22
39.09
532.00
133.00
240.10
60.03
4295.43
0
19.71
8.00
3653.34
3653
19.71
8.00
3876.59
3877
19.71
8.00
4099.88
4100
19.71
8.00
4323.14
4323
Sl.
No.
27
Description
Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop. (Cement : Screened sand
using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional siz
23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing
Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into morta
joints of main brick walls where applicable including cost and conveyance of all materials like cemen
steel, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on a
materials, all operational, incidental charges such as labour charges for mixing cement morta
scaGFolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractor
profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APS
No. of 501 & 509)
(BLD-CSTN-5-12)
Unit - 10sqm
A.MATERIALS :
Common burnt clay bricks 23x11x7cms
565 Nos.
3825.88
1000 Nos.
Cement
79.20 Kgs
6054.94
1000 Kgs
Fine aggregate ( Sand )
0.22 cu.m.
569.92
1 cu.m.
B.LABOUR :
1st class mason
0.60 Nos.
350.00
1 Each
2nd class mason
0.60 Nos.
320.00
1 Each
Mazdoor (Unskilled)
2.75 Nos.
280.00
1 Each
water charges @ 1%
0.01
1172.00
Add for MA @ 25%
0.25
1183.72
Rate for 1 cum
Rate for 1 sqm
Internal walls :
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate for 1 sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Bricks
Fine aggregate
Rate per 1 sqm
Say
28
Quantity
GF
424.62
8.99
54.34
13.59
0.00
0.00
501.54
0.00
FF
424.62
8.99
77.01
19.25
11.84
2.96
544.67
0
SF
424.62
8.99
99.69
24.92
23.67
5.92
587.81
0
4F
424.62
8.99
122.36
30.59
35.51
8.88
630.95
0
2.18
0.88
504.60
505
2.18
0.88
547.73
548
2.18
0.88
590.87
591
2.18
0.88
634.01
634
Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lim
solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strengt
of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., t
site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, lik
mixing cement mortar, scaGFolding charges, constructing masonry, lift charges, curing, overheads an
contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).
(BLD-CSTN-5-17)
Unit = 1 Cum
A.MATERIALS
No of blocks required for
1 Cum of Masonry
Cement
Fine aggregate ( Sand )
110 Nos
24.00 Kgs
0.10 cu.m.
19613.21
6054.94
569.92
1000 Nos
1000 Kgs
1 cu.m.
Sl.
No.
Description
B .LABOUR
Mason 1st class
Mason 2nd class
Man Mazdoor
water charges @ 1%
Add for MA @ 25%
Rate for 1 cum.
Quantity
0.24 Nos.
0.56 Nos.
1.89 Nos.
0.01
0.25
1 Each
1 Each
1 Each
Sl.
No.
Description
Quantity
3360.17
3360.17
1 cum
40.00
1 cum
say
b) Superstructure :
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate for 1 cum.
Say
29
GF
3360.17
39.96
241.51
60.38
0.00
0.00
3702.01
0.00
FF
3360.17
39.96
342.27
85.57
80.03
20.01
3928.00
0.00
SF
3360.17
39.96
443.07
110.77
160.06
40.02
4154.04
0.00
4F
3360.17
39.96
543.82
135.96
240.10
60.03
4380.02
0.00
4.40
3706.41
3706
4.40
3932.40
3932
4.40
4158.44
4158
4.40
4384.42
4384
Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) usin
fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressiv
strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends o
the reinforcement pegged into mortar joints of main brick walls where applicable including cost an
conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including seigniorag
charges, sales & other taxes on all materials, all operational, incidental charges such as labour charge
for mixing cement mortar, scaGFolding charges, constructing masonry, lift charges, curing, etc., an
overheads & contractors profit but excluding cost of steel and its fabrication charges complete fo
finished item of work. (APSS No. of 509)
(BLD-CSTN-5-12)
Unit - 10sqm
A.MATERIALS :
Flyash lime solid blocks
247 Nos.
10272.54
1000 Nos.
Cement
36.00 Kgs
6054.94
1000 Kgs
Fine aggregate ( Sand )
0.10 cu.m.
569.92
1 cu.m.
B.LABOUR :
1st class mason
0.60 Nos.
350.00
1 Each
2nd class mason
0.60 Nos.
320.00
1 Each
Mazdoor (Unskilled)
2.75 Nos.
280.00
1 Each
water charges @ 1%
0.01
1172.00
Add for MA @ 25%
0.25
1183.72
Rate for 10 sqm
Rate for 1 sqm
Sl.
No.
Description
Internal walls :
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate per 1 sqm
Overheads&Contractors Profit @0%
Rate per 1 sqm
Seigniorage charges
Fine aggregate
Rate per 1 sqm
Say
30
Quantity
GF
429.19
8.99
54.34
13.59
0.00
0.00
506.11
0.00
506.11
FF
429.19
8.99
77.01
19.25
11.84
2.96
549.24
0.00
549.24
SF
429.19
8.99
99.69
24.92
23.67
5.92
592.38
0.00
592.38
4F
429.19
8.99
122.36
30.59
35.51
8.88
635.52
0.00
635.52
4.40
510.51
511
4.40
553.64
554
4.40
596.78
597
4.40
639.92
640
Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite met
(coarse aggregate) ( consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm an
10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fin
aggregate(sand), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on a
materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges , an
overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work. (APSS No. 402)
(BLD-CSTN-3-10 & 11)
Unit : 1cum
A.MATERIALS :
HBG 20mm size metal
Sand
Cement
Water ( including for curing )
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity
Crew Charges
Add MA on crew charges
C.LABOUR :
1st class mason
Mazdoor (Unskilled)
Add for MA @ 25%
Rate for 1 Cum
Rate for other Floors
Rate as worked out above
Hire charges of centering and
scaGFolding
Lift charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate per Cum
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
0.90 Cum
0.45 Cum
220.00 Kgs
1.20 Kl
1342.97
449.92
6054.94
100.00
1 Cum
1 Cum
1 MT
1 Kl
1.00 hour
1.00 hour
0.25
128.90
174.20
174.20
1 hour
1 hour
0.10 Nos.
1.39 Nos.
0.25
350.00
280.00
424.20
1 Each
1 Each
GF
3740.12
FF
3740.12
SF
3740.12
4F
3740.12
137.00
415.00
103.75
0.00
0.00
4395.87
0.00
137.00
456.50
114.13
42.42
10.61
4500.77
0.00
137.00
498.00
124.50
84.84
21.21
4605.67
0.00
137.00
539.50
134.88
127.26
31.82
4710.57
0.00
45.00
18.00
4458.87
45.00
18.00
4563.77
45.00
18.00
4668.67
45.00
18.00
4773.57
Sl.
No.
Description
say
31
Quantity
4459
4669
4774
Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machin
crushed graded metal (Coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15%
13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry, using a minimum quantity of 350 kg
of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggrega
(Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including ste
centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrcto
profit etc., complete for finished item of work (APSS No. 402 & 403) for steps
(BLD-CSTN-3-11)
Unit : 1cum
A.MATERIALS :
HBG 20mm size metal
Sand
Cement
Water ( including for curing )
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity
Crew Charges
Needle vibrator 40mm ( petrol )
Crew charges
Add MA on crew charges
C.LABOUR :
1st class mason
Mazdoor (Unskilled)
Add for MA @ 25%
Rate for 1 Cum
Rate for other Floors
Rate as worked out above
Hire charges of centering and
scaGFolding
Lift charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate per 1 cum
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Say
0.90 Cum
0.45 Cum
350.00 Kgs
1.20 Kl
1342.97
449.92
6054.94
100.00
1 Cum
1 Cum
1000 Kgs
1 Kl
1.00 hour
1.00 hour
1.00 hours
1.00 hours
0.25
128.90
174.20
26.80
125.40
299.60
1 hour
1 hour
1 hour
1 hour
0.10 Nos.
1.39 Nos.
0.25
350.00
280.00
424.20
1 Each
1 Each
GF
4710.82
FF
4710.82
SF
4710.82
4F
4710.82
137.00
415.00
103.75
0.00
0.00
5366.57
0.00
137.00
456.50
114.13
42.42
10.61
5471.47
0.00
137.00
498.00
124.50
84.84
21.21
5576.37
0.00
137.00
539.50
134.88
127.26
31.82
5681.27
0.00
45.00
18.00
5429.57
5430
45.00
18.00
5534.47
5534
45.00
18.00
5639.37
5639
45.00
18.00
5744.27
5744
Sl.
No.
32
Description
Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded met
(Coarse aggregate) ( consisting of nominal size metal 60% of 13.20/12.50mm , 20% of 10mm and 20% of 6m
) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including co
and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site an
cost of seigniorage charges on all materials including steel centering, shuttering, machine mixing, layin
concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APS
No. 402 & 403) for sill slabs.
(BLD-CSTN-3-13 - A)
A.MATERIALS :
Cement
12mm HBG graded metal
Sand
B.LABOUR :
1st class Mason
2nd class Mason
Mazdoor (both men&women)
Add for MA @ 25%
C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity
Crew charges
Add MA on crew charges
Water(including for curing)
Basic cost per 1cum
Cost of RCC(1:2:4)
Rate per 1sqm
Rate for other Floors
Rate as worked out above
Hire charges of centering and
scaGFolding
Lift charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate per 1sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Rate per 1sqm
Say
33
Quantity
350.00 Kgs
0.90 Cum
0.45 Cum
6054.94
1147.72
449.92
1000 Kgs
1 Cum
1 Cum
0.133 Nos
0.267 Nos
3.60 Nos
0.25
350.00
320.00
280.00
1139.99
1 Each
1 Each
1 Each
1.00 hour
1.00 hour
0.25
1.20 kl
128.90
174.20
174.20
100.00
1 hour
1 hour
1.00 cum
5246.28
1 cum
1 kl
GF
5246.28
FF
5246.28
SF
5246.28
TF
5246.28
137.00
415.00
103.75
0.00
0.00
5902.03
0.00
137.00
456.50
114.13
114.00
28.50
6096.40
0.00
137.00
498.00
124.50
228.00
57.00
6290.78
0.00
137.00
539.50
134.88
342.00
85.50
6485.15
0.00
45.00
18.00
5965.03
5965
45.00
18.00
6159.40
6159
45.00
18.00
6353.78
6354
45.00
18.00
6548.15
6548
Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed grade
metal (Coarse aggregate) ( consisting of nominal size metal 60% of 13.20/12.50mm , 20% of 10mm an
20% of 6mm ) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum o
concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coars
aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering
shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors prof
complete for finished item of work (APSS No. 402 & 403) for plaSForms and shelves.
(BLD-CSTN-3-13 - C)
A.MATERIALS :
Cement
350.00 Kgs
6054.94
1000 Kgs
Sl.
No.
Description
12mm HBG graded metal
Sand
B.LABOUR :
1st class Mason
2nd class Mason
Mazdoor (both men&women)
Add for MA @ 25%
C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity
Crew charges
Add MA on crew charges
Water(including for curing)
Basic cost per 1cum
Quantity
0.90 Cum
0.45 Cum
1 Cum
1 Cum
0.067 Nos
0.133 Nos
2.50 Nos
0.25
350.00
320.00
280.00
766.01
1 Each
1 Each
1 Each
0.267 hour
0.267 hour
0.25
1.20 kl
128.90
174.20
46.51
100.00
1 hour
1 hour
1 kl
Sl.
No.
Description
a) 50mm thick plaSForms :
Cost of RCC(1:2:4)
Rate for other Floors
Rate as worked out above
Hire charges of centering and
scaGFolding (50% of roof slab)
Lift charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate per 1 sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Rate per 1 sqm
Say
b) 25mm thick shelves :
Cost of RCC(1:2:4)
Rate per 1sqm
Rate for other Floors
Rate as worked out above
Hire charges of centering and
scaGFolding
Lift charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate per 1 sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Rate per 1 sqm
Say
Quantity
0.08 cum
4524.71
1 cum
GF
339.35
FF
339.35
SF
339.35
TF
339.35
68.00
55.50
13.88
0.00
0.00
476.73
0.00
68.00
61.00
15.25
5.75
1.44
490.78
0.00
68.00
66.50
16.63
11.49
2.87
504.84
0.00
68.00
72.00
18.00
17.24
4.31
518.90
0.00
3.38
1.35
481.45
481
6413
3.38
1.35
495.51
496
3.38
1.35
509.57
510
3.38
1.35
523.62
524
0.025 cum
4524.71
1 cum
GF
113.12
FF
113.12
SF
113.12
TF
113.12
68.00
55.50
13.88
0.00
0.00
250.49
0.00
68.00
61.00
15.25
1.92
0.48
259.76
0.00
68.00
66.50
16.63
3.83
0.96
269.03
0.00
68.00
72.00
18.00
5.75
1.44
278.30
0.00
1.13
0.45
252.07
252
1.13
0.45
261.34
261
1.13
0.45
270.61
271
1.13
0.45
279.87
280
Sl.
No.
33
Description
Quantity
Providing High Yield Strength Deformed (HYSD) (Fe 415 grade as per IS 1786-1979) of diGFeren
diameters for RCC works , including labour charges for straightening, cutting, bending to required size
and shapes, placing in position with cover blocks of approved materials and size and tying and lap
splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs an
drawings, including cost and conveyance of steel bars, including all wastages such as overlap
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and a
incidental, operational, labour charges such as cutting, bending, placing in position, tying includin
sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item
of work in all floors.( APSS No.126)
(BLD-CSTN-4.2)& Amendment in SoR 2011-12 page No. 392
Unit - 1 MT
a) Material
HYSD bars including 5% for overlaps
and wastage
1.05 MT
6.00 Kgs
Binding wire
b) Labour for cutting , bending , shifting to
site , tying and placing in position
10.00 Nos.
Blacksmith / Barbender
Mazdoor(Unskilled)
10.00 Nos.
Add for MA @ 25%
0.25
GF
58764.08
0.00
0.00
58764.08
0.00
58764.08
58764
FF
58764.08
630.00
157.50
59551.58
0.00
59551.58
59552
48065.79
70.00
1 MT
1 Kgs
350.00
280.00
6300.00
1 Each
1 Each
SF
4F
58764.08 58764.08
1260.00 1890.00
315.00
472.50
60339.08 61126.58
0.00
0.00
60339.08 61126.58
60339
61127
Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of diGFerent diameter
for RCC works , including labour charges for straightening, cutting, bending to required sizes an
shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicin
with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs an
drawings, including cost and conveyance of steel bars, including all wastages such as overlap
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and a
incidental, operational, labour charges such as cutting, bending, placing in position, tying includin
sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item
of work in all floors.( APSS No.126)
(BLD-CSTN-4.2)& Amendment in SoR 2011-12 page No. 392
Unit - 1 MT
a) Material
TMT bars including 5% for overlaps and
wastage
1.05 MT
6.00 Kgs
Binding wire
b) Labour for cutting , bending , shifting to
site , tying and placing in position
10.00 Nos.
Blacksmith / Barbender
Mazdoor(Unskilled)
10.00 Nos.
Add for MA @ 25%
0.25
GF
59289.08
FF
59289.08
48565.79
70.00
1 MT
1 Kgs
350.00
280.00
6300.00
1 Each
1 Each
SF
4F
59289.08 59289.08
Sl.
No.
Description
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate per MT
Overheads&Contractors Profit @0%
Rate per 1 MT
Say
35
Quantity
0.00
0.00
59289.08
0.00
59289.08
59289
1260.00 1890.00
315.00
472.50
60864.08 61651.58
0.00
0.00
60864.08 61651.58
60864
61652
Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of diGFerent diameters including labou
charges for straightening, cutting, bending to required sizes and shapes, placing in position with cove
blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, formin
grills for reinforcement work as per approved designs and drawings, including cost and conveyance o
steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost an
conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting
bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads
contractors profit complete for finished item of work in all floors.( APSS No.126)
(BLD-CSTN-4.2)& Amendment in SoR 2011-12 page No. 392
Unit - 1 MT
a) Material
Mild steel bars including 5% for
overlaps and wastage
1.05 MT
Binding wire
6.00 Kgs
b) Labour for cutting , bending , shifting to
site , tying and placing in position
10.00 Nos.
Blacksmith / Barbender
Mazdoor(Unskilled)
10.00 Nos.
Add for MA @ 25%
0.25
GF
61914.08
0.00
0.00
61914.08
0.00
61914.08
61914
FF
61914.08
630.00
157.50
62701.58
0.00
62701.58
62702
51065.79
70.00
1 MT
1 Kgs
350.00
280.00
6300.00
1 Each
1 Each
SF
4F
61914.08 61914.08
1260.00 1890.00
315.00
472.50
63489.08 64276.58
0.00
0.00
63489.08 64276.58
63489
64277
Sl.
No.
36
Description
Quantity
Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened sand including cost an
conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & othe
taxes on all materials, and all operational, incidental charges on materials and including cost of all labou
charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contracto
profit complete for finished item of work.(SS 901,903 & 904)
(BLD-CSTN-8-3)
Unit : 10 sqm
A.MATERIALS :
Cement
Fine aggregate ( Sand )
B.LABOUR :
1st Class Mason
Mazdoor (Unskilled)
Add for MA @ 25%
Rate per 10 Sqm
Rate per 1 Sqm
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate per 1 Sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 1 Sqm
Say
37
43.20 Kgs
0.15 cu.m.
6054.94
569.92
1000 Kgs
1 cu.m.
0.60 Nos.
0.96 Nos.
0.25
350.00
280.00
478.80
1 Each
1 Each
GF
94.56
2.11
11.08
2.77
0.00
0.00
110.52
0.00
FF
94.56
2.11
15.57
3.89
4.79
1.20
122.12
0.00
SF
94.56
2.11
20.05
5.01
9.58
2.40
133.71
0.00
4F
94.56
2.11
24.54
6.14
14.36
3.59
145.30
0.00
0.60
111.12
111
0.60
122.72
123
0.60
134.31
134
0.60
145.90
146
Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and to
coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of a
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on a
materials, and all operational, incidental charges on materials and including cost of all labour charge
for mixing mortar, finishing, scaGFolding, lift charges, curing, including cutting grooves as directed b
Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (S
901,903 & 904)
( BLD-CSTN-8-10)
Unit : 10 sqm
A.MATERIALS :
Base coat in CM(1:6) , 8mm thick
Cement
Fine aggregate (Sand)
Top coat in CM(1:4) , 4mm thick
Cement
Fine aggregate (Sand)
B.LABOUR :
1st Class Mason
2nd Class Mason
Mazdoor (Unskilled)
Add for MA @ 25%
Rate per 10 Sqm
Rate per 1 Sqm
26.40 Kgs
0.11 Cum
6054.94
569.92
1000 Kgs
1 Cum
14.40 Kgs
0.04 Cum
6054.94
569.92
1000 Kgs
1 Cum
0.63 Nos.
1.47 Nos.
3.90 Nos.
0.25
350.00
320.00
280.00
1782.90
1 Each
1 Each
1 Each
Sl.
No.
Description
Walls in superstructure :
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate per 1 Sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate(0.015 cum)
Say
38
Quantity
GF
256.12
0.90
5.43
1.36
0.00
0.00
263.81
0.00
FF
256.12
0.90
7.70
1.93
17.83
4.46
288.94
0.00
SF
256.12
0.90
9.97
2.49
35.66
8.92
314.06
0.00
4F
256.12
0.90
12.24
3.06
53.49
13.37
339.18
0.00
0.60
264.41
264
0.60
289.54
290
0.60
314.66
315
0.60
339.78
340
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of a
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on a
materials, and all operational, incidental charges on materials and including cost of all labour charges for mixin
mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete fo
finished item of work.(SS 901,903 & 904)
(BLD-CSTN-8-3)
Unit : 10 sqm
A.MATERIALS :
Cement
Fine aggregate ( Sand )
B.LABOUR :
1st Class Mason
Mazdoor (Unskilled)
Add for MA @ 25%
Rate per 10 Sqm
Rate per 1 Sqm
a) for basement :
Rate per 1 Sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 1 Sqm
43.20 Kgs
0.15 cu.m.
6054.94
569.92
1000 Kgs
1 cu.m.
0.60 Nos.
0.96 Nos.
0.25
350.00
280.00
478.80
1 Each
1 Each
1.00 sqm
0.00
94.56
94.56
1 sqm
0.15 Cum
40.00
1 Cum
Say
Sl.
No.
Description
b) Walls in superstructure :
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 1 Sqm
Say
39
Quantity
GF
94.56
0.90
5.43
1.36
0.00
0.00
102.25
0.00
FF
94.56
0.90
7.70
1.93
4.79
1.20
111.07
0.00
SF
94.56
0.90
9.97
2.49
9.58
2.40
119.90
0.00
4F
94.56
0.90
12.24
3.06
14.36
3.59
128.71
0.00
0.60
102.85
103
0.60
111.67
112
0.60
120.50
120
0.60
129.31
129
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) an
top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of a
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on a
materials, and all operational, incidental charges on materials and including cost of all labour charge
for mixing mortar, finishing, scaGFolding, lift charges, curing, including cutting grooves as directed b
Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(S
901,903 & 904)
(BLD-CSTN-8-9)
Unit : 10 sqm
A.MATERIALS :
Base coat in CM(1:6) , 16mm thick
Cement
43.20 Kgs
6054.94
1000 Kgs
Fine aggregate (Sand)
0.18 Cum
569.92
1 Cum
Top coat in CM(1:4) , 4mm thick
Cement
14.40 Kgs
6054.94
1000 Kgs
Fine aggregate (Sand)
0.04 Cum
569.92
1 Cum
B.LABOUR :
1st Class Mason
0.63 Nos.
350.00
1 Each
2nd Class Mason
1.47 Nos.
320.00
1 Each
Mazdoor (Unskilled)
3.90 Nos.
280.00
1 Each
Add for MA @ 25%
0.25
1782.90
Rate per 10 Sqm
Rate per 1 Sqm
Sl.
No.
Description
Walls in superstructure :
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 1 Sqm
Say
40
Quantity
GF
270.28
0.90
5.43
1.36
0.00
0.00
277.97
0.00
FF
270.28
0.90
7.70
1.93
17.83
4.46
303.10
0.00
SF
270.28
0.90
9.97
2.49
35.66
8.92
328.22
0.00
4F
270.28
0.90
12.24
3.06
53.49
13.37
353.34
0.00
0.88
278.85
279
0.88
303.98
304
0.88
329.10
329
0.88
354.22
354
Plastering 20mm thick single coat in CM(1:5) using screened sand including cost and conveyance of a
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on a
materials, and all operational, incidental charges on materials and including cost of all labour charges for mixin
mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete fo
finished item of work .(SS 901,903 & 904)
(BLD-CSTN-8-8)
Unit : 10 sqm
A.MATERIALS :
Cement
Fine aggregate (Sand)
B.LABOUR :
2nd Class Mason
Mazdoor (Unskilled)
Add for MA @ 25%
Rate per 10 Sqm
Rate per 1 Sqm
a) for basement :
Rate per 1 Sqm
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 1 Sqm
Say
60.48 Kgs
0.21 Cum
6054.94
569.92
1000 Kgs
1 Cum
0.94 Nos.
1.60 Nos.
0.25
320.00
280.00
748.80
1 Each
1 Each
1.00 sqm
0.00
142.19
142.19
1 sqm
0.022 Cum
40.00
1 Cum
Say
Sl.
No.
Description
b) Walls in superstructure :
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 1 Sqm
Say
41
Quantity
GF
142.19
0.90
5.43
1.36
0.00
0.00
149.88
0.00
FF
142.19
0.90
7.70
1.93
7.49
1.87
162.08
0.00
SF
142.19
0.90
9.97
2.49
14.98
3.75
174.28
0.00
4F
142.19
0.90
12.24
3.06
22.46
5.62
186.47
0.00
0.84
150.72
151
0.84
162.92
163
0.84
175.12
175
0.84
187.31
187
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop
using screened sand 20mm thick (average) mixed with water proofing compound manufactured b
reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roo
slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regula
intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofin
compound, water etc., to site, including seigniorage charges, sales & other taxes on all materials an
operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth an
thread lining, curing including rounding oGF junctions of wall and slab etc., and overheads
contractors profit complete for finished item of work. (APSS No. 901 & 903).
(BLD-CSTN-10-25)
Unit : 10 sqm
A.MATERIALS :
Cement
Fine aggregate (Sand)
Impervious Water proof compound
B.LABOUR :
1st Class Mason
2nd Class Mason
Mazdoor (Unskilled)
Add for MA @ 25%
Rate per 10 Sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 1 Sqm
Say
100.80 Kgs
0.21 Cum
2.00 Kgs
6054.94
569.92
24.00
1000 Kgs
1 Cum
0.50 Kgs
0.66 Nos.
1.54 Nos.
3.70 Nos.
0.25
350.00
320.00
280.00
1759.80
1 Each
1 Each
1 Each
GF
3025.77
0.00
0.00
3025.77
0.00
FF
3025.77
175.98
44.00
3245.75
0.00
SF
3025.77
351.96
87.99
3465.72
0.00
4F
3025.77
527.94
131.99
3685.70
0.00
8.40
3034.17
303.42
303
8.40
3254.15
325.41
325
8.40
3474.12
347.41
347
8.40
3694.10
369.41
369
Sl.
No.
42
Description
Providing impervious coat to exposed RCC roof slab surfaces of sump , sump side wall,sump bottom
slab,in side of septic tank , in sunken slabs etc. to required slopes with CM (1:3) prop. using screene
sand 12mm thick mixed with water proofing compound manufactured by reputed manufacturers a
approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green
finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm
where ever necessary including cost and conveyance of all materials like cement, sand, water proofin
compound, water etc., to site, including seigniorage charges, sales & other taxes on all materials an
operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth an
thread lining, curing including rounding oGF junctions of wall and slab etc., and overheads
contractors profit complete for finished item of work. (APSS No. 901 & 903).
(BLD-CSTN-8-2)
A.MATERIALS :
Cement
Fine aggregate (Sand)
Impervious Water proof compound
B.LABOUR :
1st Class Mason
Mazdoor (Unskilled)
Add for MA @ 25%
Rate per 10 Sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
43
Quantity
72.00 Kgs
0.15 Cum
1.44 Kgs
6054.94
569.92
24.00
1000 Kgs
1 Cum
0.50 Kgs
0.60 Nos.
0.96 Nos.
0.25
350.00
280.00
478.80
1 Each
1 Each
GF
1189.06
0.00
0.00
1189.06
0.00
FF
1189.06
47.88
11.97
1248.91
0.00
SF
1189.06
95.76
23.94
1308.76
0.00
4F
1189.06
143.64
35.91
1368.61
0.00
6.00
1195.06
119.51
120
6.00
1254.91
125.49
125
6.00
1314.76
131.48
131
6.00
1374.61
137.46
137
RCM facia 50mm thick using screened sand for drop walls, fins with rabbit wire mesh & nomian
reinforcement as directred by Engineer - In - Charge with dubara sponge finishing,including cost an
conveyance of all materials to site,seigniorage charges,sales&othertaxes on all materials,operationa
&incidental,cost and conveyance of cement,wire mesh,water to work site,centering,scaGFolding an
form work,lift charges etc., and overheads & contractors profit complete for finished item of work bu
excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903)
(BLD-CSTN-8-11)
Unit : 10 sqm
A)MATERIALS
Rabbit wire mesh
Cement for base coat and plastering
Cement for lumps
Fine aggregate (Sand)
Excluding HYSD steel/mild steel &
binding wire
B) LABOUR CHARGES
1st Class Mason
Operator concrete mixer
Mazdoor (Unskilled)
Add for MA @ 25%
C)Machinery :
13.30 sqm
240.00 Kgs
50.00 Kgs
0.50 cu.m.
16.00
6054.94
6054.94
569.92
1 sqm
1000 Kgs
1000 Kgs
1 cu.m.
8.00 Nos.
1.00 Nos.
10.00 Nos.
0.25
350.00
350.00
280.00
5950.00
1 Each
1 Each
1 Each
Sl.
No.
Description
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity
Crew charges
Add MA on crew charges
Rate per 10 Sqm
Rate per 1 Sqm
Quantity
2.00 hours
2.00 hours
0.25
1 hours
1 hours
Sl.
No.
Description
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 1 Sqm
Say
44
Quantity
GF
1038.45
0.90
5.43
1.36
0.00
0.00
1046.14
0.00
FF
1038.45
1.80
7.70
1.93
59.50
14.88
1124.26
0.00
SF
1038.45
2.70
9.97
2.49
119.00
29.75
1202.36
0.00
4F
1038.45
3.60
12.24
3.06
178.50
44.63
1280.48
0.00
2.00
1048.14
1048
2.00
1126.26
1126
2.00
1204.36
1204
2.00
1282.48
1282
Flooring with polished shahabad / Tandur stone slabs of 15mm to 18mm thick 0.457m x 0.457m or an
other size as specified set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid C
bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm an
jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, wate
flooring stones etc. complete including seigniorage charges, sales & other taxes on all materials including a
labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges
cost of base coat etc., and overheads & contractors profit complete for finished item of work. (APSS No.703
701)
(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
Polished shahabad stone 15 to 18mm
thick
Cement for CM (1:8) proportion for
base coat
Cement for slurry
Cement for pointing
Sand for CM(1:8)
B .LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Rate for other floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Shahabad stone
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
11.00 Sqm
1574.77
10 Sqm
21.60 Kgs
33.00 Kgs
20.00 Kgs
0.12 Cum
6054.94
6054.94
6054.94
569.92
1000 Kgs
1000 Kgs
1000 Kgs
1 Cum
3.10 Nos
1.10 Nos
0.86 Nos
0.01
0.25
350.00
320.00
280.00
1677.80
1694.58
1 Each
1 Each
1 Each
GF
4370.56
0.00
0.00
4370.56
0.00
FF
4370.56
169.46
42.37
4582.38
0.00
SF
4370.56
338.92
84.73
4794.21
0.00
4F
4370.56
508.37
127.09
5006.02
0.00
77.00
4.80
4452.36
445.24
445
77.00
4.80
4664.18
466.42
466
77.00
4.80
4876.01
487.60
488
77.00
4.80
5087.82
508.78
509
Sl.
No.
45
Description
Quantity
Flooring with Polished black Kadapa slabs minimum of 15mm thick (0.457m x 0.457m) or any other siz
as specified set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RC
roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed wi
neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stone
etc. complete including seigniorage charges, sales & other taxes on all materials including all labour charge
like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of bas
coat etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)
(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
Polished black Kadapa slabs minimum
of 15mm thick
Cement for CM (1:8) proportion for
base coat
Cement for slurry
Cement for pointing
Sand for CM(1:8)
B .LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Rate for other floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Kadapa stone
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
11.00 Sqm
1314.97
10 Sqm
21.60 Kgs
33.00 Kgs
20.00 Kgs
0.12 Cum
6054.94
6054.94
6054.94
569.92
1000 Kgs
1000 Kgs
1000 Kgs
1 Cum
3.10 Nos
1.10 Nos
0.86 Nos
0.01
0.25
350.00
320.00
280.00
1677.80
1694.58
1 Each
1 Each
1 Each
GF
4084.78
0.00
0.00
4084.78
0.00
FF
4084.78
169.46
42.37
4296.60
0.00
SF
4084.78
338.92
84.73
4508.43
0.00
4F
4084.78
508.37
127.09
4720.24
0.00
44.00
4.80
4133.58
413.36
413
44.00
4.80
4345.40
434.54
435
44.00
4.80
4557.23
455.72
456
44.00
4.80
4769.04
476.90
477
Sl.
No.
46
Description
Quantity
Flooring with ceramic tiles 7.30mm thick , 1st quality and of size as approved by Engineer-in-charge, s
over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC ro
slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly wi
white cement paste to full depth mixed with pigment of matching shade, including cost of all materials lik
cement, sand , water and tiles etc., and overheads & contractors profit complete including seigniorage charge
etc., complete for finished item of work. (APSS No.701 & 707)
(BLD-CSTN-9-6)
Unit = 10 sqm.
A. MATERIALS:
Ceramic tiles 7.3mm thick of 1st quality
Cement for CM(1:8) proportion for base
coat
Cement for slurry
White Cement
Sand for CM(1:8)
B .LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
47
10.50 Sqm
447.00
1 Sqm
21.60 Kgs
33.00 Kgs
2.00 Kgs
0.12 Cum
6054.94
6054.94
27.00
569.92
1000 Kgs
1000 Kgs
1 Kg
1 Cum
0.96 Nos
2.24 Nos
3.30 Nos
0.01
0.25
350.00
320.00
280.00
1976.80
1996.57
1 Each
1 Each
1 Each
GF
7642.20
0.00
0.00
7642.20
0.00
FF
7642.20
199.66
49.92
7891.78
0.00
SF
7642.20
399.31
99.83
8141.34
0.00
4F
7642.20
598.97
149.74
8390.91
0.00
4.80
7647.00
764.70
765
4.80
7896.58
789.66
790
4.80
8146.14
814.61
815
4.80
8395.71
839.57
840
Flooring with Edge cut Rectified ceramic tiles 8mm thick , of size not less than 400mm x 400mm 1
quality and with borders and design as per the approved flooring pattern as directed by the Engineer-Charge, laying tiles using spacers of 2mm thick, set over base coat of cement mortar (1:8), 12mm thick usin
screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey lik
consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed wi
pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc
complete including seigniorage charges etc., and overheads & contractors profit complete for finished item
work. (APSS No.701 & 707)
(BLD-CSTN-9-6)
Unit = 10 sqm.
A. MATERIALS:
Ceramic tiles 8mm thick
Cement for CM(1:8)proportion for base
coat
Cement for slurry
White Cement
Sand for CM(1:8)
B .LABOUR
10.50 Sqm
538.00
1 Sqm
21.60 Kgs
33.00 Kgs
2.00 Kgs
0.12 Cum
6054.94
6054.94
27.00
569.92
1000 Kgs
1000 Kgs
1 Kg
1 Cum
Sl.
No.
Description
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10sqm
Quantity
0.96 Nos
2.24 Nos
3.30 Nos
0.01
0.25
1 Each
1 Each
1 Each
Sl.
No.
Description
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
48
Quantity
GF
8597.70
0.00
0.00
8597.70
0.00
FF
8597.70
199.66
49.92
8847.28
0.00
SF
8597.70
399.31
99.83
9096.84
0.00
4F
8597.70
598.97
149.74
9346.41
0.00
4.80
8602.50
860.25
860
4.80
8852.08
885.21
885
4.80
9101.64
910.16
910
4.80
9351.21
935.12
935
Flooring with vitrified polished floor tiles of 1st quality and make as approved by Engineer-in-charge of siz
not less than 598 mm x 598 mm , 8mm thickness regular finish and normal colours with borders and desig
as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2m
thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid o
RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointe
neately with white cement paste to full depth mixed with pigment of matching shade including cost an
conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C
bed) including cost of seigniorage charges on all materials, cost of base coat and all labour charges fo
mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,an
overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)
(BLD-CSTN-9-5)
Unit = 10 sqm.
A. MATERIALS:
Vitrified tiles 8mm thick of size not less
than 598mm x 598mm
Cement for CM(1:8)proportion for base
coat
Cement for slurry
White Cement
Sand for CM(1:8)
B .LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
10.50 Sqm
607.00
1 Sqm
21.60 Kgs
33.00 Kgs
6.00 Kgs
0.12 Cum
6054.94
6054.94
27.00
569.92
1000 Kgs
1000 Kgs
1 Kg
1 Cum
0.96 Nos
2.24 Nos
3.30 Nos
0.01
0.25
350.00
320.00
280.00
1976.80
1996.57
1 Each
1 Each
1 Each
GF
9430.20
0.00
0.00
9430.20
0.00
FF
9430.20
199.66
49.92
9679.78
0.00
SF
4F
9430.20 9430.20
399.31
598.97
99.83
149.74
9929.34 10178.91
0.00
0.00
4.80
9435.00
943.50
944
4.80
9684.58
968.46
968
4.80
4.80
9934.14 10183.71
993.41 1018.37
993
1018
Sl.
No.
49
Description
Quantity
Flooring with granite stone tiles 8mm thick (mirror polished of all shades) of 1st quality and of size a
approved by Engineer-in-charge with borders and design as per the approved flooring pattern as directed by th
Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12m
thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of hone
like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixe
with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tile
white cement etc., to site (excluding cost of C.C. bed) including cost of seigniorage charges on all material
cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope a
directed by the Engineer- in-charge etc., and overheads & contractors profit complete for finished item
work. (APSS No.701 & 707)
(BLD-CSTN-9-9)
Unit = 10 sqm.
A. MATERIALS:
Granite stone tiles 8mm thick (mirror
polished of all shades)
Cement for CM(1:8) for base coat
Cement for slurry
White Cement
Sand for CM(1:8)
B .LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
10.50 Sqm
21.60 Kgs
33.00 Kgs
6.00 Kgs
0.12 Cum
933.00
6054.94
6054.94
27.00
569.92
1 Sqm
1000 Kgs
1000 Kg
1 Kg
1 Cum
0.96 Nos
2.24 Nos
3.30 Nos
0.01
0.25
350.00
320.00
280.00
1976.80
1996.57
1 Each
1 Each
1 Each
GF
12853.20
0.00
0.00
12853.20
0.00
FF
12853.20
199.66
49.92
13102.78
0.00
SF
4F
12853.20 12853.20
399.31
598.97
99.83
149.74
13352.34 13601.91
0.00
0.00
4.80
12858.00
1285.80
1286
4.80
13107.58
1310.76
1311
4.80
4.80
13357.14 13606.71
1335.71 1360.67
1336
1361
Sl.
No.
50
Description
Flooring with 16 to 18mm thick high polished granite stone slabs other than black and regular colour
(i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as pe
the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of ceme
mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat gre
cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement pas
mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement
sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half roundin
the edges of treads , polishing charges and seigniorage charges and all other taxes on all materials, cost
base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)
(BLD-CSTN-9-7)
Unit = 10 sqm.
A. MATERIALS:
High polished granite slabs other than
black 16 to 18mm thick
Cement for CM(1:8) for base coat
Cement for slurry
White cement for jointing
Sand for CM(1:8)
B .LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Granite
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
51
Quantity
10.50 Sqm
36.00 Kgs
33.00 Kgs
6.00 Kgs
0.20 Cum
2392.00
6054.94
6054.94
27.00
569.92
1 Sqm
1000 Kgs
1000 Kgs
1 Kg
1 Cum
3.00 Nos
1.00 Nos
8.00 Nos
0.01
0.25
350.00
320.00
280.00
3610.00
3646.10
1 Each
1 Each
1 Each
GF
30367.40
0.00
0.00
30367.40
0.00
FF
30367.40
364.61
91.15
30823.16
0.00
SF
4F
30367.40 30367.40
729.22 1093.83
182.31
273.46
31278.92 31734.69
0.00
0.00
343.67
8.00
30719.06
3071.91
3072
343.67
8.00
31174.83
3117.48
3117
343.67
343.67
8.00
8.00
31630.59 32086.35
3163.06 3208.64
3163
3209
Flooring with 16 to 18 mm thick high polished granite stone slabs black colour as approved by th
Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm
thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurr
of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixe
with pigment of matching shade to full depth including cost and conveyance of all materials lik
cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & li
charges, half rounding the edge , polishing charges and seigniorage charges and all other taxes on a
materials, cost of base coat and overheads & contractors profit complete for finished item of work fo
plaSForms (S.S.701 & special)
(BLD-CSTN-9-7)
Unit = 10 sqm.
A. MATERIALS:
High polished granite slabs black 16 to
18mm thick
10.50 Sqm
2033.00
1 Sqm
36.00
Kgs
6054.94
1000
Kgs
Cement for CM(1:8) for base coat
Sl.
No.
Description
Cement for slurry
White cement for jointing
Sand for CM(1:8)
B .LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Machine cutting charges
Half rounding the edges
Add for MA @ 25%
Rate for 10 sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Granite
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
52
Quantity
33.00 Kgs
6.00 Kgs
0.20 Cum
6054.94
27.00
569.92
1000 Kgs
1 Kg
1 Cum
3.00 Nos
1.00 Nos
8.00 Nos
0.01
0.25
16.67 RM
16.67 RM
0.25
350.00
320.00
280.00
3610.00
3646.10
13.00
245.00
1720.34
1 Each
1 Each
1 Each
1 RM
1 RM
GF
31328.85
0.00
0.00
31328.85
0.00
FF
31328.85
364.61
91.15
31784.61
0.00
SF
4F
31328.85 31328.85
729.22 1093.83
182.31
273.46
32240.37 32696.13
0.00
0.00
343.67
8.00
31680.51
3168.05
3168
343.67
8.00
32136.27
3213.63
3214
343.67
343.67
8.00
8.00
32592.04 33047.80
3259.20 3304.78
3259
3305
Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machin
crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size n
exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread linin
including cost of all materials like cement, metal sand and water etc. complete, including seigniorage charge
etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 710)
(BLD-CSTN-9-13)
Unit : 10sqm
A.MATERIALS :
6mm to 12mm HBG Metal
Cement
Sand
Add for glass strips
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Add for MA @ 25%
Rate per 10 Sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
0.17 Cum
120.00 Kgs
0.085 Cum
10.00 Sqm
1147.72
6054.94
449.92
5.00
1 Cum
1000 Kgs
1 Cum
1 Sqm
1.25 Nos.
0.06 Nos.
3.00 Nos.
0.01
0.25
350.00
320.00
280.00
1296.70
1309.67
1 Each
1 Each
1 Each
GF
2647.03
0.00
0.00
2647.03
0.00
FF
2647.03
130.97
32.74
2810.74
0.00
SF
2647.03
261.93
65.48
2974.44
0.00
4F
2647.03
392.90
98.23
3138.16
0.00
Sl.
No.
Description
Coarse aggregate
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
53
8.50
3.40
2658.93
265.89
266
8.50
3.40
2986.34
298.63
299
8.50
3.40
3150.06
315.01
315
Flooring with chequered terrazo tiles of 30mm thick (dark shade) of size 0.305m x 0.305m set over bas
coat of cement mortar (1:6), 12 mm thick using screened sand over CC bed alredy laid or RCC roof sla
including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm and jointed with neat whi
cement to full depth mixed with pigment of matching shade including cost and conveyance of all materials lik
cement , sand , water and tiles etc.,and overheads & contractors profit complete including seigniorage charge
complete for finished item of work.
(BLD-CSTN-9-4)
Unit : 10sqm
A.MATERIALS :
Chequred terrazo tiles 30mm thick
Cement for CM(1:6) proportion for base
coat
Cement for slurry
Cement for jointing
Sand for CM(1:6) proportion
B. LABOUR
Mason 2nd class
Man Mazdoor
Mazdoor (unskiled)
Add water charges 1%
Add for MA @ 25%
Rate per 10 Sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
54
Quantity
10.50 sqm
266.00
1 sqm
28.80 Kgs
33.00 Kgs
6.00 Kgs
0.12 Cum
6054.94
6054.94
6054.94
569.92
1000 Kgs
1000 Kgs
1000 Kgs
1 Cum
0.96 Nos.
2.24 Nos.
3.30 Nos.
0.01
0.25
320.00
280.00
280.00
1858.40
1876.98
1 Each
1 Each
1 Each
GF
5618.15
0.00
0.00
5618.15
0.00
FF
5618.15
187.70
46.93
5852.77
0.00
SF
5618.15
375.40
93.85
6087.40
0.00
4F
5618.15
563.10
140.78
6322.02
0.00
4.80
5622.95
562.29
562
4.80
5857.57
585.76
586
4.80
6092.20
609.22
609
4.80
6326.82
632.68
633
Providing polished shahabad / Tandur stone slabs of 15mm to 18mm thick in single piece as specified s
over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof sla
including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat ceme
to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones et
complete including seigniorage charges, sales & other taxes on all materials including all labour charges lik
dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, l
charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work fo
treads and risers. (APSS No.703 & 701)
a) Treads of 0.30m wide :
(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
Sl.
No.
Description
Polished shahabad stone 15 to 18mm
thick
Cement for CM (1:5) proportion for
base coat
Cement for slurry
Cement for jointing
Sand for CM(1:5)
B .LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Flat nosing the edges
Add for MA @ 25%
Rate for 10sqm
Rate for other floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Shahabad stone
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
b) Risers of 0.15m height :
(BLD-CSTN-9-23)
Unit = 10 sqm
A.MATERIALS :
Cost of shahabad stone slabs
Sand for CM(1:5) base coat
Cement for CM(1:5) base coat
Cement for slurry
B.LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(unskilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Risers 15cm height :
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Shahabad stone
Quantity
11.00 Sqm
1574.77
10 Sqm
34.56 Kgs
33.00 Kgs
20.00 Kgs
0.12 Cum
6054.94
6054.94
6054.94
569.92
1000 Kgs
1000 Kgs
1000 Kgs
1 Cum
3.10 Nos
1.10 Nos
0.86 Nos
0.01
0.25
33.33 RM
0.25
350.00
320.00
280.00
1677.80
1694.58
13.00
173.32
1 Each
1 Each
1 Each
1 RM
GF
4925.65
0.00
0.00
4925.65
0.00
FF
4925.65
169.46
42.37
5137.47
0.00
SF
4925.65
338.92
84.73
5349.30
0.00
4F
4925.65
508.37
127.09
5561.11
0.00
77.00
4.80
5007.45
500.74
501
77.00
4.80
5219.27
521.93
522
77.00
4.80
5431.10
543.11
543
77.00
4.80
5642.91
564.29
564
11.00 sqm
0.12 cum
34.56 Kgs
33.00 Kgs
1574.77
569.92
6054.94
6054.94
0.96 Nos.
2.24 Nos.
3.10 Nos.
0.01
0.25
350.00
320.00
280.00
1920.80
1940.01
10 sqm
1 cum
1000 Kgs
1000 Kgs
1 Each
1 Each
1 Each
GF
4634.72
0.00
0.00
4634.72
0.00
FF
4634.72
194.00
48.50
4877.22
0.00
SF
4634.72
388.00
97.00
5119.72
0.00
4F
4634.72
582.00
145.50
5362.22
0.00
77.00
77.00
77.00
77.00
Sl.
No.
Description
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
55
Quantity
4.80
4716.52
471.65
472
4.80
5201.52
520.15
520
4.80
5444.02
544.40
544
Providing Polished black Kadapa slabs minimum of 15mm thick in single piece as specified set over a bas
coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including ne
cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full dep
including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete includin
seigniorage charges, sales & other taxes on all materials including all labour charges like dressing of floorin
stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base co
etc., and overheads & contractors profit complete for finished item of work for treads and risers. (APSS No.70
& 701)
a) Treads of 0.30m wide :
(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
Polished black Kadapa slabs minimum
of 15mm thick
Cement for CM (1:5) proportion for
base
coat
Cement
for slurry
Cement for jointing
Sand for CM(1:5)
B .LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Flat nosing the edges
Add for MA @ 25%
Rate for 10sqm
Rate for other floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Shahabad stone
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
b) Risers of 0.15m height :
(BLD-CSTN-9-23)
Unit = 10 sqm
A.MATERIALS :
Cost of Kadapa stone slabs
Sand for CM(1:5) base coat
Cement for CM(1:5) base coat
Cement for slurry
11.00 Sqm
34.56 Kgs
33.00 Kgs
20.00 Kgs
0.12 Cum
1972.46
6054.94
6054.94
6054.94
569.92
10 Sqm
1000 Kgs
1000 Kgs
1000 Kgs
1 Cum
3.10 Nos
1.10 Nos
0.86 Nos
0.01
0.25
33.33 RM
0.25
350.00
320.00
280.00
1677.80
1694.58
13.00
173.32
1 Each
1 Each
1 Each
1 RM
GF
5363.10
0.00
0.00
5363.10
0.00
FF
5363.10
169.46
42.37
5574.93
0.00
SF
5363.10
338.92
84.73
5786.75
0.00
4F
5363.10
508.37
127.09
5998.57
0.00
44.00
4.80
5411.90
541.19
541
44.00
4.80
5623.73
562.37
562
44.00
4.80
5835.55
583.56
584
44.00
4.80
6047.37
604.74
605
11.00 sqm
0.12 cum
34.56 Kgs
33.00 Kgs
1972.46
569.92
6054.94
6054.94
10 sqm
1 cum
1000 Kgs
1000 Kgs
Sl.
No.
Description
B.LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(unskilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Risers 15cm height :
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Shahabad stone
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
Quantity
0.96 Nos.
2.24 Nos.
3.10 Nos.
0.01
0.25
350.00
320.00
280.00
1920.80
1940.01
1 Each
1 Each
1 Each
GF
5072.17
0.00
0.00
5072.17
0.00
FF
5072.17
194.00
48.50
5314.67
0.00
SF
5072.17
388.00
97.00
5557.17
0.00
4F
5072.17
582.00
145.50
5799.67
0.00
44.00
4.80
5120.97
512.10
512
44.00
4.80
5363.47
536.35
536
44.00
4.80
5605.97
560.60
561
44.00
4.80
5848.47
584.85
585
Sl.
No.
56
Description
Quantity
Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e.
shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per th
pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of ceme
mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat gre
cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement pas
mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement
sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half roundin
the edges of treads , polishing charges and seigniorage charges and all other taxes on all materials, cost
base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.70
& special)
a) Treads of 0.30m wide :
(BLD-CSTN-9-7)
Unit = 10 sqm.
A. MATERIALS:
High polished granite slabs other than
black 16 to 18mm thick
Cement for CM(1:5) for base coat
Cement for slurry
White cement for jointing
Sand for CM(1:5)
B .LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(un skilled)
Add water charges 1%
Add for MA @ 25%
Machine cutting charges
Half rounding the edges
Add for MA @ 25%
Rate for 10sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Granite
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
b) Risers of 0.15m height :
(BLD-CSTN-9-19)
Unit = 10 sqm
A.MATERIALS :
Cost of high polished granite
Sand for CM(1:5) base coat
Cement for CM(1:5) base coat
Cement for slurry
White cement for jointing & pointing
Machine cutting charges
10.50 Sqm
34.56 Kgs
33.00 Kgs
6.00 Kgs
0.12 Cum
2392.00
6054.94
6054.94
27.00
569.92
1 Sqm
1000 Kgs
1000 Kgs
1 Kg
1 Cum
3.00 Nos
1.00 Nos
8.00 Nos
0.01
0.25
33.33 RM
33.33 RM
0.25
350.00
320.00
280.00
3610.00
3646.10
13.00
245.00
3439.66
1 Each
1 Each
1 Each
1 RM
1 RM
GF
39772.14
0.00
0.00
39772.14
0.00
FF
39772.14
364.61
91.15
40227.90
0.00
SF
4F
39772.14 39772.14
729.22 1093.83
182.31
273.46
40683.67 41139.43
0.00
0.00
343.67
4.80
40120.61
4012.06
4012
343.67
4.80
40576.37
4057.64
4058
343.67
343.67
4.80
4.80
41032.13 41487.89
4103.21 4148.79
4103
4149
10.50 sqm
0.12 cum
34.56 Kgs
33.00 Kgs
5.00 Kgs
66.67 RM
2392.00
569.92
6054.94
6054.94
27.00
13.00
1 sqm
1 cum
1000 Kgs
1000 Kgs
1 Kg
1 RM
Sl.
No.
Description
Add for MA @ 25%
B.LABOUR
Mason 1st class
Man Mazdoor(Beldar)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Granite
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
57
Quantity
0.25
346.68
2.10 Nos.
4.90 Nos.
0.01
0.25
350.00
280.00
2107.00
2128.07
1 Each
1 Each
GF
29341.93
0.00
0.00
29341.93
0.00
FF
29341.93
212.81
53.20
29607.94
0.00
SF
4F
29341.93 29341.93
425.61
638.42
106.40
159.61
29873.94 30139.96
0.00
0.00
343.67
4.80
29690.40
2969.04
2969
343.67
4.80
29956.41
2995.64
2996
343.67
343.67
4.80
4.80
30222.41 30488.42
3022.24 3048.84
3022
3049
Providing skirting to internal walls to 10.00 cm height with Polished Shahabad/Tandur stone slabs 15mm
to 18mm thick, length equal to flooring stones set over base coat of CM(1:5) 12 mm thick using screened san
with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with whi
cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tile
cement, sand and water etc., complete including seigniorage charges etc., and overheads & contractors pro
complete for finished item of work.(APSS No.701 &707)
(BLD-CSTN-9-23)
Unit = 10 sqm
A.MATERIALS :
Cost of shahabad stone slabs
Sand for CM(1:5) base coat
Cement for CM(1:5) base coat
Cement for slurry
B.LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(unskilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Shahabad stone
Fine aggregate
Rate per 10 Sqm
Rate per 1 RM
Say
11.00 sqm
0.12 cum
34.56 Kgs
33.00 Kgs
1574.77
569.92
6054.94
6054.94
0.96 Nos.
2.24 Nos.
3.10 Nos.
0.01
0.25
350.00
320.00
280.00
1920.80
1940.01
10 sqm
1 cum
1000 Kgs
1000 Kgs
1 Each
1 Each
1 Each
GF
4634.72
0.00
0.00
4634.72
0.00
FF
4634.72
194.00
48.50
4877.22
0.00
SF
4634.72
388.00
97.00
5119.72
0.00
4F
4634.72
582.00
145.50
5362.22
0.00
77.00
4.80
4716.52
47.17
47
77.00
4.80
4959.02
49.59
50
77.00
4.80
5201.52
52.02
52
77.00
4.80
5444.02
54.44
54
Sl.
No.
58
Description
Providing skirting to internal walls to 10.00 cm height with Polished Kadapa stone slabs minimum o
15mm thick, length equal to flooring stones set over base coat of CM(1:5) 12 mm thick using screened san
with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with whi
cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tile
cement, sand and water etc., complete including seigniorage charges etc., and overheads & contractors pro
complete for finished item of work.(APSS No.701 &707)
(BLD-CSTN-9-23)
Unit = 10 sqm
A.MATERIALS :
Cost of Kdapa stone slabs
Sand for CM(1:5) base coat
Cement for CM(1:5) base coat
Cement for slurry
B.LABOUR
Mason 1st class
Mason 2nd class
Mazdoor(unskilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Shahabad stone
Fine aggregate
Rate per 10 Sqm
Rate per 1 RM
Say
59
Quantity
11.00 sqm
0.12 cum
34.56 Kgs
33.00 Kgs
1314.97
569.92
6054.94
6054.94
0.96 Nos.
2.24 Nos.
3.10 Nos.
0.01
0.25
350.00
320.00
280.00
1920.80
1940.01
10 sqm
1 cum
1000 Kgs
1000 Kgs
1 Each
1 Each
1 Each
GF
4348.94
0.00
0.00
4348.94
0.00
FF
4348.94
194.00
48.50
4591.44
0.00
SF
4348.94
388.00
97.00
4833.94
0.00
4F
4348.94
582.00
145.50
5076.44
0.00
44.00
4.80
4397.74
43.98
44
44.00
4.80
4640.24
46.40
46
44.00
4.80
4882.74
48.83
49
44.00
4.80
5125.24
51.25
51
Providing skirting to internal walls to 10 cm height with Edge cut Rectified ceramic tiles 8 mm thic
length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slur
of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed wi
pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc
complete including seigniorage charges etc., and overheads & contractors profitcomplete for finished item
work.(APSS No.701 &707)
(BLD-CSTN-9-18)
Unit = 10 sqm
A.MATERIALS :
Cost of Edge cut Rectified ceramic tiles
8 mm thick
Sand for CM(1:5) base coat
Cement for CM(1:5) base coat
Cement for slurry
White cement for jointing & pointing
B.LABOUR
Mason 1st class
Mazdoor(unskilled)
Add water charges 1%
10.50 sqm
0.12 cum
34.56 Kgs
33.00 Kgs
6.00 Kgs
538.00
569.92
6054.94
6054.94
27.00
0.77 Nos.
0.80 Nos.
0.01
350.00
280.00
493.50
1 sqm
1 cum
1000 Kgs
1000 Kgs
1 Kg
1 Each
1 Each
Sl.
No.
Description
Add for MA @ 25%
Rate per 10 Sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 10 Sqm
Rate per 1 RM
Say
60
0.25
498.44
GF
6911.51
0.00
0.00
6911.51
0.00
FF
6911.51
49.84
12.46
6973.81
0.00
SF
6911.51
99.69
24.92
7036.12
0.00
4F
6911.51
149.53
37.38
7098.42
0.00
4.80
6916.31
69.16
69
4.80
6978.61
69.79
70
4.80
7040.92
70.41
70
4.80
7103.22
71.03
71
Providing skirting to internal walls to 10 cm height with vitrified tiles 8mm thick , regular finish an
normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened san
with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with whi
cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tile
cement, sand and water etc.,and overheads & contractors profit complete including seigniorage charges etc
complete for finished item of work.(APSS No.701 &707)
(BLD-CSTN-9-20)
Unit = 10 sqm
Cost of vitrified tiles 8mm thick
Sand for CM(1:5) base coat
Cement for CM(1:5) base coat
Cement for slurry
White cement for jointing & pointing
B.LABOUR
Mason 1st class
Mazdoor(unskilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 10 Sqm
Rate per 1 RM
Say
61
Quantity
10.50 sqm
0.12 cum
34.56 Kgs
33.00 Kgs
2.00 Kgs
607.00
569.92
6054.94
6054.94
27.00
0.77 Nos.
0.80 Nos.
0.01
0.25
350.00
280.00
493.50
498.44
1 sqm
1 cum
1000 Kgs
1000 Kgs
1 Kg
1 Each
1 Each
GF
7528.01
0.00
0.00
7528.01
0.00
FF
7528.01
49.84
12.46
7590.31
0.00
SF
7528.01
99.69
24.92
7652.62
0.00
4F
7528.01
149.53
37.38
7714.92
0.00
4.80
7532.81
75.33
75
4.80
7595.11
75.95
76
4.80
7657.42
76.57
77
4.80
7719.72
77.20
77
a) Providing skirting to internal walls to 10 cm height with 8mm thick mirror polished granite tiles leng
equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry
honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed wi
pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc
and overheads & contractors profit complete including seigniorage charges etc., complete for finished item
work.(APSS No.701 &707)
Sl.
No.
Description
(BLD-CSTN-9-21)
Unit = 10 sqm
A.MATERIALS :
Cost of granite tiles 8mm thick
Sand for CM(1:5) base coat
Cement for CM(1:5) base coat
Cement for slurry
White cement for jointing & pointing
B.LABOUR
Mason 1st class
Mazdoor(unskilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 10 Sqm
Rate per 1 RM
Say
Quantity
10.50 sqm
0.12 cum
34.56 Kgs
33.00 Kgs
5.00 Kgs
933.00
569.92
6054.94
6054.94
27.00
0.77 Nos.
0.80 Nos.
0.01
0.25
350.00
280.00
493.50
498.44
1 sqm
1 cum
1000 Kgs
1000 Kgs
1 Kg
1 Each
1 Each
GF
11032.01
0.00
0.00
11032.01
0.00
FF
11032.01
49.84
12.46
11094.31
0.00
SF
4F
11032.01 11032.01
99.69
149.53
24.92
37.38
11156.62 11218.92
0.00
0.00
4.80
11036.81
110.37
110
4.80
11099.11
110.99
111
4.80
4.80
11161.42 11223.72
111.61
112.24
112
112
b) Cladding to internal walls with 8mm thick mirror polished granite tiles length equal to flooring tiles, s
over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency sprea
at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade
full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contracto
profit complete including seigniorage charges etc., complete for finished item of work.(APSS No.701 &707)
GF
11032.01
0.00
0.00
11032.01
0.00
FF
11032.01
49.84
12.46
11094.31
0.00
SF
4F
11032.01 11032.01
99.69
149.53
24.92
37.38
11156.62 11218.92
0.00
0.00
4.80
11036.81
1103.68
1104
4.80
11099.11
1109.91
1110
4.80
4.80
11161.42 11223.72
1116.14 1122.37
1116
1122
a) Providing skirting to internal walls 10cm height with High Polished Granite 16 to 18 mm thick up to 8'-0
(2.43 M) other than black and regular colours, length equal to flooring stones set over base coat of CM(1:
12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs pe
sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost
all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., and overhead
& contractors profit complete for finished item of work.
(BLD-CSTN-9-19)
Unit = 10 sqm
A.MATERIALS :
Sl.
No.
Description
Cost of high polished granite
Sand for CM(1:5) base coat
Cement for CM(1:5) base coat
Cement for slurry
White cement for jointing & pointing
Machine cutting charges
Add for MA @ 25%
B.LABOUR
Mason 1st class
Man Mazdoor(Beldar)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Granite
Fine aggregate
Rate per 10 Sqm
Rate per 1 RM
Say
Quantity
10.50 sqm
0.12 cum
34.56 Kgs
33.00 Kgs
5.00 Kgs
66.67 RM
0.25
2392.00
569.92
6054.94
6054.94
27.00
13.00
346.68
2.10 Nos.
4.90 Nos.
0.01
0.25
350.00
280.00
2107.00
2128.07
1 sqm
1 cum
1000 Kgs
1000 Kgs
1 Kg
1 RM
1 Each
1 Each
GF
29341.93
0.00
0.00
29341.93
0.00
FF
29341.93
212.81
53.20
29607.94
0.00
SF
4F
29341.93 29341.93
425.61
638.42
106.40
159.61
29873.94 30139.96
0.00
0.00
343.67
4.80
29690.40
296.90
297
343.67
4.80
29956.41
299.56
300
343.67
343.67
4.80
4.80
30222.41 30488.42
302.22
304.88
302
305
b) Providing cladding to walls with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other tha
black and regular colours, length equal to flooring stones set over base coat of CM(1:5) 12 mm thick usin
screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointin
with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials lik
tiles, cement, sand and water etc., complete including seigniorage charges etc., and overheads & contracto
profit complete for finished item of work.
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Granite
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
63
GF
29341.93
0.00
0.00
29341.93
0.00
FF
29341.93
212.81
53.20
29607.94
0.00
SF
4F
29341.93 29341.93
425.61
638.42
106.40
159.61
29873.94 30139.96
0.00
0.00
343.67
4.80
29690.40
2969.04
2969
343.67
4.80
29956.41
2995.64
2996
343.67
343.67
4.80
4.80
30222.41 30488.42
3022.24 3048.84
3022
3049
Providing dadooing to walls with glazed plain coloured wall tiles 1st quality of size of size not less tha
300mm x 200mm with bordersas approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thic
using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm an
jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of a
materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., and overheads
contractors profit complete for finished item of work.
(BLD-CSTN-9-18)
Unit = 10 sqm
Sl.
No.
Description
A.MATERIALS :
Cost of glazed coloured tiles
Sand for CM(1:5) base coat
Cement for CM(1:5) base coat
Cement for slurry
White cement for jointing & pointing
B.LABOUR
Mason 1st class
Mazdoor(unskilled)
Add water charges 1%
Add for MA @ 25%
Rate for 10 sqm
Rate for other Floors
Rate as worked out above
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Overheads&Contractors Profit @0%
Seigniorage charges
Fine aggregate
Rate per 10 Sqm
Rate per 1 Sqm
Say
Quantity
10.50 sqm
0.12 cum
34.56 Kgs
33.00 Kgs
6.00 Kgs
397.00
569.92
6054.94
6054.94
27.00
0.77 Nos.
0.80 Nos.
0.01
0.25
350.00
280.00
493.50
498.44
1 sqm
1 cum
1000 Kgs
1000 Kgs
1 Kg
1 Each
1 Each
GF
5431.01
0.00
0.00
5431.01
0.00
FF
5431.01
49.84
12.46
5493.31
0.00
SF
5431.01
99.69
24.92
5555.62
0.00
4F
5431.01
149.53
37.38
5617.92
0.00
4.80
5435.81
543.58
544
4.80
5498.11
549.81
550
4.80
5560.42
556.04
556
4.80
5622.72
562.27
562
Sl.
No.
64
Description
Quantity
Filling with light weight concrete in Cement Concrete (1:5:10) proportion using brick jelly for low roofs
including cost and conveyance of all materials like cement, sand, brick bats etc., to site, including cost
seigniorage charges on all materials including cost of all labour charges for laying concrete, ramming, curing
overheads & contractors profit etc., complete for finished item of work. (APSS. No. 402)
(BLD-CSTN-3-7)
Unit: 1 Cum
A. Materials :Cement
Cost of brick jelly 20mm size(1/3rd rate)
Fine aggregate ( Sand )
Water (including curing)
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity
Crew Charges
Add MA on crew charges
C.LABOUR :
1st class mason
Mazdoor (unskilled)
Add for MA @ 25%
6054.94
1000 Kgs
460 Nos.
0.45 Cum
1.20 kl
3825.88
449.92
100.00
1000 Nos.
1 Cum
1 kl
1.00 hour
1.00 hour
0.25
128.90
174.20
174.20
1 hour
1 hour
0.10 Nos.
1.39 Nos.
0.25
350.00
280.00
424.20
1 Each
1 Each
129.60 Kgs
GF
2570.72
0.00
0.00
2570.72
0.00
FF
2570.72
42.42
10.61
2623.74
0.00
SF
2570.72
84.84
21.21
2676.77
0.00
4F
2570.72
127.26
31.82
2729.79
0.00
5.93
18.00
2594.65
2595
5.93
18.00
2647.67
2648
5.93
18.00
2700.70
2701
5.93
18.00
2753.72
2754
Sl.
No.
65
Description
Reinforced cement concrete (1:5:10) proportion (Cement: fine aggregates: coarse aggregate) using 40m
size (SS5) hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of a
materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and cost of seigniorag
charges on all materials including centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners
Wood Posts , Wall Plates etc., shuttering, machine mixing, laying concrete, lifting concrete manually , curin
etc., and overheads & contractors profit complete as per drawings but excluding cost of steel and it's fabricatio
charges for finished item of work (APSS NO. 402 & 403) for Dummy columns.
(BLDS-CSTN-3-13)
Unit: 1 Cum
A.MATERIALS :
Cement
40mm HBG metal
Sand
B.LABOUR :
1st class Mason
2nd class Mason
Mazdoor (unskilled)
Add for MA @ 25%
C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity
Crew charges
Needle vibrator 40mm ( petrol )
Crew charges
Add MA on crew charges
Water(including for curing)
Basic cost per 1cum
Rate for other Floors
Rate as above
Hire charges of centering and
scaGFolding
Labour , lift charges for scaGFolding
Add for MA @ 25%
Lift charges
Add for MA @ 25%
Rate per 1 cum
Overheads&Contractors Profit @0%
Seigniorage charges
Coarse aggregate
Fine aggregate
Say
66
Quantity
129.60 Kgs
0.90 Cum
0.45 Cum
6054.94
1007.72
449.92
1000 Kgs
1 Cum
1 Cum
0.167 Nos
0.167 Nos
4.70 Nos
0.25
350.00
320.00
280.00
1427.89
1 Each
1 Each
1 Each
1.00 hour
1.00 hour
1.00 hour
1.00 hour
0.25
1.20 kl
128.90
174.20
26.80
125.40
299.60
100.00
1 hour
1 hour
1 hour
1 hour
FF
4329.19
SF
4329.19
205.00
1288.00
322.00
142.79
35.70
6322.68
0
205.00
1405.00
351.25
285.58
71.40
6647.42
0
45.00
18.00
6385.68
6386
45.00
18.00
6710.42
6710
1 kl
Supplying and fixing of stainless steel ( grade 202 ) hand railing as per approved drawing with top rail o
50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium
class 2 Nos for each step fixed with base plate of 75mm dia using bonding agent and anchor fastne
and welding, drilling of 20mm dia holes with pneumatic compressor for fixing railing, buGFing
polishing all members of the railing thouroughly , lacquer finishing to present seamless finis
including cost and conveyance of all materials, electrodes, welding charges, cost of all consumable
labour charges , overheads & contractors profit etc., complete for finished item of work.
For a flight length of 4.60 M.
Cost of 50mm dia SS pipe (1x4.60)
Cost of 25mm dia SS pipe (26x0.90)
4.60 RM
4.60 RM
23.40 RM
Sl.
No.
Description
50.00mm pipe (4.60 x 2.39 Kgs/RM)
25mm pipe (23.40x 0.89 Kgs/RM)
Cost of stainless steel pipes
Labour charges for fabrication
Drilling of 20mm dia hole(13 x 0.10)
Base Plate 75mm dia.
Add for anchor bars
Add for bonding
Rate per 1 RM
Rate per 1 Sqm
Overheads&Contractors Profit @0%
Quantity
10.99 Kgs
20.83 Kgs
31.82 Kgs
31.82 Kgs
1.30 RM
13 Nos.
13 Nos.
13 Nos.
0.00
187.00
101.00
140.00
75.00
25.00
10.00
1 Kg
1 Kg
1 RM
1 Each
1 No
1 No
2602.94
say
Supplying and fixing of Mild Steel hand railing as per approved drawing with top rail of 50mm dia pip
and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium class 2 Nos fo
each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding
drilling of 20mm dia holes with pneumatic compressor for fixing railing, buGFing, polishing all member
of the railing thouroughly , lacquer finishing to present seamless finish including cost and conveyanc
of all materials, electrodes, welding charges, cost of all consumables, labour charges , overheads
contractors profit etc., complete for finished item of work.
For a flight length of 4.60 M.
Cost of 50mm dia SS pipe (1x4.60)
Cost of 25mm dia SS pipe (26x0.90)
50.00mm pipe (4.60 x 2.39 Kgs/RM)
25mm pipe (23.40x 0.89 Kgs/RM)
Cost of stainless steel pipes
Labour charges for fabrication
Drilling of 20mm dia hole(13 x 0.10)
Base Plate 75mm dia.
Add for anchor bars
Add for bonding
Rate per 1 RM
Rate per 1 Sqm
Overheads&Contractors Profit @0%
4.60 RM
4.60 RM
23.40 RM
10.99 Kgs
20.83 Kgs
31.82 Kgs
31.82 Kgs
1.30 RM
13 Nos.
13 Nos.
13 Nos.
0.00
187.00
101.00
140.00
75.00
25.00
10.00
1 Kg
1 Kg
1 RM
1 Each
1 No
1 No
2602.94
say
Sl.
No.
67
Description
Quantity
Providing 110 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.c
pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all othe
accessories and fixing in position including cost and conveyance of all materials, sales & other taxes o
materials to site, operational & incidental charges including all labour charges for fixing at site etc., an
overheads & contractors profit complete for finished item of work. (APSS No. 1328)
PVC pipe 110mm dia
MS Clamps
Labour charges for fixing pipes
Rate per 6 RM
6.00 RM
3 Nos.
6.00 RM
139.00
18.00
65.00
0.00
213.00
1 RM
1 Each
1 RM
Say
68
Supply and fixing jallies ( cement concrete ) of 50mm thick as per the design approved by the Engineer-i
Charge including cost and conveyance of materials to site and labour charges etc., overheads & contracto
profit complete for finished item of work in all floors.
Cost of 50mm thick jali
1st class mason
2nd class mason
Mazdoor(unskilled)
Add for MA @ 25%
Rate for other Floors
Rate as worked out above
Hire charges for Access ScaGFolding
Labour charges for scaGFolding
Add for MA @ 25%
Lift charges ( Page 131 of Std. Data )
Add for MA @ 25%
Rate for 1 sqm
Overheads&Contractors Profit @0%
Rate per 1 sqm
Say
69
1.00 sqm
0.06 Nos.
0.06 Nos.
0.275 Nos.
0.25
375.00
350.00
320.00
280.00
117.20
1 sqm
1 Each
1 Each
1 Each
GF
521.50
FF
521.50
SF
521.50
4F
521.50
8.99
54.34
13.59
0.00
0.00
598.42
8.99
77.01
19.25
11.84
2.96
641.55
8.99
99.69
24.92
23.67
5.92
684.69
8.99
122.36
30.59
35.51
8.88
727.83
0.00
598.42
598
0
641.55
642
0
684.69
685
0
727.83
728
White washing two coats with paint grade white lime to ceiling to give an even shade after thourough
brushing the surface to remove all dirt and remains of loose powdered materials including cost of a
materials , labour charges and incidental such as scaGFolding , lift charges etc., and overheads
contractors profit complete for finished item of work but excluding conveyance of materials in all floors
(BLD-CSTN-11-5)
Unit : 10 sqm
A.MATERIALS :
Surya cement
B.LABOUR :
Painter 1st class
Painter 2nd class
Mazdoor(unskilled)
Sundries including brushes , ladders
etc., @ 1%
2.00 kgs
515.00
0.063 Nos.
0.147 Nos.
0.32 Nos.
400.00
320.00
280.00
1%
161.84
25 kgs
1 Each
1 Each
1 Each
Sl.
No.
Description
Add for MA @ 25%
Rate per 10 sqm
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
Quantity
0.25
163.46
0.00
245.52
Say
Sl.
No.
70
Description
Quantity
Painting to new walls with 2 coats of Acrylic based Oil bound Washable Distemper having VOC conten
less than 50 grams/litre over deco orient base as approved by Engineer-In-Charge, making 3 coats in all
give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdere
materials, including cost and conveyance of all materials to work site and all operational, incidental, labou
charges etc., and overheads & contractors profit complete for finished item of work as per APSS 911 for intern
walls in all floors.
(BLD-CSTN-12-1)
Unit = 10 Sqm
Cost of deco orient base
Painter 1st class
Painter 2nd class
Cost of washable oil bound distemper
Painter 1st class
Painter 2nd class
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
1.00 Kg
0.08 Nos.
0.19 Nos.
1.70 Ltrs
0.36 Nos.
0.84 Nos.
631.00
400.00
320.00
81.00
400.00
320.00
0.01
0.25
505.60
510.66
0.00
801.26
25 Kg
1 Each
1 Each
1 Ltr
1 Each
1 Each
Say
71
Painting to old walls with 2 coats of Acrylic based Oil bound Washable Distemper having VOC conten
less than 50 grams/litre as approved by Engineer-In-Charge, to give an even shade after thourughly brushin
the old surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
materials to work site and all operational, incidental, labour charges etc., and overheads & contractors pro
complete for finished item of work as per APSS 911 for internal walls in all floors.
(BLD-CSTN-11-10)
Unit = 10 Sqm
Cost of washable oil bound distemper
Painter 1st class
Painter 2nd class
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
1.70 Ltrs
0.36 Nos.
0.84 Nos.
81.00
400.00
320.00
0.01
0.25
412.80
416.93
0.00
658.86
1 Ltr
1 Each
1 Each
Say
72
Painting to old walls with 2 coats of water proof cement paint of shade as approved by the Engineer-I
Charge to give an even shade after thourughly brushing the surface to remove all dirt and remains of loos
powdered materials, including cost and conveyance of all materials to work site and all operational, incidenta
labour charges etc., and overheads & contractors profit complete for finished item of work as per SS 912 in a
floors.
(BLD-CSTN-12-4)
Water proof cement paint
Painter 1st class
Painter 2nd class
Mazdoor(unskilled)
1.00 Kgs
0.15 Nos.
0.35 Nos.
1.50 Nos.
1106.00
400.00
320.00
280.00
25 Kgs
1 Each
1 Each
1 Each
Sl.
No.
Description
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
Quantity
0.01
0.25
592.00
597.92
0.00
791.64
Say
73
Supply & application of one coat deco orient base & two coats of acrylic emulsion paint having VO
(Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyanc
of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads
contractors profit complete for finished item of work in all floors.
(BLD-CSTN-12-2& Amendment in SoR 2011-12)
Unit 10 Sqm.
A. Materials:Cost of deco orient base
1.00 Kg
Painter 1st class
0.21 Nos.
Painter 2nd class
0.49 Nos.
Acrylic emulsion paint
0.80 Ltrs
Painter 1st class
0.36 Nos.
Painter 2nd class
0.84 Nos.
Sundries including brushes , ladders
etc., @ 1%
0.01
Add for MA @ 25%
0.40
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
0.00
631.00
300.00
260.00
180.00
300.00
260.00
25 Kg
1 Each
1 Each
1 Ltrs
1 Each
1 Each
516.80
521.97
900.00
Say
74
Supply & application of one coat of deco orient base & two coats of acrylic exterior emulsion pain
having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost an
conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,an
overheads & contractors profit complete for finished item of work in all floors.
Unit 10 Sqm.
A. Materials:Cost of deco orient base
Painter 1st class
Painter 2nd class
Acrylic emulsion paint
Painter 1st class
Painter 2nd class
Mazdoor
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
1.00 Kg
0.21 Nos.
0.49 Nos.
0.80 Ltrs
0.21 Nos.
0.49 Nos.
1.50 Nos.
631.00
400.00
320.00
183.00
400.00
320.00
280.00
0.01
0.25
901.60
910.62
0.00
1309.91
25 Kg
1 Each
1 Each
1 Ltrs
1 Each
1 Each
1 Each
Say
Sl.
No.
75
Description
Quantity
Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting tw
coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre
approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charge
etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes o
cost of all materials etc.and overheads & contractors profit complete (APSS No.1200, 1207 & 1211) in all floors
(BLD-CSTN-12-6 & 12-12-195)
Cost of Putty for wood work
Primer Coat
Cost of Wood Primer
1st Class Painter
2nd Class Painter
2 coats of Enamel painting
Cost of Synthetic Enamel Paint
1st Class Painter
2nd Class Painter
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
1 Kg
135.00
1 Kg
0.70 Ltr
0.21 Nos.
0.49 Nos.
135.00
400.00
320.00
1 Ltr
1 Each
1 Each
1.20 Ltr
0.36 Nos.
0.84 Nos.
175.00
400.00
320.00
1 Ltr
1 Each
1 Each
0.01
0.25
653.60
660.14
0.00
1264.67
Say
1.70mts
76
1.80mts
Painting to old wood work and flush shutters with two coats of synthetic enamel paint Grade-II VO
(Volatile Organic Compound) content less than 50 grams/litre of approved brand and shade including cost an
conveyance of all materials to site and all labour charges etc. complete, sales & other taxes on cost of a
materials etc.and overheads & contractors profit complete (APSS No.1200, 1207 & 1211) in all floors.
(BLD-CSTN-12-12-196)
Cost of Synthetic Enamel Paint
1st Class Painter
2nd Class Painter
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
1.10 Ltr
0.36 Nos.
0.84 Nos.
175.00
400.00
320.00
0.01
0.25
412.80
416.93
0.00
713.66
1 Ltr
1 Each
1 Each
Say
77
Painting primer coat on new wood work using red oxide Iron primer paint grade - 1 of approved bran
including cost and conveyance of all materials to site , all labour charges etc.and overheads & contractors pro
complete in all floors.(APSS No. 1201, 1212 & 1207).
(BLD-CSTN-12-7)
Unit : 10 sqm
A.MATERIALS :
Red oxide primer
B.LABOUR :
1st Class Painter
2nd Class Painter
0.70 Ltr
121.00
1 Ltr
0.21 Nos.
0.49 Nos.
400.00
320.00
1 Each
1 Each
Sl.
No.
Description
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
Quantity
0.01
0.25
240.80
243.21
0.00
388.71
Say
78
Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content les
than 50 grams/litre to new iron work including cost and conveyance of all materials to site, sales & othe
taxes, incidental, operational and all labour charges etc.,and overheads & contractors profit complete for finishe
item of work in all floors. (SS No. 1201, 1212 & 1207).
(BLD-CSTN-12-12-197)
Unit : 10 sqm
A.MATERIALS :
Cost of Synthetic Enamel Paint
B.LABOUR :
1st Class Painter
2nd Class Painter
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
1.10 Ltr
175.00
1 Ltr
0.33 Nos.
0.77 Nos.
400.00
320.00
1 Each
1 Each
0.01
0.25
378.40
382.18
0.00
670.23
Say
79
Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content les
than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of a
materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads
contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).
(BLD-CSTN-12-7 & 12-12-197)
Unit : 10 sqm
A.MATERIALS :
Red oxide primer
Cost of Synthetic Enamel Paint
B.LABOUR :
for primer coat
1st Class Painter
2nd Class Painter
for enamel painting
1st Class Painter
2nd Class Painter
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
0.70 Ltr
1.10 Ltr
121.00
175.00
1 Ltr
1 Ltr
0.21 Nos.
0.49 Nos.
400.00
320.00
1 Each
1 Each
0.33 Nos.
0.77 Nos.
400.00
320.00
1 Each
1 Each
0.01
0.25
619.20
625.39
0.00
1058.94
Say
Sl.
No.
80
Description
Quantity
Painting two coats with synthetic enamel paint Gr-I having VOC (Volatile Organic Compound) content les
than 50 grams/litre to old iron work including cost and conveyance of all materials to site, sales & other taxe
incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished ite
of work in all floors. (SS No. 1201, 1212 & 1207).
(BLD-CSTN-12-12-198)
Unit : 10 sqm
A.MATERIALS :
Cost of Synthetic Enamel Paint
B.LABOUR :
1st Class Painter
2nd Class Painter
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 sqm
Rate per 1 sqm
0.90 Ltr
175.00
1 Ltr
0.33 Nos.
0.77 Nos.
400.00
320.00
1 Each
1 Each
0.01
0.25
378.40
382.18
0.00
635.23
Say
81
Polishing two coats to teak wood doors using French spirit polish of approved brand for new wood work
teak wood frame and shutters including sand papering to smooth surfaces etc. including cost and conveyanc
of all materials to site, all labour charges etc., complete for finished item of work in all floors.
(BLD-CSTN-12-15)
A.Materials
French polish
cost of spirit
B.Labour
1st Class Painter
2nd Class Painter
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 10 Sqm
Rate per 1 Sqm
0.228 Ltrs
1.63 Ltrs
177.00
95.00
1 Ltrs
1 Ltrs
0.96 Nos.
2.24 Nos.
0.25
400.00
320.00
1100.80
1 Nos.
1 Nos.
0.00
1571.21
Say
82
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked togeth
through their entire length and jointed together at the ends by end-locks, mounted on specially designed pip
shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom lockin
plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover an
springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc
overheads & contractors profit complete for finished item of work as per special spn: 1108
Rate as per SSR
Overheads&Contractors Profit @0%
Rate per 1 sqm
1.00 sqm
0.00
2500.00
2500.00
1 sqm
Sl.
No.
83
Description
Quantity
Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 m
centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frame
of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm M
flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, locking arrangement
stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc., overhead
& contractors profit complete for finished item of work as per special spn 1105
Rate as per SSR
Overheads&Contractors Profit @0%
Rate per 1 sqm
84
1.00 sqm
0.00
2187.00
2187.00
1 sqm
Providing Expansion joint treatment with poly sulphide compound of approved make of finished size 25
12mm including making of 25mm x 12mm groove and primer coat over finished groove with finishing of edge
true to straight line and level over the finished surface of expansion joint including cost and conveyance of a
materials to site, all incidental, operational, labour charges ,.overheads & contractors profit etc., complete fo
finished item of work as per approved drawing (for all floors on top of slab i.e in the flooring and for intern
vertical joints of grooves in dadooing surface)
As per market rate
Rate per 1 RM
85
1.00 RM
400.00
1 RM
Say
Providing and fixing of Expansion joint filler board for buildings, columns, beams and slabs 25 mm thic
including cost and conveyance of all materials to site, all incidental, operational, labour charges etc.overheads
contractors profit complete for finished item of work as per approved drawing for all floors
Rate as per SSR
Overheads&Contractors Profit @0%
Rate per 1 sqm
1.00 Sqm
0.00
376.00
376.00
1 Sqm
Say
1.70mts
86
1.80mts
Providing and fixing of 24 gauge alluminium sheet over expansion joint groove of width 15cm fixed to wal
/ columns at one edge and resting over the other block walls/columns concealing expansion joint with slotte
holes for free edge of aluminium sheet to facilitate free movement of aluminium sheet over the finished surfac
of expansion joint and wall face using sheet metal screws with nylon receiver complete including cost an
conveyance of all materials to site, all incidental, operational, labour charges , overheads & contractors pro
etc., complete for finished item of work as per approved drawing (for all floors for vertical joints and bottom
slab)
Cost of aluminium sheet 24 gauge
Add for labour charges including cost of
nails, making holes to wall and in
aluminium sheet etc.
Rate per 1 sqm
Rate per 1 RM
Overheads&Contractors Profit @0%
1.00 Sqm
282.00
1 Sqm
6.60 RM
15.00
1 RM
0.00
58.00
Say
Sl.
No.
87
Description
Quantity
Providing and fixing in true horizontal level 12 mm - Mineral Fiber sheet 600 x 600 (Square / Tegular) edg
tiles with a Humidity Resistance of 90% RH,Average NRC 0.50, Light Reflectance >80%, Thermal Conductivi
= 0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1 using hot dipped Galvanized Steel section expose
surface with pre-coated capping, main Tee of size 24 x 32 mm at every 1200 mm c/c maximum and rota
stitched cross tee of size 24 x 27 mm at every 600 mm c/c and sub-cross tee of size 24 mm x 25 mm at 120
mm c/c and wall angle of size 19 x 19 mm fixed to periphery of the wall and the above grid is suspended
every 1200 mm c/c in both directions using 2.0 mm thick pre-straightened GI Wire including cost an
conveyance of all materials and labour charges such as cutting , fixing of standing of frame work exposing ro
making, overheads & contractor profit etc., complete for finished item of work in all floor in all floors.
317.00
1 sqm
37.00
1 RM
44.50
1 RM
43.00
1 RM
9.00
2.00
1 RM
1 No.
350.00
320.00
400.00
320.00
1 No.
1 No.
1 No.
1 No.
117.00
1 No.
108.00
280.00
120.54
1 No.
1 No.
117.00
1 No.
108.00
1 No.
0.01
708.56
0.00
715.64
Say
Sl.
No.
88
Description
Quantity
Providing and fixing in true horizontal level 13 mm - Mineral Fiber sheet 595 x 595 (Square / Tegula
Fissura fine model edge tiles with a Humidity Resistance of 90% RH,Average NRC 0.50, Light Reflectanc
>80%, Thermal Conductivity = 0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1 using hot dippe
Galvanized Steel section exposed surface with pre-coated capping, main Tee of size 24 x 32 mm at every 120
mm c/c maximum and rotary stitched cross tee of size 24 x 27 mm at every 600 mm c/c and sub-cross tee
size 24 mm x 25 mm at 1200 mm c/c and wall angle of size 19 x 19 mm fixed to periphery of the wall and th
above grid is suspended at every 1200 mm c/c in both directions using 2.0 mm thick pre-straightened GI Wir
including cost and conveyance of all materials and labour charges such as cutting , fixing of standing of fram
work exposing roof making, overheads & contractor profit etc., complete for finished item of work in all floor in a
floors.
(BLD-CSTN-10-33 & vide Page No. 391 of SoR 2011-12)
Unit 1 Sqm
A) Material requirement
1.00 sqm
12mm Mineral Fiber sheet 600 x 600
Hotdipped GI Angle - Precoated - Grid 19mmx19mmX0.7mm
0.40 RM
Polyster painted GI - T section 1200mm - 24x32mm and 24x25mm
(sub-cross Tee)
1.60 RM
Polyster painted GI-T Section - 300mm
- 24mm x 27mm
1.60 RM
GI Rod - prestraightened - 2.0mm dia
-Connecting Rod
1.28 RM
1.28 Nos.
6mm Nylon Rawl Plug
B) Labour charges
0.12 Nos.
1st Class Carpenter
0.12 Nos.
2nd Class Carpenter
0.024
Nos.
1st Class Painter
0.024 Nos.
2nd Class Painter
Power Saw cutter - Hand Operated Operator
0.012 Nos.
Power Drill - Hand Operated - Operator
0.012 Nos.
0.072 Nos.
Unskilled Mazdoor
Add for MA @ 25%
0.25
C) Machinery
Power Saw cutter - Hand Operated Hire Charges
0.32 Hours
Power Drill - Hand Operated - Hire
Charges
0.32 Hours
ScaGFolding charges 1%
Basic Cost per 1 sqm
Overheads&Contractors Profit @0%
Rate per 1 sqm
344.00
1 sqm
37.00
1 RM
44.50
1 RM
43.00
1 RM
9.00
2.00
1 RM
1 No.
350.00
320.00
400.00
320.00
1 No.
1 No.
1 No.
1 No.
117.00
1 No.
108.00
280.00
120.54
1 No.
1 No.
117.00
1 No.
108.00
1 No.
0.01
735.56
0.00
742.91
Say
Sl.
No.
1
Description
Quantity
Providing Plinth protection 1.20m width along with drain constructed with 230 mm thick brick walls usin
common burnt clay bricks (23x11x7cm) over 100 mm thick over PCC(1:5:10) bed and plastering with CM (1:5
12mm thick single coat for brick masonry drain and providing PCC(1:5:10) 100mm thick in between basement
the building and brick wall and 20mm thick granolithic concrete flooring with CC(1:1:2) prop. up to the edge
the brick masonry wall using 6mm to 12mm size graded hard granite machine crushed metal laid monolithical
already laid, in alternate panels of size not exceeding 1.5 x 1.5 Mts. and providing 5mm thick glass strip
between the pannels and finishing the top surface to required smoothness and slopes including grooves, threa
lining as directed by the Engineer - in - charge including cost and conveyance of all materials to sit
seigniorage charges, sales & other taxes on all materials and operational & incidental and labour charges lik
mixing of cement concrete, laying, curing, overheads & contractor profit etc., complete
P.C.C.(1:5:10)
Brick masonry in CM(1:8)
Plastering 12 mm th Single coat in
C.M(1:5)
Granolithic concrete flooring
Rate per 1.00 RM (1.20 Sqm)
Rate per 1 Sqm
0
Seigniorage charges
40mm metal
12mm graded metal
Sand
in PCC
in brick masonry
in plastering
in granolithic concrete
Bricks
Rate per 1 Sqm
0.211 cum
0.138 cum
2954.00
3291.22
1 cum
1 Cum
1.43 sqm
1.20 sqm
94.56
2647.03
10 sqm
10 sqm
0.00
1173.87
0.1899 cum
0.0204 cum
50.00
50.00
1 cum
1 cum
0.084 cum
0.029 cum
0.018 cum
0.009
0.140 cum
71 Nos.
40.00
38.50
1 cum
1000 Nos.
Say
Sl.
No.
89
Description
Quantity
Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1) using 12.5 m
thick Gyp Board conforming to IS 2095 - 1993 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 m
x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c
and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soGFit
1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners
connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed
direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edg
Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and pape
tape to have a flush look including filling the tapered & square edges with jointing compound, two coats
drywall topcoa including overheads and contractor profit etc., complete for finished item of work
232.00
1 sqm
69.00
1 RM
79.00
1 RM
78.00
1 RM
69.00
2.00
2.00
2.00
2.00
27.00
5.00
133.00
1 RM
1 No.
1 No.
1 No.
1 No.
1 Kg.
1 RM
1 Ltr
350.00
320.00
400.00
320.00
117.00
108.00
280.00
121.84
1 No.
1 No.
1 No.
1 No.
1 No.
1 No.
1 No.
117.00
108.00
1 Hour
1 Hour
785.80
793.65
Say
Sl.
No.
90
Description
Quantity
Supplying and fixing Gyp board Fine line Grid false ceiling (GS-FLC-4.6)using 12.5mm thick Gyp Boar
sheet tiles of size 595mm x 595mm conforming to IS 2095 - 1992 fixing to Gyp steel precoated GI wa
angle of size 25mm x 25mm x 0.70mm thick along the perimeter of ceiling screw fixed to brick work
partition at 610mm center to center and suspending the frame work using precoated GI Tee sectio
(24mm x 38mm x 0.7mm) from soGFit at 1220mm center to center fixed with GI SoGFit Cleat, rawl plug
and steel expansion fasteners & connecting clip to the GI Tee section with 4mm dia GI rod wit
galvanised spring steel level clip of PVC unversal holding clips system at 1200mm center to center an
fixing the 12.5mm Gypboard sheet tiles of size 595mm x 595mm and finishing two coats of drywall to
coat, overheads and contractor profit complete for finished item of work in all floors.
(BLD-CSTN-10-32 & vide Page No. 390 of SoR 2011-12)
Unit - 1 Sqm
A) Material requirement as per India Gypsum
12.5mm Gypboard Tiles
1.00 sqm
595mm x 595mm
GI Angle - Precoated - 25mm x 25mm
x0.7mm
0.40 RM
GI pre coated - T section - 3600mm
long - 24mm x 38mm x 0.7mm thick
3.20 RM
1.28 RM
GI Rod - 4mm dia - Connecting Rod
1.28 Nos.
Rawl Plug
1.28 Nos.
SoGFit Cleats
5.36 Nos.
Universal Holding Clips
0.15 Ltrs
Drywall Top coat
B) Labour Charges
0.12 Nos.
1st Class Carpenter
0.12 Nos.
2nd Class Carpenter
0.02 Nos.
1st Class Painter
0.024 Nos.
2nd Class Painter
0.012 Nos.
Power Saw cutter - Hand Operated Operator
0.012 Nos.
Power Drill - Hand Operated - Operator
0.072 Nos.
Unskilled Mazdoor
0.25
Add for MA @ 25%
C) Machinery
0.32 Hours
Power Saw cutter - Hand Operated Hire Charges
0.32 Hours
Power
Drill -(BMC-X.02)
Hand Operated - Hire
Charges (BMC-X.03)
0.01
ScaGFolding charges @ 1%
Basic Cost per 1 Sqm
0.00
Overheads&Contractors Profit @0%
Rate per 1 sqm
255.00
1 sqm
38.00
1 RM
50.00
11.00
2.00
2.00
3.00
133.00
1 RM
1 RM
1 No.
1 No.
1 No.
1 Ltr
350.00
320.00
400.00
320.00
350.00
350.00
280.00
126.24
1 No.
1 No.
1 No.
1 No.
1 No.
1 No.
1 No.
117.00
108.00
1 Hour
1 Hour
715.23
722.38
Say
Sl.
No.
91
Description
Quantity
Providing and fixing Thermocole False ceiling in true horizontal level 600mm x 600mm using 12mm thic
Thermocole sheet, anodized Aluminium Tee sections of size 24.50mm x 24.0mm x 2.4mm in grid with cross te
of size 24mm x 24.5mm at every 600mm center to center and anodised aluminium wall angle of size 24mm
24mm fixed to periphery of the wall and the above grid is suspended at every 1200mm center to center in bo
directions using 2.0mm thick GI wire for finished of size 600mm x 600mm including cost and conveyance of a
materials and labour charges such as cutting , fixing of standing of frame work exposing roof complete fo
finished item of work in all floors. (The rate is inclusive of overheads & contractor profit).
(BLD-CSTN-10-34 & vide Page No. 392 of SoR 2011-12)
Unit 1 Sqm
A) Material requirement
1.00 sqm
12mm Thermocole sheet
0.40 RM
Aluminium angle - 24mmx 24mm
3.20 RM
Anodised Aluminium T section - 24mm
x 24.5mm
x 2.4mm
1.28 Nos.
GI
rod-prestraightened
2.0mm dia. Connecting
1.28 Nos.
Rawl plugs rod
B) Labour charges
0.11 Nos.
1st Class Carpenter
0.11 Nos.
2nd Class Carpenter
0.02 Nos.
Power Saw cutter - Hand Operated Operator
0.04 Nos.
Power Drill - Hand Operated - Operator
0.20 Nos.
Unskilled Mazdoor
0.25
Add for MA @ 25%
C) Machinery
0.16 Hours
Power Saw cutter - Hand Operated Hire Charges
0.32 Hours
Power
Drill - Hand Operated - Hire
Charges
0.01
ScaGFolding charges 1%
Basic Cost per 1 Sqm
0.00
Overheads&Contractors Profit @0%
Rate per 1 sqm
24.00
24.00
32.00
9.00
2.00
1 sqm
1 RM
1 RM
1 No.
1 No.
350.00
320.00
350.00
350.00
280.00
149.36
1 No.
1 No.
1 No.
1 No.
1 No.
117.00
108.00
1 No.
1 No.
390.06
393.96
Say
92
Supplying and fixing 50mm dia nominal bore Medium Grade properties & weight as per IS 1239 ISI mark M
Tube for fixing of GI Sheet including cost and conveyance of all materials to work site and all operationa
incidental, labour charges , overheads & contractors profit for finished item of work.etc., complete for finishe
item of work in all floors for stair case head room roof.
Cost of MS Tube
Labour charges for fabrication
Labour charges for fixing
Add for MA @ 25%
Rate per 1 RM
Overheads&Contractors Profit @0%
5.10 Kgs
5.10 Kgs
5.10 Kgs
0.25
0.00
57.00
20.00
4.00
61.20
1 Kgs
1 Kgs
Kgs
428.40
Say
93
Roofing with corrugated G.I sheets 0.80mm thick fixed with G.I J bolts & nuts 8 mm dia with bitumen & G
limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved pai
on over lapping of sheets complete (up to a pitch of 600) and seigniorage charges, etc., complete, excluding th
cost of purlins, rafters, trusses including cost and conveyance of all materials , labour charges , overheads an
contractors profit etc., complete for finished item of work in all floors.
Unit : 10 sqm
A. MATERIALS:
G.I corrugated 0.80 mm thick sheets
103.09 Kgs
56.00
1 Kg
Sl.
No.
Description
G.I scam bolts & nuts 2 x 27 (laps) x 17
= 884
G.I
J bolts 8 mm dia 2 x 5 x 27 sheets
x 3 noswashers
= 810 (for
nos. scam
with washers
or
Limpet
& J bolts)
srews,
if wooden
884
+ 810
= 1694battens used.
Bitumen
washers
Zinc cromate yellow paint
Ready mixed paint
B. LABOUR
For roofing
Carpenter II class
Man mazdoor (beldar)
For primer painting one coat
Painter 1st class
Painter 1st class
Mazdoor (coolie)
For two coats of painting to over laps
Painter 1st class
Painter 1st class
Mazdor (coolie)
Add for MA @ 25%
Rate per 10 sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
Rate per 1 sqm
Quantity
47.91 Nos.
43.90 Nos.
91.82 Nos.
91.82 Nos.
0.14 Ltrs
0.20 Ltrs
5.00
9.00
0.30
0.25
175.00
175.00
1 No.
1 No.
1 No.
1 No.
1 Ltr
1 Ltr
0.84 Nos.
0.91 Nos.
320.00
280.00
1 No.
1 No.
0.018 Nos.
0.042 Nos.
0.06 Nos.
400.00
320.00
280.00
1 No.
1 No.
1 No.
0.042 Nos.
0.098 Nos.
0.14 Nos.
0.25
400.00
320.00
280.00
648.40
1 No.
1 No.
1 No.
0.00
732.82
say
D A T A ( SoR 2012-13)
F OFFICE CUM LABORATORY BUILDING AT CRS, TIRUPATI, CHITTOR
DISTRICT
CM (1:8)
598.42
1089.89
56.00
14.00
1758.31
DATA
Amount
(Rs.)
efully stacking useful materials for re-use and disposal of unserviceable
ed by Executive Engineer duly taking actual premeasurements before
es , overheads & contractor profit etc., complete
114.52
28.63
143.15
0.00
143.15
143
683.20
170.80
854.00
0.00
854.00
854
1366.40
341.60
1708.00
0.00
1708.00
1708
1209.60
302.40
160.00
140.00
75.00
1887.00
0.00
1887.00
1887
53.00
13.25
66.25
6.63
0.00
6.63
7
Amount
(Rs.)
306.00
76.50
382.50
0.00
382.50
383
96.00
24.00
120.00
12.00
0.00
12.00
12
106.00
26.50
132.50
13.25
0.00
13.25
13
160.00
40.00
200.00
0.00
200.00
200
33.00
8.25
41.25
4.13
0.00
4.13
4
37.00
9.25
46.25
4.63
0.00
4.63
5
Amount
(Rs.)
34.00
8.50
42.50
4.25
0.00
4.25
4
36.00
9.00
45.00
4.50
0.00
4.50
5
Amount
(Rs.)
clear storey windows, Ventilators etc., ( wood or steel ) shutters including
nd other attachments etc., and stacking them within 100m lead including
contractors profit complete for finished item of work
32.00
56.00
16.00
26.00
130.00
0.00
130.00
130
41.60
75.60
22.40
34.90
174.50
0.00
174.50
175
R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton
g and boring equipment in site as per IS 2911 - 1980 as per approved
ental, labour charges, hire charges of machinery, augur bore drill and shell
s and for finished item of work for piles of 300mm dia.
156.80
39.20
196.00
0.00
196.00
19.60
22.00
41.60
42
Amount
(Rs.)
1019.20
254.80
1274.00
0.00
1274.00
127.40
22.00
149.40
149
2329.60
582.40
8846.40
1123.20
280.80
13162.40
9871.80
0.00
23034.20
95.98
22.00
117.98
118
Amount
(Rs.)
ons (Mechanical Means) for buildings in ordinary soils and depositing
al lead of 10m and up to 3m depth including all operational, incidental,
eting, planking, strutting etc., and overheads & contractors profit complete
gniorage including dewatering charges etc., as per SS 20 B(APSS 308)
2329.60
582.40
8846.40
1123.20
280.80
13162.40
394.87
13557.27
0.00
13557.27
56.49
22.00
78.49
78
Amount
(Rs.)
ons (Mechanical Means) for buildings in ordinary soils and depositing
al lead of 10m and 3m to 6m depth including all operational,incidental,
eting, planking, strutting etc., and overheads & contractors profit complete
gniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
2329.60
582.40
8846.40
1123.20
280.80
13162.40
0.00
13162.40
62.68
22.00
84.68
85
2329.60
582.40
8846.40
1123.20
280.80
13162.40
394.87
13557.27
0.00
13557.27
64.56
22.00
86.56
87
Amount
(Rs.)
tions (Manual Means) of buildings in ordinary rock ( not requiring
k with an initial lead of 10m and depth up to 3m including all
s such as shoring, sheeting, planking, strutting etc., and overheads &
d item of work including seigniorage excluding dewatering charges etc., as
1456.00
364.00
1820.00
0.00
1820.00
182.00
50.00
232.00
232
1747.20
436.80
8846.40
1123.20
280.80
12434.40
0.00
12434.40
69.08
50.00
119.08
119
Amount
(Rs.)
ions for buildings in hard rock (requiring blasting) and depositing on
ad of 10m and up to 3m depth including all operational,incidental, labour
planking, strutting etc., and overheads & contractors profit complete for
orage excluding dewatering charges etc., as per SS 20 B(APSS 308)
175.00
100.00
2338.00
653.25
916.00
41.00
167.20
522.60
172.45
255.50
182.00
5523.00
0.00
5523.00
552.30
50.00
602.30
602
1456.00
364.00
5496.00
246.00
1003.20
3135.60
1034.70
12735.50
Amount
(Rs.)
0.00
12735.50
1273.55
50.00
1323.55
1324
960.63
9.61
840.00
70.40
227.60
2108.24
210.82
63.25
31.62
2413.93
0.00
2413.93
241
86.80
21.70
Amount
(Rs.)
2099.52
2208.02
0.00
2208.02
368.00
40.00
408.00
408
86.80
21.70
1488.48
1596.98
0.00
1596.98
266.16
22.00
288.16
288
86.80
21.70
108.50
0.00
108.50
18.08
18
Amount
(Rs.)
rock) including excavation and carting with a lead of 1.0 Km in trenches,
with initial lead in layers not exceeding 15cm thick, watering and ramming
ter to work site and all operaitonal, incidental, labour charges, hire charges
ctors profit complete for fnished item of work (APSS NO.309&310)
510
26
86.80
21.70
644.82
0.00
644.82
107.47
107
Amount
(Rs.)
cement: fine aggregate: Coarse aggregate) for foundations and under
te 40mm size hard , machine crushed granite from approved quarry
materials like cement, sand, coarse aggregate, water etc. to site, including
axes on all materials and including all charges for machine mixing, laying
ooring bed, ramming in 15 cm layers finishing top surface to the required
ntractors profit complete for finished item of work. (APSS No. 402)
980.90
906.95
202.46
120.00
128.90
174.20
43.55
35.00
389.20
106.05
3087.21
0.00
3087.21
45.00
18.00
3150.21
3150
784.72
906.95
202.46
120.00
128.90
174.20
43.55
35.00
389.20
106.05
Amount
(Rs.)
2891.03
0.00
2891.03
45.00
18.00
2954.03
2954
CM (1:8) prop: (Cement: Screened sand) using hard other than granite
including cost and conveyance of all materials like cement, screened sand,
arry, to site and including seigniorage charges, sales & other taxes on all
stones to required size and shape, mixing, of cement, mortar, construction,
ors profit complete for finished item of work in foundation and basement.
359.66
213.73
188.07
420.00
560.00
245.00
1986.47
0.00
1986.47
55.00
13.20
2054.67
2055
359.66
307.23
188.07
420.00
560.00
245.00
2079.97
Amount
(Rs.)
0.00
2079.97
55.00
13.20
2148.17
2148
:3:6) nominal mix using 40mm size machine crushed hard granite metal
quarry including cost and conveyance of all materials like cement, fine
water etc. to site, including seigniorage charges, sales & other taxes on all
ng concrete in position, vibrating, curing, centering charges, overheads &
of work for footings and basement 400mm thick.
906.95
202.46
1332.09
120.00
128.90
174.20
43.55
26.80
125.40
31.35
35.00
389.20
106.05
3621.95
870.00
1065.00
266.25
5823.20
0.00
45.00
18.00
5886.20
5886
Amount
(Rs.)
MED PILES including Bore pile stem and under ream bulbs
2300.88
1074.38
179.97
35.00
64.00
966.00
266.25
234.40
269.50
67.38
120.00
5577.75
2300.88
1074.38
179.97
46.55
85.44
1288.00
355.00
312.46
359.24
35.72
167.16
131.60
120.00
6456.39
Amount
(Rs.)
6456.39
137.00
415.00
103.75
7112.14
0.00
40.00
16.00
7168.14
7168
6456.39
109.00
660.00
165.00
7390.39
0.00
40.00
16.00
7446.39
7446
6456.39
1158.00
1000.00
250.00
8864.39
0.00
40.00
16.00
8920.39
8920
1484.97
31.51
95.45
23.86
1635.79
0.00
9.20
3.68
1648.67
1649
Amount
(Rs.)
2300.88
1074.38
179.97
58.45
53.44
1568.00
419.97
312.46
359.24
35.72
167.16
131.60
120.00
6781.27
Amount
(Rs.)
1017.19
Amount
(Rs.)
Amount
(Rs.)
2034.38
Amount
(Rs.)
Mix Concrete M 25 grade corresponding to IS 456 with minimum cement
ncrete using WEIGH BATCHER / MIXER with 20mm size graded machine
aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of
10% of 6mm ) from approved quarry including cost and conveyance of all
e (sand) coarse aggregate, water etc., to site and including Seigniorage
aterials , centering using Casurina Ballies , Bamboos , Wooden Reapers ,
etc., including all operational, incidental and labour charges such as weigh
oncrete manually, laying concrete, curing , overheads & contractors profit
eel and its fabrication charges for finished item of work (APSS No. 402)
2300.88
1074.38
179.97
23.45
42.56
861.56
231.89
72.20
83.01
8.25
38.62
30.41
120.00
5067.17
Amount
(Rs.)
380.04
582.72
633.40
Amount
(Rs.)
760.08
Amount
(Rs.)
886.75
1520.15
Amount
(Rs.)
Mix Concrete M 25 grade corresponding to IS 456 with minimum cement
ncrete using WEIGH BATCHER / MIXER with 20mm size graded machine
aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of
10% of 6mm ) from approved quarry including cost and conveyance of all
e (sand) coarse aggregate, water etc., to site and including Seigniorage
aterials , centering using Casurina Ballies , Bamboos , Wooden Reapers ,
etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick
ss of 6.25cm including all operational, incidental and labour charges such
g, lifting of concrete manually, laying concrete, curing, overheads &
excluding cost of steel and its fabrication charges for finished item of work
2300.88
1074.38
179.97
23.45
42.56
861.56
231.89
72.20
83.01
20.75
120.00
5010.64
187.90
Amount
(Rs.)
superstructure with CM (1:8) prop: (Cement : Screened sand) using
s as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x
having minimum crushing strength of 40 Kg/Sqcm. including cost and
ment, screened sand, bricks, water etc., to site, including seigniorage
ll materials and such as labour charges, like mixing cement mortar,
g masonry, lift charges, curing, etc.,and overheads & contractors profit
. (APSS No. 501 & 504).
217.98
1958.85
113.98
84.00
179.20
529.20
7.92
200.08
3291.22
3291.22
0.00
19.71
8.00
3318.93
3319
Amount
(Rs.)
tion walls (11.0 cm thick) in CM (1:4) prop. (Cement : Screened sand)
class as per Table- I of IS:1077-1992, Non- Modular or traditional size
urce having minimum crushing strength of 40 Kg/Sq.cm and placing 2
ry third layer with free ends of the reinforcement pegged into mortar
pplicable including cost and conveyance of all materials like cement,
o site, including seigniorage charges, sales & other taxes on all
ntal charges such as labour charges for mixing cement mortar,
g masonry, lift charges, curing, etc., and overheads & contractors
and its fabrication charges complete for finished item of work. (APSS
2161.62
479.55
125.38
210.00
192.00
770.00
11.72
295.93
4246.21
424.62
2157.45
145.32
56.99
Amount
(Rs.)
84.00
179.20
529.20
7.92
200.08
3360.17
Amount
(Rs.)
3360.17
0.00
4.00
3364.17
3364
2537.32
217.98
56.99
210.00
192.00
770.00
11.72
295.93
4291.94
429.19
Amount
(Rs.)
minal mix using 20mm size graded machine crushed hard granite metal
minal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and
rry including cost and conveyance of all materials like cement, fine
water etc. to site, including seigniorage charges, sales & other taxes on all
for mixing, laying concrete in position, curing etc., & lift charges , and
d Blocks & Hold Fasts for finished item of work. (APSS No. 402)
1208.67
202.46
1332.09
120.00
128.90
174.20
43.55
35.00
389.20
106.05
3740.12
Amount
(Rs.)
n mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine
gregate) ( consisting of nominal size metal 60% of 20mm , 15% of
10% of 6mm ) from approved quarry, using a minimum quantity of 350 kgs.
luding cost and conveyance of all materials like cement, fine aggregate
., to site and cost of seigniorage charges on all materials including steel
g, lift charges, laying concrete,vibrating, curing, overheads & contrctors
of work (APSS No. 402 & 403) for steps
1208.67
202.46
2119.23
120.00
128.90
174.20
26.80
125.40
74.90
35.00
389.20
106.05
4710.82
Amount
(Rs.)
design mix using 12mm size hard granite machine crushed graded metal
ominal size metal 60% of 13.20/12.50mm , 20% of 10mm and 20% of 6mm
mum quantity of 350 kgs. of cement per 1 cum of concrete including cost
e cement, fine aggregate (Sand), coarse aggregate, water etc., to site and
materials including steel centering, shuttering, machine mixing, laying
d overheads & contractors profit complete for finished item of work (APSS
2119.23
1032.95
202.46
46.55
85.44
1008.00
285.00
128.90
174.20
43.55
120.00
5246.28
5246.28
5246.28
0 design mix using 12mm size hard granite machine crushed graded
ting of nominal size metal 60% of 13.20/12.50mm , 20% of 10mm and
arry, using a minimum quantity of 350 kgs. of cement per 1 cum of
eyance of all materials like cement, fine aggregate (Sand), coarse
ost of seigniorage charges on all materials including steel centering,
concrete, lift charges, curing etc., and overheads & contractors profit
(APSS No. 402 & 403) for plaSForms and shelves.
2119.23
Amount
(Rs.)
1032.95
202.46
23.45
42.56
700.00
191.50
34.42
46.51
11.63
120.00
4524.71
Amount
(Rs.)
339.35
113.12
113.12
Amount
(Rs.)
formed (HYSD) (Fe 415 grade as per IS 1786-1979) of diGFerent
ng labour charges for straightening, cutting, bending to required sizes
with cover blocks of approved materials and size and tying and lapWG, forming grills for reinforcement work as per approved designs and
nveyance of steel bars, including all wastages such as overlaps,
cluding cost and conveyance of binding wire, cover blocks and all
arges such as cutting, bending, placing in position, tying including
als etc. ,and overheads & contractors profit complete for finished item
50469.08
420.00
3500.00
2800.00
1575.00
58764.08
50994.08
420.00
3500.00
2800.00
1575.00
59289.08
Amount
(Rs.)
53619.08
420.00
3500.00
2800.00
1575.00
61914.08
Amount
(Rs.)
m thick single coat in CM (1:5) using screened sand including cost and
ent, sand, water etc., to site, including seigniorage charges, sales & other
ational, incidental charges on materials and including cost of all labour
curing as directed by Engineer-in-charge etc., and overheads & contractors
rk.(SS 901,903 & 904)
261.57
85.49
210.00
268.80
119.70
945.56
94.56
using screened sand with base coat of 8mm thick in CM (1:6) and top
with dubara sponge finishing including cost and conveyance of all
etc., to site, including seigniorage charges, sales & other taxes on all
dental charges on materials and including cost of all labour charges
Folding, lift charges, curing, including cutting grooves as directed by
erheads & contractors profit complete for finished item of work. (SS
159.85
62.69
87.19
22.80
220.50
470.40
1092.00
445.73
2561.15
256.12
Amount
(Rs.)
261.57
85.49
210.00
268.80
119.70
945.56
94.56
94.56
0.00
6.00
100.56
101
Amount
(Rs.)
s using screened sand with base coat of 16mm thick in CM(1:6) and
with dubara sponge finishing including cost and conveyance of all
etc., to site, including seigniorage charges, sales & other taxes on all
dental charges on materials and including cost of all labour charges
Folding, lift charges, curing, including cutting grooves as directed by
heads & contractors profit complete for finished item of work .(SS
261.57
102.59
87.19
22.80
220.50
470.40
1092.00
445.73
2702.77
270.28
Amount
(Rs.)
366.20
119.68
300.80
448.00
187.20
1421.89
142.19
142.19
0.00
0.88
143.07
143
Amount
(Rs.)
osed RCC roof slab surfaces to required slopes with CM (1:3) prop.
k (average) mixed with water proofing compound manufactured by
d by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof
ooth with a floating coat of neat cement and thread lining at regular
cost and conveyance of all materials like cement, sand, water proofing
uding seigniorage charges, sales & other taxes on all materials and
charges for mixing mortar, laying, lift charges, rendering smooth and
ounding oGF junctions of wall and slab etc., and overheads &
shed item of work. (APSS No. 901 & 903).
610.34
119.68
96.00
231.00
492.80
1036.00
439.95
3025.77
Amount
(Rs.)
sed RCC roof slab surfaces of sump , sump side wall,sump bottom
ken slabs etc. to required slopes with CM (1:3) prop. using screened
ter proofing compound manufactured by reputed manufacturers as
t 1 Kg per one bag of cement, laid over roof slab when it is green,
at of neat cement and thread lining at regular intervals of 45cmx45cm
ost and conveyance of all materials like cement, sand, water proofing
uding seigniorage charges, sales & other taxes on all materials and
charges for mixing mortar, laying, lift charges, rendering smooth and
ounding oGF junctions of wall and slab etc., and overheads &
shed item of work. (APSS No. 901 & 903).
435.96
85.49
69.12
210.00
268.80
119.70
1189.06
eened sand for drop walls, fins with rabbit wire mesh & nomianl
gineer - In - Charge with dubara sponge finishing,including cost and
e,seigniorage charges,sales&othertaxes on all materials,operationals
of cement,wire mesh,water to work site,centering,scaGFolding and
verheads & contractors profit complete for finished item of work but
cation charges for finished item of work(APSS NO.403&903)
212.80
1453.19
302.75
284.96
2800.00
350.00
2800.00
1487.50
Amount
(Rs.)
257.80
348.40
87.10
10384.49
1038.45
Amount
(Rs.)
1732.25
130.79
199.81
121.10
68.39
1085.00
352.00
240.80
16.78
423.64
4370.56
Amount
(Rs.)
pa slabs minimum of 15mm thick (0.457m x 0.457m) or any other size
CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC
y of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with
st and conveyance of all materials like cement, sand, water, flooring stones
charges, sales & other taxes on all materials including all labour charges
e required size, mixing of cement mortar, laying, lift charges , cost of base
s profit complete for finished item of work. (APSS No.703 & 701)
1446.47
130.79
199.81
121.10
68.39
1085.00
352.00
240.80
16.78
423.64
4084.78
Amount
(Rs.)
m thick , 1st quality and of size as approved by Engineer-in-charge, set
8), 12mm thick using screened sand over CC bed already laid or RCC roof
honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with
xed with pigment of matching shade, including cost of all materials like
and overheads & contractors profit complete including seigniorage charges
k. (APSS No.701 & 707)
4693.50
130.79
199.81
54.00
68.39
336.00
716.80
924.00
19.77
499.14
7642.20
ceramic tiles 8mm thick , of size not less than 400mm x 400mm 1st
gn as per the approved flooring pattern as directed by the Engineer-In
f 2mm thick, set over base coat of cement mortar (1:8), 12mm thick using
dy laid or RCC roof slab, including neat cement slurry of honey like
Sqm & jointed neatly with white cement paste to full depth mixed with
g cost of all materials like cement, screened sand , water and tiles etc.,
ges etc., and overheads & contractors profit complete for finished item of
5649.00
130.79
199.81
54.00
68.39
Amount
(Rs.)
336.00
716.80
924.00
19.77
499.14
8597.70
Amount
(Rs.)
6373.50
130.79
199.81
162.00
68.39
336.00
716.80
924.00
19.77
499.14
9430.20
Amount
(Rs.)
8mm thick (mirror polished of all shades) of 1st quality and of size as
borders and design as per the approved flooring pattern as directed by the
g spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm
bed already laid or RCC roof slab , including neat cement slurry of honey
er Sqm. and jointed neately with white cement paste to full depth mixed
ding cost and conveyance of all materials like cement, sand, water, tiles,
cost of C.C. bed) including cost of seigniorage charges on all materials,
harges for mixing of cement mortar, laying tiles to required slope as
ge etc., and overheads & contractors profit complete for finished item of
9796.50
130.79
199.81
162.00
68.39
336.00
716.80
924.00
19.77
499.14
12853.20
Amount
(Rs.)
gh polished granite stone slabs other than black and regular colours
wer / copper silk / laka red / lavender blue) with borders and design as per
r-in-Charge of length not less than 2.43 mts set over base coat of cement
ened sand over CC bed already laid or RCC roof slab including neat grey
ncy spread @ 3.3 Kg per sqm and jointed neatly with white cement paste
e to full depth including cost and conveyance of all materials like cement ,
work site and all operational, incidental labour & lift charges, half rounding
ges and seigniorage charges and all other taxes on all materials, cost of
rs profit complete for finished item of work (S.S.701 & special)
25116.00
217.98
199.81
162.00
113.98
1050.00
320.00
2240.00
36.10
911.53
30367.40
21346.50
217.98
Amount
(Rs.)
199.81
162.00
113.98
1050.00
320.00
2240.00
36.10
911.53
216.71
4084.15
430.09
31328.85
195.11
726.59
38.24
50.00
437.50
19.20
840.00
12.97
327.42
2647.03
Amount
(Rs.)
es of 30mm thick (dark shade) of size 0.305m x 0.305m set over base
m thick using screened sand over CC bed alredy laid or RCC roof slab
y like consistency spread @ 3.3 kgs per sqm and jointed with neat white
ent of matching shade including cost and conveyance of all materials like
and overheads & contractors profit complete including seigniorage charges
2793.00
174.38
199.81
36.33
68.39
307.20
627.20
924.00
18.58
469.25
5618.15
dur stone slabs of 15mm to 18mm thick in single piece as specified set
mm thick using screened sand over already laid CC bed / RCC roof slab
like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement
nveyance of all materials like cement, sand, water, flooring stones etc.
ges, sales & other taxes on all materials including all labour charges like
equired size, flat nosing the edges, mixing of cement mortar, laying, lift
nd overheads & contractors profit complete for finished item of work for
701)
Amount
(Rs.)
1732.25
209.26
199.81
121.10
68.39
1085.00
352.00
240.80
16.78
423.64
433.29
43.33
4925.65
1732.25
68.39
209.26
199.81
336.00
716.80
868.00
19.21
485.00
4634.72
Amount
(Rs.)
labs minimum of 15mm thick in single piece as specified set over a base
screened sand over already laid CC bed / RCC roof slab including neat
cy spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth
materials like cement, sand, water, flooring stones etc. complete including
axes on all materials including all labour charges like dressing of flooring
g the edges, mixing of cement mortar, laying, lift charges , cost of base coat
ofit complete for finished item of work for treads and risers. (APSS No.703
2169.70
209.26
199.81
121.10
68.39
1085.00
352.00
240.80
16.78
423.64
433.29
43.33
5363.10
2169.70
68.39
209.26
199.81
Amount
(Rs.)
336.00
716.80
868.00
19.21
485.00
5072.17
Amount
(Rs.)
olished granite stone slabs other than black and regular colours (i.e. of
copper silk / laka red / lavender blue) with borders and design as per the
-Charge of length not less than 2.43 mts set over base coat of cement
ened sand over CC bed already laid or RCC roof slab including neat grey
ncy spread @ 3.3 Kg per sqm and jointed neatly with white cement paste
e to full depth including cost and conveyance of all materials like cement ,
work site and all operational, incidental labour & lift charges, half rounding
ges and seigniorage charges and all other taxes on all materials, cost of
ors profit complete for finished item of work for treads and risers (S.S.701
25116.00
209.26
199.81
162.00
68.39
1050.00
320.00
2240.00
36.10
911.53
433.29
8165.85
859.91
39772.14
25116.00
68.39
209.26
199.81
135.00
866.71
Amount
(Rs.)
86.67
735.00
1372.00
21.07
532.02
29341.93
1732.25
68.39
209.26
199.81
336.00
716.80
868.00
19.21
485.00
4634.72
Amount
(Rs.)
1446.47
68.39
209.26
199.81
336.00
716.80
868.00
19.21
485.00
4348.94
5649.00
68.39
209.26
199.81
162.00
269.50
224.00
4.94
Amount
(Rs.)
124.61
6911.51
6373.50
68.39
209.26
199.81
54.00
269.50
224.00
4.94
124.61
7528.01
Amount
(Rs.)
9796.50
68.39
209.26
199.81
135.00
269.50
224.00
4.94
124.61
11032.01
mm thick mirror polished granite tiles length equal to flooring tiles, set
ck using screened sand with cement slurry of honey like consistency spread
ointing with white cement paste mixed with pigment of matching shade to
ials like tiles, cement, sand and water etc., and overheads & contractors
charges etc., complete for finished item of work.(APSS No.701 &707)
Amount
(Rs.)
25116.00
68.39
209.26
199.81
135.00
866.71
86.67
735.00
1372.00
21.07
532.02
29341.93
glazed plain coloured wall tiles 1st quality of size of size not less than
proved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick
urry of honey like consistency spread at the rate of 3.30 kgs per sqm and
xed with pigment of matching shade to full depth, including cost of all
water etc., complete including seigniorage charges etc., and overheads &
d item of work.
Amount
(Rs.)
4168.50
68.39
209.26
199.81
162.00
269.50
224.00
4.94
124.61
5431.01
Amount
(Rs.)
in Cement Concrete (1:5:10) proportion using brick jelly for low roofs
all materials like cement, sand, brick bats etc., to site, including cost of
including cost of all labour charges for laying concrete, ramming, curing ,
omplete for finished item of work. (APSS. No. 402)
784.72
586.63
202.46
120.00
128.90
174.20
43.55
35.00
389.20
106.05
2570.72
Amount
(Rs.)
10) proportion (Cement: fine aggregates: coarse aggregate) using 40mm
e aggregate) from approved quarry including cost and conveyance of all
e (sand), coarse aggregate, water etc., to site and cost of seigniorage
ntering using Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
tering, machine mixing, laying concrete, lifting concrete manually , curing
ofit complete as per drawings but excluding cost of steel and it's fabrication
SS NO. 402 & 403) for Dummy columns.
784.72
906.95
202.46
58.45
53.44
1316.00
356.97
128.90
174.20
26.80
125.40
74.90
120.00
4329.19
teel ( grade 202 ) hand railing as per approved drawing with top rail of
dium class and vertical posts of 25mm dia and 1.6mm thick medium
ith base plate of 75mm dia using bonding agent and anchor fastner
dia holes with pneumatic compressor for fixing railing, buGFing,
ling thouroughly , lacquer finishing to present seamless finish
all materials, electrodes, welding charges, cost of all consumables,
ractors profit etc., complete for finished item of work.
Amount
(Rs.)
5950.34
3213.82
182.00
975.00
325.00
130.00
10776.16
2342.64
2602.94
0.00
2602.94
2603
hand railing as per approved drawing with top rail of 50mm dia pipe
vertical posts of 25mm dia and 1.6mm thick medium class 2 Nos for
f 75mm dia using bonding agent and anchor fastner and welding,
eumatic compressor for fixing railing, buGFing, polishing all members
er finishing to present seamless finish including cost and conveyance
ng charges, cost of all consumables, labour charges , overheads &
r finished item of work.
5950.34
3213.82
182.00
975.00
325.00
130.00
10776.16
2342.64
2602.94
0.00
2602.94
2603
Amount
(Rs.)
d PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm
ost of necessary PVC Bends, shoes, iron / PVC clamps and all other
ncluding cost and conveyance of all materials, sales & other taxes on
dental charges including all labour charges for fixing at site etc., and
ete for finished item of work. (APSS No. 1328)
834.00
54.00
390.00
1278.00
213.00
0.00
213.00
213
concrete ) of 50mm thick as per the design approved by the Engineer-innce of materials to site and labour charges etc., overheads & contractors
rk in all floors.
375.00
21.00
19.20
77.00
29.30
521.50
41.20
25.20
47.04
89.60
1.62
Amount
(Rs.)
40.86
245.52
0.00
245.52
24.55
25
Amount
(Rs.)
of Acrylic based Oil bound Washable Distemper having VOC content
orient base as approved by Engineer-In-Charge, making 3 coats in all to
brushing the surface to remove all dirt and remains of loose powdered
yance of all materials to work site and all operational, incidental, labour
actors profit complete for finished item of work as per APSS 911 for internal
25.24
32.00
60.80
137.70
144.00
268.80
5.06
127.66
801.26
0.00
801.26
80.13
80
137.70
144.00
268.80
4.13
104.23
658.86
0.00
658.86
65.89
66
of water proof cement paint of shade as approved by the Engineer-Inthourughly brushing the surface to remove all dirt and remains of loose
nd conveyance of all materials to work site and all operational, incidental,
& contractors profit complete for finished item of work as per SS 912 in all
44.24
60.00
112.00
420.00
Amount
(Rs.)
5.92
149.48
791.64
0.00
791.64
79.16
79
deco orient base & two coats of acrylic emulsion paint having VOC
less than 50 grams/litre for internal walls including cost and conveyance
taxes, incidental, operational and all labour charges etc.,and overheads &
d item of work in all floors.
25.24
63.00
127.40
144.00
108.00
218.40
5.17
208.79
900.00
0.00
900.00
90.00
90
of deco orient base & two coats of acrylic exterior emulsion paint
und) content less than 50 grams/litre for exterior walls including cost and
ales & other taxes, incidental, operational and all labour charges etc.,and
ete for finished item of work in all floors.
25.24
84.00
156.80
146.40
84.00
156.80
420.00
9.02
227.65
1309.91
0.00
1309.91
130.99
131
Amount
(Rs.)
sh shutters with lappam finish , over a primary coat and painting two
ade-II VOC (Volatile Organic Compound) content less than 50 grams/litre of
onveyance of all materials to site cost of primer coat and all labour charges
d paper on lappam coats for neat finish including sales & other taxes on
s & contractors profit complete (APSS No.1200, 1207 & 1211) in all floors.
135.00
94.50
84.00
156.80
210.00
144.00
268.80
6.54
165.03
1264.67
0.00
1264.67
126.47
126
ush shutters with two coats of synthetic enamel paint Grade-II VOC
less than 50 grams/litre of approved brand and shade including cost and
and all labour charges etc. complete, sales & other taxes on cost of all
ctors profit complete (APSS No.1200, 1207 & 1211) in all floors.
192.50
144.00
268.80
4.13
104.23
713.66
0.00
713.66
71.37
71
d work using red oxide Iron primer paint grade - 1 of approved brand
materials to site , all labour charges etc.and overheads & contractors profit
1, 1212 & 1207).
84.70
84.00
156.80
Amount
(Rs.)
2.41
60.80
388.71
0.00
388.71
38.87
39
192.50
132.00
246.40
3.78
95.55
670.23
0.00
670.23
67.02
67
84.70
192.50
84.00
156.80
132.00
246.40
6.19
156.35
1058.94
0.00
1058.94
105.89
106
Amount
(Rs.)
enamel paint Gr-I having VOC (Volatile Organic Compound) content less
including cost and conveyance of all materials to site, sales & other taxes,
charges etc., and overheads & contractors profit complete for finished item
12 & 1207).
157.50
132.00
246.40
3.78
95.55
635.23
0.00
635.23
63.52
64
doors using French spirit polish of approved brand for new wood work to
ng sand papering to smooth surfaces etc. including cost and conveyance
ges etc., complete for finished item of work in all floors.
40.36
154.85
384.00
716.80
275.20
1571.21
0.00
1571.21
157.12
157
Amount
(Rs.)
eel shutters with vertical, double channel of 20 x10x2 mm of 100 mm
mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames
mx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS
ed with necessary hold fasts, bolts, nuts, rivets, locking arrangements,
fixtures and painted with one coat of approved steel primer etc., overheads
hed item of work as per special spn 1105
2187.00
0.00
2187
joint filler board for buildings, columns, beams and slabs 25 mm thick
materials to site, all incidental, operational, labour charges etc.overheads &
d item of work as per approved drawing for all floors
376.00
0.00
376.00
376
luminium sheet over expansion joint groove of width 15cm fixed to walls
over the other block walls/columns concealing expansion joint with slotted
et to facilitate free movement of aluminium sheet over the finished surface
ng sheet metal screws with nylon receiver complete including cost and
all incidental, operational, labour charges , overheads & contractors profit
ork as per approved drawing (for all floors for vertical joints and bottom of
282.00
99.00
381.00
58.00
0.00
58.00
58
Amount
(Rs.)
ntal level 12 mm - Mineral Fiber sheet 600 x 600 (Square / Tegular) edge
0% RH,Average NRC 0.50, Light Reflectance >80%, Thermal Conductivity
mance Class 0/Class 1 using hot dipped Galvanized Steel section exposed
ain Tee of size 24 x 32 mm at every 1200 mm c/c maximum and rotary
m at every 600 mm c/c and sub-cross tee of size 24 mm x 25 mm at 1200
19 mm fixed to periphery of the wall and the above grid is suspended at
ons using 2.0 mm thick pre-straightened GI Wire including cost and
ur charges such as cutting , fixing of standing of frame work exposing roof
etc., complete for finished item of work in all floor in all floors.
317.00
14.80
71.20
68.80
11.52
2.56
42.00
38.40
9.60
7.68
1.40
1.30
20.16
30.14
37.44
34.56
708.56
7.09
715.64
0.00
715.64
716
Amount
(Rs.)
ontal level 13 mm - Mineral Fiber sheet 595 x 595 (Square / Tegular)
a Humidity Resistance of 90% RH,Average NRC 0.50, Light Reflectance
52 to 0.057 w/mk, Fire Performance Class 0/Class 1 using hot dipped
rface with pre-coated capping, main Tee of size 24 x 32 mm at every 1200
d cross tee of size 24 x 27 mm at every 600 mm c/c and sub-cross tee of
c and wall angle of size 19 x 19 mm fixed to periphery of the wall and the
00 mm c/c in both directions using 2.0 mm thick pre-straightened GI Wire
materials and labour charges such as cutting , fixing of standing of frame
s & contractor profit etc., complete for finished item of work in all floor in all
344.00
14.80
71.20
68.80
11.52
2.56
42.00
38.40
9.60
7.68
1.40
1.30
20.16
30.14
37.44
34.56
735.56
7.36
742.91
0.00
742.91
743
Amount
(Rs.)
width along with drain constructed with 230 mm thick brick walls using
m) over 100 mm thick over PCC(1:5:10) bed and plastering with CM (1:5)
onry drain and providing PCC(1:5:10) 100mm thick in between basement of
m thick granolithic concrete flooring with CC(1:1:2) prop. up to the edge of
12mm size graded hard granite machine crushed metal laid monolithically
size not exceeding 1.5 x 1.5 Mts. and providing 5mm thick glass strips
e top surface to required smoothness and slopes including grooves, thread
- in - charge including cost and conveyance of all materials to site,
axes on all materials and operational & incidental and labour charges like
ring, overheads & contractor profit etc., complete
623.29
454.19
13.52
317.64
1408.64
1173.87
0.00
9.50
1.02
5.60
2.73
1192.72
1193
Amount
(Rs.)
spended regular single layer false ceiling (GS-MFSC-4.1) using 12.5 mm
95 - 1993 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm
g the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c
g Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soGFit at
m x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners &
ls (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in
mediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge
s at 230 mm c/c & jointing and finishing using joint compound and paper
filling the tapered & square edges with jointing compound, two coats of
nd contractor profit etc., complete for finished item of work
238.96
44.16
66.36
65.52
27.60
3.68
1.28
1.28
36.00
14.85
7.30
19.95
42.00
38.40
9.60
7.68
1.40
2.59
20.16
30.46
37.44
69.12
785.80
7.86
793.65
0.00
793.65
794
Amount
(Rs.)
ine line Grid false ceiling (GS-FLC-4.6)using 12.5mm thick Gyp Board
m conforming to IS 2095 - 1992 fixing to Gyp steel precoated GI wall
0mm thick along the perimeter of ceiling screw fixed to brick work /
er and suspending the frame work using precoated GI Tee section
GFit at 1220mm center to center fixed with GI SoGFit Cleat, rawl plugs
connecting clip to the GI Tee section with 4mm dia GI rod with
of PVC unversal holding clips system at 1200mm center to center and
tiles of size 595mm x 595mm and finishing two coats of drywall top
ofit complete for finished item of work in all floors.
255.00
15.20
160.00
14.08
2.56
2.56
16.08
19.95
42.00
38.40
9.60
7.68
4.20
4.20
20.16
31.56
37.44
34.56
715.23
7.15
722.38
0.00
722.38
722
Amount
(Rs.)
False ceiling in true horizontal level 600mm x 600mm using 12mm thick
um Tee sections of size 24.50mm x 24.0mm x 2.4mm in grid with cross tee
0mm center to center and anodised aluminium wall angle of size 24mm x
nd the above grid is suspended at every 1200mm center to center in both
for finished of size 600mm x 600mm including cost and conveyance of all
as cutting , fixing of standing of frame work exposing roof complete for
e rate is inclusive of overheads & contractor profit).
24.00
9.60
102.40
11.52
2.56
37.80
34.56
7.00
14.00
56.00
37.34
18.72
34.56
390.06
3.90
393.96
0.00
393.96
394
minal bore Medium Grade properties & weight as per IS 1239 ISI mark MS
ng cost and conveyance of all materials to work site and all operational,
ds & contractors profit for finished item of work.etc., complete for finished
head room roof.
290.70
102.00
20.40
15.30
428.40
0.00
428.40
428
s 0.80mm thick fixed with G.I J bolts & nuts 8 mm dia with bitumen & G.I
& including a coat of approved steel primer and two coats of approved paint
up to a pitch of 600) and seigniorage charges, etc., complete, excluding the
ing cost and conveyance of all materials , labour charges , overheads and
nished item of work in all floors.
5773.04
Amount
(Rs.)
239.55
395.10
27.55
22.96
24.50
35.00
268.80
254.80
7.20
13.44
16.80
16.80
31.36
39.20
162.10
7328.19
732.82
0.00
732.82
733
Joinery data
200
JOINERY DATA
COMMON SoR 2012-2013
a)
b)
Labour charges for aluminium doors ( S.No.11 of Page No. 396 of SoR 2011-12 )
1st class carpenter
0.099 Nos.
350.00
2nd class carpenter
0.198 Nos.
320.00
Power Saw Cutter -Hand Operated
-Operator
0.099 Nos.
350.00
Power Drill -Hand Operated -Operator
0.099 Nos.
350.00
Mazdoor(Unskilled)
0.297 Nos.
280.00
Non-technical work inspector
0.099 Nos.
335.00
Add for MA @ 25%
0.25
283.64
Machinery
Power Saw Cutter -Hand Operated -Hire
charges (BMC-X.02)
0.793 Hrs
117.00
Power Drill -Hand Operated -Hire
charges (BMC-X.03)
0.793 Hrs
108.00
Power charges for Motors 1%
Labour charges per 1 sqm
c)
0.01
1 Each
1 Each
1 Each
Each
Each
Each
Each
Each
Each
1 Hour
1 Hour
532.97
Labour charges for aluminium sliding windows ( S.No.10 of Page No. 395 of SoR 2011-12 )
1st class carpenter
0.096 Nos.
350.00
Each
2nd class carpenter
0.289 Nos.
320.00
Each
Power Saw Cutter -Hand Operated
-Operator
0.096 Nos.
350.00
Each
Power Drill -Hand Operated -Operator
0.096 Nos.
350.00
Each
Mazdoor(Unskilled)
0.289 Nos.
280.00
Each
Non-technical work inspector
0.096 Nos.
335.00
Each
Add for MA @ 25%
0.25
306.36
C.Machinery
Power Saw Cutter -Hand Operated -Hire
charges (BMC-X.02)
0.771 Hrs
117.00
1 Hour
Power Drill -Hand Operated -Hire
charges (BMC-X.03)
0.771 Hrs
108.00
1 Hour
Power charges for Motors 1%
Labour charges per 1 sqm
d)
350.00
320.00
280.00
0.01
556.43
Labour charges for aluminium partitions partly glazed ( S.No.8 of Page No. 394 of SoR 2011-12 )
1st class carpenter
0.434 Nos.
350.00
Each
2nd class carpenter
0.434 Nos.
320.00
Each
Power Saw Cutter -Hand Operated
-Operator
0.043 Nos.
350.00
Each
Power Drill -Hand Operated -Operator
0.058 Nos.
350.00
Each
Mazdoor(Unskilled)
0.145 Nos.
280.00
Each
Non-technical work inspector
0.072 Nos.
335.00
Each
Add for MA @ 25%
0.25
390.85
C.Machinery
Joinery data
Power Saw Cutter -Hand Operated -Hire
charges (BMC-X.02)
Power Drill -Hand Operated -Hire
charges (BMC-X.03)
Power charges for Motors 1%
Labour charges per 1 sqm
201
0.347 Hrs
117.00
1 Hour
0.463 Hrs
108.00
1 Hour
0.01
579.17
Joinery data
e)
202
Labour charges for aluminium casement windows ( S.No.9 of Page No. 394 of SoR 2011-12 )
1st class carpenter
0.100 Nos.
350.00
Each
2nd class carpenter
0.300 Nos.
320.00
Each
Power Saw Cutter -Hand Operated
-Operator
0.100 Nos.
350.00
Each
Power Drill -Hand Operated -Operator
0.100 Nos.
350.00
Each
Mazdoor(Unskilled)
0.300 Nos.
280.00
Each
Non-technical work inspector
0.100 Nos.
335.00
Each
Add for MA @ 25%
0.25
318.50
C.Machinery
Power Saw Cutter -Hand Operated -Hire
charges (BMC-X.02)
0.800 Hrs
117.00
1 Hour
Power Drill -Hand Operated -Hire
charges (BMC-X.03)
0.800 Hrs
108.00
1 Hour
Power charges for Motors 1%
Labour charges per 1 sqm
0.01
578.13
Joinery data
1
203
Supply and fixing of two shutter main door cum fixed window as per approved drawing with best teak
wood frame of section 150mm x 100 mm with fixed fan light of 500mm at top and fixed panels of 600mm width
at sides fixed with 12mm thick Tinted - Bronze/Green glass using 12mm x 12mm teak wood beading and fixing
ornamental grill made of 25mm x 5mm MS flats as per the approved drawing in fan light portion and fixed
panels and 1st class teak wood top and middle rails & styles of section 120mm x 35mm, bottom rail of size
150mm x 35mm and 12mm thick plain float glass for shutter with ornamental etching including cost and
conveyance to site of teak wood frame, shutters, glass including supply and fixing 6 nos MS Zhold fasts o
size 300 mm x 40 mm x 5mm including cost of ISI marked brass fixtures of 8 Nos butt hinges(IS:205) 250mm
long , 1 No. aldrop (IS:2681) 450mm long, 3 Nos tower bolts- 10mm (IS:204) of 200 mm long , 2 Nos 450 mm
long fancy handles, 2 Nos door stoppers including fixing the fixtures to door with required number of screws
bolt and nuts including labour charges for fixing the frame in position, fixing the shutters to the frame etc.
including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The
vertical frame of door shall be embedded in flooring for a depth of not less than 40 mm) (3000mmX2600mm)
Quantity analysis
Size :
3.00m x 2.60m
2x3.00 + 2x2.60+2x2.10
= 15.40 RM x 0.15 x 0.10
Cost analysis
Cost of best TW frame 2 m to 3m
length
Cost of best TW frame up to 2 m length
Cost of 12mm thick tinted glass
Cost of 12mm thick plain float glass
Cost of teak wood beading
Cost of 250mm long brass butt hinges
Cost of 450mm long brass fancy
handles
Cost of 450mm long brass heavy duty
aldrop
Cost of 200mm long brass tower bolts
Cost of brass door stoppers
Cost of Z hold fasts
Cost of MS Ornamental Grill
Labour charges
Add for MA @ 25%
Labour charges for fixing glass
Add for MA @ 25%
0.0353 Cum
0.0151 Cum
0.0095 Cum
0.1184 Cum
4.02 Sqm
3.78 Sqm
2x2(0.60+0.50)+2x2(0.90+0.50)
2x6(0.60+0.70)
2x2(0.90+2.10)
2 Nos
1 No
3 Nos
2 Nos
6 Nos
4.02 Sqm
0.3494 Cum
0.25
3.78 Sqm
0.25
0.2310 Cum
0.0585 Cum
3.00x0.50+2x0.60x2.10
2x0.90x2.10
0.2310 Cum
0.1184 Cum
4.02 Sqm
3.78 Sqm
37.60 RM
8 Nos
7.80
10.00 RM
15.60 RM
12.00 RM
37.60 RM
116540.00
109477.00
1443.00
1099.00
20.00
250.00
1 Cum
1 Cum
1 Sqm
1 Sqm
1 RM
Each
1482.00
Each
2442.00
198.00
179.00
18.00
1707.84
8287.30
2895.58
221.00
835.38
Each
Each
Each
Each
1 Sqm
1 Cum
1 Sqm
Joinery data
Labour charges for glass designing
work( Etching work)
Add for MA @ 25%
Add for screws and nails
Rate for 7.80 Sqm
Rate for 1 Sqm
Overheads&Contractors Profit @0%
204
3.78 Sqm
0.25
737.00
2785.86
0.00
9497.51
1 Sqm
Say
2
Supply and fixing of ornamental grill made of 25mm x 5mm MS flats for fixing in fan light portion and side
fixed panels for door cum window as per the approved drawing including cutting the flat to required length
welding, painting with red oxide single coat including cost and conveyance of all materials, labour charges etc.
complete for finished otem of work.
for grill of size 535mm x 435mm
MS flats: 4(0.535+0.435)+4x0.1+2x0.38
Cost of MS flats
Labour charges for fabrication
labour charges for fixing in position
Add for MA @ 25%
Painting with red oxide
Rate per 0.2327 Sqm
Rate per 1 Sqm
Painting with Red oxide
Cost of red oxide
Painter 1st class
Painter 2st class
Sundries including brushes , ladders
etc., @ 1%
Add for MA @ 25%
5.04 RM
5.04 Kgs
5.04 Kgs
5.04 Kgs
0.25
0.2327 Sqm
1 Kg/Rm
50065.79
20.00
4.00
60.48
388.71
0.70 Ltr
0.21 Nos.
0.49 Nos.
121.00
400.00
320.00
0.01
0.25
240.80
243.21
0.2327
5.04
1000 Kgs
1 Kg
1 Kg
10 Sqm
1 Ltr
1 Each
1 Each
Joinery data
3
205
Supply and fixing of doors as per approved drawings with best teak wood frame of section 100mm x 65 mm
with fixed fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x 12mm Teak Wood
beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 35mm thick double
shutters with bond wood solid block board type core having cross bands and face veneers, hot pressed
bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I
both sides commercial ply with internal lipping on all sides
including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 nos MS
Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked brass fixtures of 6 Nos butt hinges
(IS:205) 150mm long , 1 No. aldrop (IS:2681) 300mm long, 2 Nos tower bolts- 10mm (IS:204) of 200 mm long
at top, 1 No. tower bolt- 10mm bolt (IS:204) 150mm long at bottom, 2 Nos. 150mm long fancy handles
(IS:208) , 2 Nos door stopper and 2 Nos rubber bushes including fixing the fixtures to door with required
number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to
the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 &
1002 The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (2000mm x
2600mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
2.00m x 2.60 m
2 x 2.61
= 5.22 x 0.10 x 0.065
2 x 2.00 + 0.50
= 4.50 x 0.10 x 0.065
5.20
0.03393
0.02925
0.06318
2 x 1.00 x 0.50
2 x 2 (1.00+0.50)
2 x 0.95 x 2.05
2 x 2.00 x 0.785
1.00
6.00
3.895
3.140
0.03393 cum
0.02925 cum
1.00 sqm
6.00 RM
3.895 sqm
6 Nos.
2 Nos.
1 No.
6 Nos.
1 No.
2 Nos.
2 Nos.
2 Nos.
3.14 Kgs
0.06318 cum
0.25
116540.00
109477.00
309.00
20.00
844.00
18.00
198.00
148.00
219.00
891.00
303.00
179.00
20.00
51065.79
8287.30
523.59
3.895 sqm
0.25
295.00
1149.03
0.00
16990.12
1 cum
1 cum
1 sqm
1 RM
1 sqm
Each
Each
Each
Each
Each
Each
Each
Each
1000 Kgs
1 cum
1 sqm
Joinery data
206
Joinery data
4
207
Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65
mm with fixed fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x 12mm Teak
Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick double
shutters with bond wood solid block board type core having cross bands and face veneers, hot pressed
bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I
both sides commercial ply with internal lipping on all sides
including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos
butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts - 10mm (IS:204) o
200 mm long at top, 2 Nos. 150mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes
including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges fo
fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profi
complete for finished item of work as per APSS 1001 & 1002 The vertical frame of door shall be embedded in
flooring for a depth of not less than 10 mm) (1800mm x 2600mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
1.80m x 2.60m
2 x 2.61
= 5.22 x 0.10 x 0.065
2 x 1.80 + 0.50
= 4.10 x 0.10 x 0.065
4.68
0.03393
0.02665
0.06058
0.90
5.60
3.485
2.826
70630.00
1 cum
63567.00
309.00
1 cum
1 sqm
5.60 RM
3.485 sqm
6 Nos.
20.00
771.00
18.00
1 rm
1 sqm
Each
2 Nos.
50.00
Each
6 Nos.
40.00
Each
1 No.
164.00
Each
2 Nos.
46.00
Each
2 Nos.
2 Nos.
2.826 Kgs
0.06058 cum
0.25
46.00
20.00
51065.79
8287.30
502.04
Each
Each
1000 Kgs
1 cum
3.485 sqm
0.25
295.00
1028.08
1 sqm
Joinery data
Rate for 4.68 sqm
Overheads&Contractors Profit @0%
208
0.00
10062.61
Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65
mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x 12mm
Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick
double shutters with bond wood solid block board type core having cross bands and face veneers, ho
pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202
1991 (Part-I) both sides commercial ply with internal lipping on all sides,
including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos
butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x
10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes
including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges fo
fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profi
complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in
flooring for a depth of not less than 10 mm) (1500mm x 2600mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
1.50m x 2.60m
3.90
2 x 2.61
= 5.22 x 0.10 x 0.065
2 x 1.50 + 0.50
= 3.50 x 0.10 x 0.065
0.03393
0.02275
0.05668
2 x 1.50 x 0.30
2 x 2 (1.50+2 x 0.30)
2 x 0.70 x 2.05
2 x 1.50 x 0.785
0.90
8.40
2.87
2.355
0.03393 cum
70630.00
1 cum
0.02275 cum
0.90 sqm
8.40 RM
2.87 sqm
6 Nos.
63567.00
309.00
20.00
771.00
18.00
1 cum
1 sqm
1 rm
1 sqm
Each
2 Nos.
50.00
Each
6 Nos.
40.00
Each
1 No.
164.00
Each
2 Nos.
46.00
Each
2 Nos.
2 Nos.
2.355 Kgs
46.00
20.00
51065.79
Each
Each
1000 Kgs
Joinery data
Labour charges for frame work
Add for MA @ 25%
Labour charges for fixing flush door
shutter to the frame , fixing the fixtures
to the shutter
Add for MA @ 25%
Add for nails & screws etc.
Rate for 3.90 sqm
Overheads&Contractors Profit @0%
209
0.05668 cum
0.25
8287.30
469.72
1 cum
2.87 sqm
0.25
295.00
846.65
1 sqm
0.00
9108.84
Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65
mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x 12mm
Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick
double shutters with bond wood solid block board type core having cross bands and face veneers, ho
pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202
1991 (Part-I) both sides commercial ply with internal lipping on all sides,
including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos
butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x
10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes
including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges fo
fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete
for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring
for a depth of not less than 10 mm) (1200mm x 2600mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
1.20m x 2.60m
3.12
2 x 2.61
= 5.22 x 0.10 x 0.065
2 x 1.20 + 0.50
= 2.90 x 0.10 x 0.065
0.03393
0.01885
0.05278
2 x 1.20 x 0.30
2 x 2 (1.20+2 x 0.30)
2 x 0.55 x 2.05
2 x 1.20 x 0.785
0.72
7.20
2.255
1.884
0.03393 cum
70630.00
1 cum
0.01885 cum
0.72 sqm
7.20 RM
2.255 sqm
6 Nos.
63567.00
309.00
20.00
771.00
18.00
1 cum
1 sqm
1 rm
1 sqm
Each
2 Nos.
50.00
Each
6 Nos.
40.00
Each
Joinery data
Cost of MS powder coated aldrop
300mm long
Cost of MS powder coated handle
150mm long
Cost of MS powder coated door stopper
Cost of rubber bush
Cost of 10mm MS square bars
Labour charges for frame work
Add for MA @ 25%
Labour charges for fixing flush door
shutter to the frame , fixing the fixtures
to the shutter
Add for MA @ 25%
Add for nails & screws etc.
Rate for 3.12 sqm
Overheads&Contractors Profit @0%
210
1 No.
164.00
Each
2 Nos.
46.00
Each
2 Nos.
2 Nos.
1.884 Kgs
0.0528 cum
0.25
46.00
20.00
51065.79
8287.30
437.40
Each
Each
1000 Kgs
1 cum
2.255 sqm
0.25
295.00
665.23
0.00
1 sqm
8015.07
Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65
mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x 12mm
Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick
single shutter with bond wood solid block board type core having cross bands and face veneers, hot pressed
bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I
both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood
frame, flush shutter including supply and fixing
6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated
fixtures of 3 Nos. butt hinges (IS:205) 150mm long , 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bol
(IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 1 No. door stopper and 1 No
rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labou
charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors
profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (1000mm x 2600mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
1.00m x 2.60m
2 x 2.61
= 5.22 x 0.10 x 0.065
2 x 1.00
= 2.00 x 0.10 x 0.065
2.60
0.03393
0.01300
0.04693
2 x 1.00 x 0.30
2 x (1.00+2 x 0.30)
2 x 0.90 x 2.05
2 x 1.00 x 0.785
0.60
3.20
1.845
1.570
0.03393 cum
70630.00
1 cum
0.0130 cum
0.60 sqm
63567.00
309.00
1 cum
1 sqm
Joinery data
Cost of TW beading
[ 2x2 (1.00+2x0.30)]
Cost of 30 mm thick flush shutter
Cost of MS Z hold fasts
Cost of MS poder coated tower bolt
200mm long
Cost of MS powder coated butt hinges
150mm long
Cost of MS powder coated aldrop
300mm long
Cost of MS powder coated handle
150mm long
211
3.20 RM
1.845 sqm
6 Nos.
20.00
771.00
18.00
1 rm
1 sqm
Each
1 No.
50.00
Each
3 Nos.
40.00
Each
1 No.
164.00
Each
2 Nos.
46.00
Each
1 No.
1 No.
1.57 Kgs
0.0469 cum
0.25
46.00
20.00
51065.79
8287.30
388.92
Each
Each
1000 Kgs
1 cum
1.845 sqm
0.25
295.00
544.28
0.00
1 sqm
6747.56
Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65
mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x 12mm
Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick
single shutter with bond wood solid block board type core having cross bands and face veneers, hot pressed
bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I
both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood
frame, flush shutter including supply and fixing
6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated
fixtures of 3 Nos. butt hinges (IS:205) 150mm long , 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bol
(IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 1 No. door stopper and 1 No
rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labou
charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors
profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (900mm x 2600mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
0.90m x 2.60m
2 x 2.61
= 5.22 x 0.10 x 0.065
2 x 0.90
= 1.80 x 0.10 x 0.065
2 x 0.90 x 0.30
2 x (0.90+2 x 0.30)
2 x 0.80 x 2.05
2.34
0.03393
0.01170
0.04563
0.54
3.00
1.64
Joinery data
10 mm MS square bars
212
2 x 0.90 x 0.785
Cost analysis
Cost of medium TW frame 2 m to 3m
length
Cost of medium TW frame up to 2 m
length
Cost of 4 mm thick pin headed glass
Cost of TW beading
[ 2x2 (1.00+2x0.30)]
Cost of 30 mm thick flush shutter
Cost of MS Z hold fasts
Cost of MS poder coated tower bolt
200mm long
Cost of MS powder coated butt hinges
150mm long
Cost of MS powder coated aldrop
300mm long
Cost of MS powder coated handle
150mm long
Cost of MS powder coated door stopper
Cost of rubber bush
Cost of 10mm MS square bars
Labour charges for frame work
Add for MA @ 25%
Labour charges for fixing flush door
shutter to the frame , fixing the fixtures
to the shutter
Add for MA @ 25%
Add for nails & screws etc.
Rate for 2.34 sqm
Overheads&Contractors Profit @0%
1.413
0.03393 cum
70630.00
1 cum
0.0117 cum
0.54 sqm
63567.00
309.00
1 cum
1 sqm
3.00 RM
1.640 sqm
6 Nos.
20.00
771.00
18.00
1 rm
1 sqm
Each
1 No.
50.00
Each
3 Nos.
40.00
Each
1 No.
164.00
Each
2 Nos.
46.00
Each
1 No.
1 No.
1.413 Kgs
0.0456 cum
0.25
46.00
20.00
51065.79
8287.30
378.15
Each
Each
1000 Kgs
1 cum
1.640 sqm
0.25
295.00
483.80
0.00
1 sqm
6386.30
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and IS
marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core
having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on al
sides including cost and conveyance to site of teak wood frame, flush shutter including
supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS
powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos
tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers
and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts
including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads
& contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of doo
shall be embedded in flooring for a depth of not less than 10 mm) (2000mm x 2100mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
2.00m x 2.10m
2 x 2.11
= 4.22 x 0.10 x 0.065
1 x 2.00
4.20
0.02743
Joinery data
213
0.01300
0.04043
2 x 0.95 x 2.05
3.895
0.02743 cum
70630.00
1 cum
0.01300 cum
3.895 sqm
6 Nos.
63567.00
771.00
18.00
1 cum
1 sqm
Each
2 Nos.
50.00
Each
6 Nos.
40.00
Each
1 No.
164.00
Each
2 Nos.
46.00
Each
2 Nos.
2 Nos.
46.00
20.00
Each
Each
3.895 sqm
0.25
295.00
1149.03
0.00
1 sqm
1915.48
Say
Joinery data
10
214
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and IS
marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core
having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on al
sides including cost and conveyance to site of teak wood frame, flush shutter including
supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS
powder coated fixtures of 6 Nos. butt hinges (IS:205)150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos
tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. doo
stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bol
and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including
overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame
of door shall be embedded in flooring for a depth of not less than 10 mm) (1800mm x 2100mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
1.80m x 2.10m
3.78
2 x 2.11
= 4.22 x 0.10 x 0.065
1 x 1.80
= 1.80 x 0.10 x 0.065
0.02743
0.01170
0.03913
2 x 0.85 x 2.05
3.485
0.0274 cum
70630.00
1 cum
0.0117 cum
3.485 sqm
6 Nos.
63567.00
771.00
18.00
1 cum
1 sqm
Each
2 Nos.
50.00
Each
6 Nos.
40.00
Each
1 No.
164.00
Each
2 Nos.
46.00
Each
2 Nos.
2 Nos.
46.00
20.00
Each
Each
3.49 sqm
0.25
295.00
1028.08
0.00
1982.81
1 sqm
Say
Joinery data
11
215
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and IS
marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core
having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on al
sides including cost and conveyance to site of teak wood frame, flush shutter including
supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS
powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos
tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers
and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts
including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads
& contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of doo
shall be embedded in flooring for a depth of not less than 10 mm) (1500mm x 2100mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
1.50m x 2.10m
3.15
2 x 2.11
= 4.22 x 0.10 x 0.065
1 x 1.50
= 1.50 x 0.10 x 0.065
0.02743
0.00975
0.03718
2 x 0.70 x 2.05
2.87
0.02743 cum
70630.00
1 cum
0.00975 cum
2.87 sqm
6 Nos.
63567.00
771.00
18.00
1 cum
1 sqm
Each
2 Nos.
50.00
Each
6 Nos.
40.00
Each
1 No.
164.00
Each
2 Nos.
46.00
Each
2 Nos.
2 Nos.
0.03718 cum
0.25
46.00
20.00
8287.30
308.12
Each
Each
1 cum
2.87 sqm
0.25
295.00
846.65
1 sqm
0.00
2239.68
Say
Joinery data
12
216
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and IS
marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core
having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on al
sides including cost and conveyance to site of teak wood frame, flush shutter including
supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS
powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos
tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers
and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts
including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads
& contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of doo
shall be embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
1.20m x 2.10m
2.52
2 x 2.11
= 4.22 x 0.10 x 0.065
1 x 1.20
= 1.20 x 0.10 x 0.065
0.02743
0.00780
0.03523
2 x 0.55 x 2.05
2.255
0.0274 cum
70630.00
1 cum
0.0078 cum
2.255 sqm
6 Nos.
63567.00
771.00
18.00
1 cum
1 sqm
Each
2 Nos.
50.00
Each
6 Nos.
40.00
Each
1 No.
164.00
Each
2 Nos.
46.00
Each
2 Nos.
2 Nos.
0.035 cum
0.25
46.00
20.00
8287.30
291.96
Each
Each
1 cum
2.255 sqm
0.25
295.00
665.23
1 sqm
0.00
2464.29
Say
Joinery data
13
217
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and IS
marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core having
cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin
factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides
including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 3 Nos
butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x
10 mm dia at top , 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including
fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the
frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete fo
finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a
depth of not less than 10 mm) (1000mm x 2100mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
1.00m x 2.10m
2.10
2 x 2.11
= 4.22 x 0.10 x 0.065
1 x 1.00
= 1.00 x 0.10 x 0.065
0.02743
0.00650
0.03393
0.90 x 2.05
1.845
0.02743 cum
70630.00
1 cum
0.00650 cum
1.845 sqm
6 Nos.
63567.00
771.00
18.00
1 cum
1 sqm
Each
1 No.
50.00
Each
3 Nos.
40.00
Each
1 No.
164.00
Each
2 Nos.
46.00
Each
1 No.
1 No.
0.0339 cum
0.25
46.00
20.00
8287.30
281.19
Each
Each
1 cum
1.845 sqm
0.25
295.00
544.28
1 sqm
0.00
5410.00
Joinery data
14
218
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and IS
marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core having
cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin
factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides
including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 3 Nos
butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x
10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including
fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the
frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete fo
finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a
depth of not less than 10 mm) (900mm x 2100mm)
(BLD-CSTN-13-16)
Size :
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
0.90m x 2.10m
1.89
2 x 2.11
= 4.22 x 0.10 x 0.065
1 x 0.90
= 0.90 x 0.10 x 0.065
0.02743
0.00585
0.03328
0.80 x 2.05
1.64
0.02743 cum
70630.00
1 cum
0.00585 cum
1.64 sqm
6 Nos.
63567.00
771.00
18.00
1 cum
1 sqm
Each
1 No.
50.00
Each
3 Nos.
40.00
Each
1 No.
164.00
Each
2 Nos.
46.00
Each
1 No.
1 No.
0.03328 cum
0.25
46.00
20.00
8287.30
275.80
Each
Each
1 cum
1.64 sqm
0.25
295.00
483.80
1 sqm
0.00
5130.00
Joinery data
15
219
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and IS
marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having
cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin
factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides
including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and
fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked MS powder coated fixtures 3
Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long,
1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush
including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside including labou
charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors
profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be
embedded in flooring for deth of not less than 10mm) ( 800mm x 2100mm )
(BLD-CSTN-13-16)
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
Size :
0.80m x 2.10m
2 x 2.11
= 4.22 x 0.10 x 0.065
1 x 0.80
= 0.80 x 0.10 x 0.065
1.68
0.02743
0.00520
0.03263
0.70 x 2.05
1.435
0.02743 cum
70630.00
1 cum
0.00520 cum
1.435 sqm
6 Nos.
63567.00
771.00
18.00
1 cum
1 sqm
Each
1 No.
35.00
Each
3 Nos.
40.00
Each
1 No.
137.00
Each
1 No.
1 No.
1.435 sqm
31.00
20.00
150.00
Each
Each
1 sqm
1.435 sqm
0.0326 cum
0.25
50.00
8287.30
270.41
1 sqm
1 cum
1.435 sqm
0.25
295.00
423.33
1 sqm
0.00
4985.00
Joinery data
16
220
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and IS
marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having
cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin
factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides
including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and
fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked MS powder coated fixtures 3
Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150
mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush including supplying and fixing
1.20mm thick PVC sheet to full height of the shutter inside including labour charges for fixing the frame in
position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item
of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of no
less than 10mm) ( 750mm x 2100mm )
(BLD-CSTN-13-16)
Quantity analysis
Outer frame - Vertical
Outer frame - Horizontal
Size :
0.75m x 2.10m
2 x 2.11
= 4.22 x 0.10 x 0.065
1 x 0.75
= 0.75 x 0.10 x 0.065
1.575
0.02743
0.00488
0.03231
0.65 x 2.05
1.333
0.02743 cum
70630.00
1 cum
0.00488 cum
1.333 sqm
6 Nos.
63567.00
771.00
18.00
1 cum
1 sqm
Each
1 No.
35.00
Each
3 Nos.
40.00
Each
1 No.
137.00
Each
1 No.
1 No.
1.333 sqm
31.00
20.00
150.00
Each
Each
1 sqm
1.333 sqm
0.03231 cum
0.25
50.00
8287.30
267.76
1 sqm
1 cum
1.333 sqm
0.25
295.00
393.24
1 sqm
0.00
4825.00
Joinery data
17
221
Supply and fixing powder coated aluminium fully glazed swing door as per the approved drawing with
fixed fan light of 500mm height at top door using aluminium sections of 101.60 mmm x 44.45mm , 3.18 mm
thick for frame and door shutter made of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm thick
and bottom rail of 114.30mm x 44.45 mm , 3.18mm thick,powder coating of alluminium sections 25mm microns
thick, 5 mm thick plain float glass fitted with suitable aluminium glazing clips and rubber beading in fan ligh
portion, double shutters fitted with 5mm thick frosted / ground glass in the top half and 12mm thick
prelaminated particle board ( One side choice colour and other side balancing white lamnation ) in the
bottom half fitted with suitable aluminium glazing clips and rubber beading,shutters mounted on double action
hydraulic floor spring of approved brand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors
including cost of cutting floors as required , embedding in floors
and SS cover plates with brass pivot and sigle piece MS Sheet outer box with slide plate etc.complete
(Weight Capacity up to 130 Kgs) as approved by Engineer-in-Charge including supply and fixing ISI marked
powder coated aluminium fixtures of 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long , 4 Nos.alluminium
handles (IS:208) 150mm dia and 2 Nos. aldrops (IS:2681) 300mm long including labour charges fo
manufacturing door , fixing the door with required No. of screws etc., including overheads & contractors profi
complete for finished item of work. (The Aluminium section used shall be standard make confirming to IS
1948 1961) and as approved by the Engineer) (2000mmx2600mm)
(BLD-CSTN-13-31)
Quantity analysis
Size :
2.00m x 2.60m
Outer frame (101.60 x 44.45, 3.18mm
thick)
2 x 2.00 + 2 x 2.60
Mullions (101.60 x 44.45, 3.18mm thick)
1 x 0.50
5.20
9.20 RM
0.50 RM
9.70 RM
23.319
4 x 2.10 + 2 x 2 x 1.00
12.40 RM
= 12.40 RM @1.501 Kgs/ RM
18.612
2 x 1.00 x 0.50
2 x 1.00 x 1.20
2 x 1.00 x 0.90
2 x 2(1.00+0.50)+2 x 2(1.00+1.20)
LS
51.748 Kgs.
1.00 sqm.
2.40 sqm.
1.80 sqm.
14.80 RM
2 Nos.
4 Nos.
4 Nos.
2 Nos.
5.20 sqm.
0.00
300.00
521.00
697.00
806.00
2.00
3198.00
159.00
100.00
341.00
538.30
30120.00
5.292
4.525
51.748
1.00 sqm.
2.40 sqm.
1.80 sqm.
14.80 RM
1 Kg.
1 sqm.
1 sqm.
1 sqm.
1 RM
Each
Each
Each
Each
1 sqm.
Joinery data
222
Supply and fixing powder coated aluminium fully glazed swing door as per the approved drawing with
fixed fan light of 500mm height at top door using aluminium sections of 101.60 mmm x 44.45mm , 3.18 mm
thick for frame and door shutter made of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm thick
and bottom rail of 114.30mm x 44.45 mm , 3.18mm thick,powder coating of alluminium sections 25mm microns
thick, 5 mm thick plain float glass fitted with suitable aluminium glazing clips and rubber beading in fan ligh
portion, double shutters fitted with 5mm thick frosted / ground glass in the top half and 12mm thick
prelaminated particle board ( One side choice colour and other side balancing white lamnation ) in the
bottom half fitted with suitable aluminium glazing clips and rubber beading,shutters mounted on double action
hydraulic floor spring of approved brand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors
including cost of cutting floors as required , embedding in floors
and SS cover plates with brass pivot and sigle piece MS Sheet outer box with slide plate etc.complete( Weigh
Capacity up to 130 Kgs ) as approved by Engineer-in-Charge including supply and fixing ISI marked powde
coated aluminium fixtures of 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long , 4 Nos.alluminium handles
(IS:208) 150mm dia and 2 Nos. aldrops (IS:2681) 300mm long including labour charges for manufacturing
door , fixing the door with required No. of screws etc., including overheads & contractors profit complete fo
finished item of work. (The Aluminium section used shall be standard make confirming to IS 1948 1961) and
as approved by the Engineer) (1800mmx2600mm)
(BLD-CSTN-13-31)
Quantity analysis
Size :
1.80m x 2.60m
Outer frame (101.60 x 44.45, 3.18mm
thick)
2 x 1.80 + 2 x 2.60
Mullions (101.60 x 44.45, 3.18mm thick)
1 x 0.50
4.68
8.80 RM
0.50 RM
9.30 RM
22.357
4 x 2.10 + 2 x 2 x 0.90
12.00 RM
= 12.00 RM @1.501 Kgs/ RM
18.012
2 x 0.90 x 0.50
2 x 0.90 x 1.20
2 x 0.90 x 0.90
2 x 2(0.90+0.50)+2 x 2(0.90+1.20)
49.414 Kgs.
0.90 sqm.
2.16 sqm.
1.62 sqm.
14.00 RM
2 Nos.
4 Nos.
4 Nos.
300.00
521.00
697.00
806.00
2.00
3198.00
159.00
100.00
4.763
4.282
49.414
0.90 sqm.
2.16 sqm.
1.62 sqm.
14.00 RM
1 Kgs.
1 sqm.
1 sqm.
1 sqm.
1 RM
Each
Each
Each
Joinery data
Cost of Al. aldrops 300mm
B.Labour charges
Add for Screws, Nails, Nuts, Bolts etc.,
Rate per 4.68 Sqm:
Overheads&Contractors Profit @0%
223
2 Nos.
4.68 sqm.
341.00
538.30
Each
1 sqm.
LS
0.00
28780.00
Supply and fixing powder coated aluminium fully glazed swing door as per the approved drawing with
fixed fan light of 500mm height at top door using aluminium sections of 101.60 mmm x 44.45mm , 3.18 mm
thick for frame and door shutter made of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm thick
and bottom rail of 114.30mm x 44.45 mm , 3.18mm thick,powder coating of alluminium sections 25mm microns
thick, 5 mm thick plain float glass fitted with suitable aluminium glazing clips and rubber beading in fan ligh
portion, double shutters fitted with 5mm thick frosted / ground glass in the top half and 12mm thick
prelaminated particle board ( One side choice colour and other side balancing white lamnation ) in the
bottom half fitted with suitable aluminium glazing clips and rubber beading,shutters mounted on double action
hydraulic floor spring of approved brand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors
including cost of cutting floors as required , embedding in floors
and SS cover plates with brass pivot and sigle piece MS Sheet outer box with slide plate etc.complete( Weigh
Capacity up to 130 Kgs ) as approved by Engineer-in-Charge including supply and fixing ISI marked powde
coated aluminium fixtures of 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long , 4 Nos.alluminium handles
(IS:208) 150mm dia and 2 Nos. aldrops (IS:2681) 300mm long including labour charges for manufacturing
door , fixing the door with required No. of screws etc., including overheads & contractors profit complete fo
finished item of work. (The Aluminium section used shall be standard make confirming to IS 1948 1961) and
as approved by the Engineer) (1500mmx2600mm)
(BLD-CSTN-13-31)
Quantity analysis
Size :
1.50m x 2.60m
Outer frame (101.60 x 44.45, 3.18mm
thick)
2 x 1.50 + 2 x 2.60
Mullions (101.60 x 44.45, 3.18mm thick)
1 x 0.50
3.90
8.20 RM
0.50 RM
8.70 RM
20.915
4 x 2.10 + 2 x 2 x 0.90
11.40 RM
= 11.40 RM @1.501 Kgs/ RM
17.111
2 x 0.75 x 0.50
2 x 0.75 x 1.20
2 x 0.75 x 0.90
2 x 2(0.75+0.50)+2 x 2(0.75+1.20)
45.91 Kgs.
0.75 sqm.
1.80 sqm.
1.35 sqm.
300.00
521.00
697.00
806.00
3.969
3.919
45.914
0.75
1.80
1.35
12.80
1 Kgs.
1 sqm.
1 sqm.
1 sqm.
Joinery data
Cost of rubber beading
Cost of floor springs
Cost of Al. tower bolts 300mm
Cost of Al. round handles 150mm dia.
Cost of Al. aldrops 300mm
B.Labour charges
Add for Screws, Nails, Nuts, Bolts etc.,
Rate per 3.90 Sqm:
Overheads&Contractors Profit @0%
224
12.80 RM
2 Nos.
4 Nos.
4 Nos.
2 Nos.
3.90 sqm.
2.00
3198.00
159.00
100.00
341.00
538.30
1 RM
Each
Each
Each
Each
1 sqm.
LS
0.00
26760.00
20
Providing & Fixing of Scientific Doors with metal door frames and door shutters made of galvanize
steel (base steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120
GSM)coated with Zinc Phosphate Primer to receive any paint on site or finished with Thermosetting
Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy polyeste
powder for powder coating paint thickness 50-60 microns (Dry film thickness) outer frame section of 100 x 58
mm x 1.2 mm thick, shutter section of 0.80 mm thick galvanized steel sheet pressed (roll formed) for 46mm
thick fully flush, double skin door shell seam joints at stile edges, in-fill of honeycomb Kraft paper used to give
the required rigidity and effective acoustic insulation with 6 Tower bolt 1 No., 6 D handles 2 Nos., 10
Aldrops 1 No., Butt Hinges 3 Nos, Mortise Lock of approved quality 1 No, frames fixed to the
concrete/masonry wall by means of self expanding screws including overheads and contractor profi
etc.,complete for finished item of work for Single leaf Door
Rate as per SSR
Overheads&Contractors Profit @0%
Rate per 1 Sqm:
1.00 Sqm
0.00
8889.00
8889.00
1 Sqm
Say
21
Providing & Fixing of Scientific Doors with metal door frames and door shutters made of galvanize
steel (base steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120 GSM)
coated with Zinc Phosphate Primer to receive any paint on site or finished with Thermosetting Polyurethane
paint of Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy polyester powder fo
powder coating paint thickness 50-60 microns (Dry film thickness) outer frame section of 100 x 58 mm x 1.2
mm thick, shutter section of 0.80 mm thick galvanized steel sheet pressed (roll formed) for 46mm thick fully
flush, double skin door shell seam joints at stile edges, in-fill of honeycomb Kraft paper used to give the
required rigidity and effective acoustic insulation with 6 Tower bolt 2 Nos., 6 D handles 2 Nos., 10 Aldrops
1 No., Butt Hinges 6 Nos, Mortise Lock of approved quality 1 No, frames fixed to the concrete/masonry
wall by means of self expanding screws including overheads and contractor profit etc., complete for finished
item of work for Double leaf Door
Rate as per SSR
Overheads&Contractors Profit @0%
Rate per 1 Sqm:
1.00 Sqm
0.00
9482.00
9482.00
1 Sqm
Say
Joinery data
22
225
Providing & Fixing of Openable Windows with Fly-mesh made of pre-painted steel (Base Steel as per IS
513 of 0.58 mm thick galvanized as per IS 277 with zinc of 150 GSM) primer coated with epoxy primer of 5-7
microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns
thick alkyd backer and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed
glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion
sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh
shutter section of 20 x 40 mm and the sections cut to length metre joined with corner bracket, centre mullions
fixed with mullion cap, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and
panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubbe
gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws
including 10mm Square guard bars with 6 (152.4mm) pitch including overheads and contractor profit etc.
complete for finished item of work
a Centre fixed both side openable shutter window : 1800mm x1800mm
2.34 Sqm
5513.00
Window portion
0.90 Sqm
5198.00
Fan light portion
Rate per 3.24sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
0.00
5425.50
3.24
1 Sqm
1 Sqm
2.70
1 Sqm
1 Sqm
Say
Joinery data
226
c Double shutter window 1200x1800 with fixed fan light of 500mm at top :
1.56 Sqm
6930.00
Window portion
0.60 Sqm
5198.00
Fan light portion
Rate per 2.70sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
0.00
6448.89
Rate per 1 sqm
2.16
1 Sqm
1 Sqm
Say
d Double shutter window 900x1800 with fixed fan light of 500mm at top :
1.17 Sqm
6930.00
Window portion
0.45 Sqm
5198.00
Fan light portion
Rate per 2.70sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
0.00
6448.89
Rate per 1 sqm
1.62
1 Sqm
1 Sqm
Say
e Centre fixed both side openable shutter window 1800mmx1300mm :
Window portion
2.34 Sqm
5513.00
Rate per 1 sqm
Overheads&Contractors Profit @0%
0.00
5513.00
Rate per 1 sqm
2.34
1 Sqm
Say
f Centre fixed both side openable shutter window 1500mmx1300mm :
1.95 Sqm
6300.00
Window portion
Rate per 1 sqm
Overheads&Contractors Profit @0%
0.00
6300.00
Rate per 1 sqm
1.95
1 Sqm
Say
g Double shutter window 1200mmx1300mm :
Window portion
Rate per 1 sqm
Overheads&Contractors Profit @0%
Rate per 1 sqm
1.56
1.56 Sqm
6930.00
0.00
6930.00
1 Sqm
Say
h Double shutter window 900mmx1300mm:
Window portion
Rate per 1 sqm
Overheads&Contractors Profit @0%
Rate per 1 sqm
1.17
1.17 Sqm
6930.00
0.00
6930.00
1 Sqm
Say
Joinery data
23
227
Supply and fixing of pre-painted steel windows & top hung and fixed louvered ventilators made of pre
painted steel (base steel as per IS 513 of -0.58 mm thick 'D" quality, galvanized as per IS 277 with zinc of 120
GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16
microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm
section and for shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading should be 18 x
25 mm and section for louvered ventilation of 33 x 56 mm Box section and the windows panelled with 5 mm
thick plain float glass & 4 mm pinhead glass for ventilators with Ethyl propylene Diamine monomer Gaske
(EPDM) and the sections cut to length mitre joined with corner brocket centre mullions fixed using mullion cap
and with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made o
CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wal
by means of self expanding screws including 10 mm square guard bars with 6" pitch including overheads &
contractors profit etc., complete for finished item of work.
A) WINDOWS
a Centre fixed both side openable shutter window 1800x1800 with fixed fan light of
500mm at top :
Window portion
Fan light portion
Rate per 3.24sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
Rate per 1 sqm
2.34 Sqm
0.90 Sqm
5145.00
5198.00
0.00
5159.72
3.24
1 Sqm
1 Sqm
Say
b Centre fixed both side openable shutter window 1500x1800 with fixed fan light of
500mm at top :
Window portion
Fan light portion
Rate per 3.24sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
Rate per 1 sqm
1.95 Sqm
0.75 Sqm
5145.00
5198.00
0.00
5159.72
2.70
1 Sqm
1 Sqm
Say
c Double shutter window 1200x1800 with fixed fan light of 500mm at top :
1.56 Sqm
5775.00
Window portion
0.60
Sqm
5198.00
Fan light portion
Rate per 3.24sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
0.00
5614.72
Rate per 1 sqm
2.16
1 Sqm
1 Sqm
Say
d Double shutter window 900x1800 with fixed fan light of 500mm at top :
1.17 Sqm
5775.00
Window portion
0.45 Sqm
5198.00
Fan light portion
Rate per 3.24sqm
Rate per 1 sqm
Overheads&Contractors Profit @0%
0.00
5614.72
Rate per 1 sqm
1.62
1 Sqm
1 Sqm
Say
e Centre fixed both side openable shutter window 1800mmx1300mm :
Rate as per SSR
1.00 Sqm
5145.00
Overheads&Contractors Profit @0%
0.00
5145.00
Rate per 1 sqm
1 Sqm
Joinery data
228
Say
1 Sqm
Say
g Double shutter window 1200mmx1300mm :
Rate as per SSR
Overheads&Contractors Profit @0%
Rate per 1 sqm
1.00 Sqm
0.00
5775.00
5775.00
1.00 Sqm
Say
h Double shutter window 900mmx1300mm :
Rate as per SSR
Overheads&Contractors Profit @0%
Rate per 1 sqm
1.00 Sqm
0.00
5775.00
5775.00
1.00 Sqm
Say
B) VENTILATORS :
a Top Hung of any size
Overheads&Contractors Profit @0%
Rate for 1 Sqm
1.00 Sqm
0.00
5985.00
5985.00
1 Sqm
Say
b Fixed louvered of any size
Overheads&Contractors Profit @0%
Rate for 1 Sqm
1.00 Sqm
0.00
4095.00
4095.00
1 Sqm
Say
24
Providing and fixing of Two shutter Sliding Windows made of Galvanized Steel (Base Steel as per IS 513
D quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made section powder coated with Pure
polyester powder up to 50-60 microns thick with total coated thickness of 0.8 mm for Outer Frame and 0.58
mm thickness for Sliding Shutter Section, the Outer Frame for Two Tracks with Grill provision size of 90 mm x
50 mm and without grill provision is of 75 mm x 50 mm and the Window Shutter section of 58 mm x 36 mm and
the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the
Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame
fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistan
accessories and handle made of Aluminium 1 No. per each shutter and cut to length mitre joined with corne
brackets including installation of window system at site using anchor fasteners, Silicon sealant applied at the
Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site
including overheads & contractors profit etc., complete finished item of work.
Window with Two Sliding Shutters and with Grill Outer Frame Size 90 mm x 50 mm have a rebate of 15mm x 5
mm to fit grill made of 10mm MS Sq Rods for horizontal bars welded at a regular pitch of 150mm to 12mm x 6
mm MS flat.
Rate as per SSR
Overheads&Contractors Profit @0%
Rate for 1 Sqm
1.00 Sqm
0.00
5490.00
5490.00
1.00 Sqm
Say
Joinery data
25
229
Providing and fixing of Three shutter Sliding Windows made of Galvanized Steel (Base Steel as per IS
513, D quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made section powder coated with
Pure polyester powder up to 50-60 microns thick with total coated thickness of 0.8 mm for Outer Frame and
0.58 mm thickness for Sliding Shutter Section, the Outer Frame for three tracks with grill provision size of 105
mm x 50 mm and without grill provision is of 90 mm x 50 mm and the Window Shutter section of 58 mm x 36
mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide
the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame
fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistan
accessories and handle made of Aluminium 1 No. per each shutter and cut to length mitre joined with corne
brackets including installation of window system at site using anchor fasteners, Silicon sealant applied at the
Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site
including overheads & contractors profit etc., complete finished item of work.
Centre Shutter Fixed: centre shutter frame made of section with size 20mm x 47mm should be fitted with 5mm
thick plain float glass of reputed make, EPDM gasket all around the glass and fixed to the Outer Frame with the
supporting section of size 29mm x 20mm of 0.58mm thick fixed horizontally on top and bottom of the shutte
frame.
Rate as per SSR
Overheads&Contractors Profit @14%
Rate for 1 Sqm
1.00 Sqm
0.14
5800.00
5800.00
1.00 Sqm
Say
26
Supply and fixing powder coated alimunium fully glazed 2 shutter windows with fixed panel in between
openable shutters as per approved drawings using anodized aluminium sections of 38.50mm x 33mm , 3mm
thick for outer frame, 59mm(3mm) x 33mm(2.5mm) x 30mm(3mm) for mullions and 38.5mm x 33mm , 3mm
thick for shutter frame , powder coating of alluminium sections 25mm microns thick and fixing 5 mm thick plain
glass fitted with suitable aluminium galzing clips and rubber beading including supplying and fixing powde
coated aluminium adjustable frictional stay hinges (2 Nos. per shutter), handle with lock (1 No. per shutter
including cost and conveyance to site of powder coated aluminium sections, glass, rubber beading, fixtures
etc., including labour charges for manufacturing window, fixing in position using wooden blocks and sheet meta
screws, etc., complete for finished item of work in all floors. (The aluminium sections used shall be standard
make confirming to IS 1948-1961 and as approved by the Engineer and fixtures shall be of ISI marked
(1800mm x 1300mm).
Quantity analysis
1) Outer frame ( 38.50mm x 33mm,
3mm thick )
2) Mullions[59mm (3mm)
(2.50mm) x 30mm (3mm) ]
Size :
1.80m x 1.30m
2.34
2 ( 1.80 + 1.30 )
6.20 RM @ 0.775 Kgs / RM
4.81 Kgs.
2 x 1.30
2.60 RM @ 1.123 Kgs / RM
2.92 Kgs.
33mm
16.44 Kgs.
2.34 sq.m.
11.40 RM
4 Nos.
2 Nos.
2.34 Sqm.
LS
300.00
521.00
2.00
97.00
50.00
583.91
7.56 Kgs.
1.15 Kgs.
16.44 Kgs.
1 Kgs.
1 sq.m.
1 RM
1 Each
1 Each
1 Sqm.
Joinery data
Overheads&Contractors Profit @0%
Rate per 2.34 Sqm:
Rate per 1 Sqm:
230
8032.06
0.00
Say
1
Supply and fixing powder coated alimunium fully glazed 2 shutter windows with fixed panel in between
openable shutters as per approved drawings using anodized aluminium sections of 38.50mm x 33mm , 3mm
thick for outer frame, 59mm(3mm) x 33mm(2.5mm) x 30mm(3mm) for mullions and 38.5mm x 33mm , 3mm
thick for shutter frame , powder coating of alluminium sections 25mm microns thick and fixing 5 mm thick plain
glass fitted with suitable aluminium galzing clips and rubber beading including supplying and fixing powde
coated aluminium adjustable frictional stay hinges (2 Nos. per shutter), handle with lock (1 No. per shutter
including cost and conveyance to site of powder coated aluminium sections, glass, rubber beading, fixtures
etc., including labour charges for manufacturing window, fixing in position using wooden blocks and sheet meta
screws, etc., complete for finished item of work in all floors. (The aluminium sections used shall be standard
make confirming to IS 1948-1961 and as approved by the Engineer and fixtures shall be of ISI marked
(1200mm x 1300mm).
Quantity analysis
1) Outer frame ( 38.50mm x 33mm,
3mm thick )
2) Mullions[59mm (3mm)
(2.50mm) x 30mm (3mm) ]
Size :
1.20m x 1.30m
1.56
2 ( 1.20 + 1.30 )
5.00 RM @ 0.775 Kgs / RM
3.88 Kgs.
2 x 1.30
2.60 RM @ 1.123 Kgs / RM
2.92 Kgs.
33mm
15.51 Kgs.
1.56 sq.m.
11.40 RM
4 Nos.
2 Nos.
1.56 Sqm.
300.00
521.00
2.00
97.00
50.00
583.91
7.56 Kgs.
1.15 Kgs.
15.51 Kgs.
1 Kgs.
1 sq.m.
1 RM
1 Each
1 Each
1 Sqm.
LS
6891.23
0.00
Say
27
Supply and fixing powder coated alimunium fully glazed top hung ventilators fixed with 5mm thick plain
glass using suitable alluminium glazing clips and rubber beading as per approved drawings using anodized
aluminium sections of 38.50mm x 33mm , 3mm thick for outer frame, 59mm(3mm) x 33mm(2.5mm) x
30mm(3mm) for mullions shutters z section of 38.50mmx33mm,3mm thick,powder coating of all alluminium
sections 25mm microns thick, including cost and conveyance to site of powder coated aluminium sections,
glass, rubber beading, fixtures etc., including labour charges for manufacturing window, fixing in position using
wooden blocks and sheet metal screws, etc., complete for finished item of work. (The aluminium sections used
shall be standard make confirming to IS 1948-1961 and as approved by the Engineer and fixtures shall be o
ISI marked) (900mm x 500mm).
Quantity analysis
1) Outer frame ( 38.50mm x 33mm,
3mm thick )
Size :
0.90mx 0.50m
2 ( 0.90 + 0.50 )
0.45
Joinery data
231
5.07 Kgs.
0.45 sq.m.
3.80 RM
0.45 Sqm.
2.17 Kgs.
2.52 Kgs.
0.38 Kgs.
5.07 Kgs.
300.00
521.00
2.00
583.91
1 Kgs.
1 sq.m.
1 RM
1 Sqm.
LS
0.00
2028.56
Say
28
Supply and fixing powder coated alimunium sliding window with fixed fan light at top as per approved
drawings with all required accessories such as stoppers,bolts,weather stripping etc. for all sizes and sections in
accordance with approved drawings and as per IS 1948-1961 with top section of window of size 62mm x 32mm
,1.47mm thick, window side frames of size 61.85mm x 31.75mm,1.50mm thick and bottom frame size
61.85mm x 31.75mm,1.50mm thick sloping outwards for drainage and fixed and sliding shutters with
bottom,sides and top with section of 40mm x 18mm ,1.70mm thick,inter locking section 40mm x 28mm x
18mm,1.60mm thick inter locked for weather scaling and mounted on nylon rollers of lift type and fan light top
&side sections of size 63.50mmx38.10mm,1.53mm thick, powder coating of all alluminium sections 25mm
microns thick and fixing 5mm thick plain glass in fan light and for shutters fitted with
alluminium glazing clips and rubber beading including cost and conveyance to site of powder coated aluminium
sections, glass, rubber beading, fixtures etc., including labour charges for manufacturing window, fixing in
position using wooden blocks and sheet metal screws, overheads & contractors profit etc., complete fo
finished item of work. (The aluminium sections used shall be standard make confirming to IS 1948-1961 and
as approved by the Engineer and fixtures shall be of ISI marked) ( 1800mm x 1800mm )
(BLD-CSTN-13-30 & S.No.10 of SoR , page 395)
Size
1.80m x 1.80m
Quantity analysis
Window frame
bottom : (8932)
1.80m
0.909 Kgs/RM
sides : (8931)
2 x 1.30m
0.784 Kgs/RM
top : (8992)
1.80m
1.005 Kgs/RM
fan light sides&top(4687) 2x0.50+
1.80+2x 0.50
0.942 Kgs/RM
Window shutters
bottom : (8603)
3 x 0.60m
0.641 Kgs/RM
plain sides & top : (8604)
3 (1.30+0.60)
0.522 Kgs/RM
sides inter locking : (8602)
3 x 1.30m
0.663 Kgs/RM
Glazing clips
3x2(0.60+0.50)+3x2x(0.60+1.30)
= 18.00 RM @ 0.101 Kgs /RM
1.80m x 1.80m
27.038 Kgs.
3.24
1.636 Kgs.
2.038 Kgs.
1.809 Kgs.
2.638 Kgs.
11.54 Kgs.
2.975 Kgs.
2.586 Kgs.
1.818 Kgs.
27.038 Kgs.
3.24 sqm
9.00 RM
300.00
1 Kgs.
Joinery data
Cost of 5mm thick plain glass
Cost of rubber beading
B.Labour charges
Add for Screws, Nails, Nuts, Bolts etc.,
Rate per 3.06 Sqm:
Overheads&Contractors Profit @0%
232
3.24 sqm.
9.00 RM
3.24 sqm
521.00
2.00
561.99
1 sqm.
1 RM
1 sqm
LS
0.00
11650.05
Joinery data
29
233
Supply and fixing powder coated alimunium sliding window with fixed fan light at top as per approved
drawings with all required accessories such as stoppers,bolts,weather stripping etc. for all sizes and sections in
accordance with approved drawings and as per IS 1948-1961 with top section of window of size 62mm x 32mm
,1.47mm thick, window side frames of size 61.85mm x 31.75mm,1.50mm thick and bottom frame size
61.85mm x 31.75mm,1.50mm thick sloping outwards for drainage and fixed and sliding shutters with
bottom,sides and top with section of 40mm x 18mm ,1.70mm thick,inter locking section 40mm x 28mm x
18mm,1.60mm thick inter locked for weather scaling and mounted on nylon rollers of lift type and fan light top
&side sections of size 63.50mmx38.10mm,1.53mm thick, powder coating of all alluminium sections 25mm
microns thick and fixing 5mm thick plain glass in fan light and 5mm thick ground glass for shutters fitted
with alluminium glazing clips and rubber beading, powder coating of all alluminium sections 25mm microns
thick including cost and conveyance to site of powder coated aluminium sections, glass,
rubber beading , fixtures etc., including labour charges for manufacturing window, fixing in position using
wooden blocks and sheet metal screws, overheads & contractors profit etc., complete for finished item of work.
(The aluminium sections used shall be standard make confirming to IS 1948-1961 and as approved by the
Engineer and fixtures shall be of ISI marked) (1200mm x 1800mm)
Quantity analysis
Quantity analysis
Window frame
bottom : (8932)
sides : (8931)
top : (8992)
fan light sides&top(4687) 2x0.50+
Window shutters
bottom : (8603)
plain sides & top : (8604)
sides inter locking : (8602)
Glazing clips
Size :
1.20m x 1.80m
1.80m
2 x 1.30m
1.80m
1.20+2x 0.50
2.16
0.909 Kgs/RM
0.784 Kgs/RM
1.005 Kgs/RM
0.942 Kgs/RM
1.636 Kgs.
2.038 Kgs.
1.809 Kgs.
2.072 Kgs.
2 x 0.60m
0.641 Kgs/RM
2 (1.30+0.60)
0.522 Kgs/RM
2 x 1.30m
0.663 Kgs/RM
2x2(0.60+0.50)+2x2x(0.60+1.30)
= 12.00 RM @ 0.101 Kgs /RM
7.69 Kgs.
1.984 Kgs.
1.724 Kgs.
1.20m x 1.80m
20.17 Kgs.
2.16 sqm.
6.00 RM
2.16 sqm
1.212 Kgs.
20.167 Kgs.
2.16 sqm
6.00 RM
300.00
521.00
2.00
561.99
1 Kgs.
1 sqm.
1 RM
1 sqm
LS
0.00
8407.36
Supply and fixing of BISON LAM aluminium glazed partitions using 10MM BISONLAM and 5.00 mm thick
plain glass to full height. Using with BISON LAM to a height of 0.91 meter at bottom panel and remaining heigh
with glass and aluminium sections anodized to 12 to 15 microns and of sections of size 37mm x 62mm and
1.5mm thickness with one meter centre to centre duly fixed with clip beading on both sides including fixing the
frame to pillars by M.S. flats, bolts and nuts including cost and conveyance of all materials including overheads
& contractors profit etc., complete as directed during execution.
Rate as per SSR
Overheads&Contractors Profit @0%
1.00 sqm
0.00
3207.00
3207.00
1 sqm
Joinery data
234
Say
Supply and fixing of BISONPANEL (IS 14276) box type cupboard using BISONPANEL for making frame o
size 100mm x 35mm using two sandwiched 16MM boards, one BISONPANEL and one BISONLAM with plain
35mm wood lipping. The Shutters are made of 16MM thick BISONLAM (Pre-Laminated Cement Bonded
Particle Board) of approved shade inclusive of hardware like M.S. powder coated Piano hinges of size x
Aluminium powder coated handles of size 4 (101.6mm), Aluminium tower bolt 4 (101.6mm) Godrej locks
screws, wood lipping and Fevicol including overheads & contractors profit etc., complete finish item of work.
1.00 sqm
0.00
3218.00
3218.00
1 sqm
Say
Joinery data
JOINERY DATA
COMMON SoR 2012-2013
1858.50
3964.80
2464.00
8287.30
92.78
85.64
532.97
5.33
538.30
90.21
83.27
556.43
5.56
561.99
235
Joinery data
40.60
50.00
579.17
5.79
584.96
236
Joinery data
93.60
86.40
578.13
5.78
583.91
237
Joinery data
main door cum fixed window as per approved drawing with best teak
mm with fixed fan light of 500mm at top and fixed panels of 600mm width
- Bronze/Green glass using 12mm x 12mm teak wood beading and fixing
mm MS flats as per the approved drawing in fan light portion and fixed
and middle rails & styles of section 120mm x 35mm, bottom rail of size
n float glass for shutter with ornamental etching including cost and
me, shutters, glass including supply and fixing 6 nos MS Zhold fasts of
ng cost of ISI marked brass fixtures of 8 Nos butt hinges(IS:205) 250mm
m long, 3 Nos tower bolts- 10mm (IS:204) of 200 mm long , 2 Nos 450 mm
pers including fixing the fixtures to door with required number of screws,
es for fixing the frame in position, fixing the shutters to the frame etc.,
rofit complete for finished item of work as per APSS 1001 & 1002 (The
ded in flooring for a depth of not less than 40 mm) (3000mmX2600mm)
sqm
26920.74
12962.08
5800.86
4154.22
752.00
2000.00
2964.00
2442.00
594.00
358.00
108.00
6865.53
2895.58
723.90
835.38
208.85
238
Joinery data
2785.86
696.47
13.13
74080.59
9497.51
0.00
9497.51
9498
rill made of 25mm x 5mm MS flats for fixing in fan light portion and side
s per the approved drawing including cutting the flat to required length,
e coat including cost and conveyance of all materials, labour charges etc.,
Sqm
Kgs
252.33
100.80
20.16
15.12
9.05
397.46
1707.84
84.70
84.00
156.80
2.41
60.80
388.71
239
Joinery data
e of teak wood frame, flush shutter including supply and fixing 6 nos MS
m x 5mm including cost of ISI marked brass fixtures of 6 Nos butt hinges
IS:2681) 300mm long, 2 Nos tower bolts- 10mm (IS:204) of 200 mm long
lt (IS:204) 150mm long at bottom, 2 Nos. 150mm long fancy handles
2 Nos rubber bushes including fixing the fixtures to door with required
uding labour charges for fixing the frame in position, fixing the shutter to
contractors profit complete for finished item of work as per APSS 1001 &
be embedded in flooring for a depth of not less than 10 mm) (2000mm x
sqm
cum
cum
cum
sqm
RM
sqm
Kgs
3954.20
3202.20
309.00
120.00
3287.38
108.00
396.00
148.00
1314.00
891.00
606.00
358.00
40.00
160.35
523.59
130.90
1149.03
287.26
5.22
16990.12
0.00
16990.12
240
Joinery data
3267.33
3267
241
Joinery data
e of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
m x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos.
No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts - 10mm (IS:204) of
m long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes
with required number of screws, bolt and nuts including labour charges for
he shutter to the frame etc., including overheads & contractors profit
per APSS 1001 & 1002 The vertical frame of door shall be embedded in
0 mm) (1800mm x 2600mm)
sqm
cum
cum
cum
sqm
RM
sqm
Kgs
2396.48
1694.06
278.10
112.00
2686.94
108.00
100.00
240.00
164.00
92.00
92.00
40.00
144.31
502.04
125.51
1028.08
257.02
2.08
242
Joinery data
10062.61
0.00
10062.61
2150.13
2150
e of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos.
No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x
ong handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes
with required number of screws, bolt and nuts including labour charges for
he shutter to the frame etc., including overheads & contractors profit
per APSS 1001 & 1002 (The vertical frame of door shall be embedded in
0 mm) (1500mm x 2600mm)
sqm
cum
cum
cum
sqm
RM
sqm
Kgs
2396.48
1446.15
278.10
168.00
2212.77
108.00
100.00
240.00
164.00
92.00
92.00
40.00
120.26
243
Joinery data
469.72
117.43
846.65
211.66
5.62
9108.84
0.00
9108.84
2335.60
2336
e of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos.
No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x
long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes
with required number of screws, bolt and nuts including labour charges for
shutter to the frame etc, including overheads & contractors profit complete
S 1001 & 1002 (The vertical frame of door shall be embedded in flooring
1200mm x 2600mm)
sqm
cum
cum
cum
sqm
RM
sqm
Kgs
2396.48
1198.24
222.48
144.00
1738.61
108.00
100.00
240.00
244
Joinery data
164.00
92.00
92.00
40.00
96.21
437.40
109.35
665.23
166.31
4.78
8015.07
0.00
8015.07
2568.93
2569
cum
cum
cum
sqm
RM
sqm
Kgs
2396.48
826.37
185.40
245
Joinery data
64.00
1422.50
108.00
50.00
120.00
164.00
92.00
46.00
20.00
80.17
388.92
97.23
544.28
136.07
6.15
6747.56
0.00
6747.56
2595.22
2595
sqm
cum
cum
cum
sqm
RM
sqm
246
Joinery data
Kgs
2396.48
743.73
166.86
60.00
1264.44
108.00
50.00
120.00
164.00
92.00
46.00
20.00
72.16
378.15
94.54
483.80
120.95
5.20
6386.30
0.00
6386.30
2729.19
2729
wings with medium teak wood frame of section 100mm x 65 mm and ISI
m thick double shutters with bond wood solid block board type Core
rs, hot pressed bonded with water proof phenol formaldehyde synthetic
2202-1991 (Part-I) both sides commercial ply with internal lipping on all
to site of teak wood frame, flush shutter including
Sqm
cum
247
Joinery data
cum
cum
sqm
1937.38
826.37
3003.05
108.00
100.00
240.00
164.00
92.00
92.00
40.00
1149.03
287.26
5.92
8045.00
1915.48
0.00
1915.48
1915
248
Joinery data
wings with medium teak wood frame of section 100mm x 65 mm and ISI
m thick double shutters with bond wood solid block board type Core
rs, hot pressed bonded with water proof phenol formaldehyde synthetic
2202-1991 (Part-I) both sides commercial ply with internal lipping on all
to site of teak wood frame, flush shutter including
Sqm
cum
cum
cum
sqm
1937.38
743.73
2686.94
108.00
100.00
240.00
164.00
92.00
92.00
40.00
1028.08
257.02
5.86
7495.00
1982.81
0.00
1982.81
1983
249
Joinery data
wings with medium teak wood frame of section 100mm x 65 mm and ISI
m thick double shutters with bond wood solid block board type Core
rs, hot pressed bonded with water proof phenol formaldehyde synthetic
2202-1991 (Part-I) both sides commercial ply with internal lipping on all
to site of teak wood frame, flush shutter including
Sqm
cum
cum
cum
sqm
1937.38
619.78
2212.77
108.00
100.00
240.00
164.00
92.00
92.00
40.00
308.12
77.03
846.65
211.66
5.61
7055.00
2239.68
0.00
2239.68
2240
250
Joinery data
wings with medium teak wood frame of section 100mm x 65 mm and ISI
mm thick double shutters with bond wood solid block board type Core
rs, hot pressed bonded with water proof phenol formaldehyde synthetic
2202-1991 (Part-I) both sides commercial ply with internal lipping on all
to site of teak wood frame, flush shutter including
Sqm
cum
cum
cum
sqm
1937.38
495.82
1738.61
108.00
100.00
240.00
164.00
92.00
92.00
40.00
291.96
72.99
665.23
166.31
5.71
6210.00
2464.29
0.00
2464.29
2464
251
Joinery data
wings with medium teak wood frame of section 100mm x 65 mm and ISI
thick single shutter with bond wood solid block board type Core having
pressed bonded with water proof phenol formaldehyde synthetic resin
1991 (Part-I) both sides commercial ply with internal lipping on all sides
e of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
x 5mm including cost of ISI marked MS powder coated fixtures of 3 Nos.
No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x
ng handles (IS:208), 1 No. door stopper and 1 No. rubber bush including
ed number of screws, bolt and nuts including labour charges for fixing the
to the frame etc., including overheads & contractors profit complete for
001 & 1002 (The vertical frame of door shall be embedded in flooring for a
mm x 2100mm)
sqm
cum
cum
cum
sqm
1937.38
413.19
1422.50
108.00
50.00
120.00
164.00
92.00
46.00
20.00
281.19
70.30
544.28
136.07
5.11
5410.00
0.00
5410.00
2576.19
2576
252
Joinery data
wings with medium teak wood frame of section 100mm x 65 mm and ISI
thick single shutter with bond wood solid block board type Core having
pressed bonded with water proof phenol formaldehyde synthetic resin
1991 (Part-I) both sides commercial ply with internal lipping on all sides
e of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
x 5mm including cost of ISI marked MS powder coated fixtures of 3 Nos.
No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x
ng handles (IS:208), 1 No. door stopper and 1 No. rubber bush including
ed number of screws, bolt and nuts including labour charges for fixing the
to the frame etc, including overheads & contractors profit complete for
001 & 1002 (The vertical frame of door shall be embedded in flooring for a
m x 2100mm)
sqm
cum
cum
cum
sqm
1937.38
371.87
1264.44
108.00
50.00
120.00
164.00
92.00
46.00
20.00
275.80
68.95
483.80
120.95
6.81
5130.00
0.00
5130.00
2714.29
2714
253
Joinery data
wings with medium teak wood frame of section 100mm x 65mm and ISI
thick single shutter with bond wood solid block board type Core having
pressed bonded with water proof phenol formaldehyde synthetic resin
-1991 (Part-I) both sides commercial ply with internal lipping on all sides
te of medium teak wood door frame, flush shutter, including suply and
300mm x 40mm x 5mm including ISI marked MS powder coated fixtures 3
ong, 1 No. aldrop (IS:2681) 250 mm long,
m x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush
mm thick PVC sheet to full height of the shutter inside including labour
on, fixing the shutter to the frame etc., including overheads & contractors
work as per APSS 1001 & 1002. (The vertical frame of door shall be
ess than 10mm) ( 800mm x 2100mm )
sqm
cum
cum
cum
sqm
1937.38
330.55
1106.39
108.00
35.00
120.00
137.00
31.00
20.00
215.25
71.75
270.41
67.60
423.33
105.83
5.51
4985.00
0.00
4985.00
2967.26
2967
254
Joinery data
wings with medium teak wood frame of section 100mm x 65mm and ISI
thick single shutter with bond wood solid block board type Core having
pressed bonded with water proof phenol formaldehyde synthetic resin
-1991 (Part-I) both sides commercial ply with internal lipping on all sides
te of medium teak wood door frame, flush shutter, including suply and
300mm x 40mm x 5mm including ISI marked MS powder coated fixtures 3
ong, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150
ong handles (IS:208),1 No. rubber bush including supplying and fixing
ght of the shutter inside including labour charges for fixing the frame in
e etc., including overheads & contractors profit complete for finished item
(The vertical frame of door shall be embedded in flooring for deth of not
)
sqm
cum
cum
cum
sqm
1937.38
310.21
1027.74
108.00
35.00
120.00
137.00
31.00
20.00
199.95
66.65
267.76
66.94
393.24
98.31
5.82
4825.00
0.00
4825.00
3063.49
3063
255
Joinery data
aluminium fully glazed swing door as per the approved drawing with
p door using aluminium sections of 101.60 mmm x 44.45mm , 3.18 mm
e of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm thick
mm , 3.18mm thick,powder coating of alluminium sections 25mm microns
ted with suitable aluminium glazing clips and rubber beading in fan light
h 5mm thick frosted / ground glass in the top half and 12mm thick
side choice colour and other side balancing white lamnation ) in the
inium glazing clips and rubber beading,shutters mounted on double action
rand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors
uired , embedding in floors
and sigle piece MS Sheet outer box with slide plate etc.complete
approved by Engineer-in-Charge including supply and fixing ISI marked
f 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long , 4 Nos.alluminium
2 Nos. aldrops (IS:2681) 300mm long including labour charges for
with required No. of screws etc., including overheads & contractors profit
. (The Aluminium section used shall be standard make confirming to IS
e Engineer) (2000mmx2600mm)
sqm
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
15524.40
521.00
1672.80
1450.80
29.60
6396.00
636.00
400.00
682.00
2799.15
8.25
30120.00
0.00
256
Joinery data
30120.00
5792.31
5792
aluminium fully glazed swing door as per the approved drawing with
p door using aluminium sections of 101.60 mmm x 44.45mm , 3.18 mm
e of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm thick
mm , 3.18mm thick,powder coating of alluminium sections 25mm microns
ted with suitable aluminium glazing clips and rubber beading in fan light
h 5mm thick frosted / ground glass in the top half and 12mm thick
side choice colour and other side balancing white lamnation ) in the
inium glazing clips and rubber beading,shutters mounted on double action
rand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors
uired , embedding in floors
and sigle piece MS Sheet outer box with slide plate etc.complete( Weight
ed by Engineer-in-Charge including supply and fixing ISI marked powder
tower bolts 10mm bolt (IS:204) 300mm long , 4 Nos.alluminium handles
drops (IS:2681) 300mm long including labour charges for manufacturing
No. of screws etc., including overheads & contractors profit complete for
m section used shall be standard make confirming to IS 1948 1961) and
mmx2600mm)
sqm
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
14824.20
468.90
1505.52
1305.72
28.00
6396.00
636.00
400.00
257
Joinery data
682.00
2519.24
14.42
28780.00
0.00
28780.00
6149.57
6150
aluminium fully glazed swing door as per the approved drawing with
p door using aluminium sections of 101.60 mmm x 44.45mm , 3.18 mm
e of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm thick
mm , 3.18mm thick,powder coating of alluminium sections 25mm microns
ted with suitable aluminium glazing clips and rubber beading in fan light
h 5mm thick frosted / ground glass in the top half and 12mm thick
side choice colour and other side balancing white lamnation ) in the
inium glazing clips and rubber beading,shutters mounted on double action
rand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors
uired , embedding in floors
and sigle piece MS Sheet outer box with slide plate etc.complete( Weight
ed by Engineer-in-Charge including supply and fixing ISI marked powder
tower bolts 10mm bolt (IS:204) 300mm long , 4 Nos.alluminium handles
drops (IS:2681) 300mm long including labour charges for manufacturing
No. of screws etc., including overheads & contractors profit complete for
m section used shall be standard make confirming to IS 1948 1961) and
mmx2600mm)
sqm
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
sqm.
sqm.
sqm.
RM
13774.20
390.75
1254.60
1088.10
258
Joinery data
25.60
6396.00
636.00
400.00
682.00
2099.36
13.39
26760.00
0.00
26760.00
6861.54
oors with metal door frames and door shutters made of galvanize
0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120
Primer to receive any paint on site or finished with Thermosetting
e providing high levels of scratch resistance and durability/Epoxy polyester
kness 50-60 microns (Dry film thickness) outer frame section of 100 x 58
of 0.80 mm thick galvanized steel sheet pressed (roll formed) for 46mm
ll seam joints at stile edges, in-fill of honeycomb Kraft paper used to give
oustic insulation with 6 Tower bolt 1 No., 6 D handles 2 Nos., 10
Nos, Mortise Lock of approved quality 1 No, frames fixed to the
of self expanding screws including overheads and contractor profit
k for Single leaf Door
8889.00
0.00
8889.00
8889
oors with metal door frames and door shutters made of galvanize
58 mm thick D quality, galvanized as per IS 277 with Zinc of 120 GSM).
to receive any paint on site or finished with Thermosetting Polyurethane
gh levels of scratch resistance and durability/Epoxy polyester powder for
0 microns (Dry film thickness) outer frame section of 100 x 58 mm x 1.2
m thick galvanized steel sheet pressed (roll formed) for 46mm thick fully
joints at stile edges, in-fill of honeycomb Kraft paper used to give the
c insulation with 6 Tower bolt 2 Nos., 6 D handles 2 Nos., 10 Aldrops
e Lock of approved quality 1 No, frames fixed to the concrete/masonry
ews including overheads and contractor profit etc., complete for finished
9482.00
0.00
9482.00
9482
259
Joinery data
sqm
12900.42
4678.20
17578.62
5425.50
0.00
5425.50
5426
sqm
12285.00
3898.50
16183.50
5993.89
0.00
5993.89
5994
260
Joinery data
sqm
10810.80
3118.80
13929.60
6448.89
0.00
6448.89
6449
sqm
8108.10
2339.10
10447.20
6448.89
0.00
6448.89
6449
sqm
12900.42
5513.00
0.00
5513.00
5513
sqm
12285.00
6300.00
0.00
6300.00
6300
sqm
10810.80
6930.00
0.00
6930.00
6930
sqm
8108.10
6930.00
0.00
6930.00
6930
261
Joinery data
eel windows & top hung and fixed louvered ventilators made of pre 13 of -0.58 mm thick 'D" quality, galvanized as per IS 277 with zinc of 120
mer of 5-7 microns thick, finish painted with a polyester paint of 12-16
5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm
m section for mullion 46 x 70 mm, and section for beading should be 18 x
tilation of 33 x 56 mm Box section and the windows panelled with 5 mm
ead glass for ventilators with Ethyl propylene Diamine monomer Gasket
h mitre joined with corner brocket centre mullions fixed using mullion cap
e aluminium powder coated and nylon receiver, corner brackets made of
caps made of glass filled nylon, frames fixed to the concrete /masonry wall
including 10 mm square guard bars with 6" pitch including overheads &
nished item of work.
sqm
12039.30
4678.20
16717.50
5159.72
0.00
5159.72
5160
sqm
10032.75
3898.50
13931.25
5159.72
0.00
5159.72
5160
sqm
9009.00
3118.80
12127.80
5614.72
0.00
5614.72
5615
sqm
6756.75
2339.10
9095.85
5614.72
0.00
5614.72
5615
5145.00
0.00
5145.00
262
Joinery data
5145
5145.00
0.00
5145.00
5145
5775.00
0.00
5775.00
5775
5775.00
0.00
5775.00
5775
5985.00
0.00
5985.00
5985
4095.00
0.00
4095.00
4095
263
Joinery data
rame made of section with size 20mm x 47mm should be fitted with 5mm
e, EPDM gasket all around the glass and fixed to the Outer Frame with the
0mm of 0.58mm thick fixed horizontally on top and bottom of the shutter
5800.00
812.00
6612.00
6612
sqm
4932.00
1219.14
22.80
388.00
100.00
1366.34
3.78
8032.06
264
Joinery data
0.00
8032.06
3432.50
3433
sqm
4653.00
812.76
22.80
388.00
100.00
910.89
3.78
6891.23
0.00
6891.23
4417.46
4417
alimunium fully glazed top hung ventilators fixed with 5mm thick plain
ing clips and rubber beading as per approved drawings using anodized
33mm , 3mm thick for outer frame, 59mm(3mm) x 33mm(2.5mm) x
section of 38.50mmx33mm,3mm thick,powder coating of all alluminium
ing cost and conveyance to site of powder coated aluminium sections,
ncluding labour charges for manufacturing window, fixing in position using
ws, etc., complete for finished item of work. (The aluminium sections used
o IS 1948-1961 and as approved by the Engineer and fixtures shall be of
sqm
265
Joinery data
1521.00
234.45
7.60
262.76
2.75
2028.56
0.00
2028.56
4507.91
4508
alimunium sliding window with fixed fan light at top as per approved
s such as stoppers,bolts,weather stripping etc. for all sizes and sections in
and as per IS 1948-1961 with top section of window of size 62mm x 32mm
es of size 61.85mm x 31.75mm,1.50mm thick and bottom frame size
k sloping outwards for drainage and fixed and sliding shutters with
of 40mm x 18mm ,1.70mm thick,inter locking section 40mm x 28mm x
weather scaling and mounted on nylon rollers of lift type and fan light top
.10mm,1.53mm thick, powder coating of all alluminium sections 25mm
lain glass in fan light and for shutters fitted with
sqm
8111.40
266
Joinery data
1688.04
18.00
1820.85
11.76
11650.05
0.00
11650.05
3595.69
3596
267
Joinery data
alimunium sliding window with fixed fan light at top as per approved
s such as stoppers,bolts,weather stripping etc. for all sizes and sections in
and as per IS 1948-1961 with top section of window of size 62mm x 32mm
es of size 61.85mm x 31.75mm,1.50mm thick and bottom frame size
k sloping outwards for drainage and fixed and sliding shutters with
of 40mm x 18mm ,1.70mm thick,inter locking section 40mm x 28mm x
weather scaling and mounted on nylon rollers of lift type and fan light top
.10mm,1.53mm thick, powder coating of all alluminium sections 25mm
plain glass in fan light and 5mm thick ground glass for shutters fitted
bber beading, powder coating of all alluminium sections 25mm microns
o site of powder coated aluminium sections, glass,
6050.10
1125.36
12.00
1213.90
6.00
8407.36
0.00
8407.36
3892.29
3892
268
Joinery data
3207.00
3207
(IS 14276) box type cupboard using BISONPANEL for making frame of
wiched 16MM boards, one BISONPANEL and one BISONLAM with plain
are made of 16MM thick BISONLAM (Pre-Laminated Cement Bonded
clusive of hardware like M.S. powder coated Piano hinges of size x ,
of size 4 (101.6mm), Aluminium tower bolt 4 (101.6mm) Godrej locks,
uding overheads & contractors profit etc., complete finish item of work.
3218.00
0.00
3218.00
3218
269
Page-270
Description
Qty
Unit
Rate
per Unit
Amount
Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127
with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in
any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope
including cost and conveyance of all materials to site and all labour charges , overheads &
contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318)
a) 101.60mm dia upto 914.40mm (3')
depth
Rate as per SSR
Overheads&Contractors Profit @0%
Rate per 1 RM
1.00 RM
0.00
262.00
262.00
1 RM
say
b) 152.40mm dia upto 914.40mm (3')
depth
Rate as per SSR
Overheads&Contractors Profit @0%
1.00 RM
0.00
407.00
407.00
Rate per 1 RM
c) 203.20mm dia upto 1524mm (5')
depth
Cost of SWG pipe
labour charges for laying , jointing ,
testing
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 1 RM
1 RM
262.00
0.00
262.00
262
say
407.00
0.00
407.00
407
1.00 RM
453.00
1 RM
453.00
1.00 RM
0.25
154.00
154.00
1 RM
0.00
645.50
say
154.00
38.50
645.50
0.00
645.50
646
1.00 RM
829.00
1 RM
829.00
1.00 RM
0.25
154.00
154.00
1 RM
say
154.00
38.50
1021.50
0.00
1021.50
1022
0.00
1021.50
1.00 RM
1195.00
1 RM
1195.00
1.00 RM
0.25
154.00
154.00
1 RM
154.00
38.50
1387.50
0.00
1387.50
1388
0.00
1387.50
say
Sl.No
2
Description
Qty
Unit
Page-271
Rate
per Unit
Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved
source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar
1:3 prop; thick both inside and outside fitted with 20 dia RCC manhole covers and frames
including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and
laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and
channel 100 mm thick as per Standard specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials
and all incidental and operational, labour charges like mixing cement mortar, constructing masonry,
lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per
Standard specification.
1 No.
0.00
4999.00
4999.00
1 No.
0.00
7662.00
7662.00
Each
say
7662.00
0.00
7662.00
7662
1 No.
0.00
3104.00
3104.00
Each
say
4999.00
0.00
4999.00
4999
Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved
source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar
1:3 prop; thick both inside and outside fitted with 20 dia RCC manhole covers and frames
including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock)
and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching
and channel 100 mm thick as per Standard specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials
and all incidental and operational, labour charges like mixing cement mortar, constructing masonry,
lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per
Standard specification.
Each
say
Amount
3104.00
0.00
3104.00
3104
Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651 &
4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate chamber
and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of standard make as
approved including cost and conveyance of all materials to site, labour charges, overheads &
contractors profit etc., complete for finished item of work.
Rate as per SSR
Deduct cost of CI frame and cover
Add for RCC Cover
1 No.
1 No.
1 No.
530.00
111.00
100.00
1 Each
1 No.
1 No.
530.00
-111.00
100.00
Sl.No
Description
Overheads&Contractors Profit @0%
Qty
Unit
0.00
Page-272
Rate
per Unit
519.00
say
1 No.
0.00
102.00
102.00
1 Each
say
102.00
0.00
102.00
102
Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any other ISI Brand) as per site requirements with standard
practice for all floors including cost and conveyance of all materials to site, labour charges ,
overheads & contractors profit etc., complete for finished item of work.
Rate as per SSR
Overheads&Contractors Profit @0%
1 No.
0.00
144.00
144.00
1 Each
say
519.00
0.00
519.00
519
Supplying and fixing of 3" (76.2mm) multi floor trap with jali - UPVC/SWR pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any other ISI Brand) as per site requirements with standard
practice for all floors including cost and conveyance of all materials to site, labour charges ,
overheads & contractors profit etc., complete for finished item of work.
Rate as per SSR
Overheads&Contractors Profit @0%
Amount
144.00
0.00
144.00
144
Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet 1st quality
ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer
with brick - ISI mark and providing masonry seat, CC squatting plate and 10 litres capacity single
flush PVC low level cistern Parryware or equivalent with internal components fixed on 2 Nos. of
teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by
Engineer-in-charge, 12.70mm PVC connection with brass union nuts CP coated , 31.75mm brass
plumber union, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well
above the joint to stop leakage at the joint etc., complete including cost and conveyance of all
materials to site, cost of CC bed, labour charges and seigniorage charges, overheads & contractors
profit etc., complete for finished item of work.
Cost of Orissa pan
Add MA on labour charges for fixing
Orissa pan
Cost of Brick masonry seat
Cost of C C squatting plate
Cost of slim line PVC flush tank 10 Ltrs.
capacity single flush
12.70mm PVC connection with brass
union nuts
Add MA on labour charges for fixing
PVC connection with brass union nuts
31.75mm brass plumber union
Add MA on labour charges for fixing
31.75mm brass plumber union
Teak wood blocks 76.2mm x 101.6mm
1 No.
1157.00
1 Each
1157.00
0.25
1 No.
1 No.
320.00
278.00
83.00
1 Each
1 Each
80.00
278.00
83.00
1 No.
1455.00
1 Each
1455.00
1 No.
95.00
1 Each
95.00
0.25
1 No.
18.00
64.00
1 Each
4.50
64.00
0.25
13.00
2 Nos.
24.00
0.25
8.00
0.00
3269.75
3.25
1 Each
48.00
2.00
3269.75
0.00
Sl.No
Description
Rate per Each
Qty
Unit
Page-273
Rate
per Unit
Amount
3269.75
3270
Sl.No
9
Description
Qty
Unit
Page-274
Rate
per Unit
Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of
Hindustan / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing best Indian
make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 25481996 and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal
components and fixed using required size of nails and screws, 12mm PVC connections with brass
union nuts CP coated including cost and conveyance of all materials to site, overheads &
contractors profit etc., complete for finished item of work for all floors.
Cost of EWC with 'S' trap
Add MA on labour charges for fixing
EWC
Supply and fixing of 10 lts. Capacity
lowdown PVC flushing tank
Plastic seat and lid for European Water
Closet and rubber buffers
Add MA on labour charges for fixing
Plastic seat and lid for EWC and rubber
buffers
12.70mm dia PVC connection with
brass union nuts
Add MA on labour charges for fixing
PVC connection with brass union nuts
1 No
0.25
1582.00
1 Each
224.00
1582.00
56.00
1 No
1455.00
1 Each
1455.00
1 No
430.00
1 Each
430.00
0.25
1 No
0.25
65.00
95.00
1 Each
18.00
0.25
8.00
0.00
3688.75
2 Nos
16.25
24.00
95.00
4.50
1 Each
48.00
2.00
3688.75
0.00
3688.75
3689
Amount
Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st
quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice or equivalent
complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with
brass union nuts CP coated , 1 No.12.70mm NP bib tap 400 gms Seiko or equivalent , 31.75mm
dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all
materials to site, labour charges , overheads & contractors profit for finished item of work
1 No.
0.25
1 No.
0.25
1 No.
1 No.
0.00
1455.00
1 Each
320.00
95.00
80.00
1 Each
18.00
39.00
26.00
1455.00
95.00
4.50
1 Each
1 Each
1621.50
say
-39.00
26.00
1621.50
0.00
1621.50
1622
Sl.No
11
Description
Qty
Unit
Page-275
Rate
per Unit
Supplying and fixing NP soap dish heavy type of approved make ISI quality with NP screws etc.,
complete including cost and conveyance of all materials, labour charges for fixing , overheads &
contractors profit for finished item of work in all floors
Cost of NP soap dish
Add for MA @ 25%
1 No.
0.25
227.00
11.00
0.00
229.75
1 No.
0.25
479.00
106.00
0.00
505.50
479.00
26.50
505.50
0.00
505.50
506
Supplying and fixing of 25.4mm dia , 609.6mm long aluminium anodized towel rods with
brackets and aluminium screws including cost and conveyance of all materials, labour charges ,
overheads & contractors profit for finished item of work.
Rate as per SSR
Add for MA @ 25%
1 No.
0.25
153.00
40.00
0.00
163.00
Each
say
153.00
10.00
163.00
0.00
163.00
163
Supplying and fixing 12.70mm dia NP push cock as approved by the Engineer-In-Charge
including cost and conveyance of all materials, labour charges , overheads & contractors profit
complete for finished item of work in all floors.
Rate as per SSR
Overheads&Contractors Profit @0%
1 No.
0.00
253.00
253.00
Each
say
Each
say
227.00
2.75
229.75
0.00
229.75
230
Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm ,
plywood back with NP screws 1st quality including cost and conveyance of all materials, labour
charges , overheads & contractors profit for finished item of work in all floors.
1 Each
say
Amount
253.00
0.00
253.00
253
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make heavy duty as approved
by the Engineer-In-Charge including cost and conveyance of all materials, labour charges ,
overheads & contractors profit complete for finished item of work in all floors.
Rate as per SSR
Add for MA @ 25%
1 No.
0.25
241.00
26.00
0.00
247.50
Each
say
241.00
6.50
247.50
0.00
247.50
248
Sl.No
16
Description
Qty
Unit
Page-276
Rate
per Unit
Supplying and fixing of SWR PVC pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4
Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double
junctions as per site requirement, fixing with PVC clamps if necessary with required number of
Bombay nails including cost and conveyance of all materials to site, labour charges, overheads &
contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 &
1326)
a) 75mm dia
Data for 6 RM
Cost of 75mm dia pipe
Cost of PVC clamps
Labour charges
Rate per 1 RM
Overheads&Contractors Profit @0%
6.00 RM
3 Nos.
6.00 RM
255.00
15.00
65.00
0.00
157.50
3 RM
Each
1 RM
say
b) 90mm dia
Data for 6 RM
Cost of 90mm dia pipe
Cost of PVC clamps
Labour charges
Rate per 1 RM
Overheads&Contractors Profit @0%
6.00 RM
3 Nos.
6 RM
405.00
17.00
65.00
0.00
208.50
3 RM
Each
1 RM
say
c) 110mm dia
Data for 6 RM
Cost of 110mm dia pipe
Cost of PVC clamps
Labour charges
Rate per 1 RM
Overheads&Contractors Profit @0%
6.00 RM
3 Nos.
6 RM
484.00
18.00
65.00
0.00
235.33
3 RM
Each
1 RM
say
17
Amount
510.00
45.00
390.00
945.00
157.50
0.00
157.50
158
810.00
51.00
390.00
1251.00
208.50
0.00
208.50
209
968.00
54.00
390.00
1412.00
235.33
0.00
235.33
235
Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark in
ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union
flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting,
refilling, chiselling masonry walls and making good the walls & floors to the original surface and
fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour
charges , overheads & contractors profit complete for finished item of work.
a) 15mm Nominal bore
Rate as per SSR
Add for MA @ 25%
Overheads&Contractors Profit @0%
Rate per 1 RM
1.00 RM
0.25
173.00
37.00
0.00
182.25
1 RM
say
173.00
9.25
182.25
0.00
182.25
182
Sl.No
Description
b) 20mm Nominal bore
Rate as per SSR
Add for MA @ 25%
Overheads&Contractors Profit @0%
Qty
Unit
Page-277
Rate
per Unit
1.00 RM
0.25
192.00
37.00
0.00
201.25
say
Rate per 1 RM
c) 25mm Nominal bore
Rate as per SSR
Add for MA @ 25%
Overheads&Contractors Profit @0%
1.00 RM
0.25
252.00
37.00
0.00
261.25
1.00 RM
0.25
354.00
37.00
0.00
363.25
1.00 RM
0.25
396.00
40.00
0.00
406.00
1.00 RM
0.25
427.00
61.00
0.00
442.25
1 RM
say
Rate per 1 RM
18
1 RM
say
Rate per 1 RM
f) 50mm Nominal bore
Rate as per SSR
Add for MA @ 25%
1 RM
say
Rate per 1 RM
e) 40mm Nominal bore
Rate as per SSR
Add for MA @ 25%
1 RM
say
Rate per 1 RM
d) 32mm Nominal bore
Rate as per SSR
Add for MA @ 25%
1 RM
Amount
192.00
9.25
201.25
0.00
201.25
201
252.00
9.25
261.25
0.00
261.25
261
354.00
9.25
363.25
0.00
363.25
363
396.00
10.00
406.00
0.00
406.00
406
427.00
15.25
442.25
0.00
442.25
442
Supplying and fixing 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per
IS 1239 in ground or on wall with GI fittings such as elbows tees couplings, nipples, plugs including
excavation for trenches and refilling the trenches ,chiselling masonry walls and making good the
walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and
conveyance of all materials and labour charges , overheads & contractors profit complete for
finished item of work except for GI bends union and GI connectors with checkout and socket Tata
or Zenith make or equivalent
Rate as per SSR
Overheads&Contractors Profit @0%
Rate per 1 RM
1.00 RM
0.00
757.00
757.00
1 RM
say
757.00
0.00
757.00
757
Sl.No
19
Description
Qty
Unit
Page-278
Rate
per Unit
Amount
Supplying and fixing Gunmetal Gate ( GM peet ) valve as per IS-778 Class - I , Indian make
heavy type including cost and conveyance of all materials , labour charges , overheads &
contractors profit complete for finished item of work.
a) 15mm Nominal bore
Rate as per SSR
Add for MA @ 25%
Overheads&Contractors Profit @0%
1 No.
0.25
350.00
40.00
0.00
360.00
say
1 No.
0.25
474.00
40.00
0.00
484.00
1 No.
0.25
698.00
40.00
0.00
708.00
1 No.
0.25
1044.00
40.00
0.00
1054.00
Each
say
Each
say
Each
say
Each
1 No.
0.25
1423.00
61.00
0.00
1438.25
Each
say
350.00
10.00
360.00
0.00
360.00
360
474.00
10.00
484.00
0.00
484.00
484
698.00
10.00
708.00
0.00
708.00
708
1044.00
10.00
1054.00
0.00
1054.00
1054
1423.00
15.25
1438.25
0.00
1438.25
1438
Sl.No
Description
f) 50mm Nominal bore
Rate as per SSR
Add for MA @ 25%
Overheads&Contractors Profit @0%
Qty
Unit
Page-279
Rate
per Unit
1 No.
0.25
2055.00
82.00
0.00
2075.50
say
1 No.
0.25
3920.00
102.00
0.00
3945.50
1 No.
0.25
5548.00
121.00
0.00
5578.25
21
2055.00
20.50
2075.50
0.00
2075.50
2076
3920.00
25.50
3945.50
0.00
3945.50
3946
5548.00
30.25
5578.25
0.00
5578.25
5578
Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with
double layer approved brand and manufacture with cover and suitable locking arrangement and
making necessary holes for inlet and outlets and over flow pipes but without fittings and base
support for tanks including cost and conveyance of all materials and labour charges , overheads &
contractors profit complete for finished item of work.
Rate as per SSR
Add for MA @ 25%
1 Ltr
0.25
6.00
1.00
0.00
6.25
1 Ltr
6.00
0.25
6.25
0.00
6.25
Supplying and fixing of stainless steel sink of size 508.00mm x 457.2mm x 203.20mm, 1mm
thick of Indian make fixed on cantilever brackets including supply and fixing 31.75mm C.P. waste
coupling, 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality ncluding
chiselling brick masonry wall and making good & restoring to original surfaces , overheads &
contractors profit complete for finished item of work in all floors
Rate as per SSR
Add for MA @ 25%
1 No
0.25
4579.00
409.00
0.00
4681.25
Each
say
Each
say
Each
say
Each
Amount
4579.00
102.25
4681.25
0.00
4681.25
4681
Supplying and fixing of stainless steel sink of size 914.4 mm x457.2mm, 1mm thick of Indian
make fixed on cantilever brackets including supply and fixing 31.75mm C.P. waste coupling, 31.75
mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality ncluding chiselling brick masonry
wall and making good & restoring to original surfaces overheads & contractors profit complete.for
finished item of work in all floors.
Rate as per SSR
1 No
6409.00
Each
6409.00
Sl.No
Description
Qty
Unit
Page-280
Rate
per Unit
0.25
461.00
0.00
6524.25
say
1 No
0.25
759.00
128.00
Each
759.00
32.00
1 No
0.25
1 No
1 No
95.00
18.00
253.00
26.00
Each
0.00
95.00
4.50
253.00
26.00
1169.50
0.00
1169.50
1170
Each
Each
1169.50
Say
Supplying and fixing white glazed flat back half stall urinals of size 590 mm x 375 mm x 390
mm with integral flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer)
conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing
12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality
of approved make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality
including cost and conveyance of all materials to site, labour charges etc., overheads & contractors
profit complete for finished item of work for all floors.
Rate as per SSR
Add for MA @ 25%
12.7mm PVC connections with brass
plumber union nuts
Add for MA @ 25%
12.70mm NP push cock
31.75mm dia. PVC flexible waste pipe
1 No
0.25
2530.00
128.00
Each
2530.00
32.00
1 No
0.25
1 No
1 No
95.00
18.00
253.00
26.00
Each
0.00
95.00
4.50
253.00
26.00
2940.50
0.00
2940.50
2941
Each
Each
2940.50
Say
115.25
6524.25
0.00
6524.25
6524
Supplying and fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm
with integral flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming
to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing 12.7mm PVC
connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality of approved
make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and
conveyance of all materials to site, labour charges , overheads & contractors profit complete for
finished item of work for all floors.
Amount
Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 4' 0" x
2' 0" for urinals including full rounding the edges , fixing in position, polishing, including cost and
conveyance of all materials and labour charges , overheads & contractors profit complete for
finished item of work for all floors.
Rate as per SSR
Chiselling the brick masonry wall
0.72 Sqm
935.97
1 Sqm
673.90
1.20 RM
26.00
1 RM
31.20
0.25
2.40 RM
31.20
317.00
1 RM
7.80
760.80
Sl.No
Description
Qty
Unit
0.72 Sqm
0.25
0.00
Page-281
Rate
per Unit
498.44
35.89
10 Sqm
1518.56
Say
Amount
35.89
8.97
1518.56
0.00
1518.56
1519
Sl.No
25
Description
Qty
Unit
Page-282
Rate
per Unit
Supplying and fixing of 101.60mm x 609.60mm white glazed porcelain channels 1st quality
fixed in brick masonry to the required slopes , white cement pointing including cost and conveyance
of all materials and labour charges , overheads & contractors profit complete for finished item of
work for all floors.
Rate as per SSR
Rate for 1 RM
Overheads&Contractors Profit @0%
1 No
(1/0.6096)
0.00
462.00
462.00
757.87
1 Each
Say
26
Amount
462.00
757.87
0.00
757.87
758
Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60
mm in CM (1:8) prop including plastering and finishing with 12mm thick in CM (1:5) including cost
and conveyance of all materials and all labour charges, overheads & contractors profit complete for
finished item of work for all floors.
Rate as per SSR
Overheads&Contractors Profit @0%
Rate per Each
1 No
0.00
68.00
68.00
1 Each
Say
68.00
0.00
68.00
68
DETAILED ESTIMATE
SPECFICATION REPORT
Estimate Cost: 115.00 Lakhs
The Specfication Report accompanies the estimate for the work "Construction of
Girls Hostel for PG Students at HC&RI, Venkataramannagudem, West Godavari District."
3. The estimate is prepared to provide eight rooms in Ground Floor and Eight rooms in
First floor, Total of 16 Rooms.
4. Each room consists of kitchen and balcony.
The estimates is prepard with 2013-14
Description of Item
Amount in Rs.
Civil works
7512092.00
213426.00
Electrical works
385051.00
Total:
4
8110569.00
@ 5%
405528.00
@3%
243317.00
@ 5%
405528.45
@ 1%
81105.69
@ 0.25%
20276.42
@ 0.5%
40552.85
10
6093.00
9312970
-1812970.41
DESCRIPTION OF WORK
Nos
CIVIL
L
D/H
QTY
PER
Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and
depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all
operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and
overheads & contractors profit complete for finished item of work including seigniorage excluding
dewatering charges etc., as per SS 20 B(APSS 308)
14
2.50
2.35
2.00
164.50
cum
14
2.30
2.15
2.00
138.46
cum
2.00
2.00
2.00
16.00
cum
L/W
23.47
0.60
0.75
21.12
cum
C/W
11.69
0.60
0.75
10.52
cum
Sump
8.29
5.24
2.51
108.71
cum
Septic Tank
6.65
3.20
3.57
75.97
cum
535.29
cum
535.00
cum
RATE
Say
118.00
1cum
Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not
exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and
all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit
complete for fnished item of work(APSS NO.309&310)
Filling inside the building
277.83
1.05
291.72
cum
-78.00
(-)cum
-33.00
(-)cum
-18.00
(-)cum
162.72
cum
163.00
cum
say
288.00
1cum
Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides
of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and
ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour
charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of
work (APSS NO.309&310)
Excavation quantity
535.00
cum
-78.00
(-)cum
-33.00
(-)cum
-18.00
(-)cum
406.00
cum
Deductions:
say
406.00
cum
18.00
1cum
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and
under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from
approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate,
water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all
charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm
layers finishing top surface to the required level curing etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 402)
14
2.50
2.35
0.10
8.23
cum
14
2.30
2.15
0.10
6.92
cum
2.00
2.00
0.10
0.80
cum
Sump
8.29
5.24
0.15
6.51
cum
Septic Tank
6.65
3.20
0.15
3.19
cum
25.65
cum
26.00
cum
say
3150.00
1cum
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and
under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from
approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate,
water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all
charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm
layers finishing top surface to the required level curing etc.,and overheads & contractors profit
complete for finished item of work. (APSS No. 402)
a)
Under RR Masonry :-
b)
L/W
23.47
0.60
0.10
2.82
cum
C/W
11.69
0.60
0.10
1.40
cum
Stilt Area
277.83
0.10
27.78
cum
Portico
4.26
0.10
1.70
cum
33.71
cum
34.00
cum
say
2954.00
1cum
Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite
stones carted from approved quarry including cost and conveyance of all materials like cement,
screened sand, water, stones etc., from approved quarry, to site and including seigniorage charges,
sales & other taxes on all materials including labour for cutting stones to required size and shape,
mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for
finished item of work in foundation and basement. (APSS No. 601 & 615)
Below GL
L/W
23.47
0.45
0.60
12.67
cum
C/W
11.69
0.45
0.60
6.31
cum
L/W
23.47
0.45
0.45
9.51
cum
C/W
11.69
0.45
0.45
4.73
cum
Above GL
say
33.23
cum
33.00
cum
2055.00
1cum
Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with
minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of
nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel
centering plates etc., including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)
14
2.50
2.35
0.45
37.01
cum
STEP-2
14
1.35
1.20
0.45
10.21
cum
STEP-1
14
2.30
2.15
0.30
20.77
cum
STEP-2
14
1.25
1.13
0.30
5.93
cum
STEP-1
2.00
2.00
0.45
3.60
cum
STEP-2
1.10
1.10
0.30
0.73
cum
78.25
cum
78.00
cum
say
7168.00
1cum
14
0.45
0.28
0.30
0.53
cum
14
0.45
0.23
0.30
0.43
cum
0.30
0.30
0.30
0.05
cum
1.02
cum
1.00
cum
say
7446.00
1cum
23.57
0.23
0.45
9.76
cum
11.79
0.23
0.45
8.54
cum
18.30
cum
18.00
cum
C/W
say
8920.00
1cum
7.98
4.93
39.34
sqm
6.35
2.90
18.42
sqm
57.76
sqm
58.00
sqm
say
1649.00
1sqm
Sump
top slab slab thick 175mm
7.98
4.93
say
39.34
sqm
39.34
sqm
39.00
sqm
1179.00
1sqm
Septic Tank
top slab slab think 200mm
6.35
2.90
say
18.42
sqm
18.42
sqm
18.00
sqm
1819.00
1sqm
Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with
minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of
nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall
Plates etc., including all operational, incidental and labour charges such as weigh batching, machine
mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc.,
complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.
402)
Columns:-
Stilt floor :
(H=0.95+0.6+0.38+3.05=4.98m)
cat-1
14
0.23
0.45
5.00
7.25
cum
cat-2
14
0.23
0.45
5.00
7.25
cum
14.49
cum
14.49
cum
say
8506.00
1cum
ii
First floor :
(H=3.35)
cat-1
14
0.23
0.45
3.35
4.85
cum
cat-2
14
0.23
0.45
3.35
4.85
cum
0.30
0.30
5.28
0.95
cum
10.66
cum
11.00
cum
say
8862.00
1cum
Lintels:-
First floor :
Lintel over MD
2.26
0.23
0.23
0.12
cum
(1.8+0.23+0.23) = 2.26
Lintel over D
1.96
0.23
0.23
0.31
cum
1.65
0.23
0.23
0.52
cum
1.21
0.12
0.23
0.10
cum
11
1.96
0.23
0.23
1.14
cum
1.46
0.23
0.20
0.07
cum
1.50
0.23
0.20
0.21
cum
2.47
cum
2.47
cum
(1.5+0.23+0.23) = 1.96
Lintel over D1
(1.05+0.23+0.23) = 1.65
Lintel over D2
(0.75+0.23+0.23) = 1.21
Lintel over door W
(1.8+0.23+0.23=1.96)
Lintel over door W1
(1.2+0.23+0.23=1.96)
Lintel over ventilation V
(0.9+0.23+0.23=1.50)
say
8560.00
1cum
L/w's
7.98
1.98
47.40
sqm
C/w's
4.57
1.98
18.11
sqm
L/w's
6.35
2.90
36.83
sqm
C/w's
2.90
2.90
25.23
sqm
127.57
sqm
128.00
sqm
Say
2932.00
1 sqm
Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum
cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal
60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering
using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc.,
including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting
of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)
Roof Beams:-
Stilt floor :
L/W
23.47
0.23
0.45
9.72
cum
3.80
0.23
0.45
0.39
cum
2.00
0.23
0.38
0.52
cum
Portico
4.26
0.23
0.45
0.44
cum
C/W
11.79
0.23
0.45
8.54
cum
Portico
4.30
0.23
0.45
0.89
cum
4.50
0.23
0.45
0.47
cum
Beam B1
6.35
0.23
0.30
0.88
cum
Beam B1
2.90
0.23
0.30
0.60
cum
22.45
cum
22.00
cum
say
7552.00
1cum
ii
First floor :
L/W
23.47
0.23
0.45
9.72
cum
3.80
0.23
0.45
0.39
cum
2.00
0.23
0.38
0.52
cum
Portico
4.26
0.23
0.45
0.44
cum
C/W
11.79
0.23
0.45
8.54
cum
Portico
4.30
0.23
0.45
0.89
cum
4.50
0.23
0.45
0.47
cum
20.97
cum
21.00
cum
say
7790.00
1cum
Slab:-
Stilt floor :
150mm thick
Stilt slab [23.57+0.6+0.6=24.77]
[11.79+0.6+0.6=12.99]
Deductions:
24.77
12.99
321.76
sqm
Staircase
4.26
4.85
-20.66
(-sqm)
9.98
0.60
-5.99
(-sqm)
3.30
1.25
8.25
sqm
Landing
4.25
1.25
5.31
sqm
308.68
sqm
309.00
sqm
say
1043.00
1sqm
ii
First floor :
150mm thick
Stilt slab [23.57+0.6+0.6=24.77]
[11.79+0.6+0.6=12.99]
24.77
12.99
321.76
sqm
Portico [4.26+0.6+0.6=5.46]
5.46
4.30
23.48
sqm
Staircase
4.26
4.85
-20.66
(-sqm)
9.98
0.60
-5.99
(-sqm)
Deductions:
Staircase :-
3.30
1.25
8.25
sqm
Landing
4.25
1.25
5.31
sqm
332.15
sqm
332.00
sqm
say
1074.00
1 sqm
ii
second floor
150mm thick
Head room slab
1
4.03
4.85
19.55
sqm
3.30
1.25
8.25
sqm
Landing
4.25
1.25
5.31
sqm
33.11
sqm
33.00
sqm
say
10
1106.00
Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum
cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal
60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials , centering
using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., for
60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average
thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit
complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402, 403 & 903)
SUN SHADES:
First floor :
For Windows W ( 1.80+0.30+0.30 = 2.4)
10
2.40
24.00
Rmt
1.80
3.60
Rmt
27.60
Rmt
28.00
Rmt
say
366.00
1 Rmt
11
Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand)
using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or
traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water
etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour
charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing,
etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).
Stilt floor :
steps
3.79
0.30
0.45
0.51
cum
3.79
0.30
0.30
0.34
cum
3.79
0.30
0.15
0.17
cum
1.02
cum
1.00
cum
say
3653.00
1cum
i
First floor :
L/W
2
23.47
0.23
2.75
29.69
cum
11.79
0.23
2.75
22.37
cum
4.50
0.23
2.75
14.23
cum
Main door MD
1.80
0.23
2.10
-0.87
(-) cum
Main door D1
1.20
0.23
2.10
-0.58
(-) cum
Window W
10
1.80
0.23
1.20
-4.97
(-) cum
Window W1
1.20
0.23
1.20
-0.66
(-) cum
Ventilator V
0.90
0.23
0.60
-0.37
(-) cum
58.84
cum
59.00
cum
C/W
Deductions:
say
3877.00
1cum
iii
3.80
0.23
2.40
4.20
cum
C/W
4.85
0.23
2.40
5.35
cum
Parapet
74.84
0.23
0.75
12.91
cum
Door D1
0.90
0.23
2.10
-0.43
(-) cum
Window W
1.80
0.23
1.20
-0.50
(-) cum
21.53
cum
21.50
cum
Deductions:
say
4100.00
1cum
12
Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop. (Cement : Screened
sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or
traditional size
23 x 11 x 7 cms from approved source having minimum crushing strength of 40
Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the
reinforcement pegged into mortar joints of main brick walls where applicable including cost and
conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, all operational, incidental charges such as labour
charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,
and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for
finished item of work. (APSS No. of 501 & 509)
First floor :
L/W
corridor
14.81
2.75
81.46
sqm
2.00
2.75
16.50
sqm
0.88
2.10
5.54
sqm
0.48
0.75
1.08
sqm
3.95
2.75
21.73
sqm
C/W
scientist room
Deductions:
Door D
1.50
2.10
-6.30
(-) sqm
Door D1
1.05
2.10
-11.03
(-) sqm
Door D2
0.75
2.10
-4.73
(-) sqm
104.25
sqm
104.00
sqm
say
548.00
1 sqm
13
Plain Cement Concrete (1:3:6) nominal mix using 6mm to 20mm size graded machine crushed
hard granite metal(coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of
13.20/12.50mm , 15% of 10mm and 10% of 6mm )from approved quarry including cost and
conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on all materials and including all charges for
mixing, laying concrete in position, curing etc., & lift charges , and Overheads & Contractors profit for
Bed Blocks & Hold Fasts for finished item of work. (APSS No. 402) (BLD-CSTN-3-10 & 11)
First floor :
for Door D hold fast beds
13x6
0.23
0.23
0.10
0.41
cum
12x4
0.23
0.23
0.10
0.25
cum
3x4
0.23
0.23
0.10
0.06
cum
0.73
cum
1.00
cum
say
4564
1cum
14
Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard
granite machine crushed graded metal (Coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all
materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of
seigniorage charges on all materials including steel centering, shuttering, machine mixing, lift
charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished
item of work (APSS No. 402 & 403) for steps
Staircase:
Stilt Floor:
steps
20
0.5X0.15X1.24x0.30
Say
0.56
cum
0.56
cum
1.00
cum
5430.00
1 cum
ii
First Floor:
steps
22
0.5X0.15X1.24x0.30
Say
0.62
cum
0.62
cum
1.00
cum
5534.00
1 cum
15
Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed
graded metal (Coarse aggregate) ( consisting of nominal size metal 60% of 13.20/12.50mm , 20% of
10mm and 20% of 6mm ) from approved quarry, using a minimum quantity of 350 kgs. of cement per
1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including
steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads &
contractors profit complete for finished item of work (APSS No. 402 & 403) for platforms and
shelves.
First floor
Shelve's :
Rooms [4x3=12]
12
2.00
0.60
say
14.40
sqm
14.40
sqm
14.00
sqm
496.00
1 sqm
First floor
Shelve's :
Rooms [4*1=4]
2.10
0.60
say
5.04
sqm
5.04
sqm
5.00
sqm
261.00
1 sqm
16
Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different
diameters for RCC works , including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved materials and size and tying and
lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars, including all wastages such as
overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks
and all incidental, operational, labour charges such as cutting, bending, placing in position, tying
including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for
finished item of work in all floors.( APSS No.126)
Ground floor
Footings
( 80 Kg / Cum )
5.00
Tonnes
2.00
Tonnes
2.50
Tonnes
3.00
Tonnes
3.00
Tonnes
3.00
Tonnes
2.00
Tonnes
0.55
Tonnes
0.45
Tonnes
1.00
Tonnes
22.50
Tonnes
22.50
Tonnes 59289.00
Pedestals
( 80 Kg / Cum )
say
1 MT
ii
First Floor:
columns ( 140 Kg / Cum )
5.00
Tonnes
2.00
Tonnes
3.00
Tonnes
5.00
Tonnes
0.50
Tonnes
Sunshade ( 80 Kg / Cum )
say
0.50
Tonnes
16.00
Tonnes
16.00
Tonnes 60077.00
1 MT
ii
Second Floor:
head Slabs(150mm thk)( 80 Kg / Cum )
say
1.50
Tonnes
1.50
Tonnes 60864.00
1 MT
17
Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened sand including
cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-incharge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
Ground floor :
total area
23.57
23.47
11.8
277.89
sqm
0.90
84.49
sqm
3.80
0.90
3.42
sqm
2.00
0.76
4.56
sqm
Portico
4.26
0.90
3.83
sqm
C/W
11.79
0.90
74.28
sqm
Portico
4.30
0.90
7.74
sqm
4.50
0.90
4.05
sqm
460.26
sqm
460.00
sqm
Beams
L/W
say
111.00
1sqm
ii
First floor :
Toilet Block
2.00
3.00
18.00
sqm
Toilet Block
2.00
1.70
10.20
sqm
Toilet Block
2.00
1.09
6.54
sqm
scientist room
4.00
6.00
72.00
sqm
office room
4.00
4.50
18.00
sqm
5.76
4.50
25.92
sqm
Corridor
19.47
2.00
38.94
sqm
lobby
3.80
2.20
8.36
sqm
Portico
4.26
4.00
17.04
sqm
conference hall
11.20
4.50
50.40
sqm
83.81
0.60
50.29
sqm
315.69
sqm
316.00
sqm
say
123.00
1sqm
iii
second floor :
Head room
4.03
4.85
19.55
sqm
say
19.55
sqm
20.00
sqm
134.00
1sqm
18
ii
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm
thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials,
and all operational, incidental charges on materials and including cost of all labour charges for mixing
mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer
in charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished
item of work. (SS 901,903 & 904) for: Plastering 2 coats in CM (1:4) & (1:6): 12 mm
Stilt floor :
cat-1
14
1.36
2.49
47.31
sqm
cat-2
14
1.36
2.49
47.31
sqm
Toilet Block=2*(2+1.50)=7
7.00
2.75
57.75
sqm
2*(2+3)=10
10.00
2.75
82.50
sqm
2*(2+1.09)=6.18
6.18
2.75
50.99
sqm
scientist room=2*(4+4.6)=36.80
36.80
2.75
303.60
sqm
office room=2*(4+4.5)=17
17.00
2.75
46.75
sqm
20.52
2.75
56.43
sqm
Corridor =2*(14.46+2)=32.92
32.92
2.75
90.53
sqm
lobby2*(3.8+4.84)=17.28
17.28
2.75
47.52
sqm
31.40
2.75
86.35
sqm
Main door MD
1.80
2.10
-3.78
(-) sqm
Door D
1.50
2.10
-9.45
(-) sqm
Door D1
1.05
2.10
-13.23
(-) sqm
Door D2
0.75
2.10
-4.73
(-) sqm
Window W
11
1.80
1.20
-23.76
(-) sqm
Window W1
1.20
1.20
-1.44
(-) sqm
Ventilator V
0.90
0.50
-1.35
(-) sqm
1.52
2.10
-9.58
(-) sqm
849.73
sqm
850.00
sqm
First floor :
Deductions :
say
290.00
1Sqm
iii
second floor:
1
3.08
2.40
7.39
sqm
4.62
2.40
11.09
sqm
1.80
1.20
-2.16
(-sqm)
16.32
sqm
16.00
sqm
Deductions :
window
say
315.00
1sqm
19
Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6)
and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of
all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes
on all materials, and all operational, incidental charges on materials and including cost of all labour
charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as
directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of
work .(SS 901,903 & 904)
first floor:
all around the builiding
70.31
3.35
235.54
sqm
Column's (Portico)
1.20
3.35
8.04
sqm
Main door MD
1.80
2.10
-3.78
(-) sqm
Window W
11
1.80
1.20
-23.76
(-) sqm
Window W1
1.20
1.20
-1.44
(-) sqm
Ventilator V
0.90
0.50
-1.35
(-) sqm
213.25
sqm
213.00
sqm
Deduction:
say
304.00
1sqm
second floor:
1
4.03
2.40
9.67
sqm
4.85
2.40
11.64
sqm
1.80
1.20
-2.16
(-sqm)
19.15
sqm
19.00
sqm
Deductions :
window
say
329.00
1sqm
20
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3)
prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured
by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid
over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand,
water proofing compound, water etc., to site, including seigniorage charges, sales & other taxes on all
materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges,
rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and
overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).
FF slab Terrace
Stilt slab [23.57+0.6+0.6=24.77]
[11.79+0.6+0.6=12.99]
24.77
12.99
321.76
sqm
Portico [4.26+0.6+0.6=5.46]
5.46
4.30
23.48
sqm
Staircase
4.26
4.85
-20.66
(-sqm)
9.98
0.60
-5.99
(-sqm)
318.59
sqm
319.00
sqm
Deductions:
say
325.00
1sqm
21
Providing impervious coat to exposed RCC roof slab surfaces of sump , sump side wall,sump
bottom slab,in side of septic tank , in sunken slabs etc. to required slopes with CM (1:3) prop.
using screened sand 12mm thick mixed with water proofing compound manufactured by reputed
manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab
when it is green, finished smooth with a floating coat of neat cement and thread lining at regular
intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like
cement, sand, water proofing compound, water etc., to site, including seigniorage charges, sales &
other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying,
lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and
slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 &
903).
L/w's
7.98
1.98
47.40
sqm
C/w's
4.57
1.98
18.11
sqm
L/w's
6.35
2.90
36.83
sqm
C/w's
2.90
2.90
25.23
sqm
7.98
4.57
36.47
sqm
6.35
2.90
18.42
sqm
7.98
4.57
36.47
sqm
6.35
2.90
18.42
sqm
237.33
sqm
237.00
Sqm
say
120.00
1Sqm
22
Flooring with vitrified polished floor tiles of 1st quality and make as approved by Engineer-incharge of size not less than 598 mm x 598 mm , 8mm thickness regular finish and normal
colours with borders and design as per the approved flooring pattern as directed by the Engineer-In
-Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick
using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of
honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to
full depth mixed with pigment of matching shade including cost and conveyance of all materials like
cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of
seigniorage charges on all materials, cost of base coat and all labour charges for mixing of cement
mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads &
contractors profit complete for finished item of work. (APSS No.701 & 707)
First floor
scientist room=2*(4+4.6)=20
4.00
4.60
55.20
sqm
office room=2*(4+4.5)=17
4.00
4.50
18.00
sqm
5.76
4.50
25.92
sqm
Corridor =2*(14.46+2)=32.92
14.93
2.00
29.86
sqm
lobby2*(3.8+4.84)=17.28
3.80
2.20
8.36
sqm
11.20
4.50
50.40
sqm
say
187.74
sqm
188.00
sqm
968.00
1sqm
23
Providing skirting to internal walls to 10 cm height with vitrified tiles 8mm thick , regular finish
and normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using
screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm
and jointing with white cement paste mixed with pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit
complete including seigniorage charges etc., complete for finished item of work.(APSS No.701 &707)
First floor :
scientist room=2*(4+4.6)=17.20
17.20
51.60
Rmt
office room=2*(4+4.5)=17
17.00
17.00
Rmt
20.52
20.52
Rmt
Corridor =2*(14.93+2)=33.86
33.86
33.86
Rmt
lobby2*(3.8+2.2)=12
12.00
12.00
Rmt
31.40
31.40
Rmt
Main door MD
1.80
-1.80
(-Rmt)
Door D
1.50
-4.50
(-Rmt)
Door D1
1.05
-3.15
(-Rmt)
opening
3.80
-3.80
(-Rmt)
153.13
Rmt
153.00
Rmt
Deductions :
say
76.00
1 Rmt
24
Providing 16 to 18mm thick high polished granite stone slabs other than black and regular
colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders
and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts
set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid
or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per
sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth
including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work
site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing
charges and seigniorage charges and all other taxes on all materials, cost of base coat and
overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 &
special)
Ground floor
Treads:
Landing
4.25
1.20
5.10
sqm
Steps (Stairs)
20
1.25
0.30
7.50
sqm
main steps
3.79
0.30
3.41
sqm
main steps
3.79
1.50
5.69
sqm
21.70
sqm
22.00
sqm
say
4012.00
1sqm
ii
First floor
Landing
4.25
1.20
5.10
sqm
Steps (Stair's)
22
1.25
0.30
8.25
sqm
13.35
sqm
13.00
sqm
say
4058.00
1sqm
Ground floor
Risers:
Raisers (Stair's)
20
1.24
0.15
3.72
sqm
main steps
3.79
0.15
1.71
sqm
main steps
3.79
0.15
0.57
sqm
5.99
sqm
6.00
sqm
say
2969.00
1sqm
ii
First floor
Risers:
Raisers (Stair's)
22
1.24
0.15
say
4.09
sqm
4.00
sqm
2996.00
1sqm
25
Flooring with ceramic tiles 7.30mm thick , 1st quality and of size not less than 300mm x 300mm
as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using
screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like
consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed
with pigment of matching shade, including cost of all materials like cement, screened sand , water and
tiles etc., and overheads & contractors profit complete including seigniorage charges etc., complete
for finished item of work (in toilets). (APSS No.701 & 707)
First floor
Toilet Block
2.00
1.50
9.00
sqm
2.00
3.00
18.00
sqm
27.00
sqm
27.00
sqm
say
790.00
1sqm
26
Providing dadooing to walls with glazed plain coloured wall tiles 1st quality of size of size not
less than 300mm x 200mm with bordersas approved by Engineer-in-Charge set over base coat of
CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the
rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade
to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including
seigniorage charges etc., and overheads & contractors profit complete for finished item of work.
First floor
Toilet Block2*(2+1.50)=7
7.00
1.50
31.50
sqm
10.00
1.50
45.00
sqm
1.05
1.50
-4.73
(-) sqm
Deductions:
Doors D1
Doors D2
0.75
1.50
say
-3.38
(-) sqm
68.40
sqm
68.00
sqm
550.00
1sqm
27
Filling with light weight concrete in Cement Concrete (1:5:10) proportion using brick jelly for low
roofs including cost and conveyance of all materials like cement, sand, brick bats etc., to site,
including cost of seigniorage charges on all materials including cost of all labour charges for laying
concrete, ramming, curing , overheads & contractors profit etc., complete for finished item of work.
(APSS. No. 402)
First Floor:
Toilet & Baths
2.01
4.510 0.300
Say
8.16
cum
8.16
cum
8.00
cum
2648.00
1cum
28
Reinforced cement concrete (1:5:10) proportion (Cement: fine aggregates: coarse aggregate)
using 40mm size (SS5) hard granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to
site and cost of seigniorage charges on all materials including centering using Casurina Ballies ,
Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., shuttering, machine mixing,
laying concrete, lifting concrete manually , curing etc., and overheads & contractors profit complete as
per drawings but excluding cost of steel and it's fabrication charges for finished item of work (APSS
NO. 402 & 403) for Dummy columns.
iii
Second Floor:
cat-1
14
0.23
0.45
0.90
1.30
cum
cat-2
14
0.30
0.30
0.90
1.13
cum
2.44
cum
2.00
cum
say
6710.00
1 cum
29
Supplying and fixing stainless steel hand railing, balustrade etc using 304 or 202 grade stainless steel
pipes of 50 mm dia nominal bore for hand railing at 3'0" high from ground level and 40 mm dia
nominal bore for vertical supports placed at 5'0" c/c and two numbers 25 mm dia nominal bore for
horizontal pipes placed below hand railing pipe as per the approved drawing including cost and
conveyance of all materials buffing charges polishing charges etc complete for finished item of work
Ground floor
Staircase
ii
7.45
1.20
8.94
sqm
7.45
1.20
8.94
sqm
17.88
sqm
18.00
sqm
First floor
Staircase
.
say
2603.00
1sqm
30
Providing 110 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0
kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps
and all other accessories and fixing in position including cost and conveyance of all materials, sales &
other taxes on materials to site, operational & incidental charges including all labour charges for fixing
at site etc., and overheads & contractors profit complete for finished item of work. (APSS No. 1328)
All floors
6
11.250
say
67.50
Rmt
68.00
Rmt
213.00
1 Rmt
31
Painting to new walls cement pricemr as Priming Coat to give an even shade after thourughly
brushing the surface to remove all dirt and remains of loose powdered materials, including cost and
conveyance of all materials to work site and all operational, incidental, labour charges etc., and
overheads & contractors profit complete for finished item of work as per APSS 911 for internal and
external walls in all floors. Painting, Priming Coat on New Plastered Surface
1894.00
sqm
41.00
1sqm
32
Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to
2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly
brushing the surface to remove all dirt and remains of loose powdered materials, applying emery
paper, Sand the surface, clean & wipe oGF loose dust, applying knifing paste filler by putty knife /
muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation
including cost and conveyance of all materials to work site and all operational, incidental, labour
charges etc. complete for finished item of work for Internal walls
Same as above item (19)
Say
1894.00
sqm
146.00
1 Sqm
33
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including
cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.
complete for finished item of work as per SS 911 for internal walls
for ceiling and internal walls
1662.00
sqm
71.00
1sqm
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including
cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.
complete for finished item of work as per SS 911 for external walls
for extenal walls
232.00
sqm
99.00
1sqm
34
Painting to new wood work and flush shutters with lappam finish , over a primary coat and
painting two coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content
less than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost
of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for
neat finish including sales & other taxes on cost of all materials etc.and overheads & contractors profit
complete (APSS No.1200, 1207 & 1211) in all floors.
First floor
For MD [2x1=2]
1.80
2.10
7.56
sqm
For D [2x3=6]
1.50
2.10
18.90
sqm
For D1 [2x6=12]
12
1.20
2.10
30.24
sqm
For D2 [2x3=6]
0.90
2.10
#REF!
11.34
sqm
68.04
sqm
68.00
sqm
126.00
1sqm
35
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm
and ISI marked flush door shutters of 30 mm thick double shutters with bond wood solid block
board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol
formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial
ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush
shutter including
supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked
MS powder coated fixtures of 6 Nos. butt hinges (IS:205)150mm long, 1 No. aldrop (IS:2681) 300mm
long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles
(IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with
required number of screws, bolt and nuts including labour charges for fixing the frame in position,
fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item
of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a
depth of not less than 10 mm) (1800mm x 2100mm)
Ground floor
For MD
1.80
2.10
3.78
sqm
#REF!
3.78
sqm
1983.00
1 sqm
36
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm
and ISI marked flush door shutters of 30 mm thick double shutters with bond wood solid block
board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol
formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial
ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush
shutter including
supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked
MS powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm
long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles
(IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with
required number of screws, bolt and nuts including labour charges for fixing the frame in position,
fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item
of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a
depth of not less than 10 mm) (1500mm x 2100mm)
First floor
For D
1.50
2.10
#REF!
9.45
sqm
9.45
sqm
9.45
sqm
2240.00
1 sqm
37
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65
mm and ISI marked flush door shutters of 30 mm thick single shutter with bond wood solid block
board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol
formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial
ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush
shutter including supply and
fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder
coated fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No.
tower bolt (IS:204) of 200 mm x 10 mm dia at top , 2 Nos. 150 mm long handles (IS:208), 1 No. door
stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws,
bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame
etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 &
1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm)
(1050mm x 2100mm)
i
Ground floor
For D1
1.05
2.10
#REF!
13.23
sqm
13.23
sqm
13.00
sqm
2576.00
1 sqm
37
Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm
and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board
type Core having cross bands and face veneers, hot pressed bonded with water proof phenol
formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial
ply with internal lipping on all sides including cost and conveyance to site of medium teak wood door
frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm
including ISI marked MS powder coated fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No.
aldrop (IS:2681) 250 mm long,
1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber
bush including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside
including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including
overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The
vertical frame of door shall be embedded in flooring for deth of not less than 10mm) ( 750mm x
2100mm )
Ground floor
For D2
0.75
2.10
#REF!
4.73
sqm
4.73
sqm
5.00
sqm
3063.00
1 sqm
38
Supply and fixing powder coated alimunium fully glazed 2 shutter windows with fixed panel in between
openable shutters as per approved drawings using anodized aluminium sections of 38.50mm x 33mm
, 3mm thick for outer frame, 59mm(3mm) x 33mm(2.5mm) x 30mm(3mm) for mullions and 38.5mm x
33mm , 3mm thick for shutter frame , powder coating of alluminium sections 25mm microns thick and
fixing 5 mm thick plain glass fitted with suitable aluminium galzing clips and rubber beading including
supplying and fixing powder coated aluminium adjustable frictional stay hinges (2 Nos. per shutter),
handle with lock (1 No. per shutter) including cost and conveyance to site of powder coated aluminium
sections, glass, rubber beading, fixtures etc., including labour charges for manufacturing window,
fixing in position using wooden blocks and sheet metal screws, etc., complete for finished item of work
in all floors. (The aluminium sections used shall be standard make confirming to IS 1948-1961 and as
approved by the Engineer and fixtures shall be of ISI marked) (1800mm x 1300mm).
ii
First floor
Window W
12
1.80
1.30
say
28.08
sqm
28.08
sqm
28.00
sqm
3433.00
1sqm
First floor
Window W
1.20
1.30
say
3.12
sqm
3.12
sqm
3.00
sqm
4417.00
1sqm
39
Supply and fixing powder coated alimunium fully glazed top hung ventilators fixed with 5mm thick
plain glass using suitable alluminium glazing clips and rubber beading as per approved drawings
using anodized aluminium sections of 38.50mm x 33mm , 3mm thick for outer frame, 59mm(3mm) x
33mm(2.5mm) x 30mm(3mm) for mullions shutters z section of 38.50mmx33mm,3mm thick,powder
coating of all alluminium sections 25mm microns thick, including cost and conveyance to site of
powder coated aluminium sections, glass, rubber beading, fixtures etc., including labour charges for
manufacturing window, fixing in position using wooden blocks and sheet metal screws, etc., complete
for finished item of work. (The aluminium sections used shall be standard make confirming to IS
1948-1961 and as approved by the Engineer and fixtures shall be of ISI marked) (900mm x 500mm).
VENTILATORS :
First Floor:
ventilator V
0.90
0.50
#REF!
40
1.35
sqm
1.35
sqm
1.35
sqm
4508.00
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked
together through their entire length and jointed together at the ends by end-locks, mounted on
specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide
channels, stoppers, bottom locking plates and arrangements for inside & outside locking with pushpull operations including cost of hood cover and springs complete, painted with one coat of approved
steel primer, locks, ball bearings, all accessories etc., overheads & contractors profit complete for
finished item of work as per special spn: 1108
3.00
2.75
#REF!
8.25
sqm
8.25
sqm
8.00
sqm
2500.00
1sqm
TOTAL
ORATORY
AMOUNT
274.3643
5904.32
6494752
63130
46944
7308
81900
100436
67815
559104
7446
160560
95642
45981
32742
123252
97482
21101
375296
856
166144
163590
322287
779
356568
36498
10248
3653
228743
88150
56992
4564
5430
5534
6944
1305
1333765
277.13 sqm
7.54133221 kg/sft
961232
91296
51060
38868
296.15 sqm
5.01920064 kg/sft
2680
246500
5040
29
64752
6251
103675
28440
181984
11628
88264
7.6
52754
17814
11984
21330
37400
21184
13420
46854
14484
77654
276524
118002
22968
8568
7496
21168
33488
15315
96124
13251
6086
20000
7512092
NAME OF THE WORK : CONSTRUCTION OF OFFICE CUM LABORATORY BUILDING AT CRS, TIRUPATI, CHITTOR
DISTRICT
PART:II
S.No
DESCRIPTION
N0
QTY
UNIT
Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 &
4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket
pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the
required slope including cost and conveyance of all materials to site and all labour charges,
overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318)
50
50
Rmt
RATE
262.00
1Rm
50
50
Rmt
407.00
1Rm
Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from
approved source having a minimum crushing strength of 5 N/sq.mm including plastering with
cement mortar 1:3 prop; thick both inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of
soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal
and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and
including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost
of seigniorage charges on all materials and all incidental and operational, labour charges like
mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit
etc., complete for finished item of work as per Standard specification.
Manholes
say
Nos 4999.00
Each
Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from
approved source having a minimum crushing strength of 5 N/sq.mm including plastering with
cement mortar 1:3 prop; thick both inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of
soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal
and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and
including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost
of seigniorage charges on all materials and all incidental and operational, labour charges like
mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit
etc., complete for finished item of work as per Standard specification.
2
say
Nos 7662.00
Each
Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651
& 4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate
chamber and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of
standard make as approved including cost and conveyance of all materials to site, labour
charges, overheads & contractors profit etc., complete for finished item of work.
Ground Floor:
Toilets
say
Nos
519.00
Each
Supplying and fixing of 3" (76.2mm) multi floor trap with jali - UPVC/SWR pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any other ISI Brand) as per site requirements with
standard practice for all floors including cost and conveyance of all materials to site, labour
charges , overheads & contractors profit etc., complete for finished item of work.
First Floor:
7
say
Nos
102.00
Each
Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-21973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing
best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers
as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern Parryware or
equivalent with internal components and fixed using required size of nails and screws, angle
stop cock 12.70mm dia. first quality Indian make heavy duty Seiko/Senior/Nice or equivalent,
12mm PVC connections with brass union nuts CP coated including cost and conveyance of all
materials to site, overheads & contractors profit etc., complete for finished item of work for all
floors.
First Floor:
Nos 3689.00
Each
3689.00
Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer)
1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm
nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams
Seiko/Senior/Nice or equivalent complete with standard CI brackets including wooden blocks ,1
No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock 12.70mm dia.
first quality Indian make heavy duty Seiko/Senior/Nice or equivalent, 31.75mm dia. PVC flexible
waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site,
labour charges , overheads & contractors profit for finished item of work
First Floor:
Nos 1622.00
Each
Supplying and fixing NP soap dish heavy type of approved make ISI quality with NP screws
etc., complete including cost and conveyance of all materials, labour charges for fixing ,
overheads & contractors profit for finished item of work in all floors
First Floor:
Nos
506.00
Each
Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm ,
plywood back with NP screws 1st quality including cost and conveyance of all materials, labour
charges , overheads & contractors profit for finished item of work in all floors.
First Floor:
Nos
506.00
Each
10 Supplying and fixing of 25.4mm dia , 609.6mm long aluminium anodized towel rods with
brackets and aluminium screws including cost and conveyance of all materials, labour charges ,
overheads & contractors profit for finished item of work.
i
First Floor:
Nos
163.00
Each
11
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make heavy duty as
approved by the Engineer-In-Charge including cost and conveyance of all materials, labour
charges , overheads & contractors profit complete for finished item of work in all floors.
Short body
Ground Floor :
1
Nos
248
Each
ii
First Floor:
1
Nos
248
Each
Supplying and fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315
mm with integral flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer)
conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing
12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st
12 quality of approved make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist
quality including cost and conveyance of all materials to site, labour charges , overheads &
contractors profit complete for finished item of work for all floors.
Nos
1170
Each
Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with double
layer approved brand and manufacture with cover and suitable locking arrangement and making
13 necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks
including cost and conveyance of all materials and labour charges , overheads & contractors profit
complete for finished item of work.
All floors
2000
2000
Nos
6.25
Each
14 Supplying and fixing of SWR PVC pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand)
4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions,
double junctions as per site requirement, fixing with PVC clamps if necessary with required
number of Bombay nails including cost and conveyance of all materials to site, labour charges,
overheads & contractors profit complete for finished item of work at all floor levels. (APSS No.
1302 1319 & 1326)
i
First Floor:
90mm dia
10
30
Rmt
209.00
Each
110mm dia
10
30
Rmt
235.00
Each
15 Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark in
ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints,
union flanges, unions etc. with necessary excavation in all types of soils except rock requiring
blasting, refilling, chiselling masonry walls and making good the walls & floors to the original
surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all
materials and labour charges , overheads & contractors profit complete for finished item of
work.
a
Ground Floor:
Toilet / WC
Rmt
Toilet / WC
18
Rmt
Wash basins
15
45
Rmt
69
Rmt
69
Rmt
First Floor:
say
182.00
1 Rmt
First Floor:
6
24
Rmt
24
Rmt
201.00
1 Rmt
16
Rmt
261.00
1 Rmt
30
30
Rmt
406.00
1 Rmt
30
30
Rmt
442.00
1 Rmt
16 Supplying and fixing 65 mm Nominal Bore GI pipe Medium Grade properties & weight as
per IS 1239 in ground or on wall with GI fittings such as elbows tees couplings, nipples, plugs
including excavation for trenches and refilling the trenches ,chiselling masonry walls and making
good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls
including cost and conveyance of all materials and labour charges , overheads & contractors
profit complete for finished item of work except for GI bends union and GI connectors with
checkout and socket Tata or Zenith make or equivalent
a
30
30
Rmt
757.00
1 Rmt
17 Supplying and fixing Gunmetal Gate ( GM peet ) valve as per IS-778 Class - I , Indian
make heavy type including cost and conveyance of all materials , labour charges ,
overheads & contractors profit complete for finished item of work.
a
First Floor:
Toilets
NO'S 360.00
EACH
First Floor:
From syntax tank to toilet line
NO'S 484.00
EACH
i
from main pipe line
NO'S 708.00
EACH
NO'S 1438.00
EACH
NO'S 2076.00
EACH
NO'S 3946.00
EACH
TOTAL
RUPATI, CHITTOR
AMOUNT
13100
20350
14997
15324
2595
714
11067
4866.0
1518
1518
489
248
1736
2340
12500
6270
7050
12558
4824
4176
12180
13260
22710
1080
1452
2124
4314
6228
11838
213426
NAME OF THE WORK : CONSTRUCTION OF OFFICE CUM LABORATORY BUILDING AT CRS, TIRUPATI, CHITTOR
DISTRICT
S.No
Description of Work
Unit
Rate(Rs)
Amount
Supply and fixing of 25mm outer dia 2.20 mmthick Heavy grade PVC pipe (ISI
MARK) concealed in Roof Slabs with all required MS deep boxes and all
accessories including and labour charges etc., complete.
400 ONE RM
56
22400
Supply and fixing of 25mm outer dia 1.8 mm Medium grade PVC pipe (ISI
MARK) concealed in wall with all required MS junction boxes and all
accessories including masionary work for light,Fan and seperate plug point
with MS Modular switch box including all labour charges etc., complete for
EPABX, LAN, and CCTV, Bell,Light,Fan Points.Makes:- Sudhakar/ Modi.
300 ONE RM
60
18000
Supply and erecting MS galvanised Fan hook box with hook in RCC slab
including all Labour charges etc., complete.
18
Each
45
810
WIRING
4
Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLC P.V.C. insulated flexible
copper cable (ISI MARK) in existing pipe with 6A Modular Switch,Ceiling
rose/BH/SBH/ Modular switches with cover plate including all labour Charges
etc., complete (for Non- Residential building) Makes of wires:L&T/FINOLEX/RPG/HAVELLS/V-GUARD/HPL/POWER
FLEX/POLYCAB/ANCHOR/GOLD MEDAL/STANDARD/MILLION/FORTUNE
ART/SUNCAB. Makes of switches/sockets:- Cabtree Thames
Platinum/GM/Million/Anchor Roma Viola/Toyoma/L&T/Fortune Art/CPL.
60
Each PT
460
27600
Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLC P.V.C. insulated flexible
copper cable (ISI MARK) in existing pipe with 6A Modular Switch,Ceiling
rose/BH/SBH/ Modular switches with cover plate including all labour Charges
etc., complete (for Non- Residential building) for Staircase points (2 way
Switch). Makes of wires:- L&T/FINOLEX/RPG/HAVELLS/VGUARD/HPL/POWER FLEX/POLYCAB/ANCHOR/GOLD MEDAL/
STANDARD /MILLION /FORTUNE ART/SUNCAB. Makes of
switches/sockets:- Cabtree Thames Platinum/GM/Million/Anchor Roma
Viola/Toyoma/L&T/Fortune Art/CPL.
Each PT
690
1380
Wiring with three runs of 22/0.3mm (1.5 Sq.mm) FRLC P.V.C. insulated
flexible copper cable (Phase,Neutral,Earth) in existing conduit pipe with 6A
Modular type Switch,and 6A 3/2 pin Modular type Socket with cover plate on
common switch board etc., complete Makes of wires:- L&T/ FINOLEX/ RPG/
HAVELLS/V-GUARD/HPL/POWER FLEX/POLYCAB/ANCHOR/GOLD
MEDAL/STANDARD/MILLION/FORTUNE ART/SUNCAB. Makes of
switches/sockets:- Cabtree Thames Platinum/GM/Million/Anchor Roma
Viola/Toyoma/L&T/Fortune Art/CPL.
10
Each PT
273
2730
Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLC P.V.C. insulated flexible
copper cable (ISI MARK) in existing conduit pipe with 6A Switch and 6A, 3/2
pin Modular type Socket with 6A switch control and MS boxes with cover plate
fixing on separate board etc., complete including all labour charges etc.,
Makes of wires:- L&T/FINOLEX/RPG/HAVELLS/V-GUARD /HPL /POWER
FLEX/POLYCAB/ANCHOR/GOLD MEDAL /STANDARD /MILLION/FORTUNE
ART /SUNCAB. Makes of switches/sockets:- Cabtree Thames
Platinum/GM/Million/Anchor Roma Viola/Toyoma/L&T/Fortune Art/CPL.
Each PT
415
830
Wiring with three runs of 22/0.3mm (1.5 Sq.mm) FRLC P.V.C. insulated
flexible copper cable (ISI MARK) in existing conduit pipe with 6A Modular type
Switch control- 3nos and 6A, 3/2 pin Modular type Socket 3 nos fixing on
separate board including all labour charges etc., complete(for LABs &
Computer Use) Makes of wires:- L&T/FINOLEX/RPG/HAVELLS/VGUARD/HPL/POWER FLEX/POLYCAB/ANCHOR/GOLD MEDAL
/STANDARD /MILLION/FORTUNE ART/SUNCAB. Makes of
switches/sockets:- Cabtree Thames Platinum/GM/Million/Anchor Roma
Viola/Toyoma/L&T/Fortune Art/CPL.
Each PT
865
6920
S&D of 16 A/6A, 2 in one socket with 16 A switch control modular type with
MS flush boxes with front cover plate including all labour charges etc.,
complete. Makes of switches/sockets:- Cabtree Thames
Platinum/GM/Million/Anchor Roma Viola/Toyoma/L&T/Fortune Art/CPL.
Each
335
670
RUN OF MAINS
10
Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLC P.V.C. insulated flexible
250 ONE RM
copper cable (ISI MARK) in existing pipe with 6A Modular Switch,Ceiling
rose/BH/SBH/ Modular switches with cover plate including all labour Charges
etc., complete. Makes of wires:- Polycab/Havells/Sun Cab/Gold
Medal/Million/Fortune Art/HPL/L&T/Power Flex/RPG/Anchor.
19
4750
11
Supply and run of 3 of 2.5 Sq.mm (phase neutral and earth) FRLC P.V.C.
insulated flexible copper cable in existing MS conduit pipe for individual
lighting circuits including all labour charges etc., complete as required for
switch boards. Makes of wires:-KEI/ Polycab/Havells/Sun Cab/Gold
Medal/Million/Fortune Art/HPL/Power Flex/RPG/Anchor.
300 ONE RM
80
24000
12
Supply and run of 3 of 4.0 Sq.mm (phase neutral and earth) FRLC P.V.C.
insulated flexible copper cable in existing conduit pipe for run of mains
including labour charges etc., complete as required including labour charges
for 16 A sockets. Makes of wires:-KEI/ Polycab/Havells/Sun Cab/Gold
Medal/Million/Fortune Art/HPL/Power Flex/RPG/Anchor.
80
ONE RM
113
9040
13
167
16700
14
50
ONE RM
278
13900
15
Supply and run of 5 of 10.0 Sq.mm (phase neutral and earth)FRLC P.V.C.
insulated flexible copper cable in existing conduit pipe for run of mains from
Power panel Board to TPN DB'S with pin type lugs and connectionsetc.,
complete. (for PDB's). Makes of wires:-KEI/ Polycab/Havells/Sun Cab/Gold
Medal/Million/Fortune Art/HPL/Power Flex/RPG/Anchor.
50
ONE RM
422
21100
Each
1456
8736
16
DISTRIBUTION BOARDS
Supply and fixing single phase DB in sheet steel enclosure with metallic plug
and socket with 1 No.20/32A, 10KA 'c' curve SPMCB (Motor characteristics
MCB's) control including making connections etc., complete concealing in wall
for A.C. points etc. Make:Legrand/Schneider.
17
Supply and fixing of TPN 4 way distribution board IP-43 (8+12 Module) with
provision to accommodate the ELCB incomer and suitable for single pole
outgoing MCB's in sheet steel enclosure with 32A 4 pole MCB as incomer and
12 No of 6 to 32 Amps single pole, 10KA breaking capacity 'C' curve MCB
outgoings including making components etc., complete concealing on wall.
(LIGHTING DB'S) Makes: Legrand/ Schneider.
Each
7094
7094
18
Supply and fixing of TPN 4 way distribution board IP-43 (8+12 Module) with
provision to accommodate the ELCB incomer and suitable for single pole
outgoing MCB's in sheet steel enclosure with 63A 4 pole MCB as incomer and
12 No of 6 to 32 Amps single pole, 10KA breaking capacity 'C' curve MCB
outgoings including making components etc., complete concealing on wall.
(POWER DB'S) Makes: Legrand/ Schneider.
Each
7712
7712
19
Supply and fixing of TPN 8 way Vertical type distribution board IP-43
Protection (Metal Door) suitable to accommodate MCCB as incomer and
single/three pole MCB's as outgoings with 125A, 4 pole 25KA MCCB as
incomer with 6No of 40/63A, 10 KA TP MCB's 'c' curve and 6No, 6-32 A, 10
KA SP MCB's 'c' curve as outgoing including making connections and labour
charges etc., complete concealing on wall. Makes: Legrand/ Schneider.
Each
29631
29631
20
Supplyand fixing of cable adopter box with cover for DB's including massanory
work etc., complete.
Makes: Legrand/ Schneider.
Each
600
1800
Each
3520
7040
21
EARTHINGS
Providing Independent earthing for important equipment with 40mm dia 'B'
class 2.5m long G.I. pipe and 19mm dia 'B' class G.I. pipe of 0.3 mtr long
connected with reducer providing G.I. funnel with mesh enclosed in
C.C.chamber of 400m X 400m X 400mm with RCC slab cover duly providing
staggered holes filling with salt and charcoal from the bottom of the pipe giving
earth connection from electrode through G.I. strip og 40 X 6mm X 200mm
length with all accessories and labour charges complete, as per IS
specifications 732/1982 (Part II).
22
Supply and run of 25mmX6mm G.I. strip including cost of all accessories and
labour charges etc complete.
FIXTURES
Supply and Transportation,Fixing of 4-28W box type tube light fitting with 28
Watt electronic ballast with all accessories with 40 Watt tube and operating
voltage 90 to 350 volts , power factor 0.98 and harmonics shall be as per IS
specifications including all labour charges and conveyance of all materials etc
complete with flexible wire and connections.(TRINIC Make only with 4 Years
Warranty.,)
50
RM
88
4400
28
Each
1180
33040
24
10
Each
90
25
18
Each
1600
28800
26
Supply and fixing of modular Electronic Step type fan regulator hum free step
type socket size with MS box,front plate in the existing switch board (Modular
Type).
Make:MK/Cabtree/Anchor Roma/Salzar/Legrand/Mosaic model as per
Dept.,Direction.
18
Each
473
8514
27
Supply and erecting 19/20mm steel tube down rod of one meter length with
bolts & nuts duly painted with matching colour of fan complete
20
Each
84
1680
28
Labour Charges for fixing of Ceiling fan including giving connections with twin
core wire etc., complete.
Supply Transportation of heavy duty exhaust fan 12"(300mm) size 1350 rpm
with metal blades wire mesh with all accessories etc
complete.Make:Orient/Crompton Greeves/GE/Almonard/Bajaj Fresh.
18
Each
91
1638
Each
2645
10580
Each
410
1640
31
100 ONE RM
280
28000
32
Earth work excavation of Trench in hard ground soil, laying of U.G. cables of
size on sand cushion covering the cable with bricks and back filling of Trench
duly providing route indicator (as per general instructions S.NO.14 of SSR)
embedded in C.C including cost and conveyance of materials and labour
charges etc ., complete.
80
ONE RM
154
12320
Each
138
276
Each
20
120
Each
1800
7200
400
3200
33
9900
23
29
30
33
CABLE GLANDS
S&F of Heavy duty Flange type Brass cable glands of following sizes for PVC
armoured cable with brass washers,earth tag etc complete including all labour
charges
25 to 50 Sq.mm
34
ALUMINIUM LUGS
Supply and Fixing of Crimping type Aluminium lugs confirming to IS
Specification for following cables including nuts and bolts with connections.
50Sq.mm.
35
36
37
900
STREET LIGHTS
Supply and fixing of 4' - 28 w weatherproof streetlight fitting comprising
canopy of sheet aluminium in stove enamel finish with energy saving
Electronic Ballast and 1no 40/36 Wtube Light to the pole / wallwith suitable
length of G.I. pipe bracket massonary work etc., complete with connections as
required at site. Makes:Crompton/Bajaj/HPL/Surya/Havells.
LAN
Supply and Termination of cat-6 RJ 45 out lets including dual face plate of
8
Each
MAKES:Beldan/D link/ Legrand/AMP/Krone.
Supply and Laying of CAT 6 UTP cable including all taxes etc
300 ONE RM
complete.Make:D-Link/AMP/Krone/Finolex.
Sub Total
385051
Estimate
Quantity
(only
Err:509
Figures)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Rate (INR)
- Upto 2
APSS /.
Decimals
Number
308
Err:509
309&310
Err:509
SS
Err:509
402
Err:509
309&310
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
402
Err:509
901 & 903
Err:509
402
Err:509
402
Err:509
SS
Err:509
501 & 504
Err:509
501 & 504
Err:509
501 & 504
Err:509
501 & 509
Err:509
501 & 509
Err:509
402
Err:509
402
Err:509
901,903 & 904 Err:509
901,903 & 904 Err:509
Unit
1 Cum
1 Cum
1 Sqm
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Rmt
1 Rmt
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Sqm
1 Cum
1 Cum
1 Sqm
1 Sqm
Amount
(INR) Upto 2
Err:509
Decimals
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
318.5913
36.4686
Err:509
Err:509
51.6
12
-3.15
0
7.5
22
13.35
0
1.7055
0
0
0
0
0
0
3
0
0
GF : Plastering 12mm thick in two coats GF : Plastering 12mm thick in two GF : Plastering 12mm
with
coat of
8mmthick
thickinintwo
CM coats
(1:6) coats
with base
coat
of in8mm
two coats12mm
with
FF : base
Plastering
12mm
FF : Plastering
12mm
thick
two thick
FF : inPlastering
and
top
coat
of
4mm
thick
in
CM
(1:4)
with
thick
in
CM
(1:6)
and
top
coat
of
base
coat
of
8mm
thick
with: base
coat of
8mmthick
thickinintwo
CM coats
(1:6) GF
coats
with base
coat
of in8mm
thick: inPlastering
two coats20mm
with
GF
Plastering
20mm
: Plastering
20mm
thick
two GF
dubara
sponge
finishing
including
cost
and
4mm
thick
in
CM
(1:4)
with
in
CM
(1:6)
and
top
coat
and
top
coat
of
4mm
thick
in
CM
(1:4)
with
thick
in
CM
(1:6)
and
top
coat
of
base
coat
of
8mm
thick
using
screened 20mm
sand with
coat
of FF
coats
using screened
sandin with
thick: inPlastering
two coats 20mm
using
FF
: Plastering
thick base
in two
coats
: Plastering
20mm thick
two FF
conveyance
of
all
materials
like
cement,
dubara
sponge
including
of
4mm
thick
inwith
CM
(1:4)
dubara
sponge
finishing
including
cost
and
4mm
thick
infinishing
CM (1:4)
with
in
CM in
(1:6)
and
topusing
coat
16mm
thick
in
CM(1:6)
and
top
base
coat
of
16mm
thick
in
screened
sand
base
using
screened
sand
with
base
coat
of
coats
using
screened
sand
with
thick
two
coats
GF
: Flooring
with
vitrified
polished
floor GF
: and
Flooring
with vitrified
GF
: Flooring
with vitrified
sand,
water
etc.,
to
site,
including
cost
conveyance
of
all
with
dubara
sponge
conveyance
of
all
materials
like
cement,
dubara
sponge
finishing
including
of
4mm
thick
in
CM
(1:4)
4mm
thick
in in
CM(1:4)
with
dubara
sponge
andoftop
coat
ofquality
4mm
of floor
16mm
thick
in
16mm
thick
CM(1:6)
and
topapproved
coat
of CM(1:6)
base
coat
16mm
in coat
screened
sand
with
tiles
1st
quality
and
make
as
polished
floor
tiles
of 1stthick
polished
tiles
ofbase
1st
FF
: of
Flooring
with
vitrified
polished
floor
FF
: and
Flooring
with
vitrified
FF
: Flooring
with
vitrified
seigniorage
charges,
sales
&
other
taxes
materials
like
cement,
sand,
finishing
including
cost
sand,
water
etc.,
to
site,
including
cost
conveyance
of
all
with
dubara
sponge
finishing
including
cost
and
conveyance
of
thick
in
CM(1:4)
with
dubara
CM(1:6)
and
top
coat
of
4mm
thick
in CM(1:4)
with
dubara
sponge
CM(1:6)
and as
top
coat
ofquality
4mm
coat
of and
16mm
thick
in
by
Engineer-in-charge
of
size
not
less and
approved
by
quality
make
as
tiles
of
1st
quality
and
make
as
approved
polished
floor
tiles
of
1st
polished
floor
tiles
ofwith
1st
GF
:all
Flooring
with
ceramic
7.30mm
GF
: make
Flooring
with
ceramic
tiles
GF
: thick
Flooring
on
materials,
and
all&tiles
operational,
water
etc.,
site,
including
and
conveyance
of
all
seigniorage
charges,
sales
other
taxes
materials
liketo
cement,
sand,
finishing
including
cost
all
materials
like
cement,
sand,
water
etc.,
sponge
finishing
including
cost
4mm
in
CM(1:4)
finishing
including
cost
and
conveyance
of
thick
in
CM(1:4)
with
dubara
CM(1:6)
and
top
coat
of
than
598
mm
x 598
mm
,ofmaterials
8mm
thickness
Engineer-in-charge
of sales
size
not
approved
by
Engineer-inby
Engineer-in-charge
size
not
less
make
as
approved
by
and
make
as
thick
, 1st
quality
and
of size
as
approved
7.30mm
thick charges,
,with
1st
quality
and
of
ceramic
tiles
7.30mm
incidental
charges
on
and and
seigniorage
& quality
materials
like
cement,
FF
:site,
Flooring
with
ceramic
7.30mm
FF
: conveyance
Flooring
ceramic
tiles
FF
: Flooring
with
ceramic
on
all
materials,
and
all tiles
operational,
water
etc.,
to
site,
including
and
conveyance
of all
to
including
seigniorage
charges,
and
of
all598
materials
with
dubara
sponge
all
materials
like
cement,
sand,
water
etc.,
sponge
finishing
including
cost
4mm
thick
in not
CM(1:4)
regular
finish
and
normal
colours
with
less
than
598
mm
x
mm
,
charge
of
size
less
than
598
mm
x
598
mm
,
8mm
thickness
Engineer-in-charge
of
size
not
approved
by
Engineer-inby
Engineer-in-charge,
set
over
base
coat
size
astaxes
approved
by
Engineer-inthick
,water
1stincluding
quality
and
of
including
cost
of
allon
labour
charges
for 7.30mm
other
on
all
materials,
and
sand,
etc.,
to
thick
,&1st
quality
and
of
size
as
approved
thick
,dadooing
1st
and
of
7.30mm
thick
,site,
1st
incidental
charges
on
materials
and
seigniorage
charges,
sales
& tiles
materials
like
cement,
GF:
Providing
dadooing
to
walls
with
GF:
Providing
to
walls
GF:
Providing
dadooing
to
sales
other
taxes
all
materials,
like
cement,
sand,
water
etc.,
to
finishing
cost
to
site,
including
seigniorage
charges,
and
conveyance
ofquality
all598
materials
with
dubara
sponge
borders
and
design
as per
the
approved
8mm
thickness
regular
finish
and
than
598
mm
x 598
mm
,
regular
finish
and
normal
colours
with
less
than
598
mm
x
mm
,
charge
of
size
not
less
of
cement
mortar
(1:8),
12mm
thick
over
charge,
set
over
base
coat
of
size
as
approved
by
mixing
mortar,
finishing,
scaffolding,
lift
all
operational,
incidental
charges
including
seigniorage
by
Engineer-in-charge,
set
over
base
size
as
approved
Engineer-inquality
and
of dadooing
size
as
including
cost taxes
ofdadooing
allonlabour
charges
for
other
taxes
on
allby
materials,
and
sand,
water
etc.,
to
glazed
coloured
tiles
1st
quality
of coat
size
glazed
coloured
tiles
1st
walls
with
glazed
all
operational,
incidental
charges
on with
site,
including
seigniorage
and
conveyance
ofsite,
all
FF
:
Providing
to
walls
with
FF
:
Providing
dadooing
to
walls
FF
:
Providing
sales
&
other
all
materials,
and
like
cement,
sand,
water
etc.,
to
finishing
including
cost
flooring
pattern
as
directed
by
the
normal
colours
with
borders
and
8mm
thickness
regular
borders
and
design
as orper
the thick
approved
8mm
thickness
regular
finish
than
598 mm
x 598
mm
CC
bed
already
laid
RCC
roof
slab,
cement
mortar
(1:8),
12mm
thick
set,
charges,
curing,
including
cutting
on
materials
and
including
cost
of Engineer-in-charge,
charges,
sales
other
of
cement
mortar
(1:8),
12mm
over
charge,
set
over
base
coat
approved
by
Engineer-inmixing
mortar,
finishing,
scaffolding,
lift
all
operational,
incidental
charges
including
seigniorage
with
borders
asincluding
approved
by
Engineer-inquality
of
size
borders
as
coloured
tiles
1st&
quality
materials
and
cost
of
allgrooves
labour
charges,
sales
&with
other
taxes
on
materials
like
cement,
glazed
coloured
tiles
1st
quality
of
size
with
glazed
coloured
tiles
1st
to
walls
with
glazed
all
operational,
incidental
charges
on
site,
including
seigniorage
and
conveyance
ofwalls
all
Painting
to
new
walls
cement
pricemr
as
Painting
to
new
walls
cement
Painting
to
new
Engineer-In
-Charge
set
over
a
base
coat
design
as
per
the
approved
finish
and
normal
colours
flooring
pattern
as
directed
by
the
normal
colours
with
borders
and
8mm
thickness
regular
including
neat
cement
slurry
of
honey
like
over
CC
bed
already
laid
or
RCC
over
base
coat
of
cement
as
directed
by
Engineer
- in
- charge
etc.,
all
labour
charges
for mixing
taxes
onwith
alletc.,
materials,
CC
bed
already
laid or
RCC
roof
slab,
cement
mortar
(1:8),
12mm
thick
charge,
set
over
base
charges,
curing,
including
cutting
grooves
on
materials
and
including
cost
of of
charges,
sales
&
other
Charge
set
over
base
coat
of
CM(1:5)
12
approved
by
Engineer-in-Charge
size
borders
as
charges
for
mixing
mortar,
finishing,
all
materials,
and
all
operational,
sand,
water
to
site,
with
borders
as
approved
by
Engineer-inquality
of
size
with
borders
as
coloured
tiles
1st
quality
materials
and
including
cost
of
all
labour
charges,
sales
&
other
taxes
on
materials
like
cement,
Priming
Coat
tofor
give
an
even
shade
after
pricemr
as
Priming
Coat
to give
cement
pricemr
as
of
CM
(1:8)
prop.
12mm
thick
over
CC
flooring
pattern
as
directed
by Internal
with
borders
and
design
Internal
Walls:
Providing
and
applying
Internal
Walls:
Providing
and
Walls:
Providing
Engineer-In
-Charge
set
over
a
base
coat
design
as
per
the
approved
finish
and
normal
colours
consistency
spread
@
3.3
Kgs
per
Sqm
&
roof
slab,
including
neat
cement
mortar
(1:8),
12mm
thick
and
complete
finished
item
of
work.
mortar,
finishing,
scaffolding,
lift
and
all
operational,
including
neat
cement
slurry
of
honey
like
over
CC
bed
already
laid
or
RCC
coat
of
cement
mortar
as
directed
by
Engineer
in
charge
etc.,
all
labour
charges
for
mixing
taxes
on
all
materials,
mm
thick
with
set
over
base
coat
of
CM(1:5)
12 of
approved
by
Engineer-inscaffolding,
lift
charges,
curing,
including
incidental
charges
on
materials
including
seigniorage
Charge
set
over
base
coat
ofroof
CM(1:5)
12, approved
by
Engineer-in-Charge
size
with
borders
as
charges
for
mixing
mortar,
finishing,
all
materials,
and
all
operational,
sand,
water
etc.,
to
site,
thourughly
brushing
the
surface
to
remove
an
even
shade
after
thourughly
Priming
Coat
to
give
an
bed
already
laid
or
RCC
slab
the
Engineer-In
-Charge
set
over
as
per
the
approved
synthetic
plaster
putty
or
plaster
of
paris
applying
synthetic
plaster
putty
and
applying
synthetic
of
CM
(1:8)
prop.
12mm
thick
over
CC
flooring
pattern
as
directed
by
with
borders
and
design
Internal
Walls:
Painting
to cement
new
walls
with
2 Internal
Walls:
Painting
to
new
Walls:
Painting
to
jointed
neatly
white
paste
to
slurry
offinishing,
honey
like
consistency
over
CC
bed
already
laid
(SS
901,903
& with
904)
(@BLD-CSTN-8-10)
charges,
curing,
including
cutting
incidental
charges
on
consistency
spread
3.3
Kgs
per
Sqm
&
roof
slab,
including
neat
cement
(1:8),
12mm
thick
over
and
complete
for
finished
item
of
work.
mortar,
scaffolding,
lift
and
all
operational,
at
the
rate
of
3.30
kgs
mm
thick
with
cement
slurry
of Internal
Charge
set
over
base
cutting
grooves
as
directed
by
Engineer-inand
including
cost
of
all
labour
charges,
sales
& other
mm
thick
with
cement
slurry
of
honey
like
set
over
base
coat
CM(1:5)
12
approved
by
Engineer-inscaffolding,
lift
charges,
curing,
including
incidental
charges
on
materials
including
seigniorage
all
dirt
and
remains
of
loose
powdered
brushing
the
surface
to
remove
even
shade
after
including
neat
cement
slurry
of
honey
a
base
coat
of
CMof
(1:8)
prop.
flooring
pattern
as
putty
or
lime
punning
of
average
1
to
2
or
plaster
of
paris
putty
or
lime
plaster
putty
or
plaster
bed
already
laid
or
RCC
roof
slab
,
the
Engineer-In
-Charge
set
over
as
per
the
approved
coats
of
plastic
emulsion
paint
of
walls
with
2
coats
of
plastic
new
walls
with
2
coats
of:
full
depth
mixed
with
pigment
of
matching
spread
@
3.3
Kgs
per
Sqm
&
or
RCC
roof
slab,
grooves
as
directed
by
Engineer
materials
and
including
GF
External
Walls:
: cement
Providing
and
GF
External
Walls:
: all
Providing
GF
External
Walls:
jointed
neatly
with
white
paste
to honey
slurry
of
honey
likeofconsistency
CC
bed
already
laid
or
(SS
901,903
& and
904)
( BLD-CSTN-8-10)
charges,
curing,
including
cutting
incidental
charges
on
per
sqm
and
jointing
with
white
cement
like
consistency
spread
at
ofonCM(1:5)
mm
charge
etc.,
complete
for
finished
charges
for
mixing
mortar,
taxes
all
materials,
consistency
spread
at
the
rate
of
3.30
kgs
mm
thick
with
cement
slurry
of coat
Charge
set
over
base
cutting
grooves
asspread
directed
by
Engineer-inand
including
cost
labour
charges,
sales
&12
other
materials,
including
cost
and
conveyance
all
dirt
and
remains
of
loose
thourughly
brushing
the
like
consistancy
@
3.3
kgs
per
12mm
thick
over
CC
bed
already
directed
by
the
Engineermm
thickness
over
plastered
surface
to
punning
of
average
1
to
2
mm
paris
putty
or
lime
including
neat
cement
slurry
of
honey
a
base
coat
of
CM
(1:8)
prop.
flooring
pattern
as
approved
brand
and
shade
after
emulsion
paint
of
approved
brand
plastic
emulsion
paint
of
shade,
including
cost
of
all
materials
like
jointed
neatly
with
white
cement
including
neat
cement
in
charge
etc.,
and
complete
for
cost
of
all
labour
charges
applying
synthetic
plaster
plaster
and
applying
synthetic
plaster
Providing
and
applying
full
depth
mixed
with
pigment
of or
matching
spread
@
3.3
Kgs
per
Sqm
&- FF
RCC
roof
slab,
including
grooves
as
directed
by
Engineer
materials
and
FF
External
Walls:
: &putty
Providing
and
External
Walls:
: Providing
and
External
Walls:
paste
with
pigment
of
the
rate
ofscaffolding,
3.30
kgs
per
sqm
thick
with
cement
slurry
item
ofmixed
work
.(SS
901,903
904)
finishing,
lift
charges,
and
all
operational,
per
sqm
and
jointing
with
white
cement
honey
like
consistency
spread
at
coat
of
CM(1:5)
12
charge
etc.,
and
complete
for
finished
charges
for
mixing
mortar,
taxes
on
all
materials,
of
all
materials
to
work
site
and
all FF
powdered
materials,
including
surface
to
remove
all
dirt
Sqm.
and
jointed
neately
with
white
laid
orshade
RCC
roof
slab
,thoroughly
In
-Charge
set
over
a:
prepare
the
surface
even
and
smooth
after
thickness
over
plastered
surface
punning
of
average
1mm
to
like
consistancy
spread
@and
3.3
kgs
per
12mm
thick
over
CC
bed
already
directed
by
the
Engineerthoroughly
brushing
the
surface
to
remove
and
after
approved
brand
and
cement,
sand
,
water
tiles
etc.,
paste
to
full
depth
mixed
with
slurry
of
honey
like
finished
item
of
work.
(SS
for
mixing
mortar,
of
paris
putty
or
lime
punning
of
average
1
putty
or
plaster
of
paris
putty
or
synthetic
plaster
putty
or
shade,
including
cost
of
all
materials
like
jointed
neatly
with
white
cement
neat
cement
slurry
of
in
charge
etc.,
and
complete
for
cost
of
all
labour
charges
applying
synthetic
plaster
putty
or
plaster
applying
synthetic
plaster
putty
Providing
applying
shade
to
full.(SS
depth,
including
cost
ofwith
all
jointing
with
white
cement
of
honey
like
consistency
curing,
including
cutting
grooves
incidental
charges
on
Painting
to
new
walls
with
2
coats
of Painting
to
new
walls
with
2ofpaste
coats
toand
new
walls
paste
with
pigment
ofwith
matching
the
rate
ofscaffolding,
3.30
kgs
sqm
and
thick
with
cement
slurry
item
ofmixed
work
&
904)
finishing,
lift
charges,
and
allthickness
operational,
operational,
incidental,
labour
charges
cost
and
conveyance
all Painting
remains
of
loose
cement
paste
to 901,903
full
depth
mixed
neat
cement
slurry
of
honey
base
coat
of
CM
(1:8)
thoroughly
brushing
the
to
remove
to
prepare
the
surface
even
and
mm
over
Sqm.
and
jointed
neately
white
laid
or
RCC
roof
slabper
,to
including
In
-Charge
set
over
a
all
and
remains
ofsurface
loose
powdered
brushing
surface
remove
shade
after
thoroughly
complete
including
seigniorage
charges
pigment
of
matching
shade,
consistency
spread
@
3.3
901,903
&the
904)
( BLD-CSTN-8-10)
finishing,
scaffolding,
lift
to
2dirt
mm
thickness
over
plastered
surface
lime
punning
of
average
1
to
22
plaster
of
paris
putty
or
cement,
sand
, paint
water
andof
tiles
etc.,
paste
to
full
depth
mixed
with
honey
like
consistency
finished
item
of
work.
(SS
for
mixing
mortar,
of
paris
putty
or
lime
punning
average
1
or
plaster
of
paris
putty
or
lime
synthetic
plaster
putty
materials
like
tiles,
cement,
sand
and
mixed
with
pigment
of
matching
spread
at
the
rate
of
3.30
as
directed
by
Engineer-in-charge
materials
and
including
plastic
emulsion
of
approved
brand
of
plastic
emulsion
paint
of
with
2
coats
of
plastic
shade
to
full
depth,
including
cost
of
all
jointing
with
white
cement
paste
of
honey
like
consistency
curing,
including
cutting
grooves
incidental
charges
on
Supply
and
fixing
powder
coated
Supply
and
fixing
powder
coated
Supply
and
fixing
powder
etc.,
and
complete
for
finished
item
of
materials
to
work
site
and
all
powdered
materials,
pigment
of
matching
shade
including
cost
like
consistancy
spread
@
3.3
kgs
prop.
12mm
thick
over
all
dirt
and
remains
of
loose
powdered
smooth
after
thoroughly
brushing
plastered
surface
to
cement
paste
to
full
depth
mixed
with
neat
cement
slurry
of
honey
base
coat
of
CM
(1:8)
materials,
including
cost
and
conveyance
all
dirt
and
remains
offinished
loose
brushing
the
surface
etc.,
complete
for
finished
item
of
work. mm
including
cost
of
all
materials
like lime
Kgs
per
Sqm
&including
jointed
charges,
curing,
to
prepare
the
surface
even
and
smooth
thickness
over
plastered
punning
of
average
complete
including
seigniorage
charges
pigment
of
matching
shade,
spread
@
3.3
Kgs
per
901,903
&
904)
( and
BLD-CSTN-8-10)
finishing,
scaffolding,
lift
2
mm
over
plastered
surface
of
average
1
to
2
mm
plaster
of
paris
putty
or
water
etc.,thickness
complete
including
seigniorage
shade
to
full
depth,
including
cost
kgs
per
sqm
and
jointing
etc.,
and
complete
for
cost
of
all
labour
charges
and
shade
after
thoroughly
brushing
the punning
approved
brand
shade
after
emulsion
paint
of
materials
like
tiles,
cement,
sand
and
mixed
with
pigment
of
matching
spread
at
the
rate
of even
3.30
as
directed
by
Engineer-in-charge
materials
and
including
alimunium
sliding
window
with
fixed
fan
alimunium
sliding
window
with
coated
alimunium
sliding
work
as
per
APSS
911
for
internal
operational,
incidental,
labour
including
cost
and
and
conveyance
of
all
materials
like
per
Sqm.
and
jointed
neately
CC
bed
already
laid
or
Supply
and
fixing
powder
coated
Supply
and
fixing
powder
coated
Supply
and
fixing
powder
materials,
applying
emery
paper,
Sand
the
the
surface
to
remove
all
dirt
and
prepare
the
surface
pigment
of
matching
shade
including
cost
like
consistancy
spread
@
3.3
kgs
prop.
12mm
thick
over
of
all
materials
to
work
site
and
all
powdered
materials,
including
remove
all
dirt
and
(APSS
No.701
&
707)(BLD-CSTN-9-6)
cement,
sand
,
water
and
tiles
neatly
with
white
cement
cutting
grooves
as
after
thoroughly
brushing
the
surface
to
surface
to
prepare
the
1
to
2
mm
thickness
over
etc.,
complete
for
finished
item
of
work.
including
cost
of
all
materials
like
Sqm
&
jointed
neatly
charges,
curing,
including
to
prepare
the
surface
even
and
smooth
thickness
over
plastered
surface
lime
punning
of
average
charges
etc.,
and
complete
for
finished
of
all
materials
like
tiles,
cement,
with
white
cement
paste
item
of
work
.(SS
901,903
&
904)
for
mixing
mortar,
surface
to
remove
all
dirt
and
remains
of
thoroughly
brushing
the
approved
brand
and
water
etc.,
complete
including
seigniorage
shade
to
full
depth,
including
cost
kgs
per
sqm
and
jointing
etc.,
and
complete
for
finished
cost
of
all
labour
charges
light
at
top
as
per
approved
drawings
with
fixed
fan
light
at
top
as
per
window
with
fixed
fan
external
walls
in
all
floors.
Painting,
charges
etc.,
and
complete
for
conveyance
of
all
cement,
sand,
water,
tiles,
white
cement
with
white
cement
paste
to
full
RCC
roof
slab
,
including
alimunium
fully
glazed
top
hung
alimunium
fully
glazed
top
hung
coated
alimunium
fully
surface,
clean
& and
wipe
off
loose
dust,
remains
of
powdered
and
smooth
after
and
conveyance
of
all
materials
like Painting
per
Sqm.
and
jointed
neately
CC
bed
already
or
Painting
to
new
wood
work
and
flush
to
new
wood
work
and
to
new laid
wood
operational,
incidental,
labour
charges
etc.
and
conveyance
of tiles
all Painting
remains
of
loose
etc.,
complete
including
paste
to
full
depth
mixed
directed
by
Engineer
- lift
in
remove
all
dirt
remains
offinished
loose
even
and
smooth
after
thoroughly
plastered
surface
to
(APSS
No.701
&and
707)(BLD-CSTN-9-6)
cement,
sand
,loose
water
and
with
white
cement
paste
cutting
grooves
as
after
thoroughly
brushing
the
surface
to cost
to
prepare
the
surface
even
and
to 2at
mm
thickness
over
item
of
work.(BLD-CSTN-9-18)
sand
and
water
etc.,
complete
mixed
with
pigment
of
finishing,
scaffolding,
loose
powdered
materials,
including
cost
remove
all
dirt
and
remains
of 1
shade
after
thoroughly
charges
etc.,
complete
for
of
all
materials
like
tiles,
cement,
with
white
cement
paste
item
of
work
.(SS
901,903
&thick
904)
for
mixing
mortar,
all
required
accessories
such
as
approved
drawings
with
all
light
top
as
per
Priming
Coat
on
New
Plastered
Surface
finished
item
of
work
as
per
APSS
materials
to
work
site
etc.,
to
site
(excluding
cost
of
C.C.
bed)
depth
mixed
with
pigment
of
neat
cement
slurry
of
ventilators
fixed
with
5mm
thick
plain
ventilators
fixed
5mm
glazed
top
hung
applying
knifing
paste
filler
by
putty
materials,
applying
emery
paper,
thoroughly
brushing
the
cement,
sand,
water,
tiles,
white
cement
with
white
cement
paste
to
full
RCC
roof
slab
,
including
shutters
with
lappam
finish
,
over
a
flush
shutters
with
lappam
finish
,
work
and
flush
shutters
complete
for
finished
item
of
work
as
per
materials
to
work
site
and
all
powdered
materials,
seigniorage
charges
etc.,
with
pigment
of
matching
charge
etc.,
and
Supply
&
fixing
of
Door
frames
made
of
all
Supply
&
fixing
of
Door
frames
Supply
&
fixing
of
Door
powdered
materials,
applying
emery
brushing
the
surface
to
remove
prepare
the
surface
even
etc.,
complete
including
to
full
depth
mixed
with
directed
by
Engineer
in
remove
all
dirt
and
remains
ofto for
loose
smooth
after
thoroughly
brushing
plastered
surface
including
seigniorage
charges
matching
shade
to
full
charges,
curing,
including
and
conveyance
all stripping
materials
loose
powdered
materials,
the
surface
to
item
of
work.(BLD-CSTN-9-18)
sand
and
water
etc.,
complete
mixed
with
pigment
of
finishing,
scaffolding,
lift
stoppers,bolts,weather
etc.
required
accessories
such
as
approved
drawings
with
911
for
internal
and
external
and
all
operational,
including
cost
of of
seigniorage
on
matching
shade
including
cost
honey
like
consistancy
glass
using
suitable
alluminium
glazing
plain
glass
using
suitable
ventilators
fixed
with
knife
/ Sand
muslin
pad,
air
dry
for
2
- 3work
hrs,
Sand
the
surface,
clean
&labour
wipe
surface
to
remove
all
dirt
etc.,
to
site
(excluding
cost
ofcharges
C.C.
bed)
depth
mixed
with
pigment
of brushing
neat
cement
slurry
of
primary
coat
and
painting
two
coats
of
over
a
primary
coat
and
painting
with
lappam
finish
,
over
SS
911
for
internal
walls
operational,
incidental,
including
cost
and
complete
for
finished
item
shade,
including
cost
complete
for
finished
formed
sections
of
1.25mm
thick
CRCA
made
of
all
formed
sections
of
frames
made
of
all
paper,
the
surface,
clean
&
wipe
off
all
dirt
and
remains
of
loose
and
smooth
after
seigniorage
charges
etc.,
pigment
of
matching
-charges,
charge
etc.,
and
Supply
and
fixing
of of
ISI
Flush
door
and
fixing
ofconveyance
ISIfor
marked
and
fixing
of
ISI
powdered
materials,
applying
emery
the
surface
to remove
all
dirt
and
prepare
the
surface
even
etc.,
and
complete
finished
depth,
including
cost
of
cutting
grooves
as
site
and
all
operational,
incidental,
labour
including
cost
and
of Supply
remove
all
dirt
and
seigniorage
charges
matching
shade
to
full
curing,
including
all
sizes
and
sections
inmarked
accordance
with
stoppers,bolts,weather
stripping
all
required
accessories
walls
inetc.
all
floors.
Painting,
incidental,
labour
materials,
cost
base
coat
and
all Supply
and
conveyance
of
all
materials
spread
@
3.3
kgs
per
clips
and
rubber
as per
approved
alluminium
glazing
clips
and
5mm
thick
plain
glass
sand
with
180
and
320
No.,
emery
paper
off
loose
dust,
applying
knifing
and
remains
of
loose
including
cost
ofbeading
seigniorage
charges
on
matching
shade
including
cost
honey
like
consistancy
synthetic
enamel
paint
Grade-II
VOC
two
coats
of
synthetic
enamel
a
primary
coat
and
charges
complete
finished
conveyance
of
all
work.
(APSS
No.701
&for
707)(BLDall
materials
like
cement,
item
of
work.
(SS
section;
size
should
be
50x60mm
with
1.25mm
thick
CRCA
section;
size
formed
sections
loose
dust,
applying
knifing
paste
filler
by
powdered
materials,
applying
thoroughly
brushing
the
complete
for
finished
item
of
shade,
including
cost
of
complete
for
finished
shutters
35
mm
thick
solid
bond
wood
Flush
door
shutters
35
mm
thick
marked
Flush
door
paper,
Sand
the
surface,
clean
&
wipe
off
remains
of
loose
powdered
and
smooth
after
item
of
work.(BLD-CSTN-9-18)
all
materials
like
tiles,
directed
by
Engineer-inProviding
Plinth
protection
with
bed
of
Plinth
protection
with
a
Plinth
charges
etc.
complete
for
finished
item
of Providing
all
materials
to
work
site
and
all Providing
remains
ofalluminium
loose
etc.,
and
complete
for
finished
depth,
including
cost
of
cutting
grooves
as
approved
drawings
and
asaluminium
per
ISa 1948etc.
for
all
sizes
and
sections
in for
such
as
Priming
Coat
on
New
Plastered
charges
etc.,
and
labour
charges
for
mixing
of
cement
like
cement,
sand,
water,
tiles,
Sqm.
and
jointed
neately
drawings
using
anodized
rubber
beading
as
per
approved
using
suitable
for
theknife
surface
preparation
including
cost
paste
filler
byNo.701
putty
knife
/surface,
muslin
powdered
materials,
all
materials,
cost
ofpad,
base
coat
and
all
and
conveyance
of
all
materials
spread
@
3.3
kgs
per
(Volatile
Organic
Compound)
content
less
paint
Grade-II
VOC
(Volatile
painting
two
coats
of
item
of
work
as
per
SS
911
materials
to
work
site
CSTN-9-6)
sand
, of
water
and
tiles
901,903
&
904)
(
BLD32mm
rebate.
The
corner
of
the
frame
should
be
50x60mm
with
32mm
1.25mm
thick
CRCA
putty
/
muslin
air
dry
for
2
3
emery
paper,
Sand
the
surface
to
remove
all
dirt
work.
(APSS
&
707)(BLDall
materials
like
cement,
item
work.
(SS
block
board
type
with
commercial
ply
on
solid
bond
wood
block
board
type
shutters
35
mm
thick
loose
dust,
applying
knifing
paste
filler
by
materials,
applying
emery
paper,
thoroughly
brushing
the
cement,
sand
and
water
charge
etc.,
and
100mm
thick
PCC(1:5:10)
using
40mm
bed
of
100mm
thick
PCC(1:5:10)
protection
with
a
bed
of
work
as
per
SS
911
for
external
walls
operational,
incidental,
labour
powdered
materials,
item
of
work.(BLD-CSTN-9-18)
all
materials
like
tiles,
directed
by
Engineer-inProviding
110
mm
Dia
ISI
marked
PVC
110
mm
Dia
ISI
marked
Providing
110
mm
Dia
ISI
1961
with
top
section
of
window
ofslope
size
accordance
with
approved
stoppers,bolts,weather
Surface
complete
for
finished
mortar,
laying
tiles
to
required
as Providing
white
cement
etc.,
to
site
with
white
cement
paste
sections
of
38.50mm
x
33mm
,
3mm
thick
drawings
using
anodized
glazing
clips
and
rubber
and
conveyance
of
all
materials
to
work
pad,
air
dry
for
2
3
hrs,
sand
applying
emery
paper,
labour
charges
for
mixing
of
cement
like
cement,
sand,
water,
tiles,
Sqm.
and
jointed
neately
than
50
grams/litre
of
approved
shade
Organic
Compound)
content
less
synthetic
enamel
paint
internal
walls
operational,
etc.,
complete
including
CSTN-8-10)
should
be welded.
The
frame
should
be
rebate.
The
corner
ofclean
the
frame
section;
size
should
be
hrs,
sand
with
180
and
320
No.,
emery
clean
&
wipe
off
loose
dust,
and
remains
of
loose
CSTN-9-6)
sand
, all
water
and
tiles
901,903
&wood
904)
(all
BLDboth
faces.:
conforming
to
IS:2202,
hot
commercial
ply
on
both
solid
bond
block
putty
knife
/take
muslin
pad,
air
dry
for
2 - 3 with
Sand
the
surface,
&with
wipe
surface
to
remove
dirt
etc.,
complete
including
complete
for
finished
size
HB
metal
and
on
top
of
40mm
size
HB
Granite
thick
PCC(1:5:10)
charges
etc.
complete
for
finished
including
cost
cement,
sand
and
water
charge
etc.,
and
down
water
pipes
with
socket
, PCC,
PVC
down
water
take
pipes
marked
PVC
down
water
62mm
xGranite
32mm
,1.47mm
thick,
window
drawings
and
as 320
per
IS
1948stripping
etc.
for
all
sizes
item
of
work
as
per
APSS
directed
by
the
Engineerin-charge
(excluding
cost
of
C.C.
bed)
to
fullwhite
depth
mixed
with
for
outer
frame,
59mm(3mm)
xpreparation
aluminium
sections
38.50mm
x 100mm
beading
as
per
approved
site
and
all
operational,
incidental,
labour
with
180
and
No.,
emery
Sand
the
surface,
clean
&
mortar,
laying
tiles
to
required
slope
as using
white
cement
etc.,
to
site
with
cement
paste
including
cost
and
conveyance
of
all
than
50
grams/litre
of
approved
Grade-II
VOC
(Volatile
incidental,
labour
seigniorage
charges
etc.,
painted
with
one
coat
of
primer
and
should
be
welded.
The
frame
50x60mm
with
32mm
paper
for
the
surface
applying
knifing
paste
filler
by
powdered
materials,
etc.,
complete
including
CSTN-8-10)
pressed
bonded
with
water
proof
phenol
faces.:
conforming
to
IS:2202,
board
type
with
hrs,
sand
with
180
and
320
No.,
emery
off
loose
dust,
applying
knifing
and
remains
of
loose
seigniorage
charges
etc.,
item
of
work
.(SS
20mm
thick
granolithic
concrete
flooring
metal
and
on
top
of
PCC,
20mm
using
40mm
size
HB
item
of
work
as
per
SS
911
for
conveyance
of
all
etc.,
complete
including
complete
for
finished
2.5mm
thick
4kg/sq.cm
pressure
of
ISI
socket
,
2.5mm
thick
4kg/sq.cm
take
pipes
with
socket
,
side
frames
of
size
61.85mm
x
1961
with
top
section
of
window
and
sections
in
911
for
internal
and
etc.,and
complete
for
finished
item
including
cost
of
seigniorage
pigment
of
matching
33mm(2.5mm)
x
30mm(3mm)
for
33mm
,
3mm
thick
for
outer
drawings
using
anodized
charges
etc.
complete
for
finished
item
of
paper
for
the
surface
preparation
wipe
off
loose
dust,
directed painted
by
the
Engineerin-charge
(excluding
cost
of
C.C.air
bed)
to
full depth
mixed
with
101.60mm
dia
upto
914.40mm
(3')
depth:
dia
upto
914.40mm
dia
upto
materials
to
site
cost
ofresin
primer
coat
shade
including
cost
and
Organic
Compound)
charges
etc.
complete
for
complete
for
finished
finished
with
pure
polyester
paint.
should
bewalls
painted
with
one
coat
rebate.
The
corner
of
the
including
cost
and
conveyance
of and
all 101.60mm
putty
knife
/bonded
muslin
pad,
dry 101.60mm
applying
paper,
seigniorage
charges
etc.,
formaldehyde
synthetic
factory
hot
pressed
with
water
commercial
ply
on
both
paper
for
the
surface
preparation
paste
filler
by
knife
/ muslin
powdered
materials,
and
complete
for
finished
901,903
& emery
904)
with
CC(1:1:2)
prop.using
6mm
to 12mm
thick
granolithic
concrete
flooring
Granite
metal
and
on
top
external
materials
to
work
site
seigniorage
charges
etc.,
item
of
work
.(SS
marked
including
cost
ofcomplete
necessary
PVC
pressure
of
ISI
marked
including
2.5mm
thick
4kg/sq.cm
31.75mm,1.50mm
thick
and
bottom
frame
of
size
62mm
xputty
32mm
,1.47mm
accordance
with
external
walls
in
all
work.
(APSS
No.701
&
707)
(BLD-CSTN-9charges
on
all
materials,
cost
of
shade
including
cost
and
mullions
shutters
z
section
of
frame,
59mm(3mm)
x
aluminium
sections
of
work
for
Internal
walls
including
cost
and
conveyance
of
applying
knifing
paste
etc.,and
complete
for
finished
item
of
cost
of
seigniorage
pigment
of
matching
Supplying
and
laying,
filling,
jointing
and
(3')
depth:
Supplying
and
laying,
914.40mm
(3')
depth:
all
labour
charges
etc.
including
conveyance
of
all
materials
to
content
less
than
finished
item
of
work
as
item
of
work.
(APSS
152.40mm
dia
upto
914.40mm
(3')crushed
depth:
dia
upto
152.40mm
dia
upto
The
frame
should
be
provided
of
primer
and
finished
painted
frame
should
be
welded.
materials
to
work
site
and
all with
operational,
for
2CC(1:1:2)
- 3 dry
hrs,
sand
with
180
and
Sand
the
surface,
clean
&
complete
for
finished
made
conforming
to
IS
2202-1991
(Part-I)
proof
phenol
formaldehyde
faces.:
conforming
toall50
including
cost
and
conveyance
of
all 152.40mm
pad,
air
for
2PVC
-914.40mm
3Bends,
hrs,
sand
applying
emery
paper,
item
of
work.(BLD-CSTNsize
graded
hard
granite
machine
with
prop.using
6mm
to
of
PCC,
20mm
thick
and
all
operational,
complete
for
finished
901,903
&
904)
Bends,
shoes,
iron
/
PVC
clamps
and
all
cost
of
necessary
pressure
of
ISI
marked
size
61.85mm
x
31.75mm,1.50mm
thick
thick,
window
side
frames
of
size
approved
drawings
and
floors.
Painting,
Priming
5)
base
coat
and
all
labour
charges
conveyance
of
38.50mmx33mm,3mm
thick,powder
33mm(2.5mm)
x
30mm(3mm)
for
38.50mm
x
33mm
,
3mm
all
materials
to
work
site
and
filler
by
putty
knife
/
work.
(APSS
No.701
&
707)
(BLD-CSTN-9charges
on
all
materials,
cost
of
shade
including
cost
and
testing
SWG
SP-1
pipe
conforming
to
ISI
filling,
jointing
and
testing
SWG
Supplying
and
laying,
applying
sand
paper
on
lappam
coats
for
site
cost
of
primer
coat
and
all
grams/litre
of
approved
per
SS
911
for
internal
No.701
&
707)(BLDSupplying
and
laying,
filling,
jointing
and
(3')
depth:
Supplying
and
laying,
914.40mm
(3')
depth:
approved
quality
butt
hinges
of
3
Nos.
with
pure
polyester
paint.
The
The
frame
should
be
incidental,
labour
charges
etc.
complete
320
No.,
emery
paper
for
the
wipe
off
loose
dust,
item
of
work.
(APSS
Depth
904
mm
:
Constructing
904.0
mm
Depth
904
mm
:
Constructing
Depth
904
mm
:
both
sides
commercial
ply
with
internal
synthetic
resin
factory
made
IS:2202,
hot
pressed
materials
to
work
site
and
all
operational,
with
180
and
320
No.,
emery
Sand
the
surface,
clean
&
9-18)
metal
laid
monolithically
already
laid,
in
12mm
size
graded
hard
granite
granolithic
concrete
incidental,
labour
item
of
work.(BLD-CSTNother
accessories
and
fixing
in
position
shoes,
iron
/
PVC
clamps
and
all
including
cost
of
sloping
outwards
for
drainage
and
fixed
61.85mm
x
31.75mm,1.50mm
as
per
IS
1948-1961
with
Coat
on
New
Plastered
for
mixing
of
cement
mortar,
materials
like
cement,
coating
of
all
alluminium
sections
25mm
mullions
shutters
z
section
of
thick
for
outer
frame,
operational,
incidental,
labour
muslin
pad,
air
dry
for
2
5)
base
coat
and
all
labour
charges
conveyance
of
all
651
&
4127
with
air
tight
Cement
joints
in
SP-1
pipe
conforming
to
ISI
651
&
filling,
jointing
and
neat
finish
including
sales
&
other
taxes filling,
labour
charges
etc.
complete
shade
including
cost
and
walls
CSTN-9-6)
testing
SWG
SP-1
conforming
to
ISI
jointing
and
testing
SWG
and
laying,
complete
for
finished
item.:
Single
shutter
frame
should
be
provided
with
painted
with
one
coat
of
for
finished
item
work
for exceeding
Internal
walls
surface
preparation
including
cost Supplying
applying
knifing
paste
No.701
&
707)(BLD(30)
dia
brick
masonry
inspection
904.0
mm
(30)
dia
brick
Constructing
904.0
mm
lipping
on
all
sides
including
cost
and
conforming
to
IS
(Partbonded
water
proof
incidental,
labour
charges
etc.
complete
paper
for
the
surface
preparation
wipe
off
loose
dust,
Depth
1524
mm
:ofpipe
Constructing
904.0
mm
1524
mm
:2202-1991
Constructing
Depth
1524
mm
:180
alternate
panels
of
size
1.5
machine
crushed
metal
laid
flooring
with
CC(1:1:2)
charges
etc.
complete
for
9-18)
including
cost
and
conveyance
of
all
other
accessories
and
fixing
in on
necessary
PVC
Bends,
and
sliding
shutters
withnot
bottom,sides
and Depth
thick
and
bottom
frame
size
top
section
of
of
Surface
laying
tiles
to
required
slope
as
sand,
water,
tiles,
white
microns
thick,
including
cost
and
38.50mmx33mm,3mm
59mm(3mm)
xwindow
charges
etc.
complete
for
finished
3
hrs,
sand
with
and
for
mixing
of
cement
mortar,
materials
like
cement,
CM
(1.5:1)
prop.
including
excavation
of
4127
with
air
tight
Cement
joints
testing
SWG
SP-1
pipe
on
cost
of
all
materials
etc.and
complete
including
applying
sand
paper
conveyance
of
all/
651
&
4127
with
air
tight
Cement
joints
in
SP-1
pipe
conforming
to
ISI
651
&
filling,
jointing
and
3'-0"
x
7'-0"
(914.4x2133.6mm)
outer
approved
quality
butt
hinges
of
3
primer
and
finished
and
conveyance
of
all
materials
filler
by
putty
knife
CSTN-9-6)
chamber
as
per
IS
4111:
Part-1:1986
with
masonry
inspection
chamber
as
(30)
dia
brick
masonry
conveyance
to
site
flush
shutter
including
I)
both
sides
commercial
ply
with
phenol
formaldehyde
for
finished
item
of
work
for
Internal
walls
including
cost
and
conveyance
of
applying
knifing
paste
(30)
dia
brick
masonry
inspection
904.0
mm
(30)
dia
brick
Constructing
904.0
mm
x
1.5
Mts.
and
providing
5mm
thick
glass
monolithically
already
laid,
in
prop.using
6mm
to
finished
item
of
work
as
Constructing
457.2
mm
xtaxes
457.2
mm
457.2
mm
xwalls
457.2
457.2
x
materials,
sales
&
on
materials
position
including
cost
and
shoes,
iron
/xto
PVC
clamps
top
with
section
ofother
40mm
x any
18mm
, floors. Constructing
61.85mm
xby31.75mm,1.50mm
size
62mm
32mm
, &
directed
the
Engineerincement
etc.,
to
site
conveyance
to
site
of
powder
coated
thick,powder
coating
of
all
33mm(2.5mm)
x
item
of
work
for
Internal
320
No.,
emery
paper
for
laying
tiles
to
required
slope
as
sand,
water,
tiles,
white
trenches
and
socket
pits
in
soil
in
CM
(1.5:1)
prop.
including
conforming
ISI
651
(APSS
No.1200,
1207
&
1211)
in
all
lappam
coats
for
neat
finish
materials
to
site
cost
of
CM
(1.5:1)
prop.
including
excavation
of
4127
with
air
tight
Cement
joints
testing
SWG
SP-1
pipe
frame
section
size
of
50
x
60
mm
Nos.
complete
for
finished
item.:
painted
with
pure
to
work
site
and
all
operational,
muslin
pad,
air
dry
for
2
-/
cement
mortar
(1:6)
prop
using
2nd
Class
per
IS
4111:
Part-1:1986
with
inspection
chamber
as
supply
and
fixing
3
nos
MS
Z
hold
fasts
of
internal
lipping
on
sides
synthetic
resin
factory
all
materials
to
work
site
and
all
filler
by
putty
knife
chamber
as
per
IS
4111:
Part-1:1986
with
masonry
inspection
chamber
as
(30)
dia
brick
masonry
strips
between
the
pannels
and
finishing
alternate
panels
of
size
not
12mm
size
graded
hard
per
SS
911
for
external
(1'6"x1'6")
brick
in
CM
1:6
prop.
Masonry.
mm
(1'6"x1'6")
brick
in
CM
1:6
457.2
mm
(1'6"x1'6")
to
site,
operational
&
incidental
charges
conveyance
of
all
materials,
sales
and
all
other
accessories
1.70mm
thick,inter
locking
section
40mm
thick
sloping
outwards
for
1.47mm
thick,
window
charge
etc.,and
complete
for
(excluding
cost
of
C.C.
Supplying
and
fixing pits
of
SWG
Gully
Supplying
and
fixing
of
SWG
Gully
and
fixing
ofand
aluminium
sections,
glass,
rubber
alluminium
sections
25mm
30mm(3mm)
for
the
surface
preparation
directed
by
the
Engineerincement
etc.,
to
site
(except
rock
requiring
blasting)
andtraps
excavation
of
trenches
and
socket
4127
with
air
tight
including
sales
& conveyance
other
taxes
on Supplying
primer
coat
and
alltrenches
and
socket
in
any
soil
in
CM
(1.5:1)
prop.
including
conforming
to
ISI
651
&
Single
shutter
3'-0"
x
7'-0"
polyester
paint.
The
incidental,
labour
charges
etc.
3
hrs,
sand
with
180
Clay
Bricks
of
225
thick
from
cement
mortar
(1:6)
prop
using
per
IS
4111:
Part-1:1986
size
300
mm
x
40
mm
x
5mm
including
including
cost
and
to
made
conforming
to
IS
operational,
incidental,
labour
muslin
pad,
air
dry
for
2
cement
mortar
(1:6)
prop
using
2nd
Class
per
IS150mm
- 4111:
Part-1:1986
with
inspection
chamber
the
top surface
toetc.,
required
smoothness
exceeding
1.5fixed
xInspection
1.5
Mts.
and
granite
machine
crushed
walls
Inspection
chamber
upto
914.4
mm
(3'0")
prop.
Masonry.
brick
in
CM
1:6
prop.
including
all
labour
for
fixing
at
&
other
taxes
on
materials
to(APSS
and
fixing
in
position
x
28mm
18mm,1.60mm
thick
inter
drainage
and
and
sliding
side
frames
of
size
finished
item
of
work.
bed)
including
cost
of
150mm
xxfixtures
100mm
ofcharges
ISI
make
traps
x
100mm
of
ISI
SWG
Gully
traps
150mm
beading,
including
labour
microns
thick,
including
cost
and
mullions
shutters
zofasC.C.
including
cost
and
charge
etc.,and
complete
for
(excluding
cost
Supplying
and
fixing
580mm
xconfirming
440mm
Supplying
and
fixing
580mm
xsite,
and
fixing
refilling
with
watering
and
tamping
to
the
pits
in
any
soil
(except
rock
Cement
joints
in
CM
cost
of
all
materials
etc.and
labour
charges
etc.
(except
rock
requiring
blasting)
and
excavation
ofcomplete
trenches
and
socket
4127
with
air
tight
(914.4x2133.6mm)
outer
frame
frame
should
be
provided
complete
for
finished
item
of Supplying
320
No.,
emery
paper
for
approved
source
having
a
minimum
2nd
Class
Clay
Bricks
of
225
mm
with
cement
mortar
(1:6)
cost
of
ISI
marked
Aluminium
fixtures
of
3
site
flush
shutter
including
2202-1991
(Part-I)
both
charges
etc.
for
finished
3
hrs,
sand
with
180
and
Clay
Bricks
of
225
mm
thick
from
cement
mortar
(1:6)
prop
using
per
IS
4111:
Part-1:1986
slopes
including
grooves,
thread
lining
providing
5mm
thick
glass
strips
metal
laid
monolithically
and
fitted
with
light
weight
457.2
mm
x
chamber
upto
914.4
mm
(3'0")
Masonry.
Inspection
site
etc.,
complete
for
finished
item
of
operational
&
incidental
charges
including
cost
and
locked
for
weather
scaling
and
mounted
shutters
with
bottom,sides
and
61.85mm
x
No.701
&
707)
(BLD-CSTN-9-5)
seigniorage
charges
on
to
IS
651
&
4127
with
C.I
grating
&
make
confirming
to
IS
651
&
4127
x
100mm
of
ISI
make
charges
for
manufacturing
window,
fixing
conveyance
to
site
of
powder
section
of
conveyance
of
all
finished
item
of
work.
(APSS
bed)
including
cost
of
long
Orissa
pan
white
glazed
Water
Closet
440mm
long
Orissa
pan
white
580mm
x
440mm
long
required
slope
including
cost
and
requiring
blasting)
and
refilling
(1.5:1)
prop.
including
complete
(APSS
No.1200,
1207
&
complete
including
Supplying
and
fixing
European
Water
Supplying
and
fixing
European
Supplying
and
fixing
refilling
with
watering
and
tamping
to
the
pits
in
any
soil
(except
rock
Cement
joints
in
CM
section
size
of
50
x
60
mm
with
approved
quality
work
for
Internal
walls
the
surface
preparation
crushing
strength
of
5type
N/sq.mm
including
thick
from
approved
source
prop
using
2nd
Class
Nos
butt
hinges
(IS:205)
150mm
long
, 1 2nd
supply
and
fixing
3 40mm
nos
MS
Z
sides
commercial
ply
item
of
work
for
Internal
walls
320
No.,
emery
paper
for
approved
source
having
a
minimum
Class
Clay
Bricks
of
225
mm
with
cement
mortar
(1:6)
as
directed
by
the
Engineer
- infan
-and
charge
between
the
pannels
and
already
laid,
in
alternate
457.2
mm
(1'6"x1'6")
C.I
frame
and
cover
and
fitted
with
light
weight
457.2
chamber
upto
914.4
mm
work.
(APSS
No.
1328)
including
all
labour
charges
for
conveyance
of
all
on
nylon
rollers
of
lift
and
light
top
with
section
of
x
31.75mm,1.50mm
thick
all
materials,
cost
of
constructing
cement
brick
masonry
in
CM
with
C.I
grating
&
constructing
confirming
to
IS
651
&
in
position
using
wooden
blocks
sheet
coated
aluminium
sections,
38.50mmx33mm,3mm
materials
work
site
No.701
707)
(BLD-CSTN-9-5)
seigniorage
charges
1st
quality
ISI
marked
confirming
to
glazed
Water
Closet
1st
quality
ISI European
Orissa
pan
white
glazed
conveyance
of
all
materials
to
site
and
with
watering
and
tamping
the
excavation
of
trenches
1211)
in
all
floors.
applying
sand
paper
on
Closet
of slope
1st
quality
conforming
Water
Closet
of
1st
quality
Water
Closet
of
required
including
costmake
and
requiring
blasting)
and
refilling
(1.5:1)
prop.
butt
hinges
ofincluding
3fixing
Nos.
including
cost
Supplying
and
fixing
Flat
Supplying
and
fixing
Indian
make
Supplying
and
plastering
with
cement
mortar
1:3
prop;
having
a&site
minimum
crushing
Clay
Bricks
of
225
mm
No.
aldrop
(IS:2681)
300mm
long,
1
Nosall
hold
of
size
300
mm
xto
40
with
internal
lipping
onand
the
surface
preparation
crushing
strength
of
5Indian
N/sq.mm
including
from
approved
source
prop
using
2nd
Class
including
cost
and
conveyance
ofto
all
finishing
the
top
surface
to
panels
of
size
not
of
20
Kg
including
cost
and
conveyance
of thick
mm
xfasts
457.2
mm
(1'6"x1'6")
C.I
(3'0")
and
fitted
with
fixing
at
etc.,
complete
for
materials,
sales
&
other
top
&side
sections
of
size
18mm
,1.70mm
thick,inter
and
bottom
frame
size
base
coat
and
all
labour
(1:6)
prop.,
intermediate
chamber
and
cement
brick
masonry
in
CM
(1:6)
4127
with
C.I
grating
&
metal
screws,
etc.,
complete
for
finished
glass,
rubber
beading,
fixtures
thick,powder
coating
of
all
operational,
all
materials,
cost
of
IS:2556-Part-3-1981
with
"P"
or
"S"
trap
marked
confirming
to
IS:2556Water
Closet
1st
quality
labour
charges
,
overheads
&
contractor
required
slope
including
cost
and
and
socket
pits
in
any
lappam
coats
for
neat
IS:2556-Part-2-1973
of
Hindustan
/
Neycer
conforming
to
IS:2556-Part-21st
quality
conforming
to
conveyance
of
all
materials
to
site
and
with
and
tamping
the Indian
excavation
of
trenches
complete
for
finished
conveyance
ofBack
all
Back
Wash
Hand
Basin
(HSW/Parryware/
Back
Wash
Hand
Basin
make
Flat
thick
both
inside
and
outside
fitted
strength
of
5including
N/sq.mm
including
from
tower
bolts10mm
(IS:204)
ofthick,
200
mmall Flat
mm
xwatering
5mm
cost
oftoNo.
ISI
all
sides
including
cost
including
cost
and
plastering
with
cement
mortar
1:3
prop;
having
asection
minimum
crushing
Clay
Bricks
of
225
mm
materials
to
site
including
seigniorage
required
smoothness
and
slopes
exceeding
1.5
x
1.5
Mts.
all
materials
like
cement,
sand,
bricks,
and
cover
of
20
light
weight
457.2
x&
finished
item
work.
(APSS
taxes
on
materials
to
63.50mmx38.10mm,1.53mm
locking
40mm
xKg
28mm
x thick
61.85mm
xapproved
charges
for
mixing
of
fitted
with
mm
X
288.6
mm
(12"x9")
prop.,
intermediate
chamber
and
constructing
cement
item
of
work.
(The
aluminium
sections
etc.,
including
charges
for
all
alluminium
sections
incidental,
base
coat
and
all
labour
Hindware
/ 304.8
Parryware
/ Neycer
with
brick
- frame
Part-3-1981
with
"P"
or
"S"
trap
ISI
marked
confirming
to
profit
etc.,
complete
for
finished
item
of
conveyance
ofoflabour
all
materials
to
soil
(except
rock
finish
including
sales
or
Parryware
make
white
glazed
with
'S'
1973
of
Hindustan
/
Neycer
or
IS:2556-Part-2-1973
of
labour
charges
,
overheads
&
contractor
required
slope
including
cost
and
and
socket
pits
in
any
item.:
Single
shutter
3'materials
to
work
site
Neycer)
1st
quality
conforming
to
IS:2556(HSW/Parryware/
Neycer)
1st
Wash
Hand
Basin
with
20
dia
RCC
manhole
covers
and
plastering
with
cement
mortar
source
having
a
long
at
top,
1
No.
tower
bolt10mm
bolt
marked
Aluminium
fixtures
of
3
and
conveyance
to
site
conveyance
of
all
thick
both
inside
and
outside
fitted
strength
of
5 N/sq.mm
including
thick
from
approved
charges,
sales
&
taxes
on
all
grooves,
thread
lining
providing
5mm
thick
water
etc.,
to
site,
cost
of
seigniorage
cost
and
conveyance
mm
(1'6"x1'6")
C.I
1328)
site,
operational
&
powder
coating
ofother
all
alluminium
sections
18mm,1.60mm
thick
inter
locked
31.75mm,1.50mm
thick
cement
mortar,
laying
C.I
Frame
with
hinged
cover
of
standard
fitted
with
304.8
mm
X
288.6
mm
brick
masonry
in
CM
(1:6)
used
shall
be
standard
make
confirming
to including
manufacturing
window,
fixing
inof 457.2
25mm
microns
thick,
charges
etc.
complete
for
for
mixing
of
ISI
mark
and
providing
masonry
seat,
CC
Hindware
/
Parryware
/
Neycer
IS:2556-Part-3-1981
with
work
(APSS
NO
1301
&
1318)
site
and
all
labour
charges
,
requiring
blasting)
and
other
taxes
on
cost
of
all
trap,supplying
and
fixing
best
Indian
Parryware
make
white
glazed
Hindustan
/
Neycer
or
profit
etc.,
complete
for
finished
item
of
conveyance
of
all
materials
to
soil
(except
rock
0"
x
7'-0"
and
all
operational,
Part-4:1972
of
size
550mm
x
400mm
with
quality
conforming
to
IS:2556(HSW/Parryware/
Neycer)
frames
including
excavating
pits
up
to a
1:3
prop;
thick
both
inside
minimum
crushing
(IS:204)
150mm
long
at bottom,
2
Nos.
Nos
butt hinges
(IS:205)
150mm
flush
shutter
including
materials
to
site
with
20
dia
RCC
manhole
covers
and
with
cement
mortar
having
awork
materials
and
operational
&
incidental
and plastering
as
directed
by
the
Engineer
- in
- source
glass
strips
between
the
charges
on
all
materials
and
allby
incidental
all
materials
like
cement,
sand,
frame
and
cover
of
20
incidental
charges
25mm
microns
thick
and
fixing
5mm
for
weather
scaling
and
mounted
sloping
outwards
for
tiles
to
required
slope
make
as
approved
including
cost
and
(12"x9")
C.I
Frame
with
hinged
prop.,
intermediate
IS
1948-1961
and
as
approved
thethick
position
using
wooden
blocks
and
including
cost
and
finished
item
of
work
for
cement
mortar,
laying
squatting
plate
and
10
litres
capacity
brick
-&
ISI
mark
and
"P"
or
"S"
trap
Hindware
overheads
contractor
profit
refilling
with
watering
materials
etc.and
make
plastic
seat
and
for
European
with
'S'
trap,supplying
and
Parryware
make
white
work
(APSS
NO
1301
&lid
1318)
site
and
all
labour
charges
,fixing
requiring
blasting)
and
(914.4x2133.6mm)
outer
incidental,
labour
32
mm
nominal
size
C.P.
Fitting
with
Part-4:1972
of
size
550mm
x
1st
quality
conforming
to/
depth
of
904
mm
(3'-0")
in
all
sorts
of
soils
and
outside
fitted
with
20
dia
strength
of
5
N/sq.mm
150mm
long
1
handles
(IS:208)
,1
Nos
long
,
1
No.
aldrop
(IS:2681)
supply
and
fixing
3
nos
and
all
operational,
frames
including
excavating
pits
up
to
a
1:3
prop;
thick
both
inside
minimum
crushing
labour
charges
like
mixing
of
cement
charge
including
cost
and
pannels
and
finishing
the
and
operational,
labour
charges
like
bricks,
water
etc.,
to
site,
cost
of
Kg
including
cost
and
including
all
labour
plain
glass
in
fan
light
and
5mm
thick
on
nylon
rollers
of
lift
type
and
drainage
and
fixed
and
as
directed
by
the
conveyance
of
all
materials
to
site,
labour
cover
of
standard
make
as
chamber
fitted
with
Engineer
and
fixtures
shall
be
of
ISI
sheet
metal
screws,
etc.,
conveyance
to
site
of
Internal
walls
tiles
to
required
slope
single
flush
PVC
low
level
cistern
providing
masonry
seat,
CC
Parryware
/
Neycer
with
etc.,
complete
for
finished
item
of
and
tamping
to
the
complete
(APSS
No.1200,
water
closets
with
rubber
or
plastic
Buffers
best
Indian
make
plastic
seat
and
glazed
with
'S'
overheads
&
contractor
profit
refilling
with
watering
frame
section
size
50for
x
charges
etc.
parallel
thread
conforming
to theof
400mm
withfitted
32
mm
nominal
IS:2556-Part-4:1972
of
(exculding
rock)
and
layingincement
RCC
manhole
covers
and
frames
including
plastering
with
door
and
including
fixing
300mm
long,
1
Nos
tower
boltsZ hold
fasts
of of
size
incidental,
labour
depthstopper
ofpipe
1524
mm
(5'-0")
all sorts
and outside
with
20
diasize MS
strength
of
5 complete
N/sq.mm
1 Sqm
901,903 & 904 Err:509
1 Sqm
901,903 & 904 Err:509
1 Sqm
901,903 & 904 Err:509
1 Sqm
901,903 & 904 Err:509
1 Sqm
701 & 707
Err:509
1 Sqm
701 & 707
Err:509
1 Sqm
701 & 707
Err:509
1 Sqm
701 & 707
Err:509
1 Sqm
701 & 707
Err:509
1 Sqm
701 & 707
Err:509
911
0.00
1 Sqm
911
0.00
1 Sqm
911
Err:509
1 Sqm
911
Err:509
1 Sqm
911
0.00
1 Sqm
911
0.00
1 Sqm
SS
0.00
1 Sqm
SS
1 Rmt
1 Sqm
SS
0.00
1 Sqm
1 Rmt
SS
4012.00
1 Sqm
0.00
1 Sqm
701 & 710
0.00
1328
0.00
1 Rmt
1301 & 1318
1301 & 1318
SS
SS
SS
SS
SS
SS
SS
1Rm
0.00
0.00
0.00
Each
Each
3689.00
0.00
0.00
1 Rmt
1 Rmt
1 No.
1 No.
1 No.
1 No.
1 No.
1 No.
1 No.
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0
0
Err:509
Err:509
0
0
0
#VALUE!
0
88264
0
0
0
Err:509
#VALUE!
0
0
0
#VALUE!
#VALUE!
11067
0
0
0
0
0
1
0
2
2000
0
0
6
69
0
24
16.00
30.00
0.00
0.00
3.00
3
3
0.00
Each PT
Each PT
0.00
0.00
ONE RM
ONE RM
ONE RM
Each
Each
Each
Each
Supplying and fixing NP soap dish heavy Supplying and fixing NP soap dish Supplying and fixing NP
SS
0.00
type
of
approved
make
ISI
quality
with
NP
heavy
type
of
approved
make
ISI
soap
dish
heavy
type
of
Supplying and fixing TV shape mirror with Supplying and fixing TV shape
Supplying and fixing TV
SS
0.00
screws
etc.,
complete
quality
with
NPfixing
screws
make
ISIplastic
plastic frame
offixing
size 609.6mm
xcost
mirror with
plastic
frame
of size approved
shape mirror
Supplying
and
ofincluding
25.4mm
dia and
,
Supplying
and
of etc.,
25.4mm
Supplying
andwith
fixing
of
SS
0.00
conveyance
of
all
materials,
labour
complete
including
cost
and
quality
with
NP
screws
457.2mm
,
plywood
back
with
NP
screws
609.6mm
x
457.2mm
,
plywood
frame
of
size
609.6mm
x
609.6mm long
aluminium
anodized
towel Supplying
dia , 609.6mm
long aluminium
25.4mm dia
, 609.6mm
Supplying
and fixing
12.70mm
dia NP
and fixing
12.70mm
Supplying
and
fixing
SS
248.00
charges
for
fixing , and
for
finished
item
of
conveyance
ofscrews
all
materials,
etc.,
complete
including
1st
quality
including
cost
and
conveyance
back
with
NPcock
1st quality
457.2mm
,dia
plywood
back
rods
with
brackets
aluminium
screws
anodized
towel
rods
with
brackets
long
aluminium
anodized
push
cock
as
approved
by
the
Engineer-India
NP
push
as
approved
by
12.70mm
NP
push
Supplying
and
fixing NP bib taps of size
Supplying
and fixing
NP bib
and fixing NP
SS
Each
work
allcost
floors
labour
charges
for
fixing
, fortapsof Supplying
cost
and
conveyance
of
of
all in
materials,
labour
charges
, for
cost and
conveyance
with
NP
screws
1st
including
and
conveyance
of
all of including
and
aluminium
screws
including
towel
rods
with
brackets
Charge
including
cost
and
conveyance
the
Engineer-In-Charge
including
cock
as
approved
by
the
12.70mm
dia
of
Indian
make
of
size
12.70mm
dia
of
Indian
bib
taps
of
size
12.70mm
Supplying
andoffixing
Chrome
plated bib
Supplying
andlabour
Chrome
andlabour
fixing
SS
1170.00
finished
item
offixing
workcharges
in
all
materials,
finished
item
work
in all, floors.
all materials,
, for Supplying
quality
including
cost and
materials,
labour
charges
for
finished
and
conveyance
of all
all floors
and
aluminium
screws
all
materials,
labour
, complete
for cost
Engineer-In-Charge
Seiko/Senior/Nice
as charges
approved
bylong
the
make
Seiko/Senior/Nice
as
dia
of
Indian
make
cock
cum
health
faucet
with
1m
plated
bib
cock
cum
health
faucet
Chrome
plated
bib
cock
75mm
dia
:
Supplying
and
fixing
of
SWR
75mm
dia
:
Supplying
and
fixing
75mm
dia
:
Supplying
1302
1319
&
1326
6.25
charges
for
fixing
,
for
finished item
of work
in all, floors.
conveyance
ofand
all
item
of work.
materials,
labour
charges
for
including
cost
finished
itemand
of work
in
all floors.
Engineer-In-Charge
including
cost
and
approved
by
the
Engineer-InSeiko/Senior/Nice
as
flexible
tube
wall
hook
of
Jaquar
with
1m
long
flexible
tube
and
cum
health
faucet
with
PVC pipes
4 Kg/Sq.cm.
of
SWR PVC
and
fixing
of
PVCin 1302 1319 & 1326 0.00
finished
item
of work
110mm
dia(Prince/Sudhakar)
: Supplying and fixing
of SWR 110mm
dia
:pipes
Supplying
andoffixing 110mm
dia
: SWR
Supplying
materials,
labour
charges
finished
item
of work.
complete
for
finished
item
conveyance
alltube
conveyance
of
all materials,
labour
Charge
including
cost
and queen
approved
by of
the
make
queen
series/Jupiter
Aqua
Lines-JALwall
hook
of pipes
Jaquar
make
1m
long
flexible
and
and
fixing
all
special
such
as
plain
bends,
(Prince/Sudhakar)
4
Kg/Sq.cm.
pipes
(Prince/Sudhakar)
4:
all
floors
PVC
pipes
(Prince/Sudhakar)
4
Kg/Sq.cm.
of
SWR
PVC
and
fixing
of
SWR
PVC
,
for
finished
item
of
work
15.90mm
OD CPVC for
pipe
: Supply
andof
15.90mm
CPVC
pipe : Supply 15.90mm
OD
CPVC
pipe
SS
0.00
work
in allOD
floors.
materials,
labour
charges
charges
,
complete
finished
item
conveyance
of
all
materials,
Engineer-In-Charge
make
Nira
as
approved
by
Engineer-Inseries/Jupiter
Aqua
Lines-JALwall
hook
of
Jaquar
make
off
sets,
door
bends,
single
junctions,
and
fixing
all
special
such
as
plain
Kg/Sq.cm.
and
fixing
all
and
fixing
all
special
such
as
plain
bends,
(Prince/Sudhakar)
4
Kg/Sq.cm.
pipes
(Prince/Sudhakar)
4
in
all
floors.
laying
of
ASHIRVAD
/
AJAY
/
ASTRAL
and
laying
of
ASHIRVAD
/
AJAY
/
Supply
and
laying
of
,
for
finished
item
of
22.20mm
CPVC
pipe
: Supply
22.20mm
OD
CPVC
pipeby
: Supply
22.20mm
OD
pipe
:
SS
0.00
complete
forCPVC
finished
work
in junctions
allOD
floors.
labour
charges
,door
complete
for
including
cost
Charge
with
7bends,
years
warranty
withand
make
Nira
as special
approved
queen
series/Jupiter
Aqua
double
as per
site
requirement,
bends,
off
sets,
bends,
special
such
asand
plain
off
sets,
door
single
junctions,
and
fixing
all
such
as plain
Kg/Sq.cm.
and
fixing
all
flowgaurd
or equivalent
CPVC
Pipes
and
ASTRAL
flowgaurd
orpipe
equivalent
ASHIRVAD
/ laying
AJAY
/ of
work.
laying
of
ASHIRVAD
/
AJAY
/
ASTRAL
and
laying
of
ASHIRVAD
/
AJAY
/
Supply
and
item
of
work
in
all
floors.
34.90mm
OD
CPVC
pipe
:
Supply
and
34.90mm
OD
CPVC
:
Supply
34.90mm
OD
CPVC
pipe
:
SS
0.00
finished
item
of
work
in
all
floors.
conveyance
of
all
necessary
fittings
etc.,
complete
including
Engineer-In-Charge
with
7 years bends,
Lines-JAL-make
Nira
as
fixing
with
PVC
clamps
ifsite
necessary
with
single
junctions,
double
junctions
off
sets,
door
double
junctions
as
per
requirement,
bends,
off
sets,
door
bends,
special
such
as plain
Fittings
for
hot
and
cold
water
conforming
CPVC
Pipes
and
Fittings
for
hot
ASTRAL
flowgaurd
or
flowgaurd
or
equivalent
CPVC
Pipes
and
ASTRAL
flowgaurd
or
equivalent
ASHIRVAD
/
AJAY
/
laying
of number
ASHIRVAD
/pipe
AJAY
/Supply
ASTRAL
and
laying
of
ASHIRVAD
/fixing
AJAY
/
Supply
and
laying
ofpipe :
materials,
labour
charges
41.30mm
OD
CPVC
:necessary
and
41.30mm
OD
CPVC
pipejunctions
:fittings
Supply
41.30mm
OD
CPVC
SS
0.00
cost
and
conveyance
ofifall
materials,
warranty
with
necessary
approved
by
Engineer-Inrequired
of
Bombay
nailsspecials
as
per
site
requirement,
single
junctions,
fixing
with
PVC
clamps
with
single
junctions,
double
off
sets,
door
to
IS 15778:2007
with
malleable
and
cold
water
conforming
to
IS bends,
equivalent
CPVC
Pipes
Fittings
for
hot
and
cold
water
conforming
CPVC
Pipes
and
Fittings
for
hot
ASTRAL
flowgaurd
or
flowgaurd
or
equivalent
CPVC
Pipes
and
ASTRAL
flowgaurd
or
equivalent
ASHIRVAD
/
AJAY
/
,
complete
for
finished
laying
of
ASHIRVAD
/
AJAY
/
ASTRAL
and
laying
of
ASHIRVAD
/
AJAY
/
Supply
and
laying
of
labour
charges
,
overheads
&
contractor
etc.,
complete
including
cost
and
Charge
with
7
years
54.00mm
OD elbows,
CPVC
pipe
: Supply
54.00mm
OD
CPVC
pipe fixing
: Supply
ODfor
CPVC
SS
201.00
including
cost
andofconveyance
of and
all
with
PVC
clamps
ifmalleable
necessary
with 54.00mm
double
junctions
as pipe
per :
required
number
Bombay
nails
as
per
site
requirement,
single
junctions,
such
as tees,
check
nuts,
unions,
15778:2007
with
and
Fittings
hot
to
IS 15778:2007
with
malleable
specials
and
cold
water
conforming
to
IS bends,
equivalent
CPVC
Pipes
Fittings
for
hot
and
cold
water
conforming
CPVC
Pipes
and
Fittings
for
hot
ASTRAL
flowgaurd
orand
item
of and
work
innecessary
all
floors.
flowgaurd
or
equivalent
CPVC
Pipes
and
ASTRAL
flowgaurd
or
equivalent
ASHIRVAD
/
AJAY
/
profit
complete
for
finished
item
of
work
in
conveyance
of
all
materials,
warranty
with
laying
of
ASHIRVAD
/
AJAY
/
ASTRAL
and
laying
of
ASHIRVAD
/
AJAY
/
Supply
laying
of
materials
to
site,
labour
charges,
complete
required
number
of
Bombay
nails
site
requirement,
fixing
15mm
bore:
Supplying
and
Nominal
bore:
Supplying
Nominal
SS
261.00
including
cost
and
conveyance
of
all fixing 15mm
with
PVC
clamps
ifmalleable
necessary
with 15mm
double
junctions
as per
bushes,
etc,
solvent
cement
including
specials
such
asconforming
tees,
elbows,
water
conforming
to
such
asNominal
tees,
elbows,
check
nuts,
unions,
15778:2007
with
and
Fittings
for bore:
hot
to
IS
15778:2007
with
malleable
specials
and
cold
water
to
ISof cold
equivalent
Fittings
for
hot
and
cold
water
conforming
CPVC
Pipes
and
for
hot
ASTRAL
flowgaurd
orand
all
floors.
labour
charges
, Fittings
overheads
&
fittings
etc.,
complete
flowgaurd
oritem
equivalent
CPVC
Pipes
and
ASTRAL
flowgaurd
or
equivalent
ASHIRVAD
/CPVC
AJAY
/Pipes
for
finished
of
work
at) all
floor
levels.
including
cost
and
conveyance
with
PVC
clamps
iffixing
Gunmetal
Gate
(
GM
peet
valve
as
per
and
fixing
Gunmetal
Gate
(
GM
Supplying
and
fixing
materials
to
site,
labour
charges,
complete
required
number
of
Bombay
nails
site
requirement,
20mm
Nominal
bore:
Supplying
and
fixing
20mm
Nominal
bore:
Supplying
20mm
Nominal
bore:
SS
406.00
fixing
in
walls
,
ceiling
,
floors
Including
check
nuts,
unions,
bushes,
etc,
IS
15778:2007
with
bushes,
etc, solvent
cement
including
specials
such
asconforming
tees,
elbows,
cold
watercost
conforming
such
as
tees,
elbows,
check
nuts,
unions, 15778:2007
with
malleable
and
Fittings
for
hot
andto
to
IS
15778:2007
with
malleable
specials
and
cold
water
to
ISof
equivalent
CPVC
Pipes
contractor
profit
complete
for
including
and
Fittings
for
hot
and
cold
water
conforming
CPVC
Pipes
and
Fittings
for
hot
ASTRAL
flowgaurd
or
(APSS
No.
1302
1319
&
1326)
all
materials
to
site,
labour
necessary
with
required
IS-778
Class
I
,
Indian
make
heavy
type
peet
)
valve
as
per
IS-778
Class
I
Gunmetal
Gate
(
GM
peet
for
finished
item
of
work
at
all
floor
levels.
including
cost
and
conveyance
with
PVC
clamps
if
Gunmetal
Gate
(bore:
GM cement
peet
valve
assoils,
per
and
fixing
Gunmetal
Gate
( GM
Supplying
and
fixing
necessary
excavation
in
all) sorts
of
solvent
cement
including
fixing
malleable
specials
suchto
32mm
Supplying
and
fixing 32mm
Nominal
bore:
Supplying
Nominal
bore:
SS
1 Rmt
fixing
inNominal
walls
, ceiling
, floors
Including
check
nuts,
unions,
bushes,
etc,in 32mm
IS
15778:2007
with
bushes,
etc,
solvent
including
specials
such
asconforming
tees,
elbows,
cold
water
conforming
such
as
tees,
elbows,
check
nuts,
unions,
15778:2007
with
malleable
Fittings
for
hot
and
finished
item
of
work
in
all floors.
conveyance
of
all
to
IS 15778:2007
with
malleable
cold
water
to IS - I and
CPVC
Pipes
charges,
complete
for
finished
number
of
Bombay
nails
including
cost
and
conveyance
ofspecials
all
,and
Indian
make
heavy
type
)equivalent
valve
as
per
IS-778
(APSS
No.
1302
1319
&
1326)
all
materials
to
site,
labour
necessary
with
required
IS-778
Class
I
,
Indian
make
heavy
type
peet
)
valve
as
per
IS-778
Class
Gunmetal
Gate
(
GM
peet
chiselling
in
the
walls
etc,
refilling
,
walls
,
ceiling
,
floors
Including
as
tees,
elbows,
check
Gunmetal
Gate
(
GM
peet
)
valve
as
per
and
fixing
Gunmetal
Gate
(
GM
Supplying
and
fixing
necessary
excavation
in
all
sorts
of
soils,
solvent
cement
including
fixing
in
malleable
specials
such
40mm
bore:cement
Supplying
and
fixing 40mm
Nominal
bore:
Supplying
Nominal
bore:
SS
1 Rmt
fixing
inNominal
wallssolvent
, ceiling
, floors
Including
check
unions,
bushes,
etc, 40mm
IS
15778:2007
with
bushes,
etc,
including
such
as
tees,
elbows,
cold
water
conforming
to
materials,
labour
charges
such
as
tees,
elbows,
check
nuts,
unions,
15778:2007
with
malleable
and
Fittings
for
hot
and
item
ofnuts,
work
at
all
floor
levels.
including
cost
and
materials
,inlabour
charges
, complete
for specials
including
cost
and
conveyance
of
Class
- Ias
, Indian
make
charges,
complete
for
finished
number
of
Bombay
nails
including
cost
and
conveyance
ofof
all
,necessary
Indian
make
heavy
type
)nuts,
valve
per
IS-778
consolidation
with
the
excavated
earth
excavation
in
all
sorts
unions,
bushes,
etc,
IS-778
Class
I
,
Indian
make
heavy
type
peet
)
valve
as
per
IS-778
Class
I
Gunmetal
Gate
(
GM
peet
chiselling
the
walls
etc,
refilling
,
walls
,
ceiling
,
floors
Including
as
tees,
elbows,
check
Gunmetal
Gate
(
GM
peet
)
valve
as
per
and
fixing
Gunmetal
Gate
(
GM
Supplying
and
fixing
necessary
excavation
in
all
sorts
soils,
solvent
cement
including
fixing
in
malleable
specials
such
50mm
bore:
Supplying
and fixing 50mm
Nominal
bore:
Supplying
50mm
Nominal
bore: cost
SS
360.00
fixing
inNominal
wallssolvent
, ceiling
, floorsincluding
Including
check
unions,
bushes,
etc,
IS
15778:2007
with
,heavy
overheads
&
contractor
bushes,
etc,
cement
such
as
tees,
elbows,
cold
water
conforming
to
(APSS
No.
1302
1319
& walls
1326)
conveyance
ofand
all
finished
item
of
work.
all
materials
,at
labour
charges
,etc,
including
item
ofnuts,
work
all
floor
including
cost
materials
,inlabour
charges
, complete
for specials
including
cost
and
conveyance
of
- type
Ias
, Indian
make
and
making
holes
in
walls
&
ceiling
etc.
of
soils,
chiselling
in
the
solvent
cement
including
including
cost
and
conveyance
ofof
all
,necessary
Indian
make
type
)nuts,
valve
per
IS-778
consolidation
the
excavated
earth
excavation
inlevels.
all
sorts
unions,
bushes,
etc,
IS-778
Class
- with
I,placing
,ceiling
Indian
make
heavy
type
peet
), nuts,
valve
as,heavy
per
IS-778
Class
-(I Class
Gunmetal
Gate
(for
GM
peet
chiselling
the
etc,
, soils,
walls
ceiling
floors
Including
as
tees,
elbows,
check
Gunmetal
Gate
(walls
GM
peet
)refilling
valve
as
per
and
fixing
Gunmetal
Gate
(
GM
Supplying
and
fixing
necessary
excavation
in
all
sorts
solvent
cement
including
fixing
in
malleable
specials
such
profit
complete
Providing
and
on
terrace
(
at
all
Providing
and
placing
on
terrace
Providing
and
placing
on
SS
484.00
fixing
in
walls
,
floors
Including
check
unions,
bushes,
etc,
IS
15778:2007
with
materials
to
site,
labour
complete
for
item
ofthe
and
conveyance
of allcost
(APSS
No.
1302
1319
&with
1326)
conveyance
of, all
finished
item
of
work.
materials
,finished
labour
charges
,etc,
heavy
type
including
good
the
chiselled
surface
in all
refilling
,chiselling
consolidation
fixing
walls
ceiling
,
materials
,inlabour
charges
, complete
for
including
cost
and
conveyance
of
Class
-in
Ias
,item
Indian
make
and
making
holes
in
walls
&
ceiling
etc.
of
soils,
in
the
walls
solvent
cement
including
including
cost
and
conveyance
of
all
,
Indian
make
heavy
type
)
valve
per
IS-778
consolidation
with
the
excavated
earth
necessary
excavation
in
all
sorts
nuts,
unions,
bushes,
etc,
IS-778
Class
I
,
Indian
make
heavy
type
peet
)
valve
as
per
IS-778
Class
I
Gunmetal
Gate
(
GM
peet
chiselling
the
walls
etc,
refilling
,
walls
,
ceiling
,
floors
Including
as
tees,
elbows,
check
finished
of
work
in
floor
levels
) polyetheylene
water
at
all floor
levels
) polyetheylene
terrace
( complete
at
all
levels
necessary
excavation
in all sorts
ofstorage
soils,
solvent
cement
including
fixing
in Construction
malleable
specials
such
charges,
for
Construction
of
brick
masonry
support
for
of
brick
masonry
of,floor
brick
SS
708.00
work.
materials
,to
labour
site,
labour
complete
for
item
ofthe
and
conveyance
of
all
cement
mortar
and
complete
including
excavated
earth
and
making
floors
Including
finished
item
of
work.
all
materials
,finished
labour
charges
,etc,
type
including
cost
and
making
good
the
chiselled
surface
in Construction
refilling
,chiselling
consolidation
fixing
walls
ceiling
,
materials
,inlabour
charges
, complete
for
cost
and
conveyance
of heavy
-in
Ias
,item
Indian
make
holes
in
walls
&
ceiling
etc.
of
soils,
in
the
walls
solvent
cement
including
including
cost
and
conveyance
ofbrand
all
,including
Indian
make
heavy
type
)Class
valve
per
IS-778
consolidation
with
the
excavated
earth
necessary
excavation
inwith
all sorts
nuts,
unions,
bushes,
etc,
all
floors.
tank
with
double
layer
approved
water
storage
tank
with
double
polyetheylene
water
chiselling
the
walls
etc,
refilling
,
walls
,
ceiling
,
floors
Including
as
tees,
elbows,
check
finished
of
work
at
GI
pipe
of
size
304.80mm
x
228.60mm
x
support
for
GI
pipe
of
size
masonry
support
for
GI
charges
,
complete
for
charges,
complete
for
work.
materials
, excavation
labour
when
making
a and
transition
using
metal in complete
holes
in ,walls
&
ceiling
etc.of
and
necessary
in
for
item
conveyance
of allcost
cement
mortar
complete
including
earth
and
making
floors
Including
finished
item
of
work.
all
materials
,finished
labour
charges
,etc,
heavy
type
including
and
making
good
the
chiselled
surface
refilling
consolidation
the
fixing
walls
, (APSS
ceiling
,
materials
, labour
charges
, complete
for excavated
including
cost
and
conveyance
of and
Class
-in
Isize
,item
Indian
make
holes
in
walls
&
ceiling
etc.
of
soils,
chiselling
in
the
walls
solvent
cement
including
and
manufacture
with
cover
and
suitable
layer
approved
brand
and
storage
tank
with
double
consolidation
with
the
excavated
earth
necessary
excavation
inwith
all
sorts
nuts,
unions,
bushes,
etc,
all
floor
levels.
No.
228.60
mm
in
CM
(1:8)
prop
including
304.80mm
x
228.60mm
x
228.60
pipe
of
304.80mm
x
finished
of
work.
work
at
charges
,
complete
for
threads
fittings,
including
cost
and
making
good
the
chiselled
all
sorts
of
soils,
Supply
and
laying
of
20mm
dia
2.0mm
Supply
and
laying
of
20mm
dia
Supply
and
laying
of
SS
0.00
work.
materials
,
labour
when
making
a
transition
using
metal
holes
in
walls
&
ceiling
etc.
and
necessary
excavation
in
complete
for
finished
item
of
and
conveyance
of
all
cement
mortar
and
complete
including
excavated
earth
and
making
floors
Including
finished
item
offinishing
work.
all
materials
,with
labour
charges
,etc, layer
heavy
type
including
cost
good
the
chiselled
surface
in manufacture
refilling
,chiselling
consolidation
with
the
fixing
in
walls
,1326)
ceiling
,
locking
arrangement
and
making
cover
and
approved
brand
and
making
holes
in walls
& ,ceiling
etc.
of
soils,
in
the
walls
solvent
cement
including
1302
1319
&
plastering
and
with
12mm
thick
mm
in
CM
(1:8)
prop
including
228.60mm
x
228.60
mm
all
floor
levels.
(APSS
No.
finished
item
of
work.
conveyance
of
all
materials
all
taxes
,
surface
in
cement
mortar
and
chiselling
in
the
walls
etc,
thick
PVC
pipe
ISI
mark
of
sudhakar
/
Maco
2.0mm
thick
PVC
pipe
ISI
mark
of
20mm
dia
2.0mm
thick
charges
,
complete
for
threads
fittings,
including
cost
and
making
good
the
chiselled
all
sorts
of
soils,
Supply
and
laying
of
25mm
dia
2.0mm
Supply
and
laying
of
25mm
dia
Supply
and
laying
of
SS
690.00
work.
materials
,
labour
when
making
a
transition
using
metal
holes
in
walls
&
ceiling
etc.
and
necessary
excavation
in
complete
for
finished
item
ofthe
conveyance
of
all ,
cement
mortar
and
complete
including
excavated
earth
and making
floors
Including
necessary
holes
for
inlet
and
outlets
and
arrangement
and and
manufacture
with
and
making
good
the
chiselled
surface
in suitable
refilling
,locking
consolidation
with
fixing
in
walls
,1326)
ceiling
in
CM
(1:5)
including
cost
and
plastering
and
finishing
with
CM
(1:8)
prop
1302
1319
&
labour
charges
, ISI
overheads
and
complete
when
making
refilling
,of
consolidation
Plast
/PVC
Avon
Plast
/materials
Modi
make
concealed
sudhakar
/including
Maco
Plast
/ etc.
Avon
Plast in
PVC
pipe
ISI
mark
of
finished
item
of
work.
conveyance
ofaall
,dia
all
taxes/ ,
surface
in
cement
mortar
and
chiselling
in
the
walls
thick
ppipe
mark
of
sudhakar
2.0mm
thick
PVC
ppipe
ISI
mark
25mm
dia
2.0mm
thick
charges
,
complete
foretc,
threads
fittings,
including
cost
and
making
good
the
chiselled
all
sorts
soils,
Supply
and
laying
of
50mm
2.5mm
Supply
and
laying
of
50mm
dia
Supply
and
laying
of
SS
415.00
work.
materials
,
labour
when
making
transition
using
metal
holes
in
walls
&
ceiling
and
necessary
excavation
in
over
flow
pipes
but
without
fittings
and
making
necessary
holes
for
inlet including
cover
and
suitable earth
cement
mortar
and
complete
including
excavated
earth
and
making
floors
Including
conveyance
of required
all
materials
and
all
labour 12mm
thick
in
CM
(1:5)
including
plastering
and
contractors
profit
etc.,
complete
for
a
transition
using
metal
threads
with
the
excavated
in
wall
with
all
PVC
/Metallic
/
Modi
make
concealed
in
wall
sudhakar
/
Maco
Plast
/
labour
charges
,
overheads
and
complete
including
when
making
refilling
,
consolidation
Maco
Plast
/
Avon
Plast
/
Modi
make
of
sudhakar
/
Maco
Plast
/
Avon
PVC
ppipe
ISI
mark
of
finished
item
of
work.
conveyance
of
all
materials
,
all
taxes
,
surface
in
cement
mortar
and
chiselling
in
the
walls
etc,
thick
PVC
ppipe
ISI
mark
of
sudhakar
/
2.5mm
thick
PVC
ppipe
ISI
mark
50mm
dia
2.5mm
thick
charges
,
complete
for
threads
fittings,
including
cost
and
making
good
the
chiselled
all
sorts
of
soils,
Wiring
with
2 of
runs
of
(1.0
Wiring
2 runs
of flow
14/0.3mm
Wiring
with
2holes
runs
of and
SS
0.00
base
support
for
tanks
(directed
BMW
A
0.04
and
outlets
and
over
pipes
locking
arrangement
when
making
a transition
using-item
metal
holes
inwith
walls
& ceiling
etc.
and
necessary
excavation
in
charges,
complete
for14/0.3mm
finished
of
cost
and
conveyance
ofand
all
finishing
with
12mm
finished
item
as
by
the)
fittings,
including
cost
and
making
in
Junction
Boxes
including
masonary
work
with
all
required
PVC
/Metallic
Avon
Plast
/Maco
Modi
make
contractors
profit
etc.,
complete
for
a
transition
using
metal
threads
with
the
excavated
earth
concealed
in
wall
with
all
required
PVC
Plast
/ Modi
make
concealed
in
sudhakar
/in
Plast
/
labour
charges
, work
overheads
and
complete
including
when
making
refilling
,of
consolidation
Maco
Plast
/
Avon
Plast
/
Modi
make
of
sudhakar
/
Maco
Plast
/
Avon
PVC
ppipe
ISI
mark
of
finished
item
of
work.
conveyance
of
all
materials
,
all
taxes
,
surface
in
cement
mortar
and
chiselling
the
walls
etc,
Sq.mm)
Fire
Retardant
(FR)
P.V.C.
insulated
(1.0
Sq.mm)
Fire
Retardant
(FR)
14/0.3mm
(1.0
Sq.mm)
but
without
fittings
and
base
making
necessary
holes
threads
fittings,
including
cost
and
making
good
the
chiselled
all
sorts
soils,
Supply
of 6A
3directed
pin wall
plug
Supply
and
fixing
of
6Aand
3charges,
pin, all
wall Supply
fixing
of
6Aall
3
SS
0.00
work
forand
all
floors.
materials
and
labour
thick
in
CMin(1:5)
Engineer
In fixing
charge.
conveyance
ofall
all
materials
walls
& and
ceiling
etc.
such
as
cutting
in
the
maasonary
Junction
Boxes
including
concealed
wall
with
finished
item
of,groves
work
as
by
the
fittings,
including
cost
and
making
holes
inand
/Metallic
Junction
Boxes
including
wall
with
all
required
PVC
Avon
Plast
Modi
make
contractors
profit
etc.,
complete
for
a
transition
using
metal
threads
with
the
excavated
earth
concealed
in6A
wall
with
all
required
PVC
Plast
/insulated
Modi
make
concealed
in
sudhakar
/in/Maco
Plast
/
labour
charges
overheads
and
complete
including
when
making
refilling
,plug
consolidation
flexible
copper
cable
(ISI
MARK)
in
existing
P.V.C.
flexible
copper
Fire
Retardant
(FR)
P.V.C.
support
for
tanks
(
BMW
A
for
inlet
and
outlets
and
conveyance
of
all
materials
, all
taxes
,
surface
in
cement
mortar
and
chiselling
the
walls
etc,
socket
with
switch
control
on
a
plug
socket
with
6A
switch
control
pin
wall
socket
with
complete
for
finished
item
of
including
cost
and
Supply
and
fixing
of
16A
flush
type
Switch
Supply
and
fixing
of
16A
flush
Supply
and
fixing
of
16A
SS
80.00
taxes
, labour
, cutting
making
good
the
and
makin
good
with
fixing
chicken
masonary
work
such
as
required
PVC
/Metallic
Engineer
Inwork
charge.
conveyance
ofcharges
all
materials
, all concealed
walls
& ceiling
etc.
masonary
as
cutting
groves
in /Metallic
Junction
Boxes
including
in
wall
with
all
finished
item
of,such
work
as
directed
by mesh
the
fittings,
including
cost
and
and
making
holes
inand
/Metallic
Junction
Boxes
including
wall
all
required
PVC
Avon
Plast
/ Modi
make
contractors
etc.,
complete
for
a
transition
using
metal
threads
with
the
earth
pipe
with
6Aprofit
switch,
Ceiling
rose
and
3mm
cable
(ISI
MARK)
in
existing
pipe
insulated
flexible
copper
0.04
)Switch
over
flow
pipes
but
labour
charges
overheads
and
complete
including
when
making
refilling
,excavated
consolidation
common
switch
board
with
earth
on
a with
common
switch
board
with
6A
switch
control
on
a
work
for
all
floors.
conveyance
ofthe
all
Socket
combined
(2
in
one)
on
decolam
type
Socket
combined
(2
flush
type
Switch
Socket
overheads
and
contractors
profit
chiselled
surface
in
Supply
and
run
of
2
of
22/0.3mm
(1.5
Supply
and
run
of
2
of
22/0.3mm
Supply
and
run
of
2
of
SS
167.00
and
plastering
etc.,
and
labour
charges
groves
in
the
maasonary
and
Junction
Boxes
including
taxes
,
labour
charges
,
making
good
the
maasonary
makin
good
with
fixing
masonary
work
such
asand
cutting
required
PVC
/Metallic
Engineer
Inwork
charge.
conveyance
of all
materials
,and
all concealed
walls
&
ceiling
etc.
masonary
such
as
cutting
groves
in /Metallic
Junction
Boxes
including
inholes
wall
with
all
finished
item
of and
work
as
directed
by the
fittings,
including
cost
and
making
inand
thick
hylam
sheet
covering
to switch
with
6A
switch,
Ceiling
rose
cable
(ISI
MARK)
in
without
fittings
and
base
contractors
profit
etc.,
complete
for
a
transition
using
metal
threads
with
the
excavated
earth
continuity
including
wire
leads,
earth
earth
continuity
including
wire
common
switch
board
materials
and
all
labour
sheet
covered
board
including
earth
in
one)
on
decolam
sheet
covered
combined
(2
in
one)
on
etc.,
complete
for
finished
item
of
cement
mortar
and
Sq.mm)
F.R
P.V.C.
insulated
flexible
copper
(1.5
Sq.mm)
F.R
P.V.C.
insulated
22/0.3mm
(1.5
Sq.mm)
etc.,
complete
for
Run
of
mains.
makin
good
with
fixing
chicken
masonary
work
such
as
overheads
and
contractors
chiselled
surface
Supply
and
Run
of plastering
2makin
of
/good
0.3mm
( the
2.5
and
Run
ofcost
2 of
/ profit
Run
ofin6A
of
SS
422.00
chicken
mesh
and
etc.,
and
groves
in
the
and
Junction
Boxes
including
taxes
, labour
charges
,36
making
good
the
the
maasonary
and
with
fixing Supply
masonary
work
such
asand
cutting
required
PVC
/Metallic
Engineer
In including
charge.
conveyance
ofmaasonary
all
materials
, all Supply
walls
& and
ceiling
etc.
and
control
box
all
labour
charges
3mm
thick
hylam
sheet
covering
existing
pipe
with
support
for
tanks
(2
BMW
finished
item
of
work
as36
directed
by
fittings,
including
and
making
holes
in
connections
along
with
all
labour
charges
leads,
earth
connections
along
with
earth
continuity
charges,
complete
for
connection
and
all
labour
charges
etc.,
board
including
earth
connection
decolam
sheet
covered
work
as
directed
by
the
Engineer
complete
including
when
cable
in
existing
pipe
for
mains
inlcuding
flexible
copper
cable
in
existing
F.R
P.V.C.
insulated
mesh
and
plastering
etc.,
and
cutting
groves
in
the
etc.,
complete
for
finished
item
of
cement
mortar
and
sqmm)
FR/FRLS
PVC
insulated
flexible
ISI
0.3mm
(
2.5
sqmm)
FR/FRLS
PVC
36
/
0.3mm
(
2.5
sqmm)
labour
charges
etc.,
complete
for
Run
of
makin
good
with
fixing
chicken
masonary
work
such
as
overheads
and
contractors
profit
chiselled
surface
in
Supply
and
Run
of light,
2 of 56
/ 0.3mm
(4.0
Supply
and
Run
of
2 of
/ , allall Supply
and
Run
of 2and
of
SS
1456.00
chicken
mesh
and
plastering
etc.,and
and
groves
in
the
and
Junction
Boxes
including
taxes
, labour
charges
,56
making
good
the
etc.,
complete
for
bell,
fan
to
switch
control
box
including
switch,
Ceiling
rose
and
-walls
A 0.04
)item
Engineer
In
conveyance
ofmaasonary
all
materials
&including
ceiling
etc.
complete.
with
all
labour
charges
etc.,
including
wire
leads,
finished
of
work
for
complete
oncharge.
wall.
and
all
labour
charges
etc.,
board
earth
charge.
making
a
transition
using
all
labour
charges
etc.,
complete.
pipe
for
mains
inlcuding
alland
labour
flexible
copper
cable
in
labour
charges
etc.,
complete
for
maasonary
and
makin
work
as
directed
by
the
Engineer
complete
including
when
mark
copper
cable
ofof
RPG
Havells
/(10.0
V- of
insulated
flexible
ISI
mark
copper
FR/FRLS
PVC
insulated
mains.
mesh
and
plastering
etc.,
cutting
groves
in
the
etc.,
complete
for
finished
item
of
cement
mortar
and
sqmm)
FR/FRLS
PVC
insulated
flexible
ISI In
0.3mm
(4.0
sqmm)
FR/FRLS
PVC
56
/
0.3mm
(4.0
sqmm)
labour
charges
etc.,
complete
for
Run
makin
good
with
fixing
chicken
masonary
work
such
as
overheads
and
contractors
profit
chiselled
surface
in
Supply
and
of
2in
140/0.3mm
Supply
and
run
of
2
of
Supply
and
run
of
2
of
SS
7712.00
exhaust
fan run
points
Non-Residential
labour
charges
etc.,
complete
for
3mm
thick
hylam
sheet
taxes , labour
charges ,
making
good
the
complete.
earth
connections
along
all
floors.
complete
on wall.
connection
and
all
labour
metal
threads
fittings,
charges
etc.,
complete.
existing
pipe
for
mains
Run
of
mains.
good
with
fixing
chicken
In
charge.
making
a
transition
using
Guard
/
Power
flex
/
Polycab
/
Gold
medal
cable
of
RPG
Havells
/
VGuard
/
flexible
ISI
mark
copper
labour
charges
etc.,
complete
for
maasonary
and
makin
work
as
directed
by
the
Engineer
complete
including
when
mark
copper
cable
of
RPG
Havells
/
Vinsulated
flexible
ISI
mark
copper
FR/FRLS
PVC
insulated
mains.
mesh
and
plastering
etc.,
and
cutting
groves
in
the
etc.,
complete
for
finished
item
of
cement
mortar
and
Sq.mm)
FR Transportation
P.V.C. insulatedofflexible
140/0.3mm
(10.0
Sq.mm)
140/0.3mm
(10.0
Buildings
light,
bell,
and
exhaustFR
fan
covering
to
switch
overheads
and
contractors
profit Supply
chiselled
surface
incontrol
Supply
and
1x40Wcopper
patty Supply
andfan
Transportation
of
and
SS
600.00
with
all
labour
charges
charges
etc.,
complete
including
cost
and
inlcuding
all
labour
mesh
and
plastering
etc.,
metal
threads
fittings,
standard
million
/pipe
/ mains
Suncab/
Paragon cable
Power
flex
/ Polycab
//Gold
medal
cable
of
RPG
Havells
/ VRun
of
mains.
good
with
fixing
chicken
In
charge.
making
a
transition
using
Guard/Power
flex
/Vimal
Polycab
/ Gold
medal
of
RPG
Havells
V-copper
flexible
ISI
mark
copper
labour
charges
etc.,
complete
for
maasonary
and
makin
work
as
directed
by
the
Engineer
complete
including
when
cable
in
existing
for
inlcuding
P.V.C.
insulated
flexible
Sq.mm)
FR
P.V.C.
points
in
Non-Residential
box
including
all
labour
etc.,
complete
for
finished
item
of
cement
mortar
and
type
tube
light
luminaire
with
copper
1x40W
patty
type
tube
light
Transportation
of
1x40W
etc.,
complete.
Supply
900 mmpipe
(36")
/ 1200
(48") / Supply
of million
900 mm
(36") // Suncab/
1200
Supply
900
mm
/
SS
3520.00
on
wall.
conveyance
of
all /(36")
complete.
and
labour
charges
etc.,
including
cost
and
make
inofexisting
for
run ofmm
mains
standard
/pipe
Guard
/ of
Power
flex
mesh
and
plastering
etc.,
metal
threads
fittings,
standard
million
/ Vimal
/ Suncab/
Paragon Guard/Power
flex
/Vimal
Polycab
/ Gold charges
cable
of
RPG
Havells
/ VRun
ofas
good
with
fixing
chicken
In
charge.
making
aetc.,
transition
using
all
labour
charges
etc.,
complete.
cable
inmains.
existing
for
mains
insulated
flexible
copper
Buildings
charges
etc.,
complete
work
directed
by
the
Engineer
complete
including
when
choke,
starter
etc.,
including
1No
40W
luminaire
with
copper
choke,
patty
type
tube
light
1400
mm
(56")
sweep
230V,
A.C
50
mm
(48")
/
1400
mm
(56")
sweep
1200
mm
(48")
/
1400
materials
,
all
taxes
,
complete
for
Run
of etc.,
conveyance
of
allpipe
earth
contnutity
including
all labour
Paragon
make
in million
existing
pipe
for
Gold
medal
and
labour
charges
including
cost
and
make
in existing
pipe for run
of mains
medal
standard
/ Vimal
/ Polycab
Guard/Power
flex
/and
mesh
and
plastering
etc.,
metal
threads
fittings,
inlcuding
all
labour
charges
etc.,
cable
in
for
for
light,
bell,
fan
In
charge.
making
a/existing
transition
using
tube etc.,
including
of and
40W
tube
starter
etc.,
1No
luminaire
with
copper
Hz.Ceiling
fan with 3Fixing
Blades
double
230V,
A.C
50including
Hz.Ceiling
fan40W
with
mm
(56")
sweep
230V,
labour
charges
,
mains.
materials
,
all
taxes
,
charges
etc.,complete
run
of
mains
earth
contnutity
standard
million
/
Vimal
/
complete
for
Run
of
conveyance
of
all
earth
contnutity
including
all
labour
Suncab/
Paragon
make
in
existing
Polycab
/
Gold
medal
and
labour
charges
etc.,
including
cost
and
complete.
mains
inlcuding
all
labour
exhaust
fan
points
in
metal
threads
fittings,
lights
with 1/2with
Mtr all
conduit
suspension
tube
etc.,and
including
Fixing
of 40W A.C
choke,
starter
etc.,
ball
bearings
standard
accessories, 3
Blades
double
ball
bearings
50
Hz.Ceiling
fan
overheads
and
labour
charges
,
including
all labour
charges
Suncab/
Paragon
mains.
materials
, allof
taxes
, in
charges
etc.,complete
pipe lights
for run
of mains
earth
standard
million
/make
Vimal
/
complete
for
Run
of
conveyance
all
charges
etc.,
complete.
Non-Residential
Buildings
cost
and
arrangements
ceilingofwith
hooks
tube
with
1/2
Mtr
conduit
including
1No
40W
tube
Labour chargesfrom
for Fixing
Ceiling
fan
with
all standard
accessories,
with
3 Blades
and
double
contractors
profit
etc.,
overheads
and
etc.,complete
existing
pipe
for
run
of
labour
charges
,
contnutity
including
all
labour
Suncab/
Paragon
make
in
mains.
materials
, allwith
taxes
conveyance
all all, of
etc.,
includingincluding
giving connections
and all
arrangements
from
etc.,
including
Fixing
and regulator
transportation
and suspension
Labour charges
for Fixing of
ball
bearings
complete
forof
finished
1 No.
1 No.
1 No.
1 No.
1 No.
1 No.
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 No.
1 No.
1 No.
1 No.
1 No.
1 Lit
1 No.
0
0
0
248
#VALUE!
2340
12500
0
0
0
0
0
4824
4176
12180
#VALUE!
#VALUE!
1080
1452
2124
1 Rmt
1 Rmt
1 Rmt
1 Point
1 No.
1 No.
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 No.
1 No.
0
#VALUE!
#VALUE!
0
0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
Each
Each
Each
SS
SS
SS
SS
0.00
90.00
473.00
91.00
1
1
1
1
No.
No.
No.
No.
0
#VALUE!
#VALUE!
#VALUE!
ELECTRICAL DATA
SSR -2012-13
Description
2
MA@20%
Overheads&Contractors Profit @0%
P.V.C. Conduit (Concealed)
Supply and Fixing of 20mm dia 2.1mm thick P.V.C.
pipe (ISI MARK) concealed in wall with all required
accessories including masonary work for light, fan
and separate plug point with well seasoned wooden
deep box including all labour charges etc.,
complete.
Sp
ecif
1
icat
ion
No.
1.4
1.4
.1
(a)
Unit
3
0.2
0.00
Quantit
Rate Rs. Amount Rs.
y
4
5
6.00
EL
EL
EC
EC
EL
-EC
EL
1.2
8.1
-EC
.2
EL
.10
1.4
-EC
.12
1.2
.38
1.2
EL
.43
EC
EL
-EC
EL
8.1
-EC
.77
8.1
.78
8.1
.85
53
1282
123
89
94
1349
1350
1357
11
a) Material
20mm dia 2mm thick PVC pipe
U' Links
10" x 8" Wooden deep box
20mm dia 1,2,3 & 4 way deep Junction Box
20mm PVC bends
Cement
b) Labour charges :
Skilled Electrician
Semi skilled Electrician
Helpers
Mason Ist class
Sundries
MA@20%
C) Cost for 100 RM
Rate per Metre = C/100
Overheads&Contractors Profit @0%
100 M
100 Nos
Each
Each
Each
kg
1
2
3
12
12
50
23
0.4
44
48.4
4.4
5.85
2300.00
80.00
132.00
580.80
52.80
292.35
day
day
day
day
2
2
2
2
355
285
285
315.00
710.00
570.00
570.00
630.00
0.2
2480
0.00
64.13953
496.00
6413.95
64.14
0.00
ELEC 55
EL 1282
EC
ELEC 90
95
ELEC
8.1
.10
EL
EC
8.1
.77
1349
64.14
100 M
100 Nos
Each
Each
kg
1
2
12
12
50
30.3
0.4
24.2
6.1
5.85
3030.00
80.00
290.40
73.20
292.35
day
355
710.00
EL
EC
EL
-EC
8.1
.78
8.1
.85
1350
1357
11
day
day
day
2
2
2
285
285
315.00
570.00
570.00
630.00
0.2
2480
0.00
67.41953
496.00
6741.95
67.42
0.00
67.42
ELEC 152
EL
EC
EL
-EC
EL
8.1
-EC
.77
-8.1
.78
8.1
.85
1349
1350
1357
100 M
day
day
day
1480.6
2961.20
0.67
2
0.67
355
285
285
237.85
570.00
190.95
0.2
998.80
0.00
4159.76
199.76
4159.76
0.00
ELEC 188
ELEC 231
ELEC1349
ELEC1357
41.60
each
each
1
1
day
day
0.067
0.067
0.2
0.00
27
26
27.00
26.00
355
285
42.88
104.456
23.79
19.10
8.58
0.00
104.46
ELEC 142
ELEC 195
EL
EC
EL
-EC
8.1
.77
8.1
.85
3.1
.4
1349
1357
a) Material
Peeta Board of Size 15" x 20"
16A 3 pin / 6A 3pin Plug socket with indicator lamp,
fuse
unit (5charges
in 1)
b) Labour
:
Skilled Electrician
Helpers
MA@20%
Overheads&Contractors Profit @0%
each
each
1
1
day
day
0.1
0.1
0.2
0.00
165
146
355
285
64
387.8
165.00
146.00
0.00
35.50
28.50
12.80
0.00
387.80
EL
EC
EL
1.5
EC
EL
.3
-EC
EL
8.1
-EC
.77
-8.1
.78
8.1
.85
153
1349
1350
1357
100 M
2389.2
4778.40
day
day
day
0.67
2
0.67
0.2
355
285
285
998.80
0.00
59.7696
237.85
570.00
190.95
199.76
5976.96
59.77
0.00
ELEC 154
EL
EC
EL
-EC
EL
8.1
-EC
.77
8.1
.78
8.1
.85
1349
1350
1357
59.77
100 M
3650
7300.00
day
day
day
1
3
1
355
285
285
355.00
855.00
285.00
0.2
1495
0.00
9094
299.00
9094.00
0.00
90.94
Taking output=each
a)Material
ELEC 491 8way TPN D.B with IP-43 protection(MD) suitable Each
3 phase
ELCB/RCCB/FP Isolator as Each
ELE
389 for
63A 3pole
MCB /ELCB/RCCB(item-146,page-9,M
incommer(item-167,page-11,Havells
Legrend) range SP MCBs (item-126,page- Each
ELE
384 DS
10KA-6-32A
8,MDS
Legrend)
b)Labour
charges:
EL 1349 Skilled Electrician
day
EC
EL 1350 Semi Skilled Electrician
day
-EC
EL
1357 Helpers
day
8.1
-EC
MA@20%
.77
8.1
Overheads&Contractors Profit @0%
.78
8.1
.85
Rate per each
4.4.8
1 3500.00
1 1477.00
24
200.60
0.5
1
355.00
285.00
1
285.00
0.2
747.50
0.00 10688.40
3500.00
1477.00
4814.40
177.50
285.00
285.00
149.50
0.00
10688.40
a)Material
ELEC 485 Supply of 12 Way TPN DB Horizontal with IP 43 Nos
makes
L & MCCB
T / Legrand
/ GE to/ Nos
ELEC 365 Protection
Supply of of125A
4 Pole
/ Confirms
Siemens
/
Schneider.
having
Breaking
Capacity
25 KA Panel Nos
ELEC 384 IS:13947
10KA-6-32A
range
SP MCBs
(item-126,pageMounted
of makes
L & T / / GE / Schneider
8,MDS
Legrend)
ELEC-2.9.1
b)Labour charges:
EL 1349 Skilled Electrician
day
EC
EL 1350 Semi Skilled Electrician
day
-EC
EL 1357 Helpers
day
8.1
-EC
MA@20%
.77
8.1
Overheads&Contractors Profit @0%
.78
8.1
.85
8.2
.4
1 5428.10
1 8698.20
36
200.60
0.5
1
1
0.2
0.00
355.00
285.00
285.00
747.50
22244.90
5428.10
8698.20
7221.60
177.50
285.00
285.00
149.50
0.00
22244.90
EL
695
EC
###
4
3.6
.17 7.9.4
ELEC 1
ELEC 179
BMS 936
EL
EC
EL
-EC
8.1
.77
8.1
.78
1349
1350
a) Material
1x40 patty type T.L. fitting
40W FTL
Rate per each
Fixing of 40W tube lights with 1/2 Mtr conduit
suspension arrangements from ceiling with hooks
etc., including giving connections and all labour
charges etc., complete.
a) Material
20mm dia No.16 gauge conduit pipe .
23/0060 twin core flexible copper cable
Anchor screws / Hooks / Sockets & Check
b) Labour charges
Skilled Electrician/carpenter
Semi skilled Electrician / Helper
MA@20%
Overheads&Contractors Profit @0%
each
each
1
1
273
47
273.00
47.00
320.00
M
100M
each
1
1
2
64.8
9.9
4
64.80
9.90
8.00
day
day
0.166
0.166
0.2
0.00
355.00
285.00
106.24
210.19
58.93
47.31
21.25
0.00
ELEC1017
530.19
each
1
1%
M
LS
day
day
0.125
0.125
0.2
0.00
1600
1600
1600.00
16.00
1616.00
9.9
9.90
10.00
355.00
285.00
80
1731.90
44.38
35.63
16.00
0.00
EL
EC
EL
-EC
8.1
.77
8.1
.85
1349
1357
a) Material
23/0060 Twin Core wire
Unforseen item works, such as painting to down
rod,
screwscharges.
etc.,
b) Labour
Skilled Electrician
Helper
MA@20%
Overheads&Contractors Profit @0%
1731.90
ELEC 244
EL
EC
8.1
.78
1350
No.
240
240.00
day
0.1
0.2
285.00
28.5
0.00
3622.10
28.50
5.70
274.20
0.00
274.20
ELEC
ELEC
EL
EC
EL
EC
8.1
-.77
8.1
.85
Each
17.00
17.00
Each
10.00
10.00
day
0.05
355.00
1357
day
0.05
0.2
0.00
285.00
32.00
65.40
Helpers
MA@20%
Overheads&Contractors Profit @0%
17.75
14.25
6.40
0.00
65.40
each
1
1%
2645
2645
2645.00
26.45
2671.45
M
kg
1
25
9.9
5.85
9.90
146.18
day
day
day
LS
0.25
0.25
0.25
355.00
285.00
315.00
0.2
238.75
88.75
71.25
78.75
10.00
47.75
0.00
3124.026
3124.03
7.3
.1
Supply of Integral street light luminaire of 70W HPSV lamp fitting comprises of
single piece die cast Aluminium body with copper wound ballast and capacitor,
Ignitor, with pot optics including 70W HPSV lamp etc., and Fixing of 70W MH
down light and control gear box with necessary accessories in false ceiling
including giving connections and all labour charges etc., complete.
ELEC 542
ELEC 628
7.9
.2
a) Material
23/0060 twin core flexible copper cable
screws with rawal plugs
Aluminium flat / cement and sand etc., labour
charges.
b) Labour charges
Skilled Electrician/carpenter
Semi skilled Electrician / Helper
MA@20%
Overheads&Contractors Profit @0%
each
each
1
1
3921.8
495
M
each
LS
1
2
9.9
0.16
10
9.90
0.32
10.00
day
day
0.125
0.125
0.2
0.00
355.00
285.00
80
4533.02
44.38
35.63
16.00
0.00
3921.80
495.00
4416.80
4533.02
EL
EC
1.5
.5
0.00
100 M
day
day
day
1
3
1
0.2
0.00
5550
355.00
285.00
285.00
1337
1873.40
111.00
0.00
355.00
855.00
285.00
267.40
1873.40
0.00
18.73
ELEC 525
EL
767
EC
3.7
.1
ELEC 1
ELEC 179
BMS 936
EL
EC
EL
-EC
-8.1
.77
8.1
.78
2.1
.1
1349
1350
a) Material
1x40W WP flourscent street light fitting.
Lamp cost of 40W
Sundries and rounding off
Rate per each
a) Material
20mm dia No.16 gauge conduit pipe .
23/0060 twin core flexible copper cable
Anchor screws / Hooks / Sockets & Check
b) Labour charges
Skilled Electrician/carpenter
Semi skilled Electrician / Helper
MA@20%
Overheads&Contractors Profit @0%
each
each
1
1
1459.5
12
1459.50
12.00
1471.50
M
100M
each
1
1
2
day
day
0.166
0.166
0.2
0.00
64.8
9.9
4
64.80
9.90
8.00
355
285.00
106.24
1681.69
58.93
47.31
21.25
0.00
1681.69
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible
copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam
sheet covering to switch control box including all labour charges etc., complete for light, bell,
fan and exhaust fan points in Non-Residential Buildings
The R&B Department Proposed Labour, for both piping & wiring considering 40% Labour, for
Wire draw. Keeping this, the labour is proposed for wiring 100 RM.
145/134
ELEC
224/139
ELEC
222/129
ELEC
134/134
ELEC
1316/20
ELE8
6
1317/20
ELE8
6
1322/20
ELE8
6
1
6
6
0.05
1001
23
16
704
1001.00
138.00
96.00
35.20
0.6
1.2
0.6
0.2
355
285.00
285.00
726
213.00
342.00
171.00
145.20
2141.40
0.00
2141.40
0.00
2141.40
356.90
each
1
4134.9
day
day
day
0.167
0.167
0.333
0.2
0.00
355
285.00
285.00
201.785
4377.04
ELEC-1.2.21
100 M
day
day
day
LS
1.5.3
4377.04
1.5.2
4134.90
0.00
59.29
47.60
94.91
40.36
0.00
100 M
day
day
day
LS
100 M
23.1
2310
Skilled Electrician
Semi skilled Electrician
Helpers
MA @ 20%
1.5.4
day
day
day
LS
0.2
100 M
day
day
day
LS
355
285
285
355
285
570
201.785
40.357
3560.357
35.60357
27346.5
17295.5
16340.8
13637.6
2462
4350.42
16524
23065
129580
28215
278100
7560
29826
38524.5
632827.32
80
80
640
40
44
16
704
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
0.5
1
1
1
1
36
0.5
1
1
20233
6,970.00
1,355.00
184
6970
1355
4416
258.00
237.00
129
237
237.00
237
603
5026
7980
184
5026
7980
6624
258.00
237.00
237.00
129
237
237
20233
#REF!
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
4.4.8
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
477
359
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
enclosure
D.B3pole
with
63A
fixed
on
IP-43
MCB
10KA-6suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
eimens)of
TPN
DB
steel
125A
4
10KA-6Horizontal
enclosure
Pole
32A
range
b)Labour
with
fixed IP 43
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
126,pageL
&
T
/
frame
with
IS:13947
Skilled
8,MDS
Helpers
Legrand
/
125A
4P
having
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
/
1no
as
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
Each
Each
Each
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
day
day
0.5
1
258.00
237.00
129
237
day
237.00
237
603
Nos
Nos
Nos
1
1
36
5026
7980
184
5026
7980
6624
day
day
day
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
0.5
1
1
1
1
36
0.5
1
1
20233
6,970.00
1,355.00
184
6970
1355
4416
258.00
237.00
129
237
237.00
237
603
5026
7980
184
5026
7980
6624
258.00
237.00
237.00
129
237
237
20233
#REF!
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
4.4.8
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
477
359
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
enclosure
D.B3pole
with
63A
fixed
on
IP-43
MCB
10KA-6suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
eimens)of
TPN
DB
steel
125A
4
10KA-6Horizontal
enclosure
Pole
32A
range
b)Labour
with
fixed IP 43
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
126,pageL
&
T
/
frame
with
IS:13947
Skilled
8,MDS
Helpers
Legrand
/
125A
4P
having
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
/
1no
as
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
Each
Each
Each
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
day
day
0.5
1
258.00
237.00
129
237
day
237.00
237
603
Nos
Nos
Nos
1
1
36
5026
7980
184
5026
7980
6624
day
day
day
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
0.5
1
1
1
1
36
0.5
1
1
20233
6,970.00
1,355.00
184
6970
1355
4416
258.00
237.00
129
237
237.00
237
603
5026
7980
184
5026
7980
6624
258.00
237.00
237.00
129
237
237
20233
#REF!
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
4.4.8
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
477
359
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
enclosure
D.B3pole
with
63A
fixed
on
IP-43
MCB
10KA-6suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
eimens)of
TPN
DB
steel
125A
4
10KA-6Horizontal
enclosure
Pole
32A
range
b)Labour
with
fixed IP 43
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
126,pageL
&
T
/
frame
with
IS:13947
Skilled
8,MDS
Helpers
Legrand
/
125A
4P
having
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
/
1no
as
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
Each
Each
Each
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
day
day
0.5
1
258.00
237.00
129
237
day
237.00
237
603
Nos
Nos
Nos
1
1
36
5026
7980
184
5026
7980
6624
day
day
day
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
0.5
1
1
1
1
36
0.5
1
1
20233
6,970.00
1,355.00
184
6970
1355
4416
258.00
237.00
129
237
237.00
237
603
5026
7980
184
5026
7980
6624
258.00
237.00
237.00
129
237
237
20233
#REF!
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
4.4.8
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
477
359
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
enclosure
D.B3pole
with
63A
fixed
on
IP-43
MCB
10KA-6suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
eimens)of
TPN
DB
steel
125A
4
10KA-6Horizontal
enclosure
Pole
32A
range
b)Labour
with
fixed IP 43
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
126,pageL
&
T
/
frame
with
IS:13947
Skilled
8,MDS
Helpers
Legrand
/
125A
4P
having
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
/
1no
as
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
Each
Each
Each
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
day
day
0.5
1
258.00
237.00
129
237
day
237.00
237
603
Nos
Nos
Nos
1
1
36
5026
7980
184
5026
7980
6624
day
day
day
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
0.5
1
1
1
1
36
0.5
1
1
20233
6,970.00
1,355.00
184
6970
1355
4416
258.00
237.00
129
237
237.00
237
603
5026
7980
184
5026
7980
6624
258.00
237.00
237.00
129
237
237
20233
#REF!
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
4.4.8
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
477
359
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
enclosure
D.B3pole
with
63A
fixed
on
IP-43
MCB
10KA-6suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
eimens)of
TPN
DB
steel
125A
4
10KA-6Horizontal
enclosure
Pole
32A
range
b)Labour
with
fixed IP 43
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
126,pageL
&
T
/
frame
with
IS:13947
Skilled
8,MDS
Helpers
Legrand
/
125A
4P
having
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
/
1no
as
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
Each
Each
Each
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
day
day
0.5
1
258.00
237.00
129
237
day
237.00
237
603
Nos
Nos
Nos
1
1
36
5026
7980
184
5026
7980
6624
day
day
day
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
0.5
1
1
1
1
36
0.5
1
1
20233
6,970.00
1,355.00
184
6970
1355
4416
258.00
237.00
129
237
237.00
237
603
5026
7980
184
5026
7980
6624
258.00
237.00
237.00
129
237
237
20233
#REF!
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted 632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
LIGHTING
DB:Supply
and fixing
of
TPN
8way TPN
Distributio
n board on
wall
suitable
Taking
output=each
for MCB's
a)Material
in
sheet
steel
8way TPN
Each
enclosure
D.B
with
63A
3pole
Each
fixed
on
IP-43
MCB
10KA-6Each
suitable
protection(
/ELCB/RC
32A
range
angle
iron
b)Labour
MD)
CB(itemSP
frameMCBs
with
charges:
suitable
Skilled
day
146,page(item63A
3P
for
3
Electrician
9,M
DS
Semi
day
126,pageIsolator
phase
Legrend)
Skilled
8,MDS
1no
as
Helpers
day
ELCB/RC
ELECElectrician
Legrend)
incomer
CB/FP
2.9.6
ELECand
24
Isolator
as
2.9.1
No.s
6incommer(
32A
SP
itemRate per
MCB's
167,pageeach as
outgoers
11,Havells
4.4.8
POWER
including
)ELECDB:all
2.12.32
Supply
connectio
and
fixing
ns cable
of
entry DPX
box.
12way
testing
VTPN
and
Distributio
earthing
n
board on
complete
wall
for
a)Material
suitable
(Legrand/
477 Supply
of
Nos
for
MCB's
L&T/GE/S
12
Way
in
sheet
359 Supply
Nos
eimens)of
TPN
DB
steel
125A
4
10KA-6Nos
Horizontal
enclosure
Pole
32A
range
b)Labour
with
IP
43
fixed
on
MCCB
SP
MCBs/
charges:
Protection
suitable
Skilled
day
Confirms
(itemof
makes
angle
iron
Electrician
to
Semi
day
126,pageL
& T
frame
with/
IS:13947
Skilled
8,MDS
Helpers
day
Legrand
125A
having 4P/
Electrician
Legrend)
GE
/
MCCB
Breaking
ELECSiemens
1no
as/
Capacity
#REF!
#REF!
2.9.1
Schneider.
incomerKA
25
ELECand
Panel 36
2.12.26
No.s
Mounted632A
SP
of makes
MCCB's
L
& T / /
as
GE
/
outgoers
Schneider.
including
ELECall
2.8.6
connectio
ns cable
entry box.
testing
and
earthing
complete
1
1
24
6,970.00
1,355.00
184
6970
1355
4416
0.5
1
258.00
237.00
129
237
237.00
237
603
1
1
36
5026
7980
184
5026
7980
6624
0.5
1
1
258.00
237.00
237.00
129
237
237
20233
#REF!
20233
#REF!
NAME OF WORK : PROPOSED FARMERS HOSTEL FOR KVK AT PANDIRIMAMIDI, EAST GODAVARI DIST.
ELECTRICAL DATA:
Sno.
Description
Unit
Qty
Rate
1.00
1010.00
0.34
1.00
0.34
224.00
206.00
170.00
(FINOLEX/ANCHOR/POLYCAB)
Taking output=100 M
a)Material
Supply of 2 Pair telephone wire of makes Gold Medal /
Million / Payal / Sun Light / Power Flex.ELEC-7.1.1
b)Labour charges:
Skilled Electrician
Semi Skilled Electrician
Helpers
VAT@4%
100 M
day
day
day
0
1349.96
100 M
day
day
day
0
1.00
1700.00
0.34
1.00
0.34
224.00
206.00
170.00
2039.96
1 Each
(+)
1.00
0.00
2300.00
etc.,
complete.
For
A.C.
(ABB
LEGRAND / L&T)
a)Material
Supply of 20A SP Plug and Socket in SS enclosure
of makes L & T / Legrand / GE / Siemens /
Schneider. ELEC-2.93.36
Supply of 6-32A 10KA SP MCB ISI Mark of make L
& T / Legrand / GE / Siemens / Schneider.ELEC2.9.1
b)Labour charges:
Skilled Electrician
Semi Skilled Electrician
Helpers
VAT@ 4%
Nos
1.00
818.00
Nos
1.00
184.00
Nos
Nos
Nos
0.25
0.25
0.25
224.00
206.00
170.00
1152.00
(Legrand/L&T/GE/Seimens)
Taking output=each
a)Material
8way TPN D.B with IP-42 protection(MD) suitable
for
3
phase
ELCB/RCCB/FP
Isolator
as
incommer(item-167,page-11,Havells)ELEC-2.93.3
63A 3pole MCB /ELCB/RCCB(item-146,page-9,M
DS Legrend) ELEC-2.9.6
10KA-6-32A range SP MCBs (item-126,page8,MDS Legrend) ELEC-2.9.1
b)Labour charges:
Skilled Electrician
Semi Skilled Electrician
Helpers
Rate per each
VAT @4%
Each
1.00
6833.00
Each
1.00
1328.00
Each
24.00
184.00
0.50
1.00
1.00
224.00
206.00
170.00
day
day
day
0.00 13065.00
(Legrand/L&T/GE/Seimens)
a)Material
Supply of 12 Way TPN DB Horizontal with IP 43
Protection of makes L & T / Legrand / GE /
Siemens / Schneider. ELEC-2.93.24
Supply of 125A 4 Pole MCCB / Confirms to
IS:13947 having Breaking Capacity 25 KA Panel
Mounted of makes L & T / / GE / Schneider.ELEC2.8.6
10KA-6-32A range SP MCBs (item-126,page8,MDS Legrend) ELEC-2.9.1
b)Labour charges:
Skilled Electrician
Semi Skilled Electrician
Helpers
Add MA @ 20%
Sundries such as TW plugs,Screw cement etc.,
Nos
1.00
4927.00
Nos
1.00
7900.00
Nos
36.00
184.00
day
day
day
%
0.50
1.00
1.00
20.00
224.00
206.00
170.00
488.00
(+)
0.00
Each
1.00
17.00
Each
1.00
10.00
0.05
0.05
20.00
224.00
170.00
19.70
(+)
(+)
0.00
0.00
VAT
4.4.8 Supply and fixing of batten holder / slanting
holder in lieu of ceiling rose of light point
complete with all connections and all labour
charges with 40W bulb (for new installation).
Taking Output = each
a)Material
Supply of Pendent Holder / Adopter of makes
Anchor / Gold Medal Olive / Million Zoom / Vimal
opel / Maru Montero / Sunlight Power ELEC-1.7.17
40W bulb (MR)
b)Labour charges:
Skilled Electrician
Helpers
Add MA @ 20%
VAT
Add Overheads & Contractor profit @14 %
day
day
%
Amount
1010.00
76.16
206.00
57.80
1349.96
0.00
1349.96
13.50
1700.00
76.16
206.00
57.80
2039.96
0.00
2039.96
20.40
2300.00
2300.00
0.00
2300.00
818.00
184.00
1002.00
56.00
51.50
42.50
1152.00
0.00
1152.00
6833.00
1328.00
4416.00
12577.00
112.00
206.00
170.00
13065.00
0.00
13065.00
4927.00
7900.00
6624.00
112.00
206.00
170.00
97.60
0.00
19939.00
797.56
20736.56
17.00
17.00
10.00
11.20
8.50
3.94
46.70
1.87
6.54
55.11
1 Darsi