Cabinet Committee on Investment

S.No

Project Name
377 North Karanpura TPP (3*660 MW) NTPC
54 Sterlite Energy U-1,2,3,4 4X600 MW

Ministry-Department
Power
Power

303 Mumbai Airport New Terminal

Civil Aviation

326 Talwandi Sabo Power Limited

Power

55 Adani Mundra TPP Ph III, U-1,2,3 3X600 MW

Power

68 Talwandi Sabo U-1,2,3 3X660 MW

Power

71 Sipat U-1,2,3, 3X660 MW

Power

73 Bara TPS U-1,2,3 3X660 MW

Power

320 4x360 MW Uchhpinda Power Project

66 Damodaran Sanjeeviah U-1,2, 2X800 MW

Power

Power

272 Lanco Amarkantak Power Ltd

Power

78 Vallur TPP U-1,2,3 3X500 MW

Power

82 Indira gandhi Aravali/Jhajjar U-1,2,3, 3X500


MW
262 Utkal Alumina International Ltd. ( A Subsidiary
of Hindalco Industries Ltd.)

Power
Mines

91 Nabha U-1,2, 2X700 MW

Power

89 Painampuram U-1,2, 2X660 MW

Power

115 Jhajjar Power Limited 2X660 MW

Power

62 Raghunathpur TPS U-1,2 2X600 MW

Power

74 Rajiv Gandhi TPS U-1,2 , 2X600 MW

Power

90 North Chennai U-1,2, 2X600 MW

Power

92 Anuppur U-1,2, 2X600 MW

Power

101 Shree Singaji (Malwa) TPP U-1,2 2X600 MW

Power

110 Lanco Anpara U-1&2, 2X600 MW

Power

116 Rosa TPP 4X300 MW

Power

80 Vizag TPP U-1,2, 2X540 MW

Power

81 Nasik TPP U-1,2,3,4 4X270 MW

Power

59 Marwa U-1 and 2, 2X500 MW

Power

61 Marwa TPS U-1,2 2X500 MW

Chemicals and Fertilizers Chemicals and


Petrochemicals

63 Tuticorin U-1,2 2X500 MW

Power

69 Rihand TPP U-5,6 2X500 MW

Power

70 Vindhyachal U-11,12 2X500 MW

Power

79 Durgapur Steel TPP U-1,2, 2X500 MW

Power

85 Mauda U-1,2, 2X500 MW

Power

96 Bhusawal U-4,5, 2X500 MW

Power

102 Korba West TPP III U-5 & 7, 2X500 MW

Power

114 Harduaganj TPP U-8 & 9, 2X250 MW

Power

86 Dadri U-5,6, 2X490 MW

Power

318 Coal based Power Project at Tuticorin

Coal

292 Lumding-Silchar(482Km) gauge Conversion

Railways

174 Korba West Power Company Limited Phase-1


1x600MW

Power

340 SKS Power Generation (Chhattisgarh) Ltd

Power

173 Jhabua Power Limited Phase-1 1x600 MW

Power

77 Ind Bharat TPP U-1,2 2X350 MW

Power

145 Forest Clearance for Mining Renewal for 122.18 Commerce and Industryha Forest Land-Project of Ambuja Cements at
DIPP
Darlaghat, Tehsil Arki, Dist. Solan, Himachal
Pradesh

341 DB Power Limited

Power

342 Haldia Energy Limited

Power

83 Barh TPP, U-1 , 660 MW

Power

94 EMCO Warora U-1, 2 , 2X300 MW

Power

100 Derang TPP U-1, Jindal, 600 MW

Power

105 Mettur Ext U-1, 600 MW

Power

379 Raghunathpur TPP U-1 (600 MW) DVC

Power

347 Jhabua Power Ltd

Power

348 Korba West Power Co. Ltd

Power

103 Wardha warora, U-1-4, 4X135

Power

57 Ukai TPP, Unit-6, 500 MW

Power

58 Bellary TPS, U-2, 500 MW

Power

64 Bhilai JV U-1,2 2X 250 MW

Power

65 Bokaro TPP A Exp U-1 500 MW

Power

72 Nabinagar TPP U-1,2 2X250 MW

Power

84 Bongaigaon U-1,2, 2X250 MW

Power

87 Kahalgaon U-7, 500 MW

Power

88 Farakka U-6, 500 MW

Power

95 Anpara D- Unit I & II, 500 MW

Power

97 Khaper Kheda U-5, 500 MW

Power

104 Satpura U -10, 11, 2X250 MW

Power

106 Dr. N. Tata Rao TPP-IV, 500 MW

Power

107 Kothagudam-Stage VI, 500 MW

Power

108 Paricha Exts. U-5&6, 2X250 MW

Power

308 Bhairabi-Sarang new railway line

Railways

67 Muzaffarpur Ext. U-3, 4, 2X195 MW

Power

366 Khadia OC

Coal

267 Nagai Power Pvt. Ltd.

Power

353 Maruti Clean Coal and Power Limited

Power

378 BPCL Project - Installation of Integrated Crude


and Vacuum distillation units

Petroleum and Natural Gas

75 Bela U-1, 270 MW

Power

239 Loktak Downstream HEP

Power

358 BSCPL Aurang Tollway Ltd.

Road Transport and


Highways
Coal

367 Moonidih XV Seam UG


360 OCL Iron & Steel Ltd. -Integrated steel
manufacturing expansion plant

Steel

234 Essel Ahmedabad Godhra Toll Roads Limited

Road Transport and


Highways

361 Ashoka Cuttack Angul Tollway Pvt Ltd

Road Transport and


Highways

285 SHREE SIDHBALI ISPAT LTD.

Steel

363 Vandana Ispat Limited

Steel

112 Kota TPP U-7 1X195 MW

Power

359 Supreme Panvel Indapur Tollways Private


Limited
313 Development of Haldia Dock-II (South)

Road Transport and


Highways
Shipping

314 Development of Haldia Dock-II (North)

Shipping

56 Parli U-8, 250 MW

Power

93 Raichur U-8, , 250 MW

Power

98 Paras Ext U-2, 250 MW

Power

99 New Parli U-2, 250 MW

Power

109 Budge Budge U-3, 1X250 MW

Power

113 Suratgarh TPP, U-6 1X250 MW

Power

291 Salka Road-Anupur Doubling

Railways

117 Bajaj Energy P Ltd Utraula

Power

118 Bajaj Energy Pvt Ltd, Kundarki

Power

119 Bajaj Energy Pvt Ltd

Power

120 Bajaj Energy P Ltd

Power

121 Bajaj Energy Pvt Ltd

Power

38 Penganga OC

Coal

152 MANIKPUR OC

Coal

111 Chabra TPP, U-1 & 2 , 2X250 MW


25 Basundhra (W) - OCP

257 IOCL Project - New Marketing Terminal at


Eastern Sector Refinery, Paradeep (Orissa)

Power
Coal

Petroleum and Natural Gas

22 Dhuptala OC

Coal

23 Jamunia UG

Coal

12 HBI UG (Hirakhand Bundia)

Coal

204 Providing rail connectivity to the existing Tuna


Creek -Rail Connectivity Project for Kandla Port

Shipping

21 Jharkhand OC

Coal

35 Tetariakhar OCP

Coal

271 IOCL Project-POL Tap Off Point (ToP) at Jatni in


Odisha

9 Lajkura

Petroleum and Natural Gas

Coal

32 Inder UG to OC

Coal

36 Ara-Sarubera GoM

Coal

11 Samleshwari Expansion OC

Coal

37 Ray-Bachara-UG

Coal

10 Belpahar OCP

Coal

143 Coal To liquids Project - Jindal Synfuels Limited

Petroleum and Natural Gas

153 Raigarh Expansion Project

Steel

172 Tilaiya Ultra Mega Power Project

Power

190 Essar Steel India Ltd - Hazira, Gujarat

Steel

193 JSPL Patratu Steel Project

Steel

290 JSW Steel Ltd Jharkahd

Steel

385 IOCL Project - Paradip Refinery,


Abhyachandrapur

Petroleum and Natural Gas

195 JSPL Angul Steel Project

Steel

369 Jindal Steel & Power

Steel

243 Exploration and production of Hydrocarbons in


Rajasthan (RJ-ON-90/1 block)

Petroleum and Natural Gas

176 Sasan Ultra Mega Power Project (SUMPP)

Power

302 Etalin Hydro Electric Project (3097 MW)

Power

210 Essar Steel India Ltd - Odisha Complex

Steel

211 Essar Steel India Ltd - Odisha Complex

Steel

305 Expansion of Dolvi Steel Plant Capacity from 3


MTPA to 5 MTPA

Steel

311 Akaltara TPP of KSK Mahanadi Power Company


Limited

Power

309 Expansion of JSW Vijaynagar Steel Plant


capacity from 10 MTPA to 16 MTPA

Steel

161 MUMBAI SEZ LTD

Commerce and Industry Commerce

198 Indiabulls Multi Product SEZ

Commerce and Industry Commerce

282 2X600 MW Tamnar Power Plant

Power

263 Aditya Aluminium Smelter of Hindalco Industries Mines


Ltd.

49 2640 MW Mundra TPP Ph I - 4 x 330 MW & II 2 x 660 MW

Power

171 2000MW coal based Expansion Project at


SUMPP site-Sasan Power Limited

Power

383 MRPL Project - Phase - III Refinery Project,


Mangalore

Petroleum and Natural Gas

325 Lalitpur Power Generation Co Ltd

Power

304 Subansiri Lower HE Project

Power

288 Prayagraj Power Generation Company Limited

Power

264 Mahan Aluminium Project of Hindalco Industries Mines


Limited

177 Samalkot Power Limited

Power

159 Essar Power Jharkhand Ltd

Power

317 Electrosteel Steels Limited

Steel

60 VISA Steel Limited, Chhattisgarh

327 Jindal India Thermal Power

40 GSPC Project - Deendayal (West) Field


Development Project

Steel

Power

Petroleum and Natural Gas

247 Multi-product Special Economic Zone at Mundra, Commerce and Industry Adani Ports and Special Economic Zone Ltd.
Commerce

280 Coal Mine and Thermal Power Plant

Power

52 Integrated Stainless Steel

Steel

5 R.K.M Powergen Pvt. Ltd.

Power

294 SAGAR SUPER THERMAL POWER PROJECT

Power

328 GMR Chhattisgarh Energy Limited

Power

255 GAIL Project - Jagdishpur - Haldia Pipeline

Petroleum and Natural Gas

199 1320 MW IPP of Jas Infrastructure & Power


Limited, Banka

45 Mallavaram-Bhilwara-Bhopal-Vijaipur pipeline

Power

Petroleum and Natural Gas

230 1080 (8 x 135) MW, PITHEAD THERMAL POWER Power


PROJECT

329 Adani Power Rajasthan Ltd

6 Nyamjang Chhu HEP

Power

Power

149 Rajhamal Coal Bed Methane

Petroleum and Natural Gas

248 VISA Power Limited

Power

330 Lanco Babandh Power Limited

Power

240 SKS POWER GENERATION CHHATTISGARH


LIMITED

Power

31 Adani Power Maharashtra Ltd

Power

44 (2x660 MW) Shree Singaji Thermal Power


Project (Stage-II), District Khandwa

Power

296 Monnet Ispat and Energy Limited

51 1.Mehsana-Bhatinda Pipeline 2. BhatindaJammu-Srinagar Pipeline

Steel

Petroleum and Natural Gas

228 2X600 MW Stage II - Tamnar Power Plant

Power

332 Navi Mumbai SEZ (NMSEZ)

Commerce and Industry Commerce

333 Adani Power Maharashtra Ltd

Power

284 2x600 MW Singhitarai Thermal Power Project

Power

155 VISA Steel Limited,Odisha

Steel

334 Pipavav Energy Pvt Ltd

Power

122 KVK Nilachal Power Pvt. Ltd.

Power

335 Hinduja National Power Corporation Limited

Power

156 1050 MW Maithon Right Bank Thermal Power


Project at Maithon

Power

144 Essar Power Gujarat Limited

Power

281 Machhakata Coal Project

Power

188 Meenakshi Energy Private Limited

Power

96 LNG Terminal at Mundra

Petroleum and Natural Gas

336 Coastal Energen Pvt. Ltd

Power

189 Essar Steel India Ltd - Vizag Complex

Steel

124 Monnet Power Company Limited 1050 MW IPP


at Malibrahmani, Angul, Orissa

Power

287 Monnet Power Company Limited 1050 MW IPP


at Malibrahmani, Angul, Orissa

Power

123 Bharati Shipyard LImited

Shipping

154 Kakinada Regas Project (by Shell)

Petroleum and Natural Gas

157 SHREE MAHESHWAR HYDEL POWER PROJECT

Power

295 Petronet LNG Project -Gangavaram LNG


Terminal

Petroleum and Natural Gas

301 Attunli Hydro Electric Project (680 MW)

Power

337 NLC Tamil Nadu Power Ltd

Power

338 Essar Power M.P Limited

Power

261 Vedanta Aluminium Limited- Expansion of


Alumina Refinery

Mines

202 540 MW Phase 1 IPP of Corporate Power


Limited

Power

300 ANRAK ALUMINIUM LIMITED

Mines

339 GMR Kamalanga Energy Limited

Power

128 Jiribam-Imphal new line project

Railways

170 Butibori Power Project

Power

130 Byrnihat-Shillong new line project

Railways

175 1x800MW Extn Uni-8 Wanakbori TPS

Power

299 Monnet Ispat and Energy Limited

Steel

160 Gupta Energy P Ltd Thermal Power project 660 Power


MW

371 Vishnugad Pipalkoti Hydro Electric project 444


MW

Power

147 Talchir Coal Bed Methane

Petroleum and Natural Gas

148 Sohagpur Coal Bed Methane

Petroleum and Natural Gas

150 Raniganj Coal Bed Methane

Petroleum and Natural Gas

158 2x270 MW GVK Power (Goindwal Sahib)


Limited

Power

273 UCM Coal Company Limited -Chendipada &


Chendipada-II Coal Mine Project

Power

321 Mega Project, Pulp & Paper. Village Sarapaka,


Khammam Distt. AP

Commerce and IndustryDIPP

131 Sivok-Rangpo new line project

Railways

185 Six laning of Varanasi-Aurangabad section of


NH2 from Km 786.000 to Km 978.000 in the
state of Uttar Pradesh and Bihar on Design,
Build, Finance, Operate and Transfer Toll basis
under NHDP-V

Road Transport and


Highways

343 TRIL Infopark Ltd

Commerce and Industry Commerce

344 GMR Rajahmundry Energy Limited

Power

345 DB Power Ltd

Power

245 Pakri-Barwadih Coal Block

Power

319 TPS-II EXPANSION (2 X 250 MW)

Coal

4 GAIL Project- KKBMPL

Petroleum and Natural Gas

7 To augment the iron ore production capacity of


Gua Iron Ore Mine of SAIL from 2.4 MT to 10
MT including installation of Beneficiation and
Pellet Plant facilities at Gua, Jharkhand.

Steel

146 Ib Valley Coal Bed Methane

Petroleum and Natural Gas

307 Bhanupalli-Bilaspur-Beri new railway line


project
167 Koderma-Ranchi new line project

Railways

384 Pipeline-Kochi-Koottanad-Bangalore-Mangalore
Phase II

Petroleum and Natural Gas

Railways

50 Surana Power Limited (SPL) 2 x 210 MW Coal Power


Based Thermal Power Plant

268 Cairn India Project - MDPL Project Phase-II


(Salaya to Bhogat Pipeline Project)

Petroleum and Natural Gas

349 TRN Energy Pvt Ltd

Power

76 Hazira, Near well no 7, Via Surat, District Hazira Petroleum and Natural Gas
394 270 capacity expansion of existing LNG
Terminal 5 MMTPA to 10 MMTPA

310 Jayaswal Neco Industries Limited

Steel

365 Gevra OC

Coal

133 Joka-BBD Bag new metro project

Railways

241 Talaipalli Coal Block

Power

136 L&T East West Tollway Ltd

Road Transport and


Highways

42 Vijaydurg Ports Pvt Ltd

Shipping

53 Chandrapura U-7,8 2X250 MW

Power

192 Bhupdevpur-Korichapar-Dharamjaigarh

Coal

236 2*300 MW Thermal Power Plant BHARAT


ALUMINUM COMPANY LIMITED

Power

246 JSW Jaigarh Port Ltd.

Shipping

380 Mejia TPP (Unit 8) DVC

Power

47 Kameng Hydro Electric Project

Power

141 Andhra Pradesh Paper Mills Limited

Commerce and IndustryDIPP

260 Establishment of 400,000 tpa copper Smelter


and 250,000 MT pa Phosphoric Acid Plant

Mines

322 Shree Cement Ltd, Farhatabad Project, Distt.


Gulbarga, Karnataka

Commerce and IndustryDIPP

132 Neopara-Barasat via Bimanbonder metro


project

Railways

139 Beawar Pali Pindwara Tollway

Road Transport and


Highways

235 ONGC Project - Assam renewal Project ( Group- Petroleum and Natural Gas
A)

168 Tori-Shivpur-Kathutia new line project

Railways

316 Tori-Shivpur -Kathautia New BG Rail Line

Coal

375 Six-Laning of Aurangabad-Barwa Adda

Road Transport and


Highways
Steel

169 0.4 MTPA DRI Plant + 30 MW Power Plant of


Corporate Ispat Alloys Limited

2 HEO HEP - 240 MW

186 DAP fertilizer complex of 0.5 million tons per


annum by Hindustan Zinc Limited (HZL)

Power

Chemicals and Fertilizers Fertilizers

266 Kattupalli Port

Shipping

297 Bhopal Dhule Transmission Company Limited

Power

200 Pune-Satara Toll Road

Road Transport and


Highways

137 L&T Great Eastern Highways Limited

Road Transport and


Highways
Coal

26 Dipka OC

46 OIL Project - Integrated Crude Oil and Gas Field Petroleum and Natural Gas
Development project in Upper Assam districts.

3 Tato-1 HEP - 186 MW

370 Expansion of Malanjkhand Copper Project

Power

Mines

39 Alewadi Port

Shipping

125 Bangalore-Satyamangla new line via Kanakpura Railways

386 IOCL Project-Paradip-Raipur-Ranchi Pipeline

Petroleum and Natural Gas

229 Ideal Energy Projects Limited

Power

351 Khed Economic Infrastructure Pvt. Ltd.

Commerce and Industry Commerce

237 4 x 61.50 MW IPP of Abhijeet MADC Nagpur


Energy Private Limited

Power

346 Pink City Expressways Ltd (6-laning of Gurgaon- Road Transport and
Kotputli- Jaipur section of NH-8)
Highways
126 New Moynagudi-Jogigopa new line project

Railways

209 Elevated four lane link road from Chennai Port


and NH4 at Maduravoyal

Shipping

373 New 4-Lane Elevated Road from Chennai Port - Road Transport and
Maduravoyal
Highways
201 300 MW Kaizen Power Limited
Power

197 OPGS POWER GUJARAT PRIVATE LIMITED

Power

129 Hubli-Ankola new line project

Railways

381 IOCL Project - Debottlenecking of the existing


Salaya Mathura Pipeline (SMPL) system

Petroleum and Natural Gas

352 Bhushan Steel Ltd,CRNO project

Steel

242 Kerandari Coal Block

Power

289 Kamineni Steel & Power India Pvt. Ltd.

Steel

238 Development of Rampia Coal Block and Dip Side Coal


of Rampia

178 GreenField Cement Manufacturing Plant-Dalmia Commerce and IndustryCement Bharat Ltd,
DIPP

179 GreenField Cement Manufacturing Plant- Dalmia Commerce and IndustryCement Bharat Ltd for establishing Green Field DIPP
Cement Manufacturing Plant of 4 MTPA Capacity
in Satna, District of Madhya Pradesh

180 GreenField Cement Manufacturing Plant- Dalmia Commerce and IndustryCement Bharat Ltd for establishing Green Field DIPP
Cement Manufacturing plant of 4 MTPA Capacity
in Chittorgarh, District of Rajasthan

298 Jabalpur Transmission Company Ltd.

Power

324 Shree Cement Ltd, Nawalgarh Project, Tehsil


Nawalgarh, Distt Jhunjhunu (Rajasthan)

Commerce and IndustryDIPP

323 Shree Cement Ltd, Kodla Project Dist Gulbarga, Commerce and IndustryKarnataka
DIPP

278 Dighi Port

Shipping

279 Dighi Port

Shipping

374 Panikholi-Rimoli (Approved Length 106 Km)

Road Transport and


Highways
354 Kannur-Vengalam-Kuttipuram section of NH-17 Road Transport and
(package-I) from km. 148.00 to km. 230.00 on Highways
DBFOT basis

244 Chatti-Bariatu coal block

Power

355 Kannur-Vengalam-Kuttipuram section of NH-17 Road Transport and


(package-II) from km 230.00 to km 3180.00 on Highways
DBFOT basis.
48 Hassan-Bangalore new line project

Railways

212 Lenzing Modi Fibers India Private Limited

Textiles

138 L&T Deccan Tollways Limited

Road Transport and


Highways
Commerce and Industry Commerce

356 IG3 Infra Ltd. (Previously known as Indian


Green Grid Group Ltd.)

357 Adhunik Power & Natural Resources Limited


(APNRL).

Power

162 Angul Sambalpur Toll Road project

Road Transport and


Highways

254 HPCL Project - Rewari Kanpur Pipeline Project


(RKPL) Rajasthan, Haryana and U.P.

Petroleum and Natural Gas

187 GreenFiled Cement manufactureing PlantDalmia Bharat Ltd

Commerce and IndustryDIPP

203 Haridaspur - Paradip Rail Link-Rail Connectivity


Project for Paradip Port

Shipping

350 Oriental Nagpur Byepass Construction Pvt Ltd


(ONBCPL)
184 Baharampore Farakka Highways Ltd

Road Transport and


Highways
Road Transport and
Highways

376 KNT/Kerala Border to Kanuur Section(Approved Road Transport and


Length 286.3)
Highways
127 Agartala-Sabroom new line project

43 Pare HydroElectric Project (110MW) NEEPCO


LTD.

163 Cuttack Angul Tollway Project


306 Dallirajhra-Jagdalpur new railway line

Railways

Power

Road Transport and


Highways
Railways

259 Establishment of 160 MW Coal based Thermal


Power Plant, Allied infrastructure and
Desalination Plant

Power

372 4 Laning of Faraka-Raiganj

Road Transport and


Highways
Road Transport and
Highways

183 Farakka Raiganj Highways Ltd

165 SMC POWER GENERATION LTD

Steel

214 Rly. Line Jharsuguda to Bansudhara

Coal

1 PAUK HEP - 145 MW

Power

286 Salem to Ulundurpet Toll Road

Road Transport and


Highways

368 Sonepur Bazari OC

Coal

382 Four laning of Gwalior-Shivpuri

Road Transport and


Highways
Steel

181 0.4 MTPA DRI Project with 60 MW Power Plant


of Abhijeet Infrastructure Limited

293 jabalpur-Gondia gauge Conversion

362 Hospet Chitradurga Tollways Ltd

Railways

Road Transport and


Highways
140 Four lanning of Sambalpur-BaragarhRoad Transport and
Orissa/Chhatisgarh Border section of NH6 from Highways
km 0.00 to km 88.00 in the state of Orissa to
be executed as BOT (Toll) project on DBFO
pattern under NHDP Phase III Project

142 Four laning of NH-73 from UP/Haryana border,


yamunanagar-saha-panchkula in the state of
Haryana on DBFOT.

66 Trichy-Karur Toll Road

Road Transport and


Highways

Road Transport and


Highways

182 Dell International Services Business Process


Services

Commerce and Industry Commerce

191 1.2 MTPA Beneficiation & Pelletisation Plant of


Abhijeet Integrated Steel Limited (AISL).

Steel

275 Haridaspur-Paradeep new railway line

Railways

312 East North Interconnection

Power

207 4 lane NH Connectivity to ICTT, Vallarpadam


Road Connectivity Project for Cochin Port.

Shipping

265 IOCL Project - Paradip-Haldia-Durgapur LPG


Pipeline

Petroleum and Natural Gas

249 HPCL Project - Resitement of Marketing


Terminals at Visakhapatnam

Petroleum and Natural Gas

276 Talcher-Bimlagarh new railway line

Railways

164 Birmitrapur Barkote Highway project

Road Transport and


Highways
Road Transport and
Highways
Petroleum and Natural Gas

364 Birmitrapur Barkote Highway Pvt Ltd


252 HPCL Project - Mangalore Hassan Mysore Solur
LPG Pipeline Project

194 Jharsuguda- Barpalli-Sardega Railway Line

Coal

216 Hingula OCP

Coal

277 Angul-Sukhinda new line project

Railways

208 Ennore Manali Expressway (EMRIP)-Road


Connectivity Project for Chennai and Ennore
Ports

Shipping

258 GAIL Project -Bawana -Nangal Spurlines


(Uttaranchal & Punjab)

Petroleum and Natural Gas

151 BINA OC

Coal

315 Jharsuguda-Barpalli-Sardega Railway Line (53


Kms)
222 Garjanbahal OCP

Coal

219 Kaniha OCP

Coal

218 MNH Shakti Talabira OCP

Coal

220 Ananta Extn. OCP

Coal

Coal

27 Bharatpur OCP

Coal

221 Bharatpur OCP

Coal

217 MJSJ Coal Gopalprasad

Coal

253 HPCL Project - Construction of New Terminal at


Ennore

Petroleum and Natural Gas

135 Deoband-Roorkee new line project

Railways

8 Manikpur OC

250 HPCL Project - Uran-Chakan/Shikrapur LPG


Pipeline

13 Jhanjra UG

226 Samaleswari OCP

Coal

Petroleum and Natural Gas

Coal

Coal

233 ONGC Project - Upgradation of Konaban GGS & Petroleum and Natural Gas
Pipeline Grid Project (Tripura Asset)

41 OIL Project - 1 No. Gas Turbine of 20 MW


Capacity for Power Station at Duliajan, Assam

Petroleum and Natural Gas

134 Kitcha-Khatima new line project

Railways

223 Orient(U/G) 4

Coal

224 Orient(U/G) 1&2,3 &HRC

Coal

274 Jharsugda-Rengali doubling

Railways

33 Ukni Deep OCP

227 Belpahar OCP

Coal

Coal

205 Dedicated freight link from Wadala to Kurla-Rail Shipping


Connectivity Project for Mumbai Port

206 Four lane road connectivity to NH17-Road


Connectivity Project for Mormugoa Port

Shipping

231 ONGC Project - Construction of 3 ETPsMehsana

Petroleum and Natural Gas

16 Urimari OC

Coal

251 HPCL Project - Awa-Salawas Pipeline Project


(ASPL)

Petroleum and Natural Gas

232 ONGC Project - Sonamura GGS & Pipeline


Project (Tripura Asset)

Petroleum and Natural Gas

256 CPCL- New 42 inch Crude oil pipe line From


Chennai Port to CPCL refinery at Manali

Petroleum and Natural Gas

269 IOCL Project-Cauvery Basin Refinery (CBR)Trichy Pipeline

Petroleum and Natural Gas

270 IOCL Project- POL Tap Off Point (ToP) at Korba


in Chhattisgarh

Petroleum and Natural Gas

24 HBI UG (Hirakhund Bundia)

Chemicals and Fertilizers Chemicals and


Petrochemicals

29 Rohini OC

Coal

215 Nataraj(U/G) Mine

Coal

225 Lajkura OCP

Coal

34 Bhakra UG

Coal

14 Dhanpuri UG

Coal

15 Govinda Meera and Kotma (UG


mine/depillaring)

Coal

213 Kanika Siding

Coal

19 Kedla UG

Coal

20 Kedla OC

Coal

18 Murlidih OCP

Coal

28 Kotma, Govinda and Meera

Coal

30 Kapildhara UG

Coal

31 Chinda OC

Coal

17 Saunda - D

Coal

283 Non signing of State Support Agreement

Road Transport and


Highways

Description Of Projects (As furnished by the applicant)


Restoration of coal linkage by CIL. MoC already issued a letter to this
effect.
Commissioning in 2011-12
Development of new terminal buildings at the existing airport and its
upgradation.
Under Construction. FSA to be signed. In FSA list

Estimated
Investment(in
Crores)

Status
15000 All issues Resolved
12000 All issues Resolved
12000 All issues Resolved
9977 All issues Resolved

Commissioning in 2011-12

9900 All issues Resolved

Commissioning in 2013-14(U-1) 2014-15(U-2,3)

9900 All issues Resolved

Commissioning in 2011-12 (U-1,2) 2012-13(U-3)

9900 All issues Resolved

Commissiong Date- 2014-15

9900 All issues Resolved

4x360 MW domestic coal based power plant being established at


Chhattisgarh in two phases, Phase 1 of 360 MW and Phase 2 of 3x360 MW.
Financial closure of Phase-I was achieved on 24.06.2009 and Phase 2 on
01.09.2010. The scheduled CODs for the four units are Oct 2013, Jan
2014, Apr 2014 and Jul 2014. The Lead FI is Power Finance Corporation
and consortium members are REC, HUDCO, PTC Financial Services, PNB,
Bank of Baroda, Indian Bank, Corporation Bank and Vijaya Bank.

8981 All issues Resolved

Commissioning in 2014-15

8000 All issues Resolved

Phase II - 1320 MW Coal Based project under implementation. Amount


Invested so far Rs. 5837 Crs. More than 75% of the project work is
completed and balance work is in progress

7700 All issues Resolved

Commissioning- 2011-12(u-1) 2012-13(u-2) 2013-14 (u-3)

7500 All issues Resolved

Commissioning- 2010-11 (u-1) 2011-12(u-2), 2012-13 (u-3)

7500 All issues Resolved

1.5 Million MTPA Alumina Refinery Project. 8.5 Million MTPA Bauxite Mine
Project

7009 All issues Resolved

Commissioning- 2013-14(U-1), 2014-15(U-2)

7000 All issues Resolved

Commissioning- 2014-15(u-1) 2014-15(U-2)

6600 All issues Resolved

Year of Commmissioning- U 1 2011-12 U 2 2012-13

6600 All issues Resolved

Commissioning in 2013-14(u-1) 2014-15(u-2)

6000 All issues Resolved

Commissioning date- 2009-10 (U-1) 2010-11(U-2)

6000 All issues Resolved

Commissioning- 2013-14(u-1) 2012-13 (U-2)

6000 All issues Resolved

Commissioning- 2014-15

6000 All issues Resolved

Commissioning- 2013-14

6000 All issues Resolved

Year of commissioning- 2011-12

6000 All issues Resolved

Year of Commissioning U-1 2009-10 U-2 2010-11 U-3 2011-12 U-4 201112

6000 All issues Resolved

Commissioning- 2013-14 (U-1) 2014-15(U-2)

5400 All issues Resolved

Commissioning- 2013-14 (u-1,2) 2014-15 (u-3,4)

5400 All issues Resolved

Commissioning in 2013-14

5000 All issues Resolved

Commissioning in 2013-14

5000 All issues Resolved

Commissioning in 2013-14(u-1) 2014-15(u-2)

5000 All issues Resolved

Commissionig in 2012-13(U-5) 2013-14(U-6)

5000 All issues Resolved

Commissioning in 2012-13

5000 All issues Resolved

Commissioning- 2011-12(U-2) 2011-12(U-1)

5000 All issues Resolved

Commissioning- 2012-13(U-1) 2012-13 (u-2)

5000 All issues Resolved

Commissioning- 2011-12

5000 All issues Resolved

Commissioning U-5 2012-13 U-7 2010-11

5000 All issues Resolved

Year of Commissioning U-8 2011-12 U-9 2012-13

5000 All issues Resolved

Commissioning- 2009-10(U-5), 2010-11(U-6)

4900 All issues Resolved

Anticipated date of completion of Unit-I 12/2013 and Unit-II 03/2014

4284.55 All issues Resolved

Lumding-Silchar(482Km) Gauge Conversion will provide seamless


connectivity to lower Assam and Tripura, Mizoram and Manipur with rest of
India and is also vital link for new line projects providing rail connectivity to
state capitals in NE region

4255 All issues Resolved

1x600 MW Coal Based Thermal Power Project being implemented in Villages


Bade Bhandar, Chhote Bhandar, Sarvani, Amli Bhouna, Tehsil Pussor,
District Raigarh, Chhattisgarh State

3850 All issues Resolved

600 MW in FSA list approved by CCEA. FSA to be signed. 350 MW linked to


coal block. Balance 250 MW scheduled to commission after March 2015
hence not placed in FSA list.

3787.2 All issues Resolved

1x600 MW Coal based Thermal Power Plant being implemented in Villages


Barela, Gorakhpur, Tehsil Ghansore, District Seoni, Madhya Pradesh State

3550 All issues Resolved

Commissioning- 2013-14(u-1) 2014-15(U-2)

3500 All issues Resolved

Ref. MoEF File No 8-7/2002-FC Our company, Ambuja Cements Limited,


operates two integrated plants viz. Unit-Suli and Unit-Rauri in Himachal
Pradesh with combined capacity of 4.44 mtpa. Suli unit is operational since
1993 and Rauri unit since March, 2010. Limestone explored from our
nearby captive mines is used as raw material in the plants for cement
manufacturing. The clinker produced at these two plants, large quantities
are transported to the grinding units at Ropar, Bhatinda, Roorkee, Nalagarh
and a little to Dadri for manufacturing cement. The total cement
manufacturing of these five grinding units is approximately 7 million
tonnes. The investment is Rs.3500 crores or above. We were granted
Forest Clearance in 1992, subsequently renewed in 2002 and is due for
regular renewal which is being held up for quite some time inspite of our
having complied with all the requisite requirements. We applied in time for
renewal of the Forest Clearance at the time of mining renew

3500 All issues Resolved

One unit in FSA list approved by CCEA. FSA to be signed by MoC.

3440 All issues Resolved

Under construction. FSA to be signed. In FSA list approved by CCEA.

3408 All issues Resolved

Commissioning- 2014-15

3300 All issues Resolved

Commissioning- 2012-13 (U-1) 2013-14 (U-2)

3000 All issues Resolved

Commissioning - 2013-14

3000 All issues Resolved

Commissioning- 2012-13

3000 All issues Resolved

In FSA list approved by CCEA. FSA to be signed.

3000 All issues Resolved

Under Construction. In FSA list approved by CCEA. FSA to be signed.

2910 All issues Resolved

Under construction. In FSA list approved by CCEA. FSA to be signed

2872 All issues Resolved

Commissioning- U-1-3- 2010-11 U-4- 2011-12

2700 All issues Resolved

Project Commissioned

2500 All issues Resolved

Project Commissioned

2500 All issues Resolved

Commissioning in 2009-10

2500 All issues Resolved

Commissioning in 2014-15

2500 All issues Resolved

Commissioning in 2014-15

2500 All issues Resolved

Commissioning- 2014-15

2500 All issues Resolved

Commissioning- 2009-10

2500 All issues Resolved

Commissioning- 2010-11

2500 All issues Resolved

Commissioning- 2014-15

2500 All issues Resolved

Commissioning- 2011-12

2500 All issues Resolved

Commissioning U-10- 2012-13 U-11- 2013-14

2500 All issues Resolved

Commissioning- 2009-10

2500 All issues Resolved

Year of Commissioning- 2011-12

2500 All issues Resolved

Year of Commissioning- 2012-13

2500 All issues Resolved

Construction of 51.38 Km new B.G railway line from Bhairabi to Sarang for
providing connectivity to state capital of Mizoram.
Commissioning in 2013-14(u-1) 2014-15(u-2)

2293.48 All issues Resolved

1950 All issues Resolved

Khadia OC

1720.03 All issues Resolved

Promoted by KVK Energy & Infrastructure Pvt. Ltd., Nagai Power Private
Limited (NPPL) is a special purpose vehicle (SPV) implementing a 300 MW
(2 x 150 MW) Coal based thermal Power Plant in Okkur & Venkidanthangal
Village, Nagapattinam District, Tamil Nadu in two phases viz. Phase I of
150 MW and Phase II of 150 MW. The projects are implemented at a total
cost of Rs.1523.64 cr. Phase I will achieve COD by 1st October 2014 and
Phase II will achieve COD in about 24 months from the date of initial
disbursement

1523.64 All issues Resolved

Under Construction. In FSA list approved by CCEA. FSA to be signed.

1456 All issues Resolved

Installation of new state of the art Integrated Crude and Vacuum distillation
units of capacity 6.0 MMTPA with 30 percent design margin as a
replacement of old Crude and Vacuum units of BPCL. Overall Progress
achieved 26 percent. Engineering, Procurement and construction activities
are in progress.

1419 All issues Resolved

commissioning- 2012-13

1350 All issues Resolved

Loktak Downstream HEP (66MW)is a JV project between NHPC (CPSU) and


Govt. of Manipur. The estimated cost of the project is Rs. 1350 crores (Dec
12 PL). The project has been accorded environment clearance and Stage-I
Forest Clearance.

1350 All issues Resolved

Four laning under NHDP Phase-IV being constructed by BSCPL


Infrastructure Ltd.
Moonidih XV Seam UG

1232 All issues Resolved

4x1000 TPD DRI Induction Furnace 2x12 TPD 14 MW Captive Power Plant
(CPP) Planning to expand their existing DRI plant into an Integrated Steel
Plant.

1190 All issues Resolved

Four Laning of Ahmedabad to Godhra section of NH-59 from km.4+200 to


km. 122+420 in the state of Gujarat on DBFOT basis under NHDP Phase
III (Package -1)

1155.4 All issues Resolved

Four laning under NHDP Phase-III

1230 All issues Resolved

1123.69 All issues Resolved

Shri Sidhbali Ispat Ltd. an integrated Steel Plant with Captive Power Plant
having proposed capacity of 1 Million tone steel (0.3 million tone first phase
with 20 MW CPP (12.8 MW CFBC + 7.2 MW WHR) already installed during
2010 and construction of second phase of 0.7 million tone steel and 35 MW
Captive Power Plant is on. The total cost of project is Rs.1050 Crore (300
Crores in first phase already commissioned and work of second phase is
going on) Captive Power Plant of 20 MW (12.8 MW CFBC and 7.2 MW WHR)
was commissioned on 11.10.2010. SLC (Long Term) for linkage approved
our case for issuing LOA for 12 MW in its meeting held on 18/01/2007. LOA
was issued by WCL and stipulated milestones were achieved within the LOA
period. On commissioning of plant (CPP) the capacity was slightly higher,
which was accepted by Ministry of Coal in its order dated 5th Aug 2010.
Inspite of approval by MOC the officials of WCL was not signing the FSA.
The matter was placed in the review committee (SLC-L

1050 All issues Resolved

Iron and Steel Project. Environmental Clearance obtained. RTC issued by


Ministry of Railways. Purchased 245 Acres of land, 5 McM Water Resources
approved.

1019 All issues Resolved

Year of commissioning- 2009-10


Four laning under NHDP Phase-III being constructed by Supreme Infra.
Devl. Projects. Ltd.
Development of Haldia Dock-II (South)
Development of Haldia Dock-II (North)

975 All issues Resolved


942.69 All issues Resolved
886.1 All issues Resolved
821.4 All issues Resolved

Commissioning in 2013-14

750 All issues Resolved

commissioning- 2010-11

750 All issues Resolved

Commissioning- 2009-10

750 All issues Resolved

Commissioning- 2009-10

750 All issues Resolved

Year of commissioning- 2009-10

750 All issues Resolved

Year of commissioning- 2009-10

750 All issues Resolved

Salka Road-Anupur is part of Bilaspur-Katni section and is the only single


line portion on this route. This section is very important for movement of
coal and steel from Chhatisgarh to North India.

568 All issues Resolved

Year of commissioning -2011-12

450 All issues Resolved

Year of Commissioning- 2011-12

450 All issues Resolved

Year of Commissioning- 2011

450 All issues Resolved

Maqsoodpur , UP Year of commissioning- 2011-12

450 All issues Resolved

Year of Commissioning-2011-12

450 All issues Resolved

Penganga OC - WCL This is a coal mining project submitted for


Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20/02/2013.
MANIKPUR OC - SOUTH EASTERN COALFIELDS LIMITED

339.77 All issues Resolved

321.5 All issues Resolved

Year of commissioning U-1 2009-10 U-2 2010-11

250 All issues Resolved

Basundhra (W) - OCP - MCL This is a coal mining project submitted for
Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

223.06 All issues Resolved

Evacuation of New Refinery by Rail / Road. 69 percent complete - Terminal


Tankage and Piping nearing completion. Approval of DPR for Railway siding
pending with Railways.

199.75 All issues Resolved

Dhuptala OC -WCL This is a coal mining project submitted for Environment


Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

194.11 All issues Resolved

Jamunia UG -WCL This is a coal mining project submitted for Environment


Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

127.52 All issues Resolved

HBI UG (Hirakhand Bundia) MCL This is a coal mining project submitted for
Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

105.78 All issues Resolved

Providing rail connectivity to the existing Tuna Creek-Rail Connectivity


Project for Kandla Port

Jharkhand OC -CCL This is a coal mining project submitted for Stage-II


Forest Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013
Tetariakhar OCP - CCL This is a coal mining project submitted for
Environment Clearance. This project is part of CCI Note vide Case
No.4/CCinvest/2013 dated 20-02-2013
Overall Physical Progress achieved is 5.5 percent. Major construction
activities could be taken up after Environment Clearance All major
materials received at site. Pipeline laying is in progress. Compliance of
conditions imposed in 1st stage Forest Clearance in progress for obtaining
2nd stage Forest Clearance. Delay in 2nd stage Forest clearance in Odisha
and Jharkhand. Scheduled completion and Anticipated completion dates to
be assessed after receipt of Statutory clearances.

94 All issues Resolved

91.08 All issues Resolved

78.6 All issues Resolved

67 All issues Resolved

Lajkura - MCL This is a coal mining project submitted for Environment


Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

43.27 All issues Resolved

Inder UG to OC-WCL This is a coal mining project submitted for


Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

38.23 All issues Resolved

Ara-Sarubera GoM -CCL This is a coal mining project submitted for


Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

37.13 All issues Resolved

Samleshwari Expansion OC - MCL This is a coal mining project submitted


for Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

27.82 All issues Resolved

Ray-Bachara-UG -CCL This is a coal mining project submitted for


Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20/02/2013.

18 All issues Resolved

Belpahar OCP - MCL This is a coal mining project submitted for


Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

14.41 All issues Resolved

The Coal To Liquids Project is being set up by Jindal Synfuels Limited which
involves Gasfication of Coal To Raw SynGas, Purifictaion of Raw Syngas,
Conversion of Purified Raw Syngas to Synthetic Crude and finally upgrading
the synthetic Crude in Refining Units to get Petroleum Products. The
Products will be primarily Diesel and Naphtha. The Project will produce
80,000 barrels per day of Liquids Fuels equivalent to 4 MMTPA of Diesel and
Naphtha.

77450 Pending

Expansion of existing steel capacity at Raigarh, Chhattisgarh by addition of


7 MTPA Integrated Steel plant with 1320 MW CPP.

42345 Pending

Jharkhand Integrated Power limited, a Special Purpose Vehicle (SPV) and a


wholly owned subsidiary of Reliance Power is implementing 4000 MW Tilaiya
Ultra Mega Power Project (TUMPP) based on Super Critical Technology at
Tilaiya Village, Hazaribagh District, Jharkhand. Tilaiya UMPP is fourth in the
series of nine UMPPs of 4000 MW capacity each at coal mine pit-head and
coastal locations across the country. These projects are being developed
under the UMPP policy of Govt. of India. The project was awarded through
the International Competitive Bidding (ICB) Process based on lowest
levelised tariff for 25 Years. The entire Capacity from the Project has been
contracted to 18 distribution companies across 10 States for a term of 25
years. Ministry of Coal, Govt of India, has allocated Kerendari BC coal
mines for TUMPP. The project is in development phase land and acquisition
is in progress.

40000 Pending

Integrated Steel plant in Gujarat comprising of Iron &steel mills, associated


downstream facilities, including a cold rolling mill, a galvanising facility, an
extra-wide plate mill and a pipe mill. Employment Direct & Indirect
30,000.

37500 Pending

6 Million Tons per annum integrated steel Plant with 1320 MW CPP 1 Million
ton per year capacity Bar Mill and 0.6 Million ton per year capacity wire rod
mill are already under production.

37367 Pending

10 MTPA Green Field Integrated Steel Plant and 800 MW Captive Power
Plant, ML granted by State Goverment. Allocated Iron Ore and Manganese
Mine at Ankua and Rohne Coking Coal Block.Purchase 378 Ac private land.

35000 Pending

15 MMTPA Refinery to meet projected petroleum deficit in Easteren India.


Overall Progress achieved - 93.2 percent. Construction works is in progress.

29777 Pending

6 Milion Ton per annnum Steel Plant with 1142 MW CPP in two Phases

29285 Pending

6 MTPA Integrated Steel Plant & 900 MW Captive Power Plant (CPP). Major
activites of 2 MTPA Steel Plant completed. Major part of land i.e, 4147 Ac
out of 4332 Ac acquired. Operations of 1.5 MTPA Plate Mill started. 540 MW
CPP commissioned. Work for setting up balance 4 MTPA Steel Plant is in full
swing.

29285 Pending

The Rajasthan project (RJ-ON-90/1 block) is a National Asset. The project


is a joint venture between Cairn India and ONGC. The Rajasthan block
produces about 175,000 barrels of oil per day, thereby contributing about
23 percent to the domestic crude production. Every year this single asset
enables reduction in nations crude oil import bill to the extent of about INR
32,000 crore and contributes about INR 13,000 crore to the government.
To date, more than 40 discoveries have been made in the Rajasthan block.
This world-class asset has the potential to support 300,000 barrels of
production per day, which would comprise nearly 35 per cent of the current
domestic crude oil production. Consequently, it will add about INR 30,000
crore to government revenues and reduce our nations oil import bill by
about about INR 57,000 crore every year. Over 80 percent of the value
generated from the asset accrues to the Government Stakeholders namely,
Government of India, Government of Rajasthan and ONGC.

28000 Pending

3,960 MW Sasan UMPP is the largest integrated power plant with captive
coal mines. It is also the countrys first domestic coal based Ultra Mega
Power Project (UMPP) and will benefit around 35 crore people in seven
states procuring power from the Project. The project is based on
supercritical technology which is more efficient and environment friendly.
The project will supply power at lowest levelized tariff of Rs 1.196/kwh for
PPA tenure of 25 years, thereby contributing significantly to economic
development in the country Construction of the project is in very advance
stage. Power generation from the first unit (660 MW) of the Project
commenced in March 2013. Construction of remaining five Units is also
progressing fast. Sasan UMPP has achieved financial closure and tied up
long term loan facilities with Indian as well as foreign banks / financial
institutions to finance the project on limited recourse basis. The project is
largest recipient of foreign currency loan f

25000 Pending

Etalin Hydro Electric Project is a Run Of the River Hydro Electric Scheme
with an Installed Capacity of 3097 MW. The Project is located on Dri River &
Tangon River in Dibang Valley District of Arunachal Pradesh. The project is
a Green Field development.

24214 Pending

Integrated Steel Plant of 6.0 MTPA at Paradeep,Beneficiation Plant at


Dabuna (10.7 MTPA),Slurry Pipeline from Dabuna to Paradeep (253 km , on
ROW), Pellet Plant at Paradeep (12 MTPA)

22587 Pending

Integrated Steel Plant of 6.0 MTPA at Paradeep, Beneficiation Plant at


Dabuna (10.7 MTPA), Slurry Pipeline from Dabuna to Paradeep (253 km ,
on ROW), Pellet Plant at Paradeep (12 MTPA)

22587 Pending

Expansion from 3.3 MTPA to 10 MTPA

20000 Pending

Green Field coal based Power project of capacity of 6 X 600 MW Nariyara


Village, Akaltara - Tehsil District Janjgir Champa, Chhattisgarh

16190 Pending

Expansion of Brown Field steel plant capacity from 10 MTPA to 16 MTPA

15300 Pending

Acquired Non Contiguous 4600 Acres of Land sand spent Rs. 1800 Crores.
The balance land acquisition will happen only after the new Land Acqusition
Bill is passed by the Parliament.

15000 Pending

Indiabulls SEZ is a Multi-Product SEZ which is being developed over a


notified Industrial Area of 1011.264 Ha at Sinnar in Nashik, Maharashtra.
The Land has been leased from Maharashtra Industrial Development
Corporation for a period of 95 years. The SEZ is proposed to have
Manufacturing Industries from the sectors like Auto and Auto Ancillary,
Aviation and Ancillary, Pharmaceuticals(Formulations), Light Engineering
and Electronics and Electrical.

14650 Pending

2X600 MW Stage I Coal-Based Thermal Power Plant at Tamnar, Dist


Raigarh, Chhattisgarh.
3.59 LTPA Aluminium Smelter with 900 MW ( including 1 standby of 150
MW) Captive Power Plant at Lapanga, District Sambalpur. 20 Million Ton Per
Annum Talabira II & III Coal Mine associated with the above project.
Hindalco ( 15 % share of Coal) has been jointly allocated this Coal Block
with Mahanadi Coalfields ( 70 % share) and Neyveli Lignite( 15 % share)in
district Jharsuguda and Sambalpur in the state of Odisha.

13600 Pending

Adani Power is developing a 4,620 MW TPP at Mundra, Dist Kutchh,


Gujarat. The entire capacity has been commissioned and is operational.
2640 MW Mundra TPP Ph I - 4 x 330 MW and II - 2 x 660 MW
Commissioning dates - U#1 - 04.08.09 U#2 - 17.03.10 U#3 - 02.08.10
U#4 - 20.12.10 U#5 - 26.12.10 U#6 - 20.07.11 Power Supply from U# 1 6 is committed and has commenced under Long Term PPAs of aggregate
2000 MW executed with GUVNL through competitive bidding route.

13167.46 Pending

The 2000 MW coal based thermal power project is being developed by a


Group Company of Reliance Power Limited. The project is located adjacent
to Sasan UMPP site in the State of Madhya Pradesh and is being
implemented by a wholly owned subsidiary of Reliance Power Limited i.e.
Sasan Power Limited. The project would employ super critical technology.

To improve distillate yield by elimination of black oil pool, meet Euro-III and
Euro-IV specification for the entire diesel pool and increase crude
processing capacity from 12 MMTPA to 15 MMTPA. Overall Progress
achieved- 98.8 percent. Mechanical completion achieved for all Units except
for DCU. Further, CDU and VDU, HGU, DHTU and SRU have been
commissioned.

13195 Pending

13000 Pending

12160.24 Pending

3x660 MW project under construction. No coal linkage granted yet by MoC.


This project was discussed in the CCEA meeting held on 21.06.13. Minutes
are awaited.

11848 Pending

Hydro project of 2000 MW on Subansiri River

11000 Pending

Background (a)3 x 600 MW Thermal Power Project was awarded through


Case II bidding process to Jaypee Group. (b)Land Acquisition,
Environmental Approval, Coal Supply and Power Evacuation was the
responsibility of procurer i.e., UPPCL. (c)LOI issued on 2nd March, 2009
(d)SPA signed on 23rd July, 2009

10780 Pending

3.59 LTPA Aluminium Smelter with a 900 MW ( including 1 standby unit of


150 MW) Captive Power Plant. 8.5 MTPA Mahan coal Block jointly allocated
with Essar Power, The Ratio for coal is Hindalco 40 % and Essar 60 %.

10500 Pending

Samalkot Power Limited (SPL) is implementing a 2,400 MW, combined cycle


gas-based thermal power plant at Industrial Development Area of
Peddapuram, Samalkot Mandal, East Godavari District, Andhra Pradesh,
India. Reliance Infrastructure is the EPC Contractor for the Project. It has
tied up with reputed Original Equipment Manufacturers (OEM) such as
General Electric, USA (for Gas Turbines, Steam Turbines & Generators),
CMI-EPTI, USA (for Heat Recovery Steam Generator), Hamon, Belgium (for
Cooling Towers), Hyundai Heavy Industries (for transformers) and Xian
Electric (for Gas Insulated Switchyard). The Samalkot Project requires
about 9.6 million standard cubic meters per day (mmscmd) of Natural gas.
The Project was conceived based on supply of gas from the KGD6 block in
Krishna Godavari basin. SPL entered into Bulk Power Transmission
Agreement (BPTA) with Power Grid Corporation of India Ltd. (PGCIL). As
per the BPTA, the EPC contractor (Reliance Infrastructure) would construct

10000 Pending

Essar Power Jharkhand Limited (EPJL) is implementing an 1800 MW coal


based power project in Latehar, Jharkhand. Phase I (1200 MW) of the
project is expected to be commissioned in 2014-15 based on coal sourced
from the Chakla mine whereas Phase II of 600 MW is based on Ashok
Karkata coal mine. The company has signed PPAs to the tune of 750 MW
net for phase I with BSEB, 12% of power generated under variable cost
regulated tariff with Govt of Jharkhand and 240 MW with Noida Power
Company Ltd from Phase II. The company is also obligated to supply RoFR
power worth 13% of installed capacity from Phase I and II to Govt of
Jharkhand under regulated tariff.

9700 Pending

2.51 MTPA Steel Plant. The project is now ready to commence production
from June 2013. Out of capex debt of Rs.824 crores, Rs.602 crores are
sanctioned and remained Rs.222 crores loan application are pending with
Union Bank- Rs. 150 crore, LIC - Rs. 50 crores and P&S Bank- Rs.35
crores. Due to delay in tying up the shortfall of Rs.222 crores, sanctioned
debt of Rs.602 crores is not being released by the consortium of banks.

9562 Pending

2.50 million Tonnes Per Annum (TPA) Integrated Steel Plant at Village:
Kotmar & Patrapalli of Raigarh Distt., Chhattisgarh as per MoU dated 8th
August 2008 between the Government of Chhattisgarh & Government of
Chhattisgarh. Date of Financial Closure Awaiting grant of Captive Iron Ore
Mining Lease. Expected date of Financial Closure within six months of
securing Iron Ore Mine in Chhattisgarh or Odisha. Implementation Status
Substantial portion of land already acquired. Environmental Clearance
already obtained. Allocation of Water from Sapnai River secured. Schedule
date of completion Three years from the date of Financial Closure
Anticipated date of Completion Three years from the date of Financial
Closure

9349 Pending

2x600 MW. Under construction. One unit have coal linkage and other linked
to coal block. FSA signed for the linkage unit. For Unit-II mining lease
clarification pending with MoC and MoEF st-II clearance pending at State
level.

9121 Pending

Gujarat State Petroleum Corporation Ltd (GSPC) is the operator of the


Deendayal Field (Block KG-OSN/2001/03) situated offshore from the Yanam
Kakinada coast of Andhra Pradesh, India. Field Development Plan (FDP)
for DD-West (DDW) field in KG-OSN-2001/3 block was approved by the
Management Committee in November 2009. Consequently upon approval of
the FDP, GSPC as an Operator has started implementation of the DD-West
Field Development Plan. The Deendayal Field Development Project is
consisting of Well Head Platform (WHP) including drilling of Development
Wells, Process cum Living Quarter Platform (PLQP), laying of offshore
subsea pipeline from WHP to Land Fall Point (LFP), laying of onshore
pipeline from LFP to Onshore Gas Terminal (OGT) and Onshore Gas
Terminal.

9000 Pending

The total area of SEZ is 18000 ha. out of which at present 6641.2784 ha.
area is notified and 1840 ha. area is under notification. Environmental
Impact Assessment including Environment Management Plan & Risk
Assessment is carried out for total area of 18000 ha. The Multi product SEZ
at Mundra comprising of Road Network, Rail Network, IT-Telecommunication
network, Electrical Network, Water supply, conservation & drainage
Network, River Training, Desalination Plant with proposed intake & outfall
locations, Common Effluent Treatment Plant & Sewage Treatment Plant,
Natural Gas line network, Social Infrastructure, Existing Airstrip & Waste
Management & Disposal site. The Environmental Clearance for associated
Water Front Development Plan have been obtained from MoEF, New Delhi.
Environmental Public Hearing was carried out for 18000 ha and completed
on 5th October, 2010. Multi-product SEZ will provide plots to various
industries and also develop dwelling units, hotels, shopping

9000 Pending

Development of Captive Coal Mine and 1200 MW thermal Power Plant in


two phases of 600 MW each.

9000 Pending

Jindal Stainless Limited set up a fully integrated stainless steel plant at


Jajpur, Odisha & it is the only integrated stainless steel plant in the country.
This plant is capable of producing unique and wide range of products both
in terms of grades and dimensions. As a part of forward integration,
production facilities for 2,50,000 tpa Ferro Alloys, 4,30,000 tpa Coke Oven,
250MW Captive Power Plant , 1mtpa stainless steel Melt Shop, 1.6mtpa Hot
Rolling Mill and 0.95 mtpa Cold Rolling Mill have been set-up and are in
operation progressively since September 2005. Production of ferro-chrome,
ferro-manganese and silico-manganese is carried out in submerged ArcFurnaces. And Ultra-high powered Electric arc-furnace is used for melting
stainless steel. Refining is carried out in Argon-Oxygen De-carburization
Converter and slabs are cast in a vertical- bending continuous casting unit.

8986 Pending

4x360 MW domestic coal based power plant being established at


Chhattisgarh in two phases, Phase 1 of 360 MW and Phase 2 of 3x360 MW.
Financial closure of Phase-I was achieved on 24.06.2009 and Phase 2 on
01.09.2010. The scheduled CODs for the project is Jul 2014. The Lead FI is
Power Finance Corporation and consortium members are REC, HUDCO, PTC
Financial Services, PNB, Bank of Baroda, Indian Bank, Corporation Bank
and Vijaya Bank.

8981.04 Pending

Universal Crescent Power Private Limited is setting up a 1980 MW imported


coal fired Power Plant named as Sagar Super Thermal Power Plant at
Nayachar Island in Purba Medinipur district, West Bengal along with a
captive coal Jetty for unloading and transfer of coal to the Power Project
site, in accordance with the Agreement signed with Govt. of West Bengal
on 3rd November 2011. The Sagar STPP is being developed in two stages
with Stage I comprising of two units, each of 660 MW capacities, deploying
state of the art supercritical technology with a provision of expansion of 1 x
660 MW units in Stage II. Presently, we are seeking Environment Clearance
and CRZ Clearance from MoEF for Stage I consisting of 2 x 660 MW Units
after which the project will be ready to take off. The status of major
clearances, tie ups and approvals required for the project is as below 1.
Land for the power project has been acquired. 2. Fuel Supply Agreement
has been signed. 3. Power Purchase Agreement

8600 Pending

2x685 MW under construction. No coal linkage. MoC yet to grant linkage.

8290 Pending

Jagdishpur - Haldia Pipeline Project envisages following- Phase-I36/24/18/12 inch x 1860 Km, Ph-II- 24/18/12 x 190 Km and Compressor
Station at Haldia. Scheduled completion is 36 months from first 3i
notification. Present Status- 1. Route Survey completed 2. Office
established at Kolkata and Ranchi 3. Long Term gas sourcing agreements
finalized Issues- a. 3i notification yet to be published owing to customer
tie-up issues. b. Confirmation regarding Fertilizer Plants revival awaited
from Department of Fertilizers.

7596 Pending

The Company is implementing its 2 x 660 MW coal based Super Critical


Power Project near Banka in Bihar. The BTG Order has been placed on
DECL, China. The Project has achieved Financial Closure in March 2012 .
Overall progress of 28 percent has already been achieved. The project is
stalled due to non disbursement. Land has been acquired. All necessary
clearances and approvals are in place. Financial Closure achieved. EPC
Contract awarded.

7400 Pending

Laying,building,operating or expanding MBBVPL along the route of


Mallavaram(Andhra Pradesh)-Bhilwara(rajasthan)-Bhopal(Madhya Pradesh)
- Vijaipur (Madhya Pradesh)

7255 Pending

1080 -8 x 13) MW, PITHEAD THERMAL POWER PROJECT (Commisssioned)


-Enhancement of Kapurdi Lignite Mines capacity from 3 MTPA to 7 MTPA till
the Jalipa mines becomes operational

7200 Pending

2x660 MW. One unit commissioned. Second unit in next 4 months. No


linkage. Discussed in the CCEA meeting held on 21.06.13

7020 Pending

A run of the river project on river Nyamjang Chhu in Tawang district of


Arunachal Pradesh utilizing the gross head of 1057.0 for generation of 780
MW in underground power house by six units of 180 MW each.

7000 Pending

The blocks was awarded to EOL in the fourth round of CBM bidding in 2009.
EOL has 100% participating interest in the block and entered into a
contract with GoI for exploration and production of CBM gas on July 29,
2010. It is located in Rajmahal coal field in Jharkhand and covers an area of
1128 sq. km

7000 Pending

1,260 MW coal Based Thermal Power Project, comprising of Unit 1 (600MW,


sub-critical) and Unit 2 (600MW sub-critical, reconfigured to 660MW supercritical technology for higher priority for allotment of coal linkage) There is
a delay in development of Fatehpur East coal block on account of delay in
processing of the forest diversion proposal, conduct of public hearing and
processing of the previous approval for mining lease at the State level.
Hence,the project COD has be re-aligned so that coal produced from
Fatehpur East Coal block is available for captive use in the project.

7000 Pending

(2X660) MW, one Unit linked to Linkage and one Unit liked to coal
block(Rampia).PL pending at with Orissa state Government last 3 years.
Issue of overlapping with MCL to be resolved by MoC.

6930 Pending

1200 MW - 4 UNITS 300MW EACH COAL BASED IPP BEING IMPLEMENTED


AT BINJKOTE and DARAMURRA VILLAGE, RAIGARH DISTRICT IN
CHHATTISGARH. PROMOTED BY SKS ISPAT AND POWER LIMITED - SKS.
SITHE GLOBAL BLACKSTONE OF USA IS AN INVESTOR IN THE POWER
PROJECT. PROJECT IS UNDER ADVANCE STAGE OF CONSTRUCTION AND
SCHEDULED FOR COMMISSIONING OF UNIT -1 BY SEPT 27, 2014, UNIT -2
BY DEC 27, 2014 AND UNIT 3 AND 4 BY DEC 27, 2015. BOILER DRUM FOR
UNIT 1 AND 2 ALREADY EREECTED AND PLACED IN POSITION IN MAY
2013. CONSTRUCTION OF ALL THE FACILITIES SUCH AS RAW WATER PIPE
LINE and INTAKE SYSTEM, 400 KV TRANSMISSION LINE, RAILWAY SIDING,
COAL HANDLING PLANT, ASH HANDLING SYSTEM, WATER SYSTEMS, ETC
ARE IN ADVANCE STAGE. RS.2311.17CRORES INCURRED TILL 30.6.2013
MINISTRY OF POWER HAS GRANTED PROVISIONAL MEGA POWER STATUS
ON 29.2.2012. SIGNED BPTA AND TSA WITH PGCIL

6848 Pending

For the two units (2x660 MW)in phase-II. No linkage Project


,recommended by mop to moc in dec 2011. one unit commissioned in may
2013.
M.P. Power Generating Company Limited (MPPGCL), a state PSU, is
implementing 2x660 MW units under stage-II of Shree Singaji Thermal
Power Project, District Khandwa, Madhya Pradesh. The project cost is
estimated to be Rs 6500 Crores. The project has already achieved Financial
Closure and all other pre-requisites i.e. land, water etc, for installation of
units are available, except Environmental Clearance (EC). Therefore,
placement of order for installation the units is kept under hold.

6560 Pending

2.0 MTPA Integrated Steel Plant with 1.20 MTPA Sponge Iron making
facility and Power Plant. 0.25 MTPA steel capacities will come in Phase-I
remaining in Phase-II. Stage -I &II Forest Clearance obtained on
28.7.2006. Allocation of Utkal B2 Coal Block by Ministry of Coal since
16.8.1999. Prior approval under Section 5(i) for Mining Lease obtained on
20.9.2007.

6500 Pending

1.Laying, building, operating or expanding MBPL along the route of


Mehsana (Gujarat) - Ajmer (Rajasthan) - Sirsa (Haryana) -Bhatinda
(Punjab) 2.Laying, building, operating or expanding BJSPL along the route
of Bhatinda (Punjab) Jammu - Srinagar (Jammu & Kashmir)

6449 Pending

2X600 MW Stage II pit-head Coal-Based Thermal Power Plant at Tamnar,


Dist Raigarh, Chhattisgarh
NMSEZ has been notified as a Multi product SEZ on 21.11.2007. The SEZ is
not operational.

6300 Pending

Ph-I 2x660 MW all unit commissioned. Ph-II 3x660 MW 1 unit


commissioned. LOA on tapering basis has been issued to only 800 MW (140
MW for second unit of Ph-I and 660 MW of unit 1 of Ph-II. No LOA has been
granted for 2X660 MW of Ph-II. FSA signed for 1180 MW. Balance 800 MW
tapering linkage available. FSA to be signed.

6290 Pending

6500 Pending

6300 Pending

2x600 MW Singhitarai Thermal Power Project is being developed by Athena


Chhattisgarh Power Limited, an SPV formed for developing and
implementing a coal based Thermal Power Project in Janjgir-Champa
District in the State of Chhattisgarh. The project has obtained all the
statutory clearances including Environmental clearance. As on date more
than 50% of the physical works are completed. The boiler drum for unit 1
has already been erected and major equipment like Stator, Rotor has
already reached the Indian Port. Firm Power sale agreements for more than
one unit capacity executed. More than Rs. 2700 crs have been spent on the
project. The project is financed by 18 banks and financial institutions and
more than Rs. 2170 crs have been disbursed by the lenders so far.

6200 Pending

1.00 million Tonnes Per Annum (TPA) Integrated Special Steel Plant, 0.8
million TPA Coke Plant, 0.2 million TPA Ferro Chrome Plant and 250 MW
Captive Power Plant Phase I The company has already incurred a Capex of
approximately Rs.3,200 Crore and already established a 0.5 million TPA
Special Steel Plant (comprising of 0.225 million TPA Blast Furnace, 0.3
million TPA Sponge Iron Plant, 0.5 million TPA Special Steel Melt Shop and
0.5 million TPA Special Steel Rolling Mill for Bars and Wire Rods), 0.4 million
TPA Coke Plant and 150,000 TPA Ferro Chrome Plant with 75 MW Captive
Power Plant and infrastructure for the total capacity of Special Steel, Coke
and Ferro Chrome with Captive Power is in place Phase II To expand the
aforesaid capacity of Special Steel Plant from 0.5 million TPA to 1 million
TPA, Coke from 0.4 million TPA to 0.8 million TPA, Ferro Chrome Plant from
150,000 TPA to 200,000 TPA, Captive Power Plant from 75 MW to 250 MW
and construction of railway l

6000 Pending

Imported coal based plant. Approval for using sea water pending with State
Govt.
KVK Nilachal Power Private Limited (KNPL), an SPV, promoted by KVK
Energy & Infrastructure Private Limited (KEIL), is implementing a project to
set up 3x350 MW coal based power project in Cuttack District, Odisha in
two phases viz. Phase I of 1x350 MW and Phase II of 2x350 MW.

5795 Pending

Under construction. In FSA list. CRZ clearance pending with MoEF

5545 Pending

Maithon Power Limited (MPL ), a joint venture of The Tata Power Company
Limited and Damodar Valley Corporation, has set up 1050 MW thermal
power project at Maithon, Dhanbad, Jharkhand. Both the Unit 1 and 2 have
commissioned on 1st September, 2011 and 24th July, 2012 respectively.

5500 Pending

1200 MW Imported Coal based power project at Salaya, District DevBhumi


Dwaraka, Gujarat using Sea water for Cooling Water system and Coal being
conveyed from a captive jetty to be built by Essar Bulk Terminal Services
Limited for use by Essar Power Gujarat Limited. Although the power project
has been completed, the coal conveying system and sea water intake
system and coal jetty is pending for completion due to approvals required
resulting in additional costs of generation as compared to the envisaged
costs in the project.

5430 Pending

5590 Pending

1. Brief Description of Project Ministry of Coal allotted MachhakataMahanadi Coal Blocks as captive mines jointly to Maharashtra State Power
Generation Company Limited i.e.MAHAGENCO and Gujarat State Electricity
Corporation Limited i.e.GSECL on 06.02.2006 under Government
Dispensation in the ratio of 60 and 40 respectively, to meet fuel
requirement of their power plants. MAHAGENCO and GSECL are State
Government Companies of Maharashtra and Gujarat respectively.
MAHAGENCO and GSECL have formed a Joint Venture company called
Mahaguj Collieries Limited i.e. MGCL to carry out development and
operation of the mine. MGCL has selected Mine Developer and Operator i.e.
MDO through International Competitive Bidding for development and
operation of Machhakata coal block. 2.Salient Features Location-Talcher
Coalfield, Chendipada, District Angul, Odisha Annual target- 30 MTPA ROM
coal Life - 33 Years Block area - 2103.34 Ha. Geological Proved Reserve
- 1400.65 MT Mineable Coal-

5416 Pending

Development, implementation and operation of a 1000 MW coal based


power project in Nellore district in two phases- Phase-I-Already Operational
capacity of 300 MW, Lead Lender-State Bank of India,and Phase-II-Under
construction capacity of 700 MW. Financial Closure Achieved. Lead LenderRural Electrification Corporation

5400 Pending

LNG Terminal of 5 MMTPA capacity, with provision of expansion to 10


MMTPA, at Mundra in Gujarat. The LNG terminal shall meet the growing
demand of natural gas in the country. The Phase 1 capacity of 5 MMTPA
shall supply approx 18 MMSCMD of natural gas

5200 Pending

4x250 MW imported coal based plant. Approval of land reforms Deptt and
Directorate of Town and Country Planning, Govt. of Tamil Nadu pending.

5189 Pending

Exisiting facilities - 8 Million tonnes per annum Pellet Plant at Vizag Andhra Pradesh, 8 Million tones per annum Beneficiation plant at Kirandul Chhattisgarh, 267 Kms slurry pipeline connecting Pellet Plant to
Beneficiation plant. (Rs. 3600 Crores)- To be implemented - Second
pipeline connecting Beneficiation plant to Pellet Plant - 463 Kms. (Rs. 1550
Crores)

5150 Pending

MONNET POWER COMPANY LIMITED (MPCL), a subsidiary company of


Monnet Ispat & Energy Limited, is setting a 1050 MW (2X525MW) MW Coal
Based Independent Thermal Power Plant (IPP) in village Malibrahmani,
District Angul, Orissa. The Power Plant construction is in advanced stages
with major milestones as boiler hydraulic test achieved. Plant is expected to
be commissioned by December 2013. The capacity of the power plant will
eventually be increased to 1710 MW with the addition of a 660 MW unit.

5093 Pending

MONNET POWER COMPANY LIMITED (MPCL), a subsidiary company of


Monnet Ispat & Energy Limited, is setting a 1050 MW (2X525MW) MW Coal
Based Independent Thermal Power Plant (IPP) in village Malibrahmani,
District Angul, Orissa. The Power Plant construction is in advanced stages
with major milestones as boiler hydraulic test achieved. The first unit of
525 MW is expected to be commissioned by September 2013 while the
second unit of 525 MW will be operational by December 2013. The capacity
of the power plant will eventually be increased to 1710 MW with the
addition of a 660 MW unit.

5093 Pending

Delay in Implementation of CDR package

5000 Pending

Shell through its wholly owned subsidiary Andhra LNG Pvt Ltd is developing
an LNG regasification terminal to supply Andhra Pradesh with regasified
LNG. The terminal is being developed under the GOI policy permitting
100% FDI (automatic route) and is State of the art, latest generation,
floating regasification storage unit (FSRU) with up to 5 mtpa capacity using
the most efficient and environmentally friendly regasification process. The
project will provide earliest relief to 4,000 MW gas based power plants that
are now distressed. It requires no project financing thus saving significant
time. It entails FDI of approximately USD 800 mln for FSRU and
installations. The engineering and design for all elements of the project is
completed, and the FSRU has been selected. A full scale Environmental
Impact Assessment (EIA) was submitted to the state Pollution Control
Board on 28th March 2013 demonstrating only minimal environmental
impact. Several gas sales heads of agreements signed wit

5000 Pending

For generation of 400 MW electricity from Hydel means, on river Narmada


at Maheshwar, near Indore in Madhya Pradesh.

5000 Pending

Setting up LNG Import and Regasification facility terminal. Applied for


clearance from Andhra Pradesh Govt. for setting up of LNG terminal at
Gangavaram Port, near Vishakhapatnam

5000 Pending

Attunli Hydro Electric Project is a Run Of the River Hydro Electric Scheme
with an Installed Capacity of 680 MW. The Project is located on Tangon
River in Dibang Valley District of Arunachal Pradesh. The project is a Green
Field development.

5000 Pending

2x500 MW Under construction. In FSA list.

4909.54 Pending

Unit-1 commissioned. St-I clearance for Mahan coal block linked to the
project has been issued by MoEF. St-II clearance to be forwarded by State
to MoEF

4860 Pending

-Expansion of Alumina Refinery from 1 to 6 MTPA and captive Power plant


of 75 MW to 285 MW at Lanjigarh, District. Kalahandi in Orissa by M/s
Vedanta Aluminium Ltd - Environmental Clearance

4840 Pending

The company is in advance stage of commissioning the 2 X 270 MW (phase


1) coal based power project near Chandwa, Jharkhand. About 95% of the
work has been completed. Hydro Testing of Boiler has been completed.

4660 Pending

About Anrak Aluminiums Alumina Refinery project at APIIC Industrial Park,


Makavaripalem Mandal, Visakhapatnam District, Andhra Pradesh 1. As part
of rapid industrialization in Andhra Pradesh, the State Government had
entered into a Memorandum of Understanding with the Govt of Ras Al
Khaimah GoRAK on 14.02.2007 for establishment of Alumina Refinery and
Smelter with a feed stock from Jeralla Block of bauxite mines located in
Visakhapatnam Dist of Andhra Pradesh. As per the terms of MOU, GORAK
along with its associates undertook to incorporate an Indian Registered
Limited Company to take forward for the implementation of Alumina
Refinery and Smelter project. Penna Cement group along GORAK had a 5050 joint venture cement manufacturing company in the name of Pioneer
Cement Industries LLC from 2004 at UAE. In consonance with the MOU a
special purpose vehicle was incorporated in March, 2007 in the name of
Anrak Aluminium Ltd as a Joint Venture between Penna Cement group,
Hyderabad and

4608 Pending

3x350 MW TPP. For Unit-I FSA signed. Balance two units in FSA list. CCEA
approved the list in its meeting held on 21.06.13

4540 Pending

Jiribam-Imphal new line project will provide connectivity to Manipur which


is severely affected due to insurgency. Project has been declared as
national Project and is being monitored at highest level. To create
conducive environment special battalions of CRPF have been deployed.

4444 Pending

2 X 300 MW Butibori coal based power project under implementation by


Vidarbha Industries Power Limited VIPL a wholly owned subsidiary of
Reliance Power Limited is located at Butibori MIDC Industrial Area in
Nagpur district of Maharashtra. Long term PPA for 600 MW capacity from
both the units of the Power Station has been approved by Maharashtra
State Electricity Regulatory Commission for supply of power to Reliance
Infrastructure Limited - Mumbai Distribution commencing from 1st April
2014. Ministry of Coal has already approved coal linkage from WCL for both
the units with LOA quantity of 1.234 MTPA and 1.1108 MTPA for Unit 1 and
Unit 2 respectively. Signing of FSAs is being followed up with CIL / WCL.

4200 Pending

Byrnihat shillong project has been taken up to improve network in N.E.


region. Project on completion will provide direct rail connectivity to Capital
of Meghalaya. Project has also been declared as National Project.

4083 Pending

800MW SUPERCRITICAL COAL BASED THERMAL POWER PLANT TO BE


IMPLEMENTED BY GUJARAT STATE ELECTRICITY CORPORATION LTD. AT
Wanakbori near Sevalia Dist Kheda

4000 Pending

1.8 MTPA Integrated Steel Plant. 230 MW Captive Power Plant


commissioned in 2010. Grant of PL for iron ore in R.F. Bailadilla, Tehsil
Dantewada,District Bastar (Soouth)is recommended by State Govt. Gare
Palma IV/5 underground coal mines are oeprational since 2004. Joint
survey of the mine by surveyors of Monnet and SECL has been completed
on 15/2/2012.

4000 Pending

Gupta Energy Pvt is implementing Thermal Power project 660 MW in Two


Phases. The First phase 120(2x60)MW is in operation since may 2012.
However the coal linkage for Ist phase yet not been allotted even as we
had applied in May 2006. Therfore the plant has resorted shut down for
want of linkage fuel. The second Pahse 540MW (2x270) is under
implementation for which all clearances are obtained however, MoEF has
imposed Temporary moratorium in District Chandrapur of Maharashtra
State, therefore MoEF has not yet granted Environment Celarance.

3955 Pending

THDC. The Project is a run off the river scheme with a gated Diversion Dam
of 65 m height, a water conductor system and an underground Power
House located 20 km downstream of head works.All clearances are in
place, project to be awarded by THDC.

3745.08 Pending

The blocks was awarded to EOL in the fourth round of CBM bidding in 2009.
EOL has 100% participating interest in the block and entered into a
contract with GoI for exploration and production of CBM gas on July 29,
2010. It is in southern end of the Mahanadi valley Gondwana belt in Orissa
and the block covers an area of 557 sq. km covering parts of three district
namely Angul, Sambalpur & Deogarh.

3500 Pending

The blocks was awarded to EOL in the fourth round of CBM bidding in 2009.
EOL has 100% participating interest in the block and entered into a
contract with GoI for exploration and production of CBM gas on July 29,
2010. It is situated in the northeastern part of the Sohagpur coalfield and
lies in the states of Madhya Pradesh & Chhattisgarh, covering an area of
339 sq. km

3500 Pending

EOL entered into a 35 year contract with Government of India for


exploration and production of CBM on July 26, 2002 for the East Raniganj
block RG (East)-CBM-2001/I and were granted the Petroleum Exploration
License (PEL) by the Government of West Bengal on March 29, 2005 and
hold 100% participating interest in the block. The field development plan
entails drilling of around 365 wells by mid-2014 along with the installation
of surface facilities (gas handling, water treatment) and associated
pipelines to process and transport more than 3 MMSCMD of gas. Over the
life of the field, EOL envisages the drilling of 600 650 wells to support the
plateau production.

3500 Pending

2x270 MW Coal based thermal power project with 25 year of PPA with
Punjab State Power Corporation for 100 percent generation. The
expenditure incurred so far is Rs. 3196 Crores till end of July 2013. BTG
Contractor - BHEL BOP Contractor - Punj Lloyd Source of coal - Captive coal
mine at Tokisud North Sub-block, South Karanpura Coal Fields, located in
Hazaribagh Dist. Jharkhand. Unit-1 Synchronized to grid on oil firing on 6th
July 2013. Project cost break up- Power Plant - Rs. 3200 Crores Coal mine Rs. 300 Crores

3500 Pending

Ministry of Coal allotted Chendipada and Chendipada-II Coal Blocks as


captive mines jointly to UPRVUNL, CMDC and MAHAGENCO on 25/07/2007
under Government Dispensation in the ratio of 50-31.47-18.53 respectively
to meet fuel requirement of their power plant. UPRVUNL, CMDC and
MAHAGENCO are State Government companies of Uttar Pradesh,
Chhattisgarh and Maharashtra respectively. UPRVUNL, CMDC and
MAHAGENCO formed Joint Venture Company called UCMCCL to carry out
development and operation of the mine. Chendipada and Chendipada II
coal block is located in Talcher coalfield in the state of Odisha. It has a
mineable reserve of approx. 1474 Million Tonne of coal with peak coal
mining capacity is 40 Million Tonnes per Annum. Washery will also be
established for beneficiation of coal mined from Chendipada coal block in
adherence with guidelines of Ministry of Environment and Forest. Thermal
Power projects of more than 8000 MW capacity of Uttar Pradesh,
Chhattisgarh and Maharashtra are largely

3500 Pending

ITC Ltd Paperboards & Specialty Papers Division

3500 Pending

Sivok-Rangpo project provides connectivity to Sikkim. Being strategically


important, project has been declared as national Project. Project has been
entrusted to M/s IRCON for fast track implementation.Out of 45 km length,
39Km(86%) is falling in tunnels and 5% on major bridges.

3380 Pending

Six laning of Varanasi-Aurangabad section of NH2 from Km 786.000 to Km


978.000 in the state of Uttar Pradesh and Bihar on Design, Build, Finance,
Operate and Transfer Toll basis under NHDP-V

3379.45 Pending

SEZ notified on 23.1.2009 as sector specific SEZ for IT/ITES.

3348 Pending

No domestic gas available. MOPNG to allocate gas.

3250 Pending

One unit linked to coal block (Durgapur Saraya). St-II of Forest clearance
has been cleared by State Govt. and sent to MoEF in March, 13. Under
consideration of MoEF.

3200 Pending

Ministry of coal allocated the Pakri-Barwadih coal block to NTPC on


11.10.2004, it has Geological reserves of 1436 MT, Production Target Sep.2013 Annual rated capacity - 15 MTPA, Project Status as on 25.07.13
Geological Report available. Mining Plan approved by MOC. Environment
Clearance accorded by MOEF. Stage I & II forest clearances accorded by
MOEF. Forest land available. Mine Developer-cum-Operator appointed and
machinery moved to site. Other major contracts like Coal Handling Plant,
Railway Siding, Substation, R&R Colony etc. have been awarded. All
notifications for land acquisition completed. Rehabilitation Action Plan
approved by NTPC Board and Govt. of Jharkhand. Payment for 721 acres of
land compensation disbursed to project affected families, till date. Govt.
of Jharkhand has approved transfer of 502 acres of Govt. land & 543 acres
of jungle-jhari land to NTPC. Total expenditure of approx Rs. 1000 Cr.
incurred so far.

3193 Pending

Anticipated dated of completion of Unit-I - 12/2013 and Unit-II is 01/2014

3027.59 Pending

Kochi-Kootanad-Bangalore-Mangalore gas pipeline is being implemented to


evacuate gas from the Kochi LNG Terminal The pipeline will also connect
the southern states of Kerala, Karnataka and Tamilnadu with the national
gas grid at Bangalore, thus the three states will have access to the green
fuel and will have access to city gas and CNG. The power situation in these
states will also improve with the implementation of gas-based power
projects. The project is implemented in 2 phases and covers 7 districts
each in the state of Kerala and Tamilnadu and 3 districts in Karnataka. The
capacity of line is 25 MMSCMD and the operating pressure is 92Kg/cm2
max.

3025 Pending

Steel Authority of India Limited (SAIL), a Maharatna company, is currently


implementing Modernisation & Expansion plan to enhance its annual Hot
Metal production capacity from the present 13.8 Million Tonnes (MT) to
23.46 MT. Accordingly, the annual requirement of iron ore will also increase
to about 39 MT from the present level of 24 MT. SAIL at present is
operating nine iron ore mines in the State of Jharkhand, Odisha and
Chhattisgarh to meet the requirement of iron ore. To meet the increased
requirement of iron ore, SAIL is increasing the capacity of existing mines in
Jharkhand and Odisha to their full potential. Gua iron ore mine consisting of
four leases, namely Duargaiburu, Jhillingburu I, Jhillingburu II and
Topailore, located in the State of Jharkhand, is linked to the eastern sector
steel plants of SAIL at Burnpur, Rourkela, Bokaro and Durgapur for supply
of iron ore. The project involves an investment of approximately Rs 3000
Crore for augmenting the iron ore production capacity of Gua iron ore
mine, installation of a beneficiation plant of 12.5 Million Tonnes Per Annum
(MTPA) and a Pellet Plant of 4 MTPA. This pellet plant will also be the first
captive pellet plant of SAIL.

3000 Pending

The block was awarded to EOL in the fourth round of CBM bidding in 2009.
EOL has 100% participating interest in the block and entered into a
contract with GoI for exploration and production of CBM on July 29, 2010.
It is located in the IB valley coal field in Gondwana basin which forms the
central segment of the western Gondwana basin in the Mahanadi valley belt
in Orissa. This block covers an area of 209 sq. km. The block falls in two
districts Sundargarh (200 sq.km) & Jharsuguda (9 sq.km)

3000 Pending

Construction of 63.1 km new B.G. line from Bhanupalli to Bilaspur.

2966.99 Pending

Construction of 189Km long Koderma-hazaribagh-Barkakana-Ranchi new


line on cost sharing basis with Govt. of Jharkhand. Project is important for
coal evacuation also.

2957.21 Pending

Laying of 30 inch x 91 km from Alwaye to Koottanad, 24 inch x 347 km


from Koottanad to Mangalore, 24 inch x 462 km Koottanad to Bangalore.
Overall Progress achieved 74 percent. Out of 884 km, RoU handed over for
259 km and mainline welding completed for 43 km. Lowering completed for
17 km.

2915 Pending

Surana Power Limited, a subsidiary of Surana Industries Limited, is


establishing a coal based thermal power plant of 2 x 210 MW Capacity at
Raichur, Karnataka. The project is under construction phase and an overall
progress of 55% is achieved so far. However, due to certain constraints in
fund flow, the project construction activities have been significantly
retarded for the past about Nine (9) months. The project is funded by
Consortium of Banks led by IDBI Bank Limited with an original capital cost
of Rs. 2400 Crores with an original COD of End April 2013. However, on
account of unfavorable market conditions, especially in the Power Sector,
combined with delay in implementation on account of irregular fund flow,
the COD has been extended upto End December 2014/ First Quarter 2015.
Due to the extension of COD, the total capital outlay of the project
increased to Rs.2900 Crore (Revised project cost as appraised by
Institutions recently). The commercial operation date of the project is
planned by End December 2014/First Quarter 2015. The suppliers/
contractors and vendors executing the project are of repute and renowned
in the country. The main equipment supplier is BHEL and the balance of
plant (BoP) as well as offsite facilities are being executed by various
reputed Indian Suppliers and Contractors such as Alstom, Paharpur,
McNally Bharat, Macawber, ABB, Gannon Dunkerley& Co Ltd, etc. The
Owners Engineer is Tata Consulting Engineers Ltd. (TCE), Bangalore.
Following major clearances obtained for the project. 148 Acres of Land
acquired through Karnataka Industrial Area Development Board (KIADB)
Environmental Clearance from Ministry of Environment and Forest (MoEF)
Consent For Establishment (CFE) from Karnataka State Pollution Control
Board (KSPCB) NOC from Airport Authority of India (AAI) for Chimney
Construction Factory clearance from Joint Directorate of Factories &
Boilers Agreement with Krishna Bhagya Jala Nigam Limited (KBJNL) for
Water Drawl (Krishna River) and construction of pumphouse Rail
Transport Clearance (RTC) from South Central Railways Interconnectivity
agreement with PGCIL to evacuate power to PGCILs New Raichur
Substation (765/ 400kV) Approval under the Section-68 of Electricity Act
2003 from Ministry of Power for installation of dedicated transmission line
PTCC Clearance for Transmission Line PPA with PTC for Sale of 40% Power
Coal Supply Agreement with Surana Mines & Minerals Limited (SMML)
owning mines in Indonesia for supply of Imported Indonesian Coal.

2900 Pending

24 inch x 75 km heated Insulated crude oil onshore pipeline from Salaya to


Land fall point in Bhogat Sea Coast with crude oil terminal (2.7 BBL storage
capacity) at Bhogat and SPM with sub sea pipeline in Jamnagar district to
export the crude to coastal oil refineries in other parts of India. Marine
facility with sub sea pipelines completed, crude oil storage terminal is in
advance stage of completion. Onshore pipeline from Salaya to Bhogat is
stalled in Khambhalia taluka due to lock out of legally notified RoU by local
leaders of Khambhalia.

2862 Pending

Under construction. In FSA list approved by CCEA. FSA to be signed.

2844 Pending

MOEF file no : 11-88/2011-IA-III Title: Environment and CRZ clearance for


augmentation in capacity of existing LNG Terminal of 5 MMTPA to 10
MMTPA along with pipeline of 13.9 km with suitable tap at S.No. 319,
Village - Hazira Tal - Choryasi District- Surat, Gujarat by M/s Hazira LNG
Pvt. Ltd. Hazira LNG is a partnership between Shell Gas B.V and Total Gaz
Electricit Holdings France. Both the Shareholders represent two of the
largest private LNG suppliers in the world. Shell and Total have a
shareholding of 74% and 26% respectively in each of the companies that
comprise the Hazira LNG Terminal and Port project and are collectively
known as Hazira Group Companies (HGC). Environmental approvals for
1.Additional LNG tank of capacity 200,000 Cu meters and supporting
infrastructure for regasification. 2. Laying of 13.9 Km pipeline of 36 inch
diameter for gas send out

2800 Pending

Expansion from 1 to 2 MTPA is on-going and 50 MW CPP likely to be


commissioned by December 2014.

2800 Pending

Gevra OC

2675.87 Pending

Joka-BBD Bag metro project in Koklatta connect central business distt with
Joka area via Majerhat. Alignment runs parellel to flyovers and to
accomodate metro via duct land in some streches is required from mint
press, Kolkatta port trust and swapping of land from MoD.

2619 Pending

Ministry of coal allocated the Talaipalli coal block to NTPC on 25.01.2006, it


has Geological reserves of 1267 MT, Production Target - Mar.2015 Annual
rated capacity - 18 MTPA, Project Status as on 25.07.13 Block was
regionally explored at the time of allocation. Detailed exploration
undertaken by NTPC. Total 39855 mt. drilling done. Geological Report
prepared. Mining Plan approved by MOC. Environment clearance
accorded by MOEF. Stage-I forest clearance accorded. Payment towards
NPV and CA charges made. Compliance of stage-I conditions to be
submitted after receipt of NOC under FRA (New format) from Raigarh Dist.
Admin. The JV Company between NTPC & SCCL has been appointed as
MDO on nomination basis pricing & other modalities under finalization.
All notifications for mining area land acquisition completed. RAP approved
by NTPC Board. Payment for 1278 acres of land compensation disbursed to
project affected families, till date. Total expenditure of approx Rs 300

2542 Pending

Four laning of Amravati- Jalgaon Section of NH-6 from KM 166.725 to KM


441.950 in the state of Maharashtra to be executed on DBFOT pattern
under NHDP Phase IV

2538 Pending

Vijaydurg Port is being implemented through a concession agreement


under BOOST signed in 2008 valid for 50 yrs with MMB. The DPR has been
submitted to the MMB during Sept 2011. The draft terms of reference for
conducting the EIA has been submitted to MOEF during March 2011. The
total capacity of the port is 75 MTPA. The project will help the development
in the Konkan belt benefitting the states of Maharashtra, Karnataka, Goa
and triggering growth in rest of the western region.

2500 Pending

COmmissionig in 2009-10 (U-7)

2500 Pending

Bhupdevpur-Korichapar-Dharamjaigarh (180 Kms) This is a critical


evacuation line for enhancing production from the various projects of
Mand-Raigarh Coalfields of SECL, Chhatisgarh.

2500 Pending

Set up of 2* 300 MW Thermal Power Plant

2500 Pending

Phase-I of the Port with 2 berths of 550 m long quay, storage space,
unloading equipments, conveyors and stacking equipments are
commissioned in August 2009 and in operation. Phase-II DPR is ready for
implementation. Port Connectivity by 4-lane road to Mumbai-Goa Highway
(NH-17) and rail connectivity to Konkan Rail is pending for want to
approval.

2500 Pending

Tapering linkage. IN FSA list. FSA to be signed

2500 Pending

The Kameng Hydro Electric Project is a 600 MW run of the river scheme,
situated in the West Kameng district of Arunachal Pradesh.

2496.9 Pending

International Paper, USA a FDI company entered the Indian market by


acquiring The Andhra Pradesh Paper Mills Limited, in short APPM, in the
year 2011. The acquisition process was done through the due process of
obtaining RBI approval being under the Automatic Approval process under
the FDI guidelines. APPM is a public listed company. After acquisition, the
Board of APPM resolved to change the name of the two units in terms of
their geographical locations, which is Andhra Pradesh Paper Mills Limited
Rajahmundry and The Andhra Pradesh Paper Mills Kadiyam. Both these
Units had a running 5 year Coal Supply Agreement with Mahanadi
Coalfields Limited since 2008. As the coal supply agreement was valid till
June,2013 and July, 2013 respectively for the two units, an application was
made to the Ministry of Coal in May, 2012 to effect those name change.
Inability of the Coal Ministry to approve the name change has led to the
situation where both the Units may have to be closed down due to nonsupplies of coal to its captive power plants. The agreements lapsed already
and renewal could not happen as the Ministry of Coal has been unable to
issue a letter to Mahanadi Coalfields Limited so far. The Units jointly
employs 2500 direct employees and an equal number of indirect labour, all
of whom would be rendered jobless. International Paper has further plans
to invest US$ 800 Million in greenfield projects which has been put on hold
on account of the lack of certainty of government approvals.

2400 Pending

Sterlite Industries plans to expand its copper smelting and refining capacity
by 4 lakhs tonnes per annum with allied infrastructure. The facility will also
have 2.5 lakh tonne per annum of Phosphoric Acid plant. The project will be
set up in Tuticorin, Tamil Nadu. Sterlite is currently operating a 400,000
tonnes per annum Copper Smelter at Tuticorin and with this expansion, the
total capacity would be 8 lakh tonnes per annum making it one of the
largest single location copper smelter in the world. Land of approximately
320 acres has already been allotted by SIPCOT under 99 year lease. The
project would be set up as a Special Economic Zone and the SEZ has
already been notified CAPACITY-TONNES PER DAY Existing Post Expansion
Copper 1200 2400 Phosphoric Acid 800 1600 Copper Rod 410 1210

2400 Pending

6.0MTPA cement plant. 3MTPA in first phase with lime stone mining and
Captive Power plant of 80MW. The company is located at village Tigul, B.
Sardagi, Balawad & Kiranagi Dist Gulbarga, Karnataka. MOU signed on 8th
jun 2012

2400 Pending

Neopara-Barasat via Bimanbonder metro project in Kolkatta is being


executed by Metro Railway, Kolkatta. Alignment from Jessore Road xing to
New Barrackpur is passing within premises of Airport Authority of India.
Although alignment was approved in principle, permission for construction
is awaited.

2394 Pending

4- laning of Beawar Pali- Pindwara stretch on NH-14 244 km long

2388 Pending

Revamping and optimazation of 21 Surface Installation to 9 integrated


Complex and replacement of existing pipelines and laying of new 467.80
Km of pipelines. Project Progress - 79.24%. ROU is required in forest land
to complete the laying of piepline.

2378.86 Pending

Construction of Shivpur-Tori-Kathutia new line which is critical for


evacuation of coal during XII plan.

2345 Pending

This Rail Line (92.10 Km) was approved in August 2000 and Railways were
entrusted for the complete work (from land acquisition, forestry clearance
etc. up to commissioning)

2345 Pending

Six lane under NHDP Phase-V being constructed by KMC Constructions Ltd.

2340 Pending

This is the Phase-I of integrated steel Project.In Phase-I 0.4 MTPA DRI
Plant and 30 MW Power Plant with an investment of Rs.595 Cr is already
commissioned. The associated coal mining project with an investment of
Rs.885 Cr & the 0.4 MTPA Expansion (Phase-II) with an investment of
Rs.700 Cr are under implementation.The total cost of the Phase-I+PhaseII+ Mines is Rs.2179.39 Cr. The 0.4 MTPA DRI Plant is currently under shut
down due to delay in Working Capital disbursement.The financial closure of
DRI & Power Project was achieved on 31-03-2010.

2179.39 Pending

The Heo Hydro Electric Project is a 240 MW ROR Project, and the middle
Project of a cascade of 3 HEPs totalling 571 MW developed on the Yarjep
River, in the West Siang district of Arunachal Pradesh. The Heo HEP and the
two other HEPs (namely Pauk HEP and Tato-1 HEP) are developed as 100%
Foreign Direct Investment projects by Velcan Energy Group, a French group
listed on Nyse Euronext Paris.

2001 Pending

Hindustan Zinc Limited is one of the worlds largest integrated producers of


zinc and lead, based in Rajasthan, India. The company has a very strong
track record of exploration, growth and sustained performance and is one
of the major contributors to the exchequer in terms of royalty and taxes.
HZL have plan to set up a DAP fertilizer complex of 0.5 million tons per
annum at a capital investment of almost Rs 2,000 Crores. HZLs captive
generation of Sulphuric acid from its smelters is sufficient enough to
support the DAP fertilizer complex. HZL also has a small low grade rock
phosphate mine with a mining capacity of around two lakh tons per annum.
But in order to invest in large DAP fertilizer complex, the company needs to
secure sustained supply of better grade rock phosphate. Company has
applied for 4 reconnaissance permit in Jaisalmer & Maton to undertake the
exploration and mining activity to support this project.

2000 Pending

L&T in jv with TIDCO has developed Kattupalli Minor Port near Chennai in
Tiruvallur district in Tamil Nadu with an investment of Rs. 2000 Crores. The
Port has a Container Terminal of 1.2 million TEU annual capacity which has
become operational since Jan 2013. The Port has not been able to attract
shipping lines for scheduling vessel calls at Kattupalli Port because of the
Customs related issues and the traffic through the port is insignificant. The
Port infrastructure is idling despite providing to EXIM community a good
and viable alternative to the conjested Chennai Port

2000 Pending

Bhopal-Dhule Transmission (BDTCL) project involves establishment of four


765 kV Single Circuit and two 400 kV Double Circuit transmission lines that
would strengthen the transmission system in the Indian states of Madhya
Pradesh, Maharashtra and Gujarat.

2000 Pending

Six Laning of Pune Satara section of NH 4 from km 725.00 to km 865.35


(length - 140.35 km) in the State of Maharashtra to be executed as BOT
(TOLL) on DBFO pattern under NHDP Phase V

1985 Pending

4 laning of 209 kms stretch on NH-6 from Jalgaon to Maharashtra/Gujarat


border
Dipka OC - SECL This is a coal mining project submitted for Environment
Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

1968 Pending

Project-I: (i)Laying of a 16 dia, 37 km long Gas Pipeline, from Baghjan to


the CGGS near Duliajan (70 % progress till date) (ii)8 dia 45 KM long
Crude Oil Pipeline from Baghjan to Secondary Tank Farm (STF) ( 70 %
progress till date) (iii)4 dia 23 KM long Crude Oil Pipeline from Baghjan to
Makum OCS. (iv)Construction of Oil Collecting Stations (OCSs) at Baghjan
& Barekuri. (v)Makum Bowser Unloading Station (BUS) and (vi)Secondary
Tank Farm (STF), Naoholia, near Duliajan etc Project-II: (i) Tengakhat
Naharkatia Jorajan area: Laying of 20.8 Km Gas Pipeline from Chabua
FGS to CGGS (in place), 5 nos. Field Gathering Stations (FGS), 2 nos. Gas
Compressor Station (GCS) and 1 No. Central Gas Gathering Station (CGGS)
near Duliajan (87.05% completed), adjacent to BPCL installation.
(ii)Tinsukia Dhola area : 4 nos. FGSs and 5 nos. GCSs (iii)DumdumaPengeri area: 1 no. FGS. (iv)Total of 32 nos. feeder gas lines.

Tato-1 Hydro Electric Project is a 186 MW Run-Off the River Project


developed on the Yarjep River, in the West Siang District of Arunachal
Pradesh. The Project is developed since 2007 as a 100% Foreign Direct
Investment by Velcan Energy Group, a French group listed on Nyse
Euronext Paris.
Project approved on 30.09.2011 by CCEA For expansion of 2 Mta opencast
to 5 Mta underground.

1943.66 Pending

1875.5 Pending

1867 Pending

1856.36 Pending

The development of a greenfield container port in Maharashtra. Chaucer


Capital from London have been trying to close this project for over 5 years.
This project will bring in significant FDI and will be a catalyst for the
industrialisation of the region. Chaucer Capital are expecting to create
3,000 jobs during the construction and around 1,000 jobs during the
operation phase of the port. Chaucer Capital are requesting the support of
the Government of India to have the LOI granted so that the development
can proceed.

1800 Pending

Bangalore-Satyamangla new line project was sanctioned in 1996-97 but for


want of forestry clearance could not take off. On request of Govt. of
Karnataka and on their consent to provide land free of cost and share 50%
of construction cost, execution in Bangalore-Chamrajnagar section clear of
forest areas have been taken up.

1800 Pending

Overall Physical Progress achieved is 72.1 percent. All major materials


received at site. Pipeline laying is in progress. Compliance of conditions
imposed in 1st stage Forest Clearance in progress for obtaining 2nd stage
Forest Clearance. Delay in 2nd stage Forest clearance in Odisha and
Jharkhand.

1793 Pending

1.Installed capacity - 1 x 270 MW. 2.Coal Requirement - 1.3 MMT per year
per Unit. 3.Water Requirement - 7.8 MM3 per Year per Unit. 4.Energy
available for sale with 85 percent Plant Load Factor- 1829 MU per Year for
Phase-I. 5.Date of Commissioning - Phase-1- 18.07.2013-COD. 6.Land
Requirement - 141 Hectors 7.Project Implementation-Phase-1-1x270 MW.
8.PROJECT EXECUTION - PHASE-1 - commissioned 9. PROJECT LOCATION 51 kms from Nagpur on Nagpur - Chandrapur state Highway NH-7. 10.
Nearest village-Bela, Tahsil-Umred, District-Nagpur, Maharashtra State. 11.
Nearest Railway station- Borkhedi on Nagpur - Mumbai Central Railway at a
distance of 11 kms from Project site. 12. Nearest Airport Nagpur. 13).
Nearest Seaport Mumbai and Vizag. 14. MAIN PLANT i.e boiler turbine
generator and esp is supplied, erected and commissioned by bhel. 15.
Balance of plant comprising of CHP, AHP, treatme

1768 Pending

Approved on 2.1.2009, the multi product SEZ is operational.

1704 Pending

The AMNEPL Power Plant with four units of 61.50 MW each has been
developed under PPP Model with Maharashtra Airport Development
Company Limited (a Government of Maharashtra Undertaking) as 26%
Partner. The Plant has been commissioned in August 2011. Presently the
Power Plant is incurring losses as is operating on costly market coal.

Six laning under NHDP Phase-V

New Moynagudi-Jogigopa (260Km) new line project provides an important


alternate route to critical route of New jalpaigudi-Alipurdwar-New
Bogaigaon route which is lifeline of N.E.Region. Project is in advance stage
and 196km portion has been completed.

1677.85 Pending

1673.7 Pending

1656 Pending

Elevated four lane link road from Chennai Port and NH4 at Maduravoyal

1655 Pending

Chennai Elevated Tollway Ltd. Four laning under NHDP Phase-VII

1655 Pending

The company is setting up 1X 300 MW power project, primarily to meet the


power requirement of its Ferro Alloy plant. The power plant is being set up
in SEZ developed by APIIC at Achutapuram in Vizag district. The project
has achieved financial closure in Dec 2012

1644 Pending

2X150 MW COAL FIRED POWER STATION AT BHADRESHWAR VILLAGE,


KUTCH DISTRICT, GUJARAT. 100 per cent FDI PROJECT, PROMOTED BY OPG
POWER VENTURES PLC., UK, A PUBLIC COMPANY LISTED ON LONDON
STOCK EXCHANGE. PROJECT BEING SET UP UNDER GROUP CAPTIVE
SCHEME OF MINISTRY OF POWER, GOVT. OF INDIA, THUS CONTRIBUTING
TO INDIAs INDUSTRIAL AND ECONOMIC GROWTH. HIGHLY ENVIRONMENT
FRIENDLY PROJECT, BASED ON AIR COOLED TECHNOLOGY, THUS USING
98 per cent LESSER WATER THAN CONVETIONAL WATER COOLED PROJECT.
ENVIRONMENTAL CLEARANCE RECEIVED. BOILER, TURBINE SUPPLY AND
ERECTION BY BHEL - BHARAT HEAVY ELECTRICALS LTD CONSTRUCTION IN
FULL-SWING - 85 per cent OF CIVIL WORKS AND FOUNDATIONS
COMPLETED, 60 per cent OF CHIMNEY AND BOILER RELATED
CONSTRUCTION COMPLETED.

1638 Pending

Hubli-Ankola new line project connects heartland of Karnataka to Konkan


railway on West Coast and provide port connectiviy from Western Ports to
mineral rich areas. Secondly are is having very scant rail network density
and is required for development of area.

1600 Pending

The project envisages debottlenecking of the existing Salaya Mathura


Pipeline system, which would eventually lead to capacity enhancement
from 21 to 25 MMTPA. This would facilitate meeting the projected enhanced
crude oil requirement of Mathura, Panipat and Koyali refineries of IOCL.
Project consists of laying of additional 115 kms of 28 inch diameter loop
line along Salaya-Viramgam section. Another 606 km loop line of 28 inch
diameter is to be laid along Viramgam-Chaksu section and 46 kms of 24
inch diameter loop line in Chaksu- Mathura Section. Other major facilities
include provision of new pumping units at Viramgam, Aburoad and Rajola
and appropriate replacement of equipment at other locations. Project
completion duration is 30 months after receipt of statutory clearances.
(Other clearances received except Forest clearance in Rajasthan and
Wildlife clearance in Gujarat). Overall Progress achieved 47.1%.
Engineering, Procurement and construction activities in

1584 Pending

0.35 MTPA Cold Rolled Closed Annealed Steel (CRCA) and Cold Rolled Non
Grain Oriented Steel (CRNO) Integrated Steel Plant Financial Cosure is
pending as the company is yet to complete the terms and conditions of
action, post which syndication will be initiated.

1563 Pending

Ministry of coal allocated the Kerandari coal block to NTPC on 25.01.2006,


it has Geological reserves of 285 MT, Production Target - Aug.2015 Annual
rated capacity - 6 MTPA, Project Status as on 25.07.13 Geological Report
available. Mining Plan approved by MOC. Environment Clearance accorded
by MOEF. Stage-I forest clearance accorded by MOEF. Stage-II proposal is
under process at RCCF, Hazaribagh. MDO Under tendering. All
notifications for mining area land acquisition completed. RAP approved by
NTPC Board. Payment for 106 acres of land compensation disbursed to
Project Affected families, till date. Govt. of Jharkhand transferred 106
acres of Govt. land to NTPC. Total expenditure of approx Rs 119 Cr
incurred so far.

1553 Pending

Manufacture of Steel Billets with 360,000 MTPA and captive power plant of
220MW.
Rampia and Dipside of Rampia Coal Block was allotted jointly to six
Companies vide Ministry of Coal letter no 38011/1/2007-CA-I dated 17th
January,2008 for providing onshore fuel to their Power Plants. 1) M/s
Sterlite Energy Ltd 2) M/s GMR Energy Ltd 3) M/s Arcellor Mittal India Ltd
4) M/s Lanco Group Ltd 5) M/s Nabbharat Power Pvt Ltd 6) M/s Reliance
Energy Ltd In terms of compliance of the said letter of MOC, a Joint
Venture Company Ms Rampia Coal Mine and Energy Pvt. Limited (RCMEPL)
was incorporated on 19th Feb 2008. RCMEPL submitted application for
grant of Prospecting License (PL) to Govt of Odisha within the stipulated
time of 3 months. Ministry of Coal, Government of India conveyed its prior
approval for grant of Prospecting License (PL) in favour of the allottees to
Govt. of Odisha vide letter No 13116/29/2009-CA-1 dated 13th Aug 2009.
However the production of coal from the Block could not commence due to
delay in grant of Prospective License from State.

1534 Pending

GreenField Cement Manufacturing Plant-Dalmia Cement Bharat Ltd, Project


Cost Rs 1500, for establishing Green Field Cement Manufacturing plant of
4MTPA Capacity in Dist. Gulbarga, Karnataka with captive limestone mine.

1500 Pending

GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for


establishing Green Field Cement Manufacturing Plant of 4 MTPA Capacity in
Satna, District of Madhya Pradesh with captive mines.

1500 Pending

GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for


establishing Green Field Cement Manufacturing plant of 4 MTPA Capacity in
Chittorgarh, District of Rajasthan with Captive Mine.

1500 Pending

Jabalpur Transmission Company Limited (JTCL) involves 765 kv D/c


Transmission line which forms part of system strengthening common for
Western &Northern region and is designed to transfer more than 6000 MW
from Chhattisgarh & Orissa power plants.

1500 Pending

1507 Pending

Integrated Green Field Cement Plant of 3.0 MTPA Capacity along with CPP
of 36MW at N V Gothra Tehsil, Nawalgarh Dist JhunJhun, Rajasthan

1500 Pending

A Unit of Shree Cement Limited. Kondla project for 3.0MTPA Cement Plant
with lime stone mining & Internal Power plant 150MW. LOcated at Village
Kodla Benkanhalli, SEdam Dt. Gulbarga, Karnataka. MOU signed on 4th
June 2010

1450 Pending

Rail Connectivity - The Port enjoys Road connectivity to NH-17 Mumbai-Goa


via five state highways. Dighi Port is not connected by Rail at present and
has proposed rail linkage from Indapur Station on Konkan Railways to Dighi
Port. Due to recent economic and infrastructure developments in the
western part of India, especially Gujarat and Maharashtra, there has been
remarkable growth, which has consequently let to an increase in freight
traffic and has established the need for additional freight corridors and with
the construction of Dighi Port, Maharashtras first Greenfield Port, being
developed as a multipurpose all-weather port this demand has only further
accentuated. Existing lines in the project region include the Roha Thokar
line that falls under Konkan Railways. The project stretch will start from the
North Bank of Dighi Port, in Agardanda, and will connect with Konkan
railways at Indapur and Mangaon, through a Y-section. The entire project
stretch is located in the Raigad d

1432 Pending

Road Connectivity - Dighi is located in Raigad district in the state of


Maharashtra on the west coast of India on Dighi Bay of Raipuri Creek. The
creek forms the harbor basin and the port facilities are being developed at
Dighi i.e southern bank and Agardanda i.e northan bank. Nearest railway
station is Mangaon on Konkan railway line which is around 55 km from the
port. A detailed study has been conducted to identify the most appropriate
way for development of road connectivity to Northern and Southern Banks
of Dighi Port from NH- 17. The analysis of traffic data and forecasting has
been done considering port and SEZ / DMIC cluster developments. The
widening / improvement of both link roads have been proposed based on
traffic projections and capacity analysis. The two road links to be developed
are 1. Augmenting to Two Lane with Paved Shoulders of existing SH-96 &
SH-92 link from Indapur to Agardanda for North Bank -Agardanda
connectivity and 2. Augmenting to Two Lane with Paved Shou

1432 Pending

Gayatri Projects Ltd. under NHDP Phase-III

1410 Pending

Four laning under NHDP Phase-IV being executed by North Malabar


Expressway Pvt Ltd.

1366 Pending

Ministry of coal allocated the Chatti-Bariatu coal block to NTPC on


25.01.2006, it has Geological reserves of 194 MT, Production Target Feb.2015 Annual rated capacity - 7 MTPA, Project Status as on 25.07.13
Geological Report available. Mining Plan approved by MOC. Environment
clearance accorded by MOEF. Stage-I & II forest clearances accorded by
MOEF. MDO appointed. All notifications for mining area land acquisition
completed. RAP approved by NTPC Board. Payment for 190 acres of land
compensation disbursed to project affected families till date. Govt. of
Jharkhand has approved transfer of 66 acres of Govt. land. Total
expenditure of approx Rs 95 Cr. incurred so far.

1314 Pending

Four laning under NHDP Phase-III being executed by South Malabar


Expressway Pvt Ltd.

1312 Pending

Hassan-Bangalore(166Km) new line project has been taken up to provide


alternate and short route for providing connectivity of Bangalore with West
Coast of Mangalore.

1290 Pending

Lenzing Modi Fibers India Private Ltd. LMI is introducing in India, State of
the Art Technology, to manufacture Viscose Fibres. Viscose Fibers is
presently being imported by Textile Industries. Viscose Fiber is more
absorbent than Cotton. The demand for Viscose is projected at 1 million
TPA by 2020, where as production is only 3, 30,000 TPA. Renowned Modi
group has signed collaboration, technical, financial and management
agreements with Lenzing AG Austria in September 2008. Lenzing is world
largest producer of viscose fibers, having plants in Austria, UK,USA,
Indonesia and China. The LMI project is on the anvil since 2008. LMI
acquired MIDC 90 acres land at Adl. Patalganga, Taluka Panvel, District
Raigad, Declared as Industrial and Chemical Zone to manufacture 80,000
TPA viscose fiber plant. Government of Maharashtra has declared the
Project as Mega. Maharashtra Pollution Control Board has granted Consent
to Establish on October 1, 2005 & revised approval dated July 24,2012

1285 Pending

4 laning of NH-9 stretch of 145 kms from Sangareddy to Maharashtra/


Karnataka border
The Sector specific SEZ for Textiles at Uthukuli Village, Perundurai Taluk
Erode District, Tamil Nadu was approved on 31st May, 2006 and notified on
9th June, 2008. The project has been granted extension beyond 6th year
upto 30th May, 2014 on 12th June, 2013.

1272 Pending

2x270MW Ph-I project commissioned. Tapering linkage available. In FSA list


approved by CCEA. Forest clearance for the linked Ganeshpur coal block
pending with MoEF.

1263 Pending

Abhijeet Roads Limited Abhijeet Angul Sambalpur Toll Road Ltd.

1269 Pending

1220.32 Pending

The 18 inch dia x 441 km long cross country white oil multi-product
pipeline of with design capacity of 7.98 MMTPA from Rewari to Kanpur will
pass through the states of Haryana, Rajasthan and Uttar Pradesh. The
Pipeline is proposed to be laid to transfer BS III MS, BS IV MS, BS III HSD,
BS IV HSD and SKO from the existing Tap off location at Rewari of Mundra
Delhi Pipeline in Haryana up to Kanpur in Uttar Pradesh. This pipeline will
be connected to HPCLs existing installations at Bharatpur, Mathura and new
proposed marketing installation at Kanpur.

1210.64 Pending

To Establish Green Field Cement Manufacturing plant of 4MTPA Capacity


with 45 MW CPP in Belguam District of Karnataka.

1200 Pending

Haridaspur - Paradip Rail Link-Rail Connectivity Project for Paradip Port

1186 Pending

Four laning under NHDP Phase-II


Four-laning of Baharampore - Farakka section of NH34 from Km 191.416 to
Km 294.684 in the State of West Bengal under NHDP Phase-III on Design,
Build, Finance, Operate and Transfer (DBFOT) Toll Basis. Package NoNHDP-III/BOT/WB/03
Under NHDP Phase-III being constructed by M/s Transstry-OJSC
Consortium

1170.52 Pending
1169 Pending

1157.16 Pending

Agartala-Sabroom project provides connectivity to remote areas of Tripura.


Project has been declared as National Project and is being monitored at
highest level.

1142 Pending

The Pare H.E. Project formerly known as Dikrong H.E. Project is situated in
the Papum Pare District of Arunachal Pradesh. The Project site is about 15
Km from Doimukh and 5 Km down stream of Hoz Power- House. NEEPCO
has taken up this Project to harness the Hydropower potential of the river
Dikrong which is a tributary of river Brahmaputra and also utilize the tail
race discharge of the Ranganadi H.E. Project stage-I. The project is planed
as run of the river scheme. The project envisages construction of a 78m
High concrete gravity Dam and 2.81Km long Head Race Tunnel having
7.50m diameter on the right bank of the river Dikrong. The installed
capacity of the Project is 110 MW and the catchment area of the Project is
824 Sq. Km with maximum available head will be about 67.36m. CEA has
accorded TEC to the project on 24.09.2007, as per which the project will
generate annual 506.42 MU of power. The CCEA clearnace of the project
was accorded on 4th Dec2008 at an approved estimated cost of Rs.573.99
crs.IDC and finance Charges of Rs.68.06Crores at June,2007 Price
Level.The project is scheduled to be commissioned in 44 months,i.e. by
August 2012.

1128.37 Pending

Ashoka Buildcon Ashoka Cuttack Angul Tollway Ltd. MOEF Clearance


already obtained.
Construction of 235 km new B.G. line from Dallirajhra to Jagdalpur being
partly funded by SAIL & NMDC

1123.69 Pending
1105.23 Pending

Sterlite Industries plans to set up 160 MW coal based thermal power plant
with allied insfrastructure like railway siding and Set up a desalination plant
of capacity of 20 million litres per day (20 MLD)

1100 Pending

Hindustan Construction Company Ltd. four laning under NHDP Phase-IV

1078.84 Pending

Four-laning of Farakka - Raiganj section of NH34 from Km 295.000 to Km


398.000 in the State of West Bengal under NHDP Phase-III on Design,
Build, Finance, Operate and Transfer (DBFOT) Toll Basis. Package No NHDP-III/BOT/WB/04

1078.54 Pending

SMC Power Generation Ltd is an Integrated Steel Plant commissioned in the


State of Odisha after signing the MOU to set up a Steel Plant of 0.40 MTPA
and 83 MW of Power Plant with the State Govt.

1078 Pending

Mahanadi coalfields Limited Rly. Line Jharsuguda to Bansudhara (52.4 Km


double line)
The Pauk Hydro Electric Project is a 145 MW ROR Project with active
storage, and the most upstream Project of a cascade of 3 HEPs totalling
571 MW developed on the Yarjep River, in the West Siang district of
Arunachal Pradesh. The Pauk HEP and the two other HEPs (namely Heo HEP
and Tato-1 HEP) are developed as 100% Foreign Direct Investment projects
by Velcan Energy Group, a French group listed on Nyse Euronext Paris.

1072 Pending

Design,Engineering, Finance, Construction, Operation & Maintenance of


Salem Ulundurpet section from Km 0.313 to km 136.67 of NH -68 in the
state of Tamil Nadu under NHDP Ph - IIIA on BOT Basis

1061 Pending

Sonepur Bazari OC

1070 Pending

1055.05 Pending

Four lane under NHDP Phae-IV being constructed by Essel Infraprojects


Ltd. Banker - Yes Bank
AIL is installing 0.4 MTPA DRI Plant and 60 MW Power plant in Dist.
Saraikela - Kharsawan,Jharkhand. The project has achieved financial
closure in April 2011. Initial Project cost was Rs 846.33 Cr which was
funded by a consortium of nine banks. Due to cost over run and delay in
project execution the revised project cost is estimated to be Rs. 1050 Cr.
The main reason of delay has been due to slow disbursement by lenders.

1055 Pending

Gauge Conversion of 285Km jabalpur-Gondia incl. balaghat-Katangi NG


section to BG, developing an alternate route to saturated sections.

1038 Pending

Under NHDP Phase-III


The four laning of Sambalpur Baragarh - Orissa/Chhattisgarh border
section of N.H.-6 from Km.0/000 to Km.88/000 in state of Orissa to be
executed as BOT (TOLL) on DBFOT pattern under NHDP Phase III. All the
major and minor bridges and culverts are proposed to be widened to four
lane widths including 7.30 Km. Baypass of Baragarh town. The project
involves new four laning construction of 6 major bridges, 13 minor bridges,
113 culverts, 4 pedestrian / cattle underpass, 4 vehicular underpass and 3
ROBs.

1050 Pending

1033.66 Pending
1008 Pending

(1)Length of four lane Highway-104.77 km,(2)Major Bridges-14 nos,(3)


Minor Bridges-34 nos (4)ROB-1 nos (5)Fly over-5 nos (6) VUP-4 nos (7)
CUP-4 nos (8)PUP-1 nos (9) Culverts-173 nos (10) Service Road-46.972
km & (11) Toll plaza-2 nos

1001 Pending

Design, Engineering, Finance, Construction, Operation and Maintenance of


Trichy - Karur section from Km 135.800 to Km 218.028 (Excluding Lalapet
ROB) of NH - 67 in the state of Tamil Nadu under NHDP Phase IIIA on
Build, Operate and Transfer (BOT) basis

1000 Pending

Dell International Services India Private Limited has been granted approval
as a Co-Developer for providing infrastructure facilities in the IT/ITES
Special Economic Zone of M/s. Coimbatore Hitech Infrastructures Private
Limited at Keeranatham Village, Coimbatore North Taluk, Coimbatore, vide
your letter No.F.2/110/2005-EPZ dated 12th October, 2007. The
construction of Phase I has been completed and most of the permissions
have been received. We have also issued appointment letters to many
students, however, the joining dates have been moved as we have not
received the Consent To Operate (CTO) from the Tamil Nadu Pollution
Control Board (TNPCB). All inspections have been completed and the file is
ready to be approved. As a result, this has caused considerable delay in our
business activities and has consequently affected Dells planned business
expansion in India and impacted our Global plans. Therefore, we kindly
request your urgent intervention to sort this issue with the Sta

1000 Pending

The company is setting up 1.2 MTPA Beneficiation and Pelletisation plant at


Saraikela-kharsawan, Jharkhand. The project is in progress and financial
closure has already been achieved and construction of the Plant has been
started. The project cost is Rs 987 cr and has been funded by a consortium
of 7 banks.

1000 Pending

Construction of haridaspur-Paradeep new line on SPV mode to provide


alternate connectivity to Paradeep port.

1000 Pending

East North Interconnection (ENICL) Transmission Project involves


establishment of two 400kV Double Circuit transmission lines (with a total
line length of 450 kms) passing through the Indian states of Assam, West
Bengal and Bihar. Its a System Strengthening project which will facilitate
bulk transfer from north Eastern States to northern Grid.This project has
18 identified beneficiaries (mainly SEBs in the states of Rajasthan, Punjab,
Haryana, Uttaranchal and the city of Delhi), who would be directly
benefitted by this project

1000 Pending

4 lane NH Connectivity to ICTT, Vallarpadam- Road Connectivity Project for


Cochin Port.

914 Pending

Project involves laying of 710 km long, 12 inch/10 inch dia LPG pipeline
from Paradip to Durgapur via Haldia along with the associated facilities for
transportation of LPG from Paradip and Haldia to the Bottling Plants at
Balasore, Budge-Budge, Kalyani and Durgapur. Overall progress of 29.52
percent has been achieved. All statutory clearances are available except
NOC for Forest Clearance for Odisha. Scheduled completion is 30 months
after receipt of statutory clearances. Project is delayed due to delay in
receipt of NOC for Forest Clearance in Odisha. The project is anticipated for
completion by December 2014 subject to the availability of NOC for Forest
Clearance in Odisha by September 2013.

913 Pending

Resitement of existing marketing terminal to new location for better safety


norm and also to make way for enhancement of refinery capacity. All
terminals commissioned by July 2012 except railway siding works at new
LPG terminal and new white oil terminal which is expected to be
commissioned by Sept. 2013. Assistance from AP Fire Department is
sought for approval of occupancy.

898 Pending

Construction of 154 km new railway line primarily for evacuation of


minerals and alternate route for ports in Orissa.

810.78 Pending

Work has been awarded. Gammon Infrastructure Project Ltd. Birmitrapur


Barkote Highway Pvt. Ltd.
Four laning under NHDP Phase-IV

778.15 Pending
778.15 Pending

Laying of 400 km Long cross country LPG Pipeline System from HPCL
Mangalore to BPCL Solur with Spur Pipeline from Hassan to HPCL Mysore.
The ultimate capacity of pipeline shall be 3.1 MMTPA. Project has achieved
physical progress of 22.92 percent as on June 2013. PNGRB Authorisation
obtained.Approval of High Level Clearance Committee of Government of
Karnataka obtained. Environmental Clearance from MOEF, GOI and PCB,
Karnataka obtained. Categorised as Infrastructure Project.Obtained
Crossing approvals from Railways, NH, SH,Other Roads, Water Bodies
including Rivers. Placed order for coated line pipes, valves, pumps and
other items. Pending Issues 1. Approval from Forest Dept for diversion of
forest land for laying pipeline. 2. Land acquisition for IP station at Neriya
Dakshina Kannada Dist, Karnataka 3. Land acquisition for SV stations 16
Nos. along the route of the pipeline."

701 Pending

Jharsuguda- Barpalli-Sardega Railway Line (53 Kms) This is a critical


evacuation line for enhancing production from the various projects of Ib
valley coalfields of MCL, Odisha.

700 Pending

Hingula OCP (15 MTY) of Mahanadi Coalfields Limited.


Construction of 98.7 Km long Angul-Sukhinda new railway line primarily for
movement of mineral ore and export/import traffic.
Ennore Manali Expressway (EMRIP- Road Connectivity Project for Chennai
and Ennore Ports.

653.55 Pending
638.5 Pending

600 Pending

Uttrakhand Spurlines - 16 inch x 64 km, 8 inch x 90.5 km, 4 inch x 20 km


Punjab Spurlines - 24 inch x 84 km , 4 inch x 20 km Original completion
date - 20.06.2011 Revised completion date - 31.07.2012 Anticipated
completion - Dec. 2014

540.92 Pending

BINA OC - NORTHERN COALFIELDS LIMITED

535.96 Pending

Jharsuguda-Barpalli-Sardega Railway Line (53 Kms)

469 Pending

Garjanbahal OCP (10.00 Mty) MAHANADI COALFIELDS LIMITED

466.31 Pending

Kaniha OCP (10 Mty)

457.77 Pending

MNH Shakti Talabira OCP (20 Mty)

447.72 Pending

Ananta Extn. OCP (15 Mty)

446.64 Pending

Bharatpur OCP - MCL This is a coal mining project submitted for Stage-I
Forest Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

434.25 Pending

Bharatpur OCP (20 Mty)

434.25 Pending

MJSJ Coal Gopalprasad (15 Mty)

395.87 Pending

New Green field Oil Terminal is constructed at Ennore which is located on


the outskirts of the Chennai City, relocating the existing Chennai terminal.
At Ennore Port, jetty for handling liquid cargo and allied pipeline has been
developed by Ennore Tank Terminal Pvt Ltd. The project is provided with
tankage facility of 1,40,000 KL for storage and dispatch of pertroleum
products. The terminal is designed to conform to the safety norms
advocated by PESO and OISD. Pipeline and Terminal facilities completed on
December 2012. Railway siding facilities completed on March 2013. The
Terminal has been commissioned on 20 July 2013.

394 Pending

Deoband Roorkee new line project was sanctioned in 2007-08 on 50 50


cost sharing with govt. of Uttarakhand. Detailed estimate was sanctioned in
Nov 2008 at Rs 160 crore. Subsequently, revised estimate costing Rs 336
crore was sanctioned primarily due to abnormal increase in land rates. Land
rates have now been again revised and on request of railway to absorb
increase in land rates, state govt has requested to cap share of state govt
to Rs 160 crore.

336 Pending

Manikpur OC - SECL This is a coal mining project submitted for Stage-II


Forest Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

321.5 Pending

12 / 10 inch dia 165 km long LPG Pipeline from BPCL, Uran near Navi
Mumbai to HPCL,IOCL,BPCL LPG Plants at Chakan and Shikrapur near Pune
Pipeline Procured and Major procurement POs placed. Pipeline laying order
ready for finalization.ROU acquisition and crossing approvals in final stages.
Forest Approval from RCCF, Bhopal awaited. The proposals at DFO, Alibag &
DFO, Pune are pending for the last 1.5 yrs.

309.81 Pending

Jhanjra UG - ECL This is a coal mining project submitted for Stage-I Forest
clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

287.17 Pending

Samaleswari OCP (12 Mty)

284.69 Pending

1.Upgradation of Konaban GGS from 0.50 to 1.50 MMSCMD capacity. 2.


Laying of approx. 86 kms of Trunk Pipeline from Agartala Dome to OTPC via
Nimbutali with metering facilities at OTPC,pipeline from Sonamura GGS to
OTPC and pipeline from Konaban GGS to Nimbutali and laying of 64 Km of
Feeder line from Kunjaban to ADB GGS and Sundalbari to Sonamura GGS.
Project Progress-86.1 %. ROU is required including in forest land to
complete the laying of pipeline.

253.66 Pending

1 No. Gas Turbine of 20 MW Capacity for Power Station at Duliajan, Assam


for captive use in E&P related operations.

216.88 Pending

Kitcha-katima new line project was sanctioned in 2003-04 on commitment


of state govt to provide land for the project free of cost. After repeated
follw up land is not being provided and project is a non starter.

208 Pending

Orient(U/G) 4 THE COMBINED COST OF ORIENT (U/G) 1&2, 3, HRC AND


ORIENT (U/G) 4 MAHANADI COALFIELDS LIMITED

203 Pending

Orient(U/G) 1&2,3 &HRC The cost includes the cost of Orient (U/G 4)
MAHANADI COALFIELDS LIMITED
Doubling of 25.6 km Jharsugda Rengali section to enhance capacity of
saturated section.
Ukni Deep OCP-WCL This is a coal mining project submitted for
Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

203 Pending

Belpahar OCP (8 Mty)

201 Pending
185.79 Pending

181.18 Pending

Dedicated freight link from Wadala to Kurla-Rail Connectivity Project for


Mumbai Port

177 Pending

Four lane road connectivity to NH17-Road Connectivity Project for


Mormugoa Port

145 Pending

To construct 3 ETPs To deal with future water cut and injection water
quality requirement. Site survey for the Sobhasan is under progress. For
balance two sites Land Acquisition is pending.

144 Pending

Urimari OC - CCL This is a coal mining project submitted for Stage-I Forest
Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

143.57 Pending

Laying of 93 km long 10 inch Dia cross country pipeline system of 2.3


MMTPA ultimate capacity from Awa Pumping station of MDPL to Jodhpur
Depot. Receipt facility along with 3 nos. x 3500 KL MS Tanks at Jodhpur
Depot along with associated civil, mechanical, piping, electrical and
instrumentation works at Jodhpur Depot. Actual progress achieved as on
30.06.2013 is 49.79 percent. Statutory approval have been obtained
except for MoEF approval for additional storage tanks at Salawas
Depot.Construction works under progress.

134.43 Pending

1. Construction of Sonamura GGS having 0.8 MMSCMD gas processing


capacity & Gas metering station at Monarchak. 2.Laying of 10" diaX 10.5
Km gas trunk pipeline from Sonamura to Moarchak 3. Laying of 20" dia X
29.4 Km gas trunk pipeline from Agartala. Project Progress-38.6 %. ROU is
required to complete the project.

128.3 Pending

The existing 30 inch crude oil pipe line from Chennai Port to Manali Refinery
was laid during the inception of Refinery in 1969. Presently the Refinery
capacity has been increased from 2.5 to 10.5 MMTPA. The transfer rate of
crude oil is limited due to smaller size of pipe line, deteriorating internal
surface and restricted operating pressure. This causes prolonged detention
of crude tankers leading to high demurrages. Habitations have come nearer
to the pipeline over a period of time and hence the pipeline passes through
congested and thickly populated areas. Hence a new 42 inch crude oil pipe
line is proposed to be laid under the service road of Ennore Manali Road
Improvement Project. The replacement of the old pipeline with a new
pipeline in a new, less habitated route is not only an operational necessity
for CPCL but also has the most important advantage of enhancing the
safety of Crude Oil transportation from chennai Port to Manali Refinery.
Scheduled completion is 18 months fr

126 Pending

All statutory clearances are available. The entire Right of Way for laying of
pipeline was progressively acquired by September 2012. Mainline laying
work was also in progress. About 40 percent of the mailine has been laid.
On 2.4.2013, Government of Tamil Nadu issued a letter to various district
collectors advising them to ensure- 1. GAIL gives up the present project of
laying Kochi-Kootanad-Bangalore-Mangalore Gas Pipeline Project through
agriculture land and take steps for laying of pipeline alongside the National
Highways. 2. GAIL should also close all the existing trenches excavated for
laying of pipeline and handover the lands in its original conditions to the
farmers & villagers. 3. To remove the pipes already laid so as to enable the
farmers to continue their agricultural activities. This has impacted ongoing
activities of CBR-Trichy Pipeline of IndianOil and may also affect projects in
other states. A PIL has also been filed in Madras High Court Bench. Hearing
is

108 Pending

"Overall Physical Progress achieved is 30 percent. Major construction


activities could be taken up after Environment Clearance All major
materials received at site. Pipeline laying is in progress. Compliance of
conditions imposed in 1st stage Forest Clearance in progress for obtaining
2nd stage Forest Clearance. Delay in 2nd stage Forest clearance in Odisha
and Jharkhand." Scheduled completion and Anticipated completion dates to
be assessed after receipt of Statutory clearances.

108 Pending

HBI UG (Hirakhund Bundia) -MCL This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

105.78 Pending

Rohini OC - CCL This is a coal mining project submitted for Stage-I Forest
Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

105.67 Pending

Nataraj(U/G) Mine (0.64 Mty)

92.11 Pending

Lajkura OCP (2.50 Mty)

82.25 Pending

Bhakra UG - WCL This is a coal mining project submitted for Environment


Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013
Dhanpuri UG - SECL This is a coal mining project submitted for Stage-I
Forest Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013
Govinda Meera and Kotma (UG mine/depillaring)- SECL This is a coal
mining project submitted for Stage-I Forest Clearance. This project is part
of CCI Note vide Case No.4/CCInvest/2013 dated 20-02-2013

Kanika Siding Single Spur

55.28 Pending

54.7 Pending

22.52 Pending

20 Pending

Kedla UG - CCL This is a coal mining project submitted for Stage-II Forest
Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

19.86 Pending

Kedla OC - CCL This is a coal mining project submitted for Stage-II Forest
Clearance This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

19.86 Pending

Murlidih OCP - BCCL This is a coal mining project submitted for Stage-I
Forest Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

19.84 Pending

Kotma, Govinda and Meera - SECL This is a coal mining project submitted
for Stage-I Forest Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

19.14 Pending

Kapildhara UG - SECL This is a coal mining project submitted for Stage-II


Forest Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013

17.98 Pending

Chinda OC - WCL This is a coal mining project submitted for Environment


Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

17.79 Pending

Saunda - D - CCL This is a coal mining project submitted for Stage-I Forest
Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013

16.29 Pending

State Governments of Uttar Pradesh, Tamil Nadu, Gujarat and Delhi have
not signed the State Support Agreement. For smooth implementation of
the extensive programme for development of National Highways through
PPP, the Ministry of Road Transport & Highways enters into a State Support
Agreement with various state Governments for safeguarding the interest of
Concessionaires for all future programmes of National Highways in respect
of issues concerning the State Governments regarding Land Acquisition,
Utility shifting, restriction on competing roads/additional toll ways,
maintenance of Law & Order, removal of encroachments etc. with an
objective to provide umbrella uniform terms and conditions also to build up
the confidence of private investor into the Highway project.

0 Pending