Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Amasra CBM 2
07.01.2011
Main Frac
12/20 Sand
16/30 Sand
70/140 Sand
16/20 FT ISP
16/30 Optiprop
20/40 Sand
0
BioClear
WGA 20
OC DE-11
TRS CS-1
OC TEA
TRS APS
TRS CL-1
GB-102 100%
OC TS 11
0
32,000
0
0
0
0
0
7.2
440.0
235.0
15.0
180.0
47.5
Minifrac
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
liters
liters
kg
kg
liters
liters
liters
liters
liters
liters
kg
kg
liters
liters
liters
kg
kg
kg
Total
0.0
32000.0
0.0
0.0
0.0
0.0
0.0
7.2
440.0
235.0
0.0
0.0
15.0
180.0
47.5
0.0
0.0
0.0
0.0
0.0
kg
kg
kg
kg
kg
kg
kg
liters
kg
liters
liters
liters
kg
liters
kg
kg
Input any
new chemicals
here
Turkey - 1200 m
Date
07/01/2011
Mixed Volume
180.0
Max Pressure
500
Bar
16/30 Sand
Pumped Volume
Extra
Pumping Rate
Bulk Density
157.4
OC DE-11
1.5 l/m
2650
TRS CS-1
Tank
#1
#2
#3
#4
#5
#6
#7
l/m
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
0.9
1.1
1.2
1.2
APS
0.10
0.10
0.10
0.10
0.10
CL-20
1.50
1.00
1.00
1.00
1.00
GB-102 (25%)
Stage
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
CL Stage
40
10
15
30
61
0
0
0
0
0
40.0
50.2
65.8
98.4
167.6
167.6
167.6
167.6
167.6
Sand Slug
50-100
100-150
Abs Density
Bioclear
0.02 l/m
Breaker/Stage
4.8 m/min
1650
WGA 20
2.5 kg/m
22.6
Stage 6
Stage 7
Stage 8
WGA 20
kg
75
75
75
75
75
75
0
450
m
30.0
30.0
30.0
30.0
30.0
30.0
0.0
180.0
1.3
0.00
Rate
m/min
Conc
kg/m
CFR
m/min
GB-102
L/min
OC CL rate
g/l
APS rate
kg/min
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
0
50
100
230
360
0
0
0
0
0
4.8
4.71
4.63
4.42
4.23
4.80
4.80
4.80
4.80
4.80
4.3
4.7
5.1
5.3
5.1
0.0
0.0
0.0
0.0
6.2
7.2
4.7
4.6
4.4
4.2
0.0
0.0
0.0
0.0
0.0
0.48
0.47
0.46
0.44
0.42
0.00
0.00
0.00
0.00
0.00
OC DE-11
liter
45
45
45
45
45
45
0
270
BioClear
kg
0.6
0.6
0.6
0.6
0.6
0.6
0
3.6
Totals
Stage 9 Flush
1.3
TRS CS-1
liter
0
0
0
0
0
0
0
0
Sand Rate
kg/min
0
236
463
1016
1521
0
0
0
0
0
173.5 liters
15.6 kg
176.0 liters
Total Sand
kg/stage
500
1500
6900
21960
0
0
0
0
500
2000
8900
30860
30860
30860
30860
8.33
2.08
3.13
6.25
12.71
0.00
0.00
0.00
0.00
1.4
157.4
169.0
4.8
END
4.80
6.2
0.0
0.00
30860
0.29
JOB TICKET
Date
Company Rep.
Contractor Rep.
Well Number
07.01.2011
Selcuk Gurpinar
George Stavarache
Amasra CBM 2
Casing Size(mm) 4.5
Tubing Depth (m) 351
Packer set at (m) 351
Function
Time
Date
Off Location
08:00
07.01.2011
Personnel on Site, Contractor
Name
First Name
On Site
Koskamp
Ralph
Frac Engineer
Gunn
Matthew
Frac Engineer
Calota
C-tin
Frac Engineer
Angheloiu
Ioan
Frac Supervisor
Stavarache
George
Frac Supervisor
Lache
Adrian
Driver/Operator
Voica
Sorin
Driver/Operator
Carabus
Mihai
Driver/Operator
Istrate
Liviu
Driver/Operator
Ionita
Teodor
Driver/Operator
Stan
Bogdan Cat
Crew Supervisor
Aldea
Daniel
Driver/Operator
Barbu
Gheorghe
Driver/Operator
Finichiu
Alexandru
Driver/Operator
Malaescu
Iulian
Driver/Operator
Stanciu
Ioan
Driver/Operator
Cristu
Augustin
Driver/Operator
Constantin
Marian
Driver/Operator
Iancu
Ionel
Driver/Operator
Ionita
Vasile
Ionita
Remus
Driver/Operator
David
Vasile
Driver/Operator
Enache
Florin
Driver/Operator
Ionita
George
Driver/Operator
Nazaru
Valentin
Driver/Operator
Manea
Neculai
Operator
Buzatoiu
Bogdan
On Location
File: 297225721.xls
Date
07.01.2011
5 / 45
Time
16:30
Off
x
x
x
x
x
x
x
x
x
x
JOB TICKET
Signature
File: 297225721.xls
Signature
6 / 45
File: 297225721.xls
JOB TICKET
7 / 45
Treatment Summary
General Info
Wellbore Data
Type
Wellbore Configuration
Size
Wall thick Grade
Tubing:
2.4
0
Casing: 1
4.5
Job Date:
07.01.2011
Job Type: Slick water - Cross-linked Water Frac
5.2
0.0187
George Stavarache
TacRom Rep
Hema Energy
Turkey
Amasra CBM 2
Selcuk Gurpinar
Customer
Location
Well name
Customer Rep
Depth
(m)
351.0
Volume
(m)
1.34
393.5
0.21
Flush
(m)
1.55
Perforations
Top
Bottom
(m)
(m)
362.0
SPM
366.0
362
364
351.0
PBTD (m)
393.5
Treating Mode
255.0
350.0
60.0
50.0
Bar
Bar
Bar
Bar
Minifrac Results
Surface ISIP
BH ISIP
Surface closure
BH Closure
118.0
135.0
102.4
137.8
Bar
Bar
Bar
Bar
Closure time
Fluid effic.
Net Pressure
Frac Gradient
Minifrac
Rate
m
m
m
m
m
kg
Formation Treated
Proppant Data
Proppant Type
Mesh Size
Pumped Minifrac
Pumped Mainfrac
In Formation
Sand Plug sand slug
Final Conc @ Perfs
Treatment Data
Max Treating Pressure
Max Allowable Press
Annular Relief Set
Annulus Pressure
Pumping Summary
Stage
Volume
Hole fill
Step rate
Calibration
Flush
Total
Sand
Tubing
m/min
m/min
m/min
m/min
4.4
38
17.5
37.3
Pumping Summary
Stage
Volume
Pad
Sand stg
Flush
Total
min
%
Bar
kPa/m
Badger
16/30
0
32,000
32,000
0
0
0
118.0
Bar
Bar
Bar
Mainfrac
Rate
m
m
m
m
m/min
m/min
m/min
kg
Actual
Fluid + sand pumped
Sand pumped
0.0
32,000
m
kg in formation
Totals
Water mixed
Gelled Water pumped
Total Gel + sand
Sand pumped
WGA 20
Bioclear
OC DE 11
OC CS 11
440
7.2
235
0
118.0
32000.0
m
m
m
kg
kg
kg
kg
kg
kg/m
360
Sand pumped
180.0
156.9
0.0
32,000
50-100 kg/m3
230 Bar
sandstone
kg
l
l
l
Sand in formation
OC CL 20
OC TEA
OC APS
GB-102 10
180
0
15
47.5
32,000
l
l
kg
Hema Energy
Company
Contract number
Date
Contractor Rep
Customer rep
Location
January 7, 2011
George Stavarache
Selcuk Gurpinar
Turkey
Field
Well Name
Well Depth
Plug back depth
Casing Size
Tubing Size
Tubing Depth
Packer type
PSD
Perfs (from:to)
TVD Top Perf
On Loc Minifrac
Finish Minifrac
Start Main frac
Off Loc Mainfrac
Hema
Amasra CBM 2
393.5
4 1/2
2.4
351
Zone
Coal
Thickness
5.2
Time
Time
Time
Time
08:00
16:30
351
362
366
362
Date
Date
Date
Date
07.01.2011
07.01.2011
Sand
Sand
Sand
Carbolite
Optiporop
Sand
Mini Frac
12/20 Sand
16/30 Sand
70/140 Sand
16/20 FT ISP
16/30 Optiprop
20/40 Sand
Sand
Sand
Sand
Carbolite
Optiporop
Sand
Main Frac
12/20 Sand
16/30 Sand
70/140 Sand
16/20 FT ISP
16/30 Optiprop
20/40 Sand
0
kg
kg
kg
kg
kg
kg
q
kg
32,000 kg
kg
kg
kg
kg
kg
Version 1.5
Revised October 5, 2010
mm
mm
07/01/2011
Procedure:
1. Watersamples taken from each tank, tested volume 200 [ml]
2. Temperature measurement
3. pH measurement
4. add 0.3 ml OC CS 11 + OC DE 11 0.3 ml + 0,84 [g] of WGA-20 (4.2 kg/m3)
5. 5 min mixing time + 20 minutes hydration time
6. viscosity measurement
7. add 0,3 [ml] of OC CL 20 cross linker (1.5l/m3)
8. check fluid flow
9. add 0,04 g of DRB-HT Breaker (0.1 kg/m3)
10. wait 1 hour at reservoir temperature
11. check fluid flow
.
Results:
Reservoir Temperature:
T [C]
pH [-]
[cp]
Tank 1
Tank 2
Tank 3
Tank 4
Tank 5
Tank 6
Tank 7
Tank 8
2.) Mainfrac
Proceedure before Treatment:
1. Pad sample taken from each mixed tank, tested volume 200 [ml]
2. Temperature measurement
3. viscosity measurement
Minifrac Design
Amasra CBM 2
1/7/2011
Chemicals /Tank
5.0 kg/m WGA20
1.5 l/m3 OC DE 11
1.5 l/m3 OC CS 11
0.05 kg/m DRB-HT
2.0 L/m OC CL20
m3
m3/min
m3 x linked gel
m3 linear gel
4.3 m3
Minifrac Calculation
Casing
0.018721 [m3/m]
Tubing
0.003826 [m3/m]
BH
393.5 [m]
Tubing Depth
351 [m]
TOP
362 [m]
BOP
366 [m]
Hole Fill
2.1 [m3]
Step up
0 [m3]
Step down
0 [m3]
Minfrac Volu
0 [m3]
Flush
2.1 [m3]
Total Pumped
4.3 [m3]
Casing volumes
OD inches Wall mm
5 1/4
7.7
5 1/2
6.2
5 1/2
6.9
5 1/2
7.7
5 3/4
9
6 3/4
8.05
7
10.36
0.011
0.0127
0.0124
0.0121
0.0128
0.0189
0.0193
Tbg volumes
OD inches Wall mm
2 7/8
C90
2 7/8
J55
0.0025
0.003
WELL #
Amasra CBM 2
Description
UM
WGA 20
kg
Minifrac
-
Bioclear
TRS DE-1
TRS CS-1
OC TS 11
kg
OC TEA
OC APS
kg
kg
Sand
12/20 Sand
Sand
16/30 Sand
Sand
70/140 Sand
Carbolight
16/20 FT ISP
16/30 Optiprop
OC CL 20
DRB HT
Optiprop
Description
UM
WGA 20
kg
Mainfrac
Bioclear
7.20
TRS DE-1
235.00
440.00
TRS CS-1
OC TS 11
kg
OC TEA
OC APS
kg
15.00
180.00
kg
47.50
OC CL 20
DRB HT
Sand
12/20 Sand
Sand
16/30 Sand
32,000.00
Sand
70/140 Sand
Carbolight
16/20 FT ISP
16/30 Optiprop
Optiprop
FRACTURE GEOMETRY
PREJOB DESIGN
FRACTURE CONDUCTIVITY
PREJOB DESIGN
Slurry Volume
Liquid Volume
m
m
Proppant Mass
kg
PRODUCTION DATA
PREJOB DESIGN
PREJOB DESIGN
SCHEDULE
PREJOB DESIGN
NPV
PREJOB DESIGN
PREJOB DESIGN
PREJOB DESIGN
PREJOB DESIGN
PREJOB DESIGN
PREJOB DESIGN
PREJOB DESIGN
PREJOB DESIGN
PREJOB DESIGN
PREJOB DESIGN
PREJOB DESIGN
FRACTURE GEOMETRY
FRACTURE CONDUCTIVITY
Slurry Volume
Liquid Volume
m
m
Proppant Mass
kg
PRESSURE MATCH
CHEMICALS