Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Neven M
N
Matasovic
t
i
Geosyntec Consultants
Huntington Beach, CA
nmatasovic@geosyntec com
nmatasovic@geosyntec.com
13 March 2008
Participant Introduction
N
Neven
Matasovic
M t
i
nmatasovic@geosyntec.com
@
Patrick Fox
fox.407@osu.edu
Ian Fleming
ian.fleming@usask.ca
Ed Kavazanjian
Edward.Kavazanjian@asu.edu
Michelle Maugeri
mmaugeri@dica.unict.it
Jonathan Bray
Susan Burns
susan.burns@ce.gatech.edu
J h McDougall
John
M D
ll
JM D
J.McDougall@napier.ac.uk
ll@
i
k
G/Gmax=1/(1+(/a) )
09
0.9
0.8
G / G max
1.1
0.7
0.6
0.5
0.4
0.3
0.2
1E-4
0.01
0.1
Shear strain, %
10
SASW
REMI
OYO Suspension
Cross-Hole
Downhole
In-Hole Density
SPT
CPT
Pressure Meter
Dilatometer
t-z curves
p-y Curves
Modulus of Sub
bgrade
Reaction
Youngs Modullus
Moisture Reten
ntion
Shear Strength
h
Parameters
IN SITU MEASUREMENT/
SOUNDING TECHNIQUE
Hydraulic Cond
ductivity
Shear / Compre
essional
Wave Velocity
MATERIAL
PROPERTY
Modulus Reduc
ction and
Damping
Unit Weight
Recommended Field
Measurement Techniques
q
Non-Intrusive (surface):
Non SASW
S S
REMI; Ambient Vibrations
Plate Load Test
Intrusive (in(in-hole and trenching):
OYO Suspension Logging
In
In--Hole Density Measurement, Plate Load
Test,, Sondex Device,,
(Orbital) Camera
Oth
Other:
Plate Load Test in Trench
Relevant Information
Minimum Reporting
Requirements
Boring
g logs
g
Shear wave velocity profiles
Unit weight profile(s)
Moisture profile(s)
Waste classification
Other (e.g., related to back analysis)
Guidelines / Procedures
General
Synthesis of available information:
Site (disposal) history
past measurements
waste disposal procedures
Guidelines / Procedures
Special Procedures:
Perform
P f
SASW fi
first,
t recover samples
l
from low, high and intermediate
y waste,,
velocity
SM instrument
in a borehole
Settlement from
a digital topo
Other
Figure Source: Matasovic
and Kavazanjian (1998)
Path Forward
Abstract and Outline by
y 16
March 08
p
response
p
and
Participant
input by 23 March 08
08
1st draft by 20 April 08
Participant response by 4
May 08
08
2nd draft to the Chairman by
25 May 08
Participant Presentations
Model Site No. 1: OII Landfill