Sei sulla pagina 1di 13

Civil Calculation Sheet for KO Drum Foundation

Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

1 of 22

PT. PERTAMINA EP
ASSET 2
PEMBELIAN & PEMASANGAN FASILITAS KOMPRESOR
UNTUK GAS MUSI TIMUR
FIELD PENDOPO

ISSUED FOR APPROVAL

28/11/2014

NGM

AYP

ZN

ISSUED FOR REVIEW

03/10/2014

AYP

TR

ZN

REV

DESCRIPTION

DATE

BY

CHKD

APVD

PT. INDOTURBINE

CHKD

APVD

PT. PERTAMINA EP

Civil Calculation Sheet for KO Drum Foundation


Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

2 of 22

APPROVAL SHEET

PAGE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

REVISIONS
A

X
X
X
X

REMARKS

PAGE
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

REVISIONS
A

REMARKS

Civil Calculation Sheet for KO Drum Foundation


Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

REVISION SHEET
Rev.
No.

Date

ISSUED FOR REVIEW

Description

3 of 22

Civil Calculation Sheet for KO Drum Foundation


Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

4 of 22

COMMENT SHEET
Comments :
REV NO.

DATE

23/10/2014

DESCRIPTION
Attach pile properties (Revised)
Pile group efficiency (Revised)

Civil Calculation Sheet for KO Drum Foundation


Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

5 of 22

Table Of Contents
Page
1.0

INTRODUCTION

..............................................

2.0

DEFINITION OF TERMS

.......................................

2.1

Applicable Documents

.....................................

2.2

International Code

2.3

Reference

3.0

GENERAL REQUIREMENTS

3.1

Material

3.2

Unit Weight

4.0

................................................

.....................................................................

...............

.............................................

...................................................

LOADING ANALYSIS

.......................................

4.1

Load

.........................................

4.2

Temporary Load

.........................................

4.3

Load from Pile Cap (Each Support) .........................................

5.0

SOIL DATA PROPERTIES

6.0

PILING DESIGN

6.1

Mini Pile Properties

6.2

Resume Allowable Capacity

6.3

Pile Group Plan

7.0

PILE CAP REINFORCEMENT

8.0

SKETCH

.....................................

.........................................

..................................

..........................

.........................................

.............................. 11
......................................... 13

Civil Calculation Sheet for KO Drum Foundation

1.0

Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

6 of 22

INTRODUCTION
The purpose of this calculation is to design of KO Drum Foundation for Gas Compressors Facilities Musi Timur Field Pendopo
Project which is owned and operated by PT. Pertamina EP.

2.0

DEFINITION OF TERMS
The following words if found elsewhere in this document shall have the meaning
as follow :
PERTAMINA EP

PT. Pertamina EP Asset 2 as the owners and users of the facility.

CONTRACTOR

PT. Indoturbine, company or entity designated by Pertamina EP to carry out all the
work Pembelian & Pemasangan Fasilitas Kompresor Untuk Gas Musi Timur Field
Pendopo.

CONSULTANT

Parties who have been appointed by Pertamina EP as an engineering consultant for


this project.

MIGAS

Representatives from the Indonesian government that is responsible in issuing


licenses and permits oil and gas facilities.

PROJECT

Pembelian & Pemasangan Fasilitas Kompresor Untuk Gas Musi Timur Field
Pendopo

VENDOR / SUPPLIER

SUB-CONTRACTOR
2.1

2.2

2.3

Companies or entities that provide materials, equipment, documents / drawings and


technical service to carry out the work specified by the CONTRACTOR or Pertamina
EP.
Companies or entities specified and as representative CONTRACTOR to carry out
some or all of the work Pembelian & Pemasangan Fasilitas Kompresor Untuk Gas
Musi Timur Field Pendopo.

Applicable Documents
GCMT-13-MS-DS-002

Mechanical Data Sheet LP Separator

GCMT-13-CIV-SPC-002

Civil Specification for Concrete Design and Materials

GCMT-13-CIV-SPC-004

Civil Specification for Foundation

GCMT-13-CIV-SPC-012

Civil Specification for Piles

International Code
a.

ASCE 7-02

Minimum Design Loads for Buildings and Other Structures

b.

UBC 97

Uniform Building Code 1997

c.

ACI 381-05

American Concrete Institute

Reference
a.

Soil Report

b.

Principles of Foundation Engineering by Braja M Das, 1990

c.

Analisis dan Perancangan Fondasi II by Hary Christady Hardiyatmo, 2010

d.

Renforced Concrete : A Fundamental Approach by Edward G. Nawy, 2008

Civil Calculation Sheet for KO Drum Foundation


Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

3.0

GENERAL REQUIREMENTS

3.1

Material
a)

7 of 22

Bolt Connector :
Bolts shall comply with ASTM A307 Grade A, JIS B1180 Class 4.6 with tensile minimum is 413 MPa.

b) Concrete :
Concrete, 28 days cylinder compressive strength : 250 kg/cm2
Cement for upper ground portion : ASTM C150 Type I
Cement for under ground portion : ASTM C150 Type II
c) Rebar Reinforcement :
Deformed high yield steel bar

: ASTM A615 Gr. 60 or equal

Plain round steel bar

: ASTM A615 Gr. 40 or equal

d) Piles
Concrete piles shall comply with ACI 543-00 Design, Manufacture and Installation for Concrete Piles. Pre-stressed
concrete material with minimum 28 days compressive strength f c' : 500 kg/cm2
3.2

Unit Weight

Unit weight of major construction materials shall be as follows :


Steel

: 7850

kg/m3

Mortar

: 2000

kg/m

Reinforcement Concrete

: 2400

kg/m3

Plain Concrete

: 2200

kg/m

kg/m

(KS Brochure)
(SNI-03-2847-2002 Tata Cara Perencanaan
Struktur Beton untuk Bangunan Gedung)
(SNI-03-2847-2002 Tata Cara Perencanaan
Struktur Beton untuk Bangunan Gedung)

Soil

: 1700

(Soil Test Investigation, BH1)

Unit weight other than above mentioned shall be as per "Pedoman Perencanan Pembebanan Untuk Rumah dan Gedung
1987".
4.0

LOADING ANALYSIS
Diameter Spec

ID : 2500 mm

7210mm

2500 mm

2500 mm
10300 mm T/T

2500

mm

Civil Calculation Sheet for KO Drum Foundation

4.1

Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

8 of 22

Load
Load applied to this structure based on analysis by mechanical engineer on document number : GCMT-13-MS-DS011:KO Drum
Permanent load applied to structure comes from load during operation. (each support)

4.2

Axial Load ,

Pp

175,59

kN

Horizontal Load ,

Hp

48,04

kN

Moment Load ,

Mp

43,23

kN-m

Temporary Load
Temporary load applied to structure comes from load during hydrotest and load caused by the effect of earthquake at area.
(each support)

4.3

Axial Load ,

Pt

327,26

kN

Horizontal Load ,

Ht

1,35

kN

Moment Load ,

Mt

1,22

kN-m

Load from Pile Cap (Each Support)


Bottom Pile Cap

Top Pile Cap

Height ,

Hpc =

600

mm

Height ,

Hpd

300

mm

Length ,

Lpc

4000

mm

Length ,

Lpd

3500

mm

Breadth ,

Bpc =
Wpc =

2500

mm

Breadth ,

Bpd

1500

mm

Weight

Wpd

37,8

kN

Weight

144

kN
3500 mm

KO Drum saddle

Pedestal
Foundation

300

mm

600

mm

4000 mm
Foundation

2375 mm
1500
KO Drum saddle

mm

450 mm

2500 mm
Pedestal

Civil Calculation Sheet for KO Drum Foundation

5.0

Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

9 of 22

SOIL DATA PROPERTIES


Based on Geotechnical analysis report (GCMT-13-GE-GEO-001)
Unit weight of soil, g
Soil cohessivity, cu

17

kN/m3

32

kN/m2

Internal angle friction, j

6.0

PILING DESIGN

6.1

Mini Pile Properties


Mini Pile Properties

:
17,40

so the length is

6.2

250

Mini Pile =
-0,60

The pile will be at level

-18,0

to

250

meter. Level of pile decided by considered the data from SPT

Resume Allowable Capacity

Based on Geotechnical analysis report (GCMT-13-GE-GEO-001)


Parameter

6.3

0,6 m depth,

meter, and embedded into the pile cap

Symbol

Unit

Permanent Condition

Compressive Capacity

Pa

Temporary Condition

kN

338

507

Tension Capacity

Ta

kN

190

285

Lateral Force Capacity

Ha

kN

78

116

Displacement

cm

0,709

Pile Group Plan


Number of piles needed due to permanent condition
Pp + Wpc + Wpd
175,58633 + 144 + 37,8
n
=
=
Pa
338,000
Number of piles needed due to temporary condition
Pt + Wpc + Wpd
327,25534 + 144 + 37,8
n
=
=
Pa
507,000
Then, use

4 units (each support)

of pile, with the plan below :

1,057356006 units

(Each Support)

1,004053925 units

(Each Support)

Civil Calculation Sheet for KO Drum Foundation


Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

500

1500

10 of 22

500

750

Mini
pile

Mini
pile

Mini
pile

2500

4000

Mini
pile

750

2500
Check Pile Group Efficiency
Efficiency (Converse-Labare)
D

0,25

1,5

arctan (D/s)

9,46

Eg 1

Eg

(n 1)m (m 1)n
90m.n

89,49%

Pile Group Capacity


=

Compression Strength

Number of piles x capacity per piles x efficiency group

1815 kN >

357,39

kN

ok

Control pile safety due to moment and horizontal load


Permanent Load
Pmaks

Pp
n

x2

357,39

=
Pmin

Mp . X

4
Pp
n

Mp . X
x2

43,233534x0
12,5

89,3465825

<

Pall =

338,000

Ok

Civil Calculation Sheet for KO Drum Foundation


Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

357,39

43,233534x0

12,5

11 of 22

89,3465825

>

Pall tens=

-190,021

Ok

Horizontal Load
H

Hp

n
48,037

12,009 kN

<

qa

<

77,7

<

1.5 qa

<

116,5

kN

Ok

Horizontal Load
H

Hp

n
1,3517

=
7.0

0,3379 kN

kN

Ok

PILE CAP REINFORCEMENT


qdl
qpd
qpc
a

qdl

qpd =
qpc

a1

Load from KO Drum


Pedestal Width
Weight of Top Pile Cap
Pedestal Width
Weight of Bottom Pile Cap

=
=
=

327,26
3,50
37,80
3,5
144,00

Pedestal Width

To find the maximum moment on the pile cap, used SAP 2000.
Moment of pile cap

a1

a
a1
b

=
=
=

93,50152571

kN/m

10,8

kN/m

36

kN/m

=
=
=

250 mm
500 mm
2500 mm

Civil Calculation Sheet for KO Drum Foundation


Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

Max Mu-

Max Mu+

24,06 kNm

Reinforcement Neccesity
fy

400

MPa

1000

mm

fc'

25

MPa

4000

mm

dia =

25

mm

cv =

75

mm

Mu =

86,56

kNm

550

mm

Rn

rmin

rmin

fy

Ab

spacing, s

= 18,82353

0.85 fc'
Mu

86560000

fBd

0,3366456

rmin =

0,003500

0.85 x 1000 x 550^2

0,00671347

1.4
fy

4.

ruse =
As

0,0035

0,00313

0,006713

rmin B d

=
2

0.25 p dia
As
= 8
Ab
=
smax =
smax =

125

3692,406 mm2
490,8739 mm2

mm

2d
500

D25 - 100
mm

2 Layer

12 of 22

86,56

kNm

Civil Calculation Sheet for KO Drum Foundation

8.0

Document No.

Rev.

Contract No : EP37-M12LL0122D

GCMT-13-CIV-CN-016

Job. No : 31-12008PO002

13 of 22

SKETCH
D25 - 100

D25 - 100
0,3 m
0,6 m

D25 - 100

17,4 m

Dia. =

0,25 m

Potrebbero piacerti anche