During ACW pump-C start up we observed some smoke from
pump bearing housing area immediately stopped the pump.
Pump bearing housing was opened for inspection purpose and
found gun metal bush & bearing are not in proper condition. So
that both the sleeve & Bearing replacement work attended and
completed.
12-04-2012
ACW Pump-C trail run taken and found motor NDE side
horizontal vibrations having high (18 mm/sec) and same
vibration rectification purpose pump coupling hub run out
checked and observed 1.2 mm shaft run out. Pump coupled
with motor and kept in emergency stand-by.
13-04-2012
ACW pump-C dismantling work has been completed for pump
overhauling purpose. And the following abnormalities were
found.
1.
2.
LOCATION
PHYSICAL
CLEARAN
NO
1
2
3
6
7
8
Impeller OD to Impeller
housing ID
Impeller ID to Impeller shaft OD
Impeller shaft OD (Position-3)
to Rubber bearing ID (Position3)
Impeller shaft OD (Position-2)
to Rubber bearing ID (Position2)
Impeller shaft OD (Position-1)
to Rubber bearing ID (Position1)
No.4 shaft OD to No.3 Bearing
ID
No.3 Shaft OD to No.2 Bearing
ID
No.2 Shaft OD to No.1 Bearing
ID
READING
CE
307.16307.97
61.96-61.80
61.79-62.11
0.81
61.48-61.90
0.42
61.79-62.14
0.35
55.55-55.83
0.28
55.65-56.27
0.62
55.55-55.84
0.29
0.16
0.32
14-04-2012
ACW pump-C shafts sent to vemagiri work shop i.e. head shaft
& line shafts total 05 Nos to check the shafts run out. But they
could not rectify, new WPIL pump spares were arrived at site at
19:30 Hrs. After arriving the spares clearances again checked
and measured.
SL.
NO
LOCATION
1
2
PHYSICAL
READING
CLEARAN
CE
61.91-62.30
61.91-61.77
0.39 mm
0.14 mm
61.91-62.03
0.12 mm
61.91-62.13
0.22 mm
5
6
7
1)
No.4 shaft OD to No.3 Bearing
ID
No.3 Shaft OD to No.2 Bearing
ID
No.2 Shaft OD to No.1 Bearing
ID
55.58-55.92
0.34 mm
55.53-56.13
0.60 mm
55.55-55.82
0.27 mm
1
2
3
4
LOCATION
CLEARANCE
0.15 mm
0.65 mm
18 mm