Exposure
(from external
facilities)
Spacing
Between Plant
Areas & Site
Layout
Within Unit
Spacing
Construction
Fire
Separation
Control
Systems, ESD
& Interlocks
At 20% LEL, all units are tripped and main fuel shut-off valve for
plant closes.
On an engine hall fire alarm (from UV/IR sensors), units are tripped
and main fuel gas valve into plant closes. All fans are shut off and
vents are closed.
Boiler
Turbine or ICE
(Internal
Combustion
Engine)
Generator
Transformer
Operational Reliability & Redundancy
Outside the engine hall in a packaged enclosure is an auxiliary
Utilities
Black-Start diesel generator rated at 450KW and a CAT 625 hp
Reliability
Process Flow
Configuration
Plant
Utilisation
Proven
Technology
Operations
Manning,
Training &
Experience
engine
GSU 1 serves engines 1-6 and GSU 2 serves engines 7-12.
Operating &
Emergency
Procedures,
P&ID
Plant
Monitoring &
Routines
Work Permit
System
Safe Work
Practices &
Safety Critical
By-Pass
Handling
Plant
Condition,
Housekeeping
& Order
Maintenance
Organisation &
Planning
Qualifications
& Contractors
All procedures follow OEM guidelines from Caterpillar and the other
OEMs as well as Sunflower Electric routines where applicable.
Mechanical,
Electrical &
Instrumentatio
n
Spare Parts &
Repairs
Only frequently used spare parts will be kept on hand. There will
be one spare turbo cartridge (includes turbo and bearings in an
easily exchanged package). There are no plans to have a spare
crankshaft onsite. CAT has stated it would take 6 weeks to
fabricate a new crank. As there are 11 other engines available for
power production, having one engine out of service for this time
seems acceptable. There are no spare engines or generators
available at this time.
Inspection
Organisation & All procedures follow OEM guidelines from Caterpillar and the other
OEMs as well as Sunflower Electric routines where applicable.
Procedures
Boiler & Piping
Inspection
Turbine &
Generator
Inspection
Mechanics are all qualified and trained by the OEM Caterpillar.
Internal
There is no service agreement with CAT. Sunflower personnel
Combustion
perform all preventative maintenance of the generator sets. Major
Engines
overhaul work will be performed by OEM representatives
(ICE's)
Transformers
& Electrical
Systems
Records &
Analysis
Safety & Loss Prevention
The Safety Supervisor and staff conduct training and auditing for
Safety
HLS, as well as the Mid-Kansas sites. Rubart is visited by a member
Awareness &
of the safety team multiple times a month.
SMS Auditing
Management
of Change
Control of
Ignition
Sources
Risk
Management
& Contingency
Planning
Fire Protection
Fire & Gas
Detection
Firewater
Supply &
Distribution
Fixed
Firefighting
Sysetm
Manual
Firefighting
Systems
Fire Protection
Maintenance
& Testing
A well provides water to the site. The well can fill the firewater tank
within 8 hours.
240,000 gal.
Emergency Response
Fire Brigade & Distance- 15miles, response time 20 min
Mutual Aid
The Emergency Response Plan was said to be in progress, but has
Emergency
not been implemented. A recommendation was made to finalize
Planning
and then educate and train Rubart staff on the emergency response
procedures.
Security &
Surveillance