Curriculum Vitae

ARUN KUMAR SINGH


C/o Sri Udaynarayan Singh, Bidya Niketan, Lane No.-6, Jayprakash Nagar, Dhanbad- 826001
Cont.No. 9199430809 & 9835351400(M), Email- er.arunkrsingh@gmail.com/arunk_elct@yahoo.co.in
Career Objective:
To achieve excellence through positive attitude and Commitment in the field of engineering & project
and operation & maintenance looking forward to handle challenging job.
Experience :21st Years Ranging from Project to Operation & Maintenance In Oil, Petrochemicals, Power, Washery& Mines,
Electrification of Urban Area& Rural Area and 5Star Hotel Industries. During This Period I Have Covered Most
Aspects Of Projects Life Cycle & Its Operational System from Project Concept to Project Management,
Planning, Engineering, Procurement, Construction, Commissioning and Operation / Maintenance.
Country Visited For Work Purpose :- Kuwait & Bahrain
Technical Qualification:
3Years Diploma In Electrical Engineering With 73% Marks (First Division) in 1994 From Govt. Polytechnic, Dhanbad.
Computer Literacy:
MS- office, Excel, Power point, SAP
Extra Curricular Activities:
Successfully Completion Of Volume Maximizing & Quality Improvement project And 30 Days Shutdown
In 2003 At Reliance Petroleum Ltd. Jamnagar (Gujarat).

Rewarded at MAA Project of The KNPC Kuwait For Closely Contribution to Safely Handle 6 Million Manpower
& Completion The Project Before Scheduled Time With Zero Accident

Successful Completion of Electricity Transmission & Distribution System In the State of Jharkhand in Aruban as
Well as Rural field. Participated as a Project In-charge of APDRP Project at Dhanbad, And as Project Manager of
Rajeev Gandhi Rural Electrification Project of the Bokaro District.

1st Trophy winner of last 2years in DGMS annual mines safety program for power system & Power SubStation construction, Utility & its safety system development among of all government & private mines e.i
( BCCL, ECCL,WCL and Tata ect.). Responsible for all Construction to operation & maintenance as per rules &
regulation of DGMS & IER participating as Electrical In-charge.

SYNOPSIS

A result oriented professional with over 21 years of experience in project management, execution,
testing& commissioning, maintenance & operation, quality control, inventory management & Man
management.
- Deft in swiftly ramping up projects with competent skill and ensuring on time deliverables.
-

Skilful in enhancing systems to bring greater cost efficiency levels & energy.

Resourceful at strategizing techniques for maximum utilization of machinery & manpower.

Creator of documents & method and its application as per standard engineering practice with
rules and requirements.
1/5

-1-

Effective communicator and personality with sincerity & honesty, negotiation skills, strong
leadership quality and analytical power.

Career Graph
Present employer: - Electrosteel Castings Ltd.
Central Coal Mine, Parbatpur Bokaro
(The company is engaged in manufacturing of DI pipe, Sponge Iron, Mines & Washery,
Steel & Power also operating Mines & Washery and steel & power sectors)
Position

: Dy. Manager (Project)

Period
: 5th march 2008 to till Date.
Job Profile:Looking after all activities of Electrical works & ensuring all applicable rules & regulation, Construction &commissioning,
Operation & maintenance of 33KV, 11KV, 3.3KV Sub-station and its O.H. line, Washery &Open Cast
Equipments, Services area at Parbatpur mines, Planning, Basic Engineering, Budgetary estimate, Materials Indenting,
Materials Inspection, Installation, Testing & Commissioning of All Electrical & Instrumentation system & equipments of
Washery, Open Cast & surface area.
Application of own idea along with experience and without any extra expenses of the company, the 33/11KV Main
receiving Sub-station become as not only best one & got 100 % marks only but also saved relevant equipments every
time in abnormal condition.
Ensuring continuous power supply and Operation/Maintenance to 33 Receiving Sub-station,11 KV Washey Sub-station,
3.3KV Incline Sub-station & 11KV Ventilation shaft & Open cast equipments along with relevant Transmission &
Distribution lines and equipments of Washery, Open cast & services area.
Also served as Colliery Engineer co-ordination & closely supervision to The China Coal Company (A Govt. of the China
Company) for Inclines activity & Ventilation Shaft by Ukrainians, ensuring & apply all the DGMS & IER rules / regulation
for safe & smooth operation.
Responsible for all relevant document approval of all electrical system, Estimating & BOQ friezing, Materials Inspection,
Work force mobilization, Monitoring of site safety & quality progress, Verification & Certification Energy Consumption
Bills of DVC and inter departments, Materials Reconciliation & Contractor bill Certification. Ensuring Un-tripped power
supply to every area.
Achievements : Successfully completion a sound quality delivery to 33 KV double circuit transmission line & 33KV, 20MVA
power sub-station, Carried out modification in 11KV VCB Incomers Panel & Transformer panels & Its control panels for
provision of REF & Differential protection which was not provided earlier in scope, Its inspection & approval from
Central Electrical Authority, Maintaining a sound quality in control & protection system and its work quality improvement
in daily operation / maintenance with all documentations & records. During inspection by DGMS Safety Week- 2013
awarded with 100% marks in Regional power sub-station & its transmission line. Successfully Completion of 350 TPH
Cocking Coal Beneficial Plant with Complete power arrangements. Carried out Installation, Testing & commissioning of
Washery Sub-station with its 11KV transmission line, PMCC & MCC, PLC & VFD Control room panels, H.T. &
L.T. Motors, 2000 KVA D.G. Set.

(VI) Employer : VIJAI ELECTRICAL LTD.


(An ISO 9001 & 2000Organization engaged in manufacturing of Transformer.
2/5

-2-

Position

: Project Manager

Project

: (1) Rural Electrification Project, Dharbhanga (A Govt. of India Project under NHPC consultancy)
(2) Aruban power development program Dharbhanga & Madhubani District (under PGCIL)

Job Profile:
Looking all activities as a Project Manager for APDRP & RE Power Project of Dharbhanga circle, Successfully
Evaluate & successfully Construct the project & Plan. Co-ordination to H.Q., R.O., Vendors, Project Consultant, Close
Supervision with materials inspection team. QA/QC Department, Account Department and Engineering teams
Billing &found arrangement.
Achievements:- Successfully completed the both projects and handing over to NHPC & PGCIL, 70% area is flood
effected area where approaching road not available even.
(V) Employer

M/s Subash Projects & Marketing Ltd. ( Kolkata, India)


( An ISO 9001-2000 Certified EPC Based Company)

Position
Project

:
:

Project Manager
Rajeev Gandhi Gramin Vidyuti Karan Pariyojana , Bokaro
(Rural Electrification Scheme of Bokaro District)

PMC
:
Damodar Valley Corporation
Job Profile
Looking all activities as a Project Manager,i.e.- Project Formulation, Actual scope Identification and BOQ freezing,
Complied to technical Quires, application of required action plan, Billing And Payments ,Ensuring & Implementing
required work plan with sound Quality & as per IER, Interview arrangement, staff selection, arrangement of training
and envelopment program, Co-ordination with H.Q., Govt. offices, Local administration, Reporting to Management,
billing, as build drawing and materials reconciliation, Close of contact, Authorized signatory of Projects & of the bank.
Achievements : - Successfully delivered 1st RE project in the state of Jharkhand with a sound & standard quality, In
this project 60% area is coming under forest area and 20% is hilly area.
(IV) Employer
Position

M/s Nagarjuna Construction Company Ltd. ( Hyderabad, India)


(An ISO 9001-2000 Certified EPC Based Company)
:

Project

Project In-charge
: (1.) APDR Project, Dhanbad & (2.) Dhanbad Water Supply Scheme

Consultant
:
M/s Rites Ltd. (Govt. of India Enterprises)
Job Profile:
Looking all activities being as a Project In-charge for APDRP Power Project of Jharkhand State Electricity Board,
as Well as all Electrical activity for DWSS Project of PHED, Dhanbad.--- Project Formulation,Actual scope
Identification and BOQ freezing, technical Quires, application of required action plan, Project Formulation, from
Basic engineering to commissioning, Materials Inspection to billing and fond arrangement to payment.
Achievements: - Successfully deliver the project & implementation of project parameters, BOQ revising and standing
the project on ground.

III) Employer

M/S. Reliance Engineering Associates Ltd.( Jamnagar, India )

3/5

-3-

An E P C Division Of Reliance Group


Position

Project

Consultant

Volumes Maximizing Project & Participated in the world famous in


Petroleum sector 30 Days Shutdown 2003,

At Reliance Petroleum Ltd., Jamnagar (India)


ITP/PMC

Reliance Engineering Associates Ltd.

Job Profile :
Looking after Volumes Maximizing Project of RPL, Field data collection, Estimating Of Sites, Co-Ordination,
Among RPL, REAL & Contractors, Carry out Planning Schedule, Work Distribution, Daily
Scheduling, Basic Engineering And Progress Report. Inspection, Monitoring And Work Supervision With Site Safety
And Quality Progress. Execution & Maintenance. As Per Standard Engineering And According To Bechtel Standard.
Working As A Consultant, Responsible For All Electrical Activity And Site Safety From InstallationTo commissioning,
Co-ordination With Safety department, Project Department, FDC, Material Dep., and Operation Group. Authorized For
Any Types Issue And Accept Of Work Permit
Achievements
Safely, Successfully completion the
,
(II) Employer

M/s. SK Engineering & Construction Co. Ltd. - KORIA


The Company Is Engaged In Project Execution And Engineering.

Project (V)

Kuwait National Petroleum Company, Reconstruction of MAA refinery


Project, Kuwait.

ITP/PMC
:
Foster Wheeler Energy Ltd. England
Period
:
23rd Oct..2002 to 12th August 2003
Job Profile :
Working as a leader of a group of technical expert, Successfully carried out all electrification, PA System & Cathartic
protection work For CCR-1& 2 as per KNPC standard & maintained quality as per standard engineering practice. The
projected work was completed before scheduled time. Ensuring all installation as per related standard and drawing
according to the KNPC specifications, Work Co-Ordination with Site Safety And Quality Progress, Supervision.
Responsibility :
Successfully completed the project before scheduled time recorded as zero accident and rewarded for closely
contributing a major roll for Safe handling 6 Millions Man Hours.

( I) Employer

M/s.

Reunion Engineering Co. Ltd. ( Mumbai, India )

The Company Is Engaged In E&I Project Execution, Engineering, Panel and DB


Manufacturing
Position

Period

Project Engineer
19th Jun 1995 to 19th Oct 2002 (7 Years) as below listed Projects completed

Projects
( 1 ) Reliance Industries Ltd.- Hazira ( Gujrat )
( 2 ) ITC Ltd.- Chirala ( Andra Pardesh), India
(3)

UTI Data Center, Belarpur (Mumbai, India)

Consultant
H&G

- Bovies Lend Lease


- Wipro InfoTech
4/5

-4-

( 4 ) Hyatt Regency Hotel (A 5 Star Hotel in Mumbai )

- SMO Inc. London

Job Profile:
Working As A Project Engineer Carryout Design & Drawing, Basic Engineering, Estimation, Scope Freezing, Planning
Schedule, Supervision Group Of Engineer, Supervisors, Testing And Commissioning, Reconciliation, Preparation Of
As Built drawing, Handing Over &. Close Of Contact. Responsible all activity of a Project Engineer basic engineering &
drawing, Consultant and turnkey project executer. Co-Ordination With Site Safety And Quality Progress, Monitoring Of
Supervisors, Client Representatives, Measurement clearing, Billing etc.
Achievement:
All above project successfully completed as per standard engineering practice and specification. All above projects are
base on EPC, Getting a chance to learning & exercising in field of engineering & design as well as in field of testing &
commissioning, Able to handle of various type critical & fast growing projects and maintenance work in many state of
country.
Personal Details:Fathers Name
: Sri Dindyal Singh
Date of birth
: 12.02.1973
Nationality
: Indian
Religion
: Hindu
Marital Status
: Married
Passport NO.
: BO333350
Driving Licence No. : JH-10/LL/16135/06-07
Language Proficiency : English, Hindi, Gujarati & Bhojpuri
I hereby declare that all the above statements are true and correct to the best of my knowledge and belief.

Thanking You.

Yours truly,

( Arun Kumar Singh )