Generation and Reservoirs Statistics

01st November 2015

PUBLIC UTILITIES COMMISSION OF SRI LANKA

01st November 2015

Generation Mix in MWh


347

9480
CEB Hydro
CEB Thermal Oil

16714

CEB Coal
IPP Thermal
SPP Wind

30
Total Generation - 26,571 MWh

Note: Generation from other SPPs (Mini Hydro, Solar and Biomass) is not included

Cumulative Dispatch
01st November

From 01st January 01st November

Category

Dispatch (MWh)

Category

Dispatch (GWh)

CEB Hydro

16,714

62.90%

CEB Hydro

3,657

34.05%

CEB Thermal Oil

30

0.11%

CEB Thermal Oil

993

9.25%

CEB Coal

9,480

35.68%

CEB Coal

3,932

36.62%

IPP Thermal

0.00%

IPP Thermal

1,200

11.18%

SPP Wind

347

1.30%

Renewable

955

8.90%

Total

26,571

Total

10,738

Note: Generation from Mini Hydro, Solar and Biomass power plants in September, October and
November is not included in annual cumulative renewable generation figure.

Dispatch on 01st November 2015


MWh
7000

6000

5000

4000

Rated Capacity
Available
Dispatched

3000

2000

1000

Night Peak Contribution on 01st November 2015


MW
300

250

200
Installed
Capacity
150

Available
Capacity
Night Peak Load

100

50

Contribution to the Night Peak in MW


2
545
CEB Hydro
CEB Thermal Oil

1127.2

CEB Coal
IPP Thermal

23.4

SPP Wind

Night Peak - 1697.6MW

Day Peak Demand 1,225.8MW


Minimum Recorded Demand 820.7MW

Reservoir Storage Levels ( As at 06.00 hr on 02nd November 2015)


GWh
360
74.4%

330
300
270
84.3%

240
210
180
150

83.2%

120
90

76.4%

92.6%

58.7%

60
30
0
Castlereigh

Maussakelle

Kotmale

Victoria

Randenigala Samanalawewa

Note: Hydro Reservoir Storage Capacity as at 01st November 2015 968.2GWh (76.93%)

GWh

Comparison of Reservoir Storage Levels

1200

1000

800

2012
2013

600

2014
2015
400

200

Demand Variation 2015


2400

MW

2200
2000
1800
1600
1400
1200

Nigh Peak

1000

Day Peak

800

Minimum
Demand

600
400
200

Note: Contribution from Mini Hydro, Solar and Biomass is not included

22-Oct

8-Oct

24-Sep

10-Sep

27-Aug

13-Aug

30-Jul

16-Jul

2-Jul

18-Jun

4-Jun

21-May

7-May

23-Apr

9-Apr

26-Mar

12-Mar

26-Feb

12-Feb

29-Jan

15-Jan

1-Jan

Load Curve for 31st October 2015


2100

MW

1800

1500

CEB Hydro

1200

IPP Thermal
CEB Thermal Oil
CEB Coal

900

600

300

Time of Day

Note: Contribution from Wind, Mini Hydro, Solar and Biomass is not included
8

12000

GWh

Comparison of Cumulative Dispatch from 01st January - 01st November

10000

8000

SPP Wind
IPP

CEB Coal

6000

CEB Oil
CEB Hydro

4000

2000

2014

2015

Year

GWh

Comparison of Cumulative Dispatch

12000
11000
10000

9000
8000
7000

2014

6000

2015
5000
4000
3000
2000
1000
0

Note: Generation from SPP Mini Hydro, Solar and Biomass is not included

10

List of Power Stations


Power Station

Capacity (MW)

Primary Fuel

CEB Hydro
Victoria
Ukuwela
Kotmale

Randenigala
Rantambe
Bowatenna
Nilambe
Upper Kotmale
Old Laxapana
New Laxapana
Polpitiya
Wimalasurendra
Canyon
Samanalawewa
Kukuleganga
Inginiyagala
Udawalawe

210
40
201
122
49
40
3.2
150
50
115
75
50
60
120
75
10
6

CEB Thermal
Sapugaskanda 1
Sapugaskanda 2
Kelanitissa Small Gas Turbines
GT 7 - Kelanitissa
Kelanitissa CCY
Lakvijaya (Puttalam Coal)
Lakvijaya (Puttalam Coal) Stage II
Lakvijaya (Puttalam Coal) Stage III
Uthuru Janani

72
72
68
115
165
285
285
285
24

Private Thermal (IPPs)


Asia Power
AES Kelanitissa
West Coast
Northern Power

51
163
270
27

11

Heavy Fuel
Heavy Fuel
Auto Diesel
Auto Diesel
Naptha & Diesel
Coal
Coal
Coal
Heavy Fuel

Heavy Fuel
Auto Diesel
Low Sulphur Furnace oil
Auto Diesel