LER Number: 0100144_LM_Pamplona-0100147_LM_Monterrico

________________________________

Microwave Link Installation / Site Acceptance Form


OPTIX RTN 900 RADIO

Accepted by (Transmission Implementation):

______________________________________

Signature: ____________________________________ Date:

Handed over to (Transmission Operation):

________________

_______________________________________

Signature: ____________________________________ Date:

________________

Microwave Link Installation / Site Acceptance Form


RTN 900 RADIO

Site Parameters

Link
ID

Protection

Calc.
RSL
Main

1+1HSB

-33.39

Site A:EN0001 (near end)


Calc.
Actual.
Actual.
RSL
RSL
RSL
Standby
Main
Standby
-33.39

-35.2

-40

Site B:EN0009 (far end-uplink)


Calc.
Calc.
Actual
Actual.
RSL
RSL
.RSL
RSL
Main
Standby
Main
Standby
-33.39

-33.39

-35.6

-41

Site A
Site ID
IDU Type
IF Board Type
CSH Card Type
E1 card
TX Frequency
Modulation *
Main Antenna
Size

0100144
RTN950A
SL91IFU2
CSHO
ML1
14459.0 MHz
15G_XMC2_128Q_14M_78M
WTG06-144D

Site Name
ODU Type
Polarization
Coupler-OMT Type
Ethernet Card
TX Power
T/R space
Standby Antenna
Size

Pamplona
XMC-2-15G-Sub Band B-H
V
15G
EM6T
20.5
490
WTG06-144D

NOTE *: Frequency_ODU type_Modulation_BW_Capacity

Site B
Site ID
IDU Type
IF Board Type
CSH Card Type
E1 card
TX Frequency
Modulation *
Main Antenna
Size

0100147
RTN950A
SL91IFU2
CSHO
ML1
14949.0MHz
15G_XMC2_128Q_14M_78M
WTG06-144D

Name
ODU Type
Polarization
Coupler Type
Ethernet Card
TX Power
T/R space
Standby Antenna
Size

Monterrico
XMC-2-26G-Sub Band B-L
V
15G
EM6T
20.5
490
WTG06-144D

NOTE *: Frequency_ODU type_Modulation_BW_Capacity

Microwave Link Installation / Site Acceptance Form


RTN 900 RADIO

Check List
1.0) Antennas

OK or NOK

1.1) Installation location and direction of antenna should be the same as design.

1.2) All drilled holes on sides and top sealed with black plastic caps.

1.3) Ensured that Feed horn are secure.


1.4) Antenna support should be correctly installed on the pole and with standard of weight and force of
wind.
1.5) All the screws must be tightened.
1.6) Antenna should be marked by marker and contains all the information. (NEED BE CONFIRMED)

1.7) Antenna support pole is securely connected to the tower or the rooftop.
1.8) Antenna mounted on the correct tower leg.
2.0) Outdoor Units
2.1) Installation and direction of ODU should be same as design.

2.2) IF connector waterproof should been same as standard.

2.3) label should been installed correctly.

2.4) IF Cable should be routed without any overlapping or crossover and should follow ladder.
2.5)2 ground cables of IF cable should been connected to bus bar. (considerer los 3 puntos si la antenna
esta instalada a mas de 40)
2.6) should have 3 meters redundance of IF Cable under ODU.
2.7) IF cable should be curved for waterproof purposes after being led out from ODU and feeder window.
2.8) If cable should not be broken or twisted.

3.0) Indoor Units


3.1) IDU should been installed in Transmission Rack.
3.2) Grounded cable of IDU should been installed (6mm)
3.3) label of IF cable should be clear.
3.4) IDU label should been pasted with remote site names and frequency (both labels)

3.5) IF cable/fiber/Ethernet cable should been installed with ladder.

3.6) Connectors should be correctly made and tightly fixed.


3.7) Power cables should been connected to mainly and standby DC breakers.

3.8) Power position (fuse /Breakers) properly labeled.

4.0) Link Reliability Test/ Tributary test


4.1) Frequency, modulation, T/R, TX power is the same as Link Budged.

4.2) RSL should be 3 dB differences to the required RSL. (NEED BE CONFIRMED)


4.3) Automatic switch performance is Ok, if its a 1+1 link.
4.4) Confirmed no-alarms on all equipment on the transmission link.
4.5) link No bit error of 24H.
4.6) PIU test
4.7) Remote power on the POWER ENGINE Test (When apply)

Hardware and Commissioning Pending List


3

Microwave Link Installation / Site Acceptance Form


RTN 900 RADIO

This report will be prepared with the acceptance Certificate to list all the pending issues to be solved.

Item

company

Fault Description

Cleaned
By
SubContractor

Accepted
By
Customer

Signature:

Nextel

cooperator

Huawei