5S Check List
5S Evaluation
Actin Plan & Report - Individual
Cause & Effect Diagram
Cause & Effect Diagram Example
Design Of Experiment Grid
Is-Is Not page 1
Is-Is Not page 2
Kanban Worksheet
Lean Assessment
Lean Evaluation Radar Chart
Lean Project Tracking Sheet
Meeting Agenda Blank
Metrics Sheet & Example
OEE Worksheet
PDCA Sheet
Problem Solving Worksheets
Rapid Improvement Event (REI) Agendas
Rapid Improvement Event (REI) Worksheets
Rapid Improvement Event Before & After Worksheet
Six Sigma Summary Sheet
Standardized Work Chart
Standardized Work Breakdown Sheet
Standard Work Combination Sheet
Time Observation Sheet
Value Added (VA) versus Non Value Added (NVA) Worksheet
Visual Controls Check Sheet
Value Stream Map (VSM) Action Planning Sheet & Example
5 - S Evaluation
AREA EVALUATED:
SUPERVISOR:
SHIFT:
ITEM NUMBER
AND DESCRIPTION
1. REMOVING UNNECESSARY ITEMS
2. STORAGE OF CLEANING EQUIPMENT
3. FLOOR CLEANING
4. BULLETIN BOARD
5. EMERGENCY ACCESS
6. ITEMS ON THE FLOOR
7. AISLEWAYS - MARKINGS
8. AISLEWAYS - MAINTENANCE
ITEM SCORE
( 0 - 5)
ALL ITEMS NOT NECESSARY FOR PERFORMING WORK ARE
REMOVED FROM THE WORKPLACE.
ALL CLEANING EQUIPMENT IS STORED IN A NEAT MANNER.
HANDY AND EASILY AVAILABLE AS NEEDED.
ALL FLOORS ARE CLEAN AND FREE OF DEBRIS, OIL AND DIRT.
CLEANING OF FLOORS IS DONE ROUTINELY - DAILY @ MINIMUM.
NO OUTDATED, TORN OR SOILED ANNOUNCEMENTS ARE DISPLAYED.
ALL BULLETINS ARE ARRANGED IN A STRAIGHT/NEAT MANNER.
FIRE HOSES AND EXTINGUISHERS ARE UNOBSTRUCTED AND STORED
IN AN EASY-TO-LOCATE MANNER. E-STOPS ARE COLOR CODED.
WIP, TOOLS AND OTHER MATERIAL ARE NOT LEFT SITTING ON THE
FLOOR. ITEMS ARE POSITIONED ON THE FLOOR IN CLEARLY
MARKED AREAS, BOXED WITH CE's COLOR-CODED SYSTEM
AISLES AND WALKWAYS ARE CLEARLY LINED AND IDENTIFIABLE.
PAINT OR TAPE IS IN GOOD CONDITION AND NEAT.
AISLES ARE ALWAYS FREE OF MATERIAL AND OBSTRUCTIONS.
NOTHING IS PLACED ON THE LINES, AND OBJECTS ARE ALWAYS @
RIGHT ANGLES TO THE AISLEWAYS.
STORAGE OF BOXES, CONTAINERS AND MATERIAL IS ALWAYS NEAT
AND AT RIGHT ANGLES.
ALL MACHINES AND EQUIPMENT ARE NEATLY PAINTED. NO PLACES
IN THE AREA LESS THAN 2 METERS HIGH ARE UNPAINTED.
ALL MACHINES AND EQUIPMENT ARE KEPT CLEAN AND UNSOILED BY
DAILY CARE. GLASS(WINDOWS) AND WORK SURFACES ARE CLEAN
AND POLISHED. TABLE TOP SURFACES ARE CHANGED IF NEEDED.
CONTROLS OF MACHINES ARE PROPERLY LABELED AND CRITICAL
POINTS FOR DAILY MAINTENANCE CHECKS (i.e.. FLUID AND LUBE
LEVELS) ARE CLEARLY MARKED. EQUIPMENT CHECK SHEETS ARE
NEATLY DISPLAYED AND KEPT CLEAN AND UPDATED.
NOTHING IS PLACED ON TOP OF MACHINES, TOOLS OR CABINETS.
NOTHING LEANS AGAINST WALLS OR COLUMNS. GUARDS OR DEFLECTTORS ARE USED TO KEEP WASTE FROM FALLING TO THE FLOOR.
ONLY DOCUMENTS NECESSARY TO THE WORK ARE STORED AT
WORK STATIONS. DOCUMENTS ARE STORED IN A NEAT MANNER.
ALL DOCUMENTS ARE LABELED CLEARLY AS TO THE CONTENTS
AND RESPONSIBILITY FOR CONTROL AND REVISION. NO UNLABELED
BINDERS / DOCUMENTS ARE PRESENT. OBSOLETE OR UNUSED
DOCUMENTS ARE ROUTINELY PURGED.
TOOLS, JIGS AND FIXTURES ARE ARRANGED NEATLY AND STORED
IN A WAY THAT THEY ARE KEPT CLEAN AND FREE OF ANY RISK OF
DAMAGE.
TOOLS, JIGS AND FIXTURES ARE ARRANGED SO THEY CAN BE EASILY
ACCESSED WHEN CHANGE-OVERS OR SET-UPS ARE MADE, THUS
INCREASING PRODUCTIVITY. THE SAME FOR GAUGES AND MEASURING
EQUIPMENT USED FOR QUALITY.
THESE ARE ARRANGED, DIVIDED AND CLEARLY LABELED SUCH
THAT IT IS OBVIOUS WHERE THINGS ARE STORED AND WHERE
THEY SHOULD BE RETURNED.
THESE ARE KEPT FREE OF UNUSED OBJECTS, INCLUDING FILES AND
DOCUMENTS. TOOLS OR ANY PIECES OF EQUIPMENT ARE CLEANED
BEFORE BEING REPLACED TO PROPER POSITION.
THERE IS A DISCIPLINED SYSTEM OF CONTROL AND MAINTENANCE
TO ENSURE THAT ALL OF THE ABOVE MENTIONED ITEMS ARE
MAINTAINED AT THE HIGHEST POSSIBLE LEVEL. IT IS THE RESPONSIBILITY OF MANAGEMENT TO MAINTAIN THIS SYSTEM.
TOTAL =
/20 =
THIS EVALUATION IS TO BE COMPLETED EACH SHIFT BY EACH SUPERVISOR. IT IS TO EVALUATE THE
PRIOR SHIFTS PERFORMANCE ON 5S ISSUES. DROP THE EVALUATION IN THE 5S DROP BOX WHEN COMPLETED.
PLEASE PLACE COMMENTS FOR SCORES OR SUGGESTIONS FOR IMPROVEMENTS ON THE BACKSIDE OF THE SHEET.
TR09-04-01a
Last Revised: 9/20/99
/ / , and my current level of confidence with this topic and material is:
High - Medium - Low (Cirle one)
1.
2.
3.
What three things do I already do well regarding this training and topic?
1.
2.
3.
Methods
Machines
Mother Nature
Materials
Measures
KEY VARIABLES
Other Concerns
>
>
>
Page 11
Manpower
> New people
> Poor skills & slow
> Trainees to Trainer ratio
>
>
>
Machines
> Lack of good tools
> No enough tools
> Not enough assy stations
>
>
Measures
> Over capacity bookings
> Capacity planning
> order size impact on throughput
>
>
Schedule Attainment below
Goal
Methods
> No clear work instructions
> OJT training techniques effectiveness
> No tools storage standards
> Poor connection to std work & goals
> Capacity planning
> Rush orders
> Not running one piece flow
> Big batches
Mother Nature
> Lack of space
> Lack of assy stations
> Poor faclities layout?
>
Materials
> Missing or lost
> Late from supplier
> Taking from one oredr to use on another
>
KEY VARIABLES
> Drop in orders
> Schedule Changes
> Order size
> Lack of materials
> Trainees on site
Other Concerns
>
Page 12
Other Concerns
>
Page 13
Design of Experiment
Grid
Variable 1
High
Varable 2
High
Big
Medium
Low
High
High
Small
Medium
Low
High
Big
Medium
Low
Low
High
Small
Medium
Low
Big
High
Medium
Small
Low
Low
High
Medium
Big
Low
High
Medium
Small
Low
High
Meduium
Low
294408380.xls
Is/ Is Not
Date:
Symtom:
Problem Description:
Is/ Is Not Questions
What
Completed By:
Is
Is Not
Differences
Object?
Defect?
Where
On object?
Geographically?
When
First Seen?
Else seen?
In process seen?
How
What
Is the trend?
Confidential
11/11/2015
Page 15
294408380.xls
Is-Is Not p2
Area:
Date:
Current State:
Future State:
Future Actions:
eet
e:
Process:
Assessor:
Date:
Distribution:
Criteria
Scores
Max Area
VALUE STREAM MAP (Why?: Using data, visually drives flow production, short lead time, quality improvement, lowest cost
1 production)
(Evaluates material(s) and information flow form customer order entry through manufacturing to suppliers)
(a) A current state Value Stream Map does not exist for product or product families
(b) A current and future state Value Stream Map exists for product or product families
(c) A strategic implementation plan for future state exists and is being executed
0
5
10
2 TAKT TIME (Why?: Provides fast response to problems, drives elimination of causes of unplanned downtime, forces changeover)
(Calculates and synchronizes rate of production to rate of sales)
(a) The rate of production is not paced to Takt Time or rate of sales.
(b) Takt time has been determined for product(s) but is seldom followed.
(c) Takt time exists for product(s) and is strictly used to pace production.
0
5
10
CONTINUOUS FLOW (ONE-PIECE FLOW) (Why?: Drives process reliability, reduction of changeover time and unplanned
3 downtime)
(Creates production flow of one piece at a time passed immediately to next process step)
(a) There is no standard work defined for process. Pieces are batched between process steps.
(b) Standard is sometimes followed and supported by 5s some visual controls and materials
(c) Standard work strictly followed and supported by 5s, visual controls, materials and TPM
4 DEMAND-PULL (Why?: Drives accurate control of production between flows without MRP and the reduction of inventory)
(For non-continuous flow operations creates production on demand without routine scheduling)
(a) Non-continuous flow operations are scheduled. Production is not paced by customer demand.
(b) Kanban supermarkets for withdrawal and production exists but are not strictly maintained.
(c) Kanban supermarkets for withdrawal and production are strictly maintained.
0
5
10
0
5
10
5 SCHEDULE ONE PRODUCTION PROCESS (Why?: Drives inventory reduction and improves capacity utilization)
(Maintains demand-pull by scheduling only the process controlled by the outside customer's orders)
(a) For each product(s), separate schedules are set for major processes. No pacemaker process.
(b) For each produce(s), only the pacemaker process is scheduled at least 50% of the time.
(c) For each product(s), the pacemaker process is strictly scheduled to drive production flow.
0
5
10
6 LEVELED PRODUCTION MIX (Why?: Reduces lead time to fill fluctuating customer demand, reduction of inventory levels)
(Distributes the production of different products evenly over time at the pacemaker process)
(a) No mixed production exists for product families. Multiple lines or individual runs used.
(b) Mixed production consists of 2 or more units back-to-back for each product family on one line.
(c) Mixed production consists of only one unit back-to-back for each product family on one line.
0
5
10
LEVELED PRODUCTION VOLUME (Why?: Drive reliability by promptly highlighting problems for corrective action
7 improvements)
(Creates a "pull" by releasing and withdrawing small, consistent increments of work at pacemaker process)
0
5
10
SMALL LOT PRODUCTION (Why?: Drives reliability through reduction in set-up time, lead time to respond to fluctuations in
8 customer demand)
(Establishes small daily lot sizes for high volume parts in non-continuous flow processes (Fabrication, etc)
(a) No lot sizes are defined for high volume part numbers. Maximum runtime is preferred.
(b) Large lot sizes have been defined. High volume parts are run in lost sizes of 2 or more days
(c) Small lot sizes have been defined. High volume parts are run daily lot sizes or less.
0
5
10
DEDICATED CI RESOURCES (Why?: Improves daily reliability by driving change velocity through training and application of
9 lean principles)
(Drives planning and execution of lean manufacturing transformation)
(a) Management is not trained, but supports lean effort with a dedicated workforce of 1% or less.
(b) Management is trained and supports lean effort with a dedicated workforce of 1% to 2%.
(c) Management is trained and supports lean effort with a dedicated workforce of 2% or more.
### RETURN ON INVESTMENT (Why?: Drives Economic Value Added - EVA)
0
5
10
(a) No formal process exists for a "lean" review of capital investments and new products/processes.
0
(b) "Lean" review process for capital investments, new products/processes is sometimes followed.
5
(c) "Lean" review process for capital investments, new product/processes is strictly followed.
10
Maximum Lean Transformation Points 100
Actual Lean Transformation Points
Team
Scores
1
2
2
2
3
2
1
1
2
2
3.5
3
Suppli
Radar Chart
5-S
4
Quality Process
Work Cells / PC's
2
Quick Changeovers
Leveling
0Visual Controls
Standard Work
Pull Systems
TPM
Continuous Flow
Group:
Plant Manager:
Date:
Kaizen or Six Sigma Project
Complete:
On Schedule:
Over Due:
Project
Leader
Value
Stream
Map Ref:
#
Target Area
Current State
Measures
Investment
Required
Due
Date
MEETING WORKSHEET
START TIME:
STOP TIME:
MEETING TOPIC:
AREA:
DATE:
ATTENDENCE:
AGENDA
1.
1.
2.
2.
3.
3.
4.
4.
5.
5.
6.
6.
7.
7.
8.
8.
NEXT MEETING:
OTHER OUTCOMES:
Conveyance
Correction
Overproduction
Motion
Waiting
Inventory
Processes
KPI
Frequency
Data
Source
Data
Presentation
Mtd. Actual
Responsibility
Goal
2/1/2005
2/2/2005
2/3/2005
Customer
Satisfaction:
Complaints
Productivity, Cost Value Added
& Quality
(orders per
production
employee)
Daily
GM
GM
Weekly
Job
travelers
per week /
23
JH
1.5 ope
Daily
Job traveler
JH
35 jpd
GM
1500 /d
Delivery
People
Job traveler
GM
100%
Product
Inquiry
Report
GM
< 40 ppd
On Time In Full
(OTIF %)
Lead-time (weeks)
Daily
Follow Up
Sheet
Back log
AM
TC
Backlog (weeks)
Weekly
Loss Time
Daily
Back log $ /
125$
Call in list
Housekeeping
Daily
TBD
Daily
Call in list
Weekly
Below Goal =
At Goal =
1.6
1.6
1.4
37
37
32
52
22
100
100
98
1 Week
TC
3 Weeks
2.4
2.4
2.4
BH
AM
100%
BH
0.25
70%
0
0
70%
0
0
70%
0
Mtd. Projected
Mtd. Target
Ytd. Actual
Week
Total
2005
Weekly Avg
2004
Weekly Avg
2003
Weekly Avg
2002
Weekly Avg
AVAILABILITY
MONTH
1.
2.
Planned Downtime
- Breaks and Lunches
- Meetings
- Run to Run
- Planned Maintenance
- Operator not Available
Minutes
3.
4.
5.
NOVEMBER
0 Minutes
(1-2)
0 Minutes
0 Minutes
Operating Time
(3-4)
6. Availability
(5/3)
0 Minutes
#DIV/0! %
PERFORMANCE EFFICIENCY
7. Total Parts Run (Total Pieces Machined)
Parts
(Min/Part)
#DIV/0! Minutes
Cycle Time
9. Performance Efficiency
((8x7)/5)
#DIV/0!
QUALITY RATE
10. Total Defects (Opps, Errors & Crash)
11. Quality Rate
0 Parts
((7-10)/7)
#DIV/0!
((6x9x11)x100)
OEE
#DIV/0! %
= Behind
= O.K.
= Completed
Status / Legend
PROBLEM STATEMENT:
Plant:
Department:
Completed by:
DO
PLAN
CHECK
Schedule Task Timing
Status
Item
No.
Initiative
Task
Responsibility
DURATION
MEASUREMENT
(CHECK)
Reviewed by:
START
FINISH
Date
Date
Projected
Base
Who
Date
ACTIONS
EFFECTIVE?
(see Note below)
Improvement
Time/$
Actual
Yes
No
Team:
Date:
1. Define the Problem (Note all symtoms & use the Is-Is Not form)
7. Verify & Test the Corrective Action (Can the problem be turned "ON' & "OFF" )
Current state
Future State
Future Actions
rksheet
e
Include system measures, key performance indicators, data collection plan, MSA, data display methods, etc.
Project
MEASURES
Include Cause & Effect diagram, and other data analysis tools used to prove cause.(DOE etc.)
Data ANALYSIS
Describe specific improvements implemented, cost benefits, risk analysis, pilot results, before & after sketches, implementation plan & dates, etc.
IMPROVEMENTS
Implemented
Include control methods, appropriate documentation & standards, follow up plan and dates, as well as reaction plan.
Methods of
CONTROL &
follow- up
Area:
Hardware
OP
Product:
PG
sec.
T
M
I
A
M
N
E
A T W T W T
U I A I A I
T M I M L M
O E T E K E
Cycle
of
sec.
Time
Date:
Approved By (G.L.):
Date:
Checked By (M.E.):
Date:
of
Cindy Bos
Working Sequence
Walking
0
Return to Start
Safety
Precaution
SWIP
Critical
Safety
KEY POINTS
REASONS
Quality
Safety
Ease of Operation
4. Inspect stud
5.1.1. To ensure
proper assembly
7. Activate press
7.1.1 To safely
activate press
2.1.1 Standardization
294408380.xls
Date
Demand / Shift
Operation Number
Process Name
Dept.
TAKT Time
Prepared by
Step #
Time
Description of Operation
Manual
Totals
Rob Ptacek
Auto
Manual =
Walking =
Automatic =
wwwwwwwww
Wait
5s
10 s
15 s
20 s
25 s
30 s
35 s
40 s
45 s
50 s
55 s
60 s
65 s
70 s
75 s
80 s
85 s
90 s
95 s
5s
10 s
15 s
20 s
25 s
30 s
35 s
40 s
45 s
50 s
55 s
60 s
65 s
70 s
75 s
80 s
85 s
90 s
Page 47
11/11/2015
AUTODIE
INTERNATIONAL
Process:
Step
PROCESS TIMING
OBSERVATION SHEET
TIME OBSERVATION SHEET
Component Task
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
TIME FOR ONE CYCLE
VA NVA
Date:
Time:
TASK TIME
OBV:
OBV:
Notes
Process
Step
Process
Name
Type
Begin Time
Operation
time
Answer Phone
Process
0:00
0:00:25
Process
0:00
0:00:40
Process
0:01
0:00:05
Transport
0:01
0:01:15
Process
0:02
0:00:20
Process
0:02
0:03:45
Delay
0:06
0:06:05
Decision
0:12
0:00:00
Process
0:12
0:00:40
Process
0:13
0:00:05
Process
0:13
0:01:30
Process
0:14
0:00:15
Process
0:15
0:00:10
Process
0:15
0:00:05
Process
0:15
0:00:00
Process
0:15
0:07:35
Process
Process
0:22
0:22
0:00:00
0:01:45
Inspect
Process
0:24
0:25
0:00:30
0:00:10
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
18
Contact
Manufacturing for
LT Information
Is Lead Time
Acceptable?
Place Order
19
20
Validate
Customer Ship
Info
Thank Customer
16
% Value Add
0.6710526316
0.3289473684
% Value Add
0.6710526316
0.2
0.4
0.3289473684
0.6
0.8
1.2
Yes
Value Add
Total
0:00:25
0:01:05
Yes
0:01:05
0:01:10
Yes
0:01:10
0:02:25
No
0:01:10
0:02:45
No
0:01:10
0:06:30
Yes
0:04:55
0:12:35
No
0:04:55
0:12:35
Yes
0:04:55
0:13:15
No
0:04:55
0:13:20
No
0:04:55
0:14:50
Yes
0:06:25
0:15:05
No
0:06:25
0:15:15
No
0:06:25
0:15:20
No
0:06:25
0:15:20
No
0:06:25
0:22:55
No
0:06:25
0:22:55
0:24:40
No
Yes
0:06:25
0:08:10
0:25:10
0:25:20
No
Yes
0:08:10
0:08:20
Summary
Value Added
Time
Total Time
% Non Value
Add
% Value Add
0:08:20
0:25:20
67%
33%
0:17:30
0:06:05
0:01:15
0:00:30
0.014
0.012
0.01
% Value Add
0.008
0.006
Inspec tion
T ime
0.012
0.01
% Value Add
0.008
Delay T ime
T ransport T ime
0.006
0.004
0.002
1.2
Inspec tion
T ime
Max
0.002604
Min
-0.000868
Range
0.003472
Units
-20
0.00026
Plot Width
0.00
0.00
0.00
0.00
0.00
0.01
0.02
0.00
0.00
0.00
- At the SPEED of
SIGHT
- At the SPEED of
SIGHT
Page 1 of 2
- At the SPEED of
SIGHT
- At the SPEED of
SIGHT
Page 2 of 2
Item
Activity
Who
When
Progress
Comments
JW &
RP
TBD
JW &
RP
TBD
JW &
RP
TBD
JW &
RP
TBD
JW &
RP
TBD
JW &
RP
TBD
JW &
RP
TBD
9
10
Confidential
11/11/2015
Page 59