Sei sulla pagina 1di 4

RamiAdeebAzzam

Mobile:
Tel:
Address:
Email:

+971555106695
+97126222129
UAEAbuDhabi
R.azzam@hotmail.com

Objective

ToobtainaseniorpositioninaninternationalorganizationwhereIcanutilizemyexperience
inprojectmanagementnetworksaswellastoachievepersonalandorganizationalgoals.

Education

MastersinWaterResourcesUnitedArabEmiratesUniversity(AlAin)
CivilandEnvironmentalEngineeringDepartmentExpectedJune2014

B.Sc.CivilEngineeringUnitedArabEmiratesUniversity(AlAin)
CivilandEnvironmentalEngineeringDepartmentAugust2006.

EnvironmentalImpactAssessmentPrinciples&Applications.

SpatialAnalysisUsingGIS

WaterQuality

FundamentalsofGIS

HydraulicsofClosedConduits

WaterResourcesManagement

WaterLegislation&Regulation

SpecialCourses

Trainings

2013

D.I.pipes,valves&fittingsManufacturingprocesses&standardsPAMAcademy

2011

YoungTalentProgramforManagementDevelopmentTEBODINAcademy

2008

IntroductiontoInfoWorksCSWallingfordSoftware

2007

IntroductiontoArcGISI&IIGulfComputers

2007

TechnicalReportWritingSOSServicesBureau

2006

BasicHealthandSafetyTrainingTVMiddleEast

ProfessionalExperience
2011Present

TEBODINMiddleEastAbuDhabi

InfrastructureDepartment
ProjectManagerWaterProjects
ProjectmanagementofEngineeringProjects
Successfullymanagetodeliverprojectswithintimeand budget,handleClientsneeds
and ensure executing project as per the scope. Coordinate with client different
departments (Projects, Assets, O&M etc) to finalize project related issues as per
standardprocedures.Attendprofessionalmeetingswithclientandthirdparties.Make
decisions and solve problems. Supervise, delegate and oversee the work of technical
staffandengineers.MonitorthefinancialstatusoftheprojectthroughFinancialProject

Page1of4

Report(FPR)andmonthlyfinancialstatements.Monitorprojectprogress.Issueinvoices
to clients against performed services. Provide project forecasts, cost and invoices
accruals.Raiseclaims,DCNsandVariationOrders.
Theaboveactivitieswerecarriedforthefollowingprojects:
1.

HydraulicmodelingandwaterqualityanalysisforADISC(Client:Fibrex)

2.

DesignReviewandConstructionOverviewContractNo.D6625(Client:ADDC)
AlRahaBeachDevelopment

[ALDAR]

AlRahaGardensDevelopments

[ALDAR]

AlWataniDevelopmentProject

[Sorouh]

GolfGardenPhase2Development [Sorouh]
LuluatAlRahaDevelopment
2006Present

TEBODINMiddleEastAbuDhabi

InfrastructureDepartment

[ICT]

SeniorDisciplineEngineerWaterandWastewaterProjects
DesignofWaterDistributionNetworks
Including site survey, data collection, water pipeline/network layout design, route
approval, obtain authorities NOC and approvals including UPC, DoT, ADMTPD etc.
ensure compliance with authorities standards and procedures, design calculations,
preparation of preliminary and detailed design reports, setting project execution plan
and construction schedule, carryout quantity takeoff, cost estimation, detailed BOQ,
preparationoftenderdocumentsandperformtechnicalevaluationreviews.
Theaboveactivitieswerecarriedforthefollowingprojects:
ConsultancyServicesforReplacement&UpgradingofPressureRingMainsInAbu
DhabiIsland(Phase1)(ADDC)
ConsultancyServicesforReplacement&UpgradingofPressureRingMainsInAbu
DhabiIsland(Phase3)(ADDC)
ConsultancyServicesforConstructionofNewBulkConnectiontoNahilFarm.(AADC)
DesignofSecondaryInfrastructureforKP8,KP4andKP5inKPIZ(KhalifaPortand
IndustrialZone)(ADPC)
ReplacementofExistingDN800/DN600WaterPipelinefromIP35toIP17along
NajdaStreet.(ADDC)
ImprovementofWaterDistributionNetworksinMussafahandUmmAlNarAreas.
(ADDC)
DevelopmentofWaterDistributionNetworksSectorsW33&W39.(ADDC)
ReplacementofExistingDN800/DN600WaterPipelinefromIP35toIP17along
NajdaStreet.(ADDC)

HydraulicModelingandDesignofWaterDistributionNetworks
Perform water demand calculation, pipe sizing, hydraulic modeling, data integration,
demand allocation, hydraulic analysis, fire fighting simulation and detailed design of
water transmission and distribution systems, providing engineering recommendations
onnetworkdesignimprovement,carryouthydraulicmodelandwaterqualityanalysis.
The above activities are carried out using InfoWater and EPANET hydraulic modeling
softwareforthefollowingprojects:

Page2of4

HydraulicmodelingandwaterqualityanalysisforAbuDhabiInternationalShooting
Clubdevelopment.(Fibrex/PPM)
DesignofsecondarywaternetworksinKPIZKP4,5&8(ADPC)
MasterPlanningandDevelopmentofMainInfrastructureforPoliceTrainingVillage
inAlHafar.(AbuDhabiPolice)
DevelopmentandrelocationofwaterdistributionnetworkinMohammedBinZayed
CityCommercialTowersDevelopmentSectorsME8,ME9,Z6/01,Z9ANDZ29.
[ADMContractNo.664].(ADDC)
DevelopmentandrelocationofwaterdistributionnetworkinMohamedBinZayed
CityInternalRoadsandServicesinVariousSectorsPhaseIISectorsZ17/01,Z31,
Z36&Z36/01.(ADDC)
ImprovementandExtensionoftheWaterDistributionNetworkatShahama,
Shawamekh,AlSadrandNewBahya(459Plots).(ADDC)
WaterConnectionsatZebaraIsland.(ADDC)

DesignReviewofWaterDistributionNetworks
Conductingdesignreviewofhydraulicmodels,designcalculations,engineeringreports
(concept, preliminary and detailed), Tender Documents, detailed design drawings,
accordingtoclientrequirements,engineeringstandardsandspecifications.
TheaboveactivitieswerecarriedoutundertheConsultancyServicesforDesignReview
andConstructionOverviewforNewDevelopmentofthefollowingprojects:
AlRahaBeachDevelopmentEasternPrecinctsWaterNetwork
AlWataniDevelopment(Phase1and2)
LuLuatAlRahaDevelopment
GolfGardenPhase2
AlRahaGardens2Phase4.
WaterNetworkforZayedSportsCityDevelopment
BaniyasSportsClubDevelopment

Consultancyservicesforpotablewatersystems
Perform preparation of project methodology, setup of study procedures, data
collection, identification of survey inquiries as per project need, site selection, site
survey, data analysis, coordination with stakeholders, preparation of technical study
reportsandprojectpresentationforthefollowingproject:
WaterqualityinspectionsprojectRSBProject617

HydraulicModelingandDesignofSewerageNetworks
Carryoutwastewaterflowcalculation,pipesizing,hydraulicmodeling,dataintegration,
loadallocation,runninghydraulicmodelscenarios,realtimemodelsimulation,results
analysis and design assessment using InfoWorks modeling analysis software for the
followingprojects:
AGDII,EPCProjectConstructionofCampandTemporaryFacilitiesatASAB.
STPandRelatedCollectionandIrrigationSystemsatJumeirahGolfEstates.

Page3of4

WorkingwithGISDatabase
Including,PresentationofData,ProducingMaps,DatabaseEditing(creating,modifying
and deleting features) and Verifying Data Based on Actual Inspection. The above
activitieswerecarriedoutusingGISsoftware(ArcMapandArcCatalog)forthefollowing
projects:
Consultancyservicesforthestudyoftherehabilitation/replacementofthewater
distributionnetworkinAbuDhabiIsland.
InternalRoadsfor(647)HousesinShawamekhArea

SkillsandQualities
ComputerSkills

ModelingSoftware:

InfoWater

InfoWORKS

EPANET

SWWM

GISSoftware:

ArcCatalog

ProjectPlanningSoftware:

OtherSoftware:

ArcMAP

Primavera

AutoCAD

MicrosoftOffice(Word,Excel,PowerPoint)

Visio

Outlook

Photoshop

Prezi(PresentationSoftware)

CommunicationSkills

Strongpresentationskills

ExcellentuseofthecomputerandtheInternet.

Languages:ArabicandEnglish(writing,speakingandunderstanding)

StrongPersonality

Reliable,Responsible,efficient,selfmotivated,analytical.

Goalorientedprofessionalpossessingstrongworkethics.

Canworkindependentlyandingroups.

InterpersonalSkills

MicrosoftProject(XP)

MembershipandActivities

TebodinOfficeCommittee20122013

TebodinQualitySystemTeam20112013

TebodinYoungTalents2011

UAEUHonorsClub.(President20052006)

UAEUStudentsEnvironmentalAssociation(VicePresident20052006)

HonorsandAwards

TebodinChessChampionship20112012

UAEUConcreteCubeCompetition2003secondplaceinmixdesign.

UAEUHonorStudentProgram20002006

UAEUCivilandEnvironmentalEngineeringDepartmentDistinguishedstudentslist.

Page4of4

Potrebbero piacerti anche