Minesight Schedule Optimizer

MineSight Planning Tools

Planeamiento Corto Plazo


MineSight Interactive Planner (MSIP)
MineSight Haulage (MSHaulage)
MineSight Schedule Optimizer (MSSO)

Planning Spiral

Work Flow

Interaction between the Short term Planning tools


and MSPD

Overall workflow using the MS Planning tools

MineSight Schedule Optimizer (MSSO)


MSSO es una herramienta de planificacion de corto y mediano
plazo que permite obtener la Mejor Secuencia de Minado Factible

Objetivo
(minimize or
maximize)

Valor Presente Neto


Stripping Ratio
Contenido Metalico

Restricciones
Calidad y
Cantidad

Restricciones Planta
Restricciones de Waste
Restricciones Stockpiles
Restricciones de Ley y ratios

Dependencias

Misma fase
Diferentes fases

Figure 5: Cuts following Digline/Direction assignment. Cuts are colored by sequence along the digline.

Preparacion de Datos

Figure 5: Cuts following Digline/Direction assignment. Cuts are colored by sequence along the digline.

Preparacion de Datos

Figure 5: Cuts following Digline/Direction assignment. Cuts are colored by sequence along the digline.

Preparacion de Datos

MATERIAL MAPPING

Definir los
Procesos y
Destinos en MSSO

Materiales son
mapeados a
destinos basados
en intervalos de
cutoff

Restricciones del
movimiento de
material se asignan
por periodo, fase,
area de minado

Features (1/10)
STP/MTP
Scheduler

MSPD
SQL Server

Blending

MILP
Engines

Features (2/10)
Multiple
Mines

Open pit/
UG/
GSM

Multiple
Processes

Features Objetivo (3/10)


Valor Neto

Stripping
Ratio

Contenido
Metalico

Features Cantidad (4/10)


Mill

Waste

Stockpile

Leach

Features Calidad (5/10)


Grade
Mill

Grade
Waste

Grade
Stockpile

Grade
Ratio

Features Equipos (7/10)


Vertical
Advance
Rate

Shovel
Hours

Truck
Hours

Features Precedencias
(8/10)

Entre
Fases

Entre Bancos

Mismo Banco

Features Reportes (10/10)


Reporte
Full

Reporte
Resumen

Reporte
Stockpiles

Graficas

Reportes- Graficas

Flujo de Trabajo

MSSO Interface

MSSO Ejecutar el programa

Infeasibility Analysis-

Case Study EOP Maps


End of period (EOP) maps

APCOM 2009, Vancouver,

Conclusions
STP/MTP scheduler
Multiple minas/destinos/procesos
MILP engines (LINDO)
MSPD (SQL Server)
Constraints/blending
reportes & graficas
Visualizacion (MS3D)